A.

PREPARATION WORK

Existing Building Mobilization Stone and


sand for foundation work

Demolished Existing Building Site Clearance before Foundation work

Preparation for launching Ceremony The whole Stakeholder signing the


first limestone MoU for New Construction of
Covalima Evacuation Center
The Director of Municipality Administrator Municipality of
Covalima Signing the MoU Covalima representative Signing the
MoU

Commandant of PNTL Covalima Whole stake holder put their hand


Signing the MoU above the stone made a promise in
cultural ceremony

General Director is representative for Director of Education of Covalima


MSS to launching the first limestone municipality join to put the first
limestone launching ceremony
Director of Education of Covalima Director of Education and General
municipality put the rebate concrete Director of MSS make a deal for
for launching ceremony Continuation of the Contruction

Whole stake holder takes a picture


together when launching ceremony

Traditional habitual for launching


ceremony this part is Company
Responsibility
Supply water for Construction

Board name of project title


B. EARTH WORKS

Bow plank installation for Covalima Sand fill bellow the foundation
Evacuation Center thickness 10 cm

Main Building is flat ready for


Terrace Foundation Excavation
foundation excavation
Excavation

Septic tank excavation Soil back fills


Compaction sand bellows the floor thickness 15 cm
C. MASONRY WORKS

Stone Foundation in Composition (using 1pc; 4sand)


Supply and install Hollow block (10x20x40 cm and 20x20x20 cm)

Wall cement render with thickness 15 cm using composition (1pc; 5 sand)


and smooth line cement render using cement
Foundation Plaster thickness 15 cm using composition (1pc; 3 sand)
D. CONCRETE WORKS

Mobilization of bar for concrete


work

Installation of column bar Reinforced concrete for installation


of column

Installation bar of beam


Installation chasing of the ground beam Concrete work of the ground beam with
size 25x25

Supplying water for concrete work of Installation of the chasing of column


ground beam for concrete work with size 25x25 cm

Installation of the column for Installation of the top beam chasing


concrete work with size 25x25 cm for concrete work
Concrete work of top beam include concrete
column with size 15x15 cm and 25x25 cm for
concrete work
E. ROOFING WORKS

Mobilization Steel profile canal C for trusses (100x40x1.6 mm) and


Steel profile canal C for purling (80x40x1.6 mm)

Installation of the hollow block

Installation of trusses and purling for roofing works


Installation of ridge capping with zinc alum for roofing works
Mobilization and Installation of the Zinc alum roof sheet
G. CARPENTARY WORKS

Carpentry Works forming it is including Door, window and Ventilation


INSPECTION THE IMPLEMENTATION OF THE PROJECT
COVALIMAEVACUATION CENTER BY BSRP PROJECT MANAGER AND MSS
TEAM

BSRP and NDMD Team meeting with MSS Director of Municipality


Covalima include Director of the company, the objective is to explain
about the progress and do the inspection to the quality of the
implementation of Evacuation Center construction
The project manager made the inspection to the installation of the
trusses and purling work for roofing work

The BSRP Project manager ensuring the size of the building must based
on the drawing and measuring by the measuring tape.