You are on page 1of 3

EXPERIENCE

ULISES EDUARDO RUVALCABA LUGO

CONTINUOUS IMPROVEMENT ENGINNER


05/04/18 to Currently
 Currently, I have been performing 5’s projects according to
safety and quality plans at plant. Purpose is to ensure quality
eduardo.ruvalcabalugo@outlook.com process and products manufactured.
 I have carried out several capital projects such as gas natural
project to suply gas to boiler to produce steam our mold
process.
 Follow up and develop of KPI’s, OEE and yield reports. Each
report is analizing according to information provide in TQM.
686 2902063  I have created visual aids and standard operation procedures
686 2 665088 also, control plans according management total quality.
 Administration to train to coworkers according to training plan
and Standard operation procedures.
 Develop of quality weekly report where, I present results got at
the mold and finish line process.
 Follow up to inventory raw materials and WIP (Work in
Domicilio: Av. Decisión 2617, Fracc. Casa process) according to AS400.
Digna  Tracking label to finish line process about of product
C. P. 21323 manufactured, is to ensure traceability.of SKU’s produced.
 Several kaizen projects I have been performing where I’ve
collaborated and leaded to get saving finances as well.
 I’ve implemented SPC as a six sigma tool also, I have develop
several sampling plans and audits to process according to
TQM.

PURPOSE PRODUCTION SUPERVISOR AT SUKARNE


11/02/17 to 04/10/18
Generate savings projects,
 I performed inventory administration for raw materials
achieving financial objectives with
and several products during deboning process.
the application of the DMAIC lean
Manufacturing methodology.  Follow up to KPI’s (Key performance indicators)
according to check list as well.
 I created corrective actions according to plans audit
process.
SKILLS
 I collaborated to kept quality indicators such as GMP,
Biomedical engineer with extensive HACCP plans control and BRC audits.
knowledge of analogue and digital  Several training were performed toward crew co-workers
electronics as well as according to visual aids and procedures standard
instrumentation and programming. operations.
Development of protocols and
procedures (control plan).
Coordination of teams of
multidisciplinary people.
I use advanced Excel
PROTOTYPE ENGINEER AT SKYWORKS
06/15/2017 to 09/013//2017
 Generation and execution of the production plan
Complete knowledge of statistical according to the batch cycle time and customer
tools (Minitab). Knowledge and requirements.
management of Visio Profesional,  Interpretation of engineering drawings and desings as
generation of process maps and required by the Program manager and design engineer.
flow diagrams. Development of  Solve and management issue to coworkers according to
FMEA failure mode analysis. internal work procedure such as payments, vacations
Knowledge and management of and overtime, etc.
electronic instrumentation.  Oversee during assamble to PCB at SMT process on
Knowledge and management of FUJI, SIEMEENS equipments.
laboratory instrumentation.  I kept to update all documentation relationship with each
Management about of AS400. prototype (STR’s product) according to specifications
standard to ensure quality manufacture of PCB.
 Collaborate about of a six sigma Project, where had a
increase about yield at 99%.
MANAGEMETN SOFTWARES
VISIO PROFESIONAL
MINITAB
QUALITY ENGINEER AT NUTRIMEX
EXCEL 07/04/2009 to 02/04/2017
MATLAB AND SIMULINK  I carried out quality certification at plant according to
OFICCE COMPLETE Mexican regulations (NOM’s).
 I desinged several standard operation procedure such
as visual aids and control plans to ensure quality of all
products.
 I achieved to reduce claims as also to minimize
nonconforming material to costumer.
 I developed and kept to follow up several quality KPI’s.
 I developed several tools according to lean
manufacturing and six sigma for implement to all
departments in the company.
 I genered statistic process control according to six sigma
tools, this to reduce quality variance during manufacture
of product.
 Also, a verification was performed for supply water to
boiler. Where I had been checking features physical and
chemistry.
 • Furthermore, several random samplings were taken to
be evaluated according to Mexican regulation and
specification standard, also follow up sampling plans to
raw materials and products every month.

2
BACHELOR’S DEGREE

BIOMEDICAL ENGINEER IN OCTUBER 2015


Autonomouse University of Baja California

GREEN BELT SIX SIGMA CERTIFICATION IN JUANUARY 2017


Cetys University Campus Mexicali

PRODUCTION TECHNICIAN IN JUNE 2009


Cecyte B. C.

ADDITIONAL FORMATIONS

 Advanced Excel Course awarded by CANACINTRA 2016

 Green Belt Six sigma Certification in Cetys 2016.

 English levelling course taught by the ESL Institute (Current)

 Course of activated sludge and water treatment granted by the


Institute of Engineering UABC 2014

 Course of liquid and high pressure gas chromatography granted by


UABC 2014

 Food safety seminar given by DIKEN INTERNATIONAL 2016

You might also like