This document provides a schedule for conducting research activities over April, May, and June. It outlines 9 research activities including preparing the laboratory, collecting soil samples, classifying soil types, testing soil strength, mixing soil with lime and testing properties, further strength testing, analysis and discussion, drawing conclusions, and completing the research. It also provides a key for time periods within each month corresponding to specific date ranges for conducting the planned activities.
This document provides a schedule for conducting research activities over April, May, and June. It outlines 9 research activities including preparing the laboratory, collecting soil samples, classifying soil types, testing soil strength, mixing soil with lime and testing properties, further strength testing, analysis and discussion, drawing conclusions, and completing the research. It also provides a key for time periods within each month corresponding to specific date ranges for conducting the planned activities.
This document provides a schedule for conducting research activities over April, May, and June. It outlines 9 research activities including preparing the laboratory, collecting soil samples, classifying soil types, testing soil strength, mixing soil with lime and testing properties, further strength testing, analysis and discussion, drawing conclusions, and completing the research. It also provides a key for time periods within each month corresponding to specific date ranges for conducting the planned activities.
No Kegiatan m1 m2 m3 m4 m1 m2 m3 m4 m1 m2 m3 m4 m5 1. Persiapan laboratorium 2. Pengambilan sampel tanah 3. tes klasifikasi jenis tanah 4. pengujian CBR tanah asli
5. mix desain tanah dengan kapur
dan uji attenberg limit 6. Pengujian CBR 7. Analisa dan Pembahasan 8. Kesimpulan 9. Selesai