7.1. FUNCTIONS
I. Missions:
The drainage system for buildings is
responsible for the collection of all
domestic wastewater, production and
rainwater. Depending on the degree of
contamination of the wastewater, the
drainage system can directly connect
to the drainage system of the area or
have to be pre-treated.
II. Classification:
 Domestic drainage system.
 Storm-water drainage system.
 Industrial drainage system
CHAPTER 7
DRAINAGE SYSTEM FOR BUILDINGS
7.2. COMPONENTS
The drainage system for buildings consists of
the following parts:
 Water collection equipments (floor drain,
collection, ...)
 Drainage pipes
 Pumping station
 Wastewater treatment system.
CHAPTER 7
DRAINAGE SYSTEM FOR BUILDINGS
7.2. COMPONENTS OF DRAINAGE SYSTEM
Drainage pipe system:
2. Vertical pipes:
1. Branched pipes:
- Mission: to transfer wastewater from
- Mission: for collecting wastewater
the branched pipes to the main drain.
from pluming fixtures.
- Position: to be placed in the technical
- Position: to be placed on the floor or
gain.
under the ceiling by hanging
- Dimesion:
- Dimension:
+ Length: Not too long to avoid + Diameter:

blockage of pipes : Lbr  10 m. Dver  Dbr max

+ Diameter: Dbr  ddcmax


+ Slope: ibrTB, > ibrmin.
7.2. COMPONENTS OF DRAINAGE SYSTEM

3. Main drain:

- Mission: to transfer wastewater from


vertical pipes to drainage manholes.

- Position: to be placed underground


- Dimension:

+ Diameter: Dmain  Dver max


7.3. CALCULATION b. Industrial wastewater flow:

1. Calculated wastewater flow q = qt.n.p/100 (7.2)


a. Domestic wastewater flow: where:
q = qc + qdc (7.1)
qt calculated wastewater flow of
where:
qc water supply flow (l/s) plumbing fixture(l/s).
qdc wastewater flow of plumbing n number of plumbing fixture
fixtures p percentage of simultaneous
operations of plumbing fixtures.
7.3. CALCULATION
2. Hydraulic calculation
Determination of the pipe diameter, slope,
velocity is conducted the same as the
drainage area network
7.3. CALCULATION
7.3. CALCULATION
3. According to Vietnamese building codes 1999
7.3. CALCULATION
3. According to Vietnamese building codes 1999
7.4. STORMWATER DRAINAGE SYSTEM

1. Components

Stormwater drainage system


is composed: gutter, vertical
drainage pipe, drainage
trench

The diameter of vertical


drainage pipe must larger
than100mm
7.4. STORMWATER DRAINAGE SYSTEM
2. Calculation: q5 = intensity (l/s.ha) in 5 minutes and
A. Vertical pipe:
(see in index)

(i) Calculated flow: (ii) Selection of pipe numer.

(i) (7.3) 𝑄
𝑛𝑝𝑖𝑝𝑒 𝑣𝑒𝑟 > (7.4)
where:
𝑞𝑝𝑖𝑝𝑒 𝑣𝑒𝑟

Q = stormwater flow (l/s) npipe ver = numer of vertical pipe


F = area of stormwater collection (m2) Q = calculated stormwater flow (l/s)
F = Fmái + 0,3Ftường qpipe ver = calculated flow of one
Fmái = area of roof (m2) vertical pipe
Ftường = area of vertical wall on the roof
(m2)
K = 2 (hệ số)
7.4. STORMWATER DRAINAGE SYSTEM
B. Gutter: Example:
(i) To select slope i = 0,003 – 0,004
To calculate the drainage system for
(ii) To determine wet area: A  2 F
one apartment building with 5 floors
(cm2) with F (m2)
(10 apartments/1 floor) in Hochiminh
(iii) To check drainage flow according to
Mainning equation. city. Roof area of building B x L = 24 x

(iv) To check velocity V: 0,6 m/s < V < 50 m.


4m/s
Plumbing fixtures of one apartment: 1
bathtub, 1 shower, 4 washasin, 1 toilet
and 2 faucets and 1 washing machine.

1/ To determine diameter of drainage


pipes and vent pipe.

2/ To calculate stormwater system