Professional Documents
Culture Documents
Pre Cast Yard PDF
Pre Cast Yard PDF
SLAB
① BOTTOM LONGITUDINAL not include mark up Excees
Concrete Dimension Out to Out Splice Length Hook Cut Length No. Required Total Total Unit Weight In meter
Size Spacing Length Bend Type Variance
Side Cover a b c Required Length Actual Required Weight Actual Required Cut Pcs m m Cut Pcs
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (pcs) (m) (m) (m) (kg/m) (kg) (kg) (kg)
50 12 @ 300 6800 As shown 7000 0 150 12d 7 21 8 1.14 147 168 0.89 6655.958 7606.809 950.85 1 0 0 1071 5 214.2
No. of SLAB 51 pcs
No. Required 1 pcs Use excess from ② New Length Required pcs Total Kg From Excess Balance
Cut Length Splice L1 (m) L2 (m) L1 (pcs) L2 (pcs) Total Pcs L pcs kg L pcs kg
3.5 0.5 4 4 1071 1071 2142 7606.809 4 1224 4346.748 4 918 3260.061
1071
STIRRUPS 1
Concrete Dimension Out to Out Splice Cut Length No. Required Total Total Unit Weight
Size Spacing Length Bend Type Variance
Side Cover a b c Required Length Actual Required Weight Actual Required
(mm) (mm) (mm) (mm) (mm) (m) (pcs) (m) (m) (m) (kg/m) (kg) (kg) (kg)
50 10 @ 200 1800 As Shown 1800 0 1.8 511 9 5.00 919.8 919.8 0.62 1134.185 1134.185 0.00
No. Required 2
205 - pcs 10 mm dia x 6 meters
Numbers dia length
pcs (mm) (m)
205 10 9 204.4
STIRRUPS 2
Concrete Dimension Out to Out Splice Cut Length No. Required Total Total Unit Weight
Size Spacing Length Bend Type Variance
Side Cover a b c Required Length Actual Required Weight Actual Required
(mm) (mm) (mm) (mm) (mm) (m) (pcs) (m) (m) (m) (kg/m) (kg) (kg) (kg)
50 10 @ 200 1500 As Shown 1500 0 1.5 511 9 6.00 766.5 766.5 0.62 945.1543 945.1543 0.00
No. Required 2
171 - pcs 10 mm dia x 6 meters
Numbers dia length
pcs (mm) (m)
171 10 9 170.3333
9.0 Tons Railing ( 183 meters)
SLAB
① BOTTOM LONGITUDINAL Excees
Concrete Dimension Out to Out Splice Length Hook Cut Length No. Required Total Total Unit Weight In meter
Size Spacing Length Bend Type Variance
Side Cover a b c Required Length Actual Required Weight Actual Required Cut Pcs m m Cut Pcs
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (m) (pcs) (m) (m) (m) (kg/m) (kg) (kg) (kg)
50 12 @ 300 6800 As shown 7000 0 150 12d 7 21 8 1.14 147 168 0.89 12137.33 13871.24 1733.90 1 0 0 1953 5 390.6
No. of SLAB 93 pcs
No. Required 1 pcs Use excess from ② New Length Required pcs Total Kg From Excess Balance
Cut Length Splice L1 (m) L2 (m) L1 (pcs) L2 (pcs) Total Pcs L pcs kg L pcs kg
3.5 0.5 4 4 1953 1953 3906 13871.24 4 2232 7926.423 4 1674 5944.817
1953
STIRRUPS 1
Concrete Dimension Out to Out Splice Cut Length No. Required Total Total Unit Weight
Size Spacing Length Bend Type Variance
Side Cover a b c Required Length Actual Required Weight Actual Required
(mm) (mm) (mm) (mm) (mm) (m) (pcs) (m) (m) (m) (kg/m) (kg) (kg) (kg)
50 10 @ 200 2000 As Shown 2000 0 2 916 12 6.00 1832 1832 0.62 2258.999 2258.999 0.00
No. Required 2
306 - pcs 10 mm dia x 6 meters
Numbers dia length
pcs (mm) (m)
306 10 12 305.3333
STIRRUPS 2
Concrete Dimension Out to Out Splice Cut Length No. Required Total Total Unit Weight
Size Spacing Length Bend Type Variance
Side Cover a b c Required Length Actual Required Weight Actual Required
(mm) (mm) (mm) (mm) (mm) (m) (pcs) (m) (m) (m) (kg/m) (kg) (kg) (kg)
50 10 @ 200 1700 As Shown 1700 0 1.7 916 12 7.06 1557.2 1570.286 0.62 1920.149 1936.285 16.14
No. Required 2
262 - pcs 10 mm dia x 6 meters
Numbers dia length
pcs (mm) (m)
262 10 12 261.7143