: ELC-01-001
GENERATOR POWER TERMINAL INSPECTION REPORT
JOB NO. :
GENERATOR : DOC. NO.:
PRE'D BY:
TB6 - 1 A A - A
TB6 - 5 B CW CCW B - B
TB6 - 6 C C - C
A - A
TB6 - 10 A B - B
TB6 - 5 B CW CCW C - C
TB6 - 6 C
By way of signature, all parties concur the proper phase sequence &
phase location exist; Therefore generator breakers may be racked-in
TB6 - 4 A and closed.
TB6 - 5 B CW CCW
TB6 - 6 C
Witnessed by :
TB6 - 11 A CW CCW
TB6 - 5 B
TB6 - 12 C
WIKA CLIENT SUBCONT