Design equations:
Q
1. Vh
B*H
Where :
Vh = horizontal velocity of the particles.
B = Width of the grit removal.
H= hight if grit removal.
Vh * H
2. Vv =
L
where:
L = length of grit removal.
Q
3. Vv
A
Here we assume Vh =0.3m/s
Design steps for grit removal:
1. Qmax = 61502 m3
61502
2. 0.3 *24*3600 =
B*H
B*H = 2.37 m2
Assume H = 1.5B B= 1.26m , H = 1.9m
3.Detention time td
1.9
td = = 86.3 s
0.022
1
Tank dimensions
B = 1.26m
H = 1.9m
L = 26m
2
primary sedimentation tank (P.S.T)
It is the same as in T.F
Creiteria & Assumptions :
1 ) detention time is (1.5-2.5) hr
2) dimensions for rectangular
- for depth (3-5)m
- for length (15-90)m
- for width (3-24)m
3) we use rectangular P.S.T .
Use these Design equations:
1) Vo = Q / A
Where:
Vo = overflow rate m3/m2.d
2) t=24*(V/Q)
Where :
V = P.S.T volume, m3
3
Design step:
1) Calculate Qpeack = Qavg. * P.F
P.F = 1.6
Qpeak = 50294 m3/d
2) Assume removal efficiency of P.S.T = 60%.
S .Sin S .Sout 581 S .Sout
Efficiency = S .Sin
=
581
= 0.60
2.05 hr.
4
L W D 72 20 3 m
Activated Sludge
- TKN-Load
- SS-Load
- Flow rate (Q+Qr)
5
- HRT (hydraulic retention time).
2- Parameters to identify bacteria concentration :
- MLSS kg/m3 (typically value 2 – 5 kg/m3)
- MLVSS kg /m3
- Organic fraction = MLVSS/MLSS = 70 – 80%.
- F/M ratio: food (kg BOD) to bacteria (kg MLSS) ratio
typically (0.15 – 0.2 )
3- Settling parameters :
- SVI: Sludge volume index.
- SVI = SV (ml/l)/MLSS (g/l),
Where, SVI = the volume of 1 gram MLSS after 30 min . in imhof cone.
Very good
SVI < 50
Good
SVI < 80
4- Return sludge:
- R = Sa / (Sr-Sa)
- Sa =MLSS kg/m3 in A.T
- Sr = MLSS kg/m3 (return sludge)
- Sr = 1000 /SVI kg/m3
- R = fraction of Q
6
Activated sludge process sludge:
Design process include 5 point:
1) Aeration tank volume.
2) Shaping & configuration of the aeration tank.
3) Design of aeration tank A.T
4) Design of secondary sedimentation tank.
5) Amount of waste activated sludge.
7
Design of Aeration tank (A.T)
Design equations:
1. BOD (total) in system = BOD5in +0.5 * CODin
2. V = BOD load to the A.T / [ MLSS * (F/M)]
Where :
V = volume of the atreation tank.
F/M = the ratio between food and micro organisims .
MLSS= active biomass.
3. Sludge mass = MLSS * V
4. HRT = V/Qt ,
Where :
Qt = Q + Qr , Qr = RQ
R = R = Sa / (Sr-Sa) , Sr = 1000 /SVI kg/m3
Sa = MLSS.
5. Excess sludge = Mass sludge in A.T / Sludge age.
Design steps:
1) Calculate Qdesign
It was calculated in the previous project
Qdesign = 78550 m3/day
2) Calculate BOD Load:
BOD (total) in system = 494+0.5 * 853 = 920.5 mg/l.
BOD interring A.T = 0.65 * 920.5 = 598.3 mg/l.
BOD load to the A.T = 78550* 598.3 * 103 * 10-6 = 47000 kg
BOD/day.
3) Calculate volume of A.T:
We assume ( F/M = 0.15)
V = 47000 / (4*0.15) =78333.3 m3
NOW, CALCULATE SURFACE AREA OF A.T:
Assume depth = 4.5 m
surface area of A.T = Volume/depth = 78333.3 /4.5 = 17407.4 m2
Use A.T with “ 4 “ compartments
Width = 4 * 5= 20 m.
Length of each A.T = area / width = 17407.4 / 20 = 871 m.
Flow
A.T
Plug flow
USE 5 A.T each has volume = 78333.3 / 5 =15666.6 m3
9
Area of each A.T = 17407.4 / 5 = 4351.85 m2
SO, length of each A.T = 4351.85 / 20 = 217.6 m
L = 217.6 m
W = 4 *5 = 20 m
D = 4.5 m
10
4) Calculation for Oxygen requirements :
FOR BOD REMOVAL:
O2 (BOD) = 0.5 * BOD load to (A.T) * efficiency of (A .T)
O2 (BOD) = 0.5 * 47000* 0.9 = 21150 kg O2/day.
For Nitrification:
TKN in A.T = 99 mg/l , TKN in A.T= 0.9 * 99 =89.1 mg/l.
TKN (LOAD)=Qdesign.*TKNin =78550*89.1*103*10-6 =7000 kg
TKN /day.
O2 (Nitrification)=4.57*TKN(LOAD)= 4.57 * 7000 = 32000
For endogenous respiration: -
O2 (endo.) = sludge mass * F/M
Sludge mass = 4 * 78333.3 = 313333.2 kg MLSS.
O2 (endo.) = 313333.2 * 0.15 = 47000 kg O2/day.
Total Oxygen requirements =21150+32000 +47000 = 100150
kg O2/day
5) Calculation of (HRT) :
Sr = 1000 /SVI kg/m3 ( assume SVI=100 ml/g)
Sr = 1000/100 = 10 kg/m3
11
Assume 1 kw = 0.1$
Daily cost for operating for each pump = 14.3 *18 * 0.1 = 26 $ /hr
6) Calculating of Excess sludge :
in here, T = 21 Co
( ) = 3.05*(1.127)20-21 = 2.7days
Grit.R PS SS
T Aeration Tank T
12
Secondary sedimentation tank (S.S.T)
It the same as in T.F
Design Criteria:
1) Over flow rate < 32 m3/m2.day for Qdesign > 6000 m3/day
2) Minimum side water depth = 2.1 m
Design equation:
1) Vo = Q / A
Where:
Vo = overflow rate m3/m2.d
Q = average daily flow (m3/d (
A = total surface area of basin
2) t=24*(V/Q)
Where :
t = detention time (hours).
V = basin volume, m3
Q = average daily flow m3/d
3) t=24*H/Vo
Where:
t = detention time, hr
H = depth of water in tank, m
Vo = overflow rate m3/m2.d
13
Design steps:
1) Qmax = 87550 m3/d > 6000
Conventional, high Rate, and step Aeration
W = 31 m
L = 93 m
D = 2.8 m
14