You are on page 1of 2

PM's Approval

Placing of Concrete
Preparatory Work √
Depositing in Work √
Attendance of Steel Fixer and Carpenter
Concreting in Objectionable Weathe√
Concrete in Large Pours √
1.0

2.0
3.0
1.9.11
1.9.11.1
1.9.11.2
1.9.11.3
1.9.11.4
1.9.11.5
least dimension is greater than 1.5 metres.
temperature of the concrete at the time of placingshall
not exceed
peak hydration temperature shall not exceed 60 oC

difference in temperature between thermometers in the


concrete near any concrete face and the interior of the
concrete at a distance of 1 m from that face shall not
exceed 20oC at any stage after placing.

You might also like