RME FINAL - EIM NC I IVPRESENTATION - Rev1 PDF
RME FINAL - EIM NC I IVPRESENTATION - Rev1 PDF
TESDA in Electrical
Installation and Maintenance
Core Competencies
• Prepare electrical power and hydraulic tools
• Perform roughing-in activities, wiring
• Perform roughing-in activities for
and cabling works for single-phase
communication and distribution systems
distribution, power, lighting and
auxiliary systems
• Install wiring devices for floor and ground
fault current interrupting outlets • Install wiring devices of floor and wall
mounted outlets, lighting fixtures/
• Install electrical protection system for switches, and auxiliary outlets
lighting and grounding • Install electrical protective devices for
distribution, power, lighting, auxiliary,
• Install electrical lighting systems on lightning protection and grounding
auxiliary outlets and lighting fixtures systems
Qualifica(on Descrip(ons
Existing TR Amended TR
§ Electrical Installation and
Maintenance NC II § No Amendments
§ The ELECTRICAL INSTALLATION
& MAINTENANCE NC II
Qualification consists of competencies
that a person must achieve to enable
him/her to install and maintain
electrical wiring, lighting and related
equipment and systems where the
voltage does not exceed 600 volts in
residential houses/buildings.
UNIT OF COMPETENCIES
Existing TR Amended TR
Basic Competencies
• Participate in workplace communication • No Amendments
• Work in a team environment
• Practice career professionalism
• Practice occupational health and safety
procedures
Common Competencies
• Prepare construction materials and tools • Unit codes amended
Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance NC II:
Existing TR Amended TR
TOOLS EQUIPMENT MATERIALS TOOLS EQUIPMENT MATERIALS
QTY ITEM QTY ITEM QTY ITEM QTY ITEM QTY ITEM QTY ITEM
5 50 5 25
5 pcs. Spirit level Power drill RSC 5 pcs. Spirit level Electric drill RSC/IMC
units pcs. units pcs.
5 Portable 50 5
5 pcs. Hack saw IMC 5 pcs. Hack saw Portable grinder 5 pcs. Entrance cap
units grinder pcs. units
1 50 5 50 Locknut &
5 pcs. Pipe cutter Power saw EMT 5 pcs. Pipe cutter Multi-tester
unit pcs. units pairs bushing
5 Fire alarm Fire alarm Ground Fault
5 pcs. Plumb bob 5 pcs. Entrance cap Pipe system (5units Current
units system 5 pcs. 1 set 5 pcs.
5 Pipe-in Music/ 125 reamer detector, 1 interrupting
5 pcs. Pipe reamer Locknut control panel) device (GFCI)
units Paging pcs.
Pipe 5 Security 125 Pipe 100 3/16’ x 1” Metal
5 pcs. Bushing 5 pcs. 3 sets Motion sensors
threader units equipment pcs. threader pcs. Screw
5 250 Security
5 pcs. Pipe bender CCTV Metal strap Pipe 50 Conduit strap/
units pcs. 5 pcs. 1 set equipment Access
bender pcs. clamp
Control
5 10
5 pcs. Bolt cutter MATV Master Floor outlet Wiring boards,
units pcs. CCTV (4
5 pcs. Bolt cutter 1 set 5 sets ¾ ft. x 4 ft. x 8
Jack 5 Car park cameras, 1 DVR)
5 pcs. 5 pcs. Ground fault ft.
hammer set units ramp detector
Ball 5 10
5 pcs. Clamp-on meter Floor outlet
hammer units pcs.
25 Electrician Insulation 25
1 unit Working gloves
pcs. Pliers Resistance Tester pcs.
3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS
Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance
NC II:
Existing TR Amended TR
TOOLS EQUIPMENT MATERIALS TOOLS EQUIPMENT MATERIALS
QTY ITEM QTY ITEM QTY ITEM QTY ITEM QTY ITEM QTY ITEM
Current Earth
25 Electrician 10 Screwdrivers 1
Multi-tester 5 pcs. interrupting 25 pcs. resistance 10 pairs Safety shoes
pcs. Pliers units set unit
outlet tester
25 Screwdrivers 5 Mega- 25 Working 1 Labeling
5 pcs. Box Wrench 10 pcs. Hard hat
pcs. set units ohmmeter pcs. gloves unit machine
Fire
25 5 Clamp 25 1
Wrench box Safety shoes 5 pcs. Wire splicer extinguisher 10 pcs. Safety goggles
pcs. units ammeter pcs. unit
KGS ABC
Proper 1 LCD Wire AWG #12,
25 5 25 5 pcs. Wire stripper 5 boxes
Wire splicer Megger working unit Projector (3.5mm2)
pcs. units pcs.
clothes Electrician Wire AWG #14
5 pcs. 5 boxes
25 5 High potential 25 knife (2.0mm2)
Wire stripper Hard hat
pcs. units tester pcs. 10 pcs. Tools holster 5 rolls Electrical tape
Earth Push-pull 0-5
25 Electrician 5 25 Safety 5 pcs. 1 box Wood screw ½” x 8
resistance mtrs
pcs. knife units pcs. goggles
tester Claw Receptacle surface
5 pcs. 25 pcs.
25 5 Labeling 5 Wire AWG hammer type
Tools holster Receptacle flush
pcs. units machine boxes #12 5 pcs. Prick punch 25 pcs.
type
Fire
Push-pull 0-5 1 5 Wire AWG Heat gun Incandescent bulb
5 pcs. extinguisher 5 pcs. 25 pcs.
mtrs unit boxes #14 1200 watts 50 w/ 250V AC
KGS ABC
Convenient outlet
Claw 1 Electrical
5 pcs. OHP 5 rolls c.o. (grounding
hammer unit tape Heavy-duty
5 pcs. 25 sets type,/flush type) 2
Ballpeen 5 Wood screw soldering iron
5 pcs. Industrial Fan 1 box gang w/ plate and
hammer units ½” x 8 cover
3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS
Recommended list of tools, equipment and materials for the training in Electrical Installation and Maintenance NC II:
Existing TR Amended TR
TOOLS EQUIPMENT MATERIALS Flat file PVC square box, 4
QTY ITEM QTY ITEM QTY ITEM 5 pcs. TOOLS
EQUIPMENT 10 pcs. MATERIALS
smooth 8” x4
Prick Circular loom (mica
5 pcs. 50 m 5
QTY ITEM QTY 25 flexibleITEM
conduit
punch tubing 3/8”) #16 G.I wire ITEM QTY
Kgs. mtrs ½”, ¾
Heat gun
5 pcs. 1200 25 pcs. Receptacle surface type Whiteboard 4
1 pc. 10 pcs. PVC conduit ½, ¾
watts x8x¾
Heavy- Whiteboard 4
duty x 4 x ¾ with 25
5 pcs. soldering 25 pcs. Receptacle flush type 1 pc. Junction box PVC
movable pcs.
iron 1000 stand
watts
Flat file Whiteboard
Incandescent bulb 50 w/ 1 box marker, 25
5 pcs. smooth 25 pcs. Utility box
250V AC pcs.
8” assorted color
Convenient outlet C.O. Connectors PVC,
1 box Push pin 50 pcs
25 sets (flush type) 2 gang w/ ½
plate and cover Pencil Connectors PVC,
1 pc. 50 pcs
PVC square box sharpener ¾
10 pcs
4x4 25 Pencil with Connectors RSC,
50 pcs
100 pcs PVC clamp ½ pcs. eraser ¾
100 pcs PVC clamp ¾ 2 kgs Rags 20 pcs. Elbow PVC ½
50 Assorted condulet
Cleaning
50 mtrs Corrugated PVC ½”, ¾ 5 ltrs 20 pcs. Elbow PVC ¾
agent liquid
3.5 TRAINING FACILITIES
Existing TR Amended TR
Based on class size of 25 students/trainees the space requirements for the teaching/learning and
circulation areas are as follows:
TEACHING/ SIZE IN AREA IN QTY TOTAL
SPACE SIZE IN AREA IN TOTAL LEARNING METERS SQ. AREA IN
AREAS METERS SQ.
REQUIREMENTS METERS SQ. AREA IN
METERS
METERS SQ.
METERS Lecture Area 5x8 40 1 40
Laboratory 5x8 40 1 40
• Student/Trainee 2.50 x 2.50 6.25 Area
Working Space per student/ per student 156.25 Learning 4x5 20 1 20
trainee Resource Area
• Contextual Tool Room / 4x5 20 1 20
Learning 4x5 20 20 Storage Area
Laboratory Wash ,Toilet & 1x2 2 2 4
Locker Room
• L e a r n i n g
Resource 4x5 20 20
Sub-Total 124
Center
Facilities / ** Area requirement is equivalent to
• Facilities/ 30% of the total teaching/learning
Equipment /
Equipment/ 10 x 6 60 60 areas 38
Circulation area Circulation**
TOTAL AREA 256.25 TOTAL AREA 162
SECTION 4: NATIONAL CERTIFICATION AND CERTIFICATION
ASSESSMENTS
Existing TR Amended TR
4.3 Accumulation and submission of all COCs acquired 4.5 For those holders of existing National Certificate
for the relevant units of competency comprising a (NC) of individuals in Electrical Installation and
qualification, an individual shall be issued the Maintenance NC II, automatic conversion will be
corresponding National Certificate. implemented.
4.4 Assessment shall focus on the core units of 4.6 Clustering of competencies is not applicable.
competency. The basic and common units shall be 4.7 Individuals who already possess Certificate of
integrated or assessed concurrently with the core Competency (COC) in Electrical Installation &
units. Maintenance NC II are advised to take the
4.5 The following are qualified to apply for assessment assessment for this amended TR on or before the
and certification: expiration of their COCs.
Graduate of formal, non-formal, and informal 4.8 The guidelines on assessment and certification are
including enterprise-based training programs. discussed in detail in the “Procedures Manual on
Experienced workers (wage employed or self Assessment and Certification” and “Guidelines on
employed) the Implementation of the Philippine TVET
Competency Assessment and Certification System
4.6 The guidelines on assessment and certification are
(PTCACS)”.
discussed in detail in the “Procedures Manual on
Assessment and Certification” and “Guidelines on
the Implementation of the Philippine TVET
Qualification and Certification System (PTQCS)”.
¢ Task: ROUGHING-IN ACTIVITIES
¢ Layout the wiring booth for specific location of the panel, boxes
(utility box -UB)
¢ Octagonal (box- OB) and fittings.
Instructions:
¢ Prepare the materials, devices and auxiliary device for the
installation
¢ Install the circuit home run for convenience outlet.
¢ Set the CCTV monitor/recorder in accordance with the
requirement.
¢ Install the CCTV Camera based on the required location.
¢ Perform testing and commissioning activities.
LIST OF MATERIALS, TOOLS & EQUIPMENT
Hand Tools
Pliers Standard 1 pair
Screwdrivers Standard (+, -) 2 pcs.
Hack saw Standard 1 pc.
Electrician Knives Standard 1 pc.
Heat gun 100 w, 230 V 1 pc.
INSTRUMENTS
Multi-tester Analog type, tester 1 unit
Insulation Tester Analog type Insulation tester 1 unit
DEMONSTRATION
ML DC
Exit Button
BRC
EBG
EBG
EB EBG
ML - Magnetic Lock
EB - Exit Button
BRC – Biometric Reader and Controller EBG – Emergency Break Glass
DC - Door Contact
EIM NCII Sample Test Package
1 Door Access Control System
Conduit Layout UB1
90deg bend
UB1 – PVC Utility Box for ML
GOING IN UB2 – PVC Utility Box for BRC
A1 PVC ¾”
UB3 – PVC Utility Box for EBG
UB4 – PVC Utility Box for EB
A1 – 300x300x200mm Box for
20A Circuit Breaker,
300mm Power Supply Module and
12VDC Battery
90deg bend
300mm
Industrial
Socket (F)
ELECTRICAL INSTALLATION AND
MAINTENANCE NC III
ELECTRICAL and ELECTRONICS Sector
UNIT OF COMPETENCIES
Existing TR Amended TR
Core Competencies
• Prepare electrical and hydraulic tools
• Perform roughing-in and wiring for activities for bus
and underfloor ducts
• Perform installation of wiring devices for floor and
ground fault current interrupting outlets
Basic Competencies
• Lead workplace communication • No Amendments
• Lead several small working teams
• Develop and practice negotiating skills with team
members
• Guide effective solutions to problems arising from work
activities
• Check and develop the use mathematical concepts and
techniques
• Use relevant technologies applicable to assigned work
Common Competencies
• Prepare construction materials and tools • Prepare construction materials and tools
• Ensure compliance with standard procedures, • Observe procedures, specifications and manuals of
specifications and manuals of instruction instruction
• Interpret and follow technical drawings and plans • Interpret technical drawings and plans
• Supervise proper use and maintenance of tools and • Maintain tools and equipment
equipment
Note: Other unit titles are rephrased
ELECTRICAL INSTALLATION AND MAINTENANCE NC III
Existing TR Amended TR
¢ A person who has achieved this qualification § A person who has achieved this qualification
is competent to be: is competent to be:
¢ Electrical Leadman
SECTION 3: TRAINING STANDARDS
Existing TR Amended TR
Existing TR Amended TR
Existing TR Amended TR
To qualify as trainee for Electrical Installation & The trainees who wish to enter the course should
Maintenance NC III, a candidate must be: possess the following requirement/s:
¢ a holder of Electrical Installation & Maintenance
NC II or equivalent experience and training § Must be a holder and/or have undergone
¢ able communicate both orally and in writing
training in Electrical Installation &
¢ physically and mentally fit
¢ with good moral character
Maintenance NC II or Mechatronics
¢ can perform basic mathematical computation
Servicing NC II
This list does not include specific institutional requirements This list does not include specific institutional
such as educational attainment, appropriate work
experience, and others that may be required of the trainees requirements such as educational attainment,
by the school or training center delivering the TVET
program. appropriate work experience, and others that may
be required of the trainees by the school or
training center delivering the TVET program.
3.4 LIST OF TOOLS, EQUIPMENT AND MATERIALS
Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance
NC III:
Existing TR Amended TR
Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance
NC III:
Existing TR Amended TR
EQUIPMENT
5 units Controllers Industry/Institution 3 units Motors, 3-phase, 220
Quality Manual 50 pcs. Conduit strap/clamp
volts
10 sets - Motor controls User’s guide 5 units Electric drill 5 boxes Wire AWG #12, (3.5mm2)
1 set - Electro-mechanical Drawings/diagrams 5 units Portable grinder 5 boxes Wire AWG #14(2.0mm2)
controllers (e.g. 2 units Automatic Voltage
Solenoid) Regulator (AVR) 5 rolls Electrical tape
1 set - Electro-Pneumatic 3 units Clamp-on meter 5 Kgs. #16 G.I wire
controller
Insulation resistance
5 pcs. Pressure gauge 1 unit 1 pc. Whiteboard 4’ x 8’ x ¾’
tester
Recommended list of tools, equipment and materials for the training of 25 trainees for Electrical Installation & Maintenance
NC III:
Existing TR Amended TR
EQUIPMENT EQUIPMENT MATERIALS
Qty. Description Qty. Description Qty. Description
5 pcs. Pressure Analyzer/ Whiteboard 4 x 4 x ¾ with
1 unit Earth resistance tester 1 pc.
Gauge manifold movable stand
Whiteboard marker,
1 unit Labeling machine 1 box
5 pcs. Leak tester assorted color
10 units Micro PLC Fire extinguisher KGS Whiteboard eraser
1 unit 2 pcs.
25 lic. PLC Simulator ABC magnetic
Software 1 unit LCD Projector 1 box Push pin
PPEs 1 pc. Pencil sharpener
Qty. Description 3 boxes Pencil with eraser
25 pcs. Working gloves 2 kgs Rags
10 pairs Safety shoes 5 ltrs Cleaning agent liquid
10 pcs. Hard hat 1 unit First aid kit
10 pcs. Safety goggles 2 reams Bond paper
Forms/Manuals
Qty. Description
Motor Controller and
specification
As required
Requisition form(s)
Industry/Institution
Quality Manual
User’s guide
Drawings/diagrams
3.5 TRAINING FACILITIES
Existing TR Amended TR
Based on class size of 25 students/trainees the space requirements for the teaching/learning and circulation
areas are as follows: TEACHING/ SIZE IN AREA IN QTY TOTAL
LEARNING METERS SQ. AREA IN
AREAS METERS SQ.
SPACE SIZE IN AREA IN TOTAL METERS
REQUIREMENTS METERS SQ. AREA IN
METERS SQ. Lecture Area/ 5x8 40 1 40
METERS
Laboratory 5x8 40 1 40
Area
• Student/Trainee 2.50 x 2.50 6.25
Working Space per student/ per student 156.25 Learning 4x5 20 1 20
trainee Resource Area
Existing TR Amended TR
Existing TR Amended TR
Task:
¢ Prepare and select the materials, tools and equipment,
Arithmetic Operations
PLC
BASIC CONTROL SYSTEM
Transmitter
Process Variable
Primary
Element / Transducer
A TYPICAL CONTROL SYSTEM (ELECTROMECHANICAL)
INPUT DEVICES CONTROLLER OUTPUT DEVICES
RELAY
PUSHBUTTON MOTOR
COIL
LED DISPLAY
THUMB TIMER COIL
WHEEL 8 8
SWITCH
8 8 8
CLOCK
HEATER
LEVEL SWITCH COUNTER HEATER
CNT
LAMP
RESET
FLOW SWITCH
ELECTRONIC CARDS
STEPS IN PLC PROGRAMMING
PLC Layout
HARDWARE COMPONENTS
Power Supply
Input Module
Output Module
Peripheral Device
SOFTWARE COMPONENTS
1. Ladder Diagram Language – a symbolic instruction type language
2. Boolean Language- Basic level language that composed of three (3) Boolean
logic operation: AND, OR, NOT
3. Functional Blocks Language – high level instructions that permit
the user to program more complex functions using the ladder
diagram format
M
STEP II.CONTROL DIAGRAM (RELAY DIAGRAM) OF EXERCISE 1
PB FORWARD
PB STOP
FWD
REV
FWD
REV
FWD
REV
STEP III. INPUT/OUTPUT ASSIGNMENT OF EXERCISE 1
PB FWD –1 FWD-10001
PB REV - 2 REV-10002
PB STOP- 3
10001
2 3 10001
100
02
10002
STEP V. (BOOLEAN/MNEMONIC STATEMENTS) OF EXERCISE 1
FWD
1
CENTRAL
2 PROCESSING UNIT REV
3 L1 L2