Professional Documents
Culture Documents
STATEMENT OF WORK
Between
Holostik India Limited ("HOLOSTIK")
And
Patanjali Ayurved Ltd.
1 This Statement of Work (hereinafter referred as “SOW”) by and between Holostik (“HOLOSTIK”)
and Client, (here in after referred to as “CLIENT) is made and entered into on 30-01-2017 effective
from 30-01-2017, (“Effective Date”). The term of this SOW is set for until later of a period of 14
Months commencing on the Effective Date and expiring on 31-03-2018, unless extended in writing by the
parties or terminated.
Confidential Page 1 of 7
Requirement ID: 02
Number Generator:
Holostik Holograms having QR code and QR code having a unique Number (9 Digit Alpha Numeric
Number). That number is print on Holostik Hologram and to differentiate to any other and with
the help of this number user can authenticate Product genuinely.
Requirement ID: 03
Authenticate Product:
Every Product having QR Code printed Holograms and QR code having an alpha numeric code
along with a URL hosted in web. The moment we scan that hologram it will give that code and
when we redirect that code to web we will get all information about that product like product
Image, Size, MFG unit and message to genuine product and if it is fake then give invalid QR Code
and details will not show.
Requirement ID: 04
Carton Slip Generation:
Scope of Carton slip generation to print carton slip having details of carton, every carton having
10 spools and every spools having 10000 holograms means every carton having 1 lakh holograms,
it having spool ID, from No, To No, Quantity, Prefix, Customer Name etc.
Requirement ID: 05
Hologram Packing:
Scope of Hologram Packing to mapped spool with Carton it’s having From No., To No., Quantity,
Company Code and Plant Name where it will pack. The purpose of packing details is to map Carton
details with spool means we have to know which carton having which spool. Product mapping of
Hologram is to mapped hologram number with the product means which product has which
hologram number we can know with this. Procedure start with packing to product mapping is very
useful to track product details at every moment. Which carton has series of spools and which
spool has series of holograms and which hologram mapped with which product, with the help of
this we can easily authenticate product.
Confidential
Page 2 of 7
Requirement ID: 06
Dispatch Slip:
System also creating Dispatch Slip it has auto generated Shipment Number, Customer Name
(where we want to dispatch), Billing Address, Shipping Address, mode of Shipment, LR Number
and that carton id what we want to dispatch. It also creates dispatch slip to paste over cartons.
Requirement ID: 07
Replacement Hologram:
Scope of Replacement to maintain the stock if any series of holograms or any number of
holograms is damaged or any other reason to not in used so we will not consider that holograms
as a stock because we are not using that also we mention that series of holograms in replacement
records. And the scope of replacement is we can replace only that series of holograms who is in
packed holograms or Stock IN and one more thing if any series of holograms is in replacement
then we cannot map with product that series for the same.
4 Out of Scope
Below mentioned items will be considered as out of scope for implementation of this SOW:
Confidential
Page 3 of 7
The purpose of the design phase is to confirm the system requirements, architecture and
integrations.
3 Tier Architecture for software development.
Detailed Design shall be prepared.
Construction phase
Detailed planning of construction phase to be done based on scope
QA / SIT
Setup of QA / SIT environment
Final end to end integration testing of all functional and technical enhancements
UAT
UAT environment setup
End User/Business User testing support
Pilot Rollout/Support - NA
7 Testing Criteria
The testing will be carried out based on the requirements specified in this documents as agreed
upon.
Internal Testing
UAT
8. Receivable
SOW / PO
9 Deliverables
Acceptance
Project phases Deliverables Date of delivery
Criteria
Product audit
should be passed
Deployment Published Code 10-04-2017 and all internal
testing defects
should be closed.
User Training User Manual 11-04-2017 Client Feedback
Scanning Device should be
Hardware 11-04-2017
Device working
Confidential
Page 4 of 7
10 .Escalation Matrix
Escalation
Holostik Patanjali Ayurved Ltd.
Levels
Delivery Head (Mr. Dewakar Head of Operation( MR ANOOP
Level 1
Mahendru) GAUR )
11 Assumptions / Dependencies:
Assumptions:
The project will be executed in HOLOSTIK, Noida office for this SOW.
The resources will be positioned at HOLOSTIK, Noida, India.
The project plan will be shared with Patanjali.
The Bi-Weekly Status Report (WSR) will be executed to highlight, the overall project health,
progress made, risks, issues and any open action items.
PATANJALI will provide the following items to HOLOSTIK:
Availability of PATANJALI key personal.
Project Plan needs to finalized and approved by Delivery Head before starting the Requirement Design
Phase.
Confidential
Page 5 of 7
A. Pricing: NA
B. The payment schedule for this Fixed Price Engagement is outlined below
Confidential
Page 6 of 7
Patanjali Ayurved Ltd. Holostik India Limited
Confidential
Page 7 of 7