You are on page 1of 1

RVPR CONSTRUCTION PVT.

LTD
TOOL BOX TALK REPORT
DATE:
TIME:
PROJECT NAME:
LOCATION:
ACTIVITY:
Please select the work activity and place(√)

WELDING □ GAS CUTTING □ EXCAVATION □ MATERIAL HANDLING □


ERECTION □ SCAFFOLDING □ GRADING □GRINDING □ OTHER WORKS □
ACTIVITY HAZARD PRECAUTION/CONTROL
MEASURES

SL.NO NAME OF THE WORKER DESIGNATION SIGNATURE

SIGNATURE OF THE SITE ENGINEER SIGNATURE OF THE SAFETY OFFICER

You might also like