You are on page 1of 3

DALIA SPEAKS

"Dalia Sadany ASK Magazine's design In former articles ,I have elucidated on the
disciplines of all team players in the process
Owners from then on had to contractually
engage the services of an architect to
consultant, Chief Designer & Founder of Dezines of constructing your dream home such as perform design services and a contractor
The Architect , The Interior Designer, The to perform construction services resulting
Architecture & Interiors, Managing Director & Landscaper as well as The Contractor in in what is commonly known today as the
Partner of Decon Contracting as well as the all his various practices .I have highlighted
the definition , the responsibility and the
Design-Bid-Build project delivery method.
With it the specialization of services
creator of the new furniture brand GUSH is job expectation of each one of the eminent increased and new professions emerged
practitioners. A clarification was also like interior designers, interior decorators,
dwelling into the world of Architecture, Interior presented on the vital factors necessary finishing contractors, landscape architects,
Design landscaping ,and Contracting. " to be fulfilled in choosing the appropriate
professional, the most successful
methodology in dealing with them and
landscape contractors, etc.

The late 20th century witnessed renewed


broad rules of calculating their fees. interest in reviving the Masterbuilder
method to address some of the flaws in
We progressed In the previous article about Design-Bid-Build. As a result, a modern
the legendary profession of the ancient version of the Masterbuilder emerged
Masterbuilder and historical developments whereby an integrated team of design and
Picture credit by Ahmed Mleeg

through the ages leading to the emergence contracting professionals provide both
of the architect and contractor as two design and construction services under one
distinct professions, as opposed to one contract in what is commonly known today
eminent, capable individual. The rationale as the Design-Build project delivery method.
that derived the necessity to dedicate that
last article to the mythical Masterbuilder Throughout my articles I have always
was the progressive will to explain to reiterated “Use Pros to do a Pros Job”.
Building a new house 150 years ago the contractor to perform all the necessary
you the two means of construction
decision was simple – hire a Masterbuilder. design and contracting services till
methodologies of Design-Bid -build known
Today the same Owner has several options project delivery. In this context, the
as DBB and Design and Build known
to choose from. full service designer may employ or
as DB. But before diving deep into this
subcontract certain design specialists.
controversial topic , let's recap the historical
development through the ages leading to Which Pros to Hire? Likewise the full service contractor may
employ or subcontract certain contracting
reemergence of a profession where the
1. Hire the Maximum Pros Needed: In this specialists. Contractually this means two
architect and the contractor would be a sole
Option shown in Diagram-1, the Owner Design and Construction contracts till
entity known as Masterbuilder but applied
hires a specialized design pro and a project delivery.
practically as a singular unit that applies
specialized contracting pro at every stage
today the method of DB. 3. Hire One Pro: In this Option shown in
of the home building process thereby using
the maximum pros needed. Contractually diagram-3, the Owner hires one entity
HISTORY & TRENDS this means several sequential Design-Bid- (or an integrated team of designers and
In ancient times well into the 19th century contractors) to perform all design and
Build contracts till project delivery.
the Masterbuilder worked with the contracting services required till project
project Owner providing both design and 2. Hire Two Pros: In this Option shown completion. Contractually this means
construction as one seamless service. in Diagram-2, the Owner hires one full one Design-Build contract till project
To perform one without the other was service designer and one full service delivery.
unheard. Although some craftsmen like
Michel Angelo took on separate design
contracts and others like Leon Battista
Alberti (Italian Architect and Author) wrote
about establishing the art of architecture
as a profession distinct from engineering
and construction, it wasn’t till the Industrial
Revolution that the separation was made
possible. The reasons for this included an
increased demand for design expertise as
well as the trend toward specialization and
division of labor. This was supported by the
emergence of professional societies such as
the American Institute of Architects (AIIA)
in 1857 as well as formation of architectural
colleges and passing of architectural
licensing laws in 1897. The separation was
made absolute in 1935 with the passage of
the Miller Act which required contractors
on federal projects exceeding a certain
amount to post performance and payment
bonds. The implication was that project

18 ASK OCTOBER 2012 ASK OCTOBER 2012 19


DALIA SPEAKS

specifications before bids are solicited contractor. Accordingly the designer


from pre-qualified bidders. In the design is impartial and looks out for Owner’s
phase the designer would have spent interest till project delivery.
months and sometimes up to a year with
the Owner defining project requirements 5.Easier to Bring in Own Subcontractor
(preferred style, needs, requirements, The Owner is significantly involved
budget, etc) and incorporating it in the throughout the building process.
design before the Owner was satisfied Accordingly project Owners can bring
with final outcome. This means that there in their preferred subcontractors to the
should be no room for uncertainty about project with relative ease compared
what the Owner wants and what the to the Design-Build method. However,
contractor is required to do. it is important to note that bringing in
own subcontractor lengthens delivery
2.Competitive Bidding Lowers Cost schedules and could jeopardize the
The construction contract is awarded by flowing workmanship of all contractors
competitive bidding to the lowest bid. hired under the general contractor.
First, the Owner pre-qualifies contractors
after going through a careful selection Disadvantages of Design-Bid-Build
process. The pre-qualified bidders are
1. Owner Involved in Conflicts and Disputes
then motivated to give their lowest bid
Responsibility for quality and project
because they know they are competing
delivery is shared between designer and
with others and that price is the basis of
contractor. Since design and construction
selection. Moreover since the project is
of a new project is a complex undertaking
fully defined pre-qualified bidders don’t
conflicts and disputes between the
have to increase their bid to allow for
designer and contractor is not unusual.
contingencies. in back and forth between designer • Joint venture or partnership between a
“Finger pointing” is common occurrence
with each blaming the other. One major and contractor due to errors and design and contracting company
3.Relative Ease of Assuring Quality Control omissions in the design drawings and
Contractually Option-1 and Option-2 are • Bid Phase: source of conflict is errors and omissions
During construction the awarded contractor material specifications as well as design The first two forms are more common in
similar in that they are both Design-Bid- The Owner sends out the complete set in the workshop drawings and material
strictly adheres to and follows the alterations and change orders. residential type projects with the last with
Build formats with the difference only of design drawings and specifications to specifications. The Owner is usually
detailed workshop drawings and material commercial projects.
being in the number of contracts the Owner several pre-qualified contractors to present drawn into these conflicts and ends
specifications prepared by the designer. 4. Costs Unknown Until Late in the Process
administers till project delivery. On the bids awarding the contract to the lowest up paying the price of correcting the The critical aspect is that the Owner
Accordingly the designer can easily The designer prepares cost estimates as
other hand Option-3 is a Design-Build bidder. situation. contracts with a single entity, offering a
control quality during site inspections design work progresses, typically when
format. Therefore having decided to work single point of responsibility over design
•Build Phase: by comparing what is required with the workshop drawings and material
with pros the first thing the prospective 2. No Constructability Input in Design and contracting till project delivery.
Contractor builds the project in strict what has been done. If the documented specifications are 100% complete. While
home Owner should do is decide which Process This simple difference transforms the
adherence to the set of design drawings requirements are not met, it is up to the this may give the Owner an indication,
method to use. Should he or she use The awarded contractor joins the project relationship between the designer and
and material specifications under the contractor to correct the work at their there is no cost certainty until the design
Design-Bid-Build or Design-Build? And team after completion of the design contractor in Design-Build format from
supervision of the designer. own expense. phase is complete and construction bids
if Design-Bid-Build should he or she use phase. By that time detailed workshop one based on one supervising the other
the maximum number of pros or two? To drawings and material specifications received. By that time costs may exceed
Advantages of Design-Bid-Build 4. Designer Looks out for Owner’s Interest budget leading to design alterations and (as in Design-Bid-Build) to one based on
answer these questions we first need to The designer is contracted by the Owner are complete and sent out to pre- collaboration and teamwork resulting in
fully appreciate the differences between qualified bidders. That means there is no change orders.
1.Project Fully Defined to design the project and supervise cost and time savings as well as better
both methods. The project is fully defined with detailed execution. There is no contractual contractor input in the design process productivity.
(costs, availability, methods, technology, What is Design-Build?
workshop drawings and material relationship between the designer and
WHAT IS DESIGN-BID-BUILD? etc) that could otherwise improve project As mentioned earlier the Design-Build
The Design-Build Process
design. project delivery method is the modern
Design-Bid-Build is the most orthodox version of the masterbuilder system - the • Design:
usable project delivery method. It is also 3. Slow Project Delivery oldest project delivery system in history. A. Preliminary Design:
known as the traditional method despite Slow project delivery is one of the major As mentioned this version developed in Preliminary design prepared based on input
being around for only 150 years. In drawbacks of this method. Design-Bid- response to certain problems that emerged from Owner with constructability input
this method the Owner enters into two Build is a sequential process lengthened over time in the use of the traditional provided by contractor factored in the design
sequential contractual arrangements. The by the bidding phase. Further the design Design-Bid-Build method. to insure design fits and budget realistic.
first arrangement is between the Owner phase could vary from a few months
and the designer and the second between up to a year and sometimes more. In In this method the Owner hires a Design- B. Authorization to Proceed with Detailed
the Owner and contractor. In this structure the construction phase time is wasted Build entity to design and build the project Design:
there is no contractual relationship between turnkey. Contractually this means one
the designer and contractor, and the owner single contract for both the design and Once Owner is satisfied with outcome of
is the laison between both parties. contracting instead of one contract for preliminary design the Owner authorizes
design and another for contracting as in designer to start preparing detailed design.
The Design-Bid-Build Process Design-Bid-Build.
• Build:
This method involves three separate The Design-Build entity (or integrated The construction phase commences as
sequential phases as follows: designer contractor team) can take on portions of the detailed design become
several forms as follows: available. The contractor purchases
• Design Phase: materials and equipment and starts
Designer prepares a complete set of design • Single company with in-house capabilities on the early construction work such
drawings and material specifications with as plumbing, electrical work, air-
input from the Owner • One company subcontracting the other
conditioning, excavation, etc.

20 ASK OCTOBER 2012 ASK OCTOBER 2012 21


DALIA SPEAKS

can opt out with relative ease and go to 2. Subjective Contract Award
the Design-Bid-Build format if he desires. Because the project not fully defined the
Moreover making alterations to design Design-Build format cannot make use of
or material specifications during the competitive bidding where bidders bid on
construction process can be done easily the same design. In the Design-Bid-Build
compared to the Design-Bid-Build. method the designer’s contract making
up 5-10% of project cost is awarded
4. Single Point of Contact & Responsibility based on subjective criteria (reputation,
The Design-Build entity is responsible and experience, etc) while the contractor’s
accountable for issues relating to quality, contract making up 90-95% of total
cost and delivery schedule. Therefore project cost based on objective criteria
the Design-Build entity is motivated to (lowest bid). In comparison in Design-
deliver a successful project that meets the Build the contract is award totally based
Owner’s expectations, budget and quality on subjective criteria like reputation,
standards. Further having only one entity experience, qualifications and best value.
to deal with makes for greater clarity
of communication and reduces risk of 3. Contracting Cost might be Slightly higher
misinterpretation of Owner requests. Design-Build entity is responsible for all
Moreover Owner doesn’t waste time aspects related to design and contracting
coordinating between several parties as and since the project is not fully defined
in Design-Bid-Build. the Design-Build entity usually increases
the costs on some items for contingency
5. Less Stressful To Administer purposes to cover unseen risks.
In Design-Build the Owner is involved in
the design process till satisfied with the 4. Designer Not Impartial The Design-Bid-Build method has its • Do you need to move in to your house • How many Design-Build projects have
Advantages of Design-Build final outcome and authorizes designer As the designer and contractor are one advantages with the main disadvantages being: within 2 years? they done together (a good team
to proceed with detailed drawings. The entity, the Owner cannot rely on the should have a track record of 5 projects
1. Time Savings Owner is not involved in the contracting designer to be impartial and look out • More stressful to administer • Do you have a busy life and haven’t the
First by combining selection of both minimum)
process and does not have to go site for his interests during the construction As mentioned earlier , the disadvantages of time to be 100% involved?
designer and a contractor in one step, regularly. Further since the designer process. Under Design-Bid-Build, the the Design-Bid-Build method such as long • See portfolio and get into some details –
Design-Build eliminates time lost and contractor are one entity there are designer will conduct site inspections, project delivery schedules, High risk of • Are you doing this project as an ask about the budget, cost overruns, work
in the bidding process. Further this no conflicts and disputes to resolve or review bills of quantity and change orders, cost overruns and exceeding budget and investment? orders and delivery schedules, etc (see if
method allows the entity’s contractor issues of coordinating between them as in and assist in resolving disputes between more stress to administer, these cons will anything doesn’t sound right)
to start construction before the entire • Is the design you have in mind complex
Design-Bid-Build. Owner and contractor. To overcome this be compounded if the Owner administers
design is completed. Accordingly requiring close coordination of design • Try to contact Owners of previous projects
risk some Owners employ their own several Design-Bid-Build contracts in one
there is a significant fast tracking 6. Better Quality and construction expertise? and ask about their experience with them.
adviser knowledgeable in construction, project (as in Option-1). The project will
due to overlapping of the design and The Design-Build entity bears total increases costs and animosity that Design- most likely take a lot longer to complete, • Are you not familiar with the tedious That was an objective unbiased
construction phases which saves time. responsibility for design quality Build is intended to avoid. exceed budget by far and very stressful to details of either design , construction and thorough study of both formats, I
Moreover the collaborative project and cannot shift errors in design or manage. Not to mentions the fees of hiring 7 their colleration and farnkly dont want to personally have worked on both
management between the entity’s construction defects to a third party. 5. Difficult to Use Own Subs different pros is very expensive. On the plus be neck-deep into them?
designer and contractor means the For this purpose the entity’s designer The Design-Build entity is responsible side the Owner benefits from the maximum methods over the years , as well as
work can be done faster and with fewer is greatly involved in managing the for issues relating to quality, cost and design and construction expertise he or she separate design and contracting
problems. The resulting time savings construction process till project delivery. delivery schedule. Some Owners, for
Tips: How to select Design-Build
can get. Option-1 is probably more suited to assignments in several endeavors
translates into lower costs and Owner Paying high attention to quality control one reason or another, have preferred a project Owner where:
entity? but as I am the first Egyptian female
could move in to his new home earlier. and quality assurance is an important subcontractors (carpenter, stonemason, A lot of designers and contractors claim to Masterbuilder , and a genuine
feature of this method. etc) they want involved in the project. In • Cost is not an issue provide Design-Build turnkey solutions.
advocate for the anti-segregation
2. Budget Management general the Design-Build format is not How to know who is genuine or not:
The entity’s designer and contractor work of both design and construction
very flexible with regards to using subs • Delivery schedule not important
together as an integrated team evaluating • Ask about the contract – must be one professions, with an accredited
other than their own, but exceptions are education and over 15 years of
alternative designs, material specs and • Has preference to use 2 or more pros in point of responsibility for design and
made under strict guidelines.
methods to tailor a solution that meets different areas of specialization but in the contracting experience in these fields , that
Owner’s design and budget requirements. same field such as interior designer and expertise has resulted in a more
Accordingly the construction cost is Which Project Delivery Method landscape designer • Meet both designer and contractor (see broad perspective and knowledge
known earlier on during the design is better? chemistry between them) of the entire ,more coherent and
process. Cost inputs are provided by There is no perfect project delivery Tips: How to decide which • Ask about their history, experience and less client stressful, Design and
the team’s contractor according to the method. There are some advantages and method best suits your needs? build process , with its obligations
track record individually and together
designer’s specs and the Owner takes “go disadvantages to both delivery methods. Both Design-Bid-Build and Design-Build , hallmarks and taboos such as the
or no go” decisions early on. This ensures The project Owner has to appreciate the formats are applied to all project types from necessity to keep the budgetary
that the Owner plays a key role in arriving differences before deciding which method small apartments to large villas and for new constraints of the client as an utmost
at final construction cost that meets his or better suits his needs. home construction and renovation. If you importance and that during the
her budget. Consequently this reduces the Disadvantages of Design-Build answer “Yes” to any of the following then
If a Project Owner requires one entity to construction phase , the architectural
risk of cost overruns due to fewer design 1. Limited Assurance of Quality Control Design-Build is more appropriate for you.
Because the project is not fully defined be responsible for all aspects of the project and design integrity must be
alterations later on. maintained. These elements are the
in detail (as in the Design-Bid-Build from start to finish then Option-3, discussed • Do you have a good idea of your
3. More Flexible method) at the time of contract with earlier, is the appropriate choice. However, requirements (design and budget)? bible of a professional, capable DB
In Design-Build the decision to proceed the Design-Build entity the Owner may if the Owner, for any reason, decides on entity to ensure a successful dream
with project is done before substantial have limited basis to enforce the contract Design-Bid-Build method he or she is faced • Do you have a budget ceiling which project evolving to reality.
design cost and with early knowledge of and little control over the quality of with two options – hire the maximum pros is inflexible and need an early cost You can reach me at my email
final project cost. Therefore the Owner construction work. (Option-1) or 2 pros (Option-2). commitment? daliaspeaks.ask@gmail.com

22 ASK OCTOBER 2012 ASK OCTOBER 2012 23

You might also like