This document outlines the requirements and checklist for obtaining a building permit from the Office of the Municipal Engineer/Building Official in Guiguinto, Bulacan. It lists the necessary plans, forms, clearances, and documents that must be submitted, including architectural, structural, plumbing, electrical, and mechanical plans signed by licensed professionals; building, sanitary/plumbing, electrical, and mechanical forms; locational clearance; barangay clearance; land titles and taxes; soil tests; and fire safety clearance. Proper licenses and identification must also be provided for all professionals involved in the building's design.
This document outlines the requirements and checklist for obtaining a building permit from the Office of the Municipal Engineer/Building Official in Guiguinto, Bulacan. It lists the necessary plans, forms, clearances, and documents that must be submitted, including architectural, structural, plumbing, electrical, and mechanical plans signed by licensed professionals; building, sanitary/plumbing, electrical, and mechanical forms; locational clearance; barangay clearance; land titles and taxes; soil tests; and fire safety clearance. Proper licenses and identification must also be provided for all professionals involved in the building's design.
This document outlines the requirements and checklist for obtaining a building permit from the Office of the Municipal Engineer/Building Official in Guiguinto, Bulacan. It lists the necessary plans, forms, clearances, and documents that must be submitted, including architectural, structural, plumbing, electrical, and mechanical plans signed by licensed professionals; building, sanitary/plumbing, electrical, and mechanical forms; locational clearance; barangay clearance; land titles and taxes; soil tests; and fire safety clearance. Proper licenses and identification must also be provided for all professionals involved in the building's design.
PHOTO COPY OF CURRENT PTR & PRC ID OF: PERMIT Civil Engineer (Office of the Municipal Engineer/Building Official – Guiguinto, Bulacan) Architect Name of Owner __________________________________________ Professional Electrical Engineer Location ________________________________________________ Registered Electrical Engineer Project _________________________________________________ Sanitary Engineer Master Plumber I. Six (6) sets of PLANS (SCALE 1:100) Professional Mechanical Engineer ARCHITECTURAL - Signed and Sealed by a duly licensed Geodetic Engineer Architect. STRUCTURAL - Signed and sealed by a duly licensed Civil The applicants should fill-up the necessary forms: Engineer. FIVE (5) COPIES OF: (For two (2) storey building & above-signed and sealed by a BUILDING FORMS- Signed and sealed by a duly licensed licensed structural engineer) Architect / Civil Engineer /Structural Engineer PLUMBING/SANITARY - Signed and sealed by a licensed (DULY NOTARIZED) Sanitary Engineer/Master Plumber (except in those areas SANITARY/PLUMBING FORMS – Signed and sealed by a exempted or not required by the Building Official under the licensed Sanitary Engineer/Master Plumber. National Building Code) ELECTRICAL FORMS- Signed and sealed by a licensed ELECTRICAL – Signed and sealed by a Professional Electrical Professional Electrical Engineer. Engineer. (In-charge part of the forms- Signed and sealed by a MECHANICAL - Signed and sealed by a Professional licensed Registered Electrical Engineer) Mechanical Engineer. MECHANICAL FORMS - Signed and sealed by a licensed SPECIFICATIONS - Signed and sealed by a duly licensed Mechanical Engineer /Professional Mechanical Engineer. Architect/Civil Engineer. COST ESTIMATES/BILL OF MATERIALS - Signed and sealed by a AUTHORIZATION LETTER- in the absence of the owner. duly licensed Architect/Civil Engineer. SECRETARY CERTIFICATE- (For Corporation) STRUCTURAL DESIGN ANALYSIS - Signed and sealed by a duly licensed Civil Engineer. (For two (2) storey & above- Signed CONSTRUCTION SAFETY & HEALTH PROGRAM (D.O.L.E.) and sealed by a licensed Structural Engineer.) Assume Soil Bearing Capacity (90 KPA Below) PHOTO COPY OF THE OWNER’S COMMUNITY TAX RECEIPT (CTC) ELECTRICAL DESIGN ANALYSIS – (Design Analysis, Short PHOTO COPY OF ANY VALID I.D. Circuit Calculation & Voltage Drop) (DPWH Circular No. 02, Series of 2015). Signed and sealed by a licensed FOR COMMERCIAL & INDUSTRIAL BUILDING: Professional Electrical Engineer. Environmental Compliance Certificate (ECC) LOT PLAN W/ VICINITY MAP - Signed and sealed by duly Accessibility Plans (Batas Pambansa 344) licensed Geodetic Engineer. FOR CELLSITE & TELECOMMUNICATION TOWER PHOTO COPY OF ZONING/LOCATIONAL CLEARANCE Environmental Compliance Certificate (ECC) - Proceed to the office of the Deputized Zoning Officer located Barangay Resolution at the 3rd floor right wing of Municipal Building S.B. Resolution PHOTO COPY OF BARANGAY CLEARANCE- Permit to No. of Neighbors Certificate from Barangay Council construct. (For Bldg. Permit & Electrical Permit) Certification from the office of Agrarian Reform Air Transportation Office (ATO) Clearance HOME OWNERS ASSOCIATION CLEARANCE / DEVELOPER’S Health Clearance from the Department of Health. CLEARANCE LIKE US ON FACEBOOK: engineering.guiguinto PHOTO COPY OF T.C.T. (Transfer Certificate of Title) Download Forms & list of requirements. (In case the applicant is not the registered owner of the lot) Legend: PHOTO COPY of any of the following: o Contract of Lease For Construction outside residential and o Contract of Sale commercial/Industrial Subdivision o Deed of Absolute Sales
PHOTO COPY OF LATEST LAND TAX DECLARATION &
CURRENT REAL PROPERTY TAX RECEIPT
TWO (2) COPIES OF SOIL BORING ANALYSIS/TEST
- For Three (3) storey building and above.
FIRE SAFETY EVALUATION CLEARANCE / FIRE SAFETY
INSPECTION CERTIFICATE -Guiguinto Fire Station / Fire Department