Name of project: V-18 BALEWADI

Start Ht 2.7
General Data: Slope 350
Pipe material: PVC Pipe with Roughness factor Length of pipes 126
Manning's constant n:.011 Fall in Line 0.36
BOP at Last Point 2.34
Sewer Drain

Total Discharge

Slope (1 in N)
Sewage Flow

Peak Flow

Diameter
Node

Plots

Qfull, q/Qfull d/Dfull v/Vfull Vfull v d

From To Description cumec cumec cumec mm 1:n cumec m/s m/s mm


1 3 Soil Line 0.0120 0.0360 0.0360 300 350 0.061 0.590 0.552 1.04 0.86 0.90 165.6
2 3 Waste Line 0.0150 0.0450 0.0450 300 350 0.061 0.738 0.640 1.09 0.86 0.94 191.9