You are on page 1of 10

MISSION BHAGIRATHA QUESTIONNAIRE

A questionnaire survey as a part of ME project by

KATIKE NARESH

ME- Construction Engineering Management (2017-19)

Project Guide: Dr. K. SHASHIKANTH

University College of Engineering

Osmania University, Hyderabad

* Required

PART - A

Primary Questionnaire

1. 1. What is the aim of mission bhagiratha


Mark only one oval.

Industrial water supply


Drinking water to each & every house hold
Filling the ponds
Water supply to irrigation

2. 2. Specifications relevant Indian standard or internationally approved equivalent


standards are adopted for Mission Bhagiratha ?
Mark only one oval.

Yes
No
No idea

3. 3. Area covered in your segment for under


the project in hectors

4. 4. No of villages covered in your segment

PART -B

The following factors adopted for analysis of success of Mission Bhagiratha, rate the importance of
factor by your choice. Strongly disagree implies the factor not at all important for analysis of Success
and Strongly agree implies vice-versa

PLANNING OF MISSION BHAGIRATHA


5. 1. Design and location of water reservoir
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

6. 2. Design and location of intake wells


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

7. 3. Design and location of overhead tanks


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

8. 4. Location of distribution lanes and gate valves


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

9. 5. Villages covered in your segment


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
10. 6. Topography
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

11. 7. Usage of existing water tanks and distribution lines


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

FINANCIAL FACTORS

12. 1. Funds allotted to the project


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

13. 2. Inflation of budget allocation


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

14. 3. Unavailability of finances as planned


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
15. 4. Payment delays
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

16. 5. Bureaucratic procedure


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

17. 6. Misappropriation of project funds


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

EQUIPMENT FACTORS

18. 1. Number of equipment/ pipes / jcb/ pumps/ valves...etc


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

19. 2. Usage of proper equipment


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
20. 3. Management of equipment
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

21. 4. Conditions and frequent breakdown of equipment


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

22. 5. Poor operation of equipment


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

23. 6. Usage of technology in equipment


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

PROJECT STAFF FACTORS

24. 1.Trained staff for relevant field


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
25. 2. Availability of competent staff
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

26. 3. Shortage of site workers


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

27. 4. Motivation of staff


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

28. 5. Staff experience


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

29. 6. Recruitment & competence development


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

RESOURCES RELATED FACTORS


30. 1. Availability of resources
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

31. 2.Effective utilization of resources


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

QUALITY RELATED FACTORS

32. 1. Inspection and testing of materials


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

33. 2. Design parameters during the construction process


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

34. 3. Visual inspection, appearance and workmanship which are in progress during the
execution project
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

COMPLETION & DELIVERY Survey


35. 1. Project completed in in time
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly agree

36. 2. The projects are completed on budget


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly agree

37. 3. Project was completed according to scope


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

38. 4. project met the beneficiary's expectations


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

39. 5. Project was of good quality


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree
40. 6. was the contractor benefited
Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
strongly Agree

41. 7. Amount of conveyance of water as design


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
strongly Agree

42. 8. Safety precautions during the construction


Mark only one oval.

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

43. Suggestions, instructions and comments if any

Details of respondent:

44. Name
45. Designation *
Check all that apply.

Assistant engineer/ Assistant Executive Engineer


Deputy Executive Engineer
Executive Engineer
Site Engineer
Civil Engineering graduate
Faculty/ Research Persons in Civil Engineering

46. Place of Work / City

THANK YOU

Thank you for your valuable feedback towards success of my dissertation work.

Regards

KATIKE NARESH - OU

Powered by

You might also like