REQUISITION NO.

3000257511

SCHEDULE “B”

ATTACHMENT I

PROJECT DRAWINGS AND STANDARD DRAWINGS

1.0 PROJECT DRAWINGS

The following List of Drawings identifies all SAUDI ARAMCO furnished Contract
Drawings for this project, which by reference form an integral part of this
Contract.

1.1 List of Drawings


DRAWING TITLES DRAWING NO. SHT./REV. #
Drawing Control BD-442802 Rev. 00
Scope of WORK BE-442803 Rev. 00
List of Materials MTO-COM-001 Rev. 00

1.2 CONTRACTOR shall perform the WORK in accordance with the


applicable SAUDI ARAMCO Engineering Standards, SAUDI ARAMCO
Material Specifications, and the SAUDI ARAMCO Construction Safety
Manual; and all codes, standards, specifications and drawings reference
therein. All CONTRACTOR-supplied materials shall be supplied in
accordance with the latest revisions of SAUDI ARAMCO Material System
Specifications (SAMSS).

END OF ATTACHMENT I TO SCHEDULE “B”

B-I-1 of 1