1 15.1 A Restoration 54 cum 101 5454 total 7.

2% raincuts for 2nd year


4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway

For 2nd Year


1 15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
2 15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
3 15.3.I Repair of p 0 sqm 6976 0 not required
4 15.3.IV Maintenanc 0 sqm 165 0 not required
5 15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
6 15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
7 15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
8 15.11 Maintenanc 1 km 326 326
9 15.12.I Cutting br 20 no 64 1280
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass tri
12 15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
2 15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
3 15.3.I Repair of p 0 sqm 6976 0 not required
4 15.3.IV Maintenanc 0 sqm 165 0 not required
5 15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
6 15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
7 15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
8 15.11 Maintenanc 1 km 326 326
9 15.12.I Cutting br 20 no 64 1280
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
12 15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
12 15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
2 15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
3 15.3.I Repair of p 0 sqm 6976 0 not required
4 15.3.IV Maintenanc 0 sqm 165 0 not required
5 15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
6 15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
7 15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
8 15.11 Maintenanc 1 km 326 326
9 15.12.I Cutting br 20 no 64 1280
10 15.12.II Cutting of 40 no 4 160
11 15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
12 15.13 White wash 10 sqm 13 130
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 3rd Year
5 15.7.I Maintenance of Hume pipe culverts 1 15.1 A
6 15.9 Maintenance of Road signs 2 15.2.I
7 15.10.II Maintenance of RCC railing 3 15.3.I
8 15.11 Maintenance of 200 m stones and Km stones 4 15.3.IV
9 15.12.I Cutting branches of trees from roadway 5 15.7.I
10 15.12.II Cutting of shrubs from roadway 6 15.9
11 15.12.III Trimming grass and weeds from shoulder 7 15.10.II
12 15.13 White washing of parapet walls of CD works 8 15.11
Total 9 15.12.I
10 15.12.II
For 3rd Year 11 15.12.III
1 15.1 A Restoration of rain cuts 12 15.13
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway

For 2nd Year


15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 2nd Year
15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130

15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
For 3rd Year
5 15.7.I Maintenance of Hume pipe culverts 1 15.1 A
6 15.9 Maintenance of Road signs 2 15.2.I
7 15.10.II Maintenance of RCC railing 3 15.3.I
8 15.11 Maintenance of 200 m stones and Km stones 4 15.3.IV
9 15.12.I Cutting branches of trees from roadway 5 15.7.I
10 15.12.II Cutting of shrubs from roadway 6 15.9
11 15.12.III Trimming grass and weeds from shoulder 7 15.10.II
12 15.13 White washing of parapet walls of CD works 8 15.11
Total 9 15.12.I
10 15.12.II
For 3rd Year 11 15.12.III
1 15.1 A Restoration of rain cuts 12 15.13
2 15.2.I Maintenance of earthen shoulder ( stripping of excess soil)
3 15.3.I Repair of pot holes by removal of failed material and filling with 75mm BM
4 15.3.IV Maintenance of Bituminous surface (Repair to pot holes and removal of loose material)
5 15.7.I Maintenance of Hume pipe culverts
6 15.9 Maintenance of Road signs
7 15.10.II Maintenance of RCC railing
15.11 Maintenance of 200 m stones and Km stones
15.12.I Cutting branches of trees from roadway
15.12.II Cutting of shrubs from roadway

For 2nd Year


15.1 A Restoration 54 cum 101 5454 total 7.2% raincuts for 2nd year
15.2.I Maintenance 300 sqm 62 18600 total 12 % for 1st year
15.3.I Repair of p 0 sqm 6976 0 not required
15.3.IV Maintenanc 0 sqm 165 0 not required
15.7.I Maintenanc 4 no 1238 4952 maintenance to be done twice a year
15.9 Maintenanc 0.5 km 927 463.5 maintenance to be done once in 2 years
15.10.II Maintenanc 0.76 m 148 112.48 considering 4% requiring maintenance
15.11 Maintenanc 1 km 326 326
15.12.I Cutting br 20 no 64 1280
15.12.II Cutting of 40 no 4 160
15.12.III Trimming g 337.5 sqm 1 337.5 considering 15% of the total area requiring grass trim
15.13 White wash 10 sqm 13 130
Total 31815.48
Say Rs. 31815
or 2nd year 101 5454 total 7.2% raincuts for 2nd year
moval of loose material)

or 2nd year 101 5454 total 7.2% raincuts for 2nd year
62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
done twice a year 1238 4952 maintenance to be done twice a year
done once in 2 years 927 463.5 maintenance to be done once in 2 years
uiring maintenance 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
the total area requiring grass tri 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
Say Rs. 31815

or 2nd year 101 5454 total 7.2% raincuts for 2nd year
62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
done twice a year 1238 4952 maintenance to be done twice a year
done once in 2 years 927 463.5 maintenance to be done once in 2 years
uiring maintenance 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
the total area requiring grass trimming 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48

101 5454 total 7.2% raincuts for 2nd year


the total area requiring grass trimming 62 18600 total 12 % for 1st year
6976 0 not required
165 0 not required
1238 4952 maintenance to be done twice a year
927 463.5 maintenance to be done once in 2 years
148 112.48 considering 4% requiring maintenance
326 326
done twice a year 64 1280
done once in 2 years 4 160
uiring maintenance 1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
the total area requiring grass trimming 1238 4952 maintenance to be done twice a year
927 463.5 maintenance to be done once in 2 years
or 2nd year 148 112.48 considering 4% requiring maintenance
326 326
64 1280
4 160
done twice a year 1 337.5 considering 15% of the total area requiring grass trimming
done once in 2 years 13 130
uiring maintenance 31815.48
Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
the total area requiring grass trimming 2 15.2.I Maintenance 300
3 15.3.I Repair of p 0
4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
For 2nd Year 6 15.9 Maintenanc 0.5
Restoration 54 7 15.10.II Maintenanc 0.76
Maintenance 300 8 15.11 Maintenanc 1
Repair of p 0 9 15.12.I Cutting br 20
Maintenanc 0 10 15.12.II Cutting of 40
Maintenanc 4 11 15.12.III Trimming g 337.5
Maintenanc 0.5 12 15.13 White wash 10
Maintenanc 0.76 Total
Maintenanc 1
Cutting br 20
Cutting of 40
Trimming g 337.5
White wash 10 1238 4952 maintenance to be done twice a year
Total 927 463.5 maintenance to be done once in 2 years
148 112.48 considering 4% requiring maintenance
moval of loose material) 326 326
64 1280
4 160
1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
or 2nd year 2 15.2.I Maintenance 300
3 15.3.I Repair of p 0
4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
done twice a year 6 15.9 Maintenanc 0.5
done once in 2 years 7 15.10.II Maintenanc 0.76
uiring maintenance 8 15.11 Maintenanc 1
9 15.12.I Cutting br 20
10 15.12.II Cutting of 40
11 15.12.III Trimming g 337.5
the total area requiring grass trimming 12 15.13 White wash 10
Total
or 2nd year
1238 4952 maintenance to be done twice a year
927 463.5 maintenance to be done once in 2 years
148 112.48 considering 4% requiring maintenance
done twice a year 326 326
done once in 2 years 64 1280
uiring maintenance 4 160
1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
the total area requiring grass trimming Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
2 15.2.I Maintenance 300
3 15.3.I Repair of p 0
the total area requiring grass trimming 4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
6 15.9 Maintenanc 0.5
7 15.10.II Maintenanc 0.76
8 15.11 Maintenanc 1
9 15.12.I Cutting br 20
10 15.12.II Cutting of 40
done twice a year 11 15.12.III Trimming g 337.5
done once in 2 years 12 15.13 White wash 10
uiring maintenance Total

the total area requiring grass trimming 1238 4952 maintenance to be done twice a year
927 463.5 maintenance to be done once in 2 years
148 112.48 considering 4% requiring maintenance
or 2nd year 326 326
64 1280
4 160
1 337.5 considering 15% of the total area requiring grass trimming
done twice a year 13 130
done once in 2 years 31815.48
uiring maintenance Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
2 15.2.I Maintenance 300
the total area requiring grass trimming 3 15.3.I Repair of p 0
4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
6 15.9 Maintenanc 0.5
For 2nd Year 7 15.10.II Maintenanc 0.76
Restoration 54 cum 8 15.11 Maintenanc 1
Maintenance 300 sqm 9 15.12.I Cutting br 20
Repair of p 0 sqm 10 15.12.II Cutting of 40
Maintenanc 0 sqm 11 15.12.III Trimming g 337.5
Maintenanc 4 no 12 15.13 White wash 10
Maintenanc 0.5 km Total
Maintenanc 0.76 m
Maintenanc 1 km
Cutting br 20 no
Cutting of 40 no
Trimming g 337.5 sqm 1238 4952 maintenance to be done twice a year
White wash 10 sqm 927 463.5 maintenance to be done once in 2 years
Total 148 112.48 considering 4% requiring maintenance
326 326
moval of loose material) 64 1280
4 160
1 337.5 considering 15% of the total area requiring grass trimming
13 130
31815.48
Say Rs. 31815
For 2nd Year
1 15.1 A Restoration 54
2 15.2.I Maintenance 300
or 2nd year 3 15.3.I Repair of p 0
4 15.3.IV Maintenanc 0
5 15.7.I Maintenanc 4
6 15.9 Maintenanc 0.5
done twice a year 7 15.10.II Maintenanc 0.76
done once in 2 years 8 15.11 Maintenanc 1
uiring maintenance 9 15.12.I Cutting br 20
10 15.12.II Cutting of 40
11 15.12.III Trimming g 337.5
12 15.13 White wash 10
the total area requiring grass trimming Total
g grass trimming

g grass trimming
g grass trimming

g grass trimming
g grass trimming

g grass trimming
g grass trimming

You might also like