TITLE OF PROJECT: CADANGAN MEMBANGUNKAN 6 LOT BANGUNAN KEDAI PEJABAT 5 TINGKAT YANG MENGANDUNGI 5 UNIT
KEDAI PEJABAT DUA TINGKAT DAN 1 UNIT HOTEL BUDGET 84 BILIK DI ATAS LOT 39918 – 39923, MEDAN
GOPENG, MUKIM HULU KINTA, PERAK DARUL RIDZUAN UNTUK TETUAN KOPERASI PERUMAHAN MELAYU
PERAK BERHAD
PREPARED BY: MUHAMAD ASYRAF HAKEEM BIN DZULKAFLI DATE : 15 APRIL 2019
ELEMENT : TEMPORARY ELECTRICAL INSTALLATION PAGE NO : 1 of 1

MACHINERY MANPOWER
NO. TASK QUANTITY SEQUENTIAL DIAGRAM OUTPUT DURATION
/ TOOLS / LABOUR

1. Installation of power supplies 2 screw 1 site 15min


for temporary lighting with all
drivers supervisor
works and testing included
such as test running and
1 drill 2 general
balancing of power supply.
labour
SKYLINE 2 CONSTRUCTION SDN. BHD. (711542-N)
No. 16-1 , Jalan 2/23a, Taman Danau Kota,
Off Jalan Genting Kelang, 53300 Kuala Lumpur
Tel: 03-55103942 Fax: 03-55103945
Email: Skyline298@Gmail.Com

You might also like