DELIVERY SYSTEM
1. BUILDING
CONTRACT,
2. CONTRACT
APPROACH &
3. CONTRACTUAL
ARRANGEMENTS
DR AN NISHA NUR
WELLIANA BINTI ABD
RASED
INTRODUCTION
There are many alternatives contractual
approaches to bring together a team for
the design and construction of a project.
DEFINITION OF A CONTRACT:
A contract:
• is a legally binding document between that
defines and governs the rights and duties
of the parties to an agreement.
01 OFFER 05 INTENTION
INFOGRAPHIC
CONTRACT
ELEMENT
CONSENSUS
03 CONSIDERATION 07 AD ITEM
OPTION
A TRADITIONAL CONTRACT
OPTION
Design-Bid-Build
OPTION
Owner
Contract
Designer relationship
Supervise at
site only
Domestic Subcontractors Nominated Subcontractors
ADVANTAGES: Traditional Contract
The traditional method has been well known to many parties; to owners, designers,
and contractors. The procedures and contractual rules of conduct have been worked
out and are well understood.
The mode also contains considerable contractual protection for the owner. The
allocation of risk for construction performance rests almost completely on the
contractor and the subcontractors.
Additionally, the traditional method provides the owner with all the benefits of open
market competition.
The open bidding procedure, in which the lowest bidder is the ‘winner’ gives the owner
the lowest price available in the marketplace and presumably the greatest, economic
efficiency.
DISADVANTAGES: Traditional Contract
The construction professional does not enter process until the design
is complete, meaning that the design is not usually reviewed for
constructability before it is finished.
The general contractor prices and schedules the project based on the
construction documents alone.
DESIGN
PROCUMENT
CONSTRUCTION
A In design and build project,
there is no separation of design
and construction.
The owner hires a contractor who
undertakes the entire
B
responsibility of the project from
design to construction and also
commission. Entities offering this services may
be design & build firms with in-
house employees or joint-venture
DESIGN
PROCUMENT
CONSTRUCTION
ADVANTAGES: Post Modern Approach
• One major reason for choosing a design & build arrangement is to benefit from
the good communication that can occur between the design team and the
construction team.
• This collaboration allows the project to be easily fast tracked, cutting down on
overall schedule for the project.
• The owner is less heavily involved and sits outside the direct day-to-day
communication between designer and constructor.
• This keeps owner staffing to a minimum and puts the full responsibility for good
communication, problem solving, and project delivery on design/ build team.
DISADVANTAGES: Post Modern Approach
• Although it is possible to give the owner a fixed, firm price before the project
begins, this generally does not happen in a design/ build arrangement.
• This is because the firm is hired before the design has started, any real pricing is
not possible. Instead, an owner usually enters this arrangement with a conceptual
budget but without the guarantee of a firm price.
• When a design & build company has an organization that is efficient at performing
the work, the project can move very fast.
• Lack of checks and balances. In the traditional arrangement, the designer prepares
a complete set of contract documents, which is then used to measure and evaluate
the performance of the contractor in the field.
• The owner often hires the designer to oversee the work of the contractor and to
ensue that deficient work is identified and corrected.
• But in the design/ build arrangement, the designer works for the same company as
the builder.
• Similarly, during construction the builder sometimes uncovers certain design
deficiencies, errors, or omissions.
Design and Build in Malaysia
• The Design and Build system was first launched in the Public Works
Department by the Malaysia Prime Minister in 1983. The first project handled
by this unit was the Kuala Terengganu Hospital, which was completed in 1985.