PT. TRAFOINDO PRIMA PERKASA
P1 C1 C2 P2
Make sure the ground resistance shall be as small as possible and not exceed 5 ohm.
4.2. High voltage transformer connection (H1)
Page 2 of 5
PT. TRAFOINDO PRIMA PERKASA
Page 3 of 5
PT. TRAFOINDO PRIMA PERKASA
4.3. Example of wiring 3P4W CTVT with VT 1 Bushing (Ref: JIS C1210C)
P1 P2
L3 P2
L2 A P1 1S1 1S2
A P1 P2 1S1 1S2
L1 A 1S1 1S2
0 N N N
a n a n n
a
to metering
4.4. Example of wiring 3P3W CTVT with VT 2 Bushing (Ref: SPLN 57-1:1991)
P1 P2
T
B 1S1 1S2
S BA P2
P1
R A A 1S1 1S2
b
a b a
1 2 3 5 7 8 9
kWh single tariff
Page 4 of 5
PT. TRAFOINDO PRIMA PERKASA
6. Maintenance of CT/VT
6.1. CT and VT are made from resin which is no special maintenance required.
6.2. During annual maintenance, clean CT and VT and check the connection of primary and
secondary in good condition.
7. Contact detail
For further information and queries, please contact Marketing below:
PT. Trafoindo Prima Perkasa
Jl. Hayam Wuruk 4FX Jakarta 10120
Telp +62-21-3451384, 3850703
Fax +62-21-3850702, 3861869
Email: trafo@trafoindonesia.com
http://www.trafoindonesia.com
Page 5 of 5