63 blows per layer should a concrete specimen molded in a 6”x6”x21” beam mold
be rodded.
IN-SITU DENSITY OR FDT is a test that requires calibrated sand in filling the hole
in order to determine the volume of hole.
When concrete is mixed in a central mixing plant, the mixing time is NOT LESS
THAN 50 SECONDS NOR MORE THAN 90 SECONDS.
The DPWH PROJECT ENGINEER AND MATERIALS ENGINEER will approved
the Job-Mix Formula.