TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................................. 4
2. SUMMARY ........................................................................................................................................ 5
4. CONCLUSION .................................................................................................................................. 5
5. APPENDICES .................................................................................................................................... 5
1. INTRODUCTION
This document presents the barge local structural strength check during load-out operation of SV-CPP
Deck from fabrication yard onto transportation/float over barge “Holmen Pacific”.
The strength checks for barge local structure are carried out based on the following parameters: -
➢ The maximum vertical reaction along DSF row 4 for load scenarios D and E which extracted
from provided DSF structural integrity check during loadout (doc. no.: 05-1_EPC-SV-AEI-N-
RA-03060; Rev D1) is taken into consideration of barge local strength check. The detailed
providing calculation results are extracted and included in Appendix B.
➢ The skid beams Row 4 and Row 6 are symetrically arranged 12.0m offset from barge center
line. Vertical reaction along skid beams Row 4 and Row 6 will be taken by barge
frame/bulkhead/sideshell. Tank ballast water during deck loadout is also considered for barge
local strength calculation.
Detailed reaction force selection, barge local strength and miscellaneous calculations are presented in
Appendix A.
For barge structural as-built drawings, project drawings and other references, refer to Appendix B.
2. SUMMARY
The strength checks of the barge local structure were performed to evaluate structural strength for the
Load-out of SV-CPP Deck from the fabrication yard onto the launch/floatover barge “Holmen
Pacific”.
The barge local structural checks were based on AISC Manual of Steel Construction ASD 9th
Edition. The calculation is based on max. reaction at DSF for all considered load cases provided in
DSF loadout analysis. The detailed barge strength calculations are included in Appendix A.
The barge local structure strength is found within allowbable limit with strengthening by extension
skid beam wing plate as detailed at appendix B.
References
[4] Loadout Ballast Calculation Report (Doc. No.: AA3181-01-CAL-01; Rev. G)
[5] SV CPP Deck Support Frame Load Out Analysis Report (Doc. No.: 05-1_EPC-SV-AEI-N-
RA-03060; Rev D1)
[6] SV CPP Topsides- Basis of Design for Jacking, Skidding and Loadout operation
[7] SV CPP Topsides- Load-out procedure
[8] Barge As-built documentation
4. CONCLUSION
The barge local structural was checked for the simulated forces during the load-out operation of the
SV-CPP Deck based on AISC Specifications and found to be structurally adequate with proposed
barge frame strengthening by extension skid beam wing plate. The barge frame strengthing details are
included at appendix B.
The summary max. UC for barge local structure strength check are listed in below: -
5. APPENDICES
APPENDIX – A
1. DSF ISOMETRIC VIEW
The isometricview and general arrangement/dimension for Deck support Frame of SV‐CPP Topsides are as below:‐
‐ Skid beam spacing : 24m
‐ Deck grid A and B spacing: 26.0m
Page 1 of 9
APPENDIX A
2. REACTION FORCE ALONG SKIDWAY ROW 4 AND 6 ON BARGE SKID BEAM
Based on DSF structural integrity check during loadout (SV CPP Deck Support Frame Load Out Analysis Report; 05‐1_EPC‐SV‐AEI‐N‐RA‐03060; Rev D1),
The ID of Row 4 DSF's support during loadout are as follow (joint ID D401 to 482):‐
Due to symmetrical arrangement of skid beams on barge, the max. reaction force at DSF along row 4 will be used to check barge local structural strength.
The worst load combination case D and E with shifted deck CoG to ‐X direction will be considered since this will create worst input for barge local analysis.
The load combination from D400/E400 to D444/E444 (cantilevel at DSF trailing end) and D500/E500 to D671/E671 (partial +/‐25mm displacement at 3 joints
along skid beam) will be considered as this represented the situation once the deck loaded onto the barge step by step.
The reaction from DSF will spread through barge skid beam to barge structure. Maximum reaction along skid beam appeared at deck leg area. 3 modelled joints
at each deck leg locations which is within deck leg stub diameter will be considered as base load applied (joint D423 to D425 for Row A; D458 to D460 for Row B).
Since the stiffness of DSF is much stronger than barge skid beam, the deflection of barge skid beam will spread the load uniformly to barge local structure.
However, the barge local structure will be checked with conservative approaching load cases i.e. with cantilivel and partial displacement along skid beam as considered
in the provided analysis (SV CPP Deck Support Frame Load Out Analysis Report).
Barge skid beam height, from deck to top of flange = 2.00 m
Joint spacing along DSF = 0.74 m (60m length, 81 joints)
No. effective joint to spread the load to barge at deck leg area (each side) = 6.75 Nos. Say 7 nos.
No. effective base joints at deck leg area = 3.00 Nos.
Total effective joints to spread the load to barge structure at deck leg = 17.00 Nos Red highlighted above
Max. load due to cantievel at trailing end (load case D400/E400 to D444/E444)
Max. total applied load for 17 joints (D416 to D432 / D451 to D467) = 42798.40 KN Refer to reaction summary table
UDL along skid beam at barge deck = 3398.70 KN/m = 346.45 MT/m
Page 2 of 9
APPENDIX A
Max. load due to partial displacement along DSF (load case D500/E500 to D671/E671) ‐ step by step of loadout
Max. total applied load for 17 joints (D416 to D432 / D451 to D467) = 53112.00 KN Refer to reaction summary table
UDL along skid beam at barge deck = 4217.72 KN/m
Max. UDL along skid beam at barge deck = 4217.72 KN/m = 429.94 MT/m
3. BARGE LOCAL STRENGTH CHECK ALONG SKID BEAM
Typical barge frame and applied load with skid beam wing plate enxtension
1.5m
bending check @ 0.75m
off center of skid beam
span, s
Page 3 of 9
APPENDIX A
Transverse frame check
Max. span, s = 5.75 m
Distance from sideshell to row 4/6 = 8.00 m
Distance from applied load to right end ‐ side shell = 0.75 m
Distance from applied load to left end ‐ longi bhd = 5.00 m
Max. shear ‐ left end = 1384.94 KN Pinned at both ends
Allowable shear = 2580.30 KN Refer to section 4
UC = 0.537 SAFE
Max. shear ‐ right end = 9232.93 KN Pinned at both ends
Allowable shear = 5118.30 KN Including 1500x1500x18 bracket under trans. frame
UC = 1.804 NOT GOOD Required strengthening barge frame
Allowable shear with considering extension wing plate 40mm thk, 1400mm = 10382.30 KN 1400mm wing plate extension height at checked section
UC = 0.889 SAFE
Moment arm at outer flange of skid beam = 4.250 m
Max bending moment = 5885.99 KN.m
Allowable bending moment with with frame strengthening = 11438.28 KN.m Refer to section 4 with wing plate extension
UC = 0.515 SAFE
Barge sideshell/longitudinal bulkhead compression check
The reaction at both ends of transverse frame will be taken by barge sideshell/longitudinal bulkhead
Max. reaction force = 9232.93 KN
Min. allowable of sideshell/bulkhead = 9572.98 KN Refer to section 4, different ballast percentage of 69%
UC = 0.964 SAFE
Transverse bulkhead check
BHD thk. = 16 mm
Total bhd stiff. allowable bearing = 2538 KN
Bearing Capacity = 3384 KN/m
UC = 0.570 SAFE
Page 4 of 9
APPENDIX A
4. BARGE LOCAL CAPACITY CALCULATION
Based on the latest ballast plan during loadout which extracted in below, the max. tank fill percentage when the load transferred to
barge skid beam is 69% at stage 3 ‐ tank 9S/9P (13.5m pulled distance ‐ first leg is crossing the quayside). Hence 69% tank water ballast fill hydrostatic
pressure is also taken into consideration of longitudinal bulkhead capacity calculation without negative effect of opposite center tank
for conservative. Detailed ballast plan for all tanks is included in Appendix B of report.
Tank ID and ballast plan
Page 5 of 9
APPENDIX A
a2
Modulus of elasticity, E = 200000 [N/mm 2] b2
b
Yield stress Fy = 235 [N/mm 2]
Spacing = 2500 [m m]
b1 x
(a) Sectional Properties Calculation a1
(b) Ballast water - Hydrostatic Pressure Acting Onto Longitudinal BHD during loadout
Page 6 of 9
APPENDIX A
X X
Material Properties
a2 b2
N/mm 2 b
Material yield strength, Fy = 235
Barge Deck thickness, t = 25 mm
b1 x
a1
Page 7 of 9
APPENDIX A
Page 8 of 9
APPENDIX A
BARGE TRANSVERSE FRAME CAPACITY CALCULATION Code: AISC - ASD 9th Edition
(WITH STRENGTHENING MEMBER)
Barge Transverse Frame Dimension: T1500x18 + 500x20 with 40mm tkh wing plate extension
No. Width Height C.o.G x_x,x Area, A A.X I C.o.G X_X,X A.X2 I+A.X2
a, mm b, mm mm mm 2 mm 3 mm 4 mm mm 4 mm 4
1 500 20 10 10000 100000 333333.33 -1987.78 3.951E+10 3.9513E+10
2 18 1480 760 26640 20246400 4.863E+09 -1237.78 4.082E+10 4.5678E+10
3 542 25 1512.5 13541.667 20481771 705295.14 -485.28 3.189E+09 3189767260
4 40 1900 2475 76000 1.88E+08 2.286E+10 477.22 1.731E+10 4.0171E+10
5 400 40 3445 16000 55120000 2133333.3 1447.22 3.351E+10 3.3513E+10
a2 b2
b
x
a1 b1
Page 9 of 9
APPENDIX A REACTION ALONG ROW 4 ‐ LOAD SCENARIO D and E
Load case D401 D402 D403 D404 D405 D406 D407 D408 D409 D410 D411 D412 D413 D414 D415 D416 D417 D418 D419 D420 D421 D422 D423 D424 D425 D426 D427 D428 D429 D430 D431 D432 D433 D434 D435 D436 D437 D438 D439 D440 D441 D442 D443 D444 D445 D446 D447 D448 D449 D450 D451 D452 D453 D454 D455 D456 D457 D458 D459 D460 D461 D462 D463 D464 D465 D466 D467 D468 D469 D470 D471 D472 D473 D474 D475 D476 D477 D478 D479 D480 D481 D482
APPENDIX – B
DECK EL +24500
LAYDOWN AREA
DECK HATCH
X-MAS TREE
X-MAS TREE
TYPICAL
DECK
FIREWALL
HATCH
SV-41-VL-001
SV-41-HC-002
FLARE TOWER
PLATFORM
SV-41-HW-001
SV-23-KA-001
WHRU
171081.5 SKIDDING DISTANCE SV-27-IH-001
DEAD MAN
ANCHOR
PS-C
PS-C
PS-C
SV-23-HC-001A/B
SV-26-HC-001/002
LAYDOWN AREA
17000 PS-B PS-B
PS-A
SV-25-FE-001
LAYDOWN
AREA
SKIDWAY
LAYDOWN AREA
No. 1 TOTE TANK AREA
SV-24-HA-001
FIREWALL
LAYDOWN AREA
CRANE HAND-SHAKE
LAYDOWN /
HVAC
HVAC
STORAGE AREA
LAYDOWN AREA
LAYDOWN AREA
COOLERS
LO
GTG EXHAUSTS
PS-A PS-A PS-A PS-A PS-A
LAYDOWN AREA
LAYDOWN
DETAIL C DETAIL A
AREA
GALLEY LAYDOWN
AREA
DETAIL A
DETAIL B SCALE 1:50
380 HPU
380 HPU WITH PLAN VIEW : COG GENERAL ARRANGEMENT
HPU PLATFORM BREAKOUT SCALE : 1:500
JACK BRACKET
BREAKOUT
SJ 850 RETRIEVAL STRAND SJ 850
JACK BRACKET STRAND JACK
17000 JACK BRACKET
BRACKET
600T BREAKOUT
SJ 850
JACK
DETAIL B
SCALE 1:50
380
HPU
60000
0 5 10 15 20 25 30 35 40 45 50 55 60 DETAIL C
SIDE VIEW : LOADOUT GENERAL ARRANGEMENT
SCALE 1:50
SCALE : 1:500
DRAWING NOTES: TECHNICAL NOTES: Client Document Number
STRAND JACK SPECIFICATION
-ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED. LOADOUT CONDITION SJ850
C 9 JUN 18 CSR MCH ISSUED FOR PROPOSAL
SITE REF : JACKING UNIT
-ALL WEIGHTS ARE IN t (METRIC TONNES) UNLESS OTHERWISE STATED. B 28/03/18 CSR MCH ISSUED FOR PROPOSAL
1. PTSC-DW-3002 DSF Yard LIFTING 836 t
layout_rev B2 A 15/03/18 CSR MCH ISSUED FOR PROPOSAL
-ALL MATERIAL TO BE S365 OR EQUIVALENT 2. PTSC-DW-1006 TS load out PULLING 1045 t
Rev. Date Drawn Check Description QF19 (Issue 5)
arrangment_ rev B2 Layout1
STROKE 600 mm Abnormal Load Engineering Ltd.
Sotherby Road, Middlesbrough, TS3 8BS, U.K.
NUMBER OF STRANDS WIRE 55 18mmØ
Tel: +44 (0) 1642 292 299
FACTORED WEIGHT (MT) 15820 STRAND BUNDLE O.D. 370 mm Fax: +44 (0) 1642 242 004
REFER:05-1_EPC-SV-AEI-N-RA-02016_Rev Web: www.ale-heavylift.com
C3 Topsides Weight Control Report For CPP STRAND JACK WEIGHT 5110 Kg Client
[Electronic document]
The plan approval office
Ref : SPO/12/04501
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
20301T
BUREAU VERITAS Section ...................
REVIEWED
only for parts concerning Classification.
All particulars not shown on this drawing and concerning
Classification to be as per Rules.
Singapore, 01-Feb-2012
[Electronic document]
The plan approval office
Ref : SPO/12/00410
SV-CPP TOPSIDE
4 BALLAST ARRANGEMENT
Page 6 of 93
SV-CPP TOPSIDE
STAGE NUMBER
TANK REF
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18
FP(P) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
FP(S) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3P 0 264 352 424 418 484 362 240 180 0 0 0 -396 -710 -680 -600 -495 0
3C 0 264 352 424 516 550 560 570 420 384 142 124 -420 -710 -680 -600 -735 -600
3S 0 264 352 424 418 484 362 240 180 0 0 0 -396 -710 -680 -600 -495 0
4C 0 0 0 0 0 0 0 0 0 0 0 0 0 -272 0 0 0 0
5P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -300 0 0 0
6P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7P 0 0 0 0 0 0 0 0 0 0 -472 -1000 0 0 0 0 0 0
7C 0 0 0 0 0 0 0 0 0 0 0 -1142 0 0 0 0 0 0
7S 0 0 0 0 0 0 0 0 0 0 -472 -1000 0 0 0 0 0 0
8P -470 -476 -362 -288 -174 -374 -218 -178 -282 -360 -242 -664 516 368 263 435 404 28
8C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8S -470 -476 -362 -288 -174 -374 -218 -178 -282 -360 -242 -664 516 368 263 435 404 28
9P -398 -476 -362 -288 -174 -374 -218 -178 -280 -358 -246 -664 516 368 263 435 404 28
9C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9S -398 -476 -362 -288 -174 -374 -218 -178 -280 -358 -246 -664 516 368 263 435 404 28
AP(C) -290 -514 -532 -472 -602 -490 -176 -334 -98 0 0 0 0 645 1080 678 186 0
Total DeBallast: 0 -2028 -2418 -1980 -1624 -1298 -1986 -1048 -1046 -1222 -1436 -1920 -5798 -1932 -2700 -4058 -3510 -2925 -1800
Total Ballast: 0 262 1236 1506 1730 1818 2112 1768 1542 1280 892 658 1046 2064 2115 2130 2418 2610 2804
Stage Flow: 0 2290 3654 3486 3354 3116 4098 2816 2588 2502 2328 2578 6844 3996 4815 6188 5928 5535 4604
7:39 7:57 8:22 8:52 9:22 9:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37
7:57 8:22 8:52 9:22 9:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37 17:07
AP(S) 9S 8S 7S 6S 5S 4S 3S 2S
-664 -664 -1000 -300 -360 -710
1346 516 516 594 640 282 484
Stbd
Page 7 of 93
SV-CPP TOPSIDE
FP(S) 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47 7.47
2P 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40
2S 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40
3P 9.72 9.72 8.97 7.97 6.78 5.59 4.23 3.20 2.52 2.02 2.02 2.02 2.02 2.20 4.88 7.44 9.70 11.58 11.58
3C 11.52 11.52 10.86 9.98 8.96 8.19 7.37 6.54 5.69 5.07 4.50 4.29 4.10 4.21 5.61 6.96 8.15 10.01 11.51
3S 9.72 9.72 8.97 7.97 6.78 5.59 4.23 3.20 2.52 2.02 2.02 2.02 2.02 2.20 4.88 7.44 9.70 11.58 11.58
4P 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.31 9.88 10.14 11.10 11.10 11.10
4C 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 5.04 5.04 5.04 5.04 5.04
4S 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 9.14 8.35 8.52 9.08 9.35 10.31 10.31 10.31
5P 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 10.28 10.28 10.28 10.28
5C 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 4.51 5.77 6.95 8.14 9.03
5S 9.16 9.16 9.16 9.16 9.16 9.16 9.16 7.80 6.41 5.01 3.58 2.13 0.33 0.33 0.33 1.46 1.46 1.46 1.46
6P 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16 9.16
6C 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 4.53 5.79 6.97 8.14 9.04
6S 8.71 8.10 6.86 5.60 4.31 3.01 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34 1.34
7P 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 3.02 5.81 5.81 5.81 5.81 5.81 5.81 5.81
7C 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 3.78 3.78 3.78 3.78 3.78 3.78 3.78
7S 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 3.02 5.81 5.81 5.81 5.81 5.81 5.81 5.81
8P 0.37 1.46 2.79 3.81 4.61 5.10 6.14 6.75 7.25 8.04 9.04 9.72 11.59 11.34 9.97 8.99 7.37 5.86 5.78
8C 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59
8S 0.37 1.46 2.79 3.81 4.61 5.10 6.14 6.75 7.25 8.04 9.04 9.72 11.59 11.34 9.97 8.99 7.37 5.86 5.78
9P 0.49 1.49 2.82 3.82 4.63 5.11 6.16 6.76 7.26 8.04 9.04 9.72 11.59 11.34 9.97 8.99 7.38 5.88 5.80
9C 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59 11.59
9S 0.49 1.49 2.82 3.82 4.63 5.11 6.16 6.76 7.26 8.04 9.04 9.72 11.59 11.34 9.97 8.99 7.38 5.88 5.80
AP(P) 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 7.64 0.92
AP(C) 0.85 1.67 2.98 4.34 5.55 7.08 8.45 8.98 10.03 10.37 10.37 10.37 10.37 10.37 7.69 4.02 1.71 0.89 0.89
AP(S) 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 10.36 7.64 0.92
Page 8 of 93
SV-CPP TOPSIDE
Barge-Quay Airgap
350
300
250
200
150
100
50
(mm)
0
-50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
-100
-150
-200
-250
-300
-350
Stage Number
Barge Trim
100
90
80
70
60
50
40
Barge Trim (mm)
30
20
10
0
-10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
-20
-30
-40
-50
-60
-70
-80
-90
-100
Stage Number
Barge Heel
100
90
80
70
60
50
40
30
Barge Heel (mm)
20
10
0
-10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
-20
-30
-40
-50
-60
-70
-80
-90
-100
Stage Number
Page 9 of 93
SV-CPP TOPSIDE
Ballast: 109 618 753 865 909 1056 884 771 640 446 329 523 172 1410 1420 1612 1740 1402
Start Time: 07:39 07:57 08:22 08:52 09:22 09:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37
Stop Time: 07:57 08:22 08:52 09:22 09:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37 17:07
Duration: 00:18 00:25 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:05 00:40 00:40 00:40 00:40 00:30
Tide Height: 2.00 2.02 2.11 2.26 2.46 2.69 2.94 3.20 3.45 3.66 3.83 3.95 4.00 4.00 3.94 3.73 3.39 2.98 2.63
Distance: -1.5 3.5 8.5 13.5 18.5 23.5 28.5 33.5 38.5 43.5 48.5 53.5 58.5 59.5 69.5 79.5 89.5 99.5 106.9
Page 10 of 93
SV-CPP TOPSIDE
Start Time: 07:39 07:57 08:22 08:52 09:22 09:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37
Stop Time: 07:57 08:22 08:52 09:22 09:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37 17:07
Duration: 00:18 00:25 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:05 00:40 00:40 00:40 00:40 00:30
Tide
2.00 2.02 2.11 2.26 2.46 2.69 2.94 3.20 3.45 3.66 3.83 3.95 4.00 4.00 3.94 3.73 3.39 2.98 2.63
Height:
Distance
-1.5 3.5 8.5 13.5 18.5 23.5 28.5 33.5 38.5 43.5 48.5 53.5 58.5 59.5 69.5 79.5 89.5 99.5 106.9
Pulled:
Page 11 of 93
SV-CPP TOPSIDE
Start Time: 07:39 07:57 08:22 08:52 09:22 09:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37
Stop Time: 07:57 08:22 08:52 09:22 09:52 10:22 10:52 11:22 11:52 12:22 12:52 13:22 13:52 13:57 14:37 15:17 15:57 16:37 17:07
Duration: 00:18 00:25 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:30 00:05 00:40 00:40 00:40 00:40 00:30
Tide
2.00 2.02 2.11 2.26 2.46 2.69 2.94 3.20 3.45 3.66 3.83 3.95 4.00 4.00 3.94 3.73 3.39 2.98 2.63
Height:
Distance
-1.5 3.5 8.5 13.5 18.5 23.5 28.5 33.5 38.5 43.5 48.5 53.5 58.5 59.5 69.5 79.5 89.5 99.5 106.9
Pulled:
Page 12 of 93
Title: SV CPP DECK SUPPORT FRAME Rev.: Date:
LOADOUT ANALYSIS REPORT
Doc. No.: 05-1_EPC-SV-AEI-N-RA-03060 D1 06.07.18
The reference of global origin coordinate system for combined topsides is as follows:
X = 0 at gridline 1 (E 100000), positive towards platform East
Y = 0 at gridline A (N 100000), positive towards platform North
Z = 0 at LAT level
Platform co-ordinate systems are shown in Figure 3.0a and Figure 3.0b.
45 m
Y 6m
13m
SACS global
Coordinate
(0,0,0) X
topside COG
X=2.89m
Y=-0.09m
6m
Z
topside COG
X=2.89m
Y=-0.09m
Global COG Ref. Z= 28.09m
SACS global X
Coordinate (0,0,0)
COG Shift
Lx
x2
x1 dx
B3EE B3EJ
COG2
dy
COG1
Ly
GEOMETRY
CENTRE
y2
y1
y
Y
B3AQ B3AU
X
Input Data
x = Distance of geometric centre from axis in X-dir = 18.000 m
y = Distance of geometric centre from axis in Y-dir = 13.000 m
Lx = Length of couple force along X-axis = 24.000 m
Ly = Length of couple force along Y-axis = 26.000 m
Fz1 = Vertical load of COG 1 (original) = -155174.0 kN
x1 = X-coordinate of COG 1 (original) = 4.220 m
y1 = Y-coordinate of COG 1 (original) = -0.090 m
dw = Weight increase = 0.0 kN
dx = X-shift = -1.330 m
dy = Y-shift = 0.000 m
Output Data
Fz2 = Vertical load of COG 2 (shifted) = -155174.0 kN
x2 = X-coordinate of COG 2 (shifted) = 2.890 m
y2 = Y-coordinate of COG 2 (shifted) = -0.090 m
Mx = Unbalanced mom @ X-axis = 0.0 kN-m
My = Unbalanced mom @ Y-axis = -206381.4 kN-m
B3AQ = Load to be applied at -X-Y = -4299.6 kN
B3EE = Load to be applied at -X+Y = -4299.6 kN
B3AU = Load to be applied at +X-Y = 4299.6 kN
B3EJ = Load to be applied at +X+Y = 4299.6 kN
F = Total applied loads = 0.0 kN
B4 B6
(Shift 3) (Shift 1)
Y
A4 A6
(Shift 4) (Shift 2)
Total Weight, Fz 155174.00 kN
Original CoG x 2.89 m
y -0.09 m
Shift in X dir, dx 1m
Shift in Y dir, dy 1m