You are on page 1of 2

PROJECT: Dian Plaza Proposed 6 Storey

LOCATION: Dian St. Corner Enrique Makati City


OWNER: Aiwa Technologies Philippines

Dear Sir,
I am respectfully submitting my quotation for total labor cost on plumbing
works.

SCOPE OF WORKS

1. ) Installation of PVC pipe for sanitary sewer line 38 unit cr


2. ) Installation of PPR pipe water line 38 unit cr
3. ) Installation of water closet fixtures 38 pcs.
4. ) Installation of lavatory fixtures 38 pcs.
5. ) Installation of bar sink
6. ) Installation of grease trap
7. ) Installation of PVC pipe down spoot
8. ) Installation of storm drainage outlet
9. ) Installation of booster pump
10. ) Excavation, Installation of PVC pipe septic tank outlet
11. ) Testing & leak test
12. ) Installation of shower fixtures

TOTAL LABOR COST: ₱ 970,000.00

Very Truly Yours


Gilberto Grecia