You are on page 1of 6

PROGRES PEKERJAAN

PROYEK ; SOMERSED GF 1 NO 77
ALAMAT ; CITRALEND
SURABAYA
NO ITEM PEKERJAAN SAT HARGA
LANTAI 1
EXTERIOR
A PEKERJAAN BONGKARAN
1 Bongkar pintu dan kusen bh 4 Rp 150,000
2 Bonkar dindinng batu alam m2 20 Rp 100,000
3 Pasang bata merah m2 25 Rp 250,000
4 cat dinding dan plafon m2 15 Rp 50,000
5 pasang kolom praktis m1 6 Rp 150,000
6 Benangan m1 60 Rp 25,000
B INTERIOR
1 bongkar kermik toilet m2 25 Rp 75,000
2 pasang keramik dinding dan lantai toilet m2 25 Rp 150,000
3 Pasang plint granit lantai m1 85 Rp 25,000
4 asang tali air aluminium di atas plint granit m1 85 Rp 10,000
5 Pasang plafon toilet m2 6 Rp 150,000
6 Pasang list plafon gypsum m1 100 Rp 30,000
7 perubahan tinggi opening pintu bh 2 Rp 200,000
8 pekerjaan partisi dinding kalsi board 8mm m2 15 Rp 250,000
TOTAL
NO ITEM PEKERJAAN SAT VOL HARGA
LANTAI 2 ( DUA )
EXTERIOR (DEPAN )
A PEKERJAAN BONGKARAN
1 Bongkar pintu dan kusen bh 3 Rp 150,000
2 Bonkar dindinng batu alam m2 18 Rp 100,000
3 Pasang bata merah m2 8 Rp 250,000
4 cat dinding dan plafon m2 15 Rp 50,000
5 Bongkar prfil beton m1 15 Rp 100,000
6 Benangan m1 40 Rp 25,000
7 flesing atap roof top m1 8 Rp 40,000
8 plaster dinding m2 35 Rp 175,000
A1 EXTERIOR ( BELAKANG)
1 Cor beton atap m3 2.5 Rp 6,000,000
2 Aquaproof lantai m2 12 Rp 50,000
3 Pasang tandon air stanles 1500 ltr bh 1 Rp 4,000,000
4 Instalasi air bersih m1 40 Rp 30,000
5 Instalasi air panas m1 20 Rp 50,000
B INTRIOR
1 Bongkar keramik dinding dan lantai toilet
toilet utama dan lantai ruangan m2 170 Rp 75,000
2 Pasang keramik lantai granit ruangan dan
dinding toilet tengah dan toilet utama m2 170 Rp 150,000
3 Pasang plint lantai granit m1 85 25000
4 Pasang tali air aluminium m1 85 Rp 10,000
TOTAL
JUMLAH 14-Nop TOTAL

Rp 600,000 100% Rp 600,000


Rp 2,000,000 100% Rp 2,000,000
Rp 6,250,000 100% Rp 6,250,000
Rp 750,000 50% Rp 375,000
Rp 900,000 100% Rp 900,000
Rp 1,500,000 100% Rp 1,500,000

Rp 1,875,000 100% Rp 1,875,000


Rp 3,750,000 50% Rp 1,875,000
Rp 2,125,000 100% Rp 2,125,000
Rp 850,000 50% Rp 425,000
Rp 900,000 50%
Rp 3,000,000 100% Rp 3,000,000
Rp 400,000 100% Rp 400,000
Rp 3,750,000 100% Rp 3,750,000
Rp 28,650,000 Rp 25,075,000
JUMLAH 14-Nop TOTAL

Rp 450,000 100% Rp 450,000


Rp 1,800,000 100% Rp 1,800,000
Rp 2,000,000 100% Rp 2,000,000
Rp 750,000
Rp 1,500,000 100% Rp 1,500,000
Rp 1,000,000 100% Rp 1,000,000
Rp 320,000 100% Rp 320,000
Rp 6,125,000 100% Rp 6,125,000
Rp 15,000,000 100% Rp 15,000,000
Rp 600,000 100% Rp 600,000
Rp 4,000,000
Rp 1,200,000
Rp 1,000,000 100% Rp 1,000,000

Rp 12,750,000 100% Rp 12,750,000


Rp -
Rp 25,500,000 75% Rp 19,125,000
Rp 2,125,000 100% Rp 2,125,000
Rp 850,000 100% Rp 850,000
Rp 64,645,000
NO ITEM PEKERJAAN SAT
LANTAI 2 ( DUA )
C INTERIOR
1 Bongkar pasang plafon m2 15
2 pasang list plafon m1 85
3 Pasang bata merah m2 5
4 cat dinding dan plafon m2 335
5 Benangan pintu perubahan tinggi bh 5
6 pasang plafon dan toilet m2 170
7 Bongkar keramik tangga m2 7
8 pasang bata merah anak tangga m2 3
9 pasang keramik tangga m2 10
10 Pasang relling tangga m1 10
HARGA JUMLAH 14-Nop TOTAL

Rp 150.000 Rp 2.250.000 75% Rp 1,687,500


Rp 30.000 Rp 2.550.000 75% Rp 1,912,500
Rp 250.000 Rp 1.250.000 100% Rp 1,250,000
Rp 30.000 Rp 10.050.000 50% Rp 5,025,000
Rp 200.000 Rp 1.000.000 100% Rp 1,000,000
Rp 75.000 Rp 12.750.000 100% Rp 12,750,000
Rp 75.000 Rp 525.000 100% Rp 525,000
Rp 200.000 Rp 600.000 100% Rp 600,000
Rp 200.000 Rp 2.000.000 100% Rp 2,000,000
Rp 150.000 Rp 1.500.000 100% Rp 1,500,000
TOTAL Rp 28,250,000
SAMPAI SAAT INI LEMBAR 1 Rp 171,725,000
LEMBAR 2 Rp 117,970,000
TOTAL Rp 289,695,000
PENGAMBILAN Rp 255,000,000
SISA YG HARUS DI BAYARKAN Rp 34,689,000

SURABAYA ,05 - Desember 2020