Description References Quantities Unit Price (Rs) Price (Rs) Remarks

DOCs: switchgears 4
1 Installation of Generator Circuit Breakers switchgears (2 types) type1: X018495003.dwg.zip, X018495004.dwg.zip, (panels per type1) (3) 4
type2: X018495103.dwg.zip, X018495104.dwg.zip (panels per type2) (2)
switchgears 1
2 Installation of MV panels DOCs: MV Front View.zip 1
(panels per switchgear) (20)
switchgears 1
3 Installation of main LV distribution DOCs: Main LV front view.zip 1
(panels per switchgear) (8)
switchgears 4
4 Installation of GTGs MCCs Not available 4
(panels per switchgear) (5)
switchgears 1
5 Installation of MBOP MCC Not available 1
(panels per switchgear) (6)
switchgears 1
6 Installation of HRSG MCC Not available 1
(panels per switchgear) (2)
switchgears 1
7 Installation of ST MCC Not available 1
(panels per switchgear) (3)
switchgears 1
8 Installation of Fuel Oil MCC Not available 1
(panels per switchgear) (2)

switchgears 1
9 Installation of Lighting distribution Not available 1
(panels per switchgear) (2)

Included in the scope of erection works related to lighting and power socket system is:
• Erection of all the secondary supporting structures (i.e. beams, brackets, auxiliary
supports, etc.) for distribution boards, power sockets and for laminates (e.g. pylons for
luminaries), etc
• The mechanical treatment and mounting of the equipment in connection with all
fixing material and auxiliaries (i.e. fixing of luminaries, switches and power sockets)
switchgears 4 • The installation of all necessary cable trays and ladders including all necessary
10 Installation of Lighting subdistribution Not available 4 auxiliary equipment for the installation of ladders and conduits (supports, brackets,
(panels per switchgear) (1)
etc)
• The laying and the connecting of all cables (unarmoured) between the relevant
equipment (including glands on all cable entances to equipment
• Testing of the lighting and power socket installation
To Be
11 Lighting fixtures Not available pc Determined
Later
To Be
12 Power sockets Not available pc Determined
Later
switchgears 1
13 Installation of Secured distribution Not available 1
(panels per switchgear) (1)
switchgears 1
14 Installation of 110 VDC distribution Not available 1
(panels per switchgear) (1)
15 Installation of DCS panels DOCs: IEG-1012-EN-IP-DW-18-108-B.dwg panels 7 7
16 Installation of gas turbine control panels DOCs: 7215566-730014-01A.dwg panels 4 4
17 Installation of steam turbine control panels Not available panels 2 2
18 Installation of conventional panels Not available panels 4 4
19 Installation of 24 VDC chargers (control system) DOCs: 7215566-730018-05A.dwg chargers 8 8
20 Installation of 24 VDC chargers (fire protection system) DOCs: 7215566-730018-04A.dwg chargers 4 4
21 Installation of 125 VDC chargers and batteries DOCs: G70178-A001sht01rB.dwg chargers 4 4
22 Installation of 110 VDC chargers (LxDxH: 900x800x1800) Not available chargers 2 2
23 Installation of UPS (LxDxH: 1200x735x1815) Not available UPS 1 1
24 Installation of 24 VDC batteries (control system) DOCs: 7215566-730018-02A.dwg battery racks 4 4
25 Installation of 24 VDC batteries (fire protection system) DOCs: 7215566-730018-01A.dwg battery racks 4 4
26 Installation of 110 VDC batteries (LxDxH: 2700x960x1720) Not available battery racks 2 2
27 Installation of UPS batteries (LxDxH: 4100x1200x1030) Not available battery racks 1 1

Conductor Cu 1x120mm2 meters 1600 1600

Cadwell connections (optionally screw connectors) pc 200 200

28 Installation of outdoor earthing equipment


3m LONG, d 19mm, COPPER CLAD STEEL RODS pc 10 10
For plant buildings, earth rings shall be provided which have to be connected to the
main earthing ring at two or more points. Connection shall be by copper strip, cable or
flexible braid. If stranded conductors are used than approved crimped type lugs and
COPPER BAR 40/3 mm meters 30 30 bolts shall be used.
The scope of work for the electrical erection includes the earthing (grounding) and
bonding of all herein specified electrical equipment e.g.: motors, actuators, panels,
St/tZn CONDUCTOR d 10mm meters 1800 1800 local boards, transmitter racks, instruments, cable trays, cable glands, conduits and
structural steelwork as well as the earthing of all electrical equipment supplied and
erected by others (e.g. electrical motors supplied by the mechanical contractor).
In general the requirements of the KESC specification related to the earthing and
St/tZn CROSS JUNCTION pc 2 2 bonding of various electrical equipment and the attached earthing specifications are
applicable.
Included in the scope of erection work for earthing and bonding is :
• Erection of all supports for the relevant earthing conductors and bars as far as
St/tZn 'T'-JUNCTION pc 100 100 necessary.
• The mechanical treatment and mounting of the earthing conductors and bars in
27 Installation of foundation earthing equipment connection with all fixing material and auxiliaries
• Marking and connecting of the conductors and bars where necessary including
St/tZn BRIDGE pc 10 10 modifications on the various connecting points if necessary.

INOX T-JUNCTION pc 50 50

V4A STAINLESS STEEL EARTHING PIT pc 40 40

400A pc 2 2
28 Temporary power supply panels
160Α pc 3 3
1X240mm2 meters 1000 1000
1x120mm2 meters 600 600
29 Temporary power supply cables
3x50+25mm2 meters 400 400
1x25mm2 meters 400 400
30 Outdoor street lighting posts pc 12 12
PVC Φ150 meters 200 200
31 Installation of PVC pipes
PVC Φ50 οδικού φωτισμού meters 500 500
600 mm ladder meters 1700 1700
500 mm ladder meters 100 100 Included in the scope of erection works related to cable tray system is:
300 mm ladder meters 300 300 • Erection of all the secondary supporting structures (i.e. beams, brackets, auxiliary
600 mm trays meters 400 400 supports, etc.).
• The mechanical treatment and mounting of the cable tray system (i.e., trays, ladders,
32 Installation of cable trays / ladders conduits, etc.) in connection with all fixing material and auxiliaries, (i.e. fixing of trays
and conduits, connecting- and end pieces, barrier, clamping of pipes, etc.).
300 mm trays meters 300 300 • Covering of cable trays where necessary ace. EAC requirements (mainly the top
cable tray at exposed area)
33 CABLE N2XSY, 12/20 kV 1x500 mm² meters 5200 5200 162.00 842,400.00
1x500 mm² meters 3250 3250 157.00 510,250.00
34 CABLE N2XSY, 6/10kV 1x240 mm² meters 1600 1600 127.00 203,200.00
1x185 mm² meters 3300 3300 118.00 389,400.00
2XY 3x2,5 mm² 0,6/1 kV class2 meters 4,300 4,300 15.00 64,500.00
2XY 4x2,5 mm² 0,6/1 kV class2 meters 2,600 2,600 18.00 46,800.00
2XY 4x4 mm² 0,6/1 kV class2 meters 6,200 6,200 20.00 124,000.00
2XY 4x6 mm² 0,6/1 kV class 2 meters 1,300 1,300 24.00 31,200.00
2XY 4x6 mm² 0,6/1 kV class 2 meters 1,000 1,000 24.00 24,000.00
2XY 4x10 mm² 0,6/1 kV class2 meters 3100 3100 32.00 99,200.00
2XY 4x16 mm² 0,6/1 kV class2 meters 3250 3250 35.00 113,750.00
2XY 3x25rmv/16 0,6/1 kV meters 800 800 35.00 28,000.00
2XY 3x35rmv/16 0,6/1 kV meters 500 500 41.00 20,500.00 Included in the scope of erection works related to cable laving is:
2XY 3x50/25rmv 0,6/1 kV meters 300 300 49.00 14,700.00
35 N2XY, 0,6 / 1 kV cables for main LV distribution and GTGs MCCs • The mounting of the cable on cable trays, conduits, flexible pipes, etc.
2XY 3x70/35rmv 0,6/1 kV meters 800 800 60.00 48,000.00 • Dressing of cables
2XY 3x95/50rmv 0,6/1 kV meters 500 500 59.00 29,500.00 • Fixing of cables on trays or ladders
2XY 3x95/50rmv 0,6/1 kV meters 900 900 64.00 57,600.00 • Marking of each cable/core at both sides
• Drilling gland plate (if necessary), fixing cable glands / BS standard, shrouding and
2XY 1x95rmv 0,6/1 kV meters 600 600 49.00 29,400.00
bonding
2XY 1x185 mm2 0,6/1 kV class 2 meters 2,000 2,000 88.00 176,000.00 • Connecting of each cable/core on both ends
2XY 1x240 mm2 0,6/1 kV class 2 meters 750 750 98.00 73,500.00 • Testing
2XY 1x300 mm2 0,6/1 kV class 2 meters 3,300 3,300 108.00 356,400.00
2XY 1x500 mm² 0,6/1 kV meters 6,700 6,700 128.00 857,600.00
12X2,5 meters 7500 7500 40.00 300,000.00
7X2,5 meters 500 500 32.00 16,000.00
LI-YCY 4X1,5 meters 800 800 25.00 20,000.00
PVC/ISCR/OSCR/PVC-KX 5X2X1,5 meters 1000 1000 25.00 25,000.00
BELDEN CABLE P.N. 89182 1 PAIR 22AWG meters 5000 5000 12.00 60,000.00
ORION P.N. 2202 – 19T15F01319 OR 1 PAIR meters 3300 3300 12.00 39,600.00
36 GTGs control cables 2X2X1,5 meters 700 700 21.00 14,700.00
2X2X2,5 meters 3500 3500 21.00 73,500.00
5X2X1,5 meters 2000 2000 50.00 100,000.00
NYCY 2X6 meters 800 800 18.00 14,400.00
1X3X1,5 meters 6500 6500 14.00 91,000.00
Fire detection local box pc To Be
Determined 4,500.00 -
Later
Smoke detector pc To Be
Determined 1,000.00 -
Later
Detectors are mounted in socket style bases allowing the interchange of smoke and
Heat detector pc To Be
heat detectors. All detectors and “end-of-line” devices shall be terminated in the
Fire Detection System Determined 1,200.00 -
detector base. Removal of a detector from the base shall cause a fault indication at
Later
the fire alarm control panel without isolating any other device.
Alarm bell pc To Be
Determined 1,200.00 -
Later
Local Binary Switches pc To Be
Determined 1,200.00 -
Later

Total in Pak Rupees 4,894,100.00

Manpower Rate/ Hour Basis: 50 Hours /Week Overtime Rate / Hour Overtime
Saturday or above 10 Rate / Hour
Hours/ Day Sunday and
Pakistan
Hollyday The rates include site management, overheads,
site installation and tools, temporary facilities and
equipment, supervision, consumables and any other
expenses and shall constitute full compensation to
the subcontractor for the work performed.
Welder, 250 / hr 375 / hr 440 / hr
Qualified Erector Electrician 150 / hr 225 /hr 265 / hr
Helper, Cable Layer 90 / hr 135 / hr 160 / hr

Additional Item - Unit Rates

S.No Description References Quantities Unit Price (Rs) Price (Rs) Remarks

1 Fire stop Foam , 300 ml can Hilti CP620 Cans 2650 / can
2 Firestop cable coating, 20 Kg bucket Hilti CP678 Buckets 27000 / bucket
Firestop mortar, 20 Kg sack Hilti CP636 sacks 4200 / sack
3 Angle Iron, C / U - Channel Kg 100 / kg Supply / fabrication & installation