15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 3rd Year
5 15.7.I Maintenance of Hume pipe culverts 1 15.1 A
6 15.9 Maintenance of Road signs 2 15.2.I
7 15.10.II Maintenance of RCC railing 3 15.3.I
8 15.11 Maintenance of 200 m stones and Km stones 4 15.3.IV
9 15.12.I Cutting branches of trees from roadway 5 15.7.I
10 15.12.II Cutting of shrubs from roadway 6 15.9
11 15.12.III Trimming grass and weeds from shoulder 7 15.10.II
12 15.13 White washing of parapet walls of CD works 8 15.11
Total 9 15.12.I
10 15.12.II
For 3rd Year 11 15.12.III
1 15.1 A Restoration of rain cuts 12 15.13
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway
or 2nd year 101 5454 total 7.2% raincuts for 2nd year
62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
done twice a year 1238 4952 maintenance to be done twice a year
done once in 2 years 927 463.5 maintenance to be done once in 2 years
uiring maintenance 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
the total area requiring grass tri 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
Say Rs. 31815
or 2nd year 101 5454 total 7.2% raincuts for 2nd year
62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
done twice a year 1238 4952 maintenance to be done twice a year
done once in 2 years 927 463.5 maintenance to be done once in 2 years
uiring maintenance 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
the total area requiring grass trimming 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
the total area requiring grass trimming 1238 4952 maintenance to be done twice a year
927 463.5 maintenance to be done once in 2 years
148 112.48 considering 4% requiring maintenance
or 2nd year 326 326
64 1280
4 160
1 337.5 considering 15% of the total area requiring grass trimming
done twice a year 13 130
done once in 2 years 31815.48
uiring maintenance Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
2 15.2.I Maintenance 300
the total area requiring grass trimming 3 15.3.I Repair of p 0
4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
6 15.9 Maintenanc 0.5
For 2nd Year 7 15.10.II Maintenanc 0.76
Restoration 54 cum 8 15.11 Maintenanc 1
Maintenance 300 sqm 9 15.12.I Cutting br 20
Repair of p 0 sqm 10 15.12.II Cutting of 40
Maintenanc 0 sqm 11 15.12.III Trimming g 337.5
Maintenanc 4 no 12 15.13 White wash 10
Maintenanc 0.5 km Total
Maintenanc 0.76 m
Maintenanc 1 km
Cutting br 20 no
Cutting of 40 no
Trimming g 337.5 sqm 1238 4952 maintenance to be done twice a year
White wash 10 sqm 927 463.5 maintenance to be done once in 2 years
Total 148 112.48 considering 4% requiring maintenance
326 326
moval of loose material) 64 1280
4 160
1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
2 15.2.I Maintenance 300
or 2nd year 3 15.3.I Repair of p 0
4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
6 15.9 Maintenanc 0.5
done twice a year 7 15.10.II Maintenanc 0.76
done once in 2 years 8 15.11 Maintenanc 1
uiring maintenance 9 15.12.I Cutting br 20
10 15.12.II Cutting of 40
11 15.12.III Trimming g 337.5
12 15.13 White wash 10
the total area requiring grass trimming Total
or 2nd year
or 2nd year
or 2nd year
g grass trimming
g grass trimming
g grass trimming
g grass trimming
g grass trimming
g grass trimming
1 15.1 A Restoration 54 cum 101 5454
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs 1 15.1 A Restoration
7 15.10.II Maintenance of RCC railing 4 15.3.IV
15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
15.12.I Cutting branches of trees from roadway 6 15.9
15.12.II Cutting of shrubs from roadway 7 15.10.II
15.11
For 2nd Year 15.12.I
1 15.1 A Restoration 54 cum 101 5454 15.12.II
2 15.2.I Maintenance 300 sqm 62 18600
3 15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
4 15.3.IV Maintenanc 0 sqm 165 0 1 15.1 A Restoration
5 15.7.I Maintenanc 4 no 1238 4952 2 15.2.I Maintenance
6 15.9 Maintenanc 0.5 km 927 463.5 3 15.3.I Repair of p
7 15.10.II Maintenanc 0.76 m 148 112.48 4 15.3.IV Maintenanc
8 15.11 Maintenanc 1 km 326 326 5 15.7.I Maintenanc
9 15.12.I Cutting br 20 no 64 1280 6 15.9 Maintenanc
10 15.12.II Cutting of 40 no 4 160 7 15.10.II Maintenanc
11 15.12.III Trimming g 337.5 sqm 1 337.5 8 15.11 Maintenanc
12 15.13 White wash 10 sqm 13 130 9 15.12.I Cutting br
Total 31815.48 10 15.12.II Cutting of
Say Rs. 31815 11 15.12.III Trimming g
For 2nd Year 12 15.13 White wash
1 15.1 A Restoration 54 cum 101 5454 Total
2 15.2.I Maintenance 300 sqm 62 18600
3 15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
4 15.3.IV Maintenanc 0 sqm 165 0 1 15.1 A Restoration
5 15.7.I Maintenanc 4 no 1238 4952 2 15.2.I Maintenance
6 15.9 Maintenanc 0.5 km 927 463.5 3 15.3.I Repair of p
7 15.10.II Maintenanc 0.76 m 148 112.48 4 15.3.IV Maintenanc
8 15.11 Maintenanc 1 km 326 326 5 15.7.I Maintenanc
9 15.12.I Cutting br 20 no 64 1280 6 15.9 Maintenanc
10 15.12.II Cutting of 40 no 4 160 7 15.10.II Maintenanc
11 15.12.III Trimming g 337.5 sqm 1 337.5 8 15.11 Maintenanc
12 15.13 White wash 10 sqm 13 130 9 15.12.I Cutting br
Total 31815.48 10 15.12.II Cutting of
Say Rs. 31815 11 15.12.III Trimming g
10 15.12.II Cutting of 40 no 4 160 12 15.13 White wash
11 15.12.III Trimming g 337.5 sqm 1 337.5 Total
12 15.13 White wash 10 sqm 13 130
Total 31815.48 10 15.12.II Cutting of
Say Rs. 31815 11 15.12.III Trimming g
2 15.2.I Maintenance 300 sqm 62 18600 12 15.13 White wash
3 15.3.I Repair of p 0 sqm 6976 0 Total
4 15.3.IV Maintenanc 0 sqm 165 0
5 15.7.I Maintenanc 4 no 1238 4952 2 15.2.I Maintenance
6 15.9 Maintenanc 0.5 km 927 463.5 3 15.3.I Repair of p
7 15.10.II Maintenanc 0.76 m 148 112.48 4 15.3.IV Maintenanc
8 15.11 Maintenanc 1 km 326 326 5 15.7.I Maintenanc
9 15.12.I Cutting br 20 no 64 1280 6 15.9 Maintenanc
10 15.12.II Cutting of 40 no 4 160 7 15.10.II Maintenanc
11 15.12.III Trimming g 337.5 sqm 1 337.5 8 15.11 Maintenanc
12 15.13 White wash 10 sqm 13 130 9 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 10 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 11 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 12 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 3rd Year 15.13 White wash
5 15.7.I Maintenance of Hume pipe culverts Total
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing For 3rd Year
8 15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
9 15.12.I Cutting branches of trees from roadway 6 15.9
10 15.12.II Cutting of shrubs from roadway 7 15.10.II
11 15.12.III Trimming grass and weeds from shoulder 8 15.11
12 15.13 White washing of parapet walls of CD works 9 15.12.I
Total 10 15.12.II
11 15.12.III
For 3rd Year 12 15.13
1 15.1 A Restoration of rain cuts
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot hol 1 15.1 A
5 15.7.I Maintenance of Hume pipe culverts 2 15.2.I
6 15.9 Maintenance of Road signs 3 15.3.I
7 15.10.II Maintenance of RCC railing 4 15.3.IV
15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
15.12.I Cutting branches of trees from roadway 6 15.9
15.12.II Cutting of shrubs from roadway 7 15.10.II
15.11
For 2nd Year 15.12.I
15.1 A Restoration 54 cum 101 5454 15.12.II
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 2nd Year 15.13 White wash
15.1 A Restoration 54 cum 101 5454 Total
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.12.II Cutting of 40 no 4 160 15.13 White wash
15.12.III Trimming g 337.5 sqm 1 337.5 Total
15.13 White wash 10 sqm 13 130
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.2.I Maintenance 300 sqm 62 18600 15.13 White wash
15.3.I Repair of p 0 sqm 6976 0 Total
15.3.IV Maintenanc 0 sqm 165 0
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.12.II Cutting of
15.1 A Restoration 54 cum 101 5454 15.12.III Trimming g
15.2.I Maintenance 300 sqm 62 18600 15.13 White wash
15.3.I Repair of p 0 sqm 6976 0
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 3rd Year 15.13 White wash
5 15.7.I Maintenance of Hume pipe culverts Total
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing For 3rd Year
8 15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
9 15.12.I Cutting branches of trees from roadway 6 15.9
10 15.12.II Cutting of shrubs from roadway 7 15.10.II
11 15.12.III Trimming grass and weeds from shoulder 8 15.11
12 15.13 White washing of parapet walls of CD works 9 15.12.I
Total 10 15.12.II
11 15.12.III
For 3rd Year 12 15.13
1 15.1 A Restoration of rain cuts
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot hol 1 15.1 A
5 15.7.I Maintenance of Hume pipe culverts 2 15.2.I
6 15.9 Maintenance of Road signs 3 15.3.I
7 15.10.II Maintenance of RCC railing 4 15.3.IV
15.11 Maintenance of 200 m stones and Km stones 5 15.7.I
15.12.I Cutting branches of trees from roadway 6 15.9
15.12.II Cutting of shrubs from roadway 7 15.10.II
15.11
For 2nd Year 15.12.I
15.1 A Restoration 54 cum 101 5454 15.12.II
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 2nd Year 15.13 White wash
15.1 A Restoration 54 cum 101 5454 Total
15.2.I Maintenance 300 sqm 62 18600
15.3.I Repair of p 0 sqm 6976 0 For 2nd Year
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.12.II Cutting of 40 no 4 160 15.13 White wash
15.12.III Trimming g 337.5 sqm 1 337.5 Total
15.13 White wash 10 sqm 13 130
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.2.I Maintenance 300 sqm 62 18600 15.13 White wash
15.3.I Repair of p 0 sqm 6976 0 Total
15.3.IV Maintenanc 0 sqm 165 0
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
For 3rd Year 15.13 White wash
15.11 Maintenanc 1 km 326 326 Total
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160 For 3rd Year
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.11 Maintenanc 1 km 326 326 15.13 White wash
15.12.I Cutting br 20 no 64 1280 Total
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
15.1 A Restoration 54 cum 101 5454 15.12.II Cutting of
15.2.I Maintenance 300 sqm 62 18600 15.12.III Trimming g
15.3.I Repair of p 0 sqm 6976 0 15.13 White wash
15.3.IV Maintenanc 0 sqm 165 0 15.1 A Restoration
15.7.I Maintenanc 4 no 1238 4952 15.2.I Maintenance
15.9 Maintenanc 0.5 km 927 463.5 15.3.I Repair of p
15.10.II Maintenanc 0.76 m 148 112.48 15.3.IV Maintenanc
15.11 Maintenanc 1 km 326 326 15.7.I Maintenanc
15.12.I Cutting br 20 no 64 1280 15.9 Maintenanc
15.12.II Cutting of 40 no 4 160 15.10.II Maintenanc
15.12.III Trimming g 337.5 sqm 1 337.5 15.11 Maintenanc
15.13 White wash 10 sqm 13 130 15.12.I Cutting br
Total 31815.48 15.12.II Cutting of
Say Rs. 31815 15.12.III Trimming g
15.13 White wash
Total
moval of loose material)