You are on page 1of 3

195 Lyndhurst Road Lyndhurst, 2192

P.O. Box 890303 Lyndhurst, 2106


Tel: (011) 882 8900
Fax: 086 684 0155/ (011) 882 9086
Email: paulinesm@mweb.co.za

05 February 2017

Enquiries: Linda Mnaphi


Contact : 011 882 8900
Email : linda@pmaholding.co.za

TO WHOM IT MAY CONCERN

This is to certify that Aluwani Matsego 9104166248089, has successfully completed


a 1 (One) Year Construction Education and Training Authority (CETA) Civil
Engineering Internship with PMA Holding PTY LTD.

During the internship the Intern completed a number of vital tasks under the
supervision of a Mentor. These were documented in a logbook submitted by the
intern. After careful assessment, we are satisfied that the evidence provided in
logbook sufficient for the Intern to graduate.

Duration:
Start date: 01 September 2014
End date: 30 September 2015

The sections covered within the 12 months are the following:

 Upgrading of Road : Mashamba to Bokisi covering the following:

TASKS COMPLETED REMARKS


 Read & interpret construction drawings and Satisfactory
specification
 Maintaining records on the construction site Satisfactory
 Calculating quantities Satisfactory
 Procurement of materials, tools, and equipment Satisfactory
 Installation of manholes and chambers Satisfactory
 Installation of stormwater pipes Satisfactory
 Setting out of pipes,culverts and transferring of Satisfactory
levels

TASKS COMPLETED REMARKS


 Road levelling (Survey) Satisfactory
 Pothole patching Satisfactory
 Road surfacing Satisfactory

1
 Upgrading of Road : Makhado Street Rehabilitation covering the following:

TASKS COMPLETED REMARKS


 Read & interpret construction drawings and Satisfactory
specification
 Maintaining records on the construction site Satisfactory
 Calculating quantities Satisfactory
 Procurement of materials, tools, and equipment Satisfactory
 Installation of manholes and chambers Satisfactory
 Installation of storm water pipes Satisfactory
 Setting out of pipes, culverts and transferring of Satisfactory
levels

TASKS COMPLETED REMARKS


 Road levelling (Survey) Satisfactory
 Pothole patching Satisfactory
 Road surfacing Satisfactory

 Wylliespoort Building Maintenance covering the following:

Building preparation
TASK COMPLETED REMARKS
 Developing construction work plans Satisfactory
 Erecting and dismantling of scaffolds Satisfactory
 Reading & interpreting construction drawings/plans Satisfactory
 Site establishment Satisfactory
 Setting out of the building Satisfactory
 Taking measurements Satisfactory

Foundation and Slab


TASK COMPLETED REMARKS
 set out, excavate, and casting concrete strip Satisfactory
foundations
 building foundation walling Satisfactory
 apply screeds to concrete floor Satisfactory
 concrete mix ratio Satisfactory

Bricklaying and Plaster


TASK COMPLETED REMARKS
 building a one brick wall using stretcher bond Satisfactory
 building a half brick wall using English bond Satisfactory
 building using concrete hallow units Satisfactory
 building using solid units Satisfactory
 building decorative masonry elements Satisfactory
 prepare for plastering Satisfactory
 applying wallpaper Satisfactory

2
 striping formwork for straight walls Satisfactory
 Plaster Surfaces Satisfactory
 Apply specialist plastering and screed to surface Satisfactory
Carpentry work
TASKS COMPLETED REMARKS
 Preparing a site for ceiling and partitioning Satisfactory
 Installation of ceiling Satisfactory

Therefore, Intern Aluwani Matsego is recommended for Graduation.

Sincerely

Pauline Seemise
Managing Director

You might also like