MOCK-UP WORKS

1 PROCEDURE

1.1 Initiating Mock-up Works

The Project-in-Charge shall arrange a meeting of all concerned personnel in the preparation of
mock-ups on site. The meeting will discuss but not be limited to the following:

 Mock-up Milestone requirements


 Assignment of Subcontractors
 Approval of Materials
 Resolution of Design Issues that will affect Mock-up
 Mock-up Schedule per Activity
 Acceptance Criteria and level of workmanship
 Approval of Mock-up

Regular meeting have to be conducted after the initial start –up meeting on mock to ensure all
the relevant items for the proper completion of mock-up is monitored.

1.2 Monitoring of Mock-up Schedule and Implementation

The Monitoring report shall describe the mock-up units particulars, date needed, date inspected
and date approved.

1.3 Approval of Mock-ups

Mock-ups have to be approved as early as possible to avoid repair or reworks on the


succeeding works. Workmanship acceptance criteria have to be agreed by all parties to prevent
misunderstanding later during handing over of the works. Acceptance has to be documented
showing the names and signatures of all parties involved. Refer to "Acceptance of Mock-up
Works" for documentation.

The Project in-Charge in coordination with Subcontractors, Project Manager and Owner or
Owner Representative is responsible for the review and acceptance of the proposed mock up.

If possible, mock-up approval and status shall be shown in the mock-up area.