Professional Documents
Culture Documents
FOUNDATION SETTING PLAN
TOWER TYPE "HA‐120" (PAD & CHIMNEY) FD = 4.5M
(REF. WA ‐ 400857 R.0 SHT. 02 OF 02)
Hv 1384 884 + 500 (Ref. WA‐400857 SHT. 1 R.0) yb 73 Neutral axis
A C Tan (theta) Theta P L R H
NO. EXTENSION Actual b/b Projected b/b
(See Ref.) (See Ref.) Radian Degrees c/c dist. c/c diag. dist.
stub dist. stub dist.
1 BB+L2 11,604.00 12,209.00 0.2186 12.329 13,061.42 13,957.55 13,814.92 19,537.25
NOTES:
THETA = ATAN ((C ‐ A) / (2 * Hv)
P = A +2 * ( Hv + Hs ) * TAN (teta)
L = A +2 * ( Hv + Hf ) * TAN (teta)
R = L ‐ 2 * yb * COS (teta)
Hv = STUB VERTICAL HEIGHT
Hf = CHIMNEY VERTICAL HEIGHT TO G.L
Yb = STUB NEUTRAL AXIS