Rev 00
Jan-2015
Table of Contents
Objective ....................................................................................................................................................... 3
Fuel Handling Procedure............................................................................................................................... 3
Pre-checks / Visual inspection .................................................................................................................. 3
JDW-III,26.35 MW Power Plant
Objective
The purpose of this procedure is to define major steps to manage baggase yard.
Note:
Tractor must be availabble at BC-2 shoot, no matter whatever path is followed. i.e. BC-1
or BC-3.
In case of emergency, for path changeover from BC-1 to BC-3 or vice versa, tractors can
be commanded to move to desired field to feed baggase.