Professional Documents
Culture Documents
(JSA)
SYSTEM
1600
TASK
ANALYSIS BY
DESIGNATION
REVIEWED BY
DESIGNATION
APPROVED BY
Siti Amirah
DESIGNATION
HS&E Leader
SEQUENCE OF STEPS
POTENTIAL ACCIDENTS
OR HAZARDS
SIGNATURE:
DATE: 04
April 2010
SIGNATURE:
DATE: 04
April 2010
SIGNATURE:
DATE:
PREVENTIVE MEASURES
Prepararation:
1.Insert 11/2 blind at E1505C, E-1605B, E-1605A tail
pipes to RG hotwelll and E1605C vapor line to RG
hotwell.
2. Dismantle union joint from
TSP injection line to still
second ejector.
1. Hand slip
2. Hand injuries
1. Hand slip
2. Hand injuries
1. Hand slip
2. Hand injuries
1. Hand slip
2. Hand injuries
/var/www/apps/conversion/tmp/scratch_5/283958163.docx
Date : 9/6/2015
1. Back injury
2. Splash of TSP can cause
injury. TSP is high in pH ~13
and very corrosive
1. Hand slip
1. Hand slip
1. Hand slip
2. Overpressure
/var/www/apps/conversion/tmp/scratch_5/283958163.docx
Date : 9/6/2015