I PASIR,BATU DAN PC
1 Tanah urug Rp. 85,000.00
1 Tanah padas Rp. 62,500.00
2 Pasir Muntilan Rp. 400,000.00
3 Split / Kriss Rp. 250,000.00
4 Batu belah Rp. 185,000.00
5 Batu pecah 5/7 Rp. 125,000.00
6 Batu Merah Rp. 800.00
7 Semen TIGA RODA Type I Rp. 54,000.00
8 AM 30 ( Perekat keramik dinding ) Rp. 18,750.00
9 AM 55 ( Nat / Tile grout ) Rp. 64,600.00
9 AM 50 ( Nat / Tile grout ) Rp. 14,500.00
VI PENGECATAN
1 Ambril Rp. 3,000.00
2 Thinner Rp. 27,500.00
3 Alkali Resisting Primer Waterbase MOWILEX ( undercoat ) Rp. 40,000.00
4 Waterbase MOWILEX ( wallsealer ) Rp. 30,000.00
5 Cat Tembok dalam MOWILEX Lakestone W108 Intrique Rp. 51,000.00
6 Cat Tembok dalam MOWILEX VS 1801 Excellent White Rp. 75,000.00
7 Cat Tembok Luar MOWILEX Weathercoat Lakestone W 0959 Rp. 75,000.00
8 Cat Tembok Luar MOWILEX Weathercoat Morning Dew W 1518 Rp. 75,000.00
9 Cat Tembok Luar MOWILEX Weathercoat Blue lazio W 1433 Rp. 75,000.00
10 Cat Tembok Luar MOWILEX Weathercoat Cool grey W 0982 Rp. 75,000.00
11 Cat Genteng MOWILEX -45 tile Golden Rp. 60,000.00
12 Cat kayu Bee brand Rp. 70,000.00
12 Cat kayu Mowilex Woodstain WS 503 Walnut Rp. 58,000.00
VIII LAIN-LAIN
1 Upah Tenaga lantai 1 1
Upah Tenaga lantai 2 / rata-rata 1.2
2 Waterproofing coating Rp. 75,000.00
3 Waterstop L = 25 cm Rp. 100,000.00
4 Grouting Sika Grout 215 Rp. 12,000,000.00
5 Rubber sealant 1 x 1 cm Sikaflex + cutting Rp. 49,000.00
6 Selang Plastik Ø 3/4" ( pembungkus dowel ) Rp. 6,500.00
5 Ijuk Rp. 400,000.00
### Ready Mix K-250 Rp. 800,000.00
### Ready Mix K-300 Rp. 825,000.00
### Sewa Pompa Rp. 55,000.00
9 Penguin TB200 Rp. 2,500,000.00
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ bh
/ zak 2.34
/ kg
/ kg
/ kg
/ batang
/ m3
/ lbr
/ m3
/ m3
/ m3
/ m3
/ m3
/ lembar
/ kg
/ kg
/ kg
/ btg
/ btg
/ btg
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ bh
/ bh
/ bh
/ m2
/ bh
/ m3
/ bh
/ Ls
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m'
/ bh
/ bh
/ m2
/ lmbr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ ltr
/ m1
/ m1
/ m1
/ m1
/ m1
/ m1
/ m2
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ Bh
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/ btg
/m'
/m'
/m'
/m'
/m'
/m'
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
/ m2
Ls
kali
kali
/ m2 aquaproof
/m'
/ m3
/ m' Saputro
/ m' Miliard / maspion
/ m3
/ m3
/ m3
/ hr
bh
/m2
/m2
/m2
set
bh
bh
set
set
/m2
/m'
/m'
No. Uraian Pekerjaan Bahan/T.Kerja Analisa Sat
2 1 M2 Pembuatan Kantor dan Gudang Sementara Dolken Kayu Ø 8-10/ 400 cm 1.250 Btg
Kayu albasia 0.180 M3
Paku Biasa 0.850 Kg
Semen Portland 35.000 Kg
Pasir Pasang 0.150 M3
Seng Gelombang 0.250 Lbr
Playwood 3 mm 1.000 Lbr
Pekerja 0.200 Oh
Tukang Kayu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.002 Oh
5,200,000.00 3,466.67
12,000.00 240.00
5,850,000.00 7,605.00
71,500.00 7,150.00
71,500.00 7,150.00
88,000.00 880.00
88,000.00 440.00
Jumlah 26,931.67
-
-
-
-
-
-
-
-
-
-
-
Jumlah -
71,500.00 7,150.00
88,000.00 4,400.00
Jumlah 11,550.00
-
-
Jumlah -
-
-
Jumlah -
No. Uraian Pekerjaan Bahan/T.Kerja Analisa Sat
71,500.00 53,625.00
88,000.00 2,200.00
Jumlah 55,825.00
-
-
Jumlah -
-
-
Jumlah -
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
71,500.00 17,875.00
88,000.00 730.40
Jumlah 18,605.40
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
71,500.00 35,750.00
88,000.00 4,400.00
Jumlah 40,150.00
400,000.00 480,000.00
71,500.00 21,450.00
88,000.00 880.00
Jumlah 502,330.00
Jumlah
62,500.00 75,000.00
71,500.00 21,450.00
88,000.00 880.00
Jumlah 97,330.00
71,500.00 1,966.25
88,000.00 484.00
88,000.00 161.33
100,000.00 2,000.00
Jumlah 4,611.58
No. Uraian Pekerjaan Bahan/T.Kerja Analisa
m3 185,000.00 222,000.00
Oh 71,500.00 55,770.00
Oh 71,500.00 27,885.00
Oh 88,000.00 3,432.00
Oh 88,000.00 3,432.00
Jumlah 312,519.00
m3 185,000.00 222,000.00
zak 54,000.00 126,360.00
m3 400,000.00 224,400.00
Oh 71,500.00 107,250.00
Oh 71,500.00 42,900.00
Oh 88,000.00 5,280.00
Oh 88,000.00 6,600.00
Jumlah 734,790.00
I. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI
Analisa Harga Satuan Pekerjaan Penutup Lantai
Sesuai SNI 7395:2008
Lantai - Hal 24
Jumlah
Lantai - Hal 25
Keramik corak 30 x 30 cm buah 11.87 8324.90
Semen Portland Kg 10.00 1804.00
Pasir Pasang M3 0.05 227641.34
semen Warna Kg 1.50 15003.63
Pekerja Oh 0.35 70593.60
Tukang Batu Oh 0.04 98831.04
Kepala Tukang Oh 0.06 112949.76
Mandor Oh 0.03 120009.12
Jumlah
I-12 Memasang 1 M2 Lantai mosaik ukuran (30 x 30) cm, campuran spesi 1pc : 3ps
Mosaik buah 11.87 33000.00
Semen Portland Kg 14.15 1804.00
Pasir Pasang M3 0.04 227641.34
semen Warna Kg 2.00 15003.63
Pekerja Oh 0.70 70593.60
Tukang Batu Oh 0.35 98831.04
Kepala Tukang Oh 0.04 112949.76
Mandor Oh 0.04 120009.12
Jumlah
Lantai - Hal 26
semen Warna Kg 2.00 15003.63
Pekerja Oh 0.70 70593.60
Tukang batu Oh 0.35 98831.04
Kepala Tukang Oh 0.04 112949.76
Mandor Oh 0.04 120009.12
Jumlah
Lantai - Hal 27
I-18 1 M2 Lantai Parquet Jati
Parquet Jati M2 1.05 514975.92
Lem vinyl zak 0.60 31042.00
Pekerja Oh 0.70 70593.60
Tukang Kayu Oh 0.35 105890.40
Kepala Tukang Oh 0.04 112949.76
Mandor Oh 0.04 120009.12
Jumlah
Lantai - Hal 28
Jumlah
I-27 Memasang 1 m' plint vinyl karet ukuran (15 x 30) cm dengan perekat
Lantai - Hal 29
Vinyl karet buah 1.76 60500.00
Lem vinyl kg 0.08 31042.00
pekerja Oh 0.08 70593.60
Tukang Oh 0.08 98831.04
Kepala tukang Oh 0.01 112949.76
Mandor Oh 0.00 120009.12
Jumlah
Jumlah
Lantai - Hal 30
Paving block warna M2 1.01 147811.66
Pasir pasang Kg 0.10 227641.34
Pekerja Oh 0.25 70593.60
Tukang batu Oh 0.50 15003.63
Kepala Tukang Oh 0.03 112949.76
Mandor Oh 0.00 120009.12
Jumlah
Lantai - Hal 31
Plat bondex m2 1.03 385.00
Kayu Kelas II m3 0.04 2860000.00
Paku 5 - 12 cm kg 0.10 18625.20
Minyak Bekisting liter 0.05 19401.25
Plywood tebal 9 mm Lbr 0.09 194012.50
Dolken kayu galam (8-10) cm, pjng 4 m btg 1.50 439259.82
Pekerja Oh 0.17 70593.60
Tukang Kayu Oh 0.08 105890.40
Kepala Tukang Oh 0.01 112949.76
Mandor Oh 0.01 120009.12
Jumlah
I-01 Memasang 1 M2 Lantai keramik setara mulia ukuran 40 x 40 cm
keramik 40 x 40 cm buah 7.00 12675.49
Semen Portland kg 11.38 1980.00
Pasir Pasang M3 0.04 227641.34
Semen Warna Kg 1.50 15003.63
Pekerja Oh 0.35 70593.60
Tukang Batu Oh 0.04 98831.04
Kepala Tukang Oh 0.06 112949.76
Mandor Oh 0.03 120009.12
Jumlah
Lantai - Hal 32
HARGA (Rp)
#REF!
17679.20
10243.86
19504.72
17648.40
12353.88
1468.35
1560.12
#REF!
1215946.18
18040.00
10243.86
22505.45
18354.34
12848.04
1468.35
1560.12
1300966.33
43705.43
2056.56
682.92
1500.36
6353.42
8894.79
1016.55
600.05
64810.09
52312.66
2056.56
682.92
1500.36
6353.42
8894.79
1016.55
600.05
Lantai - Hal 33
73417.32
55968.00
14774.76
10243.86
41259.99
49415.52
34590.86
3953.24
4200.32
214406.56
197160.00
14774.76
10243.86
48011.63
24707.76
34590.86
3953.24
4200.32
337642.43
112697.98
18761.60
10243.86
24305.89
24707.76
3459.09
7002.89
3720.28
204899.34
76206.01
18040.00
10243.86
22505.45
24707.76
3459.09
7002.89
3720.28
165885.33
Lantai - Hal 34
98816.55
18040.00
10243.86
22505.45
24707.76
3459.09
7002.89
3720.28
188495.88
49500.00
14774.76
10243.86
24305.89
49415.52
34590.86
3953.24
4200.32
190984.45
50820.00
17679.20
10243.86
65565.88
74123.28
51886.30
5986.34
6360.48
282665.33
391710.00
25526.60
8878.01
30007.27
49415.52
34590.86
3953.24
4200.32
548281.82
42558.12
25526.60
8878.01
Lantai - Hal 35
30007.27
49415.52
34590.86
3953.24
4200.32
199129.94
69828.84
18040.00
10243.86
22505.45
18354.34
12848.04
1468.35
1560.12
154848.98
590246.56
34223.81
12000.91
16801.28
1920.15
1080.08
656272.78
98175.00
34223.81
12000.91
16801.28
1920.15
1080.08
164201.22
769636.72
14774.76
10243.86
9752.36
49415.52
34590.86
3953.24
4200.32
896567.65
Lantai - Hal 36
540724.71
18625.20
49415.52
37061.64
3953.24
4200.32
653980.63
144375.00
27006.54
49415.52
37061.64
3953.24
4200.32
266012.26
221969.00
10864.70
10589.04
15883.56
1694.25
9600.73
270601.28
17418.83
36.08
682.92
1500.36
4235.62
2964.93
338.85
360.03
27537.62
86762.39
90.20
728.45
4501.09
4235.62
2964.93
338.85
360.03
Lantai - Hal 37
99981.56
106939.69
2056.56
682.92
375.09
6353.42
8894.79
1016.55
600.05
126919.08
116600.00
2056.56
682.92
750.18
6353.42
8894.79
1016.55
600.05
136954.48
29150.00
1028.28
341.46
195.05
6353.42
8894.79
1016.55
600.05
47579.60
13512.84
2056.56
682.92
1500.36
6353.42
8894.79
1016.55
600.05
34617.50
Lantai - Hal 38
106480.00
2483.36
5647.49
7906.48
903.60
480.04
123900.97
154000.00
8471.23
11859.72
13553.97
720.05
188604.98
8580.00
715.00
8471.23
11859.72
1355.40
720.05
30981.35
37895.00
2056.56
682.92
1500.36
52945.20
74123.28
8471.23
4560.35
182234.91
127395.33
22764.13
17648.40
7501.82
2823.74
300.02
178133.43
Lantai - Hal 39
149289.77
22764.13
17648.40
7501.82
2823.74
300.02
200027.87
108427.12
22764.13
17648.40
7501.82
2823.74
300.02
159165.21
124625.87
22764.13
17648.40
7501.82
2823.74
300.02
175363.96
591091.42
22764.13
17648.40
7501.82
2823.74
300.02
641829.51
494499.06
22764.13
17648.40
7501.82
2823.74
300.02
545237.15
Lantai - Hal 40
396.55
114400.00
1862.52
970.06
17461.13
658889.73
12000.91
8471.23
1129.50
1200.09
816781.72
88728.41
22532.40
9560.94
22505.45
24707.76
3459.09
7002.89
3720.28
182217.21
Lantai - Hal 41
No. Uraian Pekerjaan Bahan/T.Kerja Analisa Sat
Pekerja 0.300 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.010 OH
Pekerja 0.300 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.010 OH
Pekerja 0.300 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.010 OH
Pekerja 0.300 OH
Tukang Batu 0.100 OH
Kepala Tukang 0.010 OH
Mandor 0.010 OH
850,000.00 63,750.00
150,000.00 11,850.00
5,000.00 5,000.00
Jumlah 80,600.00
70,000.00 21,000.00
100,000.00 10,000.00
120,000.00 1,200.00
150,000.00 1,500.00
Jumlah 33,700.00
Subtotal 114,300.00
Dibulatkan 114,300.00
850,000.00 85,000.00
150,000.00 15,750.00
5,000.00 5,000.00
Jumlah 105,750.00
71,500.00 21,450.00
71,500.00 7,150.00
88,000.00 880.00
88,000.00 880.00
Jumlah 30,360.00
Subtotal 136,110.00
Dibulatkan 136,100.00
850,000.00 106,250.00
150,000.00 19,650.00
5,000.00 5,000.00
Jumlah 130,900.00
70,000.00 21,000.00
100,000.00 10,000.00
120,000.00 1,200.00
150,000.00 1,500.00
Jumlah 33,700.00
Subtotal 164,600.00
Dibulatkan 164,600.00
850,000.00 127,500.00
150,000.00 23,625.00
5,000.00 5,000.00
Jumlah 156,125.00
70,000.00 21,000.00
100,000.00 10,000.00
120,000.00 1,200.00
150,000.00 1,500.00
Jumlah 33,700.00
Subtotal 189,825.00
Dibulatkan 189,800.00
963,000.00 96,300.00
71,820.00 7,182.00
13,500.00 13,500.00
1,500.00 1,500.00
118,482.00
963,000.00 85,707.00
71,820.00 5,673.78
13,500.00 13,500.00
1,500.00 1,500.00
Jumlah 106,380.78
64,500.00 25,800.00
15,500.00 15,500.00
2,000.00 2,000.00
Jumlah 43,300.00
75,000.00 7,500.00
11,500.00 11,500.00
19,000.00
Rp. 56,983 712.29
Rp. 9,720 9,720.00
Rp. 7,857 7,857.00
Jumlah 18,289.29
No. Uraian Pekerjaan Bahan/T.Kerja Analisa Sat
LANTAI KERJA
1 BETON 1:3:5 Semen 4.536 Zak
Kris 0.910 m3
Pasir Muntilan 0.540 m3
Pekerja 1.200 Oh
Tukang Batu 0.200 Oh
Kepala Tukang 0.020 Oh
Mandor 0.060 Oh
3 1 M3 Beton
a Beton 1:2:3 SM ( Pondasi,sloof & Btn praktis ) Semen 6.800 Zak
Kris 0.820 M3
Pasir Muntilan 0.540 M3
Pekerja 5.650 Oh
Tukang Besi 1.400 Oh
Kepala Tukang 0.323 Oh
Mandor 0.283 Oh
b Besi Beton Besi Beton 1.100 Kg
Bendrat 0.020 Kg
Tukang Besi 1.400 Oh
Kepala Tukang 0.331 Oh
Mandor 0.170 Oh
Beton Ready mix K 300 lantai Dasar / M3 Beton readymix K 300 1.0000 m3
Ongkos cor beton readymix lantai Dasar 1.0000 m3
775,000.00 775,000.00
60,000.00 60,000.00
157,500.00 189,000.00
Jumlah 1,024,000.00
15,000.00 4,050.00
12,000.00 24,000.00
25,000.00 8,333.33
33,000.00 12,283.33
15,000.00 6,346.50
12,000.00 2,400,000.00
13,000.00 39,000.00
1,050.00 339,150.00
125,000.00 65,000.00
135,000.00 105,300.00
36,000.00 174,600.00
42,500.00 14,875.00
47,500.00 74,100.00
45,000.00 63,000.00
45,000.00 14,895.00
40,000.00 6,800.00
Jumlah 3,351,733.17
54,000.00 244944.00
250,000.00 227500.00
400,000.00 216000.00
71,500.00 85800.00
71,500.00 14300.00
88,000.00 1760.00
88,000.00 5280.00
Jumlah 795,584.00
825,000.00 825,000.00
55,000.00 55,000.00
71,500.00 85,800.00
71,500.00 14,300.00
88,000.00 1,760.00
88,000.00 5,280.00
Jumlah 987,140.00
54,000.00 367,200.00
250,000.00 205,000.00
400,000.00 216,000.00
71,500.00 403,975.00
71,500.00 100,100.00
88,000.00 28,424.00
100,000.00 28,300.00
Jumlah 1,348,999.00
10,000.00 11,000.00
15,000.00 300.00
71,500.00 100,100.00
88,000.00 29,128.00
88,000.00 14,960.00
Jumlah 155,488.00
54,000.00 12,109.50
400,000.00 8,560.71
250,000.00 5,296.88
25,000.00 8,333.33
33,000.00 12,283.33
15,000.00 6,346.50
5,850,000.00 4,972,500.00
12,000.00 1,803.67
71,500.00 20,252.95
71,500.00 19,063.97
88,000.00 111,146.34
88,000.00 40,905.37
Jumlah 5,218,602.56
54,000.00 320,653.18
400,000.00 199,750.00
250,000.00 133,815.79
33,000.00 11,022.45
25,000.00 8,118.39
15,000.00 12,803.86
12,000.00 1,800.00
15,000.00 3,650.13
71,500.00 24,231.99
71,500.00 10,154.14
88,000.00 1,257.99
88,000.00 1,503.56
Jumlah 728,761.47
54,000.00 318,750.00
400,000.00 199,750.00
250,000.00 133,815.79
33,000.00 11,085.94
25,000.00 5,957.03
15,000.00 15,351.56
12,000.00 2,160.00
15,000.00 3,317.63
71,500.00 26,069.42
71,500.00 11,707.10
88,000.00 1,445.82
88,000.00 1,614.99
Jumlah 731,025.29
54,000.00 320,418.85
400,000.00 199,750.00
250,000.00 133,815.79
33,000.00 11,012.09
25,000.00 5,986.97
15,000.00 7,655.46
12,000.00 1,080.00
15,000.00 3,317.63
71,500.00 14,914.86
71,500.00 6,130.01
88,000.00 759.41
88,000.00 928.56
Jumlah 705,769.63
54,000.00 320,418.85
400,000.00 199,750.00
250,000.00 133,815.79
33,000.00 11,012.09
25,000.00 7,066.58
15,000.00 10,246.55
12,000.00 1,440.00
15,000.00 3,483.88
71,500.00 18,688.33
71,500.00 7,994.56
88,000.00 988.89
88,000.00 1,161.26
Jumlah 716,066.78
No. Uraian Pekerjaan Bahan/T.Kerja
1 1Bh - DAUN PINTU ALUMINIUM TIPE FLOOR Ambang Bawah Daun Pintu (no. kode ** : 2000)
HINGE uk. 4" x 1 3/4" Tiang Kusen Pintu (no. kode : 2001)
Ukuran Daun Pintu : 220 cm x 90 cm Penutup Ambang Bawah & Atas Daun Pintu (no. kode : 2003)
Ambang Atas Daun Pintu (no. Kode : 2005)
Sealent ex. Dow corning atau setara col. Clear / silver
Clear Glass 6 mm
Floor Hinge ex. Dekkson
Perlengkapan alat-alat & aksesories pembantu :
- Gun Sealent
- Kain Bal
- Cutter
- Aluminium Cutting Machine
- Mesin Bor
- Mata Bor aluminium dan beton
- Sekrup dan Phiser
- Paper Tape
Upah Perakitan dan Pemasangan Daun Pintu Aluminium tipe floor
hinge (include floor hinge )
Upah pemasangan aksesories : handle & lockset
Upah Pemasangan Kaca
Upah Pekerjaan Sealent
188,200.00 188,200.00
1,406.00 8,436.00
233,400.00 2,334.00
42,000.00 42,000.00
65,000.00 97,500.00
75,000.00 112,500.00
80,000.00 12,800.00
Jumlah 463,770.00
Dibulatkan 463,700.00
1,724,700.00 1,724,700.00
42,000.00 138,600.00
65,000.00 71,500.00
75,000.00 75.00
80,000.00 12,800.00
1,724,700.00 103,482.00
Jumlah 2,051,157.00
Dibulatkan 2,051,100.00
40,900.00 40,900.00
4,200.00 105.00
42,000.00 420.00
65,000.00 6,500.00
75,000.00 750.00
80,000.00 400.00
Jumlah 49,075.00
Dibulatkan 49,000.00
Rp. 66,600.00 66,600.00
Rp. 42,000.00 420.00
Rp. 65,000.00 6,500.00
Rp. 75,000.00 750.00
Rp. 80,000.00 400.00
74,670.00
1 UNIT SEPTICTANK 2.60 X 1.3 ( KAPASITAS ± 2 M3 ) POS JAGA & MUSHOLLA - P3K ( TYPE 3 )
Galian tanah 6.72 m³ 45,000.00 302,400.00
Urugan Kembali 2.24 m³ 15,187.50 34,020.00
Perataan tanah sisa galian 4.48 m³ Rp. 14,062.50 63,000.00
Pasir urug 5 cm 0.17 m³ Rp. 355,575.00 60,447.75
Beton 1:2:3 ( sloof - Plat - Kp ) 0.80 m³ Rp. 999,200.00 799,360.00
Bekisting 13.60 m² Rp. 68,315.00 929,084.00
Besi polos 141.62 kg Rp. 13,070.00 1,850,973.40
Pasangan bata 1:3 11.44 m² Rp. 129,682.80 1,483,571.23
Plesteran + acian 13.94 m² Rp. 61,302.80 854,561.03
Pasangan bata kosong 9 cm 0.34 m³ Rp. 541,500.00 184,110.00
Ijuk 0.34 m³ Rp. 400,000.00 136,000.00
Tutup manhole 40 x 40 beton 3.00 bh Rp. 150,000.00 450,000.00
7,147,527.41
1,193,598.12
Pekerjaan Persiapan
Harga
Pekerjaan satuan
(Rp.)
Direksikit m2 53.000,-
Bouwplank m1 32.000,-
Pekerjaan Pemagaran m1 33.000,-
Pekerjaan Kusen
Harga
Pekerjaan satuan
(Rp.)
Pasang Kusen Pintu unit 110.000,-
Pasang Daun Pintu Panel unit 150.000,-
Pasang Kusen Jendela unit 75.000,-
Pasang Daun Jendela unit 77.000,-
Pekerjaan Sanitasi
Harga
Pekerjaan satuan
(Rp.)
Pasang Closet Duduk unit 175.000,-
Pasang Closet Jongkok unit 100.000,-
Pasang Wall Shower unit 55.000,-
Pasang Wastafel unit 160.000,-
Pasang Floordrain unit 25.000,-
Pasang Kran unit 15.000,-
Pasang Bath unit 890.000,-
Pemipaan Air Bersih m1 20.500,-
Pemipaan Air Kotor m1 22.000,-
Bak Kontrol unit 175.500,-
Pekerjaan Pengecatan
Harga
Pekerjaan satuan
(Rp.)
Cat Dinding m2 10.500,-
Cat duco kusen (berikut material) m1 90.000,-
Cat duco daun jendela (berikut m1 90.000,-
material)
Cat duco daun pintu panel (berikut pintu 900.000,-
material)
Cat duco ram/list jendela (berikut m1 40.000,-
material)
Pekerjaan Pembongkaran
Harga
Pekerjaan satuan
(Rp.)
Bongkaran Atap m2 37.500,-
Bongkaran Dinding m2 22.000,-
Pembersihan bongkaran m2 18.000,-
6 Listplank / M2
Galvalum ex. Alspan 68
Ongkos Pasang listplank
Rangka
Cat rangka
7 Talang / M1
Zinczlume plat sheet t=0.40
Ongkos Pasang talang
Rangka siku
Cat rangka
8 Flashing / M1
Zinczlume plat sheet t=0.40
Ongkos Pasang
4 Cat eksterior ex. Mowilex Weathershield / M2 Cat eksterior ex. Mowilex Weathershield 0.010 pail
Cat dasar eksterior ex. Mowilex 0.007 pail
Amplas + material bantu 1.000 m2
Ongkos tukang 1.000 m2
5 Cat interior ex. Mowilex / M2 Cat interior ex. Mowilex 0.010 pail
Cat dasar interior ex. Mowilex 0.007 pail
Amplas + material bantu 1.000 m2
Ongkos tukang 1.000 m2
Sat.Harga Harga Sat
Total Harga
Bahan/T.Kerja Pekerjaan
25,000.00 2,500.00
30,000.00 3,000.00
75,000.00 19,500.00
42,000.00 840.00
65,000.00 4,095.00
75,000.00 472.50
80,000.00 200.00
Jumlah 30,607.50
Dibulatkan 30,600.00
30,000.00 3,600.00
75,000.00 13,500.00
42,000.00 1,176.00
65,000.00 2,730.00
75,000.00 315.00
80,000.00 200.00
Jumlah 21,521.00
Dibulatkan 21,500.00
25,000.00 2,500.00
30,000.00 3,000.00
25,000.00 9,750.00
42,000.00 1,260.00
65,000.00 6,142.50
75,000.00 712.50
80,000.00 304.00
Jumlah 23,669.00
Dibulatkan 23,600.00
1,877,904.00 18,779.04
941,868.00 6,279.12
3,240.00 3,240.00
5,000.00 5,000.00
Jumlah 33,602.16
Dibulatkan 33,600.00
1,116,828.00 11,168.28
941,868.00 6,279.12
3,240.00 3,240.00
5,000.00 5,000.00
Jumlah 25,687.40
Dibulatkan 25,600.00
No. Uraian Pekerjaan Bahan/T.Kerja Analisa Sat
1 1 m' Pipa PVC class AW 1/2" Pipa PVC class AW 1/2" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
2 1 m' Pipa PVC class AW 3/4" Pipa PVC class AW 3/4" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
3 1 m' Pipa PVC class AW 1" Pipa PVC class AW 1" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
4 1 m' Pipa PVC class AW 1-1/4" Pipa PVC class AW 1-1/4" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
5 1 m' Pipa PVC class AW 1-1/2" Pipa PVC class AW 1-1/2" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
6 1 m' Pipa PVC class AW 2" Pipa PVC class AW 2" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
7 1 m' Pipa PVC class AW 2-1/2" Pipa PVC class AW 2" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
8 1 m' Pipa PVC class AW 3" Pipa PVC class AW 3" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
9 1 m' Pipa PVC class AW 4" Pipa PVC class AW 3" 0.30 Btg
Sambungan, Fitting, Lem 1 ls
Alat bantu 1 ls
Upah pasang 1 m'
21,100.00 6,330.00
2,216.00 2,216.00
317.00 317.00
8,000.00 8,000.00
Jumlah 16,863.00
Dibulatkan 16,800.00
28,800.00 8,640.00
3,020.00 3,020.00
432.00 432.00
12,000.00 12,000.00
Jumlah 24,092.00
Dibulatkan 24,000.00
39,300.00 11,790.00
4,130.00 4,130.00
590.00 590.00
16,000.00 16,000.00
Jumlah 32,510.00
Dibulatkan 32,500.00
58,900.00 17,670.00
6,190.00 6,190.00
884.00 884.00
20,000.00 20,000.00
Jumlah 44,744.00
Dibulatkan 44,700.00
67,600.00 20,280.00
7,100.00 7,100.00
1,010.00 1,010.00
24,000.00 24,000.00
Jumlah 52,390.00
Dibulatkan 52,300.00
86500.00 25,950.00
9080.00 9,080.00
1300.00 1,300.00
32000.00 32,000.00
Jumlah 68,330.00
Dibulatkan 68,300.00
126200.00 37,860.00
13250.00 13,250.00
1890.00 1,890.00
40000.00 40,000.00
Jumlah 93,000.00
Dibulatkan 93,000.00
177800.00 53,340.00
18670.00 18,670.00
2670.00 2,670.00
48000.00 48,000.00
Jumlah 122,680.00
Dibulatkan 122,600.00
294600.00 88,380.00
30930.00 30,930.00
4420.00 4,420.00
64000.00 64,000.00
Jumlah 187,730.00
Dibulatkan 187,700.00
17 Beton Ready mix K 300 lantai Dasar / M3 Beton readymix K 300 1.0000 m3
Ongkos cor beton readymix lantai Dasar 1.0000 m3
20 Kolom praktis lantai dasar / M3 Beton site mix lantai dasar 1.0000 m3
Bekisting beton lantai dasar 13.3333 m2
Besi beton polos lantai dasar 164.0711 kg
22 Beton Ready mix K 300 lantai Atap / M3 Beton readymix K 300 1.0000 m3
Plat Dak Beton Pompa readymix 1.0000 m3
Ongkos cor beton readymix lantai Atap 1.0000 m3
`` 32 Atap metal galvalum t=0.50 ex. Alspan 68 / M2 Atap metal galvalum t=0.50 ex. Alspan 68 1.0500 m2
Screw 4.0000 bh
`` Ongkos Pasang Atap 1.0000 m2
44 1 M' Pipa PVC Ø 4" (AW) Pipa pvc Ø 4" 1.2 m'
Pekerja 0.081 org
Tukang batu 0.135 org
Kepala Tukang 0.0135 org
Mandor 0.0041 org
Perlengkapan 35 % harga pipa 0.35 lot
Jumlah
Sat.Harga Harga Sat
Total Harga
Bahan/T.Kerja Pekerjaan
Rp 70,565.20 10,867.04
Rp 27,750.00 1,384.73
Rp 3,000.00 180.00
Rp 7,560.00 7,560.00 19,991.77
Rp 7,560.00 9,072.00 21,503.77
Rp 44,632.00 6,873.33
Rp 27,750.00 1,384.73
Rp 3,000.00 180.00
Rp 7,560.00 7,560.00 15,998.05
Rp 7,560.00 9,072.00 17,510.05
Rp 75,000.00 82,500.00
Rp 14,500.00 4,828.50
Rp 54,000.00 8,812.80
Rp 400,000.00 7,760.00
Rp 43,560.00 43,560.00 147,461.30
Rp 43,560.00 52,272.00 156,173.30
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Awal
1 Pembersihan lokasi Awal
2 Buangan sampah pembersihan lokasi
3 Pasang Bouwplank (Luas Tanah) 91.88
Pasang Bouwplank (Rencana bangunan) 96.83
II PEKERJAAN TANAH
1 Galian tanah
a Galian tanah pondasi batu kali 254.72 0.58 0.50
b Galian tanah pondasi Foot plat
2 Urugan
a Urugan tanah kembali
b Pemadatan tanah 254.72 0.50
3 Tanah padas
a Urugan tanah padas 432.46 0.60
Pemadatan tanah Padas
IV PEKERJAAN BETON
1 Beton Lantai kerja 1:3:5 / m3 25.88 0.06
2 Pondasi Footplat
3 Sloof beton
a sisi depan 107.78 0.15 0.25
b sisi dalam 146.94 0.15 0.25
4 Kolom Footplate
a sisi depan
b sisi dalam
5 Kolom Praktis
a sisi depan
b sisi dalam
6 Rabat Beton
a sisi depan
b sisi dalam
6 Tiebalk 15/15
a sisi depan 137.71 0.15 0.15
b sisi dalam 117.01 0.15 0.15
7 RingBalk 15/20
a sisi depan 137.71 0.15 0.15
b sisi dalam 117.01 0.15 0.15
8 Dak Beton t=12cm
a sisi depan 0.12 145.33
b sisi dalam 0.12 141.33
9 Carport Pas.Paving Blok
10 Tangga Beton
a sisi depan 0.30 0.20 0.85 20.00
Plat Tangga t=10cm 7.20 0.85 0.10
plesteran t=3cm 0.50 0.85 20.00
b sisi dalam 0.30 0.20 0.85 20.00
Plat Tangga t=10cm 7.21 0.85 0.10
plesteran t=3cm 0.50 0.85 20.00
VI PEKERJAAN LANTAI
1 Keramik 60x60 cm
a K Tidur sisi depan
Ruang Tamu 3.00 2.62
Dapur 3.00 2.00
teras luar
b K Tidur sisi dalam
teras luar
2 Keramik lantai KM 20 x 20 cm
a sisi depan 1.50 1.50 12
b sisi dalam 1.50 1.50 16
2 Keramik dinding KM 20 x 25 cm h=2m
a sisi depan 6.00 2.05 12
b sisi dalam 6.00 2.05 16
IX PEKERJAAN LAIN-LAIN
1 Railing Tangga
depan 3.29
1.08
2.90
7.27
dalam 3.57
0.90
2.54
7.01
Bekisting
Luas bekisting 107.8 0.25 2 54
papan 2/20x3m 54 1.7 92
paku 2"-5" 54 0.30 16.2
pekerja 54 0.52 28.1
tukang 54 0.26 14.0
kepala tukang 54 0.026 1.4
mandor 54 0.026 1.4
Bekisting
Luas bekisting 1.0 0.15 2 0.30
papan 2/20x3m 0.30 1.7 0.51
paku 2"-5" 0.30 0.30 0.09
pekerja 0.30 0.52 0.16
tukang 0.30 0.26 0.08
kepala tukang 0.30 0.026 0.01
mandor 0.30 0.026 0.01
Bekisting
Luas bekisting 1.0 0.25 2 0.50
papan 2/20x3m 0.50 1.7 0.85
paku 2"-5" 0.50 0.30 0.15
pekerja 0.50 0.52 0.26
tukang 0.50 0.26 0.13
kepala tukang 0.50 0.026 0.01
mandor 0.50 0.026 0.01
730.15
1,011.46
0.16 0.54 0.59
1,460.30 3.24 10.88 11.76
2,022.91
Galian tanah Pondasi 250.41
1,460.30 fp1k1= 4bh fp2k2=17bh fp3k3=24
2,022.91
3.89 13.06 14.11
334.00 0.16 0.54 0.59
293.00 3.24 10.88 11.76
1.55
8.03
fp1 fp2 fp3
4.04
5.51 1.03 3.36 3.64
9.84 kolom1 kolom2 kolom3
5.40 1.44 4.08 4.32
6.80
2.52
3.24 rabat beton
1,243,254
124.33 33,830 235,508 872,993
114.23
3.10
2.63
- 117.01 137.71 254.72
3.10
2.63
17.44 13.185
16.96 11.858976
146.56
0.51
0.61 2x8 anak tangga+4 anak tangga 1465574.5002
8.50
0.51
0.61
8.50
-
14.48
67.60
83.20 0.92 2.70 2.00
0.82 2.20 13.00
157.05 0.68 1.33 30.00
167.52 0.88 2.70 30.00
0.50 0.54 16.00
12.00
16.00
2.48 254.72
14.43
14.43
38.02
2.16
71.52
15.00
16.00
254.72
15.00
15.00
16.00
15.50
19.15 .
179.91
187.17
Plafon t=5cm
109.88
5.07
104.81
7.50
7.50
29.00
28.72
7.00
177.79
161.18
296.20
31.06
kg
kg
m2
lbr
kg
oh kusen lt2
oh p1 0.92
oh p2 0.82
oh pj1 0.68
0.88
Bouven 0.50
kusen lt1
p1 0.92
p2 0.82
pj1 0.68
0.88
Bouven 0.50
kg
kg
m2
lbr
kg
oh
oh
oh
oh
kg
kg
m2
lbr
kg
oh
oh
oh
oh
an tanah pondasi batu kali Pondasi Batu Belah Luas Bgnan lt 1
depan total panjang 196.22 58.50 depan
254.72 0.17 0.18 13.85
27.00 pengurangan 32.38 10.47 22.59
6.05 14.66 45.32
2.00 14.94 81.75
2.00 0.55
2.00 15.93
4.00 12.42
2.05 58.50
3.00
3.00
3.00 mendatar tegak
3.00
3.53 1,494.00 362.00
3.50 1,592.00 415.00
3.50 4,200.00 362.00
3.53 354.00 150.00
3.00 400.00 150.00
3.53 200.00 150.00
14.66 200.00 415.00
17.05 400.00 150.00
1.85 207.00 362.00
14.04 143.00 308.00
12.42 461.00 150.00
137.71 200.00 361.00
200.00 150.00
400.00 308.00
204.00 150.00
461.00 150.00
700.00 300.00
184.00 300.00
1,403.00 300.00
300.00
20,162.00 13,403.00 5,293.00
dalam depan
pjg total
36.00 27.00
14.94 6.05
15.93 2.00
3.54 2.00
4.00 2.00
2.00 4.00
2.00 2.05
4.00 3.00
2.06 3.00
3.62 3.00
4.15 3.00
3.62 3.53
4.15 3.50 300.00
3.62 3.50 150.00
3.08 3.53 353.00
3.61 3.00 150.00
3.08 3.53 350.00
3.61 14.66 350.00
17.05 353.00
1.85 150.00
14.04
12.42
117.01 137.71
tu jendela bouven
2.70 1 2.48
2.20 5.0 9.02
1.33 14.0 12.62
2.70 14.0 33.26 300.00
0.54 8 2.16
59.55
131.49
160.13
6.35
297.97
7.50
P1 lantai 1 R.tidur lantai 2 R.tidur R. Tidur Penjaga Ruang Tamu
0.68 45.56 45.56 6.35 7.50
0.30 38.19 38.19
0.98 47.74 76.38
131.49 160.13 6.35
idur Penjaga
315.14
367.93
Atap
depan dalam
32.71 16.02 15.91
5.50 6.22 5.50
179.91 99.64 87.52
350.00
353.00
150.00
350.00
350.00
353.00
150.00
350.00
dalam depan 350.00
pjg total 1,494 14.94 353.00
36.00 27.00 1,592 15.92 150.00
14.94 6.05 354 3.54 350.00
15.93 2.00 400 4.00 350.00
3.54 2.00 200 2.00 353.00
4.00 2.00 200 2.00 150.00
2.00 4.00 400 4.00 350.00
2.00 2.05 207 2.07 350.00
4.00 3.00 3,600 36.00 353.00
2.06 3.00 362 3.62 150.00
3.62 3.00 416 4.16 350.00
4.15 3.00 362 3.62 350.00
3.62 3.53 415 4.15 353.00
4.15 3.50 362 3.62 150.00
3.62 3.50 308 3.08 350.00
3.08 3.53 361 3.61 350.00
5.17 4.00
32.00 16.00
66.76 165.44 64.00
296.20
padas
dalam 1,027,522.56 0.60
depan 1,047,968.45 0.60
tengah 1,881,136.01 0.34
Luas Bgnan lt 2
dalam depan dalam
46.45 45.30 105.15
58.70 45.18
112
144
256
1,466.00
sponengan
lantai 2 lantai 1 lantai 2
depan dalam dalam
154.00 160.00 133.00
300.00
150.00
350.00
353.00
150.00
350.00
350.00
150.00
350.00
350.00
353.00
350.00
350.00
150.00
350.00
350.00
7,842.00 3,054,086.05
kp
k3 k4
41.00 41.00
- 25.00
k3
0.05
1.85
-
Harga Sat
No. Uraian Pekerjaan Total Harga
Pekerjaan
1 PEKERJAAN PERSIAPAN
1 m2 Pembersihan lokasi Awal 11,550.00
1 Rit Buangan sampah pembersihan lokasi
1 m' Pasang Bouwplank 26,931.67
1 Ls Air Kerja
1 Ls Listrik Kerja
1 Ls Administrasi
2 PEKERJAAN TANAH
1m3 Galian tanah 55,825.00
1m3 Urugan tanah Kembali Galian tanah biasa sedalam 1 meter 18,605.40
1 m3 Urugan tanah padas 97,330.00
1m2 Pemadatan Tanah Pondasi (dgn Mesin Stamper) 4,611.58
1m3 Pasir Urug 502,330.00
3 PEKERJAAN PASANGAN
1 m3 Pasangan Aanstamping 312,519.00
1 m3 Pasangan Pondasi Batu Belah 1:6 734,790.00
1 m2 Pasangan bata Ringan t=10 cm 136,100.00
1 m2 Plesteran PM t=1cm 43,300.00
1 m2 Acian PM t=3mm 19,000.00
1 m' Sponeng 18,289.29
4 PEKERJAAN BETON
1 m3 Lantai Kerja 1:3:5 795,584.00
1 m3 Pondasi Footplat 987,140.00
1 m3 Sloof beton 728,761.47
1 m3 Kolom Setempat 978,300.00
1 m3 Kolom Praktis 731,025.29
1 m2 Rabat Beton 125,840.00
1 m3 Tiebalk 15/15 705,769.63
1 m3 Ringbalk 15/20 716,066.78
1 m3 Dak Beton t=12cm 1,024,000.00
1 m2 Vehicles Pas.Paving Blok 147,281.35
1 m3 Tangga Beton (Bata)
1 m3 Plat Tangga t=10cm
1 m2 plesteran t=3cm
7 PEKERJAAN LANTAI
1m2 Keramik lantai 60x60 cm
1m2 Keramik lantai KM 20x20 cm
8 PEKERJAAN CAT
1 m2 cat dinding dalam
1 m2 cat dinding luar
8 PEKERJAAN ATAP
1 m2 Atap Plafon GRC t = 4 mm + Rangka Besi Hollow
1 m2 Rangka Atap Baja Ringan
1 m2 Atap Genteng Metal
9 PEKERJAAN SANITASI
Closet Duduk
Kran Air
Shower mandi exs. WASHER
Floor Drain
Bak Dapur
Pipa pvc Ø 4"
Pipa pvc Ø 3"
Pipa pvc Ø 3/4"
Torn air 2000 liter
1 Unit Septictank 2.60 X 1.3 ( KAPASITAS ± 2 M3 )
1 Unit Peresapan Ø 100 h = 2 m
10 PEKERJAAN LAIN-LAIN
Railing Tangga
Railing Pagar Lantai 2 dan Penghubung
Proyek : Rumah Kos Kosan
Lokasi : Kudus
Owner/Pemilik : Bpk Gunawan
Tahun : 2018
RENCANA ANGGARAN BIAYA (RAB)
HARGA SATUAN
NO ITEM PEKERJAAN VOLUME SATUAN
Rp.
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Awal 432.46 m2 11,550.00
2 Buangan sampah pembersihan lokasi rit
3 Pasang Bouwplank 188.71 m' 26,931.67
4 Air Kerja 1.00 ls
5 Listrik Kerja 1.00 ls
6 Administrasi 1.00 ls
II PEKERJAAN TANAH
1 Galian tanah
a Galian tanah pondasi batu kali 73.23 m3 55,825.00
b Galian tanah pondasi Foot plat 31.06 m3 55,825.00
2 Urugan tanah kembali 34.76 m3 18,605.40
3 Tanah padas
a Urugan tanah padas 259.47 m3 97,330.00
b Pemadatan tanah Padas 259.47 m2 4,611.58
4 Urugan Pasir bawah Pondasi 6.37 m2 502,330.00
IV PEKERJAAN BETON
1 Lantai Kerja 1:3:5 1.55 m3 795,584.00
2 Pondasi Footplat 8.03 m3 987,140.00
3 Sloof beton
a sisi depan 4.04 m3 728,761.47
b sisi dalam 5.51 m3 728,761.47
4 Kolom Setempat
a sisi depan 5.40 m3 978,300.00
b sisi dalam 6.80 m3 978,300.00
5Kolom Praktis
asisi depan 2.52 m3 731,025.29
bsisi dalam 3.24 m3 731,025.29
6Rabat Beton
asisi depan 124.33 m2 125,840.00
bsisi dalam 114.23 m2 125,840.00
7Tiebalk 15/15
asisi depan 3.10 m3 705,769.63
bsisi dalam 2.63 m3 705,769.63
8Ringbalk 15/20
asisi depan 3.10 m3 716,066.78
bsisi dalam 2.63 m3 716,066.78
9Dak Beton t=12cm
asisi depan 17.44 m3 1,024,000.00
bsisi dalam 16.96 m3 1,024,000.00
10Vehicles Pas.Paving Blok 146.56 m2 147,281.35
11Tangga Beton
asisi depan 0.51 m3 3,620,670.00
Plat Tangga t=10cm 0.61 m3 3,620,670.00
plesteran t=3cm 8.50 m2 39,648.31
b sisi dalam 0.51 m3 3,620,670.00
Plat Tangga t=10cm 0.61 m3 3,620,670.00
plesteran t=3cm 8.50 m2 39,648.31
VI PEKERJAAN LANTAI
1 Keramik lantai 60x60 cm
a K Tidur sisi depan+ R Jaga 126.96 m2 156,173.30
Ruang Tamu 7.86 m2 156,173.30
Dapur 6.00 m2 156,173.30
teras luar 151.94 m2 156,173.30
b K Tidur sisi dalam 188.18 m2 156,173.30
teras luar 25.11 m2 156,173.30
2 Keramik Lantai KM 20x 20 cm
a KM sisi depan 27.00 m2 151,201.30
b KM sisi dalam 36.00 m2 151,201.30
3 Keramik Dinding KM
a KM sisi depan 147.60 m2 155,557.30
b KM sisi dalam 196.80 m2 155,557.30
IX PEKERJAAN SANITASI
1 Closet Duduk
a sisi depan 14.00 bh 1,595,400.00
b sisi dalam 16.00 bh 1,595,400.00
2 Kran Air
a sisi depan 28.00 bh 49,000.00
b sisi dalam 32.00 bh 49,000.00
3 Shower mandi exs. WASHER
a sisi depan 14.00 bh 431,250.00
b sisi dalam 16.00 bh 431,250.00
4 Floor Drain
a sisi depan 15.00 bh 74,670.00
b sisi dalam 16.00 bh 74,670.00
5 Bak Dapur 1.00 bh 420,900
8 Pipa pvc Ø 4" 177.79 m' 59,052.31
9 Pipa pvc Ø 3" 161.18 m' 46,864.81
10 Pipa pvc Ø 3/4" 296.20 m' 24,414.81
11 Torn air 2000 liter 2.00 bh 2,500,000.00
12 1 Unit Septictank 2.60 X 1.3 ( KAPASITAS ± 2 M3 ) 1.00 unit 7,147,527.41
13 1 Unit Peresapan Ø 100 h = 2 m 1.00 unit 1,193,598.12
X PEKERJAAN LAIN-LAIN
1 Railing Tangga
a sisi depan 7.50 m' 450,000.00
b sisi dalam 7.50 m' 450,000.00
2 Railing Pagar Lantai 2 dan Penghubung
a sisi depan 29.00 m' 450,000.00
b sisi dalam 28.72 m' 450,000.00
c sisi tengah 7.00 m' 450,000.00
Terbilang : TOTAL
Enam Belas Juta Empat Ratus Delapan Puluh Satu Ribu Rupiah FEE JASA 6%
GRAND TOTAL
PEMBULATAN
(Yuspika Juantoro)
PIMPINAN
Catatan :
1 Harga diatas tidak mengikat, dapat berubah sewaktu-waktu.
2 Apabila ada kerja tambah kurang, akan diperhitungkan kemudian.
3 Penawaran ini berlaku selama 1 bulan sejak diterbitkan.
JUMLAH HARGA sisi depan= bagian depan jalan masuk (Tahap II)
Rp. sisi dalam= bagian belakang (Tahap I)
1,322,902,848.01 total biaya
10,077,138.71 382.530 luas tanah
4,994,863.89 3,458,296.49 harga per m2
-
5,082,274.82
36,118,622.58
4,088,176.40 55,825.00
1,733,701.20 55,825.00
646,773.32 18,605.40
25,254,550.79 122,760.00
1,196,583.43 3,943.33
3,198,837.44 421,110.00
504,948,143.02
7,960,483.97 247,770.00
31,484,134.96 644,173.71
99,373,251.68 139,400.00
137,659,041.83 139,400.00
63,230,886.08 43,300.00
87,592,013.39 43,300.00
27,745,654.40 19,000.00
38,435,294.56 19,000.00
6,108,621.43 18,289.29
5,358,760.71 18,289.29
136,047,453.09
1,235,382.84 842,320.80
7,928,362.98 978,300.00
2,945,471.67 3,862,720.00
4,015,657.88 3,862,720.00
5,282,820.00 978,300.00
6,647,548.50 978,300.00
1,842,183.72 3,862,720.00
2,368,521.93 3,862,720.00
15,645,103.36 125,840.00
14,375,093.30 125,840.00
2,186,809.56 3,862,720.00
1,858,097.35 3,862,720.00
2,218,715.02 3,862,720.00
1,885,206.92 3,862,720.00
17,858,420.92 1,024,000.00
17,366,995.79 1,024,000.00
21,585,179.09 147,281.35 1465574.5002
1,846,541.70 3,620,670.00
2,215,850.04 3,620,670.00
337,010.60 39,648.31
1,846,541.70 3,620,670.00
2,218,927.61 3,620,670.00
337,010.60 39,648.31
106,068,137.50
1,458,860.00 97,750.00
6,810,700.00 97,750.00
8,382,400.00 97,750.00
15,822,787.50 97,750.00
16,877,640.00 97,750.00
4,830,000.00 402,500.00
6,440,000.00 402,500.00
8,193,750.00 546,250.00
8,740,000.00 546,250.00
12,960,000.00 864,000.00
15,552,000.00 864,000.00
34,925,902.50
8,855,000.00 316,250.00
10,752,500.00 316,250.00
3,542,000.00 63,250.00
4,301,000.00 63,250.00
603,750.00 40,250.00
644,000.00 40,250.00
603,750.00 40,250.00
644,000.00 40,250.00
2,227,492.50 143,750.00
2,752,410.00 143,750.00
75,109,455.91 50673306.868
-
19,827,762.17 156,173.30
1,227,522.14 156,173.30
937,039.80 156,173.30
23,728,565.15 156,173.30
29,388,566.66 156,173.30
3,922,058.17 156,173.30
4,082,435.10 151,201.30
5,443,246.80 151,201.30
22,960,257.48 155,557.30
30,613,676.64 155,557.30
111,717,120.00
32,999,400.00 33,600.00
23,763,840.00 25,600.00
31,190,040.00 33,600.00
23,763,840.00 25,600.00
133,405,495.08
9,579,177.00 91,400.00
3,139,178.70 91,400.00
12,917,833.78 91,400.00
3,064,322.10 91,400.00
29,586,096.87 164,454.00
30,780,180.92 164,454.00
21,730,828.70 120,790.58
22,607,877.00 120,790.58
105,100,542.53
22,335,600.00 1,595,400.00
25,526,400.00 1,595,400.00
-
1,372,000.00 49,000.00
1,568,000.00 49,000.00
6,037,500.00 431,250.00
6,900,000.00 431,250.00
1,120,050.00 74,670.00
1,194,720.00 74,670.00
420,900.00 420,900.00
10,498,910.19 59,052.31
7,553,670.08 46,864.81
7,231,666.72 24,414.81
5,000,000.00 2,500,000.00
7,147,527.41 7,147,527.41
1,193,598.12 1,193,598.12
35,874,000.00
3,375,000.00 450,000.00
3,375,000.00 450,000.00
13,050,000.00 450,000.00
12,924,000.00 450,000.00
3,150,000.00 450,000.00
1,322,902,848.01 1,485,753,582.06
79,374,170.88
1,402,277,018.89
1,402,277,000.00
8 1 M3 Pasang Batu Merah Kosong Batu Merah 465.0000 Bj Rp. 700.00 325,500.00
Upah 1.0000 M3 Rp. 180,000.00 180,000.00
9 1 M2 Acian plat / lantai / rabat Semen 0.0500 Zak Rp. 69,000.00 3,450.00
Upah 1.0000 M2 Rp. 10,125.00 10,125.00
10 1 M2 Cat Dinding dalam Cat Tembok 2x 0.2500 Ltr Rp. 44,632.00 11,158.00
Mowilex ( BARU ) 2 x roll Alkali Resist Sealer 1x 0.1250 Ltr Rp. 38,605.00 4,825.63
Media Dinding dg SEMEN INSTANT Ambril 0.1500 Lb Rp. 3,135.00 470.25
Upah 1.0000 M2 Rp. 9,000.00 9,000.00
11 1 M2 Cat Dinding Luar Cat Tembok 2x 0.2500 Ltr Rp. 70,565.20 17,641.30
Mowilex Weathercoat ( BARU ) 2x roll Alkali Resist Sealer 1x 0.1250 Ltr Rp. 38,605.00 4,825.63
Media Dinding dg SEMEN INSTANT Ambril 0.1500 Lb Rp. 3,135.00 470.25
Upah 1.0000 M2 Rp. 9,000.00 9,000.00
12 1 M2 Cat Dinding INTERIOR Cat Tembok 2x 0.25 Ltr Rp. 44,632.00 Rp. 11,158.0
Mowilex ( CAT ULANG ) 2 x roll Wallsealer 1X 0.0625 Ltr Rp. 35,950.00 Rp. 2,246.9
Ambril 0.15 Lbr Rp. 3,135.00 Rp. 470.3
Upah 1.0000 M2 Rp. 10,000.00 Rp. 10,000.0
13 1 M2 Cat Dinding EXTERIOR Cat Tembok 2x 0.25 Ltr Rp. 70,565.2 Rp. 17,641.3
Mowilex Weathercoat Wallsealer 1X 0.0625 Ltr Rp. 35,950.00 Rp. 2,246.9
( CAT ULANG ) 2 x roll Ambril 0.15 Lb Rp. 3,135.00 Rp. 470.3
Upah 1.0000 M2 Rp. 10,000.00 Rp. 10,000.0
17 1 unit BAK KONTROL 50x50 Galian tanah 0.5100 M3 Rp. 45,000.00 22,950.00
Buangan tanah keluar 0.5100 M3 Rp. 54,000.00 27,540.00
Urugan pasir 5 cm 0.0320 M3 Rp. 357,187.50 11,430.00
Pas bata 1:3 0.1500 m2 Rp. 124,566.30 18,684.95
Plesteran 1:3 1.4500 m2 Rp. 54,424.80 78,915.96
Siku pengaman 2 sisi 15.0000 Kg Rp. 14,200.00 213,000.00
18 1 M2 Batu andhesite bakar 20x20 Andhesite bakar 1.1000 M2 Rp. 200,000.00 220,000.00
Semen 0.1632 Zak Rp. 69,000.00 11,260.80
Pasir muntilan 0.0194 M3 Rp. 285,000.00 5,529.00
Upah 1.0000 M2 Rp. 34,875.00 34,875.00
19 1 M' SALURAN BATU BELAH Galian tanah 0.9000 M3 Rp. 45,000.00 40,500.00
Buangan tanah keluar 0.9000 M3 Rp. 54,000.00 48,600.00
Urugan pasir 5 cm 0.0500 M3 Rp. 357,187.50 17,859.38
Pas batu belah 1:5 0.6400 m3 Rp. 690,195.00 441,724.80
Beraben 1:5 2.0000 m2 Rp. 22,064.40 44,128.80
Plesteran 1:3 2.0000 m2 Rp. 54,424.80 108,849.60
Sponengan 3.0000 m' Rp. 7,875.00 23,625.00
2 Besi Beton Kolom / balok Besi Beton 1.1000 Kg Rp. 9,200.00 10,120.00
Bendrat 0.0200 Kg Rp. 12,500.00 250.00
Upah 1.0000 Kg Rp. 2,250.00 2,250.00
12,620.00
D LANTAI KERJA
1 BETON 1:2:3 Semen 6.8000 Zak Rp. 69,000.00 469,200.00
Kris 0.8200 M3 Rp. 215,000.00 176,300.00
Pasir Muntilan 0.5400 M3 Rp. 285,000.00 153,900.00
Upah Cor 1.0000 M3 Rp. 168,750.00 168,750.00
1 M3 Beton Lantai Kerja 968,150.00
K DOWEL LANTAI
1 Dowel LANTAI Besi Ø 16 mm 1.3800 kg Rp. 9,200.00 12,696.00
Ø 16 L = 100 cm tiap jarak 50 cm Selang pelindung 50 c 0.5000 M' Rp. 10,000.00 5,000.00
Upah pasang 1.0000 bh Rp. 562.50 562.50
18,258.50
Tahun 2016
upah baru
+12,5 %
Total Harga
17,336.00
45,000.00 Rp. 22,000.00
15,187.50 Rp. 7,000.00
88,312.50
690,195.00
22,064.40
OK terupdate
Rp. 12,000.00
67,592.10 Rp. 10,000.00
16,950.00
25,453.88
31,937.18
23,875.13
30,358.43
43,105.25
29,813.25
384,125.00
372,520.91
271,664.80
725,287.58
Rp 145,750.00
93,196.80
140,809.40
144,109.20
91,471.80
101,596.80
25,797.18
OK terupdate
Rp. 75,000.00
Rp. 900.00
Rp. 7,500.00
OK terupdate
Rp. 80,000.00
Rp. 900.00
Rp. 25,000.00
Rp. 10,000.00
Rp. 65,000.00
Rp. 65,000.00
Rp. 2,500.00
Rp. 2,500.00
Rp. 65,000.00
No. Nama Material Berat Jenis Tabel berat Besi
1 Pasir
Kerikil, Koral, Split 1.400 kg/m3 mm
2 (kering/lembab)
Tanah, Lempung 1.800 kg/m3 6
3 (kering/lembab) 1.700 kg/m3 8
4 Tanah, Lempung (basah) 2.000 kg/m3 10
5 Batu
Batu Alam
Belah, Batu Bulat, 2.600 kg/m3 12
6 Batu Gunung 1.500 kg/m3
7 Batu Karang 700 kg/m3
8 Batu Pecah 1.450 kg/m3
9 Pasangan Bata Belah,
Pasangan Batu Merah 1.700 kg/m3
10 Bulat, Gunung 2.200 kg/m3
11 Pasangan Batu Cetak 2.200 kg/m3
12 Pasangan Batu Karang 1.450 kg/m3
13 Kayu (Kelas I) 1.000 kg/m3
14 Beton 2.200 kg/m3
15 Beton Bertulang 2.400 kg/m3
16 Besi Tuang 7.250 kg/m3
17 Baja 7.850 kg/m3
18 Timah/Timbel 11.400 kg/m3
Semen
Mutu Beton (kg) Pasir (kg) Kerikil (kg) Air (liter) w/c ratio
7.4 MPa (K 100) 247 869 999 215 0.87
9.8 MPa (K 125) 276 828 1012 215 0.78
12.2 MPa (K 150) 299 799 1017 215 0.72
14.5 MPa (K 175) 326 760 1029 215 0.66
16.9 MPa (K 200) 352 731 1031 215 0.61
19.3 MPa (K 225) 371 698 1047 215 0.58
21.7 MPa (K 250) 384 692 1039 215 0.56
24.0 MPa (K 275) 406 684 1026 215 0.53
26.4 MPa (K 300) 413 681 1021 215 0.52
28.8 MPa (K 325) 439 670 1006 215 0.49
31.2 MPa (K 350) 448 667 1000 215 0.48
m3
1m3 sloof 15x25 4.04 tabel
1 1m3 beton
semen 4.04 299 1,208.48 kg 24 zak
pasir 4.04 799 3,229.36 kg 2.0 m3
kerikil 4.04 1017 4,110.46 kg 2.2 m3
pekerja 4.04 1.65 6.67 oh
tukang 4.04 0.275 1.11 oh
kepala tukang 4.04 0.03 0.12 oh
mandor 4.04 0.083 0.34 oh
3 bekisting 107.78
luas 0.25 2 53.89 m2
papan 53.89 1.7 91.613 lbr
paku 53.89 0.3 16.167 kg
pekerja 53.89 0.52 28.0228 oh
tukang 53.89 0.26 14.0114 oh
kepala tukang 53.89 0.026 1.40114 oh
mandor 53.89 0.026 1.40114 oh
3 bekisting 256
luas 0.15 4 153.6 m2
papan 153.6 1.7 261.12 lbr
paku 153.6 0.3 46.08 kg
pekerja 153.6 0.52 79.872 oh
tukang 153.6 0.26 39.936 oh
kepala tukang 153.6 0.026 3.9936 oh
mandor 153.6 0.026 3.9936 oh
3 bekisting 254.72
luas 0.15 2 76.416 m2
papan 76.416 1.7 129.9072 lbr
paku 76.416 0.3 22.9248 kg
pekerja 76.416 0.52 39.73632 oh
tukang 76.416 0.26 19.86816 oh
kepala tukang 76.416 0.026 1.986816 oh
mandor 76.416 0.026 1.986816 oh
3 bekisting 254.72
luas 0.20 2 101.89 m2
papan 101.89 1.7 173.21 lbr
paku 101.89 0.3 30.57 kg
pekerja 101.89 0.52 52.98 oh
tukang 101.89 0.26 26.49 oh
kepala tukang 101.89 0.026 2.65 oh
mandor 101.89 0.026 2.65 oh