Professional Documents
Culture Documents
A. Preparation Work: Existing Building
A. Preparation Work: Existing Building
PREPARATION WORK
Bow plank installation for Covalima Sand fill bellow the foundation
Evacuation Center thickness 10 cm
The BSRP Project manager ensuring the size of the building must based
on the drawing and measuring by the measuring tape.
END