You are on page 1of 1

DAILY PROGRESS REPORT (DPR FOR LAB)

Six Lanning of chitradurga-davangere including Chitradurga Bypass


section from (KM 189.000 To KM 260.000) (Design Chain age KM 0+000
Project
to KM 20+700 & KM 208+000 To KM 260+000) of NH-48 in the state of
karnataka to be executed on Hybrid Annuity Mode under NHDP Phase –V

Client National Highways Authority of India


M/s TPF Getinsa Eurostudios S.L in Association with Segmental Consulting &
Independent Engineer Infrastructure & Advisory Pvt. Ltd.

Concessionaire PNC Chitradurga Highway Private Limited

EPC Contractor M/s PNC Infratech Limited

Location of lab Date

Type of
Sl No Description of testing Remarks
Material

Prepared By Checked & Approved By Witnessed By


EPC Rep. Concessionaire IE's Rep.

You might also like