You are on page 1of 43

WHY

INVESTMEST
IN
PALGHAR
DISTRICT
PROFITABLE ???
NEW DISTRICT
NEW DEVELOPMENT
PALGHAR-BOISAR
ARE THE NEXT SMART CITIES
MAJOR EXPANSION IN ALL SECTORS

BIG BRANDS
ALREADY IN PROPERTY MARKET

OPPORTUNITY FOR BIGGER PROFITS


PROPERTY GROWTH RATE IN BOISAR

3000 - 4000

1500
1000
RATE

500

YEAR 2000 2005 2010 2017 - 18


WHAT
ARE
THE
REASONS
???
Palghar District is a district in the state of Maharashtra in Konkan Division.
On 1 August 2014, the Maharashtra State government announced the formation
of the 36th district of Maharashtra, when a new Palghar District was carved out of
the old Thane District. Palghar District starts from Dahanu at the north and ends at
Naigaon, It comprises of the talukas of Palghar, Wada, Vikramgad, Jawhar, Mokhada,
Dahanu, Talasari and Vasai-Virar. At the 2011 Census, the talukas now comprising the
district had a population of 2,990,116.
WESTERN RAILWAY LOCAL TILL DAHANU
NEW UPCOMING 8 STATIONS

SARTODI CHINTUPADA PANCHALI


BSES COLON
WADHIV MAKUNSAR KHARALE ROAD WANJARWADA

VIRAR SAPHALE PALGHAR BOISAR DAHAN


VAITARNA KELWA UMROLI VANGAON

EXISTING STATION
4 TRACK COMPLETION BY 2019
BIGGEST MIDC

AND AROUND 2000 INDUSTRIAL UNITS


INCLUDING JINDAL STEEL, TATA STEEL, VIRAJ,
AARTI DRUGS, LUPIN, SIYARAMS & MANY MORE…
JNPT to build Rs. 10,000 crore satellite port at Wadhwan
JNPT will hold a 74% stake in the project, the Maharashtra Maritime Board will hold the rest

The new-age port will be built to accommodate large-sized foreign vessels that
require up to 60-80 metres of draft. “We need a port which has a natural draft of
at least over 16 metres and Wadhwan has a 20-metre draft. The proposed port
will have a capacity of 40-60 million tonnes and it could play a critical role in
coastal shipping and in environmentally-friendly handling of cargo.
JSW NANDGAON JETTY
Located 110km north of Mumbai.
Proposed captive facility will have capability to handle Bulk Container,
LNG, Chemicals and other cargoes.
Primarily developed for captive need, the facility can handle
commercial cargo up to 25% of the capacity
(MMB Port Policy 2016).

The 6 facilities would include:


6 General Cargo berths including Containers.
1 Coal Berth.
1 LNG Berth.
3 Chemicals & Other Liquid Cargo Berths.
200 Acres of storage facility.
PROPOSED BARODA-JNPT EXPRESSWAY
DAHANU-MUMBAI PROPOSED COASTAL HIGHWAY
BULLET TRAIN STOP AT BOISAR

Mumbai-Ahmedabad bullet train: The soil testing is done to identify


the nature of the soil and the rock strata and to ascertain if the site
can support the structure. The construction of the corridor will begin
in 2018 and is expected to be completed by 2023.
PICNIC SPOTS FRESH SEAFOOD

BEAUTIFUL BEACHES FRESH VEGETABLES


PALGHAR
JUST
4.4 KMS
FROM
PALGHAR
RAILWAY
STATION
(WEST)
EASY
CONNECTIVITY
FROM PALGHAR STATION
DUM – DUM / AUTO RICKSHAW / BUS UPTO OUR PROJECT
PROJECT LAYOUT AND AREA SUMMARY
N.A. BUNGALOW PLOTS PROJECT

BOISAR
Successfully Completed Project With All Title Clear Documents
EASY
CONNECTIVITY
FROM BOISAR STATION
DUM – DUM / AUTO RICKSHAW / BUS UPTO OUR PROJECT
LOCATION MAP
KT VISION MULTIPLEX
T.V.M. CBSE SCHOOL (NEAR PROJECT)
ACTUAL SITE PICS
NANDGAON BEACH PICS (NEAR PROJECT)
PROJECT LAYOUT AND AREA SUMMARY
TWIN BUNGALOW
ROW HOUSE
THANKS ALL

You might also like