You are on page 1of 633

Engineering, Procurement, Construction and Installation

of Wellhead Platform(S1), Submarine Cables and


Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 2 of 56

TABULATION OF REVISED PAGES


REVISIONS REVISIONS
SHEET SHEET
C0 C1 C2 C3 C0 C1 C2 C3
1 X X 36 X X X
2 X X 37 X X
3 X X 38 X X
4 X X 39 X X
5 X X 40 X X
6 X X 41 X X X
7 X X 42 X X
8 X X 43 X X
9 X X 44 X X
10 X X 45 X X
11 X X X 46 X
12 X X 47 X
13 X X 48 X
14 X X 49 X X
15 X X 50 X X
16 X X 51 X X
17 X X 52 X X
18 X X 53 X X
19 X X 54 X
20 X X 55 X
21 X X 56 X
22 X X 57 X
23 X X 58
24 X X 59
25 X X 60
26 X X 61
27 X X 62
28 X X X 63
29 X X 64
30 X X 65
31 X X 66
32 X X X 67
33 X X 68
34 X X 69
35 X X 70
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 3 of 56

TABLE OF CONTENTS

1 INTRODUCTION.................................................................................................................... 6
2 DEFINITIONS ........................................................................................................................ 6
3 SCOPE OF WORK ................................................................................................................ 7
4 ABBREVIATIONS ................................................................................................................. 7
5 REFERENCES....................................................................................................................... 8
6 General Arrangement .......................................................................................................... 8
7 STRESS CRITERIA ............................................................................................................. 10
8 SUMMARY........................................................................................................................... 11
8.1 LIFT WEIGHT AND SLING FORCES ............................................................................................................ 11
8.2 MEMBER UNITY CHECK ............................................................................................................................... 12
8.3 JOINT CAN UNITY CHECK ........................................................................................................................... 13

9 ANALYSIS CRITERIA AND ASSUMPTIONS ..................................................................... 14


10 COMPUTER MODEL ........................................................................................................... 16
10.1 TOPSIDE MODEL........................................................................................................................................... 16
10.2 TACKLES AND SLINGS MODEL .................................................................................................................. 17
10.3 BOUNDARY CONDITIONS ............................................................................................................................ 20
10.4 MEMBER PROPERTIES ................................................................................................................................ 21

11 MODELLING OF EQUIPMENTS ......................................................................................... 22


12 LOADING............................................................................................................................. 23
12.1 GENERAL ....................................................................................................................................................... 23
12.2 MAIN STRUCTURE DEAD WEIGHT ............................................................................................................. 23
12.3 NON GENERATED DEAD WEIGHT .............................................................................................................. 23
12.4 BASIC LOAD CASE AND SUMMARY .......................................................................................................... 24
12.5 COG SHIFT LOADING ................................................................................................................................... 25
12.6 LOAD COMBINATION ................................................................................................................................... 26
12.7 SLINGS LOADS ............................................................................................................................................. 27

13 STRUCTURAL ANALYSIS, CRANE CAPACITY CHECK AND RIGGING DESIGN .......... 30


13.1 STRUCTURAL ANALYSIS ............................................................................................................................ 32

14 SADAF 3000 Capacity check ............................................................................................. 34


14.1 SADAF3000 A-FRAME AND JIB FRAME CHECK ....................................................................................... 36

15 Padeye Design.................................................................................................................... 39
15.1 METHODOLOGY ............................................................................................................................................ 39
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 4 of 56

15.2 LIFT WEIGHT AND SLING FORCES ............................................................................................................ 39


15.3 STRUCTURAL ANALYSIS ............................................................................................................................ 41
15.4 SLING LOADS ................................................................................................................................................ 41
15.5 PADEYE DESIGN IN FINITE ELEMENT ....................................................................................................... 41
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 5 of 56

Appendix A SACS MODEL PLOTS

Appendix B SACS INPUT FILES

SACS-INPUT FILE

JOINT CAN INPUT FILE

Appendix C SACS OUTPUT FILES

CENTER OF GRAVITY REPORT

REACTION FORCE & MOMENT SUMMARY

SPRING FORCE & MOMENT

SLING FORCE

MEMBER UNITY CHECK SUMMARY

JOINTCAN CHECK SUMMARY

Appendix D RESULT PLOTS

Appendix E PADEYE DESIGN

Appendix F DRAWING
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 6 of 56

1 INTRODUCTION
This project involves work in two locations; new facilities in satellite wellhead platform, S1, over the Salman
reservoir and additions to the existing Salman Complex. The modifications to Salman Complex facilities are
intended to increase the predictability of the oil wells by increasing gas lift capabilities in S1 facilities.

Salman Oil and Gas Field is an active oil producing complex in the Persian Gulf, in Iranian waters some 144
km south of Lavan Island. This field straddles the Iran – Abu Dhabi border with approximately two-thirds of
the producing structure lying in Iranian waters.

The existing offshore facilities at the Salman oil and gas field have been producing since 1968. The extracted
crude oil is processed and exported via a subsea pipeline to onshore facilities at Lavan Island.

The project scope includes:


 A new offshore platform and facilities,S1
 Production and test lines from S1 satellite platform to existing Salman Complex
 Gas lift line from existing Salman Complex to new S1 satellite platform
 Subsea cabling between existing Salman Complex and S1 satellite platform
 Tie-ins to existing offshore facilities
 Modification of existing platform

Item No. Description Location Depth


N: 2827565.5
1 Wellhead platform - S1 23 m
E: 715569.7
N: 2826165
2 Salman Complex - FP Platform
E: 716185
N: 2826323
3 Salman Complex - PP3 Platform
E: 716272

2 DEFINITIONS
PROJECT NAME Transportation, Engineering, Procurement,
Installation of S1 Topside for Salman Field
CLIENT Iranian Off-shore Oil Company (IOOC)
EPCIC CONTRACTOR Asfalt Tous Company (ATC)
INSTALLATION SUB-CONTRACTOR Sanaye Daryafan Qeshm (SADAF)
INSTALLATION ENGINEERING SUB- Farazan Saze Darya (FARDA)
CONTRACTOR
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 7 of 56

3 SCOPE OF WORK
Scope of this document is to summarize the results of the lifting analysis and check the adequacy of the
S1 wellhead production platform deck during lift operation with SADAF3000 crane barge.

The main objectives of this analysis are:

 To ensure that the structural elements of the S1 topside are of adequate size to resist all kinds of
forces imposed during lift conditions.

 To determine the sling forces for design of installation attachments such as slings, shackles and
padeyes.

 To design Padeyes (Two type Padeyes have been considered as HEAVY and LIGHT padeyes).

 To check SADAF 3000 crane barge capacity.

The S1 topside is assumed to be loaded out by lifting method, seafastened, transported and finally will be
lifted. Indeed, S1 topside will be lifted by SADAF 3000 crane barge at site. So lift analysis has been
carried out with considering characteristics of SADAF 3000 crane barge with two hooks (Combination of
A-Frame and Jib Frame). In fact, in order to increase crane barge capacity, combination of A-Frame and
Jib Frame have been taken into account to lift S1 topside. So this analysis has been carried out by
considering these assumptions and the relevant factors have been considered in analysis.

The design data and criteria are as described in the Structural design basis (Ref./B1/).

It is noteworthy that, the model of topside has been prepared based on weighing report which has been
weighed in site and actually, the COG and weight of sacs model are compatible with weighing report and
weighing operation completely.

4 ABBREVIATIONS
The following abbreviations are used in this document:

Table 1 – Document Abbreviations

Term Abbreviation

CF Consequence Factor

COG Centre of Gravity

DAF Dynamic Amplification Factor

EL Elevation

HAT Highest Astronomical Tide


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 8 of 56

LAT Lowest Astronomical Tide

MSL Mean Sea Level

UC Unity Check

5 REFERENCES
A. Codes & Standards
/A1/ Recommendation Practice for Planning, Designing and Constructing Fixed Offshore
Platforms, API RP 2A WSD – 21st edition

/A2/ American Institute of Steel Construction, AISC 9th edition

/A3/ AISC (13th Edition)“American Institute of Steel Construction, Specification for the
Design, Fabrication and Erection of Structural Steel for Buildings”
/A4/ NDI 0027 “Guidelines for Lifting Operations by Floating Crane Vessels”

/A5/ API Spec 5L “Specification for Line Pipe”

/A6/ API Spec 2B 1190 “Specification for Fabrication Structural Steel Pipe, 4th edition”

/A7/ API Spec 2H 1190 “Specification for Carbon-Manganese Steel Plate for offshore
Tubular Joints, 6th edition”
B. Project Specifications

/B1/ SL-EST-DB-WPS1-2001 “Structural Design Basis”

/B2/ SL-EST-SP-WPS1-3102 “Structural Material Specification”

/B3/ Contract Technical Document “Integrity Structural Design Premises”

6 GENERAL ARRANGEMENT
S1 platform is a Four (4) leg jacket with no batter. The jacket Support the following appurtenances:

One Caisson: 30”

Three risers, one 12" riser and two 6" risers

Two J tubes

The primary horizontal elevations for the jacket framing are as follows:

EL (-) 21.00 meters; bottom bracing level

EL (-) 6.00 meters; intermittent bracing level

EL (+) 6.00 meters; top bracing level (Sea deck walkway)


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 9 of 56

Pile cut-off : EL (+) 7.500 m

Top of jacket : EL (+) 7.000 m

Water depth : 23.00 m below LAT

The primary horizontal elevations for the topside are as follows:

EL (+) 9.50 meters (TOS); Drain Deck

EL (+) 13.00 meters (TOS); Cellar Deck

EL (+) 17.70 meters (TOS); Mezzanine Deck

EL (+) 21.70 meters (TOS); Weather Deck

EL (+) 24.70 meters (TOS); Heli Deck

A summary of general arrangement of the Jacket are as follows:

Description Design Data


No. of Legs 4
Jacket dimension at Working Point 11.5 x 22 (mxm)
Jacket elevation at Working Point El + 7.500 (LAT)
Height of Jacket 30.60
Number of Piles 4 (DI=46 inches)
Risers 1x12” DIA & 2X6” DIA
J-tube 2
Caisson 30”
Conductor 6 x 30” DIA
Boat Landing 1
Barge Bumper 5
The isometric view of the S1 topside in lift condition is given in Figure 1.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 10 of 56

Figure 1 - 3D View of S1 Platform (Combination of A-Frame and Jib Frame)

7 STRESS CRITERIA
All structural elements and joints are checked for compliance with the requirements of API-RP-2A WSD
(21st Edition) and AISC (9th Edition) codes. For stress checks, API-RP-2A 20th and 21st editions are
same.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 11 of 56

Member and tubular joint checks are carried out to basic allowable stresses.

Structural analysis is carried out using the SACS structural software version 5.2, which performs linear
elastic analysis, based on the displacement method.

8 SUMMARY
The narrative below is only brief summary of the pertinent findings from the structural analyses carried
out. The reader should read the report in its entirely in order to gain a full understanding of the work
carried out and findings thereof.

8.1 LIFT WEIGHT AND SLING FORCES


The weight and COG of the topside including contingencies are as follows:

Total lift weight of the topside is 10248.51 KN. (Weight including Contingencies and excluding DAF
factor), the factored weight (DAF=1.15) of topside is 11785.78 KN and by considering the relevant load
factors (refer to Sec 9) the factored weight of topside is 13129.36 KN. (This weight is included
contingency, DAF, YAW, TILT and CG factor also this weight is included rigging weight such as padeye,
shackle, sling weight).

♦ COG, X: -6.34 m

♦ COG, Y: -0.90 m

The maximum tension in slings is 5412 KN. (This load is included contingency, DAF, YAW, TILT and CG
factor).

The following describes the co-ordinates system: (The Z global axis is pointing upward with origin at 7.50
m below the topside legs)

COG location has been presented in below figure:


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 12 of 56

Y
6340 mm

COG
890 mm

Figure 2 – S1 Topside COG Location

8.2 MEMBER UNITY CHECK


The lift analysis results show that all member unity checks are within an allowable range. All member
unity checks are reported in Appendix-D.

Table 2– Topside Member Unity Check Summary

Member Maximum
LCOMB REMARKS
(Group /Joint) Unity Check
Topside leg TLC, 0114-0136 UC = 0.67* 1301 LEG B1*
Topside vertical V-brace between Cellar
TV6, 0047-0466 UC = 0.82 1301
braces Deck & Mezz. Deck
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 13 of 56

Member Maximum
LCOMB REMARKS
(Group /Joint) Unity Check
(Row B)

Support between
Topside vertical
TS1, T5O5-0327 UC = 0.59 1101 weather deck &Mezz.
supports
deck
Helideck beams HS1, T236-T67D UC = 0.76 1201 IPE300
Weather deck 1201
WS3, T5BG-0131 UC = 0.63 IPE240
beams
Mezzanine deck
MS4, 0103-0532 UC = 0.68 1401 HEB400
beams
Cellar deck beams CP4, 0073-0237 UC = 0.74 1301 HEB400

Drain deck beams DP1, 0000-T594 UC = 0.59 1101 HEB600

*Note: This member should be checked with 0.87, because this member is connected to sling and
consequence factor 1.15 should be considered for this member.

8.3 JOINT CAN UNITY CHECK


The joint punching shear results show that all the tubular joints are adequate during lift condition. All joint
punching shear unity checks are reported in Appendix-D.

Table 3– Maximum Joint Unity Check Summary


Diameter Thickness
Joint UC
(Cm) (cm)
0047 91.44 4.8 0.895
0049 91.44 3.5 0.548
0114 91.44 3.5 0.482
0113 91.44 3.5 0.462
0081 91.44 3.5 0.453
0080 91.44 3.5 0.429
0046 91.44 3.5 0.424
0048 91.44 3.5 0.406
0004 91.44 3.5 0.366
T484 50.8 2.54 0.363
0000 91.44 3.5 0.187
T473 27.31 1.27 0.086
T485 27.31 1.27 0.063
T475 27.31 1.27 0.059
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 14 of 56

9 ANALYSIS CRITERIA AND ASSUMPTIONS


The deck is lifted using 4 slings connected to two hooks (4 tackles) from the lifting padeye on the topside.
The crane tackles (4 tackles) are constrained in all degrees of freedom; however, proper member release
is considered for slings (000111 at lifting point and 000011 at tackles).

Slings are modeled using tension only gap elements and no load members with respect to the case of
study. COG shift is considered to be +/-0.50 m longitudinally and +/- 0.50m laterally. To apply the COG
shift influence, pointed loads are exerted on the lifting points so it is ensured that static equilibrium of
structure is accomplished.

The slings have been modeled by means of pipe elements having just axial stiffness.

The sling angle is considered based on 3D model of topside and crane barge. It should be noted, the
slings angles with horizontal plan are more than 60 deg.

All structural members and joints of the deck are checked as per the conditions described in the
Structural Design Basis as given below:

Lifting analysis is carried out based on the Factored Lift Weight (Lift Weight with an additional Dynamic
Amplification Factor of 1.15)

The Dynamic Amplification factor of 1.15 is applicable for the global structure as the lift weight is between
1000MT and 2500MT. Additionally, consequence factor of 1.15 has been used for checking the members
framing into the lifting points and for checking the associated joints. The rest of the structure has been
checked with a consequence factor of 1.0. A consequence factor of 1.35 is used for checking the
padeyes (or trunnion).

The lift analysis, also accommodates a COG variation of 10% of the overall width and length of deck i.e.,
within a Rectangular of1.0m x1.0m. The structure has been analyzed by shifting COG to the corners of
this rectangle, keeping the current COG as the center of the rectangle. Couples in both X and Y
directions have been used to shift the COG of the jacket to the desired location.

Below factor shall be considered for structural design, lifting padeye (or trunnion) design:

 Dynamic Amplification Factors


Unless operation-specific calculations show otherwise, for lifts by a single crane in air, the DAF shall be
derived from the following Table.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 15 of 56

Table 4-In Air Dynamic Amplification Factors (DAF)


DAF

Offshore Inshore Onshore


Gross weight, W (Tonnes)
Moving Static

W <100 1.30 1.15 1.00


100 < W < 1,000 1.20 1.10 1.00
1,000 < W < 2,500 1.15 1.05 1.00
2,500 < W < 10,000 1.10 1.05 1.00

The DAF as indicated in Table 3 above shall also apply to the following lift combinations of vessels,
cranes and locations:

 For lifts by 2 cranes on the same vessel

 For inshore lifts, in totally sheltered waters, by 2 or more vessels

 For onshore lifts by 2 or more cranes

 For offshore lifts by 2 or more hooks on the same crane boom

 Consequence Factor
Consequence factor of 1.15 has been used for checking the members framing into the lifting points and
for checking the associated joints. The rest of the structure has been checked with a consequence factor
of 1.0. A consequence factor of 1.35 is used for checking the padeyes (or trunnion).

 Hook lift factors:


For a 2-hook lift (hooks on the same vessel) the individual gross weight at each hook shall be multiplied
by the following factors, to account for increased loads due to the tolerances of the elevation in the crane
hooks:

• Centre of gravity shift factor = 1.03

• Tilt factor = 1.03

For a 2-hook lift, with 2 slings to each hook, the load to each lift point shall be multiplied by a yaw factor,
to account for tolerances in lift radii of the 2 hooks:

• Yaw factor = 1.05

 Contingencies:
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 16 of 56

The model of topside has been prepared based on weighing report which has been weighed in site and
actually, the COG and weight of SACS model are compatible with weighing report and weighing
operation completely. Additionally, 3% contingency has been considered.

10 COMPUTER MODEL
A three-dimensional structural space frame model of the S1 Topside has been developed using the
SACS suite of computer programs. The structural analysis model represents the current design status of
the structure in order to determine the joint and member stress levels in accordance with the latest
applicable codes, environmental data and state of the art technology (computer modeling). The computer
model configuration and member sizes conform to the latest available design drawings. Plots of the
computer model are included in the Appendix A.

The deck structure is modelled with all its primary trusses and beams. Secondary beams are also
modelled to facilitate input of loading.

The plots of the deck structure with node numbering are included in Appendix-A

Member groups are used to define member properties such as cross section and material properties. The
plots showing group labels assigned to different members are also enclosed in Appendix-A. For a quick
reference, the member group series are described below:

 Heli deck primary beams are identified by member groups HP series.

 Weather deck primary beams are identified by member groups WP series.

 Mezzanine deck primary beams are identified by member groups MP series.

 Cellar deck primary beams are identified by member groups CP series.

 Drain deck primary beams are identified by member groups DP series.

 Deck truss braces are identified by member groups TV series.

 Deck Legs are identified by member groups TL series.

10.1 TOPSIDE MODEL


The structure model is same as the in-place model in which all primary and secondary members are
modeled. The following modifications have been made in the Inplace model to suit for Lift analysis:

 The jacket structure has been deleted from the model.

 Equipment and piping content weights are removed from model. (Dry condition has been considered).

 Assumed sling members are added. Member groups are used to define the member properties such
as cross section and material properties. The plots showing joint numbers and member groups &
member sections assigned to different members are enclosed in Appendix-A.

 The Secondary items of Christmas tree platform at Cellar Deck levels have been deleted.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 17 of 56

The model of topside has been prepared based on weighing report which has been weighed in site and
actually, the COG and weight of SACS model are compatible with weighing report and weighing
operation completely. Additionally, 3% contingency has been considered.

The structural topside model, used for lifting analysis, includes all main structural elements of the topside
and the lifting items, including the four slings connecting the crane hooks and pad-eyes. (Slings have
been connected to two tackles).

A global view of the model with the relevant reference axis system is shown in Appendix A.

Member groups are used to define the member properties such as cross section and material properties.

10.2 TACKLES AND SLINGS MODEL


To model slings and crane barge tackles, at first a 3D model from S1 platform, Padeyes and SADAF3000
crane barge has been made and afterwards coordinates of tackles have been extracted from CAD 3D
model. At second stage, based on pervious stage, the tackles (4 tackles) were modeled in SACS
software. It should be noted all angles between slings and horizontal axes are more than 60.0 deg. It
should be noted, positions of tackles and arrangements of riggings are based on the most clearance
between topside legs and docking guides and also the most clearance between S1 platform and SADAF
3000 A-Frame.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 18 of 56

Jib-Frame has been rotated 5 deg.

A-Frame Tackles have been rotated


9.0 deg

Figure 3 – 3D Model of S1 Platform and SADAF 3000 Crane Barge


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 19 of 56

Slings are modeled as weightless tubular members with moment releases at the ends so that they carry
only the axial load.

The topside configuration that considered in the lifting analysis is shown in the following Figure.

Figure 4 - 3D View of S1 Topside


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 20 of 56

37.81 m

COG

13.25 m

Figure 5 - 3D View of S1 Topside

10.3 BOUNDARY CONDITIONS


The hook points are considered as fixed. The sling members have moment releases at their ends. Hence
in order to avoid any rigid body motion, low stiffness springs have been modeled, in such a way that
almost no load is taken by the springs. Springs force summary is given in Appendix-A. Following figure
show boundary condition.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 21 of 56

Figure 6 - 3D View of S1 Platform

10.4 MEMBER PROPERTIES


The following tables present member properties for each member group.

The K factors used for calculating allowable axial stresses for each member are as per table below.
Table 5 Buckling Coefficient Factors
Member Buckling Coefficient ‘K’
Braced Jacket Legs and Piles 1.0
Unbraced Jacket Legs 1.2
Jacket Braces in elevation 0.8
Jacket X-Braces in elevation 0.9 (Longer segment length of X-braces)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 22 of 56

Member Buckling Coefficient ‘K’


Jacket Horizontals in plan 0.8
Jacket Secondary Horizontals in plan 0.7
Pile Stick-up during installation 2.1
Deck Braces – Inplane 0.8
Deck Braces - out of plane 1.0
Deck Beams 1.0
Cantilever Beams 2.0
Bending moment reduction factors ’Cm’ is taken as 0.85 as per AISC 9th Edition, section H1.c.

Buckling coefficient ‘K’ values are given input in the group cards of SACS input file and Ly, Lz are
modified for each member. SACS multiplies both ‘K’ and ‘L’ values to get effective buckling length.

11 MODELLING OF EQUIPMENTS
For main equipment, the equipment load shall be modeled through dummy structures with the load at the
correct COG. Releases shall be used to avoid stiffness.

Profiles selected to represent the equipment skid shall be realistic, in order not to over- or under-
estimate the load distributing effect of the skid structure. In addition the vertical stubs connecting the skid
to the deck shall be given a low modulus Young (E = 2,100 MPa) so that the skid does not stiffen the
deck. Modeling of equipment support has been explained in below figures.

Figure 7 – Modeling of horizontal Vessel such as Close drain and Pig Launcher
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 23 of 56

Figure 8 – Modeling of Package Equipment (4 Skid Pads)

12 LOADING
12.1 GENERAL
The topside analyzed with the four padeyes connected with a sling each, to main tackles points. The
tackles points are located based on 3D CAD model.

The COG of the structure is determined for load combination made for topside total weight (LCOMB
WGVT), from SACS.

The tables hereafter display the basic load cases, which have been considered in order to simulate the
gravity loads. Appropriate contingencies have been considered through the loading combinations as per
Structural Design Basis.

12.2 MAIN STRUCTURE DEAD WEIGHT


The dead weight of the modelled structure is calculated automatically by the SACS program. dead
weights are generated simultaneously by the SACS program in the same Dead Load case.
TABLE 9: LOAD CASE 1 (CREATED IN SACS)
Load Case Number Description Weight (KN)
1 Dead weight (Without Contingency) 3510.29

12.3 NON GENERATED DEAD WEIGHT


Total weight of the non-generated items is presented in the following tables.

TABLE 10: BASIC LOADCOMB.ABOUT TOPSIDE


Contingency Base Weight Factored
LC Description
Factor (KN) Weight (KN)
ARCH Architectural Dry Weight 1.1 -481.85 -530.04
ELCT Electrical Dry Weight 1.1 -511.76 -562.94
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 24 of 56

Contingency Base Weight Factored


LC Description
Factor (KN) Weight (KN)
HVAC H-VAC dry weight 1.1 -138.52 -152.38
INST Instrument Dry Weight 1.1 -122.67 -134.94
MCDR Equipment Dry Weight 1.1 -254.09 -279.50
PIDR Piping Dry Weight 1.1 -1578.17 -1735.98
SFTY Safety Equipment Dry Weight 1.1 -99.98 -109.97
STRC Steel Structure Non-Modeled 1.1 -2361.38 -2597.51
CR5 Crane Weight in Rest condition 1 -350.00 -350.00
8 Rigging Weight 1.15 -258.10 -296.82
Total Topsides dry Weight (Without Deck Primary and Secondary
-6156.52 -6750.08
Steel Self Weight)

12.4 BASIC LOAD CASE AND SUMMARY


Basic load case description and load summary considered for the Topside lift analysis are given in the
following tables.

Table 6– Load Cases Description


LOAD
DESCRIPTION
LABEL
1 COMPUTER GENERATED SELF-WEIGHT
8 INSTALLATION AIDS
CGX1 COG SHIFT X DIRECTIN (MY)
CGY1 COG SHIFT Y DIRECTIN (MX)
COUPLING FORCE FOR MATCHING COG MODEL WITH
CGX
COG OF WEIGHING REPORT
COUPLING FORCE FOR MATCHING COG MODEL WITH
CGY
COG OF WEIGHING REPORT
CR5 CRANE DEAD LOAD AT REST CONDITION
CDAR CELLAR DECK ARCHITECTURAL LOADS
MDAR MEZZANINE DECK ARCHITECTURAL LOADS
WDAR WEATHER DECK ARCHITECTURAL LOADS
DDEL DRAIN DECK ELECTRICAL LOADS
CDEL CELLAR DECK ELECTRICAL LOADS
MDEL MEZZANINE DECK ELECTRICAL LOADS
WDEL WEATHER DECK ELECTRICAL LOADS
CDIN CELLAR DECK INSTRUMENT LOADS
MDIN MEZZANINE DECK INSTRUMENT LOADS
DDSA DRAIN DECK SAFETY LOADS
CDSA CELLAR DECK SAFETY LOADS
MDSA MEZZANINE DECK SAFETY LOADS
WDSA WEATHER DECK SAFETY LOADS
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 25 of 56

LOAD
DESCRIPTION
LABEL
HDSA HELI DECK SAFETY LOADS
DDPD DRAIN DECK PIPING DRY LOADS
CDPD CELLAR DECK PIPING DRY LOADS
MDPD MEZZANINE DECK PIPING DRY LOADS
WDPD WEATHER DECK PIPING DRY LOADS
DDST DRAIN DECK UNMODELED STRUCTURE LOADS
CDST CELLAR DECK UNMODELED STRUCTURE LOADS
MDST MEZZANINE DECK UNMODELED STRUCTURE LOADS
WDST WEATHER DECK UNMODELED STRUCTURE LOADS
HDST HELI DECK UNMODELED STRUCTURE LOADS
DDMD DRAIN DECK MECANICAL DRY LOADS
CDMD CELLAR DECK MECANICAL DRY LOADS
MDMD MEZZANINE DECK MECANICAL DRY LOADS
WDMD WEATHER DECK MECANICAL DRY LOADS
MDHV MEZZANINE DECK HVAC LOADS
WDHV WEATHER DECK HVAC LOADS

12.5 COG SHIFT LOADING


The lift weight of the topside is 10248.51 KN (Weight including Contingencies, DAF factor) and the C.O.G
location is as follows:

COG, X : -6.34 m

COG, Y : -0.90 m

Variation of COG Location has been considered as 10% along the overall length and width of the
structure, but not more than 1.0m x 1.0m square area. This C.O.G shift in each direction has been
achieved using a couple .Load case ‘CGX1’ and ‘CGY1’ have been considered to simulate the shift in
COG. The COG shift loads are calculated below:

W=11785.78 KN

Topside length in X direction, X=37.04m, X *0.1=3.704 m > 1.0 m

Topside width in Y direction, Y=21.00m, Y*0.1=2.100 m > 1.0 m

Moment for COG shift in X direction, My= 11785.78 x0.50=5892.89 KN-m

Couple force for COG shift in X direction, Fz=My/X1= 5892.89/22 = 267.85KN (267.85/2 = 133.92 KN to
be applied at four joints), Fz= 133.92 KN to be applied on 699L & 619L joints, Fz= -133.92 KN to be
applied on 681L & 601L joints.

Moment for COG shift in Y direction, Mx= 11785.78 x0.50=5892.89 KN-m


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 26 of 56

Couple force for COG shift in Y direction, Fz=Mx/Y1= 5892.89/ 11.5=512.43 KN (512.43/2 = 256.21 KN
to be applied at four joints), Fz= 256.21 KN to be applied on 619L & 601L joints, Fz= -256.61 KN to be
applied on 681L & 699L joints.

Center of gravity shift should be considered from each direction and each side by couple force. These
conditions have to be observed in analysis and are shown in following figure.

According to the C.O.G shift criteria (possible C.O.G location in the C.O.G envelope) 5 load combinations
have been considered to take into account the effect of cog shift. Description of above mentioned load
combinations are presented in section 12.6.

12.6 LOAD COMBINATION


The basic load cases are combined with applicable contingencies and appropriate factors.

Table 7- Load amplification factors


Checking Checking Checking Pad Checking A- Checking Crane
Load Amplification Members Members eye Frame & Jib Capacity *
Values
Factors attached to Pad Frame and
eye Tackles
Weight Contingency 1.03 X X X X X
Dynamic Amplification
1.15 X X X
Factor
Skew load factor 1.0
Consequence factor (for
1.35 X
checking joint)
Consequence factor (for
1.15 X
checking member)
C.O.G shift effect 1.03 X X X X
Yaw factor 1.05 X X X
Tilt factor 1.03 X X X X
Square
COG Envelope X X X X
1x1

*Note: DAF factor is included in SADAF3000 crane barge graph.

Table 8– Load Combination Description

LCOMB Description

LCOMB ARCH TOPSIDE ARCHITECTURAL LOAD CDAR+MDAR+WDAR

LCOMB ELCT TOPSIDE ELECTRICAL LOAD DDEL+CDEL+MDEL+WDEL

LCOMB HVAC TOPSIDE HVAC LOAD WDHV

LCOMB INST TOPSIDE INSTRUMENT LOAD CDIN+MDIN

LCOMB PIDR TOPSIDE PIPING DRY LOAD DDPD+ CDPD +MDPD+WDPD

LCOMB MCDR TOPSIDE MECANICAL DRY LOAD DDMD+ CDMD +MDMD+WDMD


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 27 of 56

LCOMB Description

LCOMB SFTY TOPSIDE SAFETY LOAD DDSA+ CDSA+MDSA+WDSA

LCOMB STRC TOPSIDE STRUCTURAL LOAD DDST+ CDST+MDST+WDST+HDST

TOTAL DECK GRAVITY LOAD 1.07*STRC+ 1.1*PIDP+ 1.1*INST+1.1* ELCT+ 1.1*SFTY+


LCOMB 111
INCLUDING CONTINGENCY 1.1*ARCH+ 1.1*HVAC+1.1* MCDP+1.07*1+1.00*CR5

LCOMB GVT THE LCOMB WHICH IS MATCHED WITH 111 x 0.9535


WEIGHING REPORT

TOPSIDE WEIGHT WITH CONSIDERING


LCOMB WGVT 3% CONTINGENCY AND MACHING COG GVT x 1.03 +CGX x 1.00+CGY x 1.00
OF MODEL TO WEIGHING REPORT

LCOMB DAF TOTAL WEIGHT INCLUDE 1.15 X GVT


DAF COEFFICIENT
TOTAL WEIGHT WITH CENTRE OF
LCOMB MEM GRAVITY SHIFT FACTOR, TILT FACTOR 1.114 X DAF (1.114=1.03x1.03x1.05)
AND YAW FACTOR
THE LCOMB WHICH IS USED TO CHECK
TACKLE CAPACITY (INCLUDES CENTRE
LCOMB TACK 1.061X WGVT (1.061=1.03x1.03)
OF GRAVITY SHIFT FACTOR, TILT
FACTOR )

Table 9– Load Combination


Load Comb. MEM CGX1 CGY1
1001 1.00 0 0
1101 1.00 +1.00 -1.00
1201 1.00 -1.00 -1.00
1301 1.00 -1.00 +1.00
1401 1.00 +1.00 +1.00

12.7 SLINGS LOADS


Maximum sling loads is as follow:

The maximum tension in slings is 5412 KN. (This load is included contingency, DAF, YAW, TILT and
CG factor).

Table 10 –Slings Loads


Axial
Member LCOMB
(KN)
PAD1-A001 1001 916.47
PAD2-A002 1001 2255.17 Without COG
PAD3-J001 1001 5198.87 Shift
PAD4-J002 1001 5042.31
PAD1-A001 1101 1424.44
PAD2-A002 1101 2006.87
PAD3-J001 1101 5133.23
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 28 of 56

Axial
Member LCOMB
(KN)
PAD4-J002 1101 4851.85
PAD1-A001 1201 1149.64
PAD2-A002 1201 1760.21
PAD3-J001 1201 5412.72
PAD4-J002 1201 5086.03
PAD1-A001 1301 408.50
PAD2-A002 1301 2503.47
PAD3-J001 1301 5264.50
PAD4-J002 1301 5232.77
PAD1-A001 1401 683.29
PAD2-A002 1401 2750.12
PAD3-J001 1401 4985.01
PAD4-J002 1401 4998.59
Based on above table padeyes are classified to two type, 1- light padeye (Row 2) and 2-Heavy Padeye
(Row 1).

Based on above table the maximum force in each slings have been tabulated as below;

Sling Axial
Number* (KN)
Sling 1 1424.44
Sling 2 2750.1
Sling 3 5412.72
Sling 4 5232.77

*Note: Refer to below figure:


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 29 of 56

Sling 3 A001

J001

Sling 1

Sling 2
J002

Sling 4
A002

Figure 9: Slings and Tackle Number


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 30 of 56

A-Frame Tackle (Joint Name in SACS


A001)
Jib-Frame Tackle (Joint Name in SACS
J001)

Jib-Frame Tackle (Joint Name in SACS


J002) A-Frame Tackle (Joint Name in SACS
A002)

Figure 10-S1 Lift Model

13 STRUCTURAL ANALYSIS, CRANE CAPACITY CHECK AND RIGGING DESIGN


Below factor shall be considered for structural design, padeye design, rigging design and crane capacity
check.

 DYNAMIC AMPLIFICATION FACTORS


Unless operation-specific calculations show otherwise, for lifts by a single crane in air, the DAF shall be
derived from the following Table.

Table 11-In Air Dynamic Amplification Factors (DAF)


DAF
Offshore Inshore Onshore
Gross weight, W (Tonnes)
Moving Static

W <100 1.30 1.15 1.00


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 31 of 56

100 < W < 1,000 1.20 1.10 1.00

1,000 < W < 2,500 1.15 1.05 1.00

2,500 < W < 10,000 1.10 1.05 1.00

The DAF as indicated in Table 11 above shall also apply to the following lift
combinations of vessels, cranes and locations:
 For lifts by 2 cranes on the same vessel
 For inshore lifts, in totally sheltered waters, by 2 or more vessels
 For onshore lifts by 2 or more cranes
 For offshore lifts by 2 or more hooks on the same crane boom
 HOOK LIFT FACTORS

For a 2-hook lift (hooks on the same vessel) the individual gross weight at each hook shall be multiplied
by the following factors, to account for increased loads due to the tolerances of the elevation in the crane
hooks:
 Centre of gravity shift factor = 1.03
 Tilt factor = 1.03

For a 2-hook lift, with 2 slings to each hook, the load to each lift point shall be multiplied by a yaw factor,
to account for tolerances in lift radii of the 2 hooks:
 Yaw factor = 1.05
 PART SLING FACTOR

Where a 2-part sling or grommet passes over, round or through a shackle, trunnion, padeye or crane
hook, other than at a termination, the total sling force shall be distributed into each part in the ratio 45:55
to account for frictional losses over the bend.

 TERMINATION EFFICIENCY FACTOR


The breaking load of a sling ending in an eye splice shall be assumed to be the calculated rope breaking
load multiplied by a factor as follows;
 For hand splices, including fiber slings; 0.75
 For resin sockets; 1.00
 Swage fittings, e.g. “Super loop”; 1.00

Other methods of termination will require special consideration.

 BENDING EFFICIENCY FACTOR


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 32 of 56

Where any wire rope sling or grommet is bent round a shackle, trunnion, pad eye or crane hook, the
breaking load shall be assumed to be the calculated breaking load multiplied by a bending efficiency
factor as follows;

Bending efficiency factor = 1 - 0.5/√ (D/d), where;

d = the sling or cable laid rope diameter

D = the minimum diameter over which the sling body, grommet end or body is bent.

Table 12-Bending Efficiency Factors


D/d <1.0 1.0 1.5 2.0 3.0 4.0 5.0 6.0 7.0
Not
Factor 0.50 0.59 0.65 0.71 0.75 0.78 0.80 0.81
Advised

It should be noted that termination and bending factors should not be applied simultaneously. The one
which results in the lower value of breaking load will govern, and should be used.

 SLING OR GROMMET SAFETY FACTORS


For steel slings and grommets, the minimum safety factor shall be not less than 2.25.

13.1 STRUCTURAL ANALYSIS


Contingency factor (1.030), dynamic amplification factor (1.15), Centre of gravity shift factor (1.03), Tilt
factor (1.03) and Yaw factor (1.05) According to NDI0027 are applied. (Refer to Table 7)

According to above sentence, below factors should be used for checking the structure:

 Contingency factor=1.030 (contingency factor 1.030 has been used in model)

 dynamic amplification factor=1.15 (DAF 1.15 has been used in model)

 Centre of gravity shift factor=1.03 (CG factor 1.03 has been used in model)

 Tilt factor =1.03 (Tilt factor 1.03 has been used in model)

 Yaw factor = 1.05 (Yaw factor 1.05 has been used in model)

 COG Shift = Envelope of COG shift has been considered in model

Members which connect to lifting padeyes should be checked with unity Check 0.87. (Consequence
factor of 1.15)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 33 of 56

Table 13– Topside Member Unity Check Summary


Member Maximum
LCOMB REMARKS
(Group /Joint) Unity Check
Topside leg TLC, 0114-0136 UC = 0.67* 1301 LEG B1*
V-brace between Cellar
Topside vertical
TV6, 0047-0466 UC = 0.82 1301 Deck & Mezz. Deck
braces
(Row B)
Support between
Topside vertical
TS1, T5O5-0327 UC = 0.59 1101 weather deck &Mezz.
supports
deck
Helideck beams HS1, T236-T67D UC = 0.76 1201 IPE300
Weather deck
WS3, T5BG-0131 UC = 0.63 1201 IPE240
beams
Mezzanine deck
MS4, 0103-0532 UC = 0.68 1401 HEB400
beams
Cellar deck beams CP4, 0073-0237 UC = 0.74 1301 HEB400

Drain deck beams DP1, 0000-T594 UC = 0.59 1101 HEB600

*Note: This member should be checked with 0.87, because this member is connected to sling and
consequence factor 1.15 should be considered for this member.

Table 14– Maximum Joint Unity Check Summary


Diameter Thickness
Joint UC
(Cm) (cm)
0047 91.44 4.8 0.895
0049 91.44 3.5 0.548
0114 91.44 3.5 0.482
0113 91.44 3.5 0.462
0081 91.44 3.5 0.453
0080 91.44 3.5 0.429
0046 91.44 3.5 0.424
0048 91.44 3.5 0.406
0004 91.44 3.5 0.366
T484 50.8 2.54 0.363
0000 91.44 3.5 0.187
T473 27.31 1.27 0.086
T485 27.31 1.27 0.063
T475 27.31 1.27 0.059
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 34 of 56

14 SADAF 3000 CAPACITY CHECK


The capacity of SADAF3000 crane barge in harbor condition and with considering Hs=1.25 m for
combination of A-Frame and Jib to lift a body have been presented in below tables:

It should be noted Jib hook has been rotated 5.0 deg so the capacity of crane shall be considered for jib
angle related to 5.0 deg. Based on Table 15 the capacity of SADAF 3000 is 1478 ton in harbor condition
with considering combination of 4 tackles and also according to Table 16 the capacity of SADAF 3000 is
1170 ton with Hs=1.25 and considering combination of 4 tackles.
Table 15 – SADAF 3000 capacity in Harbor condition (Combination of A-Frame and Jib)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 35 of 56

Table 16 – SADAF 3000 capacity with Hs=1.25 m (Combination of A-Frame and Jib)

Regarding above explanations, two cases have been investigated as below (based on NDI 0027 both
cases shall be checked):

 DHL (Dynamic hook load)

Based on weighing report, topside weight is 1046 ton (include 3% contingency) and based on NDI 0027
DAF factor is 1.15. Hence topside lifted weight is 1202 ton which shall be compared with 1478 ton.

Topside lifted weight (1202 ton) < SADAF3000 crane capacity in harbor condition (1478 ton) OK

 SHL (Static hook load)

Based on weighing report, topside weight is 1046 ton (include 3% contingency), this value shall be
compared with 1170 ton. (it should be noted 1170 ton is related to 5.0 deg Jib boom rotated with
considering Hs=1.25 m.

Topside weight (1046 ton) < SADAF3000 crane capacity with Hs=1.25 m condition (1170 ton) OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 36 of 56

14.1 SADAF3000 A-FRAME AND JIB FRAME CHECK


For checking of crane capacity shall be used contingency factor, COG shift factor, Centre of gravity shift
factor (1.03) and Tilt factor (1.03). (Refer to Table 7)

According to above sentence, below factor should be used for checking the hooks and tackles

 Contingency factor=1.030 (contingency factor 1.030 has been used in model)

 COG Shift = Envelope of COG shift has been considered in model

 Centre of gravity shift factor=1.03 (contingency factor 1.030 has been used in model). It should
be noted, this factor has been considered conservatively.

 Tilt factor =1.03 (contingency factor 1.030 has been used in model)

A-Frame
Jib-Frame

Figure 11-S1 Top View Lift Model

According to Lift analysis reactions of each tackles have been tabulated as below:

Table 17 –Tackles Reactions


Reaction-KN-With CG Reaction-Ton-With CG
Hook Tackle Tackle
LCOMB & Tilt Factors & Tilt Factors
Name No. Capacity (Ton)
(1.03*1.03) (1.03*1.03)
1001 734.55 74.88 800.00
A-
A001 1101 1226.15 124.99 800.00
Frame
1201 960.20 97.88 800.00
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 37 of 56

Reaction-KN-With CG Reaction-Ton-With CG
Hook Tackle Tackle
LCOMB & Tilt Factors & Tilt Factors
Name No. Capacity (Ton)
(1.03*1.03) (1.03*1.03)
1301 242.95 24.77 800.00
1401 508.89 51.87 800.00

1001 1807.53 184.25 800.00


1101 1567.23 159.76 800.00
A-
A002 1201 1328.53 135.43 800.00
Frame
1301 2047.83 208.75 800.00
1401 2286.54 233.08 800.00

1001 4238.19 432.03 800.00


1101 4173.58 425.44 800.00
Jib-
J001 1201 4448.69 453.48 800.00
Frame
1301 4302.80 438.61 800.00
1401 4027.69 410.57 800.00

1001 4093.40 417.27 800.00


1101 3906.71 398.24 800.00
Jib-
J002 1201 4136.25 421.64 800.00
Frame
1301 4280.09 436.30 800.00
1401 4050.55 412.90 800.00

Table 18 – A-Frame Reaction


Reaction (Hook Load)-KN-
Hook Reaction (Hook Load)-Ton-With
LCOMB With CG & Tilt Factors A-Frame Capacity
Name CG & Tilt Factors (1.03*1.03)
(1.03*1.03) (Hs=1.25)
1001 2542.08 259.13 1522
1101 2793.38 284.75 1522
A001+A002
1201 2288.73 233.31 1522
(A-Frame)
1301 2290.78 233.51 1522
1401 2795.43 284.96 1522

Table 19 – Jib-Frame Reaction

Hook Reaction (Hook Load)-Ton-With Jib-Frame Capacity


LCOMB Reaction (Hook Load)-KN
Name CG & Tilt Factors (1.03*1.03) (Hs=1.25)-Rotation 50
1001 8331.59 849.30 959
J001+J002 1101 8080.28 823.68 959
(Jib- 1201 8584.94 875.12 959
Frame) 1301 8582.89 874.91 959
1401 8078.24 823.47 959
The capacity of A-Frame and Jib have been presented and marked as below table.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 38 of 56

Table 20 – SADAF 3000 capacity with Hs=1.25 m (A-Frame)

Table 21 – SADAF 3000 capacity with Hs=1.25 m (Jib)


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 39 of 56

15 PADEYE DESIGN
Scope of this section is to summarize the results of the LIFTING PADEYE of S1 topside in lifting condition.
The main objective of this analysis is:

 To ensure that the padeye elements of the S1 topside are adequate size to resist all kinds of forces
imposed during lift conditions.

As describe in above sections, the S1 topside is lifted by SADAF 3000 crane barge at site. So lifting and
padeye analysis have been utilized with considering characteristics of SADAF 3000 crane barge with two
hooks. So this analysis has been carried out by considering these assumptions and the relevant factors have
been considered in analysis. It should be noted two types padeyes have been taken into account for S1
topside and designed. These padeye have been mentioned as light and heavy padeyes.

15.1 METHODOLOGY
To check lifting padeye two analyses have been utilized as per below:

 First analysis (Global analysis): a lift analysis has been done for calculation of sling force.

 Second analysis (Local Analysis): A finite element model has been made by ANSYS 19.2 and then
a static analysis has been done by applying sling force which is extracted from global analysis.

15.2 LIFT WEIGHT AND SLING FORCES


The weight and COG of the topside including contingencies are as follows:

Total lift weight of the topside is 10248.51 KN. (Weight including Contingencies and excluding DAF
factor), the factored weight (DAF=1.15) of topside is 11785.78 KN and by considering the relevant load
factors (refer to Sec 9) the factored weight of topside is 13129.36 KN. (This weight is included
contingency, DAF, YAW, TILT and CG factor also this weight is included rigging weight such as padeye,
shackle, sling weight).

♦ COG, X: -6.34 m

♦ COG, Y: -0.90 m

The maximum tension in slings which is connected to heavy padeye is 5412 KN and the maximum
tension in slings which is connected to light padeye is 2750. (This load is included contingency, DAF,
YAW, TILT and CG factor).

COG location has been presented in below figure:


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 40 of 56

Y
6340 mm

COG
890 mm

Figure 12 – S1 Topside COG Location


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 41 of 56

15.3 STRUCTURAL ANALYSIS


Contingency factor (1.030), dynamic amplification factor (1.15), Centre of gravity shift factor (1.03), Tilt
factor (1.03) and Yaw factor (1.05) According to NDI0027 is applied.

According above sentence, below factors should be used for checking the structure:

 Contingency factor=1.030 (contingency factor 1.030 has been used in model)

 dynamic amplification factor=1.15 (DAF 1.15 has been used in model)

 Centre of gravity shift factor=1.03 (CG factor 1.03 has been used in model)

 Tilt factor =1.03 (Tilt factor 1.03 has been used in model)

 Yaw factor = 1.05 (Yaw factor 1.05 has been used in model)

 COG Shift = Envelope of COG shift has been considered in model

 Consequence Factor for checking lifting padeye=1.35 (shall be multiplied in Sling force which is
extracted from global analysis)

15.4 SLING LOADS


The maximum tension in slings which is connected to heavy padeye is 5412 KN and the maximum
tension in slings which is connected to light padeye is 2750.

15.5 PADEYE DESIGN IN FINITE ELEMENT


For checking padeyes and legs which have been connected to padeyes, a finite element model has been
created by ANSYS software (Version 19.2) and static analysis has been done based on above load
(7306 KN =maximum sling force X 1.35 & 3712 KN =maximum sling force X 1.35 ). Von misses
stress has been checked for model (It should be noted, consequence factor=1.15 shall be considered for
checking leg which is connected to padeye. But 7306KN =maximum sling force X 1.35 & 3712 KN
=maximum sling force X 1.35.

A finite element model is utilized herein to evaluate the capacity of padeye more accurately upon lifting.
Combined loading would result in complicated stress resultants which are not accounted for in regular
practice. SOLID element (SOLID 186) has been used for defining of pad eye, Stiffeners and members
which connected to pad eyes.

Modeling and analysis was carried out using available commercial finite element program ANSYS ver. 14
which is widely accepted throughout the world and is capable of performing sophisticated nonlinear
analyses with the aid of complete element library which has been adopted for the most complicated
models and is suitable for simulating the behavior of shell elements being studied herein.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 42 of 56

Several parts of the structure are modeled such as leg, main plates, cheek plates, spacer plates and
stiffeners.

Modeling, meshing, loading, boundary condition and results of each pad eye have been presented in
below. Characteristics of pad eye have been summarized in below:

 Heavy Padeyes which are at ROW 1

Connected Leg to Pad eye : 914.40x25.40mm & 35.0 mm

Main Plate Thickness : 40 mm

Main Plate Radius : 400 mm

Cheek Plate Thickness : 40 mm

Cheek Plate Dia. : 675 mm

Spacer Plate Thickness : 40 mm

Spacer Plate Dia. : 500 mm

Pinhole Diameter : 205 mm

Ring stiffeners Plate Thickness : 25 mm

stiffeners Plate Thickness : 35 mm

Diamond Plate Thickness : 40 mm

 Light Padeyes which are at ROW 2

Connected Leg to Pad eye : 914.40x35.0 mm

Main Plate Thickness : 40 mm

Main Plate Radius : 250 mm

Cheek Plate Thickness : 40 mm

Cheek Plate Dia. : 400 mm

Spacer Plate Thickness : 25 mm

Spacer Plate Dia. (No.1) : 300 mm

Pinhole Diameter : 140 mm

Ring stiffeners Plate Thickness : 25 mm

stiffeners Plate Thickness : 35 mm


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 43 of 56

Diamond Plate Thickness : 40 mm

PL. THK=40.0

Leg 914x 25.40

PL. THK=35.0

Diamond Plate
THK=40 mm

PL. THK=35.0

Cheek Plate THK=40 mm


Leg 914x 35.0
Spacer Plate THK=40 mm

Figure 13- Model fabrication of Lifting Pad Eye structure made in ANSYS-Heavy Padeye (All unit=mm)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 44 of 56

Figure 14- Padeye Detail-Heavy Padeye (All unit=mm)


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 45 of 56

Figure 15- Padeye Detail- Heavy Padeye (All unit=mm)


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 46 of 56

PL. THK=40.0
PL. THK=35.0

Diamond Plate PL. THK=35.0


THK=40 mm
Cheek Plate THK=40 mm
Leg 914x 35.0 Spacer Plate THK=25 mm

Figure 16- Model fabrication of Lifting Pad Eye structure made in ANSYS-Light Padeye (All unit=mm)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 47 of 56

Figure 17- Padeye Detail-Light Padeye (All unit=mm)


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 48 of 56

Mesh discretization is carried out finely to suitably define wall thicknesses of several parts of the
assembly into the model. Also Fix support has been used for end of leg. The applied load has been
shown in below figure.

Fix Support
Figure 18- Meshing and boundary condition of the overall model (Heavy Padeye)

Figure 19- Meshing and boundary condition of the overall model (Light Padeye)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 49 of 56

Load Direction
F=7306 KN
It should be noted, the shear force of 4 beams which are
connected to diamond plate has been considered

80 Deg

Figure 20- Load Direction on Padeye (Heavy Padeye)

Load Direction
F=3712 KN
It should be noted, the shear force of 4 beams which are 90 Deg
connected to diamond plate has been considered

Figure 21- Load Direction on Padeye (Light Padeye)


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 50 of 56

Von Mises Stress in all compartments of heavy padeye has been presented in Figure 22 and .Von Mises
stress in each compartment has been presented in Figure 23 to Figure 25

Figure 22- Von Mises Stress (MPa) - Maximum Stress at Model


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 51 of 56

According to above figure the Von Mises stress in padeye is less than allowable stress.

Check Plate Spacer Plate


Figure 23- Von Mises Stress (MPa) - Maximum Stress at Main Plate, Cheek Plate and Spacer Plate
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 52 of 56

Figure 24- Von Mises Stress (MPa) - Maximum Stress at Topside Leg
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 53 of 56

Figure 25- Von Mises Stress (MPa) - Maximum Stress at Stiff. Plates
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 54 of 56

Von Mises Stress in all compartments of light padeye has been presented in Figure 26 and .Von Mises
stress in each compartment has been presented in Figure 27 to Figure 29.

Figure 26- Von Mises Stress (MPa) - Maximum Stress at Model

According to above figure the Von Mises stress in padeye is less than allowable stress.
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 55 of 56

Check Plate
Spacer Plate
Figure 27- Von Mises Stress (MPa) - Maximum Stress at Main Plate, Cheek Plate and Spacer Plate
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 Page 56 of 56

Figure 28- Von Mises Stress (MPa) - Maximum Stress at Topside Leg

Figure 29- Von Mises Stress (MPa) - Maximum Stress at Stiff. Plates
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 48 PAGES

APPENDIX A
SACS MODEL PLOTS
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A1 of 48 



PLAN VIEW AT Z = 21.78

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A2 of 48 



PLAN VIEW AT Z = 18.73

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A3 of 48 



PLAN VIEW AT Z = 14.73

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A4 of 48 



PLAN VIEW AT Z = 10

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A5 of 48 



PLAN VIEW AT Z = 6.53

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A6 of 48 



PLAN VIEW AT Z = 20.28

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A7 of 48 



PLAN VIEW AT Y = -5.75

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A8 of 48 



PLAN VIEW AT Y = 5.75

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A9 of 48 



PLAN VIEW AT X = 11

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A10 of 48 



PLAN VIEW AT X = -11

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A11 of 48 



PLAN VIEW AT X = -1

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A12 of 48 



PLAN VIEW AT X = -15

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A13 of 48 



PLAN VIEW AT Z = 21.78

T5VD T5V7

T5VG T5VB

T5VA
T5VF T5VC
T5V9 0531
T5VE T5V8
T224 T5VJ T316
T5VK T5V6
T223
T232
T235 0601 T5V5
T67E
T236
T67D
T231

T303 T263 T293 T5V4


T296 T304

T302 T262 T294 T5V3


T297 T229

T300
T5UQ T261 T295 T5V2
T298 T299
T301

T225 T5UR T242 T239 T5V1


T241 T238 T222

T230 T5US T271


T682 0615 T5V0
T67Z
T269
T67Y T67T
0147 T270
T67U
T288 T5UT T259 T272 T273 T274 T275

T289 T5UU T258 T268 T279 T283 T287

T290 T5UV T257 T267 T278 T282 T286

T291 T5UW T256 T266 T277 T281 T285

T292 T5UX T255 T265 T276 T280 T284

T226 T5UY T237


T66X 0629 T66N
T66W
T240
T66V 0136 T221

T305
T5UZ T246 T250 T66M
T254 T313
T306

T315 T245 T249 T66L


T253 T314

T309 T244 T248 T66K


T252 T310

T311
T243 T247 T66J
T251
T312

T227 T233 T501


T228
T66O

T491
X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A14 of 48 



PLAN VIEW AT Z = 18.73

T5LW T5MR T5LX

T5MV T5MT

T5MW T5MU

T5LU T5MS T5LV


0121 T5BG 0131 T5O2 0132 T620 T5BI 0116

0019 0003 T5O3 T58T 0009 T61Z T58U 0010

T67H
T319
T67F T66C 0122 T59Q 0113 T5O4 T5T2 0129 T61Y T5T4 T67M
0115
T67L
T68K
T6B4 T6B6
0063 T59P 0085 T5T1 0086 T61X T5T3 0089

T6A9 T6AB T6AA


T6B5 T6B7
0331 0340 T58V 0349 T61W T58W 0475

T66F T66H 0330 T5XK T5XJ 0339 T5AH 0348 T5BR T61V T5BS 0474
T497
T5XL T5XM
0329 T5A9 T5A7 0338 T5Y4 0347 T61U 0473
T6B8 T6B9
0328 T5XB T5XC 0337 T5AI 0346 T5BU T621 T5BT 0472
T5XH T5XI

T683
T5UP T681
T320
T680 T66D 0327 T5AA T5A8T684
0336 0345 T5BV T622 T5BW 0471

T5XF T5XG
0304 T5AF T5AC 0335 T5AJ 0344 T623 0353
T6BA T6BB
0138 T5XA T5X9 0334 T5YC 0343 T5TQ
T624 T5TR 0352
T5XE T5XD
T496 T5TU
T625 T5TV
T66G T66I 0137 T5AE T5AD 0333 T5AK 0342 T58Y
T626 T590 0351
T5TS
T627 T5TT
T6BE T6BD 0101 0332 0341 T58X
T628 T58Z 0350

T5TG
T629 T5TH
T6BC 0042
T6BF 0043 0052 T58N
T62A T58O 0053
T68L
T671
T5UO T685
T66Z
T317
T66Y T66E 0119 T5JB
T59R T6BG 0114 T5JH
T6BI 0130 T5TE T5TF T673
0117
T672
T686

0033 T5JA T6BH 0029T58K T5JG


T6BJ 0037 T58P T58Q 0041
T5U7T5UA T5U8 T5U9
0032 T5J9 0028T58I T5JF 0036 T504 T5BJ 0040

0031 T5J8 0025T5U5 T5JE


T6BK 0035 T503
T5U2T5U6 T5U3 T5U4
0030 T5J7 0024T58J T5JD
T6BL 0034 T502

0120 T5J6
T5BH 0133 T5JC
T5P3 T5P6 T5P4
0134 T493 T492
T5JI T5KT T5JJ
RRRR T5P9 TTTT
T5KX T5KV

Y T5P2 T5P5
T5KW T5KU T5VR
T5P1

T5JK T5KS T5JL


X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A15 of 48 



PLAN VIEW AT Z = 14.73

T5LST5MG T5MPT5LT
T5MXT5N0
T5NN T5NM
T5MYT5MZ
T5NO T5NL
T5LQT5MH T5MQT5LR
0090 T5B5 0088T5NT
T5NP T330 0105 0092

0371 T5NS 0368T5NU


T5NQ T5BO 0369 0370
T68I
0106 T433
T5X2 T5X3 0081T5NV
T5NR
T499
T6AL
T5BP 0102 0523
T6B0
T498
T6AO
T59N
T5BE
T62X
0091019902000201
0525
0098
0443
T67K
0112
0451
045204530454
0455
04470078
T68J
0389 T5OF
T5X1 T5X4 0390 T6AM
T6AN
T5A0
T584
0391 T6B1
T63T
T6AP
T63U
T62Y
0392 T62M
0406 T5OE 0415 T5S5
T5S6
0424 T580
T6AQ
T63W
T62Z
0433 T5BC
013901350118
0060
0051
0050 0039 0038
0022
TTTU
0405 T5OD 0414 T585
0423 T5SH
T5SI
T6AR
T63V
T630
0432
T63J
0404 T5OC 0413
T64F T5S7
T5S8
0422 T581
T6AS
T63X
T631
04310196019701980436
0444
0456
045704580459
0230 0227
0460
04480096
014101400021 0020 0017 0018
0403 T5OB 0412 0421 T63Y
T6AT
T63Z
T632
0430 0437

T67O
0402 T68R
T5O5
T68Q 0411 0420 T5SJ
T5SK
T6AU
T640 T68B
T633
0429
T68C 014301420438
T63S 0218 0221 T67W
0528
T67X
T67P

0401 T5OA 0410 T64I 0419 T64X


T6AVT634
0428 0440
T64J T64Y
0400 T5O9 0409 T64H 0418 T64W
T6AWT635
04270126012701280094
0445
0461
046204630464
0229 0226
0465
04490097
T63I
T63H
T63G
T63F T63E T63D
T63C
T63BT63A
0399 T5O8 T5X7T5X5
0408 T5A4 T5A50417 T6AXT636
0426
0398 T5O7 T5X8T5X6
0407 T64M T6410416 T6AYT638
0425 T5BD
0388 T5O6 T64N
0393 T5A3
T64L T64P
T5A10394 T6AZT637
0395T59ZT62LT62KT62J
T62I
T62H
T62G T62F T62E
T62D
T62CT62B
0084 T432T5IV T6B3
0080 T5J0
T6AH
T6AJ
T642T66U
0100
T66T 0519
T64R T68H0068009301250099
T639
T676
0082 0446
T677
0111
0466
046704680469 0470
04500079

0379 T5OG
T5AQ
T5IU
T5AL T6B2
0375 T5IZ
T5AS
T6AI
T5AN
T6430383 T64S 0387

0378 T5OHT5IT 0374 T5IY


T665 T6670382 T58D T58B 0386
T66A T66B
0377 T5OIT5IS 0373 T5IX
T664 T6660381
T587
T58A
T5ST
T588
T5SV
T589 0385
T668 T669
0376 T5OJ
T5AR
T5IR
T5AM 0372 T5IW
T5AT
T662
T5AOT663
0380
T6AK
T58E
T5SUT5SW
T58C
T59O 0384

T68P
0087 T500T5IP 0104 T5IQ
T5OVT5OX01030532 T5BF
06480083
T5J2T5KI T5KRT5J3
T5OZT5P0T5OY
T5KZT5L0
T5OUT5OW
T5KYT5L1 T5UN
T5OT

T5J4T5KH T5KQT5J5

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A16 of 48 



PLAN VIEW AT Z = 10

T5LO T5MN T5LP

T5N3 T5N1 T329 T328


T5N4 T5N2
T508 T509
T5LM T5MO T5LN
0064 T5AY 0065T5NW 0075 T327
T5AV 0056

0283 T5B0 0281T5NXT61I 0282 T5BM 0299


0076
0059 0049
T5ZC
T5NY
T5WA
T61H 0522 T67C
0072
T67B T5WC
T59B
T5VX
T5BN
T5AW
T67J
0054
0540
T67I
0211021202130070
0314
0124
0322
0323
0215
0524
03240325
0326
03180046
T68M T68E
0244 0236 T5W8
T61J T5W9 0238 T5WB T5VW 0239
T5VT T5XP
T5XNT5VS T60ET60DT60CT60BT60A
T609
T608
T607
T606
T605T604
T603
T602T601
0280 T59F T59E
0253 T61K 0262 0271 T5BA
T610T60Z
T60Y
T60X
T60W
T60V
T60UT60T
T60S
T60RT60Q
T495
0279 0252 T61L 0261 0270
T645
T644
T5VU T5XQ
T5XOT5VV T56V0208020902100313
0316
0363
0364
0225
0216
03650366
0223
0367
03190067
0278 T59G
T59H0251
T5W5 T61M 0260 T59CT5VZ 0269
0307
0277 0250
T5W4 T61N 0259 T5VY 0268

0276 T59I
T59K
0249 T61G
T61O 0258 T5WF T689
0267
0546 T648
TT647
649 0308 0527
T68A

0275 0248
T5W3 T5WD
T61P T6AD 0257 T6AG
T61D
T59DT5W0 0266
0311
0274 T59J T59L
0247
T5W2
T59U T5WE
T61Q T6AE
0256
T5WUT6AF
T59V T5W1 0265
T5WY T5X0
T5WZ T56W0205020602070069
0317
0358
0359
0224
0219
03600361
0222
0362
03200066
0273 0246
T5WQ T61E 0255
T5WT T61A T611 0264
T494 T64BT64C
T64D
T60PT60O
T60N
T60M
T60L
T60K
T60JT60I
T60H
T60GT60F
0272 0245
T59T T61F 0254
T5WST59W
T5S1T5S4
T612 0263 T5BB
T5WX
T5WW T600T5ZZT5ZYT5ZXT5ZW
T5ZV
T5ZU
T5ZT
T5ZS
T5ZRT5ZQ
T5ZP
T5ZOT5ZN
0243 0235
T5WP T61T 0237
T5WR T5S0T5S3
T613 0240
T68O T68F
0058T5IE T5W7 0048 T5IL 0518 T66S
0073
T66R
T5WJ T5RZT5S2
T614
T5AXT675
0055
0539
T674
0202020302040071
0315
0123
0303
0354
0220
03550356
0357
03210047
T68N T68G
0287T5ID
T596T5W6 0291 T5IK T597 0295T5WK T5B3 T615
T5B4
T5RW0077
0300
T5RX T616
T5RY
0286T5IC T5WG 0290 T5IJ 0294 T5RS T5RU
0298

0285T5IB T5WH 0289 T5II T6AC 0293


T5WL T5RT T617
T5RV
0296

0284T5IA
T5B1
T598T5WI 0288 T5IH T599 0292
T5WM T61B T618
T5B2 0297

0061T5I9
T5AZ 0062 T5IM
T5ON T5OP 0074 T61C T619
T5AU
06490057
T5IF T5KP T5IG
T5OS T5OR T5OQ
T5L5 T5L3
T5OM T5OO T5OL
T5L4 T5L2

T5IN T5KO T5IO

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A17 of 48 



PLAN VIEW AT Z = 6.53

T5M0 T5ME T5ML T5M1

T65C T65A T326 T324


T65Q
T65S
T65B T659
T507 T506
T65P
T65T
T5LZ T5MF T5MM T5LY
0011 0015T5NZ 0108 T325
T5B9 0007

0163 0155T5O0 0153 T5BK 0154

0013 0004T5O1
T5ZJ T67A
0107
T679 T660
T678
T5BL
T592 0006T151T152T153T138
T171
T179
T180
T155
T181T182
T183
T175T131
T441 0187
T5PB
T6BP
T5PE
T5ZK 0166 T65Z 0176
T5PK
T5PL
T5PJ
T438 0188
T5PC
T5PI T5PF
T5HGT5ZL
T5PH 0175 T65Y 0177 T5B6

T440 0189
T5PD
T5Q3
T5HH
T5PG
T5ZM T5Q0T5Q6
0174 T65X 0178
T5Q7
T5PYT5Q2 T5Q1T5PZ T205T148T149T150T170
T173
T193
T194
T163
T156
T195T196
T161
T197
T176T136
0044 0026T57J T57N0173
T57C
T5QH T57E 0179
T5QG
T167
T442 0190T57K T57O0172
T57D T57F
T5ZF 0180
T5Q4
T5Q9 T5QB
T5ZE T5Q5
T437 0191T57L T57P0171 T661
T5ZD T687
0181T69HT69GT69FT168 T199
T688
T443 0192T57MT5QR T57Q0170T5QT T65W
T5ZG 0182
T5QX T5QW T169
0045 0027 T57V 0169T57W T65V
T5ZH 0183
T202T145T146T147T137
T174
T188
T189
T162
T158
T190T191
T160
T192
T177T135
T444 0193 T5QU
T5QQ 0168T5QV
T5QS T65U
T5ZI 0184

T435 0194
T5WO 0167 T5ROT5RQ 0185 T5B7

T445 0195
T5WN 0165 T5RNT5RM 0186
0014 T5OK
0000 T594
T5JT T595 T66Q
0110
T66P T5RPT5RR
T593 0005T142T143T144T139
T172
T166
T184
T159
T185T186
T187
T178T132
T68D
0164 0160 T5JS 0161 0162
T56X
0012 T571
0016 T5JR T56Y
T574
0109 T577 0008

T211 T572
T210 T5JQ T56Z
T575
T209 T578 T208

T215 T573
T214 T5JP T570
T576
T213 T579 T212

T219 T218 T5JO


T5PA T217 T5B8 T216
T5JV T5KF T5KN T5JU

T658 T656

T657 T655

T5JW T5KE T5KM T5JX

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A18 of 48 



PLAN VIEW AT Z = 20.28

T690 T695 T694T6BMT68Z

T693 T69C T69DT6BNT68Y

T692 T69A T69BT6BOT68X

T691 T698 T699 T68W

T68T T696 T68U


T697 T68V
PAD3

T479T480
X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A19 of 48 



PLAN VIEW AT Y = -5.75

0662
PAD4
T226 T5UY T237
T66X 0629 T66N
T66W
T240
T66V 0136 T221

T5TKT5TL
T671
T5UO T66Z
T317
T686
T66Y
T66E
0119
T5JB
T59RT6BG0114 T5JH
T6BI 0130 T5TET5TF
T673
0117
T672

0023
PAD2
0084T432
T5IV T6B3
0080 T5J0
T6AH
T6AJ
T642
T66U
0100
T66T0519
T64R T639
T676
0082
0068
0093
0125
0099
0446
T677
0111
0466
0467
0468
0469
0470
0450
0079
T64T

0058
T5IET5W70048 T5IL0518
T66S
0073
T66R
T5WJT5RZ
T5S2
T614
T5AX
T675
0055
T674
0202
0539 0203
0204
0071
0315
0123
0303
0354
0220
0355
0356
0357
0321
0047

0001

0014
T5OK
0000T594
T5JT T595
T66Q
0110
T66PT5RP
T5RR
T5930005
T142
T143
T144
T139
T172
T166
T184
T159
T185
T186
T187
T178
T132
T5P7
T6A6
699L 681L

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A20 of 48 



PLAN VIEW AT Y = 5.75

T232
T235 0601 T5V5
T67E
T236
T67D
T231
T322
PAD3

T67H
T319
T67F
T66C0122T59Q 0113
T5O4 T5T2 0129 T61Y
T5T4
T67M
0115
T67L

0095
PAD1
0106 T433
T5X2T5X3 0081
T5NV
T5NR
T499
T6AL
T5BP 0102 0523
T6B0
T498
T6AO
T59N
T5BE
T62X
0091
0199
0200
0201
0525
0098
0443
T67K
0112
0451
045204530454
0455
0447
0078

0059 0049
T5ZC
T5NY
T5WA
T61H0522T67C
0072
T67BT5WC
T59B
T5VX
T5BN
T5AW
T67J
0054
T67I
0211
0540 0212
0213
0070
0314
0124
0322
0323
0215
0524
0324
0325
0326
0318
0046

0002

0013 0004
T5O1
T5ZJ T67A
0107
T679 T660
T678
T5BL
T5920006
T151
T152
T153
T138
T171
T179
T180
T155
T181
T182
T183
T175
T131
T5P8
T6A7
619L 601L

X
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A21 of 48 



PLAN VIEW AT X = 11

0023 0095

PAD2 PAD1

0079 T62B T5BD T63A 0097 T67X


0528
T67W 00180096 T63J T5BC T62M 0078

0047 T5ZN T5BB


T60F 0066 0527 0067 T60Q
T5BA T601 0046

0001 0002

T132 T5B7 T135 T199 T136 T5B6 T131

681L 601L

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A22 of 48 



PLAN VIEW AT X = -11

0662

PAD4

T314 T313 0136 T280 T281 T282 T283 T274


T67U
0147
T67T T238 T299 T229
T322

PAD3

0133 0024
T5U2
0025 0028
T5U7
0029 01140043 0332 0333
T496
0334 0335 0336 0337 0338
T497
0339 0340 00850113 0003 0131

0104 0372 0373 0374 0375 0080039304070408 0409 0410 T67P


0411
T67O 0412 0413 0414041503900081 0368 0088

0062 0288 0289 0290 0291 00480235 0245


T494
0246 0247 0248 0249 0250 0251
T5VV
0252
T495
0253
T5VS
02360049 0281 0065

T218 T214 T210 0016


T56X0160 00000195 0194 0193 0027 0192 0191 0190 0026
T5PY
0189 0188 01870004 0155 0015

699L 619L

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A23 of 48 



PLAN VIEW AT X = -1

0531
T505

0040 0041 0117


T68L
0053 0350 0351 0352 0353 0471 0472 0473 0474 0475 0089
T68K
0115 0010 0116

0083 0384 0385 0386 0387 0082


T68H
0395
0425
0426 0427 0428 T68C
0429
T68B 0430 0431 0432
0433
0392
T68J
0091
T68I
0370 0092

0057 0297 0296 0298 0300


0077
T68G
0055
T68F
0240
0539 T600
0263
T64B
0264
T56W
0265 0266T68A
0267
T6890268 0269
0546 T56V
0270 0271
T60E
0239
T68E
00540076
0540 0299 0056

T216 T212 T208 0008 0162


T68D
0005
0186 0185 0184
T202
0183 0182T688
0181
T687
T5Q5
0180T5QG
0179
T205
T5Q7
0178 0177 0176
0006 0154 0007 T506 T324
T5P7 T5P8
T6A6 T6A7

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A24 of 48 



PLAN VIEW AT X = -15

T66O
T501 T66JT66K T66LT66MT66N T5V0 T5V1T5V2T5V3 T5V4 T5V5
T5V6T5V8T5V9T5VAT5VB
T5VC T5V7

T68V T68W T68X T68Y T68Z

0120 0030003100320033 0119


T6BF
0042 0101 01370138
T6BB
030403270328032903300331
T6B9 T6B70063
T6B6
0122 0019 0121
T5LU T5LW

T5MBT5NF
T5MK
T5NIT5MA

T500
T68P T5OJ T5OI T5OH T5OG T432
T5O6
T5O7
T5O8T5O9 T5OA T68Q
T5O5
T68R T5OB T5OC T5OD
T5OE
T5OF
T433 T5NS T5B5
T5LQ T5LS

T5M7T5NG
T5MJ
T5NJT5M6

0061 0284028502860287
T68N
0058
T68O
0243 027202730274027502760277027802790280
T5VU T5VT
0244
T68M
0059 0283 0064
T5LM T5LO

T5M3T65G
T65N
T65HT5M2

T5LZ T5M0

Y
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A25 of 48



PLAN VIEW AT Z = 21.78

HP1HP1HP1
HS HP0 HP0HP0HP0 HP0 HP0HP0HP0HP0HP0 HP0 HP0 HP0HP0 HP0 HP0HP0 HP0 HP0 HP0

HP1
HP1HP1

HS1 HS1 HS1 HS1 HS1


HS1 HS1 HS1 HS1
HS1
HS1
HS1
HP0 HP0 HP0HP0HP0 HP0 HP0HP0HP0HP0HP0 HP0 HP0 HP0 HP0 HP0 HP0

HP1 HP1HP1HP1 HP1HP1

HS HP0 HP0HP0HP0 HP0 HP0HP0HP0HP0HP0 HP0 HP0 HP0 HP0 HP0 HP0
HS

1
HS
1
HS

HS1 HS1 HS1 HS1 HS1


HS
1
HS

HS1 HS1 HS1 HS1 HS1


S1
1

HP0 HP0 HP0 H


HS HS1 HS1 HS1 HS1 HS1 HS1HS1 HS1 HS1 HS1
HS

HS1 HS1 HS1 HS1 HS1 HS1 HS1


1
HS
1
HS

HS1 HS1 HS1 HS1 HS1 HS1 HS1


1
HS1 HS1HS1HS1HS1HS1 HS1 HS
1
HS1 HS1HS1 HS1 HS1 HS1 HS1

HP1 HP1 HP1 HP1 HP1 HP1


HP1
HP1 HP1 HP1
HP0
HP0

HS1 HS1 HS1 HS1 HS1 HS1


HSHP0 HP0HP0HP0HP0HP0HP0

HS1 HS1 HS1 HS1 HS1 HS1

HS1 HS1 HS1 HS1 HS1 HS1

HS1 HS1 HS1 HS1 HS1 HS1

HS1 HS1 HS1 HS1 HS1 HS1

HP1 HP1 HP1 HP1 HP1 HP1


HP2
HP2 HP1 HP1
HP1 HP1 HP1 HP1 HP1

HS1 HS1 HS1 HS1 HS1 HS1 HS1


HS
1
HS

1
HS1

HP0

HS1 HS1 HS1 HS1 HS1


1

1
HS

HS1 HS1 HS1 HS1 HS1


1
HS

1
HS

HS1 HS1 HS1 HS1 HS1


1
HS

1
HP0

HP0

HS1 HP1 HP1


1

HP1

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A26 of 48 



PLAN VIEW AT Z = 18.73

SW1 SW1

SW1 SW1 SW1

SW1 SW1 SW1


SW1
SW1

SW1

SW1 SW1
WS3 WS3 WS4 WS4 WS2 WS2 WS2
WS2 WS2

WS2 WS2
WP3 WS2

WS2

WP2WP2 WP2
WS3 WS1 WS1 WS1 WS2 WS2 WS2
WS2 WS2

WS2

WS3 WS3 WS3

WP2 WP2 WS2

WS3 WS3 WS3


WP2WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP4
WP4
WP2
WS3 WS3

WS3 WS3 WS3 WS3 WS3 WS3 WS3 WS3

WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2
WP1WP1 WP1WP1
WS2WS2

WS3 WS3
WS2

WS3 WS2 WS3 WS3 WS3 WS3 WS3


WS3

WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2WP2

WS3
WS2 WS2 WS2WS2
WS3

WS3 WS3 WS3 WS3 WS3 WS1 WS1 WS3 WS3 WS3 WS3

E1
E1 E1 E1 E1 E1 E1 E1 E1 E1 E1

E1 E1 E1 E1 E1 E1 E1 E1 E1 E1

WP1 WP1 WP1 WP1 WP1 WP1


WS3

WS3 WS3 WS3 WS1 WS1 WS3 WS3


WS3
WS2

WS2 WS2 WS2 WS2

WS3 WS3 WS3 WS1 WS1 WS3 WS3 WS3 WS3


E1
WS3

WP2 WP2 WP2


WP2WP2 WP2 WP2 WP2 WP2WP2 WP2 WP2 WP2 WP2 WP2

E1
WS3

WS3 WS3 WS3 WS1 WS1 WS3 WS3


WS3
WS2

WS2WS2 WS2 WS2 WS2

WS3 WS3 WS3 WS1 WS1 WS3 WS3 WS3 WS3


E1
WS3

WS3

WS3

WS3 WS3
WS3

WS3

WS3 WS3 WS3 WS3 WS3 WS1 WS1 WS3 WS3 WS3 WS3
WP1WP1 WP1WP1

WS3

WS3

WS3 WS3
WS2

WS3

WS3WS3

WS3WS3

WS3 WS3 WS3 WS3 WS3 WS3 WS3 WS3

WS3 WS3
WS3 WS3

WS2 WS3 WS3 WS3 WS3 WS3


WS2 WS2

WS3
WS3

WS3
WS3 WS3

WS3 WS3
WS2 WS2 WS2 WS2 WS2

WP2WP2 WP2 WP2WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP4
WP4
WP2WP2
WS2

WP2 WP2 WP2


WS2 WS2
WS2 WS2 WS2 WS2

WS3

WS3
WP2WP2

WS3 WS3 WS3 WS3 WS3 WS3 WS3 WS1 WS1 WS1
E1

WP2
WS2 WS2 WS2

WS3 WS3 WS3 WS3 WS3 WS2 WS2 WS2


WP2 WP2WP2

E1 WS3 WS3 WS3

WP2 WP2WP2

WS2 WS2

WS3 WS3 WS3 WS3 WS3 WS3 WS3


WS3
WS2 WS2 WS2

WS1 WS1 WS3 WS3 WS3 WS3 WS3


WP2 WP2

WP2 WP2
WS2

WS2

WS2

WS2WS2 WS2 WS3 WS1 WS1 WS1WS1WS2 WS2


WS2

SW1 SW1
WS1 WS1

WS1 WS1

WS1 WS1

WS3 WS3
SW1 SW1 SW1

SW1 SW1 SW1

SW1
SW1

Y WS1 WS1
WS1
SW1

SW1 SW1
X

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A27 of 48 



PLAN VIEW AT Z = 14.73

SW1 SW1 SW1


SW1SW1SW1
SW1SW1SW1

SW1 MP2
SW1

SW1
MP2 MP2 MP2 MP2

MP2MP2MP2 MP2 MP2 MP2 MP2 MP2MP2MP2MP2MP2 MP2 MP2 MP2

MS3
SW1 SW1 SW1
MS3 MS3 MP2MP2 MP2 MP2 MS2
MS2 MS2MS2

MS2 MS2MS2
MS2 MS2 MS2 MS2 MS2MS2MS2MS2MS2 MS2 MS2 MS2 MS2 MS2MS2MS2MS2MS2 MS2

MP1 MP2MP2

E1 MP2 MP2

MP2

MS1 MS1 MS3MS3 MS3 MS3 MS3


MP2

MP2 MP2 MP2 MP2 MP1


MP1
MP1
MP1
MP1 MP1 MP1MP1
MP1MP1
MP1
MP1
MP1MP1 MP1 MP1 MP1MP1
MP1
MP1MP1
MP4
MP4
MP1 MP1 MP1 MP1MP1
MP1
MP7
MP2MP2MP2MP2 MP2 MP2

MP1
MP3 MP3 MP3 MP3 MP3MP3MP3MP3

MS3 MS3 MS3 MS3 MS1 MS1


MS1
MS1
MS1 MS1 MS1
MS1
MS1
MS1MS1
MP1

MP1
E1

E1

E1

E1

MS3

MS3

MS3
MS3

MS3
MS3

MS3

MS3

MS3
MS3
MP1 MP1 MP1MP1MP1

MP1 MP1 MP1MP1MP1

MP1MP1MP1
MS3 MS3 MS1 MS1
MS1 MS1 MS1
MS1
MS1MS1
MS3

MS3 MS3 MS3 MS3 MS1 MS1


MS1
MS1
MS1MS1
MS1 MS1MS3

MS1 MS1MS3

MP2MS3
MS3

MS3
MS3

MS3

MS3

MS3
MS3
MP2 MP2 MP2 MP2 MP2
MP2 MP2 MP2
MP2
MP2MP2 MP2 MP2 MP2 MP2 MP2MP2MP2
MP2
MP2 MP2MP2
MP2MP2MP2

MP3 MP3

MP3 MP3

MP1 MP1 MP1


MS3 MS3 MS3
MS3 MS3 MS3 MP2 MP2 MP2 MP2

MS3 MS3 MS3 MS3 MS3


MS3
MS3MS3
MP2

MS1 MS1 MS1 MS1 MS1


MS1
MS1
MS1MS1 MP3 MP3 MP3 MP3
MP2

MP6

MP1

MS1
MP1

MP1 MP1
MP6
MP2 MP2 MP2MP2MP2MP2

MP1MP1MP1 MP1 MP1


MP1MP1MP1 MP1 MP1

MS3 MS3 MS3 MS3 MS3 MS3 MS3 MS3


MS1

MS1

MP3

MP3
P1P1
P1P1

MP2 MP2 MP2 MP2 MP2 MP2 MP2 MP2 MP2 MP2 MP2 MP2 MP2MP2MP2
MP2
MP2 MP2MP2
MP2MP2MP2
MS3 MS3 MS3

MS3 MS3 MS3


MS3 MS3 MS3

MS3 MS3 MS3

MS3 MS3 MS3

MS3 MS3 MS3


MS3 MS3 MS3

MP1MP1MP1
MS3 MS3 MS3MS3 MS3 MS3 MS3 MS3 MS3 MS3
MS3

MS3

MS3

MS3 MS3 MS3MS3 MS3 MS3 MS3 MS3 MS3 MS3


E1

E1

MS3 MS3 MS1 MS1 MS1 MS1 MS1 MS1 MS1


P1

MP2
MP1 MP1 MP1 MP1MP1 MP1

MP1
P1

MP1
MP1 MP1 MP1 MP1 MP1MP2

MS3

MS3

MS3

MP2 MP2 MP2 MP2 MP0 MP0MP0


MP0MP0
MP0
MP0MP0MP0 MP0 MP0
MP0MP0 MP0 MP0 MP0 MP0MP0
MP5
MP5
MP0 MP0 MP0 MP0MP0
MP0
MP1
MS2 MS2 MS2 MS2 MS2MS2

MS2 MS2 MS2 MS2 MS2MS2


MP2 MP2 MP2 MP2 MP2

MP2 MP2 MP2 MP2 MP2

MS1MS1
MS1MS1 MS1 MS1 MS1 MS1
MS1
MS1
MS1MS1 MS1 MS1
E1

E1

E1

MS3 MS3 MS3 MS3 MS3 MS3 MS3 MS1 MS1 MS1
E1
E1E1E1E1

E1E1E1E1

MS3 MS3 MS3 MS3 MS3 MS3 MS3 MS1MS1


MS1
MS1
MS1
MS1 MS1
E1
MP3MP3
MP3MP3 MP3 MS1 MS1
MS1MS1MS1MS1
MS1MS1
MS1MS1
MS1
MS1 MS1
E1

MP3 MP3 MP3 MS3 MS1MS1 MS1 MS4 MS4 MS4


MS4
MP2

SW1 SW1 SW1


MS1 MS1

MS1 MS1

MS1 MS1
SW1SW1SW1

MS3 MS3
SW1SW1SW1

SW1
SW1

SW1 MS1MS1
MS1

SW1 SW1 SW1

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A28 of 48 



PLAN VIEW AT Z = 10

SW1 SW1
SW1SW1SW1

SW1SW1SW1

SW1 CP4
SW1

CP4CP4 CP4 CP4 CP4 CP4 CP4 CP4 CP4CP2 CP2 CP2 CP2

CS2CP4 CP4 CP4 CP4

SW1
CS4
SW1 SW1
CS2 CS2 CS2 CS2 CP4 CP4 CP4
CP3 CP3CP3

CP3 CP3CP3
CP2 CP2

CP2

CS2 CS2 CS2 CS2 CS2 CS2 CS2


CP2
CP2

CP4 CP2
CP2
CP2
CP2 CP2 CP2CP5
CP5CP2CP2
CP2
CP2
CP2CP2
CP2
TD1
CP2
CP2 CP2 CP2 CP2 CP2CP2
CP2
CP2CP2
CP2
CP2CP2 CP2CP2
CP2
CP2
CP3

CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2


CP2
CP3

CP2

CS2

CS2

CS2 CS2 CS2

CS2 CS2 CS2 CP2 CP2 CP2 CP2 CS2 CS2 CS2
CS2 CS2 CS2

CS2 CS2 CS2


CS2 CS2 CS2
CS2 CS2 CS2
CS2 CS2 CS2

CS2 CS2 CS2

CS2 CS2 CS2


CS2 CS2 CS2
E1

E1

E1

CP2
CP2

CS1 CS1CS1
CP3

CP2

CS2 CS2 CS2 CS2 CS2 CS2


CP2CP2CP2

CP2
CP3CP3CP3

CP2

CP2CP2
CS2 CS2
CP2

CS2

CS2 CS2 CS2 CS2 P1P1


CP2

CS1 CS1CS1 CP2 CP2 CP2 CP2 CP2CP2CP2CP2


CP2
CP2CP2
CP2
CP2CP2CP2
CP2

CS1 CS1CS1CS2 CS2 CS2 CS2 CS2 CS2


CP2 CP2CP2
CP3CP3 CP3 CP3 CP3 CP3 CP3 CP3CP3

CP2CP2 CP2 CP2 CP2 CP2CP2


CS2

CS2

CS2 CS2 CS2 CS2 CS2 CS2


CS2

CS2

CP2
CP3 CP3CP3 CP3 CP3 CP3 CP3 CP3 TS1 P1P1
CP2

CS2
CP2
CP2 CP2CP2 CP2

CS2 CS2 CS2CS2CS2 CS2 CS2CS2


CS2CS2 CS2
CS2 E1

CS2

CS2

CP2
E1E1 CS2

CS2

CS2 CS2CS2
CS2
CS2
CS2CS2CS2 CS2 CS2CS2
CS2CS2 CS2
E1

E1

E1 E1 CP2 CP2 CP2 CP2 CP2CP2CP2CP2


CP2
CP2CP2
CP2
CP2CP2CP2
E1

CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2


CP4CP4CP4

CP2CP2

CS2 CS2 CS2

P1P1
E1

CS2 CS2 CS2

CS2 CS2 CS2

CS2 CS2 CS2


CS2 CS2 CS2
CS2 CS2 CS2
CS2 CS2 CS2

CS2 CS2 CS2

CS2 CS2 CS2


CS2 CS2 CS2

CP2CP2
CS2
CP2CP2

CS2 CS2 CS2 CS2 CS2CS2CS2CS2CS2 CS2


E1

E1

E1
CP2

CP2
CS2CS2

CS2CS2
E1

CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2


CP4

CP2
E1

CP2
E1

CS2
CP2

CP2
CS5 CS5 CP2 CP2 CP2 CP2 CP2CP4

CP4 CP4 CP4 CP2 CP2 CP2CP1


CP1
CP2 CP2 CP2CP2
CP2CP2
CP2
TD1
CP2
CP2 CP2 CP2 CP2 CP2CP2
CP2
CP2CP2CP2CP2 CP2CP2
CP2
CP6

CP2
CP6

CP4
CP3 CP3 CP3 CP3 CP3CP3

CP3 CP3 CP3 CP3 CP3CP3


CS2

CS2

CP4
CP3 CP3 CP3 CP3CP3

CS2CS2CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2CS2


CS2CS2
CP2 CP2 CP2 CP2CP2

E1

CP4
CS2

CS2

CS2 CS2
CP4 CP4 CP4 CP4

CS2 CS2 CS2 CS2 CS2 CS2 CS2


CS2

CS2
CS2

CS2

CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2CS2
E1

CS2

CS1
CS1
CS1CS1 CS1 CS2 CS2 CS2 CS2 CS2 CS2 CS2CS2
E1

E1

CS3CS3 CS3 CP3 CP3 CP3 CP3 CP3 CP3 CP3


CP3CP3
SW1 SW1
CS5 CS5

CS5 CS5

CS2 CS2
SW1SW1SW1

SW1SW1SW1

SW1
SW1

SW1 CS5 CS5

SW1 SW1

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A29 of 48 



PLAN VIEW AT Z = 6.53

SW1 SW1 SW1


DP2 DP2 DP2 SW1SW1SW1

SW5

SW1 DP2
SW5
SW1

SW5

DP2 DP2 DP2 DP2

DP2 DP2 DP2DP2 DP2 DP2 DP2


SW1
SW5

DS3
SW5

SW5
SW5
SW5

DS1 DS1 DS1 DP2 DP2 DP2


DP4 DP4DP4

SW1 SW1 SW1


DP4 DP4 DP4 DP4 DP4DP4 DP4 DP4 DP4 DP4 DP4 DP4 DP4 DP4 DP4 DP4 DP4DP4 DP4

DP2 DP2 DP2DP2 DP2

DS1 DS1 DS1 DS2 DS1

DP2DP2 DP2 DP8


DP8 DP2 DP2
DP2
DP2 DP2 DP2 DP2 DP2 DP2 DP2DP2DP2DP2DP2DP2 DP2DP2
DP2
DP5
DS2 DS2 DS2 DS2

DS2 DS1
DS1
DS1
DS1 DS1 DS2 DS2
DS1
DS1
DS1

DS1

DP2
DS1
DP2DP2 DP2

DP4 DS1
DS1 DS1 DS1 DS1 DS1
DS1

DS1

DS1

DS1

DS1

DS1
DS1

DS1
DS1
DS1
DS1

DS1

DS1
DS1
DS1

DS1

DS1
DS1

DS1

DS1 DS1
DS1
DS1
DS1
DS1 DS1 DS1 DS1 DS1

DP2
E1 E1 E1 DS1

DP2

DP2

DP2 DP2 DP2 DP2 DP2DP2DP2DP2


DP2
DP2DP2
DP2
DP2DP2DP2
DP2

E1 E1 E1
DP2

DS1 DS1 DS1 DS1DS1 DS1 DS1


DP2
DP2 DP2 DP2 DP2 DP2 DP2 DP2DP2

DP2
DP2

DP2
E1 E1

DP2 DP2 DP2 DP2


DP2DP2

DP2DP2

DS1 DS2 DS2 DS2DS2 DS2 DS2 DS2


DS2

DS2

DS2

DP2
E1 E1

E1 E1

E1 E1 E1 E1
DP2

DP4 DP4 DP4 DP4 DP4 DP4 DP4


DP1 DP1 DP1 DP1 DP1DP2 DP2 DP2 DP2 DP2 DP2DP2

DS2 DS2 DS2 DS2 DS2 DS2DS2


E1

DP2
DP2

DS1 DS1 DS1 DS1


DP2DP2 DP2

DS1 DS2 DS2 DS2 DS2 DS2 DS2 DS2 DS2


DS2

DS2

DS2

DP2
E2E2 E2E2

E2E2 E2E2

DS1 DP4 DP4 DP4 DP4 DP4 DP4


DP2 DP2 DP2 DP2 DP2DP2DP2DP2
DP2
DP2DP2
DP2
DP2DP2DP2
DS1 DS2 DS2 DS2 DS2 DS2 DS2
DP2 DP2 DP2DP2

DP2
DS1 DS1 DS1 DS1 DS1 DS1
DS1

DS1

DS1

DS1
DS1

DS1
DS1
DS1
DS1

DS1

DS1
DS1
DS1 DS1

DP2

DS1 DS1 DS1 DS1 DS1


DP2

DP6DP7 DP1DP1 DP1 DP1


DP1
DP1DP1 DP1 DP1 DP1 DP1 DP1 DP1 DP1 DP1DP1DP1DP1DP1DP1 DP1DP1
DP1
DP2
DP4 DP4 DP4 DP4 DP4DP4

DP2 DP2 DP2 DP2DP2

DS1 DS1 DS1 DS1


DP3
DP3

DP4 DP4 DP4 DP4 DP4DP4 DP4 DP4


DP3
DP3 DP3 DP3

DP4 DP4 DP4 DP4 DP4DP4 DP4 DP4


E1

E1

E1

E1

DP4 DP4 DP4 DP4 DP4DP4 DP4 DP4


E1

E1

E1

E1

DP4 DP4 DP4 DP4 DP4 DP4


SW1 SW1 SW1
SW1SW1SW1

SW1SW1SW1

SW1
SW1

SW1

SW1 SW1 SW1

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   &2 A30 of 48 



PLAN VIEW AT Z = 20.28

HS1 HS1 HS1 HS1


HS1 HS1 HS1 HS1

HS1 HS1 HS1 HS1

HS1 HS1 HS1 HS1

HS2 HS2

HS1
HS2 HS2 HS1 HS1

HS2 HS2 HS2 HS2


HS1 HS1

HS2 HS2 HS2

HS1 HS1 HS1 HS1

FL3
X

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A31 of 48



PLAN VIEW AT Y = -5.75

TLDTLE

HP1 HP1 HP1 HP1 HP1 HP1


HP2
HP2 HP1 HP1
TV3

TV2

TLC
2
TV

3
TV

3
TV TV EQ1
2

WS2
WP2
WP2WP2WP2
WP2WP2WP2 WP2WP2 WP2 WP2 WP2 WP2
WP4
WP4
EQ1

EQ1

WP2 WP2 WP2

TV
2 2
TS1

TLB

TS1

TD1

TV

TL5TLE
5
TV
MP2 MP2 MP2MP2 MP0MP0
MP0
MP0
MP0
MP0
MP0
MP0
MP0MP0 MP0
MP0
MP0MP0MP0MP0MP0
MP0
MP5
MP5
MP0MP0MP0MP0
MP0
MP0
P1

TV 2
2 TV
TS1

TLA

TS1

TD1

TS1

TL9
2
TV

6
TV

CP4 CP4 CP4 CP2 CP2 CP2


CP1
CP1
CP2
CP2CP2
CP2
CP2
CP2
CP2
CP2
CP2CP2CP2CP2CP2CP2
CP2
CP2
CP2
CP2
CP2CP2
CP2
CP2
TD1 TD1

TL2 TL3 TL4

TV
2 2
TV
TL1

TS1
2
TS

DP6
DP7 DP1
DP1DP1 DP1
DP1
DP1
DP1 DP1DP1DP1 DP1DP1DP1DP1DP1
DP1
DP1
DP1
DP1
DP1DP1
DP1
DP1
TD1
TD1
TL2

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A32 of 48



PLAN VIEW AT Y = 5.75

HS1 HS1 HS1 HS1HS1


HS1
HS1
TL8 TLE
TV2

2
TV

TV

2
TV
2

WP2
WP2 WP2 WP2 WP2 WP2WP2 WP2 WP2 WP2WP2
WP4
WP4
WP2
TS1

TL7

TS1

TD1
TV

TL5TLE
TV
2

TV
MP2MP2MP2 MP2 MP1
MP1MP1
MP1
MP1 MP1 MP1MP1
MP1MP1
MP1
MP1
MP1
MP1MP1 MP1MP1MP1
MP1
MP1
MP1
MP4
MP4
MP1MP1 MP1MP1
MP1
MP1

2
TV

TV
2
TS1

TL6

TS1

TD1

TS1

TL9
1
TV
2

TV

CP4 CP2
CP2
CP2
CP2CP2 CP2CP5
CP5
CP2CP2
CP2
CP2
CP2CP2
CP2
CP2
CP2CP2CP2CP2CP2
CP2
CP2
CP2CP2
CP2
CP2
CP2CP2
CP2
CP2
TD1

TL4

TV
2 2
TL1

TS1

TV
TD1
2
TS

TL2 TL3

DP2
DP2 DP2 DP8
DP8 DP2 DP2
DP2
DP2DP2 DP2 DP2DP2DP2DP2DP2DP2
DP2
DP2DP2DP2
DP2
DP2
TD1

DP5
TD1
TL2

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A33 of 48



PLAN VIEW AT X = 11
TLE

TLE
TL5

TL5
MP1 MP1 MP1 MP1 MP1 MP1
MP1 MP1 MP1 MP1 MP1 MP1 MP1

2
TV 2
TL9

TS1

TL9
TV

CP2 CP2 CP2 CP2 CP2 CP2 CP2 CP2 CP2 CP2
TL4

TL4
TL3

TL3

DP2 DP2 DP2 DP2 DP2 DP2


TL2

TL2

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A34 of 48



PLAN VIEW AT X = -11 TLE


TLD

HP0 HP0 HP0 HP0 HP0 HP0 HP0 HP0


HP0
HP0 HP0 HP0 HP0

TLE
2
TLC

TS1
TV

2
TV

TL8
WP2 WP2WP2 WP2 WP2WP2WP2 WP1 WP1 WP1 WP1WP1 WP1 WP1 WP1 WP1 WP1WP1 WP1 WP1 WP1 WP3 WS2
2
TV

2
TS1

TLB

TS1

TL7
TV

MP1 MP1 MP1 MP1 MP1 MP1MP1 MP1 MP1 MP1 MP1MP6
MP6MP1 MP1 MP1 MP1 MP1MP1 MP2 MP2
4
TS1

TLA

TS1

TL6
4
TV

TV

CP2 CP2 CP2 CP2 CP2 CP2 CP2 CP2CP2 CP2 CP2 CP2 CP2 CP2 CP2CP2
CP2CP2CP2CP2
CP2 CP2 CP2
4

4
TV

TV
TS1

TL1

TS1

TL1

DP3 DP3 DP3 DP3DP3DP3 DP2 DP2 DP2 DP2 DP2 DP2 DP2 DP2 DP2DP2 DP2 DP2 DP2 DP2 DP2
TL2

TL2

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A35 of 48



PLAN VIEW AT X = -1

TC1
2
TV

TC1
WP2 WP2WP2
WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2 WP2
WP2WP2 WP2

TV 2
TS1

2 TV

2
TD1

TD1

TC1
TV

MP2 MP2 MP2 MP2 MP2MP1


MP1MP1 MP1 MP1 MP1 MP1MP1
MP1MP1 MP1 MP1 MP1 MP1MP1 MP7
MP1 MP2MP2

TV
2 2
TD1

TS1

TD1

TC1

TV
2
TV

CP4 CP4 CP4 CP4CP4CP4


CP4CP2
CP2
CP2
CP2CP2
CP2
CP2
CP2 CP2 CP2CP2
CP2CP2 CP2 CP2
CP2 CP2 CP2
CP2
CP2
CP2
CP2
CP2
CP2
TD1

TS1

TD1

TV
2 TV
TD1

TD1

2
TS1

TV 2

DP2 DP2 DP2 DP2 DP2


DP2DP2 DP2 DP2 DP2
DP2 DP2 DP2
DP2
DP2
DP2
DP2DP2
DP2
DP2
DP2
DP2DP2 DP2 DP2 DP2 DP2 DP2 DP2
TD1

TD1
TD1

TD1

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A36 of 48



PLAN VIEW AT X = -15

HP1 HP1 HP1 HP1 HP1 HP1HP1 HP1HP1


HP1 HP1 HP1
HP1 HP1 HP1 HP1 HP1HP1

SW2

SW2

SW2
HS1 HS1 HS1
TS2

SW2

SW2
WS2 WS2 WS2 WS2 WS2 WS2
WS2
WS2 WS2 WS2WS2
WS2 WS2 WS2WS2
WS2 WS2 WS2
WS2
WS2
WS2
WS2 WS2 WS2 WS2 SW1

SW2

SW2
4
SW
TS2

TS1

TS1

TS1

SW1SW1
SW1SW1

SW2

SW2
4
SW
MP2MP2 MP2 MP2 MP2 MP2 MS2 MS2 MS2 SW1
MP2 MP2 MP2 MP2 MP2 MP2MP2
MP2MP2 MP2 MP2 MP2 MP2 MP2

4
SW2

SW2
SW

TV
TS2

TS1

TS1

TS1

2 2 2 SW1SW1
SW1SW1
TV TV
4
SW2

SW2
SW

CP3 CP3 CP3 CP3 CP3


CP6
CP6
CP3CP3 CP3 CP3 CP3 CP3 CP3 CP3CP3
CP3 CP3CP3
CP3
CP3
CP3CP3 CP3 CP3
SW1
4
SW2

SW2
SW

SW1SW1
SW1SW1
4
SW2

SW2
SW

SW1

LABEL=GROUP
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A37 of 48



PLAN VIEW AT Z = 21.78

HB300
HB500

HB300
HB500

HB300
HB300
HB500

HB300
HB500

IP300 IP300
IP300
IP300IP300
IP

HB300
30

IP300 IP300 IP300IP300


IP300
IP300
IP300
HB500

HB500

HB300

HB500
0I

0
30
3 P

P
00
HB500

HB500

HB300

HB500

I
00
IP300 IP300 IP300 IP300IP300
IP

P3
3

I
00

HB500

HB500

HB300

HB500

IP300 IP300 IP300 IP300 IP300


0
IP

HB500 30
3

P
00

IP300 IP300 IP300 IP300 IP300 IP300 IP300


IP300

HB500

HB500

HB300

HB500

I
0
I

30
P3
IP300

IP
0
IP300

HB500

HB500

HB300

HB500

HB500

IP300 IP300 IP300 IP300 IP300 IP300 IP300


0

0
IP300 30
IP
IP300

HB500
IP300

HB500

HB500

HB300

HB500

HB300 HB300HB300 HB300 HB300HB300


HB300
HB300HB300 HB300
HB500
IP300

HB500

IP300 IP300 IP300 IP300 IP300 IP300


IP300

HB500

HB500

HB500

IP300
HB500
IP300

IP300

HB500

HB500

HB500

HB500

IP300

IP300 IP300 IP300 IP300 IP300 IP300


IP300

IP300

HB500

HB500

HB500

HB500

IP300

IP300 IP300 IP300 IP300 IP300 IP300


IP300

IP300

HB500

HB500

HB500

HB500

IP300

IP300 IP300 IP300 IP300 IP300 IP300


IP300

IP300

HB500

HB500

HB500

HB500

IP300

IP300 IP300 IP300 IP300 IP300 IP300


HB300

00 HB500
IP300

HB500

HB500

HB500

IP300

HB300 HB300HB300 HB300 HB300HB300


HB302
HB302
HB300 HB300
HB300

IP300 IP300 IP300 IP300 IP300 IP300 IP300


30IP300

HB500

HB500

HB500

30
0

HB500
30

IP
HB300
IP

IP300 IP300 IP300 IP300 IP300


IP300

HB500

HB500

HB500

HB500
0

P3
HB300

0I
IP

HB500

HB500

30 HB500

IP300 IP300 IP300 IP300IP300


30
0 0

IP
3

HB300
P

00
30HB500

HB500

HB500

IP300 IP300 IP300 IP300


IP300
0I

HB300

P3
0
P3

0I
HB500

HB500

HB500

IP300 HB300 HB300


0I

IP
I P

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A38 of 48



PLAN VIEW AT Z = 18.73

IP240

IP240
IP240 IP240

IP240

IP240
IP240

IP240

IP240
IP240

IP240

IP240 IP240
IP240 IP240 IP300 IP300 HB300 HB300 HB300
HB300

HB300
HB300 HB300

HB300

HB300 HB300
HB300HB300

HB450
IP240 IP300 IP300 IP300 HB300 HB300 HB300
HB600 DIAM3

IP240

IP240

HB450
HB450
HB450 HB450 HB450 HB450 HB450HB450 HB450 HB450 HB450HB450
HB451
HB451
HB450

HB450
IP240 IP240
IP240

HB300

IP240

HB450

IP240
IP240 IP240 IP240 IP240 IP240 IP240

HB450
HB300

IP240

HB450

IP240
IP240 IP240
IP240 IP240IP240

HB300

HB600HB600

HB450HB450HB450HB450HB450HB450HB450HB450HB450HB450
IP240
HB300

HB300 IP240 IP240 IP240 IP240 IP240


IP240

HB450

IP240
HB300
HB300HB300

HB450HB450HB450HB450HB450HB450HB450HB450HB450
IP240 IP240 IP240 IP240IP240 IP300 IP300 IP240 IP240IP240 IP240
HB600
IP240

IP240

IP240
IP240 IP240IP240 IP300 IP300 IP240 IP240
HB600
IP240

IP240

IP240
HB300
HB300

IP240

IP240

HB600HB600HB600HB600

IP240 IP240IP240 IP300 IP300 IP240 IP240IP240 IP240


HB300

IP240
IP240

IP240
IP240

HB300HB300

IP240

IP240

HB450 HB450 HB450


HB450
HB450 HB450 HB450 HB450
HB450
HB450 HB450 HB450 HB450HB450 HB450
IP240

IP240

IP240
IP240 IP240IP240 IP300 IP300 IP240 IP240
IP240

IP240

IP240

IP240
HB300
HB300

IP240

IP240

IP240 IP240IP240 IP300 IP300 IP240 IP240


IP240 IP240
HB300

IP240
IP240

IP240

IP240
IP240
IP240IP240 IP240

IP240

IP240
HB600
HB300HB300HB300

IP240

IP240

IP240 IP240 IP240 IP240IP240 IP300 IP300 IP240 IP240


IP240 IP240
IP240

IP240
HB600

IP240
IP240
IP240

IP240
HB300 HB300

HB600HB600

IP240 IP240 IP240 IP240 IP240 IP240


IP240 IP240
IP240

IP240
IP240

IP240

IP240
IP240
IP240 HB300 IP240 IP240 IP240
IP240 IP240
IP240

IP240
HB300

HB450 HB600

HB450
HB300

HB450

IP240

IP240

HB450
HB450 HB450HB450
HB450
HB450 HB450 HB450HB450 HB450 HB450 HB450 HB450
HB451
HB451
IP240

HB300

HB450
HB300
HB300

HB450 HB450 HB450


HB300
HB300HB300HB300HB300HB300

HB300HB300HB300HB300HB300

IP240

IP240

HB450

IP240

IP240

HB450HB450

IP240 IP240 IP240IP240IP240


IP240 IP240 IP300 IP300 IP300
HB300
HB450

IP240

HB450
HB300

IP240 IP240 IP240IP240 IP240 HB300 HB300 HB300


HB450

IP240

HB450
HB300
HB450

IP240

HB450

HB300 HB300HB300

IP240 IP240 IP240IP240


IP240 IP240 IP240
HB300
HB450

IP240

HB450
IP240

IP300 IP300 IP240IP240


IP240 IP240 IP240
HB300
HB450

IP240

HB450
HB300

HB300
HB450

HB450
IP300IP300

IP300IP300

IP300IP300

HB300
HB300 HB300 IP240 IP300
IP300IP300
IP300
HB300HB300
IP240 IP240
IP240IP240
IP240

IP240

IP240

IP240
Y IP300
IP300
IP300
IP240

IP240

IP240
IP240

IP240

IP240 IP240
X

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A39 of 48



PLAN VIEW AT Z = 14.73


IP240

IP240 IP240 IP240


IP240

IP240
IP240

HB400
IP240

IP240
HB300IP240

IP240
HB400

HB400

IP240
IP240 IP240 IP240
IP240
HB400

HB400

IP240 IP240 HB400


HB400
HB400 HB400 HB300
HB300
HB300

HB400
HB300

HB400

HB300
HB400

HB400

IP300 IP300 IP240


IP240
IP240 IP240 IP240
HB400
HB400

HB400
HB500HB400
HB300

HB300

HB300
HB400

HB400

HB400

HB400
HB400
HB400HB400 HB500
HB500
HB500
HB500
HB500
HB500 HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB501
HB501
HB500
HB500
HB500
HB500
HB500
HB500
HB401
HB400

HB500

IP240
IP240
IP240 IP240 IP300 IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
HB300

IP240

IP240

IP240
IP240

HB400

IP240

HB300

HB500

HB500
HB400

IP240 IP240

IP240 IP240

IP240 IP240
IP240 IP240

IP240 IP240
IP240 IP240

IP240 IP240

IP240 IP240

IP240 IP240
IP240 IP240
IP240 IP240 IP300 IP300
IP300IP300IP300
IP300
IP300
IP300
HB300

HB500

HB400

HB300

HB500

HB500
HB400

IP240

IP240 IP240 IP240 IP240IP300


IP300
IP300
IP300
IP300
IP300
HB300

HB500

HB400

HB300

HB500

HB500
HB400
HB300

HB500

HB400

HB300

HB500

HB400 HB400 HB400 HB400 HB400


HB400HB400HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400

HB500
IP300

IP300

HB400

HB300

HB300

HB500
HB400
HB300

HB500

HB400

HB300

HB500

IP240 IP240 IP240


IP240 IP240 IP240 IP240IP240
IP240
IP240
IP240
HB400
HB400
HB400

HB500
IP300

IP300

HB300

HB300
HB500

HB500
HB300

HB400

HB300

HB400
HB400

IP300 IP300 IP300 IP300


IP300
IP300
IP300
IP300
IP300 HB300HB300 HB300 HB300
HB501

HB500
HB500

IP300
HB500

HB500
HB501
HB300

HB400

HB300

HB400
HB400

HB500
HB500

IP240 IP240 IP240 IP240 IP240IP240


IP240
IP240
IP300

IP300

HB300

HB300

HB500HB500
IP240
IP240
HB400
HB300

HB500

HB400

HB300

HB500

HB400

HB400 HB400 HB400 HB400 HB400HB400


HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
IP240
IP240
HB400

IP240
IP240

IP240
IP240

IP240

IP240

IP240
IP240
HB300

HB500

HB400

HB500

IP240 IP240 IP240


IP240
IP240 IP240 IP240 IP240 IP240
IP240
HB400

HB500
IP240 IP240

IP240 IP240

IP240 IP240

IP240 IP240 IP240


IP240IP240 IP240IP240 IP240 IP240
IP240
HB300

IP240

IP240
HB500

HB400

HB500

IP240
IP240

IP240
IP240

IP240

IP240

IP240
IP240
HB400

IP240 IP240 IP300


IP300
IP300IP300 IP300 IP300
IP300
IP240

HB400
HB300

HB500

HB500

HB500
IP240

HB400
HB300

HB300
HB500HB500

HB500

HB400HB400HB400
HB400 HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB601
HB601
HB600
HB600
HB600
HB600
HB600
HB600
HB500
HB300

HB400

IP240
IP240

IP240
IP240

IP240

IP240

IP240
IP240
HB500
HB300

HB300
HB300

HB400

IP240

IP240 IP240
IP240

HB500

HB400

IP300
IP300
IP300
IP300
IP300
IP300IP300
IP300
IP300
IP300
IP300
IP300IP300 IP300
HB300

HB300
HB300

HB400

HB500

HB500

HB400

IP240
IP240 IP240 IP240IP240IP240
IP240
IP300 IP300 IP300
IP240
IP240
HB300

HB300
HB300

HB400

HB500

HB500

HB400

IP240
IP240 IP240 IP240IP240IP240
IP240
IP300
IP300IP300
IP300
IP300
IP300
IP300
IP240

IP240

IP240
IP240

IP240
HB300

HB300
HB300

HB400

HB500

HB500
IP240

HB400

HB300
HB300
HB300
HB300HB300 IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP300
IP240

IP240
HB300IP240

HB300
HB400

IP300

IP300

IP300
HB300

HB500

HB500

HB400

HB300HB300 HB300 IP240IP300


IP300
IP300
HB400 HB400HB400
HB400
IP240
HB400

IP240 IP240 IP240


IP300

IP300

IP300
IP240

IP240
IP240
IP240
IP240

IP240

IP240 IP300
IP300
IP300
IP240

IP240 IP240 IP240


IP240

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A40 of 48



PLAN VIEW AT Z = 10
IP240

IP240

IP240 IP240
IP240

IP240

IP240

IP240 HB400
IP240

IP240

IP240
HB500

HB400

IP220
IP240 IP240
HB500

HB400

IP240 IP240 IP240 IP240 HB400 HB400


HB400
HB300

HB300
HB300

HB500

HB300

HB500

HB400

IP240 IP240 IP240


IP240 IP240 IP240 IP240
HB500
HB500
HB500HB500
HB300

HB300

HB500

HB400

HB400 HB500
HB500
HB500
HB500
HB500HB500
HB501
HB501
HB500
HB500
HB500
HB500
HB500
HB500
HB500
61X2.54
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB300

IP240 IP240
IP240
IP240 IP240 IP240IP240 IP240
IP240

IP240

HB400

IP240

IP240

HB500
HB300

IP240IP240

IP240 IP240

IP240

IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240

HB500
IP300 IP300
IP300
HB500
HB300

HB500

HB400

IP240 IP240
IP240IP240 IP240 IP240
HB500

HB500
HB300

HB500

IP240

IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240

HB500
HB500
HB300

HB400

HB500

IP240 IP240 IP240 IP240


IP240 IP240
HB500

IP240

IP240HB500HB500HB500HB500IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240

HB500
IP300 IP300
IP300 HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500

IP240
HB300

HB500

HB400

IP300 IP300
IP300
IP240
IP240 IP240 IP240 IP240 IP240
HB500 HB500
HB300

HB500
HB300

HB500
IP240

HB400

IP240

HB500HB500

IP240 IP240
IP240 IP240 IP240 IP240
IP240

IP240

HB500
HB300

HB500

HB400

HB300 HB300
HB300HB300
HB300 HB300 HB300 HB300
32.35X1.588 IP240
IP240
IP240
HB500
HB300

HB500

HB400

IP240

IP240 IP240
IP240
IP240
IP240 IP240 IP240
IP240
IP240
IP240 IP240
HB500

IP240

IP240

HB500
HB300

HB500
IP240

IP240 IP240

IP240

HB400

IP240

IP240

HB500

IP240 IP240
IP240
IP240
IP240
IP240
IP240
IP240 IP240
IP240
IP240
IP240
IP240 IP240
IP240 IP240 HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
IP240

HB400
IP240

HB500
HB300

HB500

IP240 IP240
IP240 IP240 IP240IP240IP240 IP240
IP240

HB400
IP240

HB500

IP240
IP240
IP240

IP240

IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240

HB500
HB500
HB500
HB300

HB400
IP240

IP240 IP240

IP240 IP240
IP240 IP240 IP240
IP240
IP240
IP240
IP240
IP240
HB500
HB500

HB500
IP240IP240

IP240
IP240

IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240
HB400
IP240

HB500

HB500
HB300

HB500

IP240

IP240

IP240

IP240 IP240
IP240 IP240 IP240
IP240 IP240IP240
HB400
IP240

HB500

HB500
HB300

HB300

IP240

IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240
HB500HB500
HB300

HB500

HB400HB400HB400 HB500 HB500HB500


HB502
HB502
HB500
HB500
HB500
HB500
HB500
HB500
HB500
61X2.54
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB400

IP240 IP240

IP240
HB301

HB500
HB301

HB400
HB300

HB300
IP240

IP240

HB500
IP240

IP240
IP240
IP240
IP240 IP240 IP240 IP240
IP240
IP240IP240
IP240
IP240
IP240
HB400
HB300

HB400

IP240
IP240
HB300

HB300

IP240
HB300

HB500

HB500

HB400

IP240IP240 IP240 IP240 IP240 IP240 IP240


IP240

IP240
HB300

HB300
HB300

IP240

HB500

HB500

IP240

IP240

HB400

IP240IP240 IP240 IP240 IP240 IP240


IP240
IP240IP240
IP240
IP240
HB300

HB300
HB300

IP240

HB500

IP240

HB500
IP240

HB400

IP300
IP300
IP300
IP300
IP300 IP240 IP240 IP240
IP240
IP240IP240
IP240
IP240
HB300

HB300
HB300

HB500

HB500

HB400

HB300
HB300 HB300 HB300HB300
HB300
HB300 HB300 HB300
HB300
HB300
HB300
IP240 IP240
IP300

IP300

IP300

IP240
IP240
IP240
IP240

IP240
IP300

IP300

IP300

IP240 IP300
IP300
IP240

IP240

IP240

IP240 IP240
IP240

IP240

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A41 of 48



PLAN VIEW AT Z = 6.53

IP240 IP240 IP240


IP240

IP240
IP240

IP300

HB400
IP300
IP300

IP240
IP240

HB400

HB400
IP300

IP240
IP300

IP300
IP300
HB400IP240

IP300

HB400

HB400
IP240 IP240 IP240 IP240 IP240 IP240 HB400 HB400
HB400
HB300
HB300

HB400
HB300

HB400

HB400

IP240 IP240 IP240 IP300 IP240


HB400HB400
HB300

HB300

HB400

HB400

HB400

HB400
HB400 HB400 HB401
HB401HB400HB400
HB400
HB400
HB400HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
H14B
DIAM
IP240

IP300IP240
IP240
IP240
IP240 IP240 IP300 IP300
HB300

HB400

IP300

HB400

IP240
IP240
IP240

IP240

HB400HB400
HB300

HB400

HB400

IP300

HB400

HB300IP240
IP240IP240 IP240 IP240 IP240
IP240

IP240

IP240

IP240

IP240

IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240
IP240

IP240

IP240
HB300

HB400

HB400

IP300

HB400

IP240IP240
IP240
IP240
IP240
IP240
IP240 IP240 IP240 IP240
IP240

IP240
IP240

HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400

HB400

IP240 IP240 IP240


HB400

HB400
HB400
HB300

IP300

IP240 IP240 IP240 IP240


IP240IP240 IP240
HB400
HB400

IP240

IP240

HB400
HB400

HB400

HB400HB400HB400HB400
HB300

HB400

IP240

IP240

IP240

IP240

IP240 IP300 IP300 IP300


IP300IP300IP300
IP300
HB400

HB400

IP300

IP300

IP300

HB400
IP240IP240IP240
IP240
HB400
IP240

IP240

HB400
HB300

HB400

IP240

IP240

HB300 HB300 HB300 HB300 HB300 HB300HB300


HB400
HB400

IP300

HB400
HB400

IP240
IP240 IP240
IP240
HB300

HB400

HB400

IP300

IP240 IP300
IP300 IP300 IP300
IP300IP300IP300
IP300
HB400
IP300

IP300

IP300

IP300

IP300

HB400
HB300

HB400

HB400

IP300

HB400

IP240 HB300 HB300 HB300HB300HB300


HB300
IP300

IP300

HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
IP300

IP300
HB300

HB400

HB400

IP300

IP240 IP300 IP300 IP300IP300IP300


IP300
HB400
IP300

IP300

HB400HB400
HB300

HB400

HB400

IP300

HB400

IP240IP240 IP240 IP240IP240 IP240


IP240

IP240

IP240

IP240
IP240

IP240
IP240
IP240
IP240

IP240

IP240
IP240
HB300

HB400

HB400

IP240

IP300

HB400

IP240IP240 IP240 IP240 IP240


HB300
HB500HB400

H16B
H26B HB600
HB600
HB600HB600
HB600
HB600
HB600HB600
HB600
HB600HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB300

HB400

IP240

IP300

HB400
HB400
HB300
HB300

HB600

IP240 IP240 IP240 IP240


HB400
HB300
HB500
HB300

HB600

HB400

HB300
HB300HB300 HB300
HB300
HB300 HB300 HB300
HB500

HB300
HB300

IP240
HB500

IP240

IP240
HB600

IP240

HB400

HB300
HB300HB300 HB300
HB300
HB300 HB300 HB300
HB300
HB300

IP240
HB500

IP240

IP240
HB600

IP240

HB400

HB300
HB300HB300 HB300
HB300
HB300 HB300 HB300
HB300
HB300

HB500

HB600

HB400

HB300 HB300HB300 HB300 HB300 HB300


IP240 IP240 IP240
IP240
IP240

IP240

IP240
IP240

IP240

IP240

IP240 IP240 IP240


IP240

IP240

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A42 of 48



PLAN VIEW AT Z = 20.28

IP300 IP300 IP300


IP300
IP300IP300

IP300IP300

IP300IP300

IP240IP240

IP300
IP240 IP240 IP300
IP300

IP240 IP240IP240
IP240
IP300

IP300

IP300

IP300

IP240 IP240 IP240


IP300

IP300

IP300

IP300

IP300 IP300
IP300IP300

21.91X1.27
X

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A43 of 48



PLAN VIEW AT Y = -5.75

3.5
91.44X
3.5 2.5
2.5

HB300 HB300
HB300HB300 HB300
HB300HB300
HB302
HB302 HB300
91.44X
91.44X
27

2.5
27.3X1.905

27.3X1.588

27 91.44X
88
.3

5
05
.5

90
X

91.44X
3.5
1.

.9 .
1

X1 X1 20X5
5

HB300
HB450
HB450
HB450
HB450
HB450
HB450
HB450 HB450
HB450 HB450 HB450HB450 HB450
HB451
HB451
20X5

20X5
88

.3
3.5

3
91.44X

. .3 7
27
HB450HB450 HB450 2 27
.3
32.35X1.58832.35X1.588

32.35X1.58832.35X1.588
91.44X
2.5

X1 88
61X2.54

2.5
.5
1 .5 05
88
91.44X

2.5
X .9
3.5

.3
1

3.5
91.44X
6X
27 HB600

3.5
HB400
HB400
HB400
HB400HB600 .5

91.44X
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600 HB600
HB600
HB600
HB600
HB600HB600
HB600 HB600
HB601
HB601
HB600
HB600
HB600
HB600
HB600
HB600
3.5
91.44X

35

91.44X
27
X1 IP240

3.5 91.44X
3.5 91.44X

.3
32.35X1.588

88
2.5
X1
88
2.5

.5
4

.5 44
61X2.5

1
.5

88 X .1 91.44X
.3
91.44X

X 2
27
.3

9
.3
27

2.53.5
4

HB400
HB400
HB400 HB500HB500 HB500
HB502
HB502
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500 HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500 32
2.53.5

91.44X
61X2.5

27
91.44X

.3
32.35X1.588

91.44X
91.44X

88
5

X1
4
90

.5 .5
2.5
61X2.5

91.44X

88 1
.

91.44X
3.5

3X
1

3.5

7. HB600
6X

91.44X
3.5

3.5

H16B
H26BHB600
HB600
HB600 HB600
HB600
HB600
HB600
2HB600 HB600HB600
HB600
HB600
HB600 HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
HB600
4
91.44X
.5

91.44X
61X2.5
4
X2.5

X2.5
61X2.5
35

91.44X

91.44X
CON1

CON1
116.84

116.84

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A44 of 48



PLAN VIEW AT Y = 5.75

IP300 IP300 IP300IP300


IP300
IP300
IP300
2.5
27
27.3X1.588

88
.3

2.5

8
291.44X
.5

58
1. X

3.5
1

.
91.44X

X1
3X
88 5

HB450
HB450
.3HB450
HB450HB450 HB450
HB450 HB450 HB450HB450
HB450
HB451
HB451
91.44X 7.
3.5

HB450 27
27
32.35X1.588 32.35X1.588

32.35X1.588 32.35X1.588 32.35X1.588


91.44X
.3
2.5

88

61X2.54

2.5
X1

05
.5

.9
91.44X

2.5
.5
3.5

X1

91.44X
5X

3.5
88

.3
.3

91.44X
3.5
HB400
HB400
HB400
HB400 HB500
HB500
HB500
HB500
HB500
HB500HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB501
HB501
HB500
HB500
HB500
HB500
HB500
HB500 32
3.5
2.591.44X

27

91.44X
27

3.5 91.44X
3.5 91.44X

.3

32.35X1.588

88

2.5
88

.5
461X2.54
X1

05
.5

1 .9
91.44X
.5

3X
X1

1
91.44X

7.
X
88

5
2
.3

.3
32
27

2.53.5
HB400 HB500
HB500
HB500
HB500
HB500 HB500
HB501
HB501
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
2.5 3.5

91.44X
61X2.5
91.44X

27
91.44X

.3
91.44X

8
05

X1
58
4

.5
91.44X
461X2.5
.9

.
2.5

88 1
91.44X

X
3.5
1

.3
3.5
6X

27 HB400
91.44X
3.5

3.5

HB400
HB400 HB400HB401
HB401
HB400HB400
HB400HB400HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
.5

91.44X

91.44X
61X2.5
35

H14B
DIAM
61X2.5
91.44X

91.44X
X2.5

X2.5
CON1

CON1
116.84

116.84

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A45 of 48



PLAN VIEW AT X = 11
2.5

2.5
3.5 91.44X

3.5 91.44X
2.5

2.5
3.591.44X

3.591.44X
91.44X

91.44X
HB500
HB500 HB500 HB500 HB500 HB500
HB500 HB500 HB500HB500 HB500 HB500
HB500
91.44X

91.44X
8
91.44X2.5

91.44X2.5
58
32.35X1.588

. 88
X1 .5
.3
1
3X
27 7. 2
3.5

3.5
91.44X391.44X

HB500HB500
HB500 HB500 HB500 HB500 HB500 HB500
HB500 HB500 91.44X391.44X
.5

.5
2.5 91.44X2.5

2.5 91.44X2.5
3.5 91.44X

3.5 91.44X
3.5

3.5

HB400 HB400 HB400 HB400 HB400 HB400


91.44X

91.44X
CON1 91.44X

CON1 91.44X
116.84X2.5

116.84X2.5

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A46 of 48



PLAN VIEW AT X = -11 2.5 2.5


91.44X
3.5
91.44X

HB500
HB500 HB500
HB500HB500HB500HB500
HB500
HB500
HB500
HB500HB500HB500
3.5
91.44X
3.5 91.44X

2.5 2.5
2.5

32.35X1.588
88

88

91.44X
3.5 91.44X

.5

.5
X1

X1

3.5 91.44X
3.5
.3

.3
27

27
91.44X

91.44X91.44X
HB450HB450
HB450
HB450
HB450HB450
HB450 HB600
HB600HB600
HB600
HB600
HB600HB600HB600HB600
HB600
HB600 HB600 DIAM3HB300
HB600HB600
91.44X

88
32.35X1.588

32.35X1.588

88
91.44X2.5

.5

91.44X2.5
.5
X1

1
.3

X
.3
27

27
3.5

3.5 3.5
3.5 3.591.44X2.5 91.44X91.44X

91.44X
HB500 HB500HB500HB500
HB500 HB500
HB500
HB500
HB500 HB500 HB500
HB501
HB501
HB500 HB500 HB500
HB500 HB500 HB400
HB500 HB400
3.5

3.5 3.591.44X2.5 91.44X


32.35X1.588

32.35X1.588
54

4 5
2.

2.
1X

1X
.3

.3
27

27

HB500 HB500HB500HB500
HB500 HB500
HB500
HB500
HB500
HB500HB500HB500HB500HB500
HB500
HB500
HB500HB500
HB500HB500
HB500 HB500HB500
2.5 91.44X

2.5 91.44X
91.44X91.44X

91.44X91.44X
54

54
32.35X1.588

32.35X1.588
2.

.
X2
1X

1
.3

.3
27
3.5 3.5

3.5 3.5
27
91.44X

91.44X

HB500 HB500HB500
HB500 HB500 HB400
HB500 HB400HB400HB400HB400HB400HB400HB400
HB400
HB400
HB400HB400
HB400 HB400HB400
91.44X

91.44X
X2.5

X2.5
CON1

CON1
116.84

116.84

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A47 of 48



PLAN VIEW AT X = -1

91.44X3.5
88

91.44X3.5
.5
X1
.3
27
HB450HB450
HB450
HB450
HB450HB450HB450HB450HB450HB450HB450HB450HB450HB450HB450
HB450HB450
HB450

27
32.35X1.588

.3 8

88

91.44X3.5
X1 58
61X2.54

.5 61X2.54

.5
88 X1.

X1
.3
27 .3
27

HB400 HB400HB400HB400HB400
HB500
HB500
HB500
HB500
HB500HB500HB500
HB500
HB500
HB500 HB500HB500
HB500
HB500 HB401
HB500 HB400
HB500 HB400

27
.3
32.35X1.588

91.44X3.5

X1 8
61X2.54

61X2.54

88 . . 58
5 58
1. 8 X1
.3
X
27
.3
27
32.35X1.588
61X2.54 61X2.54

61X2.54 61X2.54

HB400 HB400HB400HB400
HB400
HB400
HB400
HB500
HB500
HB500HB500
HB500HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500
HB500

27
.3 27
X1
32.35X1.588

8 .3
58 .5 X1
1. 88 .5
X 88
.3
27

HB400 HB400HB400HB400
HB400
HB400
HB400
HB400HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400
HB400HB400
HB400
HB400HB400HB400HB400
4 4

4 4
61X2.5

61X2.5
61X2.5

61X2.5

LABEL=SECTION
 (QJLQHHULQJ3URFXUHPHQW&RQVWUXFWLRQDQG,QVWDOODWLRQ
RI:HOOKHDG3ODWIRUP 6 6XEPDULQH&DEOHVDQG
3LSHOLQHV%HWZHHQ6DQG6DOPDQ&RPSOH[

67RSVLGH/LIW$QDO\VLV 5HSRUW 
 
 $5($ ',6&,3/ '2& 6&23( 6(4 5(9 
 3URMHFW&RGH  6/  (/7  $1  :36   & 
A48 of 48



PLAN VIEW AT X = -15

HB300HB300
HB300
HB300HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300

21.91X1.03

21.91X1.03

21.91X1.03
HB300
HB300
HB300 HB300
HB300
HB300
35.56X1.905

IP300IP300 IP300

21.91X1.03

21.91X1.03
HB300HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300HB300
HB300 HB300
HB300HB300
HB300 HB300
HB300
HB300
HB300
HB300 HB300 IP240
HB300HB300

21.91X1.03

21.91X1.03
4
. 87
35.56X1.905

32.35X1.588

32.35X1.588

32.35X1.588

0
3X
.1
IP240
IP240 IP240
IP240

4
21.91X1.03

1.03
14
87
0.
21.91X
X
HB400
HB400
HB400
HB400
HB400
HB400 HB300 IP240
HB300HB300

3
.1
HB400
HB400
HB400 HB400
HB400HB400HB400 HB400
HB400HB400HB400
HB400 HB400
HB400

14
74
.1 1.0321.91X1.03

21.91X1.0321.91X1.03
.8
X0
27
35.56X1.905

32.35X1.588

32.35X1.588

32.35X1.588

13

.3
8 X1 88
4.

58 .5 5 IP240
IP240 IP240
IP240
41

. 88 .
X1 X1
87

3
.3 .
27
0.

27
21.91X
3X

HB300HB300
HB300
HB300
HB300
HB301
HB301
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300
HB300HB300
HB300
14

IP240
4
21.91X1.03

21.91X1.03
87
0.
3X

IP240
IP240
IP240
IP240
.1
.1 1.03

21.91X1.03
14
87
0.
21.91X
3X

IP240
14

LABEL=SECTION
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 392 PAGES

APPENDIX B
SACS INPUT FILES
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B1 of 382

APPENDIX B1
SACS-INPUT FILE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B2 of 382

LDOPT NF+Z1.0280007.850000 GLOBMN CMBMPT


SALMAN (S1) TOPSIDE
OPTIONS MN SDUC 2 2 C PTPT PT PTPT
LCSEL ST 1001 1101 1201 1301 1401
UCPART 0.8000.8000.9900.990500.0
SECT
SECT CON1 CON 116.842.50091.4402.5002.500
SECT DIAM WF 45.0004.00040.0005.3502.700
SECT DIAM3 WF 30.0004.00030.0001.1002.700
SECT H14B WF 474.00361.030 121042.041464.00 30.0003.00040.0005.350
SECT H16B WF 594.00677.130 259732.060429.00 30.0003.00060.0007.5002.700
SECT H26B WF 45.0004.00060.0007.500
SECT HB300 WF 149.10189.180 25170.008563.000 30.0001.90030.0001.1002.700
SECT HB301 WF 149.10189.180 25170.008563.000 30.0003.00030.0001.5002.700
SECT HB302 WF 149.10189.180 25170.008563.000 30.0001.90030.0003.0002.700
SECT HB400 WF 197.80361.030 57680.0110820.00 30.0002.40040.0001.3502.700
SECT HB401 WF 197.80361.030 57680.0110820.00 30.0002.40040.0003.0002.700
SECT HB450 WF 218.00447.970 79890.0011720.00 30.0002.60145.0001.4002.700
SECT HB451 WF 30.0002.60145.0003.000
SECT HB500 WF 238.60548.140 107180.012620.00 30.0002.79950.0001.4502.700
SECT HB501 WF 30.0002.79950.0003.0002.700
SECT HB502 WF 238.60548.140 107180.012620.00 42.0003.00050.0001.5002.700
SECT HB600 WF 270.00677.130 171040.013530.00 30.0003.00060.0001.5502.700
SECT HB601 WF 30.0003.00060.0003.0002.700
SECT IP220 WF 33.3709.070 2771.840204.890 11.0000.92022.0000.5901.200
SECT IP240 WF 39.12012.880 3891.620283.630 12.0000.98024.0000.6201.500
SECT IP300 WF 53.81020.120 8356.100603.780 15.0001.07030.0000.7101.500
GRUP
GRUP CP1 HB502 20.007.72035.50 1 1.001.00 N7.8490
GRUP CP2 HB500 20.007.72035.50 1 1.001.00 N7.8490
GRUP CP3 HB300 20.007.72035.50 1 1.001.00 N7.8490
GRUP CP4 HB400 20.008.00035.50 1 1.001.00 N7.8490
GRUP CP5 HB501 20.008.00034.50 1 1.001.00 N7.8490
GRUP CP6 HB301 20.007.72035.50 1 1.001.00 N7.8490
GRUP CS1 IP300 20.007.72035.50 1 1.001.00 N7.8490
GRUP CS2 IP240 20.007.72035.50 1 1.001.00 N7.8490
GRUP CS3 HB300 20.008.00035.50 1 1.001.00 N7.8490
GRUP CS4 IP220 20.008.00035.50 1 1.001.00 N7.8490
GRUP CS5 IP300 20.008.00034.50 1 1.001.00 N7.8490
GRUP DP1 HB600 20.007.72035.50 1 1.001.00 N7.8490
GRUP DP2 HB400 20.007.72035.50 1 1.001.00 N7.8490
GRUP DP3 HB500 20.007.72035.50 1 1.001.00 N7.8490
GRUP DP4 HB300 20.008.00035.50 1 1.001.00 N7.8490
GRUP DP5 DIAM 20.008.00034.50 1 1.001.00 N7.8490.392
GRUP DP5 H14B 20.008.00034.50 1 1.001.00 N7.8490
GRUP DP6 H16B 20.008.00034.50 1 1.001.00 N7.8490
GRUP DP7 H26B 20.008.00034.50 1 1.001.00 N7.8490
GRUP DP8 HB401 20.008.00034.50 1 1.001.00 N7.8490
GRUP DS1 IP240 20.007.72035.50 1 1.001.00 N7.8490
GRUP DS2 IP300 20.007.72035.50 1 1.001.00 N7.8490
GRUP DS3 IP240 20.008.00035.50 1 1.001.00 N7.8490
GRUP E1 IP240 20.008.00024.80 1 1.001.00 N7.8490
GRUP E2 IP300 20.008.00034.50 1 1.001.00 N7.8490
GRUP EQ1 20.000 5.000 2.0008.00024.80 1 1.001.00 0.500N1.00-3
GRUP FL1 50.800 1.588 20.008.00035.50 1 1.001.00 0.500N7.8490
GRUP FL1 50.800 2.540 20.008.00035.50 1 1.001.00 0.500N7.8490.600
GRUP FL2 27.310 1.270 20.008.00035.50 1 1.001.00 0.500N7.8490
GRUP FL3 21.910 1.270 20.008.00035.50 1 1.001.00 0.500N7.8490
GRUP FL4 11.430 0.856 20.008.00035.50 1 1.001.00 0.500N7.8490
********************************************************************************
GRUP HP0 HB500 20.008.00035.50 1 1.001.00 N7.8490
GRUP HP1 HB300 20.008.00035.50 1 1.001.00 N7.8490
GRUP HP2 HB302 20.008.00034.50 1 1.001.00 N7.8490
GRUP HS1 IP300 20.008.00035.50 1 1.001.00 N7.8490
GRUP HS2 IP240 20.008.00034.50 1 1.001.00 N7.8490
GRUP MP0 HB600 20.007.72035.50 1 1.001.00 N7.8490
GRUP MP1 HB500 20.007.72035.50 1 1.001.00 N7.8490
GRUP MP2 HB400 20.007.72035.50 1 1.001.00 N7.8490
GRUP MP3 HB300 20.007.72035.50 1 1.001.00 N7.8490
GRUP MP4 HB501 20.008.00034.50 1 1.001.00 N7.8490
GRUP MP5 HB601 20.008.00034.50 1 1.001.00 N7.8490
GRUP MP6 HB501 20.008.00034.50 1 1.001.00 N7.8490
GRUP MP7 HB401 20.008.00034.50 1 1.001.00 N7.8490
GRUP MS1 IP300 20.007.72035.50 1 1.001.00 N7.8490
GRUP MS2 HB300 20.007.72035.50 1 1.001.00 N7.8490
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B3 of 382

GRUP MS3 IP240 20.007.72035.50 1 1.001.00 N7.8490


GRUP MS4 HB400 20.007.72035.50 1 1.001.00 N7.8490
GRUP P1 IP240 20.008.00034.50 1 1.001.00 N7.8490
GRUP SL1 30.00014.000 20.008.00024.80 1 1.001.00 0.500N1.00-3
GRUP SW1 IP240 20.008.00035.50 1 1.001.00 N7.8490
GRUP SW2 21.910 1.030 20.008.00035.50 1 1.001.00 0.500N7.8490
GRUP SW3 16.830 0.953 20.008.00035.50 1 1.001.00 0.500N7.8490
GRUP SW4 14.130 0.874 20.008.00035.50 1 1.001.00 0.500N7.8490
GRUP SW5 IP300 20.008.00034.50 1 1.001.00 N7.8490
GRUP TC1 91.440 3.500 20.007.72034.50 1 1.001.00 0.500N7.8490
GRUP TD1 61.000 2.540 20.007.72034.50 1 1.001.00 0.500N7.8490
GRUP TL1 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.18
GRUP TL1 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TL1 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.995
GRUP TL2 116.84 2.500 20.007.72034.50 1 1.001.00 0.500N7.8490.250
GRUP TL2 CON1 20.007.72034.50 1 1.001.00 N7.8490.850
GRUP TL2 91.440 3.500 20.007.72033.50 1 1.001.00 0.500N7.8490
GRUP TL3 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.610
GRUP TL3 91.440 2.500 20.008.00033.50 1 1.001.00 0.500N7.8490
GRUP TL4 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TL4 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.570
GRUP TL5 91.440 3.500 20.008.00034.50 1 1.001.00 0.500 7.8490
GRUP TL6 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.555
GRUP TL6 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TL6 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.00
GRUP TL7 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.14
GRUP TL7 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TL7 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.37
GRUP TL8 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.08
GRUP TL8 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TL9 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.05
GRUP TL9 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TL9 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.610
GRUP TLA 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.555
GRUP TLA 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TLA 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.07
GRUP TLB 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.14
GRUP TLB 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TLB 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.02
GRUP TLC 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.84901.18
GRUP TLC 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TLC 91.440 3.500 20.008.00033.50 1 1.001.00 0.500N7.8490.555
GRUP TLD 91.440 3.500 20.008.00034.50 1 1.001.00 0.500N7.8490.560
GRUP TLD 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TLE 91.440 2.500 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TMU 21.910 2.230 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TS1 32.350 1.588 20.007.72035.50 1 1.001.00 0.500N7.8490
GRUP TS2 35.560 1.905 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TV1 32.350 1.905 20.007.72035.50 1 .800.800 0.500N7.8490
GRUP TV2 27.300 1.588 20.007.72035.50 1 .800.800 0.500N7.8490
GRUP TV3 27.300 1.905 20.007.72035.50 1 .800.800 0.500N7.8490
GRUP TV4 27.310 2.540 20.008.00034.50 1 1.001.00 0.500N7.8490
GRUP TV5 35.560 1.905 20.008.00034.50 1 .800.800 0.500N7.8490
GRUP TV6 32.390 2.144 20.008.00034.50 3 .800.800 0.500N7.8490
GRUP WP1 HB600 20.007.72035.50 1 1.001.00 N7.8490
GRUP WP2 HB450 20.007.72035.50 1 1.001.00 N7.8490
GRUP WP3 DIAM3 20.008.00034.50 1 1.001.00 N7.8490
GRUP WP4 HB451 20.008.00034.50 1 1.001.00 N7.8490
GRUP WS1 IP300 20.007.72035.50 1 1.001.00 N7.8490
GRUP WS2 HB300 20.008.00035.50 1 1.001.00 N7.8490
GRUP WS3 IP240 20.007.72035.50 1 1.001.00 N7.8490
GRUP WS4 IP300 20.008.00034.50 1 1.001.00 N7.8490
MEMBER
MEMBER 0073T66R CP1RP L 5.00
MEMBER T66S0073 CP1RP L 5.003.00
MEMBER10047T5ZN CP2RP L 5.753.25
MEMBER OFFSETS 55.720
MEMBER100480235 CP2RP L 2.61
MEMBER OFFSETS 45.720
MEMBER10048T5IL CP2RP L 5.005.00
MEMBER OFFSETS 45.720
MEMBER100490281 CP2RP L 4.72
MEMBER OFFSETS 45.720
MEMBER10049T5ZC CP2RP L 5.001.00
MEMBER OFFSETS 45.720
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B4 of 382

MEMBER 00540076 CP2RP L 2.251.00


MEMBER 0054T67I CP2RP L 6.00
MEMBER 0055T674 CP2RP L 6.00
MEMBER 0055T68F CP2RP L 5.75
MEMBER100620288 CP2RP L 5.25
MEMBER OFFSETS -16.00
MEMBER 00660527 CP2RP L 5.75
MEMBER 0067T60Q CP2RP L 5.753.25
MEMBER 00690311 CP2RP L 5.002.502.500
MEMBER 00690317 CP2RP L 12.0
MEMBER 00700314 CP2RP L 6.00
MEMBER 00710315 CP2RP L 6.00
MEMBER 00720282 CP2RP L 8.93
MEMBER100740292 CP2RP L 5.25
MEMBER OFFSETS -16.00
MEMBER 0075T508 CP2RP L 8.93
MEMBER 00760299 CP2RP L 2.251.00
MEMBER 01230303 CP2RP L 6.00.9000.900
MEMBER 01240322 CP2RP L 6.00.900
MEMBER 02020203 CP2RP L 6.00
MEMBER 02030204 CP2RP L 6.00
MEMBER 02040071 CP2RP L 6.00
MEMBER 02050206 CP2RP L 12.0
MEMBER 02060207 CP2RP L 12.0
MEMBER 02070069 CP2RP L 12.0
MEMBER 02080209 CP2RP L 12.0
MEMBER 02090210 CP2RP L 12.0
MEMBER 02100313 CP2RP L 12.0
MEMBER 02110212 CP2RP L 6.00
MEMBER 02120213 CP2RP L 6.00
MEMBER 02130070 CP2RP L 6.00
MEMBER 02150524 CP2RP L 6.00.750
MEMBER 02160365 CP2RP L 12.0
MEMBER 02190360 CP2RP L 12.0
MEMBER 02200355 CP2RP L 6.00
MEMBER 02220362 CP2RP L 12.0
MEMBER 02230367 CP2RP L 12.0
MEMBER 02240219 CP2RP L 12.0
MEMBER 02250216 CP2RP L 12.0
MEMBER 02350245 CP2RP L 2.61
MEMBER102360049 CP2RP L 2.61
MEMBER OFFSETS -45.72
MEMBER 0239T68E CP2RP L 5.75
MEMBER 0240T600 CP2RP L 5.751.00
MEMBER 0245T494 CP2RP L 2.611.00
MEMBER 02460247 CP2RP L 3.14
MEMBER 02470248 CP2RP L 3.14
MEMBER 02480249 CP2RP L 3.14
MEMBER 02490250 CP2RP L 3.14
MEMBER 02500251 CP2RP L 3.14
MEMBER 0251T5VV CP2RP L 3.14
MEMBER 0252T495 CP2RP L 3.141.00
MEMBER 0253T5VS CP2RP L 2.61
MEMBER 0263T64B CP2RP L 5.75
MEMBER 0264T56W CP2RP L 5.75
MEMBER 02650266 CP2RP L 5.75
MEMBER 0266T68A CP2RP L 5.75
MEMBER 0267T689 CP2RP L 5.75
MEMBER 02680269 CP2RP L 5.75
MEMBER 0269T56V CP2RP L 5.75
MEMBER 02700271 CP2RP L 5.75
MEMBER 0271T60E CP2RP L 5.751.00
MEMBER102810065 CP2RP L 4.72
MEMBER OFFSETS 16.000
MEMBER 02820075 CP2RP L 8.93
MEMBER 02880289 CP2RP L 5.25
MEMBER 02890290 CP2RP L 5.25
MEMBER 02900291 CP2RP L 5.25
MEMBER102910048 CP2RP L 5.25
MEMBER OFFSETS -45.72
MEMBER 02920293 CP2RP L 5.25
MEMBER 02930294 CP2RP L 5.25
MEMBER 02940295 CP2RP L 5.25
MEMBER 02950073 CP2RP L 5.25
MEMBER102990056 CP2RP L 2.251.25
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B5 of 382

MEMBER OFFSETS -45.72


MEMBER 03030354 CP2RP L 6.00
MEMBER 03070313 CP2RP L 5.002.502.500
MEMBER 03080307 CP2RP L 5.002.502.500
MEMBER 03110308 CP2RP L 5.002.502.500
MEMBER 03130316 CP2RP L 12.0
MEMBER 03140124 CP2RP L 6.00.900
MEMBER 03150123 CP2RP L 6.00.900
MEMBER 03160363 CP2RP L 12.0
MEMBER 03170358 CP2RP L 12.0
MEMBER103180046 CP2RP L 6.00
MEMBER OFFSETS -45.72
MEMBER 03190067 CP2RP L 12.0
MEMBER 03200066 CP2RP L 12.0
MEMBER103210047 CP2RP L 6.00
MEMBER OFFSETS -45.72
MEMBER 03220323 CP2RP L 6.00
MEMBER 03230215 CP2RP L 6.00
MEMBER 03240325 CP2RP L 6.00
MEMBER 03250326 CP2RP L 6.00
MEMBER 03260318 CP2RP L 6.00
MEMBER 03540220 CP2RP L 6.00
MEMBER 03550356 CP2RP L 6.00
MEMBER 03560357 CP2RP L 6.00
MEMBER 03570321 CP2RP L 6.00
MEMBER 03580359 CP2RP L 12.0
MEMBER 03590224 CP2RP L 12.0
MEMBER 03600361 CP2RP L 12.0
MEMBER 03610222 CP2RP L 12.0
MEMBER 03620320 CP2RP L 12.0
MEMBER 03630364 CP2RP L 12.0
MEMBER 03640225 CP2RP L 12.0
MEMBER 03650366 CP2RP L 12.0
MEMBER 03660223 CP2RP L 12.0
MEMBER 03670319 CP2RP L 12.0
MEMBER 0518T66S CP2RP L 5.003.00
MEMBER 0522T67C CP2RP L 5.005.00
MEMBER 05240324 CP2RP L 6.00.750
MEMBER 05270067 CP2RP L 5.75
MEMBER T4940246 CP2RP L 3.141.00
MEMBER T4950253 CP2RP L 2.611.00
MEMBER1T508T329 CP2RP L 8.93
MEMBER OFFSETS 16.000
MEMBER T56V0208 CP2RP L 12.0
MEMBER T56V0270 CP2RP L 5.75
MEMBER T56W0205 CP2RP L 12.0
MEMBER T56W0265 CP2RP L 5.75
MEMBER T59BT5VX CP2RP L 5.001.26
MEMBER T5AWT67J CP2RP L 5.002.00
MEMBER T5AXT675 CP2RP L 5.002.00
MEMBER T5BAT601 CP2RP L 5.753.25
MEMBER T5BBT60F CP2RP L 5.753.25
MEMBER T5BNT5AW CP2RP L 5.002.00
MEMBER T5IL0518 CP2RP L 5.003.00
MEMBER T5NYT5WA CP2RP L 5.004.00
MEMBER T5RZT5S2 CP2RP L 5.00
MEMBER T5S2T614 CP2RP L 5.002.00
MEMBER T5VS0236 CP2RP L 2.61
MEMBER T5VV0252 CP2RP L 3.14
MEMBER T5VXT5BN CP2RP L 5.00
MEMBER T5WAT61H CP2RP L 5.001.90
MEMBER T5WCT59B CP2RP L 5.001.26
MEMBER T5WJT5RZ CP2RP L 5.00
MEMBER T5ZCT5NY CP2RP L 5.001.00
MEMBER T5ZNT5BB CP2RP L 5.753.25
MEMBER T6000263 CP2RP L 5.751.00
MEMBER1T6010046 CP2RP L 5.753.25
MEMBER OFFSETS -45.72
MEMBER T60E0239 CP2RP L 5.751.00
MEMBER T60F0066 CP2RP L 5.753.25
MEMBER T60QT5BA CP2RP L 5.753.25
MEMBER T614T5AX CP2RP L 5.002.00
MEMBER T61H0522 CP2RP L 5.001.90
MEMBER T64B0264 CP2RP L 5.75
MEMBER T66RT5WJ CP2RP L 5.00
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B6 of 382

MEMBER T6740202 CP2RP L 6.00


MEMBER T6750055 CP2RP L 5.002.00
MEMBER T67BT5WC CP2RP L 5.005.00
MEMBER T67I0211 CP2RP L 6.00
MEMBER T67J0054 CP2RP L 5.002.00
MEMBER T6890268 CP2RP L 5.75
MEMBER T68A0267 CP2RP L 5.75
MEMBER T68E0054 CP2RP L 5.75
MEMBER T68F0240 CP2RP L 5.75
MEMBER100590283 CP3RP L 5.65 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER100610284 CP3RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER10062T5IM CP3RP L 2.002.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER10064T5LM CP3RP L 5.65
MEMBER OFFSETS 10.000 10.000
MEMBER10074T61C CP3RP L 5.005.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER102430272 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10244T68M CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10249T61G CP3RP L 5.005.00
MEMBER OFFSETS 10.000 10.000
MEMBER10258T5WF CP3RP L 5.00 5.000
MEMBER OFFSETS 10.000 10.000
MEMBER102720273 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER102730274 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER102740275 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER102750276 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER102760277 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10276T59I CP3RP L 4.004.001.000
MEMBER OFFSETS -16.00 10.000 10.000
MEMBER102770278 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10278T5VU CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER102790280 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10280T5VT CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER102830064 CP3RP L 5.65 1.000
MEMBER OFFSETS 10.000 16.00010.000
MEMBER102840285 CP3RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER102850286 CP3RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER102860287 CP3RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER10287T68N CP3RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER106490057 CP3RP L 5.005.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T59IT59K CP3RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T59K0249 CP3RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5AU0649 CP3RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T5I9T5IF CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IAT5I9 CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IBT5IA CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5ICT5IB CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IDT5IC CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B7 of 382

MEMBER1T5IET5ID CP3RP L 11.9


MEMBER OFFSETS 10.000 10.000
MEMBER1T5IHT5IM CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IIT5IH CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IJT5II CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IKT5IJ CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5ILT5IK CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IMT5IG CP3RP L 11.9
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IMT5ON CP3RP L 3.00 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NWT5LN CP3RP L 5.65
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NXT5NW CP3RP L 5.65
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NYT5NX CP3RP L 5.65
MEMBER OFFSETS 10.000 10.000
MEMBER1T5ONT5OP CP3RP L 3.00 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OP0074 CP3RP L 3.00 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VT0244 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VU0279 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T5WF0267 CP3RP L 5.00 5.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T619T5AU CP3RP L 5.005.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T61CT619 CP3RP L 5.005.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T61GT61O CP3RP L 5.005.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T61O0258 CP3RP L 5.005.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T68M0059 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T68O0243 CP3RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER100570297 CP4RP L 5.00
MEMBER OFFSETS -16.00 5.000 5.000
MEMBER10058T5IE CP4RP L 4.00
MEMBER OFFSETS -16.00 5.000-16.00 5.000
MEMBER100590049 CP4RP 3.700
MEMBER OFFSETS -16.00 5.000-45.72 5.000
MEMBER100730237 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER10075T327 CP4RP L 5.00 1.000
MEMBER OFFSETS 5.000 5.000
MEMBER10077T68G CP4RP L 5.001.00
MEMBER OFFSETS 5.000 5.000
MEMBER10237T5WX CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102380072 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102540255 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER10255T5X0 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102560257 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102570258 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102580259 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102590260 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102600261 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102610262 CP4RP L 11.5
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B8 of 382

MEMBER OFFSETS 5.000 5.000


MEMBER102620238 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER102960298 CP4RP L 5.00
MEMBER OFFSETS 5.000 5.000
MEMBER102970296 CP4RP L 5.00
MEMBER OFFSETS 5.000 5.000
MEMBER102980300 CP4RP L 5.00
MEMBER OFFSETS 5.000 5.000
MEMBER103000077 CP4RP L 5.001.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T327T509 CP4RP L 4.20
MEMBER OFFSETS 5.000 5.000
MEMBER1T327T5AV CP4RP L 5.002.001.000
MEMBER OFFSETS 5.000 5.000
MEMBER1T329T328 CP4RP 1.000
MEMBER OFFSETS 5.000 5.000
MEMBER1T509T328 CP4RP L 4.20
MEMBER OFFSETS 5.000 16.000 5.000
MEMBER1T5AV0056 CP4RP L 5.002.001.000
MEMBER OFFSETS 5.000 5.000
MEMBER1T5BMT327 CP4RP L 2.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T5BNT5BM CP4RP L 2.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T5IET5W7 CP4RP L 4.00
MEMBER OFFSETS -16.00 5.000 5.000
MEMBER1T5W70048 CP4RP L 4.00
MEMBER OFFSETS 5.000-45.72 5.000
MEMBER1T5WX0254 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER1T5X00256 CP4RP L 11.5
MEMBER OFFSETS 5.000 5.000
MEMBER1T68G0055 CP4RP L 5.001.00
MEMBER OFFSETS 5.000 5.000
MEMBER 0072T67B CP5RP L 5.005.00
MEMBER T67C0072 CP5RP L 5.005.00
MEMBER10058T68O CP6RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T68N0058 CP6RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER10278T59G CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER10284T5IA CS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T598T5WI CS1RP 000000000000 L 3.001.581.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T59GT59H CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T59H0251 CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5B1T598 CS1RP L 3.001.581.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IAT5B1 CS1RP 000111000000 L 3.001.581.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VTT5XP CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VUT5XQ CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5WI0288 CS1RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5XNT5VS CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5XOT5VV CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5XPT5XN CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5XQT5XO CS1RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER10064T5AY CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10065T5NW CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10071T5ZW CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B9 of 382

MEMBER10202T5ZZ CS2RP 000111000000 L 3.253.251.000


MEMBER OFFSETS 13.000 13.000
MEMBER10203T5ZY CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10204T5ZX CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER102050208 CS2RP 000111000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10206T648 CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10207T647 CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10208T644 CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10209T60C CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10210T610 CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10216T60V CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10220T5ZS CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10235T5WP CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10236T5W8 CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10237T5WR CS2RP 000111000000 L 2.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10238T5WB CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER102430235 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER102440236 CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10245T59T CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10246T5WQ CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10247T5W2 CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10248T5W3 CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10250T5W4 CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10251T5W5 CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10252T61L CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10253T61K CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10254T5WS CS2RP L 5.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10255T5WT CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10256T5WU CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10257T6AG CS2RP 000111000000 L 5.002.801.000
MEMBER OFFSETS 13.000 13.000
MEMBER10259T5VY CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10260T59C CS2RP 000111000000 L 5.002.801.000
MEMBER OFFSETS 13.000 13.000
MEMBER102610270 CS2RP 000111000011 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER102620271 CS2RP 000111000011 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER102720245 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER102730246 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10274T59J CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER102750248 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER102770250 CS2RP L 4.004.001.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B10 of 382

MEMBER OFFSETS 13.000 13.000


MEMBER102790252 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10280T59F CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10281T5NX CS2RP 000111000011 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10282T5BM CS2RP 000111000011 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10283T5B0 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10285T5IB CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10286T5IC CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10287T5ID CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10288T5IH CS2RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10289T5II CS2RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10290T5IJ CS2RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10291T5IK CS2RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10292T5WM CS2RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER10293T5WL CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10294T5RS CS2RP 000111000011 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10295T5WK CS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER10303T5ZU CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10313T60Z CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10315T5ZV CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10316T60Y CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10319T60R CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10321T5ZO CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10354T5ZT CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10355T5ZR CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10356T5ZQ CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10357T5ZP CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10363T60X CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10364T60W CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10365T60U CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10366T60T CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER10367T60S CS2RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T596T5W6 CS2RP 000000000000 L 3.001.581.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5970295 CS2RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5970518 CS2RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5990292 CS2RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T599T6AC CS2RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T59CT5VZ CS2RP 000000000000 L 5.002.801.000
MEMBER OFFSETS 13.000 13.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B11 of 382

MEMBER1T59DT5W0 CS2RP 000000000000 L 5.002.801.000


MEMBER OFFSETS 13.000 13.000
MEMBER1T59E0253 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59FT59E CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59JT59L CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59L0247 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59TT61F CS2RP 000000000000 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59UT5WE CS2RP L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59VT5W1 CS2RP 000000000000 L 5.002.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T59WT5S1 CS2RP 000000000000 L 5.001.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5AY0065 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5B00281 CS2RP L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5B20297 CS2RP 000000000011 L 5.004.421.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5B3T615 CS2RP L 5.002.002.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5B4T5RW CS2RP 000000000000 L 5.002.002.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5BM0299 CS2RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IBT5WH CS2RP 000111000000 L 3.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ICT5WG CS2RP 000111000000 L 3.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IDT596 CS2RP 000111000000 L 3.001.581.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IHT599 CS2RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IIT6AC CS2RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IJ0294 CS2RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IKT597 CS2RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5NW0075 CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5NXT61I CS2RP 000111000000 L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ORT5OQ CS2RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5OST5OR CS2RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RST5RX CS2RP L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RTT5RS CS2RP 000111000000 L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RTT617 CS2RP L 5.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RU0298 CS2RP 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RUT5RY CS2RP L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RV0296 CS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RVT5RU CS2RP 000111000000 L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RW0300 CS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RXT5B3 CS2RP 000000000011 L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RXT616 CS2RP L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RYT5RW CS2RP 000000000011 L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5RZT5S0 CS2RP 000111000000 L 1.75
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B12 of 382

MEMBER OFFSETS 13.000 13.000


MEMBER1T5S0T5S1 CS2RP 000000000011 L 1.75
MEMBER OFFSETS 13.000 13.000
MEMBER1T5S1T5S4 CS2RP L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5S2T5S3 CS2RP 000111000000 L 1.75
MEMBER OFFSETS 13.000 13.000
MEMBER1T5S3T5S4 CS2RP 000000000011 L 1.75
MEMBER OFFSETS 13.000 13.000
MEMBER1T5S3T613 CS2RP 000111000000 L 2.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5S4T612 CS2RP L 5.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5VW0239 CS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5VWT5VX CS2RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5VY0268 CS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5VYT5VZ CS2RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5VZ0269 CS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W00266 CS2RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W10265 CS2RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W1T5W0 CS2RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W2T59U CS2RP L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W2T5W3 CS2RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W3T5WD CS2RP 000000000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W4T5W5 CS2RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W4T61N CS2RP 000000000000 L 5.004.451.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W5T61M CS2RP 000000000000 L 5.004.451.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W60291 CS2RP 000000000011 L 3.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W6T5W7 CS2RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W8T61J CS2RP L 5.001.901.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W90238 CS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WBT5VW CS2RP 000000000000 L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WDT61P CS2RP 000000000000 L 5.003.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WET61Q CS2RP 000000000000 L 5.003.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WG0290 CS2RP 000000000011 L 3.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WH0289 CS2RP 000000000011 L 3.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WKT5B3 CS2RP L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WLT5RT CS2RP L 5.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WMT61B CS2RP 000000000000 L 5.004.421.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WPT61T CS2RP 000000000000 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WQT61E CS2RP 000000000000 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WRT5S0 CS2RP 000000000011 L 2.00 1.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WST59W CS2RP L 5.001.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WTT61A CS2RP 000000000000 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B13 of 382

MEMBER1T5WUT6AF CS2RP 000000000000 L 5.002.201.000


MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZOT60G CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZPT60H CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZQT60I CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZRT60J CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZST60K CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZTT60L CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZUT60M CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZVT60N CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZWT60O CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZXT60P CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZY0206 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T5ZZT64C CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6020318 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6030326 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6040325 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6050324 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6060215 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6070323 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6080322 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6090314 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60A0070 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60B0213 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60C0212 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60D0211 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60G0320 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60H0362 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60I0361 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60J0360 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60K0219 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60L0359 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60M0358 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60N0317 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60O0069 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60P0207 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60RT602 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60ST603 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60TT604 CS2RP L 3.253.251.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B14 of 382

MEMBER OFFSETS 13.000 13.000


MEMBER1T60UT605 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60VT606 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60WT607 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60XT608 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60YT609 CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T60ZT60A CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T610T60B CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6110264 CS2RP 000000000011 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6120263 CS2RP L 5.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6130240 CS2RP 000000000011 L 2.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T615T5B4 CS2RP L 5.002.002.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T616T5RY CS2RP L 2.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T617T5RV CS2RP L 5.002.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T618T5B2 CS2RP 000000000000 L 5.004.421.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61AT611 CS2RP L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61BT618 CS2RP L 5.004.421.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61DT59D CS2RP 000000000000 L 5.002.801.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61E0255 CS2RP 000000000011 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61F0254 CS2RP 000000000011 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61I0282 CS2RP 000000000011 L 4.004.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61JT5W9 CS2RP L 5.001.901.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61K0262 CS2RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61L0261 CS2RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61M0260 CS2RP 000000000011 L 5.004.451.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61N0259 CS2RP 000000000011 L 5.004.451.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61PT6AD CS2RP 000000000000 L 5.003.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61QT6AE CS2RP 000000000000 L 5.003.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T61T0237 CS2RP 000000000011 L 5.004.401.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T644T60D CS2RP L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6470210 CS2RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6480209 CS2RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T64C0205 CS2RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6AC0293 CS2RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6AD0257 CS2RP 000000000011 L 5.003.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6AE0256 CS2RP 000000000011 L 5.003.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER1T6AFT59V CS2RP 000000000000 L 5.002.201.000
MEMBER OFFSETS 13.000 13.000
MEMBER T6AFT6AG CS2RP 000111000011
MEMBER1T6AGT61D CS2RP 000000000000 L 5.002.801.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B15 of 382

MEMBER OFFSETS 13.000 13.000


MEMBER10061T5I9 CS3RP 1.000
MEMBER OFFSETS -16.00 10.000-16.00 10.000
MEMBER1T5AZ0062 CS3RP L 3.003.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5I9T5AZ CS3RP L 3.003.001.000
MEMBER OFFSETS -16.00 10.000 10.000
MEMBER1T508T509 CS4RP L
MEMBER OFFSETS 13.000 13.000
MEMBER1T5OLT5OQ CS5RP L 2.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OMT5OO CS5RP L 2.35
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OMT5OS CS5RP L 2.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OOT5OL CS5RP L 2.35
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OOT5OR CS5RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OQ0074 CS5RP L 2.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5ORT5OP CS5RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OST5ON CS5RP L 2.00
MEMBER OFFSETS 10.000 10.000
MEMBER10000T594 DP1RP L 5.002.00
MEMBER OFFSETS 45.720
MEMBER 0005T142 DP1RP L 12.0
MEMBER 01090161 DP1RP L 5.25
MEMBER 0110T66P DP1RP L 5.005.00
MEMBER 01610110 DP1RP L 5.25
MEMBER T139T172 DP1RP L 12.0
MEMBER T142T143 DP1RP L 12.0
MEMBER T143T144 DP1RP L 12.0
MEMBER T144T139 DP1RP L 12.0
MEMBER T159T185 DP1RP L 12.0
MEMBER T166T184 DP1RP L 12.0
MEMBER T172T166 DP1RP L 12.0
MEMBER1T178T132 DP1RP L 12.0
MEMBER OFFSETS -45.72
MEMBER T184T159 DP1RP L 12.0
MEMBER T185T186 DP1RP L 12.0
MEMBER T186T187 DP1RP L 12.0
MEMBER T187T178 DP1RP L 12.0
MEMBER T2090109 DP1RP L 5.25
MEMBER T213T209 DP1RP L 5.25
MEMBER1T217T213 DP1RP L 5.25
MEMBER OFFSETS -16.00
MEMBER T5930005 DP1RP L 5.002.00
MEMBER T594T5JT DP1RP L 5.002.00
MEMBER T595T66Q DP1RP L 5.003.00
MEMBER T5JTT595 DP1RP L 5.003.00
MEMBER T5RPT5RR DP1RP L 5.005.00
MEMBER T5RRT593 DP1RP L 5.002.00
MEMBER T66PT5RP DP1RP L 5.005.00
MEMBER T66Q0110 DP1RP L 5.003.00
MEMBER100000195 DP2RP L 5.75
MEMBER OFFSETS 45.72010.000 10.000
MEMBER100040155 DP2RP L 4.73
MEMBER OFFSETS 45.72010.000 10.000
MEMBER10004T5O1 DP2RP 5.00
MEMBER OFFSETS 45.720 10.000 10.000
MEMBER100050186 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER100060154 DP2RP L 8.92
MEMBER OFFSETS 10.000 10.000
MEMBER10006T151 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER10007T506 DP2RP L 8.92
MEMBER OFFSETS 10.000 10.000
MEMBER100080162 DP2RP L 11.1
MEMBER OFFSETS 10.000 10.000
MEMBER10026T5PY DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER100270192 DP2RP L 5.75
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B16 of 382

MEMBER OFFSETS 10.000 10.000


MEMBER101070153 DP2RP L 4.73
MEMBER OFFSETS 10.000 10.000
MEMBER10108T325 DP2RP L 2.902.901.000
MEMBER OFFSETS 10.000 10.000
MEMBER101100165 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101530108 DP2RP L 4.73
MEMBER OFFSETS 10.000 16.00010.000
MEMBER101540007 DP2RP L 8.92
MEMBER OFFSETS 10.000 10.000
MEMBER101550015 DP2RP L 4.73
MEMBER OFFSETS 10.000 16.00010.000
MEMBER10162T68D DP2RP L 11.1
MEMBER OFFSETS 10.000 10.000
MEMBER101650167 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101660107 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101670168 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101680169 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101690170 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101700171 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER10171T5Q4 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER10172T5QH DP2RP L 11.51.00
MEMBER OFFSETS 10.000 10.000
MEMBER10173T5PZ DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101740175 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101750166 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101760006 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101770176 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101780177 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10179T205 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10180T5QG DP2RP L 5.751.00
MEMBER OFFSETS 10.000 10.000
MEMBER10181T687 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10182T688 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101830182 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER10184T202 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101850184 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101860185 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101870004 DP2RP L 5.75
MEMBER OFFSETS 10.000 -45.7210.000
MEMBER101880187 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101890188 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101900026 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101910190 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101920191 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101930027 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER101940193 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B17 of 382

MEMBER101950194 DP2RP L 5.75


MEMBER OFFSETS 10.000 10.000
MEMBER1T132T5B7 DP2RP L 11.53.25
MEMBER OFFSETS 45.72010.000 10.000
MEMBER1T135T199 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER1T136T5B6 DP2RP L 11.53.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T137T169 DP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T137T174 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T138T171 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T145T146 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T146T147 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T147T137 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T148T149 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T149T150 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T150T170 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T151T152 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T152T153 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T153T138 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T155T181 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T156T195 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T158T190 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T160T192 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T161T197 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T162T158 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T163T156 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T167T170 DP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T168T167 DP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T169T168 DP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T170T173 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T171T179 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T173T193 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T174T188 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T175T131 DP2RP L 12.0
MEMBER OFFSETS 10.000-45.72 10.000
MEMBER1T176T136 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T177T135 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T179T180 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T180T155 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T181T182 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T182T183 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T183T175 DP2RP L 12.0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B18 of 382

MEMBER OFFSETS 10.000 10.000


MEMBER1T188T189 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T189T162 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T190T191 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T191T160 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T192T177 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T193T194 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T194T163 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T195T196 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T196T161 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T197T176 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T199T136 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER1T2020183 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T202T145 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T205T148 DP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T205T5Q7 DP2RP L 5.75.500
MEMBER OFFSETS 10.000 10.000
MEMBER1T2080008 DP2RP L 11.1
MEMBER OFFSETS 10.000 10.000
MEMBER1T212T208 DP2RP L 11.1
MEMBER OFFSETS 10.000 10.000
MEMBER1T216T212 DP2RP L 11.1
MEMBER OFFSETS -16.0010.000 10.000
MEMBER1T325T507 DP2RP L 8.92
MEMBER OFFSETS 10.000 10.000
MEMBER1T325T5B9 DP2RP L 2.102.101.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T326T324 DP2RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T506T324 DP2RP L 8.92
MEMBER OFFSETS 10.000 16.00010.000
MEMBER1T507T326 DP2RP L 8.92
MEMBER OFFSETS 10.000 16.00010.000
MEMBER1T5920006 DP2RP L 5.002.10
MEMBER OFFSETS 10.000 10.000
MEMBER1T5B6T131 DP2RP L 11.53.25
MEMBER OFFSETS 10.000 -45.7210.000
MEMBER1T5B7T135 DP2RP L 11.53.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5B90007 DP2RP L 2.102.101.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5BKT325 DP2RP L 8.92
MEMBER OFFSETS 10.000 10.000
MEMBER1T5BLT592 DP2RP L 5.002.10
MEMBER OFFSETS 10.000 10.000
MEMBER1T5BLT5BK DP2RP L 8.92
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O1T5ZJ DP2RP L 5.004.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5PY0189 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T5PZT5Q6 DP2RP L 11.5.650
MEMBER OFFSETS 10.000 10.000
MEMBER1T5Q40172 DP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER1T5Q50180 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T5Q60174 DP2RP L 11.5.650
MEMBER OFFSETS 10.000 10.000
MEMBER1T5Q70178 DP2RP L 5.75.500
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B19 of 382

MEMBER1T5QG0179 DP2RP L 5.751.00


MEMBER OFFSETS 10.000 10.000
MEMBER1T5QH0173 DP2RP L 11.51.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5ZJT67A DP2RP L 5.004.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T660T678 DP2RP L 5.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T678T5BL DP2RP L 5.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T679T660 DP2RP L 5.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T687T5Q5 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T6880181 DP2RP L 5.75
MEMBER OFFSETS 10.000 10.000
MEMBER1T68D0005 DP2RP L 11.1
MEMBER OFFSETS 10.000 10.000
MEMBER10016T56X DP3RP L 5.251.00
MEMBER OFFSETS 5.000 5.000
MEMBER101600000 DP3RP L 5.25
MEMBER OFFSETS 5.000 -45.72 5.000
MEMBER1T2100016 DP3RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T214T210 DP3RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T218T214 DP3RP L 5.25
MEMBER OFFSETS -16.00 5.000 5.000
MEMBER1T56X0160 DP3RP L 5.251.00
MEMBER OFFSETS 5.000 5.000
MEMBER100120164 DP4RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER10012T571 DP4RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER100130163 DP4RP L 4.73
MEMBER OFFSETS 15.000 15.000
MEMBER10014T445 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10016T5JR DP4RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10027T57V DP4RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10044T440 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10045T443 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10109T577 DP4RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER101630011 DP4RP L 4.73
MEMBER OFFSETS 15.000 16.00015.000
MEMBER101640014 DP4RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER10169T57W DP4RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10171T661 DP4RP 000111000000 L 5.005.00
MEMBER OFFSETS 15.000 15.000
MEMBER10191T57L DP4RP 000111000000 L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T209T578 DP4RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T210T5JQ DP4RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T2110012 DP4RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T211T572 DP4RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T213T579 DP4RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T214T5JP DP4RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T215T211 DP4RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T215T573 DP4RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T217T5B8 DP4RP L 5.005.001.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B20 of 382

MEMBER OFFSETS 15.000 15.000


MEMBER1T218T5JO DP4RP L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T219T215 DP4RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T219T218 DP4RP L 2.002.001.000
MEMBER OFFSETS -16.00 15.000 15.000
MEMBER1T435T444 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T4370191 DP4RP
MEMBER OFFSETS -16.00 15.000 15.000
MEMBER1T437T442 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T4380188 DP4RP 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T438T441 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T440T438 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T4410013 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T4420044 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T443T437 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T4440045 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T445T435 DP4RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T56YT574 DP4RP L 3.00 2.200
MEMBER OFFSETS 15.000 15.000
MEMBER1T56ZT575 DP4RP L 3.00 2.200
MEMBER OFFSETS 15.000 15.000
MEMBER1T570T576 DP4RP L 3.00 2.200
MEMBER OFFSETS 15.000 15.000
MEMBER1T5710016 DP4RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T572T210 DP4RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T573T214 DP4RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5740109 DP4RP 000000000011 L 3.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T575T209 DP4RP 000000000011 L 3.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T576T213 DP4RP 000000000011 L 3.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5770008 DP4RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T578T208 DP4RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T579T212 DP4RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57LT57P DP4RP L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T57P0171 DP4RP 000000000011 L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T57V0169 DP4RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57WT65V DP4RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5B8T216 DP4RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JOT5JU DP4RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JOT5PA DP4RP L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JPT570 DP4RP 000111000000 L 3.00 2.200
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JPT5JO DP4RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JQT56Z DP4RP 000111000000 L 3.00 2.200
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JQT5JP DP4RP L 11.9
MEMBER OFFSETS 15.000 15.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B21 of 382

MEMBER1T5JRT56Y DP4RP 000111000000 L 3.00 2.200


MEMBER OFFSETS 15.000 15.000
MEMBER1T5JRT5JQ DP4RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JST5JR DP4RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JTT5JS DP4RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5NZT5LY DP4RP L 5.65
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O0T5NZ DP4RP L 5.65
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O1T5O0 DP4RP L 5.65
MEMBER OFFSETS 15.000 15.000
MEMBER1T5PAT217 DP4RP L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ZD0181 DP4RP 000000000011 L 5.005.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ZH0183 DP4RP L 5.002.351.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65VT5ZH DP4RP L 5.002.351.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T661T5ZD DP4RP L 5.005.00
MEMBER OFFSETS 15.000 15.000
MEMBER100040013 DP5RP L 1.000
MEMBER OFFSETS -45.72 10.000-16.00 10.000
MEMBER10014T5OK DP6RP L 2.00 1.000
MEMBER OFFSETS -16.00
MEMBER1T5OK0000 DP7RP L 2.00 1.000
MEMBER OFFSETS -45.72
MEMBER10107T679 DP8RP L 5.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T67A0107 DP8RP L 5.004.00
MEMBER OFFSETS 10.000 10.000
MEMBER100110015 DS1RP L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10015T5NZ DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10026T57J DS1RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER100440026 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER100450027 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10155T5O0 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10160T5JS DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER101610162 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER101630155 DS1RP L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER101640160 DS1RP L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10165T5RN DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10167T5RO DS1RP 000111000000 L 2.65 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10173T57C DS1RP 000111000000 L 2.65 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10174T65X DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10175T65Y DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10187T5PB DS1RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10188T5PC DS1RP 000111000011 L 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10189T5PD DS1RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10194T5WO DS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10195T5WN DS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T139T137 DS1RP 000111000011 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B22 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T142T145 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T143T146 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T144T147 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T148T151 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T149T152 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T150T153 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T156T155 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T159T158 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T166T188 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER T168T69F DS1RP
MEMBER1T170T138 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T172T174 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T173T171 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T176T175 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T178T177 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T184T189 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T185T190 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T186T191 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T187T192 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T193T179 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T194T180 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T195T181 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T196T182 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T197T183 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T4350194 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T4400189 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T4420190 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T4430192 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T4440193 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T4450195 DS1RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T57CT57E DS1RP L 2.65 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T57E0179 DS1RP 000000000011 L 2.35 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T57JT57N DS1RP L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T57N0173 DS1RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BK0154 DS1RP 000111000011 L 2.102.101.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5HHT5HG DS1RP
MEMBER OFFSETS 18.000 -38.1018.000
MEMBER1T5HHT5PG DS1RP L 5.001.201.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JS0161 DS1RP 000111000011 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B23 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T5NZ0108 DS1RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5O00153 DS1RP 000111000011 L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PBT6BP DS1RP L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PCT5PK DS1RP L 2.00 0.450
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PDT5PI DS1RP 000111000000 L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PDT5Q3 DS1RP L 5.001.201.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PET5ZK DS1RP L 5.003.301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PFT5PJ DS1RP L 2.00 0.450
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PFT5ZL DS1RP 000111000000 L 3.30 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PGT5PH DS1RP 000111000000 L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PGT5ZM DS1RP L 5.003.301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PHT5HG DS1RP
MEMBER OFFSETS 18.00038.100 18.000
MEMBER1T5PHT5PF DS1RP L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PIT5HG DS1RP
MEMBER OFFSETS 18.000-38.10 18.000
MEMBER1T5PIT5PC DS1RP L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PJT5PE DS1RP 000000000011 L 2.00 0.550
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PKT5PB DS1RP 000000000011 L 2.00 0.550
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PKT5PL DS1RP L 1.201.201.200
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PLT5HG DS1RP
MEMBER OFFSETS 18.000 38.10018.000
MEMBER1T5PLT5PJ DS1RP L 1.201.201.200
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q00174 DS1RP 000000000011 L 5.003.301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q3T5HH DS1RP L 5.001.201.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5RM0186 DS1RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5RNT5RO DS1RP 000000000011 L 1.75 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ROT5RQ DS1RP 000000000011 L 2.65 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5RPT5RN DS1RP 000111000000 L 1.75 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5RQ0185 DS1RP 000111000011 L 2.35 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5WN0165 DS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5WO0167 DS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ZK0166 DS1RP 000000000011 L 5.003.301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ZL0175 DS1RP 000000000011 L 3.30 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ZMT5Q0 DS1RP L 5.003.301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T65X0178 DS1RP 000011000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T65Y0177 DS1RP 000011000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER T69FT69G DS1RP
MEMBER T69GT69H DS1RP
MEMBER T69H0181 DS1RP
MEMBER1T6BPT5PE DS1RP L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10153T5BK DS2RP 000111000011 L 2.902.901.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B24 of 382

MEMBER OFFSETS 15.000 15.000


MEMBER10166T65Z DS2RP 000111000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10168T5QS DS2RP L 2.65 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10170T5QT DS2RP L 2.65 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10172T57D DS2RP 000111000000 L 2.65 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10190T57K DS2RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10192T57M DS2RP L 5.001.601.000
MEMBER OFFSETS 15.000 15.000
MEMBER10193T5QQ DS2RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T145T69H DS2RP 000111000000 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T146T69G DS2RP 000111000000 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T147T69F DS2RP 000111000000 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T4410187 DS2RP 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57DT57F DS2RP L 2.65 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57ET65X DS2RP L 5.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57FT5ZF DS2RP 000000000000 L 2.352.351.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57KT57O DS2RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57MT5QR DS2RP L 5.001.601.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57O0172 DS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T57Q0170 DS2RP L 5.003.401.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QQ0168 DS2RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QRT57Q DS2RP L 5.003.401.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QST65U DS2RP L 2.65 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QTT65W DS2RP L 2.65 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5RMT5RQ DS2RP L 3.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5RQT65U DS2RP L 3.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5RRT5RM DS2RP 000111000000 L 3.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ZF0180 DS2RP 000000000011 L 2.352.351.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ZG0182 DS2RP L 2.352.351.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ZI0184 DS2RP L 2.35 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65UT5ZI DS2RP L 2.35 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65UT65V DS2RP 000000000011 L 3.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65VT65W DS2RP 000111000000 L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65WT5ZG DS2RP L 2.352.351.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65WT661 DS2RP 000000000011 L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65XT65Y DS2RP L 5.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65YT65Z DS2RP L 5.75 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65Z0176 DS2RP 000011000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T65ZT660 DS2RP 000000000011 L 5.75 1.000
MEMBER OFFSETS 15.000 15.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B25 of 382

MEMBER1T661T5QB DS2RP 000111000000 L 5.75 1.000


MEMBER OFFSETS 15.000 15.000
MEMBER1T69FT150 DS2RP 000000000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T69GT149 DS2RP 000000000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T69HT148 DS2RP 000000000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T507T506 DS3RP L
MEMBER OFFSETS 18.000 18.000
MEMBER1T56ZT56Y E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T570T56Z E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T572T571 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T573T572 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T575T574 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T576T575 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T578T577 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T579T578 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57DT57C E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57FT57E E1 RP L 5.75 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T57JT5Q2 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57KT57J E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57LT57K E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57NT5Q1 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57OT57N E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T57PT57O E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T58JT5U6 E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A7T5XM E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A8T5XI E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A9T5XL E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AAT5XH E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ACT5XG E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ADT5XD E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AET5XE E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AFT5XF E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ANT6AJ E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5PYT5Q2 E1 RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q1T5PZ E1 RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q2T5Q1 E1 RP L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q4T5Q9 E1 RP 000111000000 L 2.65
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q9T57D E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5Q9T5QB E1 RP 000000000011 L 2.65
MEMBER OFFSETS 18.000 18.000
MEMBER1T5QBT57F E1 RP L 5.75 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B26 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T5QBT5ZE E1 RP 000111000000 L 2.352.351.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5UAT58K E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5W0T5WF E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W8T5WA E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5W90522 E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WBT5WC E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WET5WD E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WHT5WG E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WIT5WH E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WKT5WJ E1 RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WMT5WL E1 RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WQT5WY E1 RP L 1.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WRT5WW E1 RP 000111000000 L 1.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WST5WT E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WTT5WZ E1 RP 000111000000 L 1.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WWT5WS E1 RP 000000000011 L 1.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WXT5WW E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WYT59U E1 RP L 1.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WYT5X0 E1 RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5WZT5WU E1 RP 000000000011 L 1.00
MEMBER OFFSETS 13.000 13.000
MEMBER1T5X0T5WZ E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T5X1T5X2 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X4T5X3 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X6T5X5 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X8T5X7 E1 RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X9T5AC E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XAT5AF E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XBT5A9 E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XCT5A7 E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XDT5X9 E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XET5XA E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XET5XD E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XFT5AA E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XFT5XG E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XGT5A8 E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XHT5XB E1 RP L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XHT5XI E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B27 of 382

MEMBER1T5XIT5XC E1 RP 000000000011 L 1.00


MEMBER OFFSETS 18.000 18.000
MEMBER1T5XLT5XK E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XLT5XM E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XMT5XJ E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5ZET5Q5 E1 RP L 2.352.351.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T61FT61E E1 RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T61TT61F E1 RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T662T668 E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T663T669 E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T664T66A E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T666T66B E1 RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T668T664 E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T668T669 E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T669T666 E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T66AT665 E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T66AT66B E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T66BT667 E1 RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AET6AD E1 RP 000111000011
MEMBER OFFSETS 13.000 13.000
MEMBER1T6AIT6AH E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AKT587 E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AMT6AL E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T6ANT5BP E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B1T6B0 E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B2T6B3 E1 RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T57VT5QX E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T57WT5QW E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QQT5QU E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QST5QV E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QUT57V E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QVT57W E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QWT5QT E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5QXT5QR E2 RP L 1.001.00
MEMBER OFFSETS 15.000 15.000
MEMBER 0009T6A4 EQ1RP 000111000000
MEMBER 0034T5UF EQ1RP 000111000000
MEMBER 0037T5UI EQ1RP 000111000000
MEMBER 0173T5QK EQ1RP 000111000000
MEMBER 0342T5YD EQ1RP 000111000000
MEMBER 0344T5YF EQ1RP 000111000000
MEMBER 0346T5Y8 EQ1RP 000111000000
MEMBER 0348T5Y6 EQ1RP 000111000000
MEMBER T56YT5RJ EQ1RP 000111000000
MEMBER T570T5RL EQ1RP 000111000000
MEMBER T571T5RG EQ1RP 000111000000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B28 of 382

MEMBER T573T5RI EQ1RP 000111000000


MEMBER T574T5RC EQ1RP 000111000000
MEMBER T576T5RA EQ1RP 000111000000
MEMBER T577T5RD EQ1RP 000111000000
MEMBER T579T5RF EQ1RP 000111000000
MEMBER T57ET5QL EQ1RP 000111000000
MEMBER T57LT5PQ EQ1RP 000111000000
MEMBER T57PT5PT EQ1RP 000111000000
MEMBER T58JT5UB EQ1RP 000111000000
MEMBER T58KT5UE EQ1RP 000111000000
MEMBER T58PT5TI EQ1RP 000111000000
MEMBER T58QT5TJ EQ1RP 000111000000
MEMBER T58TT5T6 EQ1RP 000111000000
MEMBER T58UT5TD EQ1RP 000111000000
MEMBER T59GT5XX EQ1RP 000111000000
MEMBER T59HT5XY EQ1RP 000111000000
MEMBER T59IT5XV EQ1RP 000111000000
MEMBER T59KT5XW EQ1RP 000111000000
MEMBER T5AHT5YB EQ1RP 000111000000
MEMBER T5AIT5Y9 EQ1RP 000111000000
MEMBER T5AJT5YI EQ1RP 000111000000
MEMBER T5AKT5YG EQ1RP 000111000000
MEMBER T5PQT5PT EQ1RP
MEMBER T5PQT5PW EQ1RP
MEMBER T5PQT69I EQ1RP
MEMBER T5PTT5PX EQ1RP
MEMBER T5PTT69I EQ1RP
MEMBER T5PWT5PX EQ1RP
MEMBER T5PWT69I EQ1RP
MEMBER T5Q1T5PX EQ1RP 000111000000
MEMBER T5Q2T5PW EQ1RP 000111000000
MEMBER T5Q4T5QO EQ1RP 000111000000
MEMBER T5QBT5QP EQ1RP 000111000000
MEMBER T5QKT5QL EQ1RP
MEMBER T5QOT5QK EQ1RP
MEMBER T5QOT5QP EQ1RP
MEMBER T5QOT69K EQ1RP
MEMBER T5QPT5QL EQ1RP
MEMBER T5QPT69K EQ1RP
MEMBER T5QUT5QY EQ1RP 000111000000
MEMBER T5QVT5R1 EQ1RP 010111000000
MEMBER T5QWT5R3 EQ1RP 010111000000
MEMBER T5QXT5R0 EQ1RP 000111000000
MEMBER T5QYT5R0 EQ1RP
MEMBER T5QYT5R1 EQ1RP
MEMBER T5QYT69J EQ1RP
MEMBER T5R0T5R3 EQ1RP
MEMBER T5R0T69J EQ1RP
MEMBER T5R1T5R3 EQ1RP
MEMBER T5R1T69J EQ1RP
MEMBER T5RAT5RC EQ1RP
MEMBER T5RAT5RF EQ1RP
MEMBER T5RAT69L EQ1RP
MEMBER T5RCT5RD EQ1RP
MEMBER T5RCT69L EQ1RP
MEMBER T5RDT69L EQ1RP
MEMBER T5RFT5RD EQ1RP
MEMBER T5RFT69L EQ1RP
MEMBER T5RGT5RJ EQ1RP
MEMBER T5RIT5RG EQ1RP
MEMBER T5RIT5RL EQ1RP
MEMBER T5RIT69M EQ1RP
MEMBER T5RLT5RJ EQ1RP
MEMBER T5RLT69M EQ1RP
MEMBER T5S5T5S9 EQ1RP 000111000000
MEMBER T5S6T5SA EQ1RP 000111000000
MEMBER T5S7T5SB EQ1RP 001111000000
MEMBER T5S8T5SC EQ1RP 001111000000
MEMBER T5S9T5SA EQ1RP
MEMBER T5S9T69O EQ1RP
MEMBER T5SBT5S9 EQ1RP
MEMBER T5SBT5SC EQ1RP
MEMBER T5SBT69O EQ1RP
MEMBER T5SCT5SA EQ1RP
MEMBER T5SCT69O EQ1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B29 of 382

MEMBER T5SHT5SN EQ1RP 000111000000


MEMBER T5SIT5SO EQ1RP 000111000000
MEMBER T5SJT5SL EQ1RP 001111000000
MEMBER T5SKT5SM EQ1RP 001111000000
MEMBER T5SLT5SM EQ1RP
MEMBER T5SMT69N EQ1RP
MEMBER T5SNT5SL EQ1RP
MEMBER T5SNT5SO EQ1RP
MEMBER T5SNT69N EQ1RP
MEMBER T5SOT5SM EQ1RP
MEMBER T5SOT69N EQ1RP
MEMBER T5STT5SX EQ1RP
MEMBER T5SUT5SY EQ1RP
MEMBER T5SVT5SZ EQ1RP
MEMBER T5SWT5T0 EQ1RP
MEMBER T5SXT5SZ EQ1RP
MEMBER T5SXT69P EQ1RP
MEMBER T5SYT5SX EQ1RP
MEMBER T5SYT5T0 EQ1RP
MEMBER T5SYT69P EQ1RP
MEMBER T5SZT69P EQ1RP
MEMBER T5T0T5SZ EQ1RP
MEMBER T5T0T69P EQ1RP
MEMBER T5T6T69R EQ1RP
MEMBER T5T6T6A4 EQ1RP
MEMBER T5T9T5T6 EQ1RP
MEMBER T5T9T69R EQ1RP
MEMBER T5T9T6A5 EQ1RP
MEMBER T5TCT5TD EQ1RP
MEMBER T5TCT69R EQ1RP
MEMBER T5TET5TK EQ1RP 000111000000
MEMBER T5TFT5TL EQ1RP 000111000000
MEMBER T5TGT5TO EQ1RP 000111000000
MEMBER T5THT5TP EQ1RP 000111000000
MEMBER T5TIT5TJ EQ1RP
MEMBER T5TIT5TK EQ1RP
MEMBER T5TIT69S EQ1RP
MEMBER T5TJT5TL EQ1RP
MEMBER T5TJT69S EQ1RP
MEMBER T5TKT5TL EQ1RP
MEMBER T5TKT5TO EQ1RP
MEMBER T5TKT69T EQ1RP
MEMBER T5TLT5TP EQ1RP
MEMBER T5TLT69S EQ1RP
MEMBER T5TLT69T EQ1RP
MEMBER T5TOT5TP EQ1RP
MEMBER T5TST5TW EQ1RP 000111000000
MEMBER T5TTT5TX EQ1RP 000111000000
MEMBER T5TUT5U0 EQ1RP 000111000000
MEMBER T5TVT5U1 EQ1RP 000111000000
MEMBER T5TWT5TX EQ1RP
MEMBER T5TWT5U0 EQ1RP
MEMBER T5TWT69U EQ1RP
MEMBER T5TXT5U1 EQ1RP
MEMBER T5TXT69U EQ1RP
MEMBER T5U0T5U1 EQ1RP
MEMBER T5U0T69U EQ1RP
MEMBER T5U1T69U EQ1RP
MEMBER T5UBT5UF EQ1RP
MEMBER T5UBT69V EQ1RP
MEMBER T5UET5UB EQ1RP
MEMBER T5UET5UI EQ1RP
MEMBER T5UET69V EQ1RP
MEMBER T5UFT69V EQ1RP
MEMBER T5UIT5UF EQ1RP
MEMBER T5WRT5Z3 EQ1RP 000111000000
MEMBER T5WTT5Z0 EQ1RP 000111000000
MEMBER T5XDT5YP EQ1RP 000111000000
MEMBER T5XET5YQ EQ1RP 000111000000
MEMBER T5XFT5YO EQ1RP 000111000000
MEMBER T5XGT5YN EQ1RP 000111000000
MEMBER T5XHT5YM EQ1RP 000111000000
MEMBER T5XIT5YL EQ1RP 000111000000
MEMBER T5XLT5YJ EQ1RP 000111000000
MEMBER T5XMT5YK EQ1RP 000111000000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B30 of 382

MEMBER T5XNT5XS EQ1RP 000111000000


MEMBER T5XOT5XT EQ1RP 000111000000
MEMBER T5XPT5XR EQ1RP 000111000000
MEMBER T5XQT5XU EQ1RP 000111000000
MEMBER T5XRT5XS EQ1RP
MEMBER T5XRT69Z EQ1RP
MEMBER T5XST69Z EQ1RP
MEMBER T5XTT5XS EQ1RP
MEMBER T5XTT69Z EQ1RP
MEMBER T5XUT5XR EQ1RP
MEMBER T5XUT5XT EQ1RP
MEMBER T5XVT5XW EQ1RP
MEMBER T5XVT5XX EQ1RP
MEMBER T5XVT69Y EQ1RP
MEMBER T5XWT5XY EQ1RP
MEMBER T5XWT69Y EQ1RP
MEMBER T5XXT5XY EQ1RP
MEMBER T5XYT69Y EQ1RP
MEMBER T5Y8T5Y6 EQ1RP
MEMBER T5Y9T5Y8 EQ1RP
MEMBER T5Y9T5YB EQ1RP
MEMBER T5Y9T6A2 EQ1RP
MEMBER T5YBT5Y6 EQ1RP
MEMBER T5YBT6A2 EQ1RP
MEMBER T5YFT5YD EQ1RP
MEMBER T5YFT6A3 EQ1RP
MEMBER T5YGT5YD EQ1RP
MEMBER T5YGT6A3 EQ1RP
MEMBER T5YIT5YF EQ1RP
MEMBER T5YIT5YG EQ1RP
MEMBER T5YJT5YK EQ1RP
MEMBER T5YJT6A0 EQ1RP
MEMBER T5YLT5YK EQ1RP
MEMBER T5YLT6A0 EQ1RP
MEMBER T5YMT5YJ EQ1RP
MEMBER T5YMT5YL EQ1RP
MEMBER T5YMT6A0 EQ1RP
MEMBER T5YNT6A1 EQ1RP
MEMBER T5YOT5YN EQ1RP
MEMBER T5YOT6A1 EQ1RP
MEMBER T5YPT5YN EQ1RP
MEMBER T5YPT6A1 EQ1RP
MEMBER T5YQT5YO EQ1RP
MEMBER T5YQT5YP EQ1RP
MEMBER T5YQT6A1 EQ1RP
MEMBER T5Z3T5Z0 EQ1RP
MEMBER T5Z3T69W EQ1RP
MEMBER T5Z4T5Z0 EQ1RP
MEMBER T5Z7T5Z3 EQ1RP
MEMBER T5Z7T5Z4 EQ1RP
MEMBER T5Z7T69W EQ1RP
MEMBER T61ET5Z4 EQ1RP 000111000000
MEMBER T61TT5Z7 EQ1RP 000111000000
MEMBER T69IT5PX EQ1RP
MEMBER T69JT5R3 EQ1RP
MEMBER T69KT5QK EQ1RP
MEMBER T69KT5QL EQ1RP
MEMBER T69MT5RG EQ1RP
MEMBER T69MT5RJ EQ1RP
MEMBER T69NT5SL EQ1RP
MEMBER T69OT5SA EQ1RP
MEMBER T69RT5TD EQ1RP
MEMBER T69ST5TK EQ1RP
MEMBER T69TT5TO EQ1RP
MEMBER T69TT5TP EQ1RP
MEMBER T69VT5UI EQ1RP
MEMBER T69WT5Z0 EQ1RP
MEMBER T69WT5Z4 EQ1RP
MEMBER T69YT5XX EQ1RP
MEMBER T69ZT5XU EQ1RP
MEMBER T6A0T5YK EQ1RP
MEMBER T6A2T5Y6 EQ1RP
MEMBER T6A2T5Y8 EQ1RP
MEMBER T6A3T5YD EQ1RP
MEMBER T6A3T5YI EQ1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B31 of 382

MEMBER T6A4T5TD EQ1RP


MEMBER T6A5T5TC EQ1RP
MEMBER T6A9T5T9 EQ1RP 000111000000
MEMBER T6AAT5TC EQ1RP 000111000000
MEMBER T6ABT6A5 EQ1RP 000111000000
MEMBER 0532T484 FL1RP
MEMBER T493T484 FL1RP
MEMBER 0134T473 FL2RP
MEMBER T473T475 FL2RP
MEMBER T474T476 FL2RP
MEMBER T475T477 FL2RP
MEMBER T476T478 FL2RP
MEMBER T477T479 FL2RP
MEMBER T478T480 FL2RP
MEMBER T479T483 FL2RP
MEMBER T480T481 FL2RP
MEMBER T484T485 FL2RP
MEMBER T485T486 FL2RP
MEMBER T486T487 FL2RP
MEMBER T487T488 FL2RP
MEMBER T488T489 FL2RP
MEMBER T492T474 FL2RP
MEMBER T473T474 FL3RP
MEMBER T475T476 FL3RP
MEMBER T477T478 FL3RP
MEMBER T479T480 FL3RP
MEMBER T482T481 FL3RP
MEMBER T483T482 FL3RP
MEMBER T484T473 FL3RP
MEMBER T484T474 FL3RP
MEMBER T485T473 FL3RP
MEMBER T485T474 FL3RP
MEMBER T485T475 FL3RP
MEMBER T485T476 FL3RP
MEMBER T486T475 FL3RP
MEMBER T486T476 FL3RP
MEMBER T486T477 FL3RP
MEMBER T486T478 FL3RP
MEMBER T487T477 FL3RP
MEMBER T487T478 FL3RP
MEMBER T487T479 FL3RP
MEMBER T487T480 FL3RP
MEMBER T488T479 FL3RP
MEMBER T488T480 FL3RP
MEMBER T488T481 FL3RP
MEMBER T488T483 FL3RP
MEMBER T489T481 FL3RP
MEMBER T489T483 FL3RP
MEMBER T481T490 FL4RP
MEMBER T482T490 FL4RP
MEMBER T483T490 FL4RP
MEMBER T490T491 FL4RP
MEMBER10136T280 HP0RP L 5.75
MEMBER OFFSETS 45.720
MEMBER 0147T67T HP0RP L 6.83
MEMBER 0601T316 HP0RP 2.10
MEMBER 0615T239 HP0RP L 1.29
MEMBER 0629T265 HP0RP L 4.00
MEMBER T224T5VE HP0RP L 4.25
MEMBER T227T243 HP0RP L 10.5
MEMBER T228T251 HP0RP L 10.5
MEMBER T233T247 HP0RP L 4.98
MEMBER T235T224 HP0RP L 4.25
MEMBER T236T223 HP0RP L 6.27
MEMBER T237T255 HP0RP L 5.75
MEMBER T238T299 HP0RP L 6.83
MEMBER T239T295 HP0RP L 4.46
MEMBER T240T276 HP0RP L 5.75
MEMBER T241T298 HP0RP L 6.27
MEMBER T242T261 HP0RP L 6.27
MEMBER T243T244 HP0RP L 10.5
MEMBER T244T245 HP0RP L 10.5
MEMBER T245T246 HP0RP L 10.5
MEMBER T246T237 HP0RP L 10.5
MEMBER T247T248 HP0RP L 4.98
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B32 of 382

MEMBER T248T249 HP0RP L 4.98


MEMBER T249T250 HP0RP L 4.98
MEMBER T2500629 HP0RP L 4.98
MEMBER T251T252 HP0RP L 10.5
MEMBER T252T253 HP0RP L 10.5
MEMBER T253T254 HP0RP L 10.5
MEMBER T254T240 HP0RP L 10.5
MEMBER T255T256 HP0RP L 5.75
MEMBER T256T257 HP0RP L 5.75
MEMBER T257T258 HP0RP L 5.75
MEMBER T258T259 HP0RP L 5.75
MEMBER T259T271 HP0RP L 5.75
MEMBER T261T262 HP0RP L 6.27
MEMBER T262T263 HP0RP L 6.27
MEMBER T263T235 HP0RP L 6.27
MEMBER T265T266 HP0RP L 4.00
MEMBER T266T267 HP0RP L 4.00
MEMBER T267T268 HP0RP L 4.00
MEMBER T268T272 HP0RP L 1.75
MEMBER T269T241 HP0RP L 6.27
MEMBER T271T242 HP0RP L 6.27
MEMBER T2720615 HP0RP L 1.75
MEMBER T273T269 HP0RP L 5.75
MEMBER T274T67U HP0RP L 5.75
MEMBER T276T277 HP0RP L 5.75
MEMBER T277T278 HP0RP L 5.75
MEMBER T278T279 HP0RP L 5.75
MEMBER T279T273 HP0RP L 5.75
MEMBER T280T281 HP0RP L 5.75
MEMBER T281T282 HP0RP L 5.75
MEMBER T282T283 HP0RP L 5.75
MEMBER T283T274 HP0RP L 5.75
MEMBER T2930601 HP0RP L 4.46
MEMBER T294T293 HP0RP L 4.46
MEMBER T295T294 HP0RP L 4.46
MEMBER T296T236 HP0RP L 6.27
MEMBER T297T296 HP0RP L 6.27
MEMBER T298T297 HP0RP L 6.27
MEMBER T299T229 HP0RP L 6.83
MEMBER1T3130136 HP0RP L 4.20
MEMBER OFFSETS -45.72
MEMBER T314T313 HP0RP L 4.20
MEMBER T5VET5VF HP0RP L 4.25
MEMBER T5VFT5VG HP0RP L 4.25
MEMBER T5VGT5VD HP0RP L 4.25
MEMBER T67TT238 HP0RP L 6.83
MEMBER T67U0147 HP0RP L 5.75
MEMBER10136T221 HP1RP 2.10
MEMBER OFFSETS 45.720 10.000 10.000
MEMBER10147T270 HP1RP 2.10
MEMBER OFFSETS 10.000 10.000
MEMBER10615T5V0 HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER10629T66N HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T226T5UY HP1RP L 4.98
MEMBER OFFSETS 10.000 10.000
MEMBER1T230T5US HP1RP L 4.98
MEMBER OFFSETS 10.000 10.000
MEMBER1T233T501 HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T237T66X HP1RP L 3.523.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T269T67Y HP1RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T271T682 HP1RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T501T228 HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T501T66O HP1RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UST271 HP1RP L 4.98
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UYT237 HP1RP L 4.98
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B33 of 382

MEMBER1T5V0T5V1 HP1RP L 22.0


MEMBER OFFSETS 10.000 10.000
MEMBER1T5V0T67Z HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V1T5V2 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V2T5V3 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V3T5V4 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V4T5V5 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V5T5V6 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V6T5V8 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V8T5V9 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V9T5VC HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VAT5VB HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VBT5V7 HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VCT5VA HP1RP L 22.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T66JT501 HP1RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T66KT66J HP1RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T66LT66K HP1RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T66MT66L HP1RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T66NT66M HP1RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T66NT66W HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T66V0136 HP1RP
MEMBER OFFSETS 10.000-45.72 10.000
MEMBER1T66X0629 HP1RP L 3.523.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T67Y0147 HP1RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T67ZT269 HP1RP L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER1T6820615 HP1RP
MEMBER OFFSETS 10.000 10.000
MEMBER1T240T66V HP2
MEMBER OFFSETS 10.000 10.000
MEMBER1T66WT240 HP2 L 3.52
MEMBER OFFSETS 10.000 10.000
MEMBER10601T5V5 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T221T284 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T222T301 HS1RP L 2.77 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T224T232 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T224T5VJ HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T225T230 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T225T5UR HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T227T233 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T227T311 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T228T312 HS1RP L 4.27 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T229T304 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T230T288 HS1RP L 7.04 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B34 of 382

MEMBER OFFSETS 10.000 10.000


MEMBER1T231T223 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T232T235 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T232T303 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T2350601 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T236T67D HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T238T222 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T239T5V1 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T241T238 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T242T239 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T243T247 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T244T248 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T245T249 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T246T250 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T247T66J HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T248T66K HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T249T66L HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T250T66M HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T251T312 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T252T310 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T253T314 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T254T313 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T255T265 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T256T266 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T257T267 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T258T268 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T259T272 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T261T295 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T262T294 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T263T293 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T265T276 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T266T277 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T267T278 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T268T279 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T270T222 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T272T273 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T273T274 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T274T275 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B35 of 382

MEMBER1T275T270 HS1RP L 7.04 1.000


MEMBER OFFSETS 10.000 10.000
MEMBER1T276T280 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T277T281 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T278T282 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T279T283 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T280T284 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T281T285 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T282T286 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T283T287 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T284T285 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T285T286 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T286T287 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T287T275 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T288T289 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T288T5UT HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T289T290 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T289T5UU HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T290T291 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T290T5UV HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T291T292 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T291T5UW HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T292T226 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T292T5UX HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T293T5V4 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T294T5V3 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T295T5V2 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T296T304 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T297T229 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T298T299 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T299T301 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T300T225 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T300T5UQ HS1RP L 3.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T301T229 HS1RP L 2.77 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T302T262 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T302T300 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T303T263 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T303T302 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T304T231 HS1RP 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B36 of 382

MEMBER OFFSETS 10.000 10.000


MEMBER1T305T226 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T305T5UZ HS1RP L 4.00 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T306T221 HS1RP L 2.77 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T309T244 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T309T315 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T310T314 HS1RP L 4.27 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T311T243 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T311T309 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T312T310 HS1RP L 4.27 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T313T306 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T314T306 HS1RP L 2.77 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T315T245 HS1RP 2.10 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T315T305 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T315T5UZ HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T316T5VK HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UQT261 HS1RP L 3.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UQT302 HS1RP L 6.83
MEMBER OFFSETS 10.000 10.000
MEMBER1T5URT242 HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5URT5UQ HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UST5UR HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UTT259 HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UTT5US HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UUT258 HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UUT5UT HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UVT257 HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UVT5UU HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UWT256 HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UWT5UV HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UXT255 HS1RP L 4.98 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UXT5UW HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UYT5UX HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UZT246 HS1RP L 4.00 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5UZT5UY HS1RP L
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V1T241 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V2T298 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V3T297 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5V4T296 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B37 of 382

MEMBER1T5V5T67E HS1RP L 3.52 1.000


MEMBER OFFSETS 10.000 10.000
MEMBER1T5V6T223 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VJT316 HS1RP L 7.04 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5VKT5V6 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T66JT251 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T66KT252 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T66LT253 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T66MT254 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T67DT231 HS1RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T67ET236 HS1RP L 3.52 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER T68TT691 HS1RP L 4.25
MEMBER T68TT696 HS1RP L 7.04 1.000
MEMBER T68UT697 HS1RP L 3.52 1.000
MEMBER T68VT68W HS1RP L 22.0
MEMBER T68WT68X HS1RP L 22.0
MEMBER T68YT68Z HS1RP L 22.0
MEMBER T690T695 HS1RP L 6.06 1.000
MEMBER T691T692 HS1RP L 4.25
MEMBER T692T693 HS1RP L 4.25
MEMBER T693T690 HS1RP L 4.25
MEMBER T694T6BM HS1RP L 6.06 1.000
MEMBER T695T694 HS1RP L 6.06 1.000
MEMBER T696T68U HS1RP L 7.04 1.000
MEMBER T696T698 HS1RP L 7.46 1.000
MEMBER T697T68V HS1RP L 3.52 1.000
MEMBER T697T699 HS1RP L 7.46 1.000
MEMBER T698T69A HS1RP L 7.46 1.000
MEMBER T699T69B HS1RP L 7.46 1.000
MEMBER T69AT69C HS1RP L 7.46 1.000
MEMBER T69BT69D HS1RP L 7.46 1.000
MEMBER T69CT695 HS1RP L 7.46 1.000
MEMBER T69DT694 HS1RP L 7.46 1.000
MEMBER1T69DT6BN HS1RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER T6BMT68Z HS1RP L 6.06 1.000
MEMBER1T6BNT68Y HS1RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T691T698 HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T692T69A HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T693T69C HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T698T699 HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T699T68W HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T69AT69B HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T69BT6BO HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER1T69CT69D HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER T6BNT6BM HS2RP
MEMBER1T6BOT68X HS2RP 1.000
MEMBER OFFSETS 3.000 3.000
MEMBER T6BOT6BN HS2RP
MEMBER 00680093 MP0RP L 6.00
MEMBER10080T5J0 MP0RP L 5.00
MEMBER OFFSETS 45.720
MEMBER 00820068 MP0RP L 6.00
MEMBER 00930125 MP0RP L 6.00
MEMBER 00990446 MP0RP L 6.00
MEMBER 0100T66T MP0RP L 5.005.00
MEMBER 01250099 MP0RP L 6.00
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B38 of 382

MEMBER 0446T677 MP0RP L 6.00.900


MEMBER104500079 MP0RP L 6.00
MEMBER OFFSETS -45.72
MEMBER 04660467 MP0RP L 6.00
MEMBER 04670468 MP0RP L 6.00
MEMBER 04680469 MP0RP L 6.00
MEMBER 04690470 MP0RP L 6.00
MEMBER 04700450 MP0RP L 6.00
MEMBER 0519T64R MP0RP L 5.005.00
MEMBER T5J0T6AH MP0RP L 5.003.00
MEMBER T639T676 MP0RP L 5.005.00
MEMBER T642T66U MP0RP L 5.003.00
MEMBER T64RT639 MP0RP L 5.005.00
MEMBER T66T0519 MP0RP L 5.005.00
MEMBER T66U0100 MP0RP L 5.003.00
MEMBER T6760082 MP0RP L 5.005.00
MEMBER T6AHT6AJ MP0RP L 5.003.00
MEMBER T6AJT642 MP0RP L 5.003.00
MEMBER100180096 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER10079T62B MP1RP L 5.753.25
MEMBER OFFSETS 45.720 5.000 5.000
MEMBER100800393 MP1RP L 5.75
MEMBER OFFSETS 45.720 5.000 5.000
MEMBER10081T5NV MP1RP L 2.442.44
MEMBER OFFSETS 45.720 5.000 5.000
MEMBER10082T68H MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER100910199 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER10096T63J MP1RP L 5.753.25
MEMBER OFFSETS 5.000 5.000
MEMBER10097T67X MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER100980443 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER101020523 MP1RP L 2.565.00
MEMBER OFFSETS 5.000 5.000
MEMBER101030380 MP1RP L 5.25
MEMBER OFFSETS -16.00 5.000 5.000
MEMBER101040372 MP1RP L 5.25
MEMBER OFFSETS -16.00 5.000 5.000
MEMBER101990200 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER102000201 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER102010525 MP1RP L 6.001.10
MEMBER OFFSETS 5.000 5.000
MEMBER103720373 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103730374 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103740375 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103750080 MP1RP L 5.25
MEMBER OFFSETS 5.000 -45.72 5.000
MEMBER103800381 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103810382 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103820383 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103830100 MP1RP L 5.25
MEMBER OFFSETS 5.000 5.000
MEMBER103900081 MP1RP L 5.75
MEMBER OFFSETS 5.000 -45.72 5.000
MEMBER10392T68J MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER103930407 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER103950425 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104070408 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104080409 MP1RP L 5.75
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B39 of 382

MEMBER OFFSETS 5.000 5.000


MEMBER104090410 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER10410T67P MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104120413 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104130414 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104140415 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104150390 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104250426 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104260427 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104270428 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER10428T68C MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER10429T68B MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104300431 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104310432 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104320433 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER104330392 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER10443T67K MP1RP L 6.00.900
MEMBER OFFSETS 5.000 5.000
MEMBER104470078 MP1RP L 6.00
MEMBER OFFSETS 5.000-45.72 5.000
MEMBER104510452 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER104520453 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER104530454 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER104540455 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER104550447 MP1RP L 6.00
MEMBER OFFSETS 5.000 5.000
MEMBER10523T6B0 MP1RP L 2.565.00
MEMBER OFFSETS 5.000 5.000
MEMBER105250098 MP1RP L 6.001.10
MEMBER OFFSETS 5.000 5.000
MEMBER10528T67W MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T498T6AO MP1RP L 2.445.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T499T6AL MP1RP L 2.562.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T59NT5BE MP1RP L 2.445.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T5BCT62M MP1RP L 5.753.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T5BDT63A MP1RP L 5.753.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T5BET62X MP1RP L 2.445.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T5BP0102 MP1RP L 2.562.56
MEMBER OFFSETS 5.000 5.000
MEMBER1T5NRT499 MP1RP L 2.442.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T5NVT5NR MP1RP L 2.442.44
MEMBER OFFSETS 5.000 5.000
MEMBER1T62BT5BD MP1RP L 5.753.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T62M0078 MP1RP L 5.753.25
MEMBER OFFSETS 5.000 -45.72 5.000
MEMBER1T62X0091 MP1RP L 2.445.00
MEMBER OFFSETS 5.000 5.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B40 of 382

MEMBER1T63A0097 MP1RP L 5.753.25


MEMBER OFFSETS 5.000 5.000
MEMBER1T63JT5BC MP1RP L 5.753.25
MEMBER OFFSETS 5.000 5.000
MEMBER1T67O0412 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T67W0018 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T67X0528 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T68B0430 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T68C0429 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T68H0395 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T68J0091 MP1RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T6ALT5BP MP1RP L 2.562.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T6AOT59N MP1RP L 2.445.00
MEMBER OFFSETS 5.000 5.000
MEMBER1T6B0T498 MP1RP L 2.565.00
MEMBER OFFSETS 5.000 5.000
MEMBER100210436 MP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER100810368 MP2RP L 4.73
MEMBER OFFSETS 45.72010.000 10.000
MEMBER100830384 MP2RP L 5.25
MEMBER OFFSETS -16.0010.000 10.000
MEMBER10084T432 MP2RP L 3.15
MEMBER OFFSETS -16.00 10.000 10.000
MEMBER10088T5NT MP2RP L 1.00 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER100940440 MP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER100940445 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER101000394 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER101020369 MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER10105T5NL MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER10106T433 MP2RP L 3.15
MEMBER OFFSETS -16.00 10.000 10.000
MEMBER101260127 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER101270128 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER101280094 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER101960197 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER101970198 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER101980436 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER102260465 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER102270460 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER102290463 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER102300458 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER103680088 MP2RP L 4.73
MEMBER OFFSETS 10.000 10.000
MEMBER103690105 MP2RP L 8.93
MEMBER OFFSETS 10.000 16.00010.000
MEMBER103700092 MP2RP L 2.25
MEMBER OFFSETS 10.000 -45.7210.000
MEMBER103840385 MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER103850386 MP2RP L 5.25
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B41 of 382

MEMBER OFFSETS 10.000 10.000


MEMBER103860387 MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER103870082 MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER103910102 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER10394T64P MP2RP L 11.5.750
MEMBER OFFSETS 10.000 10.000
MEMBER10400T5O9 MP2RP L 11.6 1.000
MEMBER OFFSETS -16.00 10.000 10.000
MEMBER10404T5OC MP2RP L 11.6 1.000
MEMBER OFFSETS -16.00 10.000 10.000
MEMBER10409T64H MP2RP L 5.005.00
MEMBER OFFSETS 10.000 10.000
MEMBER10413T64F MP2RP L 5.005.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER104160417 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104170418 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104180419 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER10418T64W MP2RP L 3.045.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER104190420 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104200421 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104210422 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104220423 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER10422T581 MP2RP L 3.045.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER104230424 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104240391 MP2RP L 11.5
MEMBER OFFSETS 10.000 10.000
MEMBER104270126 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER104310196 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104360444 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104370021 MP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER104380437 MP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER104400438 MP2RP L 5.002.50
MEMBER OFFSETS 10.000 10.000
MEMBER104440456 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104450461 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER104480096 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104490097 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER104560457 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104570230 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104580459 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104590227 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104600448 MP2RP L 12.0
MEMBER OFFSETS 10.000 10.000
MEMBER104610462 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER104620229 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER104630464 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B42 of 382

MEMBER104640226 MP2 L 11.0


MEMBER OFFSETS 10.000 10.000
MEMBER104650449 MP2 L 11.0
MEMBER OFFSETS 10.000 10.000
MEMBER1T3300105 MP2RP L 3.50 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T432T5IV MP2RP L 4.004.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T433T5OF MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T433T5X2 MP2RP L 4.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T500T68P MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T581T6AS MP2RP L 3.045.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5BOT330 MP2RP L 2.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5BPT5BO MP2RP L 2.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5IVT6B3 MP2RP L 4.004.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NLT5NM MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NNT5NM MP2RP 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NOT5NN MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NPT330 MP2RP L 3.50 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NPT5NO MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NQT5NP MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NRT5NQ MP2RP L 8.93
MEMBER OFFSETS 10.000 10.000
MEMBER1T5NTT5NP MP2RP L 1.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O5T68Q MP2RP L 2.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O6T432 MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O7T5O6 MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O8T5O7 MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O90409 MP2RP L 11.6
MEMBER OFFSETS 10.000 10.000
MEMBER1T5O9T5O8 MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OAT5O9 MP2RP L 2.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OBT68R MP2RP L 2.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OC0413 MP2RP L 4.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OCT5OB MP2RP L 2.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T5ODT5OC MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OET5OD MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OFT5OE MP2RP L 3.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OGT432 MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OHT5OG MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OIT5OH MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5OJT5OI MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T5S7T5S8 MP2RP L 5.005.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5S80422 MP2RP L 5.005.005.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B43 of 382

MEMBER OFFSETS 10.000 10.000


MEMBER1T5X2T5X3 MP2RP L 4.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T5X30081 MP2RP L 4.00
MEMBER OFFSETS 10.000-45.72 10.000
MEMBER1T6310431 MP2RP L 1.965.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T6350427 MP2RP L 1.965.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T63XT631 MP2RP L 1.965.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T64FT5S7 MP2RP L 5.005.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T64H0418 MP2RP L 5.005.00
MEMBER OFFSETS 10.000 10.000
MEMBER1T64P0416 MP2RP L 11.5.750
MEMBER OFFSETS 10.000 10.000
MEMBER1T64WT6AW MP2RP L 3.045.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T68I0370 MP2RP L 2.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T68PT5OJ MP2RP L 5.25
MEMBER OFFSETS 10.000 10.000
MEMBER1T68QT5OA MP2RP L 2.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T68RT5O5 MP2RP L 2.50
MEMBER OFFSETS 10.000 10.000
MEMBER1T6AST63X MP2RP L 1.965.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T6AWT635 MP2RP L 1.965.005.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T6B30080 MP2RP L 4.004.00
MEMBER OFFSETS 10.000-45.72 10.000
MEMBER100170227 MP3RP
MEMBER OFFSETS 15.000 15.000
MEMBER100200230 MP3RP
MEMBER OFFSETS 15.000 15.000
MEMBER10087T500 MP3RP L 3.15
MEMBER OFFSETS -16.00 15.000 15.000
MEMBER102180020 MP3RP
MEMBER OFFSETS 15.000 15.000
MEMBER102180221 MP3RP L 7.60
MEMBER OFFSETS 15.000 15.000
MEMBER102210017 MP3RP
MEMBER OFFSETS 15.000 15.000
MEMBER102210528 MP3RP L 7.60
MEMBER OFFSETS 15.000 15.000
MEMBER102260221 MP3RP
MEMBER OFFSETS 15.000 15.000
MEMBER102290218 MP3RP
MEMBER OFFSETS 15.000 15.000
MEMBER10376T5OJ MP3RP 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10438T63S MP3RP L 7.603.05
MEMBER OFFSETS 15.000 15.000
MEMBER1T500T5IP MP3RP L 1.001.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AM0372 MP3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ART5IR MP3RP 000000000011 L 1.001.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IP0104 MP3RP L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IRT5AM MP3RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OJT5AR MP3RP 000111000000 L 1.001.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T63S0218 MP3RP L 7.603.05
MEMBER OFFSETS 15.000 15.000
MEMBER1T6APT6AO MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AQT6AP MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T6ART6AQ MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B44 of 382

MEMBER1T6AST6AR MP3RP L 8.25


MEMBER OFFSETS 15.000 15.000
MEMBER1T6ATT6AS MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AUT6AT MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AVT6AU MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AWT6AV MP3RP L 8.25
MEMBER OFFSETS 15.000 15.000
MEMBER101120451 MP4RP L 6.00.900
MEMBER OFFSETS 5.000 5.000
MEMBER1T67K0112 MP4RP L 6.00.900
MEMBER OFFSETS 5.000 5.000
MEMBER 01110466 MP5RP L 6.00.900
MEMBER T6770111 MP5RP L 6.00.900
MEMBER10411T67O MP6RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER1T67P0411 MP6RP L 5.75
MEMBER OFFSETS 5.000 5.000
MEMBER10091T68I MP7RP L 2.25
MEMBER OFFSETS 10.000 10.000
MEMBER10103T5OY MS1RP L 2.00
MEMBER OFFSETS 15.000 15.000
MEMBER101260196 MS1RP 000011000111 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER101270143 MS1RP 000011000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER101280142 MS1RP 000011000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER101400198 MS1RP 000000000111 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER101410197 MS1RP 000000000111 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER101420140 MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER101430141 MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10371T5NS MS1RP 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10372T5IW MS1RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10375T5IZ MS1RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10379T5OG MS1RP L 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10380T6AK MS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10381T587 MS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10382T58D MS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10383T64S MS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10390T6AM MS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10391T6B1 MS1RP 000111000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10393T5A3 MS1RP 000111000000 L 5.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10394T6AZ MS1RP 000111000000 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10402T5O5 MS1RP 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER104110420 MS1RP 000111000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10415T5S5 MS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10420T5SJ MS1RP 000111000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10423T5SH MS1RP 000111000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10424T580 MS1RP 000111000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T580T6AQ MS1RP 000000000000 L 3.045.001.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B45 of 382

MEMBER OFFSETS 15.000 15.000


MEMBER1T5840391 MS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T587T58A MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T588T5SV MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5890385 MS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58AT5ST MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58B0386 MS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58CT59O MS1RP 000000000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58DT58B MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58ET5SU MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T59O0384 MS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5A0T584 MS1RP 000000000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5A10394 MS1RP 000000000011 L 5.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5A3T64L MS1RP 000000000000 L 5.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ALT6B2 MS1RP 000000000000 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ANT643 MS1RP 000000000000 L 3.002.701.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AOT663 MS1RP 000000000000 L 3.001.801.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AQT5IU MS1RP 000000000011 L 1.001.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AST6AI MS1RP 000000000000 L 3.002.701.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ATT662 MS1RP 000000000000 L 3.00.7301.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IQT5OV MS1RP L .6503.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IUT5AL MS1RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IWT5AT MS1RP 000011000000 L 3.00.7301.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IZT5AS MS1RP 000111000000 L 3.002.701.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5NS0368 MS1RP 000111000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O50411 MS1RP 000111000011 L 4.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OGT5AQ MS1RP 000111000000 L 1.001.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OUT5OW MS1RP L 1.65
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OVT5OX MS1RP L 2.353.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OVT5OZ MS1RP L 2.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OWT5UN MS1RP L 1.651.18
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OX0103 MS1RP L 2.353.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OXT5P0 MS1RP L 2.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OYT5OT MS1RP L 2.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5OZT5OU MS1RP L 2.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P0T5OW MS1RP L 2.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5S5T5S6 MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5S60424 MS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B46 of 382

MEMBER1T5SHT5SI MS1RP L 3.045.001.000


MEMBER OFFSETS 15.000 15.000
MEMBER1T5SIT6AR MS1RP 000000000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5SJT5SK MS1RP L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5SKT6AU MS1RP 000000000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5STT588 MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5SUT5SW MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5SVT589 MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5SWT58C MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5UNT5OT MS1RP L .7001.18
MEMBER OFFSETS 15.000 15.000
MEMBER1T62Y0392 MS1RP 000000000011 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T62Z0433 MS1RP 000000000011 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6300432 MS1RP 000000000011 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6330429 MS1RP 000000000011 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6370395 MS1RP 000000000011 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T63TT6AP MS1RP L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T63UT62Y MS1RP L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T63VT630 MS1RP L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T63WT62Z MS1RP L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T640T633 MS1RP L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6430383 MS1RP 000000000011 L 3.002.701.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T64LT5A1 MS1RP 000000000000 L 5.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T64S0387 MS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T662T5AO MS1RP 000000000000 L 3.001.801.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6630380 MS1RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AIT5AN MS1RP 000000000000 L 3.002.701.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AKT58E MS1RP 000000000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AMT6AN MS1RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6ANT5A0 MS1RP 000000000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6APT63U MS1RP L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AQT63W MS1RP 000000000000 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6ART63V MS1RP 000000000000 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AUT640 MS1RP 000000000000 L 1.965.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6AZT637 MS1RP 000000000000 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6B1T63T MS1RP 000000000000 L 3.045.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T6B20375 MS1RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER100840388 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER100870376 MS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER101050092 MS2RP 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B47 of 382

MEMBER OFFSETS 15.000 15.000


MEMBER101060371 MS2RP L 4.73
MEMBER OFFSETS 15.000 15.000
MEMBER103710090 MS2RP L 4.73
MEMBER OFFSETS 15.000 16.00015.000
MEMBER103760377 MS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER103770378 MS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER103780379 MS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER103790084 MS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER103880398 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER103890106 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER103980399 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER103990400 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER104000401 MS2RP L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER104010402 MS2RP L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER104020403 MS2RP L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER104030404 MS2RP L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER104040405 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER104050406 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER104060389 MS2RP L 3.25
MEMBER OFFSETS 15.000 15.000
MEMBER1T433T5NS MS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER1T5B5T5LQ MS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IPT5J2 MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IQT5J3 MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IRT5IP MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IST5IR MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5ITT5IS MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IUT5IT MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IVT5IU MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IWT5IQ MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IXT5IW MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IYT5IX MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5IZT5IY MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5J0T5IZ MS2RP L 11.9
MEMBER OFFSETS 15.000 15.000
MEMBER1T5NST5B5 MS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER1T5NTT5LR MS2RP L 5.56 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5NUT5NT MS2RP L 5.56 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5NVT5NU MS2RP L 5.56 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER 00170020 MS3 000111000011
MEMBER 00180017 MS3 000111000011
MEMBER 00200021 MS3 000111000011
MEMBER100220455 MS3RP 000000000011 L 3.253.251.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B48 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER100380454 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER100390453 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER100500452 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER100510451 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER100600443 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10068T59Z MS3RP 000011000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10090T5B5 MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10093T62L MS3RP 000011000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10099T62J MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10104T5IQ MS3RP L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER101180098 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10125T62K MS3RP 000011000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER101350201 MS3RP 000000000111 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER101390200 MS3RP 000000000111 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER101960199 MS3RP 000011000111 L 3.253.253.250
MEMBER OFFSETS 18.000 18.000
MEMBER101970139 MS3RP 000011000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER101980135 MS3RP 000011000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10368T5NU MS3RP 000111000000 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER103690370 MS3RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10373T5IX MS3RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10374T5IY MS3RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10377T5OI MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10378T5OH MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10388T5O6 MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10389T5OF MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10398T5O7 MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10399T5O8 MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10401T5OA MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10403T5OB MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10405T5OD MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10406T5OE MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10407T64M MS3RP 000111000000 L 5.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10408T5A4 MS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10410T64I MS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER104120421 MS3RP 000111000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10414T585 MS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10416T6AY MS3RP 000111000000 1.000
MEMBER OFFSETS 18.000 18.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B49 of 382

MEMBER10417T6AX MS3RP 000111000000 1.000


MEMBER OFFSETS 18.000 18.000
MEMBER10419T64X MS3RP L 3.045.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10421T63Y MS3RP 000111000000 L 3.045.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER104360118 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER104440060 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10446T62I MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10448TTTU MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10450T62C MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER104560051 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER104570050 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER104580039 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER104590038 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER104600022 MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10466T62H MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10467T62G MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10468T62F MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10469T62E MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER10470T62D MS3RP 000111000000 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5850423 MS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T59Z0126 MS3RP 000000000111 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A4T5A5 MS3RP L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A50417 MS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5B50088 MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BO0369 MS3RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5IS0373 MS3RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5IT0374 MS3RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5IXT664 MS3RP 000111000000 L 3.00.7301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5IYT665 MS3RP 000111000000 L 3.00.7301.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5NOT5NL MS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5NQT5BO MS3RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5NUT5NQ MS3RP 000111000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5O60393 MS3RP 000111000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5O7T5X8 MS3RP 000111000000 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5O8T5X7 MS3RP 000111000000 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OA0410 MS3RP 000111000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OB0412 MS3RP 000111000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OD0414 MS3RP 000111000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OE0415 MS3RP 000111000011 L 4.00 1.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B50 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T5OFT5X1 MS3RP 000111000000 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OHT5IT MS3RP 000111000011 L 1.001.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OIT5IS MS3RP 000111000011 L 1.001.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5OZT5P0 MS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5P0T5OY MS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X1T5X4 MS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X40390 MS3RP 000000000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X50408 MS3RP 000000000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X60407 MS3RP 000000000011 L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X7T5X5 MS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X8T5X6 MS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62CT63B MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62DT63C MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62ET63D MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62FT63E MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62GT63F MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62HT63G MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62IT63H MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62JT63I MS3RP L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62K0128 MS3RP 000000000111 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T62L0127 MS3RP 000000000111 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6320430 MS3RP 000000000011 L 1.965.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6340428 MS3RP 000000000011 L 1.965.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6360426 MS3RP 000000000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6380425 MS3RP 000000000011 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63B0449 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63C0465 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63D0464 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63E0463 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63F0462 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63G0461 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63H0445 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63I0094 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63YT6AT MS3RP L 3.045.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T63ZT632 MS3RP L 1.965.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6410416 MS3RP 000000000011 L 5.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T64I0419 MS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B51 of 382

MEMBER1T64MT641 MS3RP L 5.002.001.000


MEMBER OFFSETS 18.000 18.000
MEMBER1T64XT6AV MS3RP 000000000000 L 3.045.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T664T666 MS3RP L 3.001.801.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T665T667 MS3RP L 3.001.801.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6660381 MS3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6670382 MS3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6ATT63Z MS3RP L 1.965.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AVT634 MS3RP 000000000000 L 1.965.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AXT636 MS3RP 000000000000 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AYT638 MS3RP 000000000000 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1TTTU0447 MS3RP 000000000011 L 3.253.251.000
MEMBER OFFSETS 18.000 18.000
MEMBER101030532 MS4RP L 1.005.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER10532T5BF MS4RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER106480083 MS4RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER1T5BF0648 MS4RP L 4.004.001.000
MEMBER OFFSETS 10.000 10.000
MEMBER 0270T645 P1 RP
MEMBER T645T644 P1 RP
MEMBER T645T646 P1 RP
MEMBER T648T649 P1 RP
MEMBER T649T647 P1 RP
MEMBER T649T64A P1 RP
MEMBER T64BT64D P1 RP
MEMBER T64DT64C P1 RP
MEMBER T64DT64E P1 RP
MEMBER T64FT64G P1 RP
MEMBER T64HT64J P1 RP
MEMBER T64JT64I P1 RP
MEMBER T64JT64K P1 RP
MEMBER T64LT64N P1 RP
MEMBER T64NT64M P1 RP
MEMBER T64NT64O P1 RP
MEMBER T64PT64Q P1 RP
MEMBER T64TT64R P1 RP
MEMBER T64UT64S P1 RP
MEMBER T64UT64V P1 RP
MEMBER T64VT64T P1 RP
MEMBER T64WT64Y P1 RP
MEMBER T64YT64X P1 RP
MEMBER T64YT651 P1 RP
MEMBER PAD1A001 SL1 000111000011
MEMBER PAD2A002 SL1 000111000011
MEMBER PAD3J001 SL1 000111000011
MEMBER PAD4J002 SL1 000111000011
MEMBER1T5IFT5KP SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5INT5IF SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5INT5KO SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5IOT5L2 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5J2T5J4 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5J2T5KI SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5J3T5L0 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5J4T5KH SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JIT5JK SW1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B52 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T5JIT5KT SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JKT5KS SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JLT5KU SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JUT5KN SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JWT5JV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JWT5KE SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JXT655 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER T5JYT5K4 SW1RP
MEMBER T5JYT65K SW1RP
MEMBER T5JZT5K5 SW1RP
MEMBER T5K4T65I SW1RP
MEMBER T5K6T5K8 SW1RP
MEMBER T5K6T5LK SW1RP
MEMBER T5K7T5K9 SW1RP
MEMBER T5K8T5LC SW1RP
MEMBER T5KAT5KC SW1RP
MEMBER T5KAT5LJ SW1RP
MEMBER T5KBT5KD SW1RP
MEMBER T5KCT5LA SW1RP
MEMBER1T5KET5KM SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KFT5JV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KHT5KQ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KIT5KR SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER T5KLT5LG SW1RP
MEMBER1T5KMT5JX SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KMT657 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KNT5KF SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KOT5IO SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5KOT5L4 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5KPT5IG SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5KQT5J5 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KQT5KY SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KRT5J3 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KST5JL SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KST5KW SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KTT5JJ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KUT5KV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KVT5JJ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KWT5KU SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KWT5KX SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KXT5KT SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KXT5KV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KYT5KZ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KYT5L1 SW1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B53 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T5KZT5KR SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5KZT5L0 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5L0T5L1 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5L1T5J5 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5L2T5L3 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5L3T5IG SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5L4T5L2 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5L4T5L5 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5L5T5KP SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5L5T5L3 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER T5LAT5LB SW1RP
MEMBER T5LBT5KD SW1RP
MEMBER T5LCT5LD SW1RP
MEMBER T5LDT5K9 SW1RP
MEMBER T5LGT5KB SW1RP
MEMBER T5LGT5LB SW1RP
MEMBER T5LHT5K7 SW1RP
MEMBER T5LHT5LD SW1RP
MEMBER T5LJT5KL SW1RP
MEMBER T5LJT5LA SW1RP
MEMBER T5LKT5LC SW1RP
MEMBER T5LKT65O SW1RP
MEMBER1T5LMT5MO SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5LOT5LM SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5LOT5MN SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5LPT5N1 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5LQT5LS SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LQT5MH SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LRT5MZ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LST5MG SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LUT5LW SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LUT5MS SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LWT5MR SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LXT5MT SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5LYT5MM SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5M0T5LZ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5M0T5ME SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER T5M2T5M4 SW1RP
MEMBER T5M3T5M5 SW1RP
MEMBER T5M3T65G SW1RP
MEMBER T5M5T65E SW1RP
MEMBER T5M6T5M8 SW1RP
MEMBER T5M6T5NJ SW1RP
MEMBER T5M7T5M9 SW1RP
MEMBER T5M8T5NB SW1RP
MEMBER T5MAT5MC SW1RP
MEMBER T5MAT5NI SW1RP
MEMBER T5MBT5MD SW1RP
MEMBER T5MCT5N9 SW1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B54 of 382

MEMBER1T5MET5ML SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MFT5LZ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MGT5MP SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MHT5MQ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER T5MJT5NG SW1RP
MEMBER T5MKT5NF SW1RP
MEMBER1T5MLT5M1 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MMT5MF SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MMT65B SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MNT5LP SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5MNT5N3 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5MOT5LN SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5MPT5LT SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MPT5MX SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MQT5LR SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MRT5LX SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MRT5MV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MST5LV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MTT5MU SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MUT5LV SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MVT5MT SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MVT5MW SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MWT5MS SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MWT5MU SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MXT5MY SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MXT5N0 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MYT5MQ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MYT5MZ SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5MZT5N0 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5N0T5LT SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T5N1T5N2 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5N2T5LN SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5N3T5N1 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5N3T5N4 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5N4T5MO SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER1T5N4T5N2 SW1RP
MEMBER OFFSETS 13.000 13.000
MEMBER T5N9T5NA SW1RP
MEMBER T5NAT5MD SW1RP
MEMBER T5NBT5NC SW1RP
MEMBER T5NCT5M9 SW1RP
MEMBER T5NFT5MB SW1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B55 of 382

MEMBER T5NFT5NA SW1RP


MEMBER T5NGT5M7 SW1RP
MEMBER T5NGT5NC SW1RP
MEMBER T5NIT5MK SW1RP
MEMBER T5NIT5N9 SW1RP
MEMBER T5NJT5MJ SW1RP
MEMBER T5NJT5NB SW1RP
MEMBER1T655T656 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T656T5JU SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T657T655 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T657T658 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T658T5KN SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T658T656 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T65BT659 SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T65BT65C SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T65CT5ML SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T65CT65A SW1RP
MEMBER OFFSETS 18.000 18.000
MEMBER T65ET65F SW1RP
MEMBER T65FT5M4 SW1RP
MEMBER T65GT65E SW1RP
MEMBER T65GT65N SW1RP
MEMBER T65HT5M2 SW1RP
MEMBER T65HT65F SW1RP
MEMBER T65IT65J SW1RP
MEMBER T65JT5K5 SW1RP
MEMBER T65KT65I SW1RP
MEMBER T65KT65M SW1RP
MEMBER T65LT5JZ SW1RP
MEMBER T65LT65J SW1RP
MEMBER T65MT65L SW1RP
MEMBER T65NT65H SW1RP
MEMBER T65OT5LH SW1RP
MEMBER T5IFT5K7 SW2RP
MEMBER T5IGT5J3 SW2RP
MEMBER T5INT5K6 SW2RP
MEMBER T5IOT5J5 SW2RP
MEMBER T5J2T5KB SW2RP
MEMBER T5J3T5JJ SW2RP
MEMBER T5J4T5KA SW2RP
MEMBER T5J5T5JL SW2RP
MEMBER T5JUT5IG SW2RP
MEMBER T5JVT5JZ SW2RP
MEMBER T5JWT5JY SW2RP
MEMBER T5JXT5IO SW2RP
MEMBER T5JYT5IN SW2RP
MEMBER T5JZT5IF SW2RP
MEMBER T5K6T5J4 SW2RP
MEMBER T5K7T5J2 SW2RP
MEMBER T5KAT5JK SW2RP
MEMBER T5KBT5JI SW2RP
MEMBER T5LMT5M7 SW2RP
MEMBER T5LNT5LR SW2RP
MEMBER T5LOT5M6 SW2RP
MEMBER T5LPT5LT SW2RP
MEMBER T5LQT5MB SW2RP
MEMBER T5LRT5LV SW2RP
MEMBER T5LST5MA SW2RP
MEMBER T5LTT5LX SW2RP
MEMBER T5LUT68X SW2RP
MEMBER T5LWT68Z SW2RP
MEMBER T5LYT5LN SW2RP
MEMBER T5LZT5M3 SW2RP
MEMBER T5M0T5M2 SW2RP
MEMBER T5M1T5LP SW2RP
MEMBER T5M2T5LO SW2RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B56 of 382

MEMBER T5M3T5LM SW2RP


MEMBER T5M6T5LS SW2RP
MEMBER T5M7T5LQ SW2RP
MEMBER T5MAT5LW SW2RP
MEMBER T5MBT5LU SW2RP
MEMBER T68VT5V6 SW2RP
MEMBER T68XT5VC SW2RP
MEMBER T68ZT5V7 SW2RP
MEMBER T690T5VD SW2RP
MEMBER T691T5VE SW2RP
MEMBER T5INT5J5 SW3RP
MEMBER T5J5T5JK SW3RP
MEMBER T5JXT5IN SW3RP
MEMBER T5LOT5LT SW3RP
MEMBER T5LTT5LW SW3RP
MEMBER T5M1T5LO SW3RP
MEMBER T5IFT65O SW4RP
MEMBER T5IOT5J3 SW4RP
MEMBER T5J3T5JL SW4RP
MEMBER T5J4T5KL SW4RP
MEMBER T5JUT5IO SW4RP
MEMBER T5JWT65M SW4RP
MEMBER T5K8T5KH SW4RP
MEMBER T5K9T5KI SW4RP
MEMBER T5KET5K4 SW4RP
MEMBER T5KFT5K5 SW4RP
MEMBER T5KHT5KC SW4RP
MEMBER T5KIT5KD SW4RP
MEMBER T5KLT5JI SW4RP
MEMBER T5LMT5MJ SW4RP
MEMBER T5LPT5LR SW4RP
MEMBER T5LRT5LX SW4RP
MEMBER T5LST5MK SW4RP
MEMBER T5LZT65N SW4RP
MEMBER T5M8T5MG SW4RP
MEMBER T5M9T5MH SW4RP
MEMBER T5MET5M4 SW4RP
MEMBER T5MFT5M5 SW4RP
MEMBER T5MGT5MC SW4RP
MEMBER T5MHT5MD SW4RP
MEMBER T5MJT5LS SW4RP
MEMBER T5MKT5LU SW4RP
MEMBER T65MT5IF SW4RP
MEMBER T65NT5LO SW4RP
MEMBER T65OT5J4 SW4RP
MEMBER1T5LYT65P SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T659T65Q SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T65AT5M1 SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T65PT659 SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T65PT65T SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T65QT65A SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T65QT65S SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T65TT65S SW5RP
MEMBER OFFSETS 15.000 15.000
MEMBER 00560092 TC1RP
MEMBER 00920116 TC1RP
MEMBER 0116T505 TC1RP
MEMBER T5050531 TC1RP
MEMBER 00050539 TD1RP
MEMBER 00060540 TD1RP
MEMBER 00540091 TD1RP
MEMBER 00550082 TD1RP
MEMBER 00820117 TD1RP
MEMBER 00910115 TD1RP
MEMBER 05390055 TD1RP
MEMBER 05400054 TD1RP
MEMBER T5P70005 TD1RP
MEMBER T5P80006 TD1RP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B57 of 382

MEMBER T6A6T5P7 TD1RP


MEMBER T6A7T5P8 TD1RP
MEMBER 00000048 TL1RP
MEMBER 00040049 TL1RP
MEMBER 601LT131 TL2RP L 2.643.18
MEMBER 619L0004 TL2RP L 2.643.18
MEMBER 681LT132 TL2RP L 2.643.18
MEMBER 699L0000 TL2RP L 2.643.18
MEMBER T1310002 TL3RP L 5.405.40
MEMBER T1320001 TL3RP
MEMBER 00010047 TL4RP L 5.405.40
MEMBER 00020046 TL4RP L 5.405.40
MEMBER 0078PAD1 TL5RP
MEMBER 0079PAD2 TL5RP
MEMBER 00490081 TL6RP
MEMBER 00810113 TL7RP
MEMBER 0113PAD3 TL8RP
MEMBER 00460078 TL9RP
MEMBER 00470079 TL9RP
MEMBER 00480080 TLARP
MEMBER 00800114 TLBRP
MEMBER 01140136 TLCRP
MEMBER 0136PAD4 TLDRP
MEMBER PAD3T322 TLE
MEMBER PAD40662 TLE
MEMBER T217T5OL TMURP
MEMBER T5OLT5OT TMURP
MEMBER T5OMT5OU TMURP
MEMBER T5ONT5OV TMURP
MEMBER T5OUT5P2 TMURP
MEMBER T5OVT5P3 TMURP
MEMBER T5PAT5OM TMURP
MEMBER T5PAT5ON TMURP
MEMBER T5UNT5VR TMURP
MEMBER 0058T432 TS1RP
MEMBER 0059T433 TS1RP
MEMBER 00620104 TS1RP
MEMBER 00720102 TS1RP
MEMBER 00730100 TS1RP
MEMBER 00740103 TS1RP
MEMBER 01000130 TS1RP
MEMBER 01020129 TS1RP
MEMBER 01040133 TS1RP
MEMBER 01070072 TS1RP
MEMBER 01100073 TS1RP
MEMBER 01230111 TS1RP
MEMBER 01240112 TS1RP
MEMBER101810546 TS1RP
MEMBER OFFSETS -30.00
MEMBER 01910249 TS1RP
MEMBER 02490411 TS1RP
MEMBER 02670429 TS1RP
MEMBER 0276T5O5 TS1RP
MEMBER 03360147 TS1RP
MEMBER 04110336 TS1RP
MEMBER104290471 TS1RP
MEMBER OFFSETS 30.000
MEMBER 05270528 TS1RP
MEMBER 05460267 TS1RP
MEMBER T2170074 TS1RP
MEMBER T2180062 TS1RP
MEMBER T4320119 TS1RP
MEMBER T4330122 TS1RP 000111000011
MEMBER T5O50327 TS1RP
MEMBER 00130059 TS2RP
MEMBER 00140058 TS2RP 000111000011
MEMBER 0061T500 TS2RP
MEMBER 0120T66O TS2RP
MEMBER T2190061 TS2RP
MEMBER T4370276 TS2RP
MEMBER T5000120 TS2RP
MEMBER100460451 TV1RP
MEMBER OFFSETS -45.72 35.820
MEMBER101120115 TV1RP
MEMBER OFFSETS 30.500 -20.33
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B58 of 382

MEMBER10046T67W TV2RP
MEMBER OFFSETS -45.7237.380
MEMBER10047T67X TV2RP
MEMBER OFFSETS 45.72037.380
MEMBER10048T66Q TV2RP
MEMBER OFFSETS 45.720 -32.00
MEMBER10049T67A TV2RP
MEMBER OFFSETS 45.720 -32.00
MEMBER10080T496 TV2RP
MEMBER OFFSETS 45.72055.660
MEMBER10080T66S TV2RP
MEMBER OFFSETS 45.720 -38.40
MEMBER10081T497 TV2RP
MEMBER OFFSETS -45.7255.660
MEMBER100910116 TV2RP
MEMBER OFFSETS 29.42052.300 -29.41-52.29
MEMBER10113T499 TV2RP
MEMBER OFFSETS 45.720 -74.98
MEMBER10113T67D TV2RP
MEMBER OFFSETS -45.72 45.440
MEMBER10114T66U TV2RP
MEMBER OFFSETS 45.720 -36.57
MEMBER10114T66V TV2RP
MEMBER OFFSETS -45.72 45.440
MEMBER101150531 TV2RP
MEMBER OFFSETS 23.75032.190 -23.74-32.18
MEMBER T3170629 TV2RP
MEMBER T3190601 TV2RP
MEMBER1T319T239 TV2RP
MEMBER OFFSETS -12.14 8.180
MEMBER T3200615 TV2RP
MEMBER T496T67U TV2RP
MEMBER T497T67T TV2RP
MEMBER1T498T67M TV2RP
MEMBER OFFSETS -30.50 -50.02
MEMBER T499T67C TV2RP
MEMBER1T66PT675 TV2RP
MEMBER OFFSETS -30.50 -21.35
MEMBER1T66RT676 TV2RP
MEMBER OFFSETS -30.50 -25.62
MEMBER1T66TT673 TV2RP
MEMBER OFFSETS -30.50 -24.40
MEMBER1T66WT66Y TV2RP
MEMBER OFFSETS -10.42 -8.880
MEMBER1T674T677 TV2RP
MEMBER OFFSETS 30.500 23.900
MEMBER1T679T67J TV2RP
MEMBER OFFSETS -30.50 -21.35
MEMBER T67BT498 TV2RP
MEMBER1T67ET67F TV2RP
MEMBER OFFSETS -10.42 -8.880
MEMBER1T67HT235 TV2RP
MEMBER OFFSETS -10.52 8.970
MEMBER1T67IT67K TV2RP
MEMBER OFFSETS 30.500 23.900
MEMBER1T67ZT680 TV2RP
MEMBER OFFSETS -10.42 -8.880
MEMBER1T681T682 TV2RP
MEMBER OFFSETS -10.52 8.970
MEMBER1T684T67Y TV2RP
MEMBER OFFSETS -25.40 25.240
MEMBER1T685T268 TV2RP
MEMBER OFFSETS 11.860 8.900
MEMBER1T686T233 TV2RP
MEMBER OFFSETS -12.40 7.480
MEMBER1T689T68J TV2RP
MEMBER OFFSETS -30.50-22.27
MEMBER T68BT68K TV2RP
MEMBER1T68D0057 TV2RP
MEMBER OFFSETS -45.7031.990
MEMBER T68ET687 TV2RP
MEMBER T68FT688 TV2RP
MEMBER T68G0083 TV2RP
MEMBER1T68HT68A TV2RP
MEMBER OFFSETS 30.500-22.27
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B59 of 382

MEMBER1T68LT68C TV2RP
MEMBER OFFSETS 30.500-21.21
MEMBER T68MT68R TV2RP
MEMBER T68NT68P TV2RP
MEMBER T68QT68O TV2RP
MEMBER T5UOT237 TV3RP
MEMBER T5UPT271 TV3RP
MEMBER1T66ZT66X TV3RP
MEMBER OFFSETS -10.52 8.970
MEMBER T671T226 TV3RP
MEMBER T683T230 TV3RP
MEMBER10000T494 TV4RP
MEMBER OFFSETS 45.72061.220
MEMBER10004T495 TV4RP
MEMBER OFFSETS -45.7261.220
MEMBER T494T67P TV4RP
MEMBER T495T67O TV4RP
MEMBER10111T672 TV5RP
MEMBER OFFSETS 30.500 -20.33
MEMBER200470466 TV6RP .800.800
MEMBER OFFSETS 70.000 -50.00
MEMBER 00430332 WP1RP L 3.29
MEMBER100850113 WP1RP L 3.29
MEMBER OFFSETS -45.72
MEMBER101140043 WP1RP L 3.29
MEMBER OFFSETS 45.720
MEMBER 03320333 WP1RP L 3.29
MEMBER 0333T496 WP1RP L 3.291.00
MEMBER 03340335 WP1RP L 2.46
MEMBER 03350336 WP1RP L 2.46
MEMBER 03360337 WP1RP L 2.46
MEMBER 03370338 WP1RP L 2.46
MEMBER 0338T497 WP1RP L 2.461.00
MEMBER 03390340 WP1RP L 3.29
MEMBER 03400085 WP1RP L 3.29
MEMBER T4960334 WP1RP L 2.461.00
MEMBER T4970339 WP1RP L 3.291.00
MEMBER100100116 WP2RP L 2.25
MEMBER OFFSETS 7.500 -45.72 7.500
MEMBER10024T5U2 WP2RP L 5.25
MEMBER OFFSETS 7.500 7.500
MEMBER100250028 WP2RP L 5.25
MEMBER OFFSETS 7.500 7.500
MEMBER10028T5U7 WP2RP L 5.25
MEMBER OFFSETS 7.500 7.500
MEMBER100290114 WP2RP L 5.25
MEMBER OFFSETS 7.500 -45.72 7.500
MEMBER10034T5U4 WP2RP L 11.0
MEMBER OFFSETS 7.500 7.500
MEMBER100350036 WP2RP L 11.0
MEMBER OFFSETS 7.500 7.500
MEMBER10036T5U9 WP2RP L 11.0
MEMBER OFFSETS 7.500 7.500
MEMBER100370130 WP2RP L 11.0
MEMBER OFFSETS 7.500 7.500
MEMBER100400041 WP2RP L 4.20
MEMBER OFFSETS -16.00 7.500 7.500
MEMBER100410117 WP2RP L 4.20
MEMBER OFFSETS 7.500 7.500
MEMBER100520341 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER100530350 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER100860129 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER10089T68K WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER10113T5O4 WP2RP L 5.001.001.000
MEMBER OFFSETS 45.720 7.500 7.500
MEMBER10114T5JH WP2RP L 10.0
MEMBER OFFSETS 45.720 7.500 7.500
MEMBER101150010 WP2RP L 2.25
MEMBER OFFSETS 7.500 7.500
MEMBER10117T68L WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B60 of 382

MEMBER10119T5JB WP2RP L 6.544.00


MEMBER OFFSETS 7.500 7.500
MEMBER10122T59Q WP2RP L 6.544.004.000
MEMBER OFFSETS 7.500 7.500
MEMBER10129T61Y WP2RP L 5.003.553.550
MEMBER OFFSETS 7.500 7.500
MEMBER101300052 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER10130T5TE WP2RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER101330024 WP2RP L 5.25
MEMBER OFFSETS -16.00 7.500 7.500
MEMBER101340034 WP2RP L 11.0
MEMBER OFFSETS -16.00 7.500 7.500
MEMBER10327T5AA WP2RP L 6.544.00
MEMBER OFFSETS -16.00 7.500 7.500
MEMBER103360345 WP2RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER103410342 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103420343 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103430344 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103440345 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103450346 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER10345T5BV WP2RP L 10.05.005.000
MEMBER OFFSETS 7.500 7.500
MEMBER103460347 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103470348 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103480349 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER10349T6AB WP2RP L 5.751.001.000
MEMBER OFFSETS 7.500 7.500
MEMBER103500351 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103510352 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103520353 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER103530471 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER104710472 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER104720473 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER104730474 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER104740475 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER104750089 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER1T317T66Y WP2RP L 6.54
MEMBER OFFSETS 7.500 7.500
MEMBER1T317T66Z WP2RP L 3.52
MEMBER OFFSETS 7.500 7.500
MEMBER1T319T67F WP2RP L 6.54 1.000
MEMBER OFFSETS 7.500 7.500
MEMBER1T319T67H WP2RP
MEMBER OFFSETS 7.500 7.500
MEMBER1T320T680 WP2RP L 6.54 2.540
MEMBER OFFSETS 7.500 7.500
MEMBER1T59Q0113 WP2RP L 6.544.00
MEMBER OFFSETS 7.500-45.72 7.500
MEMBER1T59RT6BG WP2RP L 6.544.00
MEMBER OFFSETS 7.500 7.500
MEMBER1T5A8T684 WP2RP L 6.54
MEMBER OFFSETS 7.500 7.500
MEMBER1T5AAT5A8 WP2RP L 6.54
MEMBER OFFSETS 7.500 7.500
MEMBER1T5BVT622 WP2RP L 10.05.005.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B61 of 382

MEMBER OFFSETS 7.500 7.500


MEMBER1T5BW0471 WP2RP L 10.05.005.000
MEMBER OFFSETS 7.500 7.500
MEMBER1T5JBT59R WP2RP
MEMBER OFFSETS 7.500 7.500
MEMBER1T5JHT6BI WP2RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER1T5O4T5T2 WP2RP L 5.001.551.550
MEMBER OFFSETS 7.500 7.500
MEMBER1T5T20129 WP2RP L 5.002.452.450
MEMBER OFFSETS 7.500 7.500
MEMBER1T5T4T67M WP2RP L 5.005.00
MEMBER OFFSETS 7.500 7.500
MEMBER1T5TET5TF WP2RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER1T5TFT673 WP2RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER1T5U20025 WP2RP L 5.25
MEMBER OFFSETS 7.500 7.500
MEMBER1T5U40035 WP2RP L 11.0
MEMBER OFFSETS 7.500 7.500
MEMBER1T5U70029 WP2RP L 5.25
MEMBER OFFSETS 7.500 7.500
MEMBER1T5U90037 WP2RP L 11.0
MEMBER OFFSETS 7.500 7.500
MEMBER1T5UOT671 WP2RP
MEMBER OFFSETS 7.500 7.500
MEMBER1T5UPT681 WP2RP L 3.52
MEMBER OFFSETS 7.500 7.500
MEMBER1T61YT5T4 WP2RP L 5.003.553.550
MEMBER OFFSETS 7.500 7.500
MEMBER1T622T5BW WP2RP L 10.05.005.000
MEMBER OFFSETS 7.500 7.500
MEMBER1T66C0122 WP2RP L 6.54 1.000
MEMBER OFFSETS 7.500 7.500
MEMBER1T66D0327 WP2RP L 6.54 2.540
MEMBER OFFSETS 7.500 7.500
MEMBER1T66E0119 WP2RP L 6.54
MEMBER OFFSETS 7.500 7.500
MEMBER1T66YT66E WP2RP L 6.54
MEMBER OFFSETS 7.500 7.500
MEMBER1T66ZT5UO WP2RP L 3.52
MEMBER OFFSETS 7.500 7.500
MEMBER1T67FT66C WP2RP L 6.54 1.000
MEMBER OFFSETS 7.500 7.500
MEMBER1T680T66D WP2RP L 6.54 2.540
MEMBER OFFSETS 7.500 7.500
MEMBER1T681T320 WP2RP L 3.52
MEMBER OFFSETS 7.500 7.500
MEMBER1T683T5UP WP2RP
MEMBER OFFSETS 7.500 7.500
MEMBER1T6840336 WP2RP L 6.54
MEMBER OFFSETS 7.500 7.500
MEMBER1T68K0115 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER1T68L0053 WP2RP L 5.75
MEMBER OFFSETS 7.500 7.500
MEMBER1T6AB0086 WP2RP L 5.751.001.000
MEMBER OFFSETS 7.500 7.500
MEMBER1T6BG0114 WP2RP L 6.544.00
MEMBER OFFSETS 7.500-45.72 7.500
MEMBER1T6BI0130 WP2RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER101130003 WP3RP L 4.73 4.730
MEMBER OFFSETS 45.72015.000 15.000
MEMBER10115T67L WP4RP
MEMBER OFFSETS 7.500 7.500
MEMBER10117T672 WP4RP
MEMBER OFFSETS 7.500 7.500
MEMBER1T6730117 WP4RP L 10.0
MEMBER OFFSETS 7.500 7.500
MEMBER1T67M0115 WP4RP L 5.005.00
MEMBER OFFSETS 7.500 7.500
MEMBER10003T5O3 WS1RP 000111000011 1.000
MEMBER OFFSETS 15.000 15.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B62 of 382

MEMBER10030T5J7 WS1RP 1.000


MEMBER OFFSETS 15.000 15.000
MEMBER10037T58P WS1RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER10333T5AK WS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10334T5YC WS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10335T5AJ WS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10337T5AI WS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10338T5Y4 WS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10339T5AH WS1RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1RRRRT5P2 WS1RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58PT58Q WS1RP L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58Q0041 WS1RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T58T0009 WS1RP 000000000011 L 4.004.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AH0348 WS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AI0346 WS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AJ0344 WS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5AK0342 WS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5J70024 WS1RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JCT5P3 WS1RP L .6503.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5O3T58T WS1RP 000111000000 L 4.004.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P2T5P5 WS1RP L 2.05 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P3RRRR WS1RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P3T5P6 WS1RP L 2.353.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5P40134 WS1RP L 2.353.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5P4TTTT WS1RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P5T5VR WS1RP L 2.051.021.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P6T5P4 WS1RP L 2.353.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5P6T5P9 WS1RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5P9T5P5 WS1RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5VRT5P1 WS1RP L 2.051.021.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5Y40347 WS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5YC0343 WS1RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1TTTTT5P1 WS1RP L 2.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER100030131 WS2RP L 4.73 4.730
MEMBER OFFSETS 15.000 16.00015.000
MEMBER100090132 WS2RP L 4.73
MEMBER OFFSETS 15.000 16.00015.000
MEMBER10009T61Z WS2RP 000111000000 L 5.003.553.550
MEMBER OFFSETS 15.000 15.000
MEMBER100190121 WS2RP L 5.56
MEMBER OFFSETS 15.000 16.00015.000
MEMBER100300031 WS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER100310032 WS2RP L 5.25
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B63 of 382

MEMBER OFFSETS 15.000 15.000


MEMBER100320033 WS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER100330119 WS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER10036T504 WS2RP 000111000000 L 5.00
MEMBER OFFSETS 15.000 15.000
MEMBER100420043 WS2RP L 4.004.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER100420101 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10063T6B6 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER101010137 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10119T6BF WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER101200030 WS2RP L 5.25
MEMBER OFFSETS 15.000 15.000
MEMBER10120T5J6 WS2RP L 4.001.000
MEMBER OFFSETS -16.00 15.000 15.000
MEMBER10121T5LU WS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER101220019 WS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER101290009 WS2RP L 4.73
MEMBER OFFSETS 15.000 15.000
MEMBER10132T620 WS2RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10134T493 WS2RP L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER101370138 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10138T6BB WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER103040327 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER103270328 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER10328T6B9 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER103290330 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER103300331 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER103310340 WS2RP L 4.004.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER10331T6B7 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T317T685 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T320T66F WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T492T502 WS2RP L 6.82
MEMBER OFFSETS -16.0015.000 15.000
MEMBER1T493T492 WS2RP L 2.002.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T502T503 WS2RP L 6.82
MEMBER OFFSETS 15.000 15.000
MEMBER1T503T504 WS2RP L 6.82
MEMBER OFFSETS 15.000 15.000
MEMBER1T504T5BJ WS2RP L 5.003.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T58U0010 WS2RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5BH0133 WS2RP L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5BI0116 WS2RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5BJ0040 WS2RP L 5.003.00
MEMBER OFFSETS 15.000 15.000
MEMBER1T5J6T5BH WS2RP L 3.003.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5J6T5J7 WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B64 of 382

MEMBER1T5J6T5JI WS2RP L 11.7


MEMBER OFFSETS 15.000 15.000
MEMBER1T5J7T5J8 WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5J8T5J9 WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5J9T5JA WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JAT5JB WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JCT5JJ WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JDT5JC WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JET5U3 WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JFT5JE WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JGT5U8 WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5JHT5JG WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O2T5LV WS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O3T5O2 WS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O4T5O3 WS2RP L 5.56
MEMBER OFFSETS 15.000 15.000
MEMBER1T5U3T5JD WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T5U8T5JF WS2RP L 11.7
MEMBER OFFSETS 15.000 15.000
MEMBER1T61ZT58U WS2RP 000000000000 L 5.003.553.550
MEMBER OFFSETS 15.000 15.000
MEMBER1T620T5BI WS2RP L 5.005.001.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T66FT319 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T66GT320 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T685T6BE WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T686T317 WS2RP
MEMBER OFFSETS 15.000 15.000
MEMBER1T6B60122 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T6B70063 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T6B90329 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T6BB0304 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T6BET66G WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER1T6BF0042 WS2RP L 5.75
MEMBER OFFSETS 15.000 15.000
MEMBER100190003 WS3RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10024T58J WS3RP 000111000000 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10025T5U5 WS3RP 000111000000 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10028T58I WS3RP 000111000000 L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10029T58K WS3RP 000111000000 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10031T5J8 WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10032T5J9 WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10033T5JA WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10034T502 WS3RP 000111000011 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10035T503 WS3RP 000111000011 L 2.002.001.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B65 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER100430052 WS3RP 000111000011 L 1.001.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10052T58N WS3RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10063T59P WS3RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10085T5T1 WS3RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10086T61X WS3RP 000111000000 L 5.003.553.550
MEMBER OFFSETS 18.000 18.000
MEMBER101010332 WS3RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10121T5BG WS3RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10133T5JC WS3RP L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10137T5AE WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10138T5XA WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10304T5AF WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10328T5XB WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10329T5A9 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10330T5XK WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER103320341 WS3RP 000111000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10340T58V WS3RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10341T58X WS3RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10342T58Y WS3RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10343T5TQ WS3RP 000111000000 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER10344T623 WS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10346T5BU WS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10347T61U WS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10348T5BR WS3RP 000111000000 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER10349T61W WS3RP 000111000000 L 5.003.553.550
MEMBER OFFSETS 18.000 18.000
MEMBER1RRRRT5P9 WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58IT5JF WS3RP 000011000000 L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58IT5UA WS3RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T58JT5JD WS3RP 000011000000 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58KT5JG WS3RP 000000000011 L 2.002.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58NT5TG WS3RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T58NT62A WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T58O0053 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58OT5TH WS3RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T58PT5TE WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T58QT5TF WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T58V0349 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58VT6A9 WS3RP 000111000000 L 1.00 1.000
MEMBER OFFSETS 18.000 18.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B66 of 382

MEMBER1T58W0475 WS3RP 000000000011 L 5.00 1.000


MEMBER OFFSETS 18.000 18.000
MEMBER1T58WT6AA WS3RP 000111000000 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T58XT5TS WS3RP 000111000000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58XT628 WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T58YT5TU WS3RP 000111000000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58YT626 WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T58Z0350 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T58ZT5TT WS3RP 000111000000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5900351 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T590T5TV WS3RP 000111000000
MEMBER OFFSETS 18.000 18.000
MEMBER1T59P0085 WS3RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A70338 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5A9T5A7 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AC0335 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AD0333 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AET5AD WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5AFT5AC WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BG0131 WS3RP L 4.004.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BRT61V WS3RP L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BS0474 WS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BT0472 WS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5BUT621 WS3RP L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5J80025 WS3RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5J90028 WS3RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JAT6BH WS3RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JDT6BL WS3RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JET6BK WS3RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JF0036 WS3RP 000111000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5JGT6BJ WS3RP 000111000000 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5P9TTTT WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5T10086 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5T1T5T2 WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5T2T58T WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5T30089 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5T3T5T4 WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5T4T58U WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TET58N WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TFT58O WS3RP 000111000011
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B67 of 382

MEMBER OFFSETS 18.000 18.000


MEMBER1T5TGT58X WS3RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TGT629 WS3RP 000111000000 L 1.501.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T5THT58Z WS3RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TQT624 WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TR0352 WS3RP 000000000011 L 5.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TST58Y WS3RP 000000000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TST627 WS3RP 000111000000 L 1.501.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TTT590 WS3RP 000000000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TUT5TQ WS3RP 000000000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TUT625 WS3RP 000111000000 L 1.501.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T5TVT5TR WS3RP 000000000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5U5T58I WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T5U5T5JE WS3RP 000000000011 L 2.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5U6T5U5 WS3RP 000000000011 L 1.00
MEMBER OFFSETS 18.000 18.000
MEMBER1T5X90334 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XAT5X9 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XBT5XC WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XC0337 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XJ0339 WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T5XKT5XJ WS3RP L 4.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T61U0473 WS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T61VT5BS WS3RP L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T61WT58W WS3RP 000000000000 L 5.003.551.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T61XT5T3 WS3RP 000000000000 L 5.003.553.550
MEMBER OFFSETS 18.000 18.000
MEMBER1T621T5BT WS3RP L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6230353 WS3RP 000000000011 L 5.005.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T624T5TR WS3RP 000000000011 L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T625T5TV WS3RP 000000000011 L 1.501.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T626T590 WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T627T5TT WS3RP 000000000011 L 1.501.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T628T58Z WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T629T5TH WS3RP 000000000011 L 1.501.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T62AT58O WS3RP L 5.001.501.500
MEMBER OFFSETS 18.000 18.000
MEMBER1T66DT6B8 WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T66ET6BC WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T66FT66H WS3RP L 2.54 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T66GT66I WS3RP L 2.54 1.000
MEMBER OFFSETS 18.000 18.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B68 of 382

MEMBER1T66H0330 WS3RP L 2.54 1.000


MEMBER OFFSETS 18.000 18.000
MEMBER1T66HT6B5 WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T66I0137 WS3RP L 2.54 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T66IT6BA WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6A9T5T1 WS3RP 000000000011 L 1.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6A9T6AB WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T6AAT5T3 WS3RP 000000000011 L 1.00 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6ABT6AA WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B4T66C WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B4T6B6 WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B5T6B4 WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B5T6B7 WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T6B8T66H WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER T6B8T6B9 WS3RP
MEMBER1T6BAT66D WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BAT6BB WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BCT6BD WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BCT6BF WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER T6BD0101 WS3RP
MEMBER1T6BDT66I WS3RP 1.000
MEMBER OFFSETS 18.000 18.000
MEMBER T6BET6BD WS3RP
MEMBER1T6BH0029 WS3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BHT6BG WS3RP
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BJ0037 WS3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BJT6BI WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BK0035 WS3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BL0034 WS3RP 000000000011 L 3.003.001.000
MEMBER OFFSETS 18.000 18.000
MEMBER1T6BLT6BK WS3RP 000111000011
MEMBER OFFSETS 18.000 18.000
MEMBER10131T5O2 WS4RP 1.000
MEMBER OFFSETS 15.000 15.000
MEMBER1T5O20132 WS4RP L 1.000
MEMBER OFFSETS 15.000 15.000
PGRUP
PGRUP PL Z0.8000S20.000 0.30024.800 1.0000-3
PGRUP PL2Z1.2000S20.000 0.30024.800 1.0000-3
PLATE
PLATE A116 T175T131T136T176PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A118 T183T175T176T197PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A119 T182T183T197T196PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A120 T181T182T196T195PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A121 T155T181T195T156PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B69 of 382

PLATE OFFSETS 25.000 25.000


PLATE A122 T180T155T156T194PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A123 T179T180T194T193PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A124 T171T179T193T173PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A125 T138T171T173T170PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A126 T153T138T170T150PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A127 T152T153T150T149PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A128 T151T152T149T148PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A129 0006T151T148T205PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A130 T150T170T168T69FPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A131 T149T150T69FT69GPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A132 T148T149T69GT69HPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A133 T205T148T69H0181PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A134 0181T69HT145T202PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A135 T69HT69GT146T145PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A136 T69GT69FT147T146PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A137 T69FT168T137T147PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A138 T202T145T1420005PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A139 T145T146T143T142PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A140 T146T147T144T143PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A141 T147T137T139T144PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A142 T137T174T172T139PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A143 T174T188T166T172PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A144 T188T189T184T166PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A145 T189T158T159T184PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A146 T158T190T185T159PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B70 of 382

PLATE OFFSETS 25.000 25.000


PLATE A147 T190T191T186T185PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A148 T191T192T187T186PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A149 T192T177T178T187PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A150 T177T135T132T178PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A151 0011001501550163PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A152 0163015500040013PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A153 001300040187T441PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A154 T44101870188T438PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A155 T43801880189T440PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A156 T440018900260044PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A157 01890174T5PZT5PYPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A158 T5PYT5PZ01730026PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A159 0026017301720190PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A160 0190017201710191PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A161 004400260190T442PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A162 T44201900191T437PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A164 T5PE01660175T5PFPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A166 T5PF01750174T5PGPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A167 0188T5PCT5PD0189PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A168 0015T5NZT5O00155PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A170 T5NZ01080153T5O0PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A172 0108T325T5BK0153PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A173 0153T5BKT5BL0107PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A174 T32500070154T5BKPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A175 T5BK01540006T5BLPL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B71 of 382

PLATE OFFSETS 25.000 25.000


PLATE A176 0107T660T65Z0166PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A177 0166T65ZT65Y0175PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A178 0175T65YT65X0174PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A179 T65Y01770178T65XPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A180 T66000060176T65ZPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A181 T65Z01760177T65YPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A182 0173T57ET57F0172PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A183 0172T57FT5QBT5Q4PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A184 T5Q4T5QBT6610171PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A185 T57E01790178T65XPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A186 T57E01790180T57FPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A187 T57F0180T5Q5T5QBPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A188 T5QBT5Q50181T661PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A189 T66101810182T65WPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A190 T65W01820183T65VPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A191 0171T661T65W0170PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A193 0170T65WT65V0169PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A194 T65V01830184T65UPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A195 0169T65VT65U0168PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A196 T65U01840185T5RQPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A197 T5RQ01850186T5RMPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A198 T5RM01860005T5RRPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A199 0110000501620161PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A200 0161016200080109PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A201 01090008T208T209PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B72 of 382

PLATE OFFSETS 25.000 25.000


PLATE A202 T209T208T212T213PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A203 T213T212T216T217PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A204 T5JT01100161T5JSPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A205 T5JS01610109T5JRPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A206 T5JR0109T209T5JQPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A207 T5JQT209T213T5JPPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A208 T5JPT213T217T5JOPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A209 0000T5JTT5JS0160PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A210 0160T5JST5JR0016PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A211 0016T5JRT5JQT210PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A212 T210T5JQT5JPT214PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A214 T214T5JPT5JOT218PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A215 T215T214T218T219PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A216 T211T210T214T215PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A217 00120016T210T211PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A218 0164016000160012PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A219 0014000001600164PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A220 T445019500000014PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A221 0195016501100000PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A222 0165T5RNT5RP0110PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A223 0167T5ROT5RN0165PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A225 0168T65UT5RQ0167PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A226 0193016801670194PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A227 T43501940195T445PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A228 T44401930194T435PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B73 of 382

PLATE OFFSETS 25.000 25.000


PLATE A229 004500270193T444PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A230 0027016901680193PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A231 T443019200270045PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A232 0192017001690027PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A234 0191017101700192PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A235 T43701910192T443PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A238 0318004600670319PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A239 0326031803190367PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A240 0325032603670366PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A241 0324032503660365PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A242 0215032403650216PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A243 0323021502160364PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A244 0322032303640363PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A245 0314032203630316PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A246 0070031403160313PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A247 0213007003130210PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A248 0212021302100209PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A249 0211021202090208PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A250 005402110208T56VPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A251 0320006600470321PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A252 0362032003210357PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A253 0361036203570356PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A254 0360036103560355PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A255 0219036003550220PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A256 0359021902200354PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B74 of 382

PLATE OFFSETS 25.000 25.000


PLATE A257 0358035903540303PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A258 0317035803030315PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A259 0069031703150071PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A260 0207006900710204PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A261 0206020702040203PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A262 0205020602030202PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A263 T56W020502020055PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A264 T56V02080205T56WPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A265 0208020902060205PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A266 0209021002070206PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A267 0210031300690207PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A268 0059004902360244PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A269 02440236T5VST5VTPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A270 T5VTT5VS02530280PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A271 0280025302520279PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A272 02790252T5VVT5VUPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A273 T5VUT5VV02510278PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A274 0278025102500277PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A275 0277025002490276PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A276 0276024902480275PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A277 0275024802470274PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A278 0274024702460273PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A279 0273024602450272PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A280 0272024502350243PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A281 0243023500480058PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B75 of 382

PLATE OFFSETS 25.000 25.000


PLATE A283 0287T5IDT5IC0286PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A284 0286T5ICT5IB0285PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A285 0285T5IBT5IA0284PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A286 0284T5IAT5I90061PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A288 T5ID02910290T5ICPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A290 T5IC02900289T5IBPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A291 T5IB02890288T5IAPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A292 T5B102880062T5I9PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A293 0064006502810283PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A294 0283028100490059PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A295 0065T5NWT5NX0281PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A296 T5NW00750282T5NXPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A297 0281028200720049PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A298 0075T327T5BM0282PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A299 T32700560299T5BMPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A300 0282T5BMT5BN0072PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A301 T5BM02990054T5BNPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A302 0049007202380236PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A303 0236023802620253PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A304 0253026202610252PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A305 0252026102600251PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A307 0251026002590250PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A308 0250025902580249PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A309 0249025802570248PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A310 0248025702560247PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B76 of 382

PLATE OFFSETS 25.000 25.000


PLATE A311 0247025602550246PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A312 0246025502540245PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A314 0245025402370235PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A315 0235023700730048PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A317 0291T5IKT5IJ0290PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A318 0290T5IJT5II0289PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A319 0289T5IIT5IH0288PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A320 0288T5IHT5IM0062PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A322 T5IK02950294T5IJPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A323 T5IJ02940293T5IIPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A324 T5II02930292T5IHPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A325 T5IH02920074T5IMPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A326 0072005402390238PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A328 0238023902710262PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A329 0262027102700261PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A330 0261027002690260PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A331 0260026902680259PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A332 0259026802670258PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A333 0258026702660257PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A334 0257026602650256PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A335 0256026502640255PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A336 0255026402630254PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A337 0254T5S1T5S00237PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A338 T5S402630240T5S3PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A339 0237T5S0T5RZ0073PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B77 of 382

PLATE OFFSETS 25.000 25.000


PLATE A340 T5S302400055T5S2PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A341 0073005503000295PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A342 0295T5B3T5RS0294PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A343 0294T5RST5RT0293PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A344 T5RW03000298T5RUPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A345 T5RU02980296T5RVPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A346 T5B3T5RWT5RYT5RXPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A347 0293029602970292PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A349 0292029700570074PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A350 T5ONT5OPT5ORT5OSPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A351 T5OP0074T5OQT5ORPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A352 T5ORT5OQT5OLT5OOPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A353 T5OST5ORT5OOT5OMPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A354 T329T328T509T508PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A355 T508T509T3270075PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A356 0447007800960448PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A357 0455044704480460PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A358 0454045504600459PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A359 0453045404590458PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A365 0200020101980197PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A366 0199020001970196PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A367 0091019901960431PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A368 0431019601260427PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A369 0196019701270126PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A370 0197019801280127PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B78 of 382

PLATE OFFSETS 25.000 25.000


PLATE A372 0449009700790450PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A373 0465044904500470PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A374 0464046504700469PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A375 0463046404690468PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A377 0462046304680467PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A378 0461046204670466PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A379 0445046104660446PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A380 0094044504460099PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A382 0127012801250093PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A383 0126012700930068PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A384 0427012600680082PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A385 0090T5B5T5NS0371PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A386 0371T5NST4330106PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A387 0106T433T5OF0389PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A388 0389T5OFT5OE0406PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A389 0406T5OET5OD0405PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A390 0405T5ODT5OC0404PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A391 0404T5OCT5OB0403PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A392 0403T5OBT5O50402PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A393 0402T5O5T5OA0401PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A394 0401T5OAT5O90400PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A395 0400T5O9T5O80399PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A396 0399T5O8T5O70398PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A397 0398T5O7T5O60388PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A398 0388T5O6T4320084PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B79 of 382

PLATE OFFSETS 25.000 25.000


PLATE A399 0084T432T5OG0379PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A400 0379T5OGT5OH0378PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A401 0378T5OHT5OI0377PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A402 0377T5OIT5OJ0376PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A403 0376T5OJT5000087PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A404 T5B500880368T5NSPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A405 T5NS03680081T433PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A406 T43300810390T5OFPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A407 T5OF03900415T5OEPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A408 T5OE04150414T5ODPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A409 T5OD04140413T5OCPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A410 T5OC04130412T5OBPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A411 T5OB04120411T5O5PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A412 T5O504110410T5OAPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A413 T5OA04100409T5O9PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A414 T5O904090408T5O8PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A415 T5O804080407T5O7PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A416 T5O704070393T5O6PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A417 T5O603930080T432PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A418 T432T5IVT5IUT5OGPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A419 T5OGT5IUT5ITT5OHPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A420 T5OHT5ITT5IST5OIPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A421 T5OIT5IST5IRT5OJPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A422 T5OJT5IRT5IPT500PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A423 T5IV00800375T5IUPL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B80 of 382

PLATE OFFSETS 25.000 25.000


PLATE A425 T5IU03750374T5ITPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A426 T5IT03740373T5ISPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A427 T5IS03730372T5IRPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A429 T5IR03720104T5IPPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A430 0088T5NTT5NU0368PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A431 0368T5NUT5NV0081PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A432 T5NTT5NPT5NQT5NUPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A433 T5NUT5NQT5NRT5NVPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A434 T5NPT330T5BOT5NQPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A435 T33001050369T5BOPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A436 0105009203700369PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A437 T5NQT5BOT5BPT5NRPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A438 0369037000910102PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A439 T5BO03690102T5BPPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A440 0081010203910390PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A441 0102T6AOT6AP0391PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A442 0391T6APT6AQ0424PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A443 0424T6AQT6AR0423PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A444 0423T6ART6AS0422PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A445 0422T6AST6AT0421PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A446 0421T6ATT6AU0420PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A447 0420T6AUT6AV0419PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A448 0419T6AVT6AW0418PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A449 T6AO00910392T6APPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A450 T6AP03920433T6AQPL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B81 of 382

PLATE OFFSETS 25.000 25.000


PLATE A451 T6AQ04330432T6ARPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A452 T6AR04320431T6ASPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A453 T6AS04310430T6ATPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A454 T6AT04300429T6AUPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A455 T6AU04290428T6AVPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A456 T6AV04280427T6AWPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A457 0390039104240415PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A458 0415042404230414PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A459 0414042304220413PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A460 0413042204210412PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A461 0412042104200411PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A462 0411042004190410PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A463 0410041904180409PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A464 0409041804170408PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A468 0080010003830375PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A469 0375T5IZT5IY0374PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A470 0374T5IYT5IX0373PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A471 0373T5IXT5IW0372PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A472 0372T5IWT5IQ0104PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A473 T5IZ03830382T5IYPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A474 T5IY03820381T5IXPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A476 T5IW03800103T5IQPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A477 0380038400830103PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A478 0381038503840380PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A479 0382038603850381PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B82 of 382

PLATE OFFSETS 25.000 25.000


PLATE A480 0383038703860382PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A481 0100008203870383PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A482 0394039500820100PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A483 0416042503950394PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A484 0417042604250416PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A485 0418042704260417PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A488 T5OVT5OXT5P0T5OZPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A489 T5OX0103T5OYT5P0PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A490 T5P0T5OYT5OTT5OWPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A491 T5OZT5P0T5OWT5OUPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A492 0132011600100009PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A493 0009001001150129PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A494 0129011500890086PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A495 0086008904750349PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A496 0349047504740348PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A498 0348047404730347PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A499 0347047304720346PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A500 0346047204710345PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A502 0345047103530344PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A503 0344035303520343PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A504 0343035203510342PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A505 0342035103500341PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A506 0341035000530052PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A507 0052005301170130PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A508 0130011700410037PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B83 of 382

PLATE OFFSETS 25.000 25.000


PLATE A509 0037004100400036PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A510 0121013100030019PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A511 0131T5O2T5O30003PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A512 T5O201320009T5O3PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A513 T58T00090129T5T2PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A514 T5T201290086T5T1PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A515 T5T100860349T58VPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A516 0113T5T2T5T10085PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A517 0085T5T1T58V0340PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A518 0019000301130122PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A519 0122011300850063PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A520 0063008503400331PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A521 0085T5T1T58V0340PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A522 0340034903480339PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A523 0339034803470338PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A524 0338034703460337PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A525 0337034603450336PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A526 0336034503440335PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A527 0335034403430334PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A528 0334034303420333PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A529 0333034203410332PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A530 0332034100520043PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A531 0043005201300114PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A532 0114T5JHT5JG0029PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A534 T5JH01300037T5JGPL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B84 of 382

PLATE OFFSETS 25.000 25.000


PLATE A535 T5JG00370036T5JFPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A536 0029T58KT58I0028PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A537 T58KT5JGT5JFT58IPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A538 0028T58IT5U50025PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A539 T58IT5JFT5JET5U5PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A540 T5JF00360035T5JEPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A541 0036T504T5030035PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A542 0035T503T5020034PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A543 0034T502T4920134PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A545 T5JE00350034T5JDPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A546 T5U5T5JET5JDT58JPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A547 0025T5U5T58J0024PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A548 T5JD00340134T5JCPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A549 0024T5JDT5JC0133PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A550 T5J700240133T5J6PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A551 T5J800250024T5J7PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A552 T5J900280025T5J8PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A553 0030T5J7T5J60120PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A554 0031T5J8T5J70030PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A555 0032T5J9T5J80031PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A556 0033T5JAT5J90032PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A557 T5JA00290028T5J9PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A558 T5JB01140029T5JAPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A559 0119T5JBT5JA0033PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A560 T319T66CT66HT66FPL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B85 of 382

PLATE OFFSETS 25.000 25.000


PLATE A561 T66C0122T6B6T6B4PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A562 T6B4T6B6T6B7T6B5PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A563 T6B5T6B70330T66HPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A564 T66FT66HT66DT320PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A565 T320T66DT66IT66GPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A566 T6B8T6B90330T66HPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A567 T6B8T6B90327T66DPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A568 T66D0327T6BBT6BAPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A569 T6BAT6BB0137T66IPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A570 T66I01370101T6BDPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A571 T66GT66IT6BDT6BEPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A572 T6BET6BDT66ET317PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A574 T6BD0101T6BFT6BCPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A575 T6BCT6BF0119T66EPL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A576 0331034003390330PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A577 0330033903380329PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A578 0329033803370328PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A579 0328033703360327PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A580 0327033603350304PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A581 0304033503340138PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A582 0138033403330137PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A583 0137033303320101PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A584 0101033200430042PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A585 0042004301140119PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A688 0058004802910287PL 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B86 of 382

PLATE OFFSETS 25.000 25.000


PLATE A689 0048007302950291PL 0
PLATE A691 0408041704160407PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A692 0407041603940393PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A693 0393039401000080PL 0
PLATE A694 T5O001530107T5O1PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A695 0004010701660187PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A696 T5O001530107T5O1PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A697 0194016701650195PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A706 0201009804360198PL 0
PLATE A711 0198043600940128PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A712 0128009400990125PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A713 0452045304580457PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A714 0451045204570456PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A715 0443045104560444PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A716 0098044304440436PL 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A236 T326T324T506T507PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A237 T507T5060007T325PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A486 T5NNT5NMT5NLT5NOPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A487 T5NOT5NL0105T5NPPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A586 T224T3160601T235PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A587 T316T5V6T5V50601PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A588 T2350601T293T263PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A589 T263T293T294T262PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A590 T262T294T295T261PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A591 T261T295T239T242PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A592 T242T2390615T271PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A593 T2710615T272T259PL2 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B87 of 382

PLATE OFFSETS 25.000 25.000


PLATE A594 T259T272T268T258PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A595 T258T268T267T257PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A596 T257T267T266T256PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A597 T256T266T265T255PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A598 T255T2650629T237PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A599 T2370629T250T246PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A600 T246T250T249T245PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A601 T245T249T248T244PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A602 T244T248T247T243PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A603 T243T247T233T227PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A604 0601T5V5T5V4T293PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A605 T293T5V4T5V3T294PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A606 T294T5V3T5V2T295PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A607 T295T5V2T5V1T239PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A608 T239T5V1T5V00615PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A609 0615T269T273T272PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A610 T272T273T279T268PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A611 T268T279T278T267PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A612 T267T278T277T266PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A613 T266T277T276T265PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A615 T265T276T2400629PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A616 0629T240T254T250PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A617 T250T66MT66LT249PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A618 T66MT254T253T66LPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A619 T249T66LT66KT248PL2 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B88 of 382

PLATE OFFSETS 25.000 25.000


PLATE A620 T66LT253T252T66KPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A621 T248T66KT66JT247PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A622 T66KT252T251T66JPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A623 T247T66JT501T233PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A624 T66JT251T228T501PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A625 T5V1T241T269T5V0PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A626 T5V2T298T241T5V1PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A627 T5V3T297T298T5V2PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A628 T5V4T296T297T5V3PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A629 T5V5T236T296T5V4PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A630 T5V6T223T236T5V5PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A631 T236T231T304T296PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A632 T296T304T229T297PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A633 T297T229T299T298PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A634 T298T299T238T241PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A635 T241T2380147T269PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A637 T2690147T274T273PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A638 T273T274T283T279PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A639 T279T283T282T278PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A640 T278T282T281T277PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A641 T277T281T280T276PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A642 T276T2800136T240PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A643 T2400136T313T254PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A644 T254T313T314T253PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A645 T253T314T310T252PL2 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B89 of 382

PLATE OFFSETS 25.000 25.000


PLATE A646 T252T310T312T251PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A647 0136T221T306T313PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A648 T280T284T2210136PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A649 T281T285T284T280PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A650 T282T286T285T281PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A651 T283T287T286T282PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A652 T274T275T287T283PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A653 0147T270T275T274PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A654 T238T222T2700147PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A655 T299T301T222T238PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A656 T223T231T236 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A657 T229T301T299 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A658 T306T314T313 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A659 T312T228T251 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A660 T311T243T227 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A661 T305T5UZT315 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A662 T300T5UQT302 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A663 T232T235T224 PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000
PLATE A664 T232T235T263T303PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A665 T303T263T262T302PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A666 T302T262T261T5UQPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A667 T5UQT261T242T5URPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A668 T5URT242T271T5USPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A669 T5UST271T259T5UTPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A670 T5UTT259T258T5UUPL2 1
PLATE OFFSETS 25.000 25.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B90 of 382

PLATE OFFSETS 25.000 25.000


PLATE A671 T5UUT258T257T5UVPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A672 T5UVT257T256T5UWPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A673 T5UWT256T255T5UXPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A674 T5UXT255T237T5UYPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A675 T5UYT237T246T5UZPL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A676 T5UZT246T245T315PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A677 T315T245T244T309PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A678 T309T244T243T311PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A679 T300T5UQT5URT225PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A680 T225T5URT5UST230PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A681 T230T5UST5UTT288PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A682 T288T5UTT5UUT289PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A683 T289T5UUT5UVT290PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A684 T290T5UVT5UWT291PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A685 T291T5UWT5UXT292PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A686 T292T5UXT5UYT226PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
PLATE A687 T226T5UYT5UZT305PL2 1
PLATE OFFSETS 25.000 25.000
PLATE OFFSETS 25.000 25.000
JOINT
JOINT 0000 -11. -5. 6. -75.000 53.000
JOINT 0001 11. -5. 8. -75.000 3.000
JOINT 0002 11. 5. 8. 75.000 3.000
JOINT 0003 -11. 6. 18. 75.000 73.000
JOINT 0004 -11. 5. 6. 75.000 53.000
JOINT 0005 -1. -5. 6. -75.000 53.000
JOINT 0006 -1. 5. 6. 75.000 53.000
JOINT 0007 -1. 8. 6. 53.000
JOINT 0008 -1. -7. 6. -75.000 53.000
JOINT 0009 -6. 6. 18. 75.000 73.000
JOINT 0010 -1. 6. 18. 75.000 73.000
JOINT 0011 -13. 8. 6. 53.000
JOINT 0012 -13. -7. 6. -75.000 53.000
JOINT 0013 -13. 5. 6. 75.000 53.000
JOINT 0014 -13. -5. 6. -75.000 53.000
JOINT 0015 -11. 8. 6. 53.000
JOINT 0016 -11. -7. 6. -75.000 53.000
JOINT 0017 8. 2. 14. 65.000 73.000
JOINT 0018 11. 2. 14. 73.000
JOINT 0019 -15. 6. 18. 75.000 73.000
JOINT 0020 6. 2. 14. 45.000 73.000
JOINT 0021 3. 2. 14. 40.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B91 of 382

JOINT 0022 9. 3. 14. 30.000 75.000 73.000


JOINT 0024 -11. -9. 18. -75.000 73.000
JOINT 0025 -11. -8. 18. -75.000 73.000
JOINT 0026 -11. 2. 6. 53.000
JOINT 0027 -11. -2. 6. 53.000
JOINT 0028 -11. -7. 18. -75.000 73.000
JOINT 0029 -11. -6. 18. -75.000 73.000
JOINT 0030 -15. -9. 18. -75.000 73.000
JOINT 0031 -15. -8. 18. -75.000 73.000
JOINT 0032 -15. -7. 18. -75.000 73.000
JOINT 0033 -15. -6. 18. -75.000 73.000
JOINT 0034 -6. -9. 18. -75.000 73.000
JOINT 0035 -6. -8. 18. -75.000 73.000
JOINT 0036 -6. -7. 18. -75.000 73.000
JOINT 0037 -6. -6. 18. -75.000 73.000
JOINT 0038 8. 3. 14. 40.000 75.000 73.000
JOINT 0039 7. 3. 14. 15.000 75.000 73.000
JOINT 0040 -1. -7. 18. -75.000 73.000
JOINT 0041 -1. -6. 18. -75.000 73.000
JOINT 0042 -15. -5. 18. 73.000
JOINT 0043 -11. -5. 18. 73.000
JOINT 0044 -13. 2. 6. 53.000
JOINT 0045 -13. -2. 6. 53.000
JOINT 0046 11. 5. 10. 75.000 8.000
JOINT 0047 11. -5. 10. -75.000 8.000
JOINT 0048 -11. -5. 10. -75.000 8.000
JOINT 0049 -11. 5. 10. 75.000 8.000
JOINT 0050 5. 3. 14. 90.000 75.000 73.000
JOINT 0051 5. 3. 14. 10.000 75.000 73.000
JOINT 0052 -6. -5. 18. 73.000
JOINT 0053 -1. -5. 18. 73.000
JOINT 0054 -1. 5. 10. 75.000 8.000
JOINT 0055 -1. -5. 10. -75.000 8.000
JOINT 0056 -1. 8. 10. 8.000
JOINT 0057 -1. -11. 10. 8.000
JOINT 0058 -15. -5. 10. -75.000 8.000
JOINT 0059 -15. 5. 10. 75.000 8.000
JOINT 0060 4. 3. 14. 20.000 75.000 73.000
JOINT 0061 -15. -11. 10. 8.000
JOINT 0062 -11. -11. 10. 8.000
JOINT 0063 -15. 5. 18. 73.000
JOINT 0064 -15. 8. 10. 8.000
JOINT 0065 -11. 8. 10. 8.000
JOINT 0066 11. -2. 10. -50.000 8.000
JOINT 0067 11. 2. 10. 50.000 8.000
JOINT 0068 0. -5. 14. 10.000-75.000 73.000
JOINT 0069 3. -2. 10. 40.000-50.000 8.000
JOINT 0070 3. 5. 10. 40.000 75.000 8.000
JOINT 0071 3. -5. 10. 40.000-75.000 8.000
JOINT 0072 -6. 5. 10. 75.000 8.000
JOINT 0073 -6. -5. 10. -75.000 8.000
JOINT 0074 -6. -11. 10. 8.000
JOINT 0075 -6. 8. 10. 8.000
JOINT 0076 -1. 6. 10. 55.000 8.000
JOINT 0077 -1. -6. 10. -55.000 8.000
JOINT 0078 11. 5. 14. 75.000 73.000
JOINT 0079 11. -5. 14. -75.000 73.000
JOINT 0080 -11. -5. 14. -75.000 73.000
JOINT 0081 -11. 5. 14. 75.000 73.000
JOINT 0082 -1. -5. 14. -75.000 73.000
JOINT 0083 -1. -11. 14. 73.000
JOINT 0084 -16. -5. 14.-50.000-75.000 73.000
JOINT 0085 -11. 5. 18. 73.000
JOINT 0086 -6. 5. 18. 73.000
JOINT 0087 -16. -11. 14.-50.000 73.000
JOINT 0088 -11. 8. 14. 73.000
JOINT 0089 -1. 5. 18. 73.000
JOINT 0090 -16. 8. 14.-50.000 73.000
JOINT 0091 -1. 5. 14. 75.000 73.000
JOINT 0092 -1. 8. 14. 73.000
JOINT 0093 1. -5. 14. 20.000-75.000 73.000
JOINT 0094 3. -2. 14. 40.000-50.000 73.000
JOINT 0096 11. 2. 14. 50.000 73.000
JOINT 0097 11. -2. 14. -50.000 73.000
JOINT 0098 3. 5. 14. 40.000 75.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B92 of 382

JOINT 0099 3. -5. 14. 40.000-75.000 73.000


JOINT 0100 -6. -5. 14. -75.000 73.000
JOINT 0101 -15. -4. 18. 73.000
JOINT 0102 -6. 5. 14. 75.000 73.000
JOINT 0103 -6. -11. 14. 73.000
JOINT 0104 -11. -11. 14. 73.000
JOINT 0105 -6. 8. 14. 73.000
JOINT 0106 -16. 5. 14.-50.000 75.000 73.000
JOINT 0107 -6. 5. 6. 75.000 53.000
JOINT 0108 -6. 8. 6. 53.000
JOINT 0109 -6. -7. 6. -75.000 53.000
JOINT 0110 -6. -5. 6. -75.000 53.000
JOINT 0111 5. -5. 14. -75.000 73.000
JOINT 0112 5. 5. 14. 75.000 73.000
JOINT 0113 -11. 5. 18. 75.000 73.000
JOINT 0114 -11. -5. 18. -75.000 73.000
JOINT 0115 -1. 5. 18. 75.000 73.000
JOINT 0116 -1. 8. 18. 73.000
JOINT 0117 -1. -5. 18. -75.000 73.000
JOINT 0118 3. 3. 14. 40.000 75.000 73.000
JOINT 0119 -15. -5. 18. -75.000 73.000
JOINT 0120 -15. -11. 18. 73.000
JOINT 0121 -15. 8. 18. 73.000
JOINT 0122 -15. 5. 18. 75.000 73.000
JOINT 0123 5. -5. 10. -75.000 8.000
JOINT 0124 5. 5. 10. 75.000 8.000
JOINT 0125 2. -5. 14. 30.000-75.000 73.000
JOINT 0126 0. -2. 14. 10.000-50.000 73.000
JOINT 0127 1. -2. 14. 20.000-50.000 73.000
JOINT 0128 2. -2. 14. 30.000-50.000 73.000
JOINT 0129 -6. 5. 18. 75.000 73.000
JOINT 0130 -6. -5. 18. -75.000 73.000
JOINT 0131 -11. 8. 18. 73.000
JOINT 0132 -6. 8. 18. 73.000
JOINT 0133 -11. -11. 18. 73.000
JOINT 0134 -6. -11. 18. 73.000
JOINT 0135 2. 3. 14. 30.000 75.000 73.000
JOINT 0136 -11. -5. 21. -75.000 78.000
JOINT 0137 -15. -3. 18. 73.000
JOINT 0138 -15. -2. 18. 73.000
JOINT 0139 1. 3. 14. 20.000 75.000 73.000
JOINT 0140 2. 2. 14. 30.000 73.000
JOINT 0141 1. 2. 14. 20.000 73.000
JOINT 0142 2. 0. 14. 30.000 73.000
JOINT 0143 1. 0. 14. 20.000 73.000
JOINT 0147 -11. 0. 21. 78.000
JOINT 0153 -6. 6. 6. 75.000 53.000
JOINT 0154 -1. 6. 6. 75.000 53.000
JOINT 0155 -11. 6. 6. 75.000 53.000
JOINT 0160 -11. -6. 6. -75.000 53.000
JOINT 0161 -6. -6. 6. -75.000 53.000
JOINT 0162 -1. -6. 6. -75.000 53.000
JOINT 0163 -13. 6. 6. 75.000 53.000
JOINT 0164 -13. -6. 6. -75.000 53.000
JOINT 0165 -6. -5. 6. 53.000
JOINT 0166 -6. 5. 6. 53.000
JOINT 0167 -6. -4. 6. 53.000
JOINT 0168 -6. -3. 6. 53.000
JOINT 0169 -6. -2. 6. 53.000
JOINT 0170 -6. -1. 6. 53.000
JOINT 0171 -6. 0. 6. 53.000
JOINT 0172 -6. 1. 6. 53.000
JOINT 0173 -6. 2. 6. 53.000
JOINT 0174 -6. 3. 6. 53.000
JOINT 0175 -6. 4. 6. 53.000
JOINT 0176 -1. 5. 6. 53.000
JOINT 0177 -1. 4. 6. 53.000
JOINT 0178 -1. 3. 6. 53.000
JOINT 0179 -1. 2. 6. 53.000
JOINT 0180 -1. 1. 6. 53.000
JOINT 0181 -1. 0. 6. 53.000
JOINT 0182 -1. -1. 6. 53.000
JOINT 0183 -1. -2. 6. 53.000
JOINT 0184 -1. -3. 6. 53.000
JOINT 0185 -1. -4. 6. 53.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B93 of 382

JOINT 0186 -1. -5. 6. 53.000


JOINT 0187 -11. 5. 6. 53.000
JOINT 0188 -11. 4. 6. 53.000
JOINT 0189 -11. 3. 6. 53.000
JOINT 0190 -11. 1. 6. 53.000
JOINT 0191 -11. 0. 6. 53.000
JOINT 0192 -11. -1. 6. 53.000
JOINT 0193 -11. -3. 6. 53.000
JOINT 0194 -11. -4. 6. 53.000
JOINT 0195 -11. -5. 6. 53.000
JOINT 0196 0. 2. 14. 10.000 50.000 73.000
JOINT 0197 1. 2. 14. 20.000 50.000 73.000
JOINT 0198 2. 2. 14. 30.000 50.000 73.000
JOINT 0199 0. 5. 14. 10.000 75.000 73.000
JOINT 0200 1. 5. 14. 20.000 75.000 73.000
JOINT 0201 2. 5. 14. 30.000 75.000 73.000
JOINT 0202 0. -5. 10. 10.000-75.000 8.000
JOINT 0203 1. -5. 10. 20.000-75.000 8.000
JOINT 0204 2. -5. 10. 30.000-75.000 8.000
JOINT 0205 0. -2. 10. 10.000-50.000 8.000
JOINT 0206 1. -2. 10. 20.000-50.000 8.000
JOINT 0207 2. -2. 10. 30.000-50.000 8.000
JOINT 0208 0. 2. 10. 10.000 50.000 8.000
JOINT 0209 1. 2. 10. 20.000 50.000 8.000
JOINT 0210 2. 2. 10. 30.000 50.000 8.000
JOINT 0211 0. 5. 10. 10.000 75.000 8.000
JOINT 0212 1. 5. 10. 20.000 75.000 8.000
JOINT 0213 2. 5. 10. 30.000 75.000 8.000
JOINT 0215 6. 5. 10. 65.000 75.000 8.000
JOINT 0216 6. 2. 10. 65.000 50.000 8.000
JOINT 0218 6. 0. 14. 45.000 73.000
JOINT 0219 6. -2. 10. 65.000-50.000 8.000
JOINT 0220 6. -5. 10. 65.000-75.000 8.000
JOINT 0221 8. 0. 14. 65.000 73.000
JOINT 0222 8. -2. 10. 65.000-50.000 8.000
JOINT 0223 8. 2. 10. 65.000 50.000 8.000
JOINT 0224 6. -2. 10. 45.000-50.000 8.000
JOINT 0225 6. 2. 10. 45.000 50.000 8.000
JOINT 0226 8. -2. 14. 65.000-50.000 73.000
JOINT 0227 8. 2. 14. 65.000 50.000 73.000
JOINT 0229 6. -2. 14. 45.000-50.000 73.000
JOINT 0230 6. 2. 14. 45.000 50.000 73.000
JOINT 0235 -11. -5. 10. 8.000
JOINT 0236 -11. 5. 10. 8.000
JOINT 0237 -6. -5. 10. 8.000
JOINT 0238 -6. 5. 10. 8.000
JOINT 0239 -1. 5. 10. 8.000
JOINT 0240 -1. -5. 10. 8.000
JOINT 0243 -15. -5. 10. 8.000
JOINT 0244 -15. 5. 10. 8.000
JOINT 0245 -11. -4. 10. 8.000
JOINT 0246 -11. -3. 10. 8.000
JOINT 0247 -11. -2. 10. 8.000
JOINT 0248 -11. -1. 10. 8.000
JOINT 0249 -11. 0. 10. 8.000
JOINT 0250 -11. 1. 10. 8.000
JOINT 0251 -11. 2. 10. 8.000
JOINT 0252 -11. 3. 10. 8.000
JOINT 0253 -11. 4. 10. 8.000
JOINT 0254 -6. -4. 10. 8.000
JOINT 0255 -6. -3. 10. 8.000
JOINT 0256 -6. -2. 10. 8.000
JOINT 0257 -6. -1. 10. 8.000
JOINT 0258 -6. 0. 10. 8.000
JOINT 0259 -6. 1. 10. 8.000
JOINT 0260 -6. 2. 10. 8.000
JOINT 0261 -6. 3. 10. 8.000
JOINT 0262 -6. 4. 10. 8.000
JOINT 0263 -1. -4. 10. 8.000
JOINT 0264 -1. -3. 10. 8.000
JOINT 0265 -1. -2. 10. 8.000
JOINT 0266 -1. -1. 10. 8.000
JOINT 0267 -1. 0. 10. 8.000
JOINT 0268 -1. 1. 10. 8.000
JOINT 0269 -1. 2. 10. 8.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B94 of 382

JOINT 0270 -1. 3. 10. 8.000


JOINT 0271 -1. 4. 10. 8.000
JOINT 0272 -15. -4. 10. 8.000
JOINT 0273 -15. -3. 10. 8.000
JOINT 0274 -15. -2. 10. 8.000
JOINT 0275 -15. -1. 10. 8.000
JOINT 0276 -15. 0. 10. 8.000
JOINT 0277 -15. 1. 10. 8.000
JOINT 0278 -15. 2. 10. 8.000
JOINT 0279 -15. 3. 10. 8.000
JOINT 0280 -15. 4. 10. 8.000
JOINT 0281 -11. 6. 10. 75.000 8.000
JOINT 0282 -6. 6. 10. 75.000 8.000
JOINT 0283 -15. 6. 10. 75.000 8.000
JOINT 0284 -15. -9. 10. -75.000 8.000
JOINT 0285 -15. -8. 10. -75.000 8.000
JOINT 0286 -15. -7. 10. -75.000 8.000
JOINT 0287 -15. -6. 10. -75.000 8.000
JOINT 0288 -11. -9. 10. -75.000 8.000
JOINT 0289 -11. -8. 10. -75.000 8.000
JOINT 0290 -11. -7. 10. -75.000 8.000
JOINT 0291 -11. -6. 10. -75.000 8.000
JOINT 0292 -6. -9. 10. -75.000 8.000
JOINT 0293 -6. -8. 10. -75.000 8.000
JOINT 0294 -6. -7. 10. -75.000 8.000
JOINT 0295 -6. -6. 10. -75.000 8.000
JOINT 0296 -1. -8. 10. -75.000 8.000
JOINT 0297 -1. -9. 10. -75.000 8.000
JOINT 0298 -1. -7. 10. -75.000 8.000
JOINT 0299 -1. 6. 10. 75.000 8.000
JOINT 0300 -1. -6. 10. -75.000 8.000
JOINT 0303 5. -5. 10. 10.000-75.000 8.000
JOINT 0304 -15. -1. 18. 73.000
JOINT 0307 3. 1. 10. 40.000 25.000 8.000
JOINT 0308 3. 0. 10. 40.000 8.000
JOINT 0311 3. -1. 10. 40.000-25.000 8.000
JOINT 0313 3. 2. 10. 40.000 50.000 8.000
JOINT 0314 4. 5. 10. 20.000 75.000 8.000
JOINT 0315 4. -5. 10. 20.000-75.000 8.000
JOINT 0316 4. 2. 10. 20.000 50.000 8.000
JOINT 0317 4. -2. 10. 20.000-50.000 8.000
JOINT 0318 10. 5. 10. 75.000 8.000
JOINT 0319 10. 2. 10. 50.000 8.000
JOINT 0320 10. -2. 10. -50.000 8.000
JOINT 0321 10. -5. 10. -75.000 8.000
JOINT 0322 5. 5. 10. 10.000 75.000 8.000
JOINT 0323 5. 5. 10. 90.000 75.000 8.000
JOINT 0324 7. 5. 10. 40.000 75.000 8.000
JOINT 0325 8. 5. 10. 40.000 75.000 8.000
JOINT 0326 9. 5. 10. 30.000 75.000 8.000
JOINT 0327 -15. 0. 18. 73.000
JOINT 0328 -15. 1. 18. 73.000
JOINT 0329 -15. 2. 18. 73.000
JOINT 0330 -15. 3. 18. 73.000
JOINT 0331 -15. 4. 18. 73.000
JOINT 0332 -11. -4. 18. 73.000
JOINT 0333 -11. -3. 18. 73.000
JOINT 0334 -11. -2. 18. 73.000
JOINT 0335 -11. -1. 18. 73.000
JOINT 0336 -11. 0. 18. 73.000
JOINT 0337 -11. 1. 18. 73.000
JOINT 0338 -11. 2. 18. 73.000
JOINT 0339 -11. 3. 18. 73.000
JOINT 0340 -11. 4. 18. 73.000
JOINT 0341 -6. -4. 18. 73.000
JOINT 0342 -6. -3. 18. 73.000
JOINT 0343 -6. -2. 18. 73.000
JOINT 0344 -6. -1. 18. 73.000
JOINT 0345 -6. 0. 18. 73.000
JOINT 0346 -6. 1. 18. 73.000
JOINT 0347 -6. 2. 18. 73.000
JOINT 0348 -6. 3. 18. 73.000
JOINT 0349 -6. 4. 18. 73.000
JOINT 0350 -1. -4. 18. 73.000
JOINT 0351 -1. -3. 18. 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B95 of 382

JOINT 0352 -1. -2. 18. 73.000


JOINT 0353 -1. -1. 18. 73.000
JOINT 0354 5. -5. 10. 90.000-75.000 8.000
JOINT 0355 7. -5. 10. 40.000-75.000 8.000
JOINT 0356 8. -5. 10. 40.000-75.000 8.000
JOINT 0357 9. -5. 10. 30.000-75.000 8.000
JOINT 0358 5. -2. 10. 10.000-50.000 8.000
JOINT 0359 5. -2. 10. 90.000-50.000 8.000
JOINT 0360 7. -2. 10. 40.000-50.000 8.000
JOINT 0361 8. -2. 10. 40.000-50.000 8.000
JOINT 0362 9. -2. 10. 30.000-50.000 8.000
JOINT 0363 5. 2. 10. 10.000 50.000 8.000
JOINT 0364 5. 2. 10. 90.000 50.000 8.000
JOINT 0365 7. 2. 10. 40.000 50.000 8.000
JOINT 0366 8. 2. 10. 40.000 50.000 8.000
JOINT 0367 9. 2. 10. 30.000 50.000 8.000
JOINT 0368 -11. 6. 14. 75.000 73.000
JOINT 0369 -6. 6. 14. 75.000 73.000
JOINT 0370 -1. 6. 14. 75.000 73.000
JOINT 0371 -16. 6. 14.-50.000 75.000 73.000
JOINT 0372 -11. -9. 14. -75.000 73.000
JOINT 0373 -11. -8. 14. -75.000 73.000
JOINT 0374 -11. -7. 14. -75.000 73.000
JOINT 0375 -11. -6. 14. -75.000 73.000
JOINT 0376 -16. -9. 14.-50.000-75.000 73.000
JOINT 0377 -16. -8. 14.-50.000-75.000 73.000
JOINT 0378 -16. -7. 14.-50.000-75.000 73.000
JOINT 0379 -16. -6. 14.-50.000-75.000 73.000
JOINT 0380 -6. -9. 14. -75.000 73.000
JOINT 0381 -6. -8. 14. -75.000 73.000
JOINT 0382 -6. -7. 14. -75.000 73.000
JOINT 0383 -6. -6. 14. -75.000 73.000
JOINT 0384 -1. -9. 14. -75.000 73.000
JOINT 0385 -1. -8. 14. -75.000 73.000
JOINT 0386 -1. -7. 14. -75.000 73.000
JOINT 0387 -1. -6. 14. -75.000 73.000
JOINT 0388 -16. -5. 14.-50.000 73.000
JOINT 0389 -16. 5. 14.-50.000 73.000
JOINT 0390 -11. 5. 14. 73.000
JOINT 0391 -6. 5. 14. 73.000
JOINT 0392 -1. 5. 14. 73.000
JOINT 0393 -11. -5. 14. 73.000
JOINT 0394 -6. -5. 14. 73.000
JOINT 0395 -1. -5. 14. 73.000
JOINT 0398 -16. -4. 14.-50.000-25.000 73.000
JOINT 0399 -16. -3. 14.-50.000-50.000 73.000
JOINT 0400 -16. -2. 14.-50.000-50.000 73.000
JOINT 0401 -16. -1. 14.-50.000-25.000 73.000
JOINT 0402 -16. 0. 14.-50.000 73.000
JOINT 0403 -16. 1. 14.-50.000 25.000 73.000
JOINT 0404 -16. 2. 14.-50.000 50.000 73.000
JOINT 0405 -16. 3. 14.-50.000 50.000 73.000
JOINT 0406 -16. 4. 14.-50.000 25.000 73.000
JOINT 0407 -11. -4. 14. -25.000 73.000
JOINT 0408 -11. -3. 14. -50.000 73.000
JOINT 0409 -11. -2. 14. -50.000 73.000
JOINT 0410 -11. -1. 14. -25.000 73.000
JOINT 0411 -11. 0. 14. 73.000
JOINT 0412 -11. 1. 14. 25.000 73.000
JOINT 0413 -11. 2. 14. 50.000 73.000
JOINT 0414 -11. 3. 14. 50.000 73.000
JOINT 0415 -11. 4. 14. 25.000 73.000
JOINT 0416 -6. -4. 14. -25.000 73.000
JOINT 0417 -6. -3. 14. -50.000 73.000
JOINT 0418 -6. -2. 14. -50.000 73.000
JOINT 0419 -6. -1. 14. -25.000 73.000
JOINT 0420 -6. 0. 14. 73.000
JOINT 0421 -6. 1. 14. 25.000 73.000
JOINT 0422 -6. 2. 14. 50.000 73.000
JOINT 0423 -6. 3. 14. 50.000 73.000
JOINT 0424 -6. 4. 14. 25.000 73.000
JOINT 0425 -1. -4. 14. -25.000 73.000
JOINT 0426 -1. -3. 14. -50.000 73.000
JOINT 0427 -1. -2. 14. -50.000 73.000
JOINT 0428 -1. -1. 14. -25.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B96 of 382

JOINT 0429 -1. 0. 14. 73.000


JOINT 0430 -1. 1. 14. 25.000 73.000
JOINT 0431 -1. 2. 14. 50.000 73.000
JOINT 0432 -1. 3. 14. 50.000 73.000
JOINT 0433 -1. 4. 14. 25.000 73.000
JOINT 0436 3. 2. 14. 40.000 50.000 73.000
JOINT 0437 3. 1. 14. 40.000 25.000 73.000
JOINT 0438 3. 0. 14. 40.000 73.000
JOINT 0440 3. -1. 14. 40.000-25.000 73.000
JOINT 0443 4. 5. 14. 20.000 75.000 73.000
JOINT 0444 4. 2. 14. 20.000 50.000 73.000
JOINT 0445 4. -2. 14. 20.000-50.000 73.000
JOINT 0446 4. -5. 14. 20.000-75.000 73.000
JOINT 0447 10. 5. 14. 75.000 73.000
JOINT 0448 10. 2. 14. 50.000 73.000
JOINT 0449 10. -2. 14. -50.000 73.000
JOINT 0450 10. -5. 14. -75.000 73.000
JOINT 0451 5. 5. 14. 10.000 75.000 73.000
JOINT 0452 5. 5. 14. 90.000 75.000 73.000
JOINT 0453 7. 5. 14. 15.000 75.000 73.000
JOINT 0454 8. 5. 14. 40.000 75.000 73.000
JOINT 0455 9. 5. 14. 30.000 75.000 73.000
JOINT 0456 5. 2. 14. 10.000 50.000 73.000
JOINT 0457 5. 2. 14. 90.000 50.000 73.000
JOINT 0458 7. 2. 14. 15.000 50.000 73.000
JOINT 0459 8. 2. 14. 40.000 50.000 73.000
JOINT 0460 9. 2. 14. 30.000 50.000 73.000
JOINT 0461 5. -2. 14. 10.000-50.000 73.000
JOINT 0462 5. -2. 14. 90.000-50.000 73.000
JOINT 0463 7. -2. 14. 15.000-50.000 73.000
JOINT 0464 8. -2. 14. 40.000-50.000 73.000
JOINT 0465 9. -2. 14. 30.000-50.000 73.000
JOINT 0466 5. -5. 14. 10.000-75.000 73.000
JOINT 0467 5. -5. 14. 90.000-75.000 73.000
JOINT 0468 7. -5. 14. 15.000-75.000 73.000
JOINT 0469 8. -5. 14. 40.000-75.000 73.000
JOINT 0470 9. -5. 14. 30.000-75.000 73.000
JOINT 0471 -1. 0. 18. 73.000
JOINT 0472 -1. 1. 18. 73.000
JOINT 0473 -1. 2. 18. 73.000
JOINT 0474 -1. 3. 18. 73.000
JOINT 0475 -1. 4. 18. 73.000
JOINT 0518 -7. -5. 10.-50.000-75.000 8.000
JOINT 0519 -4. -5. 14.-33.300-75.000 73.000
JOINT 0522 -7. 5. 10.-68.500 75.000 8.000
JOINT 0523 -4. 5. 14.-33.300 75.000 73.000
JOINT 0524 7. 5. 10. 75.000 8.000
JOINT 0525 3. 5. 14. 75.000 73.000
JOINT 0527 11. 0. 10. 8.000
JOINT 0528 11. 0. 14. 73.000
JOINT 0531 -1. 8. 21. 78.000
JOINT 0532 -5. -11. 14. 73.000
JOINT 0539 -1. -5. 10. -75.000 3.000
JOINT 0540 -1. 5. 10. 75.000 3.000
JOINT 0546 -1. 0. 10. 3.000
JOINT 0601 -17. 5. 21.-54.000 75.000 78.000
JOINT 0615 -17. 0. 21.-54.000 78.000
JOINT 0629 -17. -5. 21.-54.000-75.000 78.000
JOINT 0648 -2. -11. 14. 73.000
JOINT 0649 -1. -11. 10.-80.000 8.000
JOINT 0662 -11. -5. 23. -75.000 73.000
JOINT 601L 11. 5. 4. 75.000 83.000 110110
JOINT 601L 100.000100.000 100.000100.000 ELASTI
JOINT 619L -11. 5. 4. 75.000 83.000 110110
JOINT 619L 100.000100.000 100.000100.000 ELASTI
JOINT 681L 11. -5. 4. -75.000 83.000 110110
JOINT 681L 100.000100.000 100.000100.000 ELASTI
JOINT 699L -11. -5. 4. -75.000 83.000 110110
JOINT 699L 100.000100.000 100.000100.000 ELASTI
JOINT A001 10. 5. 18. 40.000 36.727 7.500 111111
JOINT A002 10. -5. 18. 40.000-36.727 7.500 111111
JOINT J001 -9. 2. 42.-30.660 10.186 64.461 111111
JOINT J002 -9. -2. 42.-30.660-10.214 64.461 111111
JOINT PAD1 11. 5. 15. 75.000 34.000
JOINT PAD2 11. -5. 15. -75.000 34.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B97 of 382

JOINT PAD3 -11. 5. 20. 75.000 20.000


JOINT PAD4 -11. -5. 22. -75.000 73.000
JOINT RRRR -8. -12. 18.-35.000 73.000
JOINT T131 11. 5. 6. 75.000 53.000
JOINT T132 11. -5. 6. -75.000 53.000
JOINT T135 11. -2. 6. -50.000 53.000
JOINT T136 11. 2. 6. 50.000 53.000
JOINT T137 3. -2. 6. 40.000-50.000 53.000
JOINT T138 3. 5. 6. 40.000 75.000 53.000
JOINT T139 3. -5. 6. 40.000-75.000 53.000
JOINT T142 0. -5. 6. 10.000-75.000 53.000
JOINT T143 1. -5. 6. 20.000-75.000 53.000
JOINT T144 2. -5. 6. 30.000-75.000 53.000
JOINT T145 0. -2. 6. 10.000-50.000 53.000
JOINT T146 1. -2. 6. 20.000-50.000 53.000
JOINT T147 2. -2. 6. 30.000-50.000 53.000
JOINT T148 0. 2. 6. 10.000 50.000 53.000
JOINT T149 1. 2. 6. 20.000 50.000 53.000
JOINT T150 2. 2. 6. 30.000 50.000 53.000
JOINT T151 0. 5. 6. 10.000 75.000 53.000
JOINT T152 1. 5. 6. 20.000 75.000 53.000
JOINT T153 2. 5. 6. 30.000 75.000 53.000
JOINT T155 6. 5. 6. 65.000 75.000 53.000
JOINT T156 6. 2. 6. 65.000 50.000 53.000
JOINT T158 6. -2. 6. 65.000-50.000 53.000
JOINT T159 6. -5. 6. 65.000-75.000 53.000
JOINT T160 8. -2. 6. 65.000-50.000 53.000
JOINT T161 8. 2. 6. 65.000 50.000 53.000
JOINT T162 6. -2. 6. 45.000-50.000 53.000
JOINT T163 6. 2. 6. 45.000 50.000 53.000
JOINT T166 5. -5. 6. 10.000-75.000 53.000
JOINT T167 3. 1. 6. 40.000 25.000 53.000
JOINT T168 3. 0. 6. 40.000 53.000
JOINT T169 3. -1. 6. 40.000-25.000 53.000
JOINT T170 3. 2. 6. 40.000 50.000 53.000
JOINT T171 4. 5. 6. 20.000 75.000 53.000
JOINT T172 4. -5. 6. 20.000-75.000 53.000
JOINT T173 4. 2. 6. 20.000 50.000 53.000
JOINT T174 4. -2. 6. 20.000-50.000 53.000
JOINT T175 10. 5. 6. 75.000 53.000
JOINT T176 10. 2. 6. 50.000 53.000
JOINT T177 10. -2. 6. -50.000 53.000
JOINT T178 10. -5. 6. -75.000 53.000
JOINT T179 5. 5. 6. 10.000 75.000 53.000
JOINT T180 5. 5. 6. 90.000 75.000 53.000
JOINT T181 7. 5. 6. 40.000 75.000 53.000
JOINT T182 8. 5. 6. 40.000 75.000 53.000
JOINT T183 9. 5. 6. 30.000 75.000 53.000
JOINT T184 5. -5. 6. 90.000-75.000 53.000
JOINT T185 7. -5. 6. 40.000-75.000 53.000
JOINT T186 8. -5. 6. 40.000-75.000 53.000
JOINT T187 9. -5. 6. 30.000-75.000 53.000
JOINT T188 5. -2. 6. 10.000-50.000 53.000
JOINT T189 5. -2. 6. 90.000-50.000 53.000
JOINT T190 7. -2. 6. 40.000-50.000 53.000
JOINT T191 8. -2. 6. 40.000-50.000 53.000
JOINT T192 9. -2. 6. 30.000-50.000 53.000
JOINT T193 5. 2. 6. 10.000 50.000 53.000
JOINT T194 5. 2. 6. 90.000 50.000 53.000
JOINT T195 7. 2. 6. 40.000 50.000 53.000
JOINT T196 8. 2. 6. 40.000 50.000 53.000
JOINT T197 9. 2. 6. 30.000 50.000 53.000
JOINT T199 11. 0. 6. 53.000
JOINT T202 -1. -2. 6. -50.000 53.000
JOINT T205 -1. 2. 6. 50.000 53.000
JOINT T208 -1. -8. 6. -75.000 53.000
JOINT T209 -6. -8. 6. -75.000 53.000
JOINT T210 -11. -8. 6. -75.000 53.000
JOINT T211 -13. -8. 6. -75.000 53.000
JOINT T212 -1. -9. 6. -75.000 53.000
JOINT T213 -6. -9. 6. -75.000 53.000
JOINT T214 -11. -9. 6. -75.000 53.000
JOINT T215 -13. -9. 6. -75.000 53.000
JOINT T216 -1. -11. 6. 53.000
JOINT T217 -6. -11. 6. 53.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B98 of 382

JOINT T218 -11. -11. 6. 53.000


JOINT T219 -13. -11. 6. 53.000
JOINT T221 -9. -5. 21. -4.000-75.000 78.000
JOINT T222 -9. 1. 21. -4.000 29.200 78.000
JOINT T223 -14. 6. 21. -1.900 27.100 78.000
JOINT T224 -21. 6. 21. -6.100 27.100 78.000
JOINT T225 -26. 1. 21. -4.000 29.200 78.000
JOINT T226 -26. -5. 21. -4.000-75.000 78.000
JOINT T227 -21. -10. 21. -6.100-72.900 78.000
JOINT T228 -14. -10. 21. -1.900-72.900 78.000
JOINT T229 -11. 3. 21. 25.200 78.000
JOINT T230 -26. 0. 21. -4.000 78.000
JOINT T231 -13. 5. 21.-49.800 75.000 78.000
JOINT T232 -21. 5. 21.-58.200 75.000 78.000
JOINT T233 -17. -10. 21.-54.000-72.900 78.000
JOINT T235 -21. 5. 21. -6.100 75.000 78.000
JOINT T236 -14. 5. 21. -1.900 75.000 78.000
JOINT T237 -21. -5. 21. -6.100-75.000 78.000
JOINT T238 -11. 1. 21. 29.200 78.000
JOINT T239 -17. 1. 21.-54.000 29.200 78.000
JOINT T240 -14. -5. 21. -1.900-75.000 78.000
JOINT T241 -14. 1. 21. -1.900 29.200 78.000
JOINT T242 -21. 1. 21. -6.100 29.200 78.000
JOINT T243 -21. -9. 21. -6.100-72.900 78.000
JOINT T244 -21. -8. 21. -6.100-72.900 78.000
JOINT T245 -21. -7. 21. -6.100-71.000 78.000
JOINT T246 -21. -6. 21. -6.100-72.900 78.000
JOINT T247 -17. -9. 21.-54.000-72.900 78.000
JOINT T248 -17. -8. 21.-54.000-72.900 78.000
JOINT T249 -17. -7. 21.-54.000-71.000 78.000
JOINT T250 -17. -6. 21.-54.000-72.900 78.000
JOINT T251 -14. -9. 21. -1.900-72.900 78.000
JOINT T252 -14. -8. 21. -1.900-72.900 78.000
JOINT T253 -14. -7. 21. -1.900-71.000 78.000
JOINT T254 -14. -6. 21. -1.900-72.900 78.000
JOINT T255 -21. -4. 21. -6.100-75.000 78.000
JOINT T256 -21. -3. 21. -6.100-75.000 78.000
JOINT T257 -21. -2. 21. -6.100-75.000 78.000
JOINT T258 -21. -1. 21. -6.100-75.000 78.000
JOINT T259 -21. 0. 21. -6.100-75.000 78.000
JOINT T261 -21. 2. 21. -6.100 29.200 78.000
JOINT T262 -21. 3. 21. -6.100 25.200 78.000
JOINT T263 -21. 4. 21. -6.100 29.200 78.000
JOINT T265 -17. -4. 21.-54.000-75.000 78.000
JOINT T266 -17. -3. 21.-54.000-75.000 78.000
JOINT T267 -17. -2. 21.-54.000-75.000 78.000
JOINT T268 -17. -1. 21.-54.000-75.000 78.000
JOINT T269 -14. 0. 21. -1.900 78.000
JOINT T270 -9. 0. 21. -4.000 78.000
JOINT T271 -21. 0. 21. -6.100 78.000
JOINT T272 -17. 0. 21.-54.000-75.000 78.000
JOINT T273 -14. 0. 21. -1.900-75.000 78.000
JOINT T274 -11. 0. 21. -75.000 78.000
JOINT T275 -9. 0. 21. -4.000-75.000 78.000
JOINT T276 -14. -4. 21. -1.900-75.000 78.000
JOINT T277 -14. -3. 21. -1.900-75.000 78.000
JOINT T278 -14. -2. 21. -1.900-75.000 78.000
JOINT T279 -14. -1. 21. -1.900-75.000 78.000
JOINT T280 -11. -4. 21. -75.000 78.000
JOINT T281 -11. -3. 21. -75.000 78.000
JOINT T282 -11. -2. 21. -75.000 78.000
JOINT T283 -11. -1. 21. -75.000 78.000
JOINT T284 -9. -4. 21. -4.000-75.000 78.000
JOINT T285 -9. -3. 21. -4.000-75.000 78.000
JOINT T286 -9. -2. 21. -4.000-75.000 78.000
JOINT T287 -9. -1. 21. -4.000-75.000 78.000
JOINT T288 -26. 0. 21. -4.000-75.000 78.000
JOINT T289 -26. -1. 21. -4.000-75.000 78.000
JOINT T290 -26. -2. 21. -4.000-75.000 78.000
JOINT T291 -26. -3. 21. -4.000-75.000 78.000
JOINT T292 -26. -4. 21. -4.000-75.000 78.000
JOINT T293 -17. 4. 21.-54.000 29.200 78.000
JOINT T294 -17. 3. 21.-54.000 25.200 78.000
JOINT T295 -17. 2. 21.-54.000 29.200 78.000
JOINT T296 -14. 4. 21. -1.900 29.200 78.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B99 of 382

JOINT T297 -14. 3. 21. -1.900 25.200 78.000


JOINT T298 -14. 2. 21. -1.900 29.200 78.000
JOINT T299 -11. 2. 21. 29.200 78.000
JOINT T300 -25. 2. 21. -4.000 29.200 78.000
JOINT T301 -10. 2. 21. -4.000 29.200 78.000
JOINT T302 -24. 3. 21. -8.000 25.200 78.000
JOINT T303 -23. 4. 21. -4.000 29.200 78.000
JOINT T304 -12. 4. 21. -4.000 29.200 78.000
JOINT T305 -25. -6. 21. -6.100-72.900 78.000
JOINT T306 -10. -6. 21. -1.900-72.900 78.000
JOINT T309 -23. -8. 21. -6.100-72.900 78.000
JOINT T310 -12. -8. 21. -1.900-72.900 78.000
JOINT T311 -22. -9. 21. -6.100-72.900 78.000
JOINT T312 -13. -9. 21. -1.900-72.900 78.000
JOINT T313 -11. -6. 21. -72.900 78.000
JOINT T314 -11. -7. 21. -71.000 78.000
JOINT T315 -24. -7. 21. -8.000-71.000 78.000
JOINT T316 -17. 6. 21.-54.000 27.100 78.000
JOINT T317 -17. -5. 18.-54.000-75.000 73.000
JOINT T319 -17. 5. 18.-54.000 75.000 73.000
JOINT T320 -17. 0. 18.-54.000 73.000
JOINT T322 -11. 5. 21. 75.000 20.000
JOINT T324 -1. 10. 6. 53.000
JOINT T325 -3. 8. 6.-10.000 53.000
JOINT T326 -3. 10. 6.-10.000 53.000
JOINT T327 -3. 8. 10. 8.000
JOINT T328 -3. 10. 10. 8.000
JOINT T329 -6. 10. 10. 8.000
JOINT T330 -7. 8. 14.-50.000 73.000
JOINT T432 -15. -5. 14. -75.000 73.000
JOINT T433 -15. 5. 14. 75.000 73.000
JOINT T435 -13. -4. 6. 53.000
JOINT T437 -13. 0. 6. 53.000
JOINT T438 -13. 4. 6. 53.000
JOINT T440 -13. 3. 6. 53.000
JOINT T441 -13. 5. 6. 53.000
JOINT T442 -13. 1. 6. 53.000
JOINT T443 -13. -1. 6. 53.000
JOINT T444 -13. -3. 6. 53.000
JOINT T445 -13. -5. 6. 53.000
JOINT T473 -5. -13. 19.-90.000-35.000 13.000
JOINT T474 -4. -13. 19.-10.000-35.000 13.000
JOINT T475 -5. -15. 19.-80.000-95.000 53.000
JOINT T476 -4. -15. 19.-20.000-95.000 53.000
JOINT T477 -5. -18. 19.-70.000-55.000 93.000
JOINT T478 -4. -18. 19.-30.000-55.000 93.000
JOINT T479 -5. -21. 20.-60.000-15.000 33.000
JOINT T480 -4. -21. 20.-40.000-15.000 33.000
JOINT T481 -4. -23. 20.-50.000-75.000 73.000
JOINT T482 -5. -23. 20. -75.000 73.000
JOINT T483 -5. -23. 20.-50.000-75.000 73.000
JOINT T484 -5. -11. 16. 73.000
JOINT T485 -5. -13. 17. -35.000 33.000
JOINT T486 -5. -15. 17. -95.000 93.000
JOINT T487 -5. -18. 18. -55.000 53.000
JOINT T488 -5. -21. 19. -15.000 13.000
JOINT T489 -5. -23. 19. -75.000 73.000
JOINT T490 -5. -23. 21. -75.000 23.000
JOINT T491 -5. -23. 21. -75.000 78.000
JOINT T492 -4. -11. 18. 73.000
JOINT T493 -5. -11. 18. 73.000
JOINT T494 -11. -3. 10. -36.000 8.000
JOINT T495 -11. 3. 10. 36.000 8.000
JOINT T496 -11. -2. 18. -60.800 73.000
JOINT T497 -11. 2. 18. 60.800 73.000
JOINT T498 -3. 5. 14.-43.900 75.000 73.000
JOINT T499 -8. 5. 14.-80.700 75.000 73.000
JOINT T500 -15. -11. 14. 73.000
JOINT T501 -15. -10. 21. -72.900 78.000
JOINT T502 -4. -9. 18. -75.000 73.000
JOINT T503 -4. -8. 18. -75.000 73.000
JOINT T504 -4. -7. 18. -75.000 73.000
JOINT T505 -1. 8. 21. 33.000
JOINT T506 -1. 9. 6. 53.000
JOINT T507 -3. 9. 6.-10.000 53.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B100 of 382

JOINT T508 -6. 9. 10. 8.000


JOINT T509 -3. 9. 10. 8.000
JOINT T56V -1. 2. 10. 50.000 8.000
JOINT T56W -1. -2. 10. -50.000 8.000
JOINT T56X -11. -7. 6. -45.000 53.000
JOINT T56Y -7. -7. 6.-70.000-75.000 53.000
JOINT T56Z -7. -8. 6.-70.000-75.000 53.000
JOINT T570 -7. -9. 6.-70.000-75.000 53.000
JOINT T571 -11. -7. 6.-70.000-75.000 53.000
JOINT T572 -11. -8. 6.-70.000-75.000 53.000
JOINT T573 -11. -9. 6.-70.000-75.000 53.000
JOINT T574 -6. -7. 6.-80.000-75.000 53.000
JOINT T575 -6. -8. 6.-80.000-75.000 53.000
JOINT T576 -6. -9. 6.-80.000-75.000 53.000
JOINT T577 -2. -7. 6.-80.000-75.000 53.000
JOINT T578 -2. -8. 6.-80.000-75.000 53.000
JOINT T579 -2. -9. 6.-80.000-75.000 53.000
JOINT T57C -5. 2. 6.-35.100 53.000
JOINT T57D -5. 1. 6.-35.100 53.000
JOINT T57E -3. 2. 6.-35.100 53.000
JOINT T57F -3. 1. 6.-35.100 53.000
JOINT T57J -9. 2. 6.-95.100 53.000
JOINT T57K -9. 1. 6.-95.100 53.000
JOINT T57L -9. 0. 6.-95.100 53.000
JOINT T57M -9. -1. 6.-95.100 53.000
JOINT T57N -6. 2. 6.-95.100 53.000
JOINT T57O -6. 1. 6.-95.100 53.000
JOINT T57P -6. 0. 6.-95.100 53.000
JOINT T57Q -6. -1. 6.-95.100 53.000
JOINT T57V -8. -2. 6.-95.000 53.000
JOINT T57W -5. -2. 6. -5.000 53.000
JOINT T580 -3. 4. 14.-58.800 25.000 73.000
JOINT T581 -3. 2. 14.-58.800 50.000 73.000
JOINT T584 -6. 5. 14.-76.800 73.000
JOINT T585 -6. 3. 14.-76.800 50.000 73.000
JOINT T587 -5. -8. 14.-22.000-75.000 73.000
JOINT T588 -3. -8. 14.-60.000-75.000 73.000
JOINT T589 -2. -8. 14.-84.900-75.000 73.000
JOINT T58A -4. -8. 14.-35.100-75.000 73.000
JOINT T58B -2. -7. 14.-84.900-75.000 73.000
JOINT T58C -2. -9. 14.-84.900-75.000 73.000
JOINT T58D -4. -7. 14.-35.100-75.000 73.000
JOINT T58E -4. -9. 14.-35.100-75.000 73.000
JOINT T58I -10. -7. 18.-20.000-75.000 73.000
JOINT T58J -10. -9. 18.-20.000-75.000 73.000
JOINT T58K -10. -6. 18.-20.000-75.000 73.000
JOINT T58N -3. -5. 18.-95.000 73.000
JOINT T58O -2. -5. 18.-45.000 73.000
JOINT T58P -3. -6. 18.-95.000-75.000 73.000
JOINT T58Q -2. -6. 18.-45.000-75.000 73.000
JOINT T58T -8. 6. 18.-45.000 75.000 73.000
JOINT T58U -2. 6. 18.-45.000 75.000 73.000
JOINT T58V -8. 4. 18.-45.000 73.000
JOINT T58W -2. 4. 18.-45.000 73.000
JOINT T58X -3. -4. 18.-95.000 73.000
JOINT T58Y -3. -3. 18.-95.000 73.000
JOINT T58Z -2. -4. 18.-45.000 73.000
JOINT T590 -2. -3. 18.-45.000 73.000
JOINT T592 -2. 5. 6.-45.500 75.000 53.000
JOINT T593 -2. -5. 6.-45.500-75.000 53.000
JOINT T594 -9. -5. 6.-40.000-75.000 53.000
JOINT T595 -7. -5. 6.-30.000-75.000 53.000
JOINT T596 -13. -6. 10.-38.700-75.000 8.000
JOINT T597 -7. -6. 10.-50.000-75.000 8.000
JOINT T598 -13. -9. 10.-38.700-75.000 8.000
JOINT T599 -7. -9. 10.-50.000-75.000 8.000
JOINT T59B -4. 5. 10. 75.000 8.000
JOINT T59F -12. 4. 10.-80.000 8.000
JOINT T59C -4. 2. 10. 8.000
JOINT T59D -4. -1. 10. 8.000
JOINT T59E -11. 4. 10.-60.000 8.000
JOINT T59G -12. 2. 10.-53.000 8.000
JOINT T59H -11. 2. 10.-86.000 8.000
JOINT T59I -12. 0. 10.-53.000 8.000
JOINT T59J -12. -2. 10.-80.000 8.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B101 of 382

JOINT T59K -11. 0. 10.-86.000 8.000


JOINT T59L -11. -2. 10.-60.000 8.000
JOINT T59N -2. 5. 14.-65.700 75.000 73.000
JOINT T59O -2. -9. 14.-65.700-75.000 73.000
JOINT T59P -13. 5. 18.-80.000 73.000
JOINT T59Q -13. 5. 18.-80.000 75.000 73.000
JOINT T59R -13. -5. 18.-80.000-75.000 73.000
JOINT T59T -10. -4. 10.-40.000 8.000
JOINT T59U -10. -2. 10.-40.000 8.000
JOINT T59V -4. -2. 10.-38.500 8.000
JOINT T59W -4. -4. 10.-38.500 8.000
JOINT T59Z 0. -5. 14. 10.000 73.000
JOINT T5A0 -7. 5. 14.-10.000 73.000
JOINT T5A1 -7. -5. 14.-10.000 73.000
JOINT T5A3 -9. -5. 14.-39.500 73.000
JOINT T5A4 -9. -3. 14.-39.500-50.000 73.000
JOINT T5A5 -7. -3. 14.-10.000-50.000 73.000
JOINT T5A7 -12. 2. 18.-10.000 73.000
JOINT T5A8 -12. 0. 18.-10.000 73.000
JOINT T5A9 -13. 2. 18.-10.000 73.000
JOINT T5AA -13. 0. 18.-10.000 73.000
JOINT T5AD -12. -3. 18.-10.000 73.000
JOINT T5AE -13. -3. 18.-10.000 73.000
JOINT T5AF -13. -1. 18.-10.000 73.000
JOINT T5AC -12. -1. 18.-10.000 73.000
JOINT T5AH -8. 3. 18.-50.000 73.000
JOINT T5AI -8. 1. 18.-50.000 73.000
JOINT T5AJ -8. -1. 18.-50.000 73.000
JOINT T5AK -8. -3. 18.-50.000 73.000
JOINT T5AL -13. -6. 14.-38.700-75.000 73.000
JOINT T5AM -13. -9. 14.-38.700-75.000 73.000
JOINT T5AN -7. -6. 14.-50.000-75.000 73.000
JOINT T5AO -7. -9. 14.-50.000-75.000 73.000
JOINT T5AQ -14. -6. 14.-90.000-75.000 73.000
JOINT T5AR -14. -9. 14.-90.000-75.000 73.000
JOINT T5AS -8. -6. 14.-70.000-75.000 73.000
JOINT T5AT -8. -9. 14.-70.000-75.000 73.000
JOINT T5AU -2. -11. 10.-20.000 8.000
JOINT T5AV -2. 8. 10.-20.000 8.000
JOINT T5AW -2. 5. 10.-20.000 75.000 8.000
JOINT T5AX -2. -5. 10.-20.000-75.000 8.000
JOINT T5AY -13. 8. 10.-80.000 8.000
JOINT T5AZ -13. -11. 10.-80.000 8.000
JOINT T5B0 -13. 6. 10.-80.000 75.000 8.000
JOINT T5B1 -13. -9. 10.-80.000-75.000 8.000
JOINT T5B2 -2. -9. 10.-20.000-75.000 8.000
JOINT T5B3 -3. -6. 10.-91.000-75.000 8.000
JOINT T5B4 -2. -6. 10.-20.000-75.000 8.000
JOINT T5B5 -15. 8. 14. 73.000
JOINT T5B6 11. 4. 6. 53.000
JOINT T5B7 11. -4. 6. 53.000
JOINT T5B8 -2. -11. 6.-20.000 53.000
JOINT T5B9 -2. 8. 6.-20.000 53.000
JOINT T5BA 11. 4. 10. 8.000
JOINT T5BB 11. -4. 10. 8.000
JOINT T5BD 11. -4. 14. -25.000 73.000
JOINT T5BE -2. 5. 14.-20.000 75.000 73.000
JOINT T5BF -2. -11. 14.-20.000 73.000
JOINT T5BG -13. 8. 18.-80.000 73.000
JOINT T5BH -13. -11. 18.-80.000 73.000
JOINT T5BI -2. 8. 18.-45.000 73.000
JOINT T5BJ -2. -7. 18.-45.000-75.000 73.000
JOINT T5BK -3. 6. 6.-10.000 75.000 53.000
JOINT T5BL -3. 5. 6.-10.000 75.000 53.000
JOINT T5BM -3. 6. 10. 75.000 8.000
JOINT T5BN -3. 5. 10. 75.000 8.000
JOINT T5BO -7. 6. 14.-50.000 75.000 73.000
JOINT T5BP -7. 5. 14.-50.000 75.000 73.000
JOINT T5BR -4. 3. 18.-40.000 73.000
JOINT T5BS -2. 3. 18.-20.000 73.000
JOINT T5BT -2. 1. 18.-20.000 73.000
JOINT T5BU -4. 1. 18.-40.000 73.000
JOINT T5BV -4. 0. 18.-40.000 73.000
JOINT T5BW -2. 0. 18.-20.000 73.000
JOINT T5HG -9. 3. 6.-90.000 85.000 53.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B102 of 382

JOINT T5HH -9. 3. 6.-90.000 53.000


JOINT T5I9 -14. -11. 10. 8.000
JOINT T5IA -14. -9. 10. -75.000 8.000
JOINT T5IB -14. -8. 10. -75.000 8.000
JOINT T5ID -14. -6. 10. -75.000 8.000
JOINT T5IE -14. -5. 10. -75.000 8.000
JOINT T5IF -14. -11. 10. -40.000 8.000
JOINT T5BC 11. 4. 14. 25.000 73.000
JOINT T5IC -14. -7. 10. -75.000 8.000
JOINT T5IG -9. -11. 10. -40.000 8.000
JOINT T5IH -9. -9. 10. -75.000 8.000
JOINT T5II -9. -8. 10. -75.000 8.000
JOINT T5IJ -9. -7. 10. -75.000 8.000
JOINT T5IK -9. -6. 10. -75.000 8.000
JOINT T5IL -9. -5. 10. -75.000 8.000
JOINT T5IM -9. -11. 10. 8.000
JOINT T5IN -14. -14. 10. 8.000
JOINT T5IO -9. -14. 10. 8.000
JOINT T5IP -14. -11. 14. 73.000
JOINT T5IQ -9. -11. 14. 73.000
JOINT T5IR -14. -9. 14. -75.000 73.000
JOINT T5IS -14. -8. 14. -75.000 73.000
JOINT T5IT -14. -7. 14. -75.000 73.000
JOINT T5IU -14. -6. 14. -75.000 73.000
JOINT T5IV -14. -5. 14. -75.000 73.000
JOINT T5IW -9. -9. 14. -75.000 73.000
JOINT T5IX -9. -8. 14. -75.000 73.000
JOINT T5IY -9. -7. 14. -75.000 73.000
JOINT T5IZ -9. -6. 14. -75.000 73.000
JOINT T5J0 -9. -5. 14. -75.000 73.000
JOINT T5J2 -14. -11. 14. -40.000 73.000
JOINT T5J3 -9. -11. 14. -40.000 73.000
JOINT T5J4 -14. -14. 14. 73.000
JOINT T5J5 -9. -14. 14. 73.000
JOINT T5J6 -14. -11. 18. 73.000
JOINT T5J7 -14. -9. 18. -75.000 73.000
JOINT T5J8 -14. -8. 18. -75.000 73.000
JOINT T5J9 -14. -7. 18. -75.000 73.000
JOINT T5JA -14. -6. 18. -75.000 73.000
JOINT T5JB -14. -5. 18. -75.000 73.000
JOINT T5JD -9. -9. 18. -75.000 73.000
JOINT T5JE -9. -8. 18. -75.000 73.000
JOINT T5JF -9. -7. 18. -75.000 73.000
JOINT T5JC -9. -11. 18. 73.000
JOINT T5JG -9. -6. 18. -75.000 73.000
JOINT T5JH -9. -5. 18. -75.000 73.000
JOINT T5JI -14. -11. 18. -40.000 73.000
JOINT T5JJ -9. -11. 18. -40.000 73.000
JOINT T5JK -14. -14. 18. 73.000
JOINT T5JL -9. -14. 18. 73.000
JOINT T5JO -9. -11. 6. 53.000
JOINT T5JP -9. -9. 6. -75.000 53.000
JOINT T5JQ -9. -8. 6. -75.000 53.000
JOINT T5JR -9. -7. 6. -75.000 53.000
JOINT T5JS -9. -6. 6. -75.000 53.000
JOINT T5JT -9. -5. 6. -75.000 53.000
JOINT T5JU -9. -11. 6. -40.000 53.000
JOINT T5JV -14. -11. 6. -40.000 53.000
JOINT T5JW -14. -14. 6. 53.000
JOINT T5JX -9. -14. 6. 53.000
JOINT T5JY -14. -14. 8. 30.500
JOINT T5JZ -14. -11. 8. -40.000 30.500
JOINT T5K4 -12. -14. 8.-80.000 30.500
JOINT T5K5 -12. -11. 8.-80.000-40.000 30.500
JOINT T5K6 -14. -14. 12. 40.500
JOINT T5K7 -14. -11. 12. -40.000 40.500
JOINT T5K8 -12. -14. 12.-80.000 40.500
JOINT T5K9 -12. -11. 12.-80.000-40.000 40.500
JOINT T5KA -14. -14. 16. 73.000
JOINT T5KB -14. -11. 16. -40.000 73.000
JOINT T5KC -12. -14. 16.-80.000 73.000
JOINT T5KD -12. -11. 16.-80.000-40.000 73.000
JOINT T5KE -12. -14. 6.-80.000 53.000
JOINT T5KF -12. -11. 6.-80.000-40.000 53.000
JOINT T5KH -12. -14. 14.-80.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B103 of 382

JOINT T5KI -12. -11. 14.-80.000-40.000 73.000


JOINT T5KL -14. -12. 16. -70.000 73.000
JOINT T5KM -10. -14. 6.-20.000 53.000
JOINT T5KN -10. -11. 6.-20.000-40.000 53.000
JOINT T5KO -10. -14. 10.-20.000 8.000
JOINT T5KP -10. -11. 10.-20.000-40.000 8.000
JOINT T5KQ -10. -14. 14.-20.000 73.000
JOINT T5KR -10. -11. 14.-20.000-40.000 73.000
JOINT T5KS -10. -14. 18.-20.000 73.000
JOINT T5KT -10. -11. 18.-20.000-40.000 73.000
JOINT T5KU -9. -13. 18. -13.300 73.000
JOINT T5KV -9. -12. 18. -26.700 73.000
JOINT T5KW -10. -13. 18.-20.000-13.300 73.000
JOINT T5KX -10. -12. 18.-20.000-26.700 73.000
JOINT T5KY -10. -13. 14.-20.000-13.300 73.000
JOINT T5KZ -10. -12. 14.-20.000-26.700 73.000
JOINT T5L0 -9. -12. 14. -26.700 73.000
JOINT T5L1 -9. -13. 14. -13.300 73.000
JOINT T5L2 -9. -13. 10. -13.300 8.000
JOINT T5L3 -9. -12. 10. -26.700 8.000
JOINT T5L4 -10. -13. 10.-20.000-13.300 8.000
JOINT T5L5 -10. -12. 10.-20.000-26.700 8.000
JOINT T5LA -12. -13. 16.-80.000-13.300 73.000
JOINT T5LB -12. -12. 16.-80.000-26.700 73.000
JOINT T5LC -12. -13. 12.-80.000-13.300 40.500
JOINT T5LD -12. -12. 12.-80.000-26.700 40.500
JOINT T5LG -14. -12. 16. -26.700 73.000
JOINT T5LH -14. -12. 12. -26.700 40.500
JOINT T5LJ -14. -13. 16. -13.300 73.000
JOINT T5LK -14. -13. 12. -13.300 40.500
JOINT T5LM -15. 8. 10. 40.000 8.000
JOINT T5LN -10. 8. 10. 40.000 8.000
JOINT T5LO -15. 11. 10. 8.000
JOINT T5LP -10. 11. 10. 8.000
JOINT T5LQ -15. 8. 14. 40.000 73.000
JOINT T5LR -10. 8. 14. 40.000 73.000
JOINT T5LS -15. 11. 14. 73.000
JOINT T5LT -10. 11. 14. 73.000
JOINT T5LU -15. 8. 18. 40.000 73.000
JOINT T5LV -10. 8. 18. 40.000 73.000
JOINT T5LW -15. 11. 18. 73.000
JOINT T5LX -10. 11. 18. 73.000
JOINT T5LY -10. 8. 6. 40.000 53.000
JOINT T5LZ -15. 8. 6. 40.000 53.000
JOINT T5M0 -15. 11. 6. 53.000
JOINT T5M1 -10. 11. 6. 53.000
JOINT T5M2 -15. 11. 8. 30.500
JOINT T5M3 -15. 8. 8. 40.000 30.500
JOINT T5M4 -13. 11. 8.-80.000 30.500
JOINT T5M5 -13. 8. 8.-80.000 40.000 30.500
JOINT T5M6 -15. 11. 12. 40.500
JOINT T5M7 -15. 8. 12. 40.000 40.500
JOINT T5M8 -13. 11. 12.-80.000 40.500
JOINT T5M9 -13. 8. 12.-80.000 40.000 40.500
JOINT T5MA -15. 11. 16. 73.000
JOINT T5MB -15. 8. 16. 40.000 73.000
JOINT T5MC -13. 11. 16.-80.000 73.000
JOINT T5MD -13. 8. 16.-80.000 40.000 73.000
JOINT T5ME -13. 11. 6.-80.000 53.000
JOINT T5MF -13. 8. 6.-80.000 40.000 53.000
JOINT T5MG -13. 11. 14.-80.000 73.000
JOINT T5MH -13. 8. 14.-80.000 40.000 73.000
JOINT T5MJ -15. 9. 12. 70.000 40.500
JOINT T5MK -15. 9. 16. 70.000 73.000
JOINT T5ML -11. 11. 6.-20.000 53.000
JOINT T5MM -11. 8. 6.-20.000 40.000 53.000
JOINT T5MN -11. 11. 10.-20.000 8.000
JOINT T5MO -11. 8. 10.-20.000 40.000 8.000
JOINT T5MP -11. 11. 14.-20.000 73.000
JOINT T5MQ -11. 8. 14.-20.000 40.000 73.000
JOINT T5MR -11. 11. 18.-20.000 73.000
JOINT T5MS -11. 8. 18.-20.000 40.000 73.000
JOINT T5MT -10. 10. 18. 13.300 73.000
JOINT T5MU -10. 9. 18. 26.700 73.000
JOINT T5MV -11. 10. 18.-20.000 13.300 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B104 of 382

JOINT T5MW -11. 9. 18.-20.000 26.700 73.000


JOINT T5MX -11. 10. 14.-20.000 13.300 73.000
JOINT T5MY -11. 9. 14.-20.000 26.700 73.000
JOINT T5MZ -10. 9. 14. 26.700 73.000
JOINT T5N0 -10. 10. 14. 13.300 73.000
JOINT T5N1 -10. 10. 10. 13.300 8.000
JOINT T5N2 -10. 9. 10. 26.700 8.000
JOINT T5N3 -11. 10. 10.-20.000 13.300 8.000
JOINT T5N4 -11. 9. 10.-20.000 26.700 8.000
JOINT T5N9 -13. 10. 16.-80.000 13.300 73.000
JOINT T5NA -13. 9. 16.-80.000 26.700 73.000
JOINT T5NB -13. 10. 12.-80.000 13.300 40.500
JOINT T5NF -15. 9. 16. 26.700 73.000
JOINT T5NC -13. 9. 12.-80.000 26.700 40.500
JOINT T5NG -15. 9. 12. 26.700 40.500
JOINT T5NI -15. 10. 16. 13.300 73.000
JOINT T5NJ -15. 10. 12. 13.300 40.500
JOINT T5NL -6. 9. 14. 73.000
JOINT T5NM -6. 10. 14. 73.000
JOINT T5NN -9. 10. 14.-50.000 73.000
JOINT T5NO -9. 9. 14.-50.000 73.000
JOINT T5NP -9. 8. 14.-50.000 73.000
JOINT T5NQ -9. 6. 14.-50.000 75.000 73.000
JOINT T5NR -9. 5. 14.-50.000 75.000 73.000
JOINT T5NS -15. 6. 14. 75.000 73.000
JOINT T5NT -10. 8. 14. 73.000
JOINT T5NU -10. 6. 14. 75.000 73.000
JOINT T5NV -10. 5. 14. 75.000 73.000
JOINT T5NW -10. 8. 10. 8.000
JOINT T5NX -10. 6. 10. 75.000 8.000
JOINT T5NY -10. 5. 10. 75.000 8.000
JOINT T5NZ -10. 8. 6. 53.000
JOINT T5O0 -10. 6. 6. 75.000 53.000
JOINT T5O1 -10. 5. 6. 75.000 53.000
JOINT T5O2 -10. 8. 18. 73.000
JOINT T5O3 -10. 6. 18. 75.000 73.000
JOINT T5O4 -10. 5. 18. 75.000 73.000
JOINT T5O5 -15. 0. 14. 73.000
JOINT T5O6 -15. -5. 14. 73.000
JOINT T5O7 -15. -4. 14. -25.000 73.000
JOINT T5O8 -15. -3. 14. -50.000 73.000
JOINT T5O9 -15. -2. 14. -50.000 73.000
JOINT T5OA -15. -1. 14. -25.000 73.000
JOINT T5OB -15. 1. 14. 25.000 73.000
JOINT T5OF -15. 5. 14. 73.000
JOINT T5PF -9. 4. 6.-30.000 53.000
JOINT T5OC -15. 2. 14. 50.000 73.000
JOINT T5OD -15. 3. 14. 50.000 73.000
JOINT T5OE -15. 4. 14. 25.000 73.000
JOINT T5OG -15. -6. 14. -75.000 73.000
JOINT T5OH -15. -7. 14. -75.000 73.000
JOINT T5OI -15. -8. 14. -75.000 73.000
JOINT T5OJ -15. -9. 14. -75.000 73.000
JOINT T5OK -11. -5. 6.-80.000-75.000 53.000
JOINT T5OL -6. -13. 10. 8.000
JOINT T5OM -8. -13. 10.-35.000 8.000
JOINT T5ON -8. -11. 10.-35.000 8.000
JOINT T5OO -7. -13. 10.-17.500 8.000
JOINT T5OP -7. -11. 10.-17.500 8.000
JOINT T5OQ -6. -12. 10. 8.000
JOINT T5OR -7. -12. 10.-17.500 8.000
JOINT T5OS -8. -12. 10.-35.000 8.000
JOINT T5OT -6. -13. 14. 73.000
JOINT T5OU -8. -13. 14.-35.000 73.000
JOINT T5OV -8. -11. 14.-35.000 73.000
JOINT T5OW -7. -13. 14.-17.500 73.000
JOINT T5OX -7. -11. 14.-17.500 73.000
JOINT T5OY -6. -12. 14. 73.000
JOINT T5OZ -8. -12. 14.-35.000 73.000
JOINT T5P0 -7. -12. 14.-17.500 73.000
JOINT T5P1 -6. -13. 18.-30.000 73.000
JOINT T5P2 -8. -13. 18.-35.000 73.000
JOINT T5P3 -8. -11. 18.-35.000 73.000
JOINT T5P4 -6. -11. 18.-30.000 73.000
JOINT T5P5 -7. -13. 18.-32.500 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B105 of 382

JOINT T5P6 -7. -11. 18.-32.500 73.000


JOINT T5P7 -1. -5. 6. -75.000 3.000
JOINT T5P8 -1. 5. 6. 75.000 3.000
JOINT T5P9 -7. -12. 18.-32.500 73.000
JOINT T5PA -8. -11. 6.-35.000 53.000
JOINT T5PB -10. 5. 6.-50.000 53.000
JOINT T5PC -10. 4. 6.-50.000 53.000
JOINT T5PD -10. 3. 6.-50.000 53.000
JOINT T5PE -9. 5. 6.-30.000 53.000
JOINT T5PG -9. 3. 6.-30.000 53.000
JOINT T5PH -9. 3. 6.-30.000 85.000 53.000
JOINT T5PI -10. 3. 6.-50.000 85.000 53.000
JOINT T5PJ -9. 4. 6.-30.000 45.000 53.000
JOINT T5PK -10. 4. 6.-50.000 45.000 53.000
JOINT T5PL -9. 4. 6.-90.000 45.000 53.000
JOINT T5PQ -9. 0. 7.-95.100 13.000
JOINT T5PT -6. 0. 7.-95.100 13.000
JOINT T5PW -9. 2. 7.-95.100 35.000 13.000
JOINT T5PX -6. 2. 7.-95.100 35.000 13.000
JOINT T5PY -11. 2. 6. 35.000 53.000
JOINT T5PZ -6. 2. 6. 35.000 53.000
JOINT T5Q0 -6. 3. 6.-95.100 53.000
JOINT T5Q1 -6. 2. 6.-95.100 35.000 53.000
JOINT T5Q2 -9. 2. 6.-95.100 35.000 53.000
JOINT T5Q3 -9. 3. 6.-95.100 53.000
JOINT T5Q4 -6. 0. 6. 50.000 53.000
JOINT T5Q5 -1. 0. 6. 50.000 53.000
JOINT T5Q6 -6. 2. 6. 85.000 53.000
JOINT T5Q7 -1. 2. 6. 85.000 53.000
JOINT T5Q9 -5. 0. 6.-35.100 50.000 53.000
JOINT T5QB -3. 0. 6.-35.100 50.000 53.000
JOINT T5QG -1. 1. 6. 85.000 53.000
JOINT T5QH -6. 1. 6. 85.000 53.000
JOINT T5QK -6. 2. 7. 13.000
JOINT T5QL -3. 2. 7.-35.100 13.000
JOINT T5QO -6. 0. 7. 50.000 13.000
JOINT T5QP -3. 0. 7.-35.100 50.000 13.000
JOINT T5QQ -8. -3. 6.-95.000 53.000
JOINT T5QR -8. -1. 6.-95.000 53.000
JOINT T5QS -5. -3. 6. -5.000 53.000
JOINT T5QT -5. -1. 6. -5.000 53.000
JOINT T5QU -8. -2. 6.-95.000-80.000 53.000
JOINT T5QV -5. -2. 6. -5.000-80.000 53.000
JOINT T5QW -5. -1. 6. -5.000-40.000 53.000
JOINT T5QX -8. -1. 6.-95.000-40.000 53.000
JOINT T5QY -8. -2. 7.-95.000-80.000 13.000
JOINT T5R0 -8. -1. 7.-95.000-40.000 13.000
JOINT T5R1 -5. -2. 7. -5.000-80.000 13.000
JOINT T5R3 -5. -1. 7. -5.000-40.000 13.000
JOINT T5RA -6. -9. 7.-80.000-75.000 13.000
JOINT T5RC -6. -7. 7.-80.000-75.000 13.000
JOINT T5RD -2. -7. 7.-80.000-75.000 13.000
JOINT T5RF -2. -9. 7.-80.000-75.000 13.000
JOINT T5RG -11. -7. 7.-70.000-75.000 13.000
JOINT T5RI -11. -9. 7.-70.000-75.000 13.000
JOINT T5RJ -7. -7. 7.-70.000-75.000 13.000
JOINT T5RL -7. -9. 7.-70.000-75.000 13.000
JOINT T5RM -3. -5. 6.-35.100 53.000
JOINT T5RN -4. -5. 6.-36.000 53.000
JOINT T5RO -4. -4. 6.-36.000 53.000
JOINT T5RP -4. -5. 6.-36.000-75.000 53.000
JOINT T5RQ -3. -4. 6.-35.100 53.000
JOINT T5RR -3. -5. 6.-35.100-75.000 53.000
JOINT T5RS -3. -7. 10.-91.000-75.000 8.000
JOINT T5RT -3. -8. 10.-91.000-75.000 8.000
JOINT T5RU -1. -7. 10.-91.000-75.000 8.000
JOINT T5RV -1. -8. 10.-91.000-75.000 8.000
JOINT T5RW -1. -6. 10.-91.000-75.000 8.000
JOINT T5RX -3. -7. 10.-91.000-45.000 8.000
JOINT T5RY -1. -7. 10.-91.000-45.000 8.000
JOINT T5RZ -4. -5. 10. -75.000 8.000
JOINT T5S0 -4. -5. 10. 8.000
JOINT T5S1 -4. -4. 10. 8.000
JOINT T5S2 -3. -5. 10. -75.000 8.000
JOINT T5S3 -3. -5. 10. 8.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B106 of 382

JOINT T5S4 -3. -4. 10. 8.000


JOINT T5S5 -6. 4. 14.-90.400 25.000 73.000
JOINT T5S6 -6. 4. 14.-63.100 25.000 73.000
JOINT T5S7 -6. 2. 14.-90.400 50.000 73.000
JOINT T5S8 -6. 2. 14.-63.100 50.000 73.000
JOINT T5S9 -6. 4. 15.-90.400 25.000 33.000
JOINT T5SA -6. 4. 15.-63.100 25.000 33.000
JOINT T5SB -6. 2. 15.-90.400 50.000 33.000
JOINT T5SH -4. 3. 14. -6.000 50.000 73.000
JOINT T5SI -3. 3. 14.-65.400 50.000 73.000
JOINT T5SJ -4. 0. 14. -6.000 73.000
JOINT T5SK -3. 0. 14.-65.400 73.000
JOINT T5SL -4. 0. 15. -6.000 33.000
JOINT T5SM -3. 0. 15.-65.400 33.000
JOINT T5SN -4. 3. 15. -6.000 50.000 33.000
JOINT T5SO -3. 3. 15.-65.400 50.000 33.000
JOINT T5ST -4. -8. 14.-13.000-75.000 73.000
JOINT T5SU -4. -9. 14.-13.000-75.000 73.000
JOINT T5SV -3. -8. 14. -7.000-75.000 73.000
JOINT T5SW -3. -9. 14. -7.000-75.000 73.000
JOINT T5SX -4. -8. 15.-13.000-75.000 33.000
JOINT T5SY -4. -9. 15.-13.000-75.000 33.000
JOINT T5SZ -3. -8. 15. -7.000-75.000 33.000
JOINT T5T0 -3. -9. 15. -7.000-75.000 33.000
JOINT T5T1 -8. 5. 18.-45.000 73.000
JOINT T5T2 -8. 5. 18.-45.000 75.000 73.000
JOINT T5T3 -2. 5. 18.-45.000 73.000
JOINT T5T4 -2. 5. 18.-45.000 75.000 73.000
JOINT T5T6 -8. 6. 19.-45.000 75.000 33.000
JOINT T5T9 -8. 4. 19.-45.000 25.000 33.000
JOINT T5TD -2. 6. 19.-45.000 75.000 33.000
JOINT T5TE -3. -5. 18.-95.000-75.000 73.000
JOINT T5TF -2. -5. 18.-45.000-75.000 73.000
JOINT T5SC -6. 2. 15.-63.100 50.000 33.000
JOINT T5TC -2. 4. 19.-45.000 25.000 33.000
JOINT T5TG -3. -4. 18.-95.000-75.000 73.000
JOINT T5TH -2. -4. 18.-45.000-75.000 73.000
JOINT T5TI -3. -6. 19.-95.000-75.000 33.000
JOINT T5TJ -2. -6. 19.-45.000-75.000 33.000
JOINT T5TK -3. -5. 19.-95.000-75.000 33.000
JOINT T5TL -2. -5. 19.-45.000-75.000 33.000
JOINT T5TO -3. -4. 19.-95.000-75.000 33.000
JOINT T5TP -2. -4. 19.-45.000-75.000 33.000
JOINT T5TQ -3. -2. 18.-95.000 73.000
JOINT T5TR -2. -2. 18.-45.000 73.000
JOINT T5TS -3. -3. 18.-95.000-55.000 73.000
JOINT T5TT -2. -3. 18.-45.000-55.000 73.000
JOINT T5TU -3. -2. 18.-95.000-55.000 73.000
JOINT T5TV -2. -2. 18.-45.000-55.000 73.000
JOINT T5TW -3. -3. 19.-95.000-55.000 33.000
JOINT T5TX -2. -3. 19.-45.000-55.000 33.000
JOINT T5U0 -3. -2. 19.-95.000-55.000 33.000
JOINT T5U1 -2. -2. 19.-45.000-55.000 33.000
JOINT T5U2 -11. -9. 18. -35.000 73.000
JOINT T5U3 -9. -9. 18. -35.000 73.000
JOINT T5U4 -6. -9. 18. -35.000 73.000
JOINT T5U5 -10. -8. 18.-20.000-75.000 73.000
JOINT T5U6 -10. -9. 18.-20.000-35.000 73.000
JOINT T5U7 -11. -7. 18. -35.000 73.000
JOINT T5U8 -9. -7. 18. -35.000 73.000
JOINT T5U9 -6. -7. 18. -35.000 73.000
JOINT T5UA -10. -7. 18.-20.000-35.000 73.000
JOINT T5UB -10. -9. 19.-20.000-75.000 33.000
JOINT T5UE -10. -6. 19.-20.000-75.000 33.000
JOINT T5UF -6. -9. 19. -75.000 33.000
JOINT T5UI -6. -6. 19. -75.000 33.000
JOINT T5UN -6. -13. 14.-70.000 73.000
JOINT T5UO -21. -5. 18. -6.100-75.000 73.000
JOINT T5UP -21. 0. 18. -6.100 73.000
JOINT T5UQ -24. 2. 21. -8.000 29.200 78.000
JOINT T5UR -24. 1. 21. -8.000 29.200 78.000
JOINT T5US -24. 0. 21. -8.000 78.000
JOINT T5UT -24. 0. 21. -8.000-75.000 78.000
JOINT T5UU -24. -1. 21. -8.000-75.000 78.000
JOINT T5UV -24. -2. 21. -8.000-75.000 78.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B107 of 382

JOINT T5UW -24. -3. 21. -8.000-75.000 78.000


JOINT T5UX -24. -4. 21. -8.000-75.000 78.000
JOINT T5UY -24. -5. 21. -8.000-75.000 78.000
JOINT T5UZ -24. -6. 21. -8.000-72.900 78.000
JOINT T5V0 -15. 0. 21. 78.000
JOINT T5V1 -15. 1. 21. 29.200 78.000
JOINT T5V2 -15. 2. 21. 29.200 78.000
JOINT T5V3 -15. 3. 21. 25.200 78.000
JOINT T5V4 -15. 4. 21. 29.200 78.000
JOINT T5V5 -15. 5. 21. 75.000 78.000
JOINT T5V6 -15. 6. 21. 27.100 78.000
JOINT T5V7 -15. 11. 21. 78.000
JOINT T5V8 -15. 7. 21. 13.600 78.000
JOINT T5V9 -15. 8. 21. 0.100 78.000
JOINT T5VA -15. 9. 21. 0.100 78.000
JOINT T5VB -15. 10. 21. 0.100 78.000
JOINT T5VC -15. 8. 21. 40.000 78.000
JOINT T5VD -21. 11. 21. -6.100 0.100 78.000
JOINT T5VE -21. 7. 21. -6.100 37.100 78.000
JOINT T5VF -21. 8. 21. -6.100 40.100 78.000
JOINT T5VG -21. 9. 21. -6.100 80.100 78.000
JOINT T5VJ -19. 6. 21. -4.100 27.100 78.000
JOINT T5VK -17. 6. 21. -2.000 27.100 78.000
JOINT T5VR -6. -13. 18.-70.000 73.000
JOINT T5VS -11. 4. 10. 45.000 8.000
JOINT T5VT -15. 4. 10. 45.000 8.000
JOINT T5VU -15. 2. 10. 44.800 8.000
JOINT T5VV -11. 2. 10. 44.800 8.000
JOINT T5VW -3. 5. 10.-19.600 8.000
JOINT T5VX -3. 5. 10.-19.600 75.000 8.000
JOINT T5VY -2. 1. 10.-99.600 8.000
JOINT T5VZ -2. 2. 10.-99.600 8.000
JOINT T5W0 -2. -1. 10.-99.600 8.000
JOINT T5W1 -2. -2. 10.-99.600 8.000
JOINT T5W2 -10. -2. 10.-44.600 8.000
JOINT T5W3 -10. -1. 10.-44.600 8.000
JOINT T5W4 -10. 1. 10.-44.600 8.000
JOINT T5W5 -10. 2. 10.-44.600 8.000
JOINT T5W6 -12. -6. 10.-41.900-75.000 8.000
JOINT T5W7 -12. -5. 10.-41.900-75.000 8.000
JOINT T5W8 -9. 5. 10.-58.500 8.000
JOINT T5W9 -7. 5. 10.-68.500 8.000
JOINT T5WA -9. 5. 10.-58.500 75.000 8.000
JOINT T5WB -4. 5. 10.-45.600 8.000
JOINT T5WD -9. -1. 10.-19.700 8.000
JOINT T5WE -9. -2. 10.-19.700 8.000
JOINT T5WF -2. 0. 10.-99.600 8.000
JOINT T5WC -4. 5. 10.-45.600 75.000 8.000
JOINT T5WG -12. -7. 10.-41.900-75.000 8.000
JOINT T5WH -12. -8. 10.-41.900-75.000 8.000
JOINT T5WI -12. -9. 10.-41.900-75.000 8.000
JOINT T5WJ -5. -5. 10.-22.000-75.000 8.000
JOINT T5WK -5. -6. 10.-22.000-75.000 8.000
JOINT T5WL -5. -8. 10.-22.000-75.000 8.000
JOINT T5WM -5. -9. 10.-22.000-75.000 8.000
JOINT T5WN -10. -5. 6.-50.000 53.000
JOINT T5WO -10. -4. 6.-50.000 53.000
JOINT T5WP -10. -5. 10.-40.000 8.000
JOINT T5WQ -10. -3. 10.-40.000 8.000
JOINT T5WR -5. -5. 10.-40.000 8.000
JOINT T5WS -5. -4. 10.-40.000 8.000
JOINT T5WT -5. -3. 10.-40.000 8.000
JOINT T5WU -5. -2. 10.-40.000 8.000
JOINT T5WW -5. -4. 10.-40.000-50.000 8.000
JOINT T5WX -6. -4. 10. -50.000 8.000
JOINT T5WY -10. -2. 10.-40.000-50.000 8.000
JOINT T5WZ -5. -2. 10.-40.000-50.000 8.000
JOINT T5X0 -6. -2. 10. -50.000 8.000
JOINT T5X1 -14. 5. 14.-40.500 73.000
JOINT T5X2 -14. 5. 14.-40.500 75.000 73.000
JOINT T5X3 -13. 5. 14. -6.800 75.000 73.000
JOINT T5X4 -13. 5. 14. -6.800 73.000
JOINT T5X5 -11. -3. 14.-61.100-50.000 73.000
JOINT T5X6 -11. -4. 14.-61.100-25.000 73.000
JOINT T5X7 -12. -3. 14.-67.600-50.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B108 of 382

JOINT T5X8 -12. -4. 14.-67.600-25.000 73.000


JOINT T5X9 -12. -2. 18.-10.000 73.000
JOINT T5XA -13. -2. 18.-10.000 73.000
JOINT T5XB -13. 1. 18.-10.000 73.000
JOINT T5XC -12. 1. 18.-10.000 73.000
JOINT T5XD -12. -2. 18.-10.000-25.000 73.000
JOINT T5XE -13. -2. 18.-10.000-25.000 73.000
JOINT T5XF -13. 0. 18.-10.000-75.000 73.000
JOINT T5XG -12. 0. 18.-10.000-75.000 73.000
JOINT T5XH -13. 0. 18.-10.000 75.000 73.000
JOINT T5XI -12. 0. 18.-10.000 75.000 73.000
JOINT T5XJ -12. 3. 18.-10.000 73.000
JOINT T5XK -13. 3. 18.-10.000 73.000
JOINT T5XL -13. 2. 18.-10.000 25.000 73.000
JOINT T5XM -12. 2. 18.-10.000 25.000 73.000
JOINT T5XN -11. 4. 10.-86.000 45.000 8.000
JOINT T5XO -11. 2. 10.-86.000 44.800 8.000
JOINT T5XP -12. 4. 10.-53.000 45.000 8.000
JOINT T5XQ -12. 2. 10.-53.000 44.800 8.000
JOINT T5XR -12. 4. 10.-53.000 45.000 68.000
JOINT T5XS -11. 4. 10.-86.000 45.000 68.000
JOINT T5XT -11. 2. 10.-86.000 44.800 68.000
JOINT T5XU -12. 2. 10.-53.000 44.800 68.000
JOINT T5XV -12. 0. 10.-53.000 68.000
JOINT T5XW -11. 0. 10.-86.000 68.000
JOINT T5XX -12. 2. 10.-53.000 68.000
JOINT T5XY -11. 2. 10.-86.000 68.000
JOINT T5Y4 -8. 2. 18.-50.000 73.000
JOINT T5Y6 -6. 3. 19. 33.000
JOINT T5Y8 -6. 1. 19. 33.000
JOINT T5Y9 -8. 1. 19.-50.000 33.000
JOINT T5YB -8. 3. 19.-50.000 33.000
JOINT T5YF -6. -1. 19. 33.000
JOINT T5YC -8. -2. 18.-50.000 73.000
JOINT T5YD -6. -3. 19. 33.000
JOINT T5YG -8. -3. 19.-50.000 33.000
JOINT T5YI -8. -1. 19.-50.000 33.000
JOINT T5YJ -13. 2. 19.-10.000 25.000 33.000
JOINT T5YK -12. 2. 19.-10.000 25.000 33.000
JOINT T5YL -12. 0. 19.-10.000 75.000 33.000
JOINT T5YM -13. 0. 19.-10.000 75.000 33.000
JOINT T5YN -12. 0. 19.-10.000-75.000 33.000
JOINT T5YO -13. 0. 19.-10.000-75.000 33.000
JOINT T5YP -12. -2. 19.-10.000-25.000 33.000
JOINT T5YQ -13. -2. 19.-10.000-25.000 33.000
JOINT T5Z0 -5. -3. 10.-40.000 68.000
JOINT T5Z3 -5. -5. 10.-40.000 68.000
JOINT T5Z4 -9. -3. 10. 68.000
JOINT T5Z7 -9. -5. 10. 68.000
JOINT T5ZD -2. 0. 6.-50.800 53.000
JOINT T5ZF -2. 1. 6.-50.800 53.000
JOINT T5ZC -10. 5. 10.-44.600 75.000 8.000
JOINT T5ZE -2. 0. 6.-50.800 50.000 53.000
JOINT T5ZG -2. -1. 6.-50.800 53.000
JOINT T5ZH -2. -2. 6.-50.800 53.000
JOINT T5ZI -2. -3. 6.-50.800 53.000
JOINT T5ZJ -9. 5. 6.-14.000 75.000 53.000
JOINT T5ZK -9. 5. 6.-14.000 53.000
JOINT T5ZL -9. 4. 6.-14.000 53.000
JOINT T5ZM -9. 3. 6.-14.000 53.000
JOINT T5ZN 11. -4. 10. -53.300 8.000
JOINT T5ZO 10. -4. 10. -53.300 8.000
JOINT T5ZP 9. -4. 10. 30.000-53.300 8.000
JOINT T5ZQ 8. -4. 10. 40.000-53.300 8.000
JOINT T5ZR 7. -4. 10. 40.000-53.300 8.000
JOINT T5ZS 6. -4. 10. 65.000-53.300 8.000
JOINT T5ZT 5. -4. 10. 90.000-53.300 8.000
JOINT T5ZU 5. -4. 10. 10.000-53.300 8.000
JOINT T5ZV 4. -4. 10. 20.000-53.300 8.000
JOINT T5ZW 3. -4. 10. 40.000-53.300 8.000
JOINT T5ZX 2. -4. 10. 30.000-53.300 8.000
JOINT T5ZY 1. -4. 10. 20.000-53.300 8.000
JOINT T5ZZ 0. -4. 10. 10.000-53.300 8.000
JOINT T600 -1. -4. 10. -53.300 8.000
JOINT T601 11. 4. 10. 53.300 8.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B109 of 382

JOINT T602 10. 4. 10. 53.300 8.000


JOINT T603 9. 4. 10. 30.000 53.300 8.000
JOINT T604 8. 4. 10. 40.000 53.300 8.000
JOINT T605 7. 4. 10. 40.000 53.300 8.000
JOINT T606 6. 4. 10. 65.000 53.300 8.000
JOINT T607 5. 4. 10. 90.000 53.300 8.000
JOINT T608 5. 4. 10. 10.000 53.300 8.000
JOINT T609 4. 4. 10. 20.000 53.300 8.000
JOINT T60A 3. 4. 10. 40.000 53.300 8.000
JOINT T60B 2. 4. 10. 30.000 53.300 8.000
JOINT T60D 0. 4. 10. 10.000 53.300 8.000
JOINT T60E -1. 4. 10. 53.300 8.000
JOINT T60F 11. -3. 10. -71.700 8.000
JOINT T60C 1. 4. 10. 20.000 53.300 8.000
JOINT T60G 10. -3. 10. -71.700 8.000
JOINT T60H 9. -3. 10. 30.000-71.700 8.000
JOINT T60I 8. -3. 10. 40.000-71.700 8.000
JOINT T60J 7. -3. 10. 40.000-71.700 8.000
JOINT T60K 6. -3. 10. 65.000-71.700 8.000
JOINT T60L 5. -3. 10. 90.000-71.700 8.000
JOINT T60M 5. -3. 10. 10.000-71.700 8.000
JOINT T60N 4. -3. 10. 20.000-71.700 8.000
JOINT T60O 3. -3. 10. 40.000-71.700 8.000
JOINT T60P 2. -3. 10. 30.000-71.700 8.000
JOINT T60Q 11. 3. 10. 71.700 8.000
JOINT T60R 10. 3. 10. 71.700 8.000
JOINT T60S 9. 3. 10. 30.000 71.700 8.000
JOINT T60T 8. 3. 10. 40.000 71.700 8.000
JOINT T60U 7. 3. 10. 40.000 71.700 8.000
JOINT T60V 6. 3. 10. 65.000 71.700 8.000
JOINT T60W 5. 3. 10. 90.000 71.700 8.000
JOINT T60X 5. 3. 10. 10.000 71.700 8.000
JOINT T60Y 4. 3. 10. 20.000 71.700 8.000
JOINT T60Z 3. 3. 10. 40.000 71.700 8.000
JOINT T610 2. 3. 10. 30.000 71.700 8.000
JOINT T611 -2. -3. 10.-50.500 8.000
JOINT T612 -2. -4. 10.-50.500 8.000
JOINT T613 -2. -5. 10.-50.500 8.000
JOINT T614 -2. -5. 10.-50.500-75.000 8.000
JOINT T615 -2. -6. 10.-50.500-75.000 8.000
JOINT T616 -2. -7. 10.-50.500-45.000 8.000
JOINT T617 -2. -8. 10.-50.500-75.000 8.000
JOINT T618 -2. -9. 10.-50.500-75.000 8.000
JOINT T619 -2. -11. 10.-50.500 8.000
JOINT T61A -4. -3. 10. -1.000 8.000
JOINT T61B -4. -9. 10. -1.000-75.000 8.000
JOINT T61D -4. -1. 10.-38.500 8.000
JOINT T61E -9. -3. 10. 8.000
JOINT T61F -9. -4. 10. 8.000
JOINT T61C -4. -11. 10. -1.000 8.000
JOINT T61G -9. 0. 10. -1.600 8.000
JOINT T61H -9. 5. 10. 75.000 8.000
JOINT T61I -9. 6. 10. 75.000 8.000
JOINT T61J -9. 5. 10. 8.000
JOINT T61K -9. 4. 10. 8.000
JOINT T61L -9. 3. 10. 8.000
JOINT T61M -9. 2. 10. 8.000
JOINT T61N -9. 1. 10. 8.000
JOINT T61O -9. 0. 10. 8.000
JOINT T61P -9. -1. 10. 8.000
JOINT T61Q -9. -2. 10. 8.000
JOINT T61T -9. -5. 10. 8.000
JOINT T61U -3. 2. 18.-38.400 73.000
JOINT T61V -3. 3. 18.-38.400 73.000
JOINT T61W -3. 4. 18.-38.400 73.000
JOINT T61X -3. 5. 18.-38.400 73.000
JOINT T61Y -3. 5. 18.-38.400 75.000 73.000
JOINT T61Z -3. 6. 18.-38.400 75.000 73.000
JOINT T620 -3. 8. 18.-38.400 73.000
JOINT T621 -3. 1. 18.-38.400 73.000
JOINT T622 -3. 0. 18.-38.400 73.000
JOINT T623 -3. -1. 18.-38.400 73.000
JOINT T624 -3. -2. 18.-38.400 73.000
JOINT T625 -3. -2. 18.-38.400-55.000 73.000
JOINT T626 -3. -3. 18.-38.400 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B110 of 382

JOINT T627 -3. -3. 18.-38.400-55.000 73.000


JOINT T628 -3. -4. 18.-38.400 73.000
JOINT T629 -3. -4. 18.-38.400-75.000 73.000
JOINT T62A -3. -5. 18.-38.400 73.000
JOINT T62B 11. -5. 14. 73.000
JOINT T62D 9. -5. 14. 30.000 73.000
JOINT T62E 8. -5. 14. 40.000 73.000
JOINT T62F 7. -5. 14. 15.000 73.000
JOINT T63D 8. -3. 14. 40.000-16.800 73.000
JOINT T63F 5. -3. 14. 90.000-16.800 73.000
JOINT T62C 10. -5. 14. 73.000
JOINT T62G 5. -5. 14. 90.000 73.000
JOINT T62H 5. -5. 14. 10.000 73.000
JOINT T62I 4. -5. 14. 20.000 73.000
JOINT T62J 3. -5. 14. 40.000 73.000
JOINT T62K 2. -5. 14. 30.000 73.000
JOINT T62L 1. -5. 14. 20.000 73.000
JOINT T62M 11. 5. 14. 73.000
JOINT T62X -1. 5. 14.-90.000 75.000 73.000
JOINT T62Y -1. 5. 14.-90.000 73.000
JOINT T62Z -1. 4. 14.-90.000 25.000 73.000
JOINT T630 -1. 3. 14.-90.000 50.000 73.000
JOINT T631 -1. 2. 14.-90.000 50.000 73.000
JOINT T632 -1. 1. 14.-90.000 25.000 73.000
JOINT T633 -1. 0. 14.-90.000 73.000
JOINT T634 -1. -1. 14.-90.000-25.000 73.000
JOINT T635 -1. -2. 14.-90.000-50.000 73.000
JOINT T636 -1. -3. 14.-90.000-50.000 73.000
JOINT T637 -1. -5. 14.-90.000 73.000
JOINT T638 -1. -4. 14.-90.000-25.000 73.000
JOINT T639 -1. -5. 14.-90.000-75.000 73.000
JOINT T63A 11. -3. 14. -16.800 73.000
JOINT T63B 10. -3. 14. -16.800 73.000
JOINT T63C 9. -3. 14. 30.000-16.800 73.000
JOINT T63E 7. -3. 14. 15.000-16.800 73.000
JOINT T63G 5. -3. 14. 10.000-16.800 73.000
JOINT T63H 4. -3. 14. 20.000-16.800 73.000
JOINT T63I 3. -3. 14. 40.000-16.800 73.000
JOINT T63J 11. 3. 14. 16.800 73.000
JOINT T63S 4. 0. 14. 20.000 73.000
JOINT T63T -3. 5. 14.-58.800 73.000
JOINT T63U -2. 5. 14.-60.800 73.000
JOINT T63V -2. 3. 14.-67.400 50.000 73.000
JOINT T63W -2. 4. 14.-60.800 25.000 73.000
JOINT T63X -2. 2. 14.-60.800 50.000 73.000
JOINT T63Y -3. 1. 14.-58.800 25.000 73.000
JOINT T63Z -2. 1. 14.-60.800 25.000 73.000
JOINT T640 -2. 0. 14.-60.800 73.000
JOINT T641 -7. -4. 14.-10.000-25.000 73.000
JOINT T642 -7. -5. 14.-10.000-75.000 73.000
JOINT T643 -7. -6. 14.-10.000-75.000 73.000
JOINT T644 0. 3. 10. 10.000 8.000
JOINT T645 0. 3. 10.-34.500 8.000
JOINT T646 0. 3. 11.-34.500 31.100
JOINT T647 2. 0. 10. 30.000 8.000
JOINT T648 1. 0. 10. 20.000 8.000
JOINT T649 2. 0. 10. 8.600 8.000
JOINT T64A 2. 0. 11. 8.600 71.100
JOINT T64B -1. -3. 10. -26.800 8.000
JOINT T64C 0. -3. 10. 10.000-26.800 8.000
JOINT T64D 0. -3. 10.-33.500-26.800 8.000
JOINT T64E 0. -3. 11.-33.500-26.800 31.100
JOINT T64F -10. 2. 14.-46.600 50.000 73.000
JOINT T64G -10. 2. 15.-46.600 50.000 57.300
JOINT T64H -9. -2. 14.-60.000-50.000 73.000
JOINT T64I -9. -1. 14.-60.000-25.000 73.000
JOINT T64J -9. -2. 14.-60.000 -9.800 73.000
JOINT T64K -9. -2. 16.-60.000 -9.800 3.000
JOINT T64L -8. -5. 14.-83.700 73.000
JOINT T64M -8. -4. 14.-83.700-25.000 73.000
JOINT T64N -8. -4. 14.-83.700-87.000 73.000
JOINT T64O -8. -4. 15.-83.700-87.000 79.500
JOINT T64P -6. -4. 14. -88.000 73.000
JOINT T64Q -6. -4. 15. -88.000 79.500
JOINT T64R -4. -5. 14.-21.600-75.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B111 of 382

JOINT T64S -4. -6. 14.-21.600-75.000 73.000


JOINT T64T -4. -5. 14.-21.600-75.000 12.200
JOINT T64U -4. -6. 14.-21.600-75.000 12.200
JOINT T64V -4. -6. 14.-21.600-25.000 12.200
JOINT T64W -3. -2. 14.-86.000-50.000 73.000
JOINT T64X -3. -1. 14.-86.000-25.000 73.000
JOINT T64Y -3. -1. 14.-86.000-99.200 73.000
JOINT T651 -3. -1. 16.-86.000-99.200 1.400
JOINT T655 -9. -13. 6. -13.300 53.000
JOINT T656 -9. -12. 6. -26.700 53.000
JOINT T657 -10. -13. 6.-20.000-13.300 53.000
JOINT T658 -10. -12. 6.-20.000-26.700 53.000
JOINT T659 -10. 9. 6. 26.700 53.000
JOINT T65A -10. 10. 6. 13.300 53.000
JOINT T65B -11. 9. 6.-20.000 26.700 53.000
JOINT T65E -13. 9. 8.-80.000 26.700 30.500
JOINT T65F -13. 10. 8.-80.000 13.300 30.500
JOINT T65C -11. 10. 6.-20.000 13.300 53.000
JOINT T65G -15. 9. 8. 26.700 30.500
JOINT T65H -15. 10. 8. 13.300 30.500
JOINT T65I -12. -13. 8.-80.000-13.300 30.500
JOINT T65J -12. -12. 8.-80.000-26.700 30.500
JOINT T65K -14. -13. 8. -13.300 30.500
JOINT T65L -14. -12. 8. -26.700 30.500
JOINT T65M -14. -12. 8. -70.000 30.500
JOINT T65N -15. 9. 8. 70.000 30.500
JOINT T65O -14. -12. 12. -70.000 40.500
JOINT T65P -10. 8. 6. 74.600 53.000
JOINT T65Q -10. 9. 6. 73.500 53.000
JOINT T65S -9. 9. 6.-25.000 73.500 53.000
JOINT T65T -9. 8. 6.-25.000 74.600 53.000
JOINT T65U -3. -3. 6.-35.100 53.000
JOINT T65V -3. -2. 6.-35.100 53.000
JOINT T65W -3. -1. 6.-35.100 53.000
JOINT T65X -3. 3. 6.-35.100 53.000
JOINT T65Y -3. 4. 6.-35.100 53.000
JOINT T65Z -3. 5. 6.-35.100 53.000
JOINT T660 -3. 5. 6.-35.100 75.000 53.000
JOINT T661 -3. 0. 6.-35.100 53.000
JOINT T662 -8. -9. 14.-27.500-75.000 73.000
JOINT T663 -6. -9. 14.-47.500-75.000 73.000
JOINT T664 -8. -8. 14.-27.500-75.000 73.000
JOINT T665 -8. -7. 14.-27.500-75.000 73.000
JOINT T666 -6. -8. 14.-47.500-75.000 73.000
JOINT T667 -6. -7. 14.-47.500-75.000 73.000
JOINT T668 -8. -9. 14.-27.500-40.000 73.000
JOINT T669 -6. -9. 14.-47.500-40.000 73.000
JOINT T66A -8. -8. 14.-27.500-20.000 73.000
JOINT T66B -6. -8. 14.-47.500-20.000 73.000
JOINT T66C -16. 5. 18.-27.000 75.000 73.000
JOINT T66D -16. 0. 18.-27.000 73.000
JOINT T66E -16. -5. 18.-27.000-75.000 73.000
JOINT T66F -17. 3. 18.-54.000 73.000
JOINT T66G -17. -3. 18.-54.000 73.000
JOINT T66H -16. 3. 18.-27.000 73.000
JOINT T66I -16. -3. 18.-27.000 73.000
JOINT T66J -15. -9. 21. -72.900 78.000
JOINT T66K -15. -8. 21. -72.900 78.000
JOINT T66L -15. -7. 21. -71.000 78.000
JOINT T66M -15. -6. 21. -72.900 78.000
JOINT T66N -15. -5. 21. -75.000 78.000
JOINT T66O -15. -11. 21. 78.000
JOINT T66P -5. -5. 6.-90.000-75.000 53.000
JOINT T66Q -6. -5. 6.-10.000-75.000 53.000
JOINT T66R -5. -5. 10.-81.600-75.000 8.000
JOINT T66S -6. -5. 10.-16.900-75.000 8.000
JOINT T66T -5. -5. 14.-89.000-75.000 73.000
JOINT T66U -6. -5. 14.-10.000-75.000 73.000
JOINT T66V -13. -5. 21.-72.800-75.000 78.000
JOINT T66W -14. -5. 21.-33.100-75.000 78.000
JOINT T66X -20. -5. 21.-90.200-75.000 78.000
JOINT T66Y -17. -5. 18.-36.300-75.000 73.000
JOINT T66Z -17. -5. 18.-70.600-75.000 73.000
JOINT T671 -21. -5. 18.-16.500-75.000 73.000
JOINT T672 0. -5. 18.-66.800-75.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B112 of 382

JOINT T673 -1. -5. 18.-32.900-75.000 73.000


JOINT T674 0. -5. 10.-71.100-75.000 8.000
JOINT T675 -1. -5. 10.-27.800-75.000 8.000
JOINT T676 -1. -5. 14.-27.800-75.000 73.000
JOINT T677 4. -5. 14. 90.000-75.000 73.000
JOINT T678 -3. 5. 6.-16.400 75.000 53.000
JOINT T679 -5. 5. 6.-81.300 75.000 53.000
JOINT T67A -6. 5. 6.-17.000 75.000 53.000
JOINT T67B -5. 5. 10.-73.500 75.000 8.000
JOINT T67C -6. 5. 10.-25.700 75.000 8.000
JOINT T67D -13. 5. 21.-73.800 75.000 78.000
JOINT T67E -14. 5. 21.-33.700 75.000 78.000
JOINT T67F -17. 5. 18.-36.300 75.000 73.000
JOINT T67H -17. 5. 18.-68.600 75.000 73.000
JOINT T67I 0. 5. 10.-70.700 75.000 8.000
JOINT T67J -1. 5. 10.-27.800 75.000 8.000
JOINT T67K 4. 5. 14. 90.000 75.000 73.000
JOINT T67L 0. 5. 18.-66.800 75.000 73.000
JOINT T67M -1. 5. 18.-42.100 75.000 73.000
JOINT T67O -11. 0. 14. 23.000 73.000
JOINT T67P -11. 0. 14. -23.000 73.000
JOINT T67T -11. 0. 21. 21.300 78.000
JOINT T67U -11. 0. 21. -21.300 78.000
JOINT T67W 11. 0. 14. 14.600 73.000
JOINT T67X 11. 0. 14. -14.600 73.000
JOINT T67Y -13. 0. 21.-71.200 78.000
JOINT T67Z -14. 0. 21.-32.800 78.000
JOINT T680 -17. 0. 18.-36.400 73.000
JOINT T681 -17. 0. 18.-70.500 73.000
JOINT T682 -20. 0. 21.-89.900 78.000
JOINT T683 -21. 0. 18.-16.400 73.000
JOINT T684 -11. 0. 18.-20.000 73.000
JOINT T685 -17. -5. 18.-54.000-62.200 73.000
JOINT T686 -17. -5. 18.-54.000-85.000 73.000
JOINT T687 -1. 0. 6. 17.500 53.000
JOINT T688 -1. 0. 6. -17.500 53.000
JOINT T689 -1. 0. 10. 16.100 8.000
JOINT T68A -1. 0. 10. -15.700 8.000
JOINT T68B -1. 0. 14. 13.100 73.000
JOINT T68D -1. -6. 6. -7.700 53.000
JOINT T68E -1. 5. 10. 50.600 8.000
JOINT T68F -1. -5. 10. -50.600 8.000
JOINT T68C -1. 0. 14. -13.100 73.000
JOINT T68G -1. -6. 10. -11.400 8.000
JOINT T68H -1. -5. 14. -56.500 73.000
JOINT T68I -1. 6. 14. 21.300 73.000
JOINT T68J -1. 5. 14. 44.600 73.000
JOINT T68K -1. 5. 18. 44.100 73.000
JOINT T68L -1. -5. 18. -43.900 73.000
JOINT T68M -15. 5. 10. 47.700 8.000
JOINT T68N -15. -6. 10. -2.300 8.000
JOINT T68O -15. -5. 10. -47.200 8.000
JOINT T68P -15. -10. 14. -75.600 73.000
JOINT T68Q -15. 0. 14. -21.300 73.000
JOINT T68R -15. 0. 14. 21.300 73.000
JOINT T68T -21. 6. 20. -6.100 27.100 28.000
JOINT T68U -17. 6. 20.-54.000 27.100 28.000
JOINT T68V -15. 6. 20. 27.100 28.000
JOINT T68W -15. 7. 20. 37.100 28.000
JOINT T68X -15. 8. 20. 40.100 28.000
JOINT T68Y -15. 9. 20. 80.100 28.000
JOINT T68Z -15. 11. 20. 0.100 28.000
JOINT T690 -21. 11. 20. -6.100 0.100 28.000
JOINT T691 -21. 7. 20. -6.100 37.100 28.000
JOINT T692 -21. 8. 20. -6.100 40.100 28.000
JOINT T693 -21. 9. 20. -6.100 80.100 28.000
JOINT T694 -17. 11. 20. -2.000 0.100 28.000
JOINT T695 -19. 11. 20. -4.100 0.100 28.000
JOINT T696 -19. 6. 20. -4.100 27.100 28.000
JOINT T697 -17. 6. 20. -2.000 27.100 28.000
JOINT T698 -19. 7. 20. -4.100 37.100 28.000
JOINT T699 -17. 7. 20. -2.000 37.100 28.000
JOINT T69A -19. 8. 20. -4.100 40.100 28.000
JOINT T69B -17. 8. 20. -2.000 40.100 28.000
JOINT T69F 2. 0. 6. 30.000 53.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B113 of 382

JOINT T69C -19. 9. 20. -4.100 80.100 28.000


JOINT T69D -17. 9. 20. -2.000 80.100 28.000
JOINT T69G 1. 0. 6. 20.000 53.000
JOINT T69H 0. 0. 6. 10.000 53.000
JOINT T69I -8. 1. 7.-45.100 17.500 53.000
JOINT T69J -7. -2. 7. -10.000 98.000
JOINT T69K -4. 1. 7.-67.500 25.000 53.000
JOINT T69L -4. -8. 7.-80.000-75.000 98.000
JOINT T69M -9. -8. 7.-70.000-75.000 98.000
JOINT T69N -3. 1. 15.-85.700 75.000 93.000
JOINT T69O -6. 3. 15.-76.700 37.500 93.000
JOINT T69P -3. -9. 16.-60.000-25.000 68.000
JOINT T69R -5. 5. 20.-45.000 50.000 43.000
JOINT T69S -3. -6. 19.-20.000-25.000 73.000
JOINT T69T -3. -5. 19.-20.000-25.000 73.000
JOINT T69U -3. -3. 19.-20.000 -5.000 73.000
JOINT T69V -8. -8. 19.-10.000-25.000 93.000
JOINT T69W -7. -3. 11.-20.000-75.000 53.000
JOINT T69Y -12. 1. 11.-20.000 8.000
JOINT T69Z -12. 3. 11.-20.000 44.900 8.000
JOINT T6A0 -12. 1. 19.-60.000 50.000 93.000
JOINT T6A1 -12. -1. 19.-60.000-50.000 93.000
JOINT T6A2 -7. 2. 19.-25.000 93.000
JOINT T6A3 -7. -2. 19.-25.000 93.000
JOINT T6A4 -6. 6. 19. 75.000 33.000
JOINT T6A5 -6. 4. 19. 25.000 33.000
JOINT T6A6 -1. -5. 5. -75.000 53.000
JOINT T6A7 -1. 5. 5. 75.000 53.000
JOINT T6A9 -8. 4. 18.-45.000 25.000 73.000
JOINT T6AA -2. 4. 18.-45.000 25.000 73.000
JOINT T6AB -6. 4. 18. 25.000 73.000
JOINT T6AC -7. -8. 10.-50.000-75.000 8.000
JOINT T6AD -7. -1. 10.-59.800 8.000
JOINT T6AE -7. -2. 10.-59.800 8.000
JOINT T6AF -4. -2. 10.-49.800 8.000
JOINT T6AG -4. -1. 10.-49.800 8.000
JOINT T6AH -8. -5. 14.-47.400-75.000 73.000
JOINT T6AI -8. -6. 14.-47.400-75.000 73.000
JOINT T6AJ -7. -5. 14.-50.000-75.000 73.000
JOINT T6AK -5. -9. 14.-22.000-75.000 73.000
JOINT T6AL -8. 5. 14.-37.200 75.000 73.000
JOINT T6AM -8. 5. 14.-37.200 73.000
JOINT T6AN -7. 5. 14.-50.000 73.000
JOINT T6AO -2. 5. 14.-96.100 75.000 73.000
JOINT T6AP -2. 5. 14.-96.100 73.000
JOINT T6AQ -2. 4. 14.-96.100 25.000 73.000
JOINT T6AR -2. 3. 14.-96.100 50.000 73.000
JOINT T6AS -2. 2. 14.-96.100 50.000 73.000
JOINT T6AT -2. 1. 14.-96.100 25.000 73.000
JOINT T6AU -2. 0. 14.-96.100 73.000
JOINT T6AV -2. -1. 14.-96.100-25.000 73.000
JOINT T6AW -2. -2. 14.-96.100-50.000 73.000
JOINT T6AX -2. -3. 14.-96.100-50.000 73.000
JOINT T6AY -2. -4. 14.-96.100-25.000 73.000
JOINT T6AZ -2. -5. 14.-96.100 73.000
JOINT T6B0 -4. 5. 14.-24.600 75.000 73.000
JOINT T6B1 -4. 5. 14.-24.600 73.000
JOINT T6B2 -11. -6. 14.-96.800-75.000 73.000
JOINT T6B3 -11. -5. 14.-96.800-75.000 73.000
JOINT T6B4 -16. 5. 18.-27.000 13.800 73.000
JOINT T6B5 -16. 4. 18.-27.000 6.600 73.000
JOINT T6B6 -15. 5. 18. 13.800 73.000
JOINT T6B7 -15. 4. 18. 6.600 73.000
JOINT T6B8 -16. 1. 18.-27.000 50.000 73.000
JOINT T6B9 -15. 1. 18. 50.000 73.000
JOINT T6BA -16. -1. 18.-27.000-50.000 73.000
JOINT T6BB -15. -1. 18. -50.000 73.000
JOINT T6BF -15. -5. 18. -6.200 73.000
JOINT T6BC -16. -5. 18.-27.000 -6.200 73.000
JOINT T6BD -16. -4. 18.-27.000 73.000
JOINT T6BE -17. -4. 18.-54.000 73.000
JOINT T6BG -12. -5. 18.-41.900-75.000 73.000
JOINT T6BH -12. -6. 18.-41.900-75.000 73.000
JOINT T6BI -8. -5. 18.-47.400-75.000 73.000
JOINT T6BJ -8. -6. 18.-47.400-75.000 73.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B114 of 382

JOINT T6BK -8. -8. 18.-47.400-75.000 73.000


JOINT T6BL -8. -9. 18.-47.400-75.000 73.000
JOINT T6BM -16. 11. 20. -1.000 0.100 28.000
JOINT T6BN -16. 9. 20. -1.000 80.100 28.000
JOINT T6BO -16. 8. 20. -1.000 40.100 28.000
JOINT T6BP -10. 5. 6. 53.000
JOINT TTTT -6. -12. 18.-30.000 73.000
JOINT TTTU 10. 3. 14. 75.000 73.000
AREA
AREAX1 49.7 -8.00 -11.00 10.981.0000061T219T216T2170062T2180074F
AREAX2 42.6 5.00 -5.75 10.981.0000055012300470005T166T132 F
AREAX3 65.1 -8.00 -11.00 15.071.000006100740057T50001030083 F
AREAX4 55.8 5.00 -5.75 15.071.000005501230047008201110079 F
AREAX5 56.0 -8.00 -11.00 19.401.0000120T493T492T50005320083 F
AREAX6 48.0 5.00 -5.75 19.401.0000082011100790117 F
AREAX7 33.5 -9.50 -11.00 22.921.0000120T4930133T501T312 F
************************
AREAXA 49.7 -8.00 8.00 10.981.000006400750056001101080077 F
AREAXB 42.6 5.00 5.75 10.981.0000006T179T131005401240046 F
AREAXC 72.1 -8.75 8.00 15.071.0000090T3300092006400750056 F
AREAXD 55.8 5.00 5.75 15.071.000005401240046009101120078 F
AREAXE 62.0 -8.75 8.00 19.401.0000090T3300092011601320121 F
AREAXF 48.0 5.00 5.75 19.401.0000091011200780115 F
AREAXG 49.0 -8.00 8.00 22.921.00001210131013201160531 F
*************************
AREAY1 67.4 -11.00 -1.50 10.981.000T218000000040015006200480049F
AREAY2 88.3 -11.00 -1.50 15.071.0000062004800040065010400800081F
AREAY3 76.0 -11.00 -1.50 19.401.0000104008000810088002401140133F
AREAY4 58.0 -11.00 -1.50 22.921.0000133011401130131T3140136T229F
************************
AREAYA 40.8 11.00 0.00 10.981.000T132T199T131004705270046 F
AREAYB 53.5 11.00 0.00 15.071.000004705270046007905280078 F
AREAYC 76.0 11.00 0.00 19.401.000008304290091004004710115 F
AREAYD 48.0 11.00 0.00 22.921.00000400471011701150531 F
CDM
CDM 0.696 1.712 1.177 1.391
CDM 200.00 0.696 1.712 1.177 1.391
LOAD
********************************************************************
********************************************************************
LOADCN 1 1.000 1.0000 1.000 1.000 1.0000
LOADLB1 COMPUTER GENERATED SELF-WEIGHT
DEAD
DEAD -Z M
LOADCN 8
LOADLB8 INSTALLATION AIDS
LOAD PAD1 -19.620 GLOB JOIN PAD-EYE
LOAD PAD2 -19.620 GLOB JOIN PAD-EYE
LOAD PAD3 -19.620 GLOB JOIN PAD-EYE
LOAD PAD4 -19.620 GLOB JOIN PAD-EYE
LOAD PAD1 -4.9050 GLOB JOIN SCHKLE
LOAD PAD2 -4.9050 GLOB JOIN SCHKLE
LOAD PAD3 -4.9050 GLOB JOIN SCHKLE
LOAD PAD4 -4.9050 GLOB JOIN SCHKLE
LOAD PAD1 -40.000 GLOB JOIN SLING
LOAD PAD2 -40.000 GLOB JOIN SLING
LOAD PAD3 -40.000 GLOB JOIN SLING
LOAD PAD4 -40.000 GLOB JOIN SLING
LOADCN CGX
LOAD 601L 101.000 GLOB JOIN MY<0
LOAD 681L 101.000 GLOB JOIN MY<0
LOAD 619L -101.00 GLOB JOIN MY<0
LOAD 699L -101.00 GLOB JOIN MY<0
LOADCN CGY
LOAD 699L 61.0000 GLOB JOIN MX<0
LOAD 681L 61.0000 GLOB JOIN MX<0
LOAD 601L -61.000 GLOB JOIN MX<0
LOAD 619L -61.000 GLOB JOIN MX<0
********************
*****************************
LOADCN CR1
LOAD 0531 -300.00 GLOB JOIN OPER
LOADCN CR2
LOAD 0531 2400.00 GLOB JOIN OPER-MX
LOADCN CR3
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B115 of 382

LOAD 0531 2400.00 GLOB JOIN OPER-MY


LOADCN CR4
LOAD 0531 -350.00 GLOB JOIN DD-EQ-OP
LOADCN CR5
LOAD 0531 -350.00 GLOB JOIN DD-EQ-RE
LOADCNBLLL
***LDS1** -7.000 12.500 -0.170 -3.000 12.500 -0.170 -7.000
***LDS2** 10.000 -0.170 -3.000 10.000 -0.170 5.000
***LDS3** 0.250 0 1 3 0 0BLLL -2EQUPPRESLIVE
***LDS1** -3.000 12.016 -0.170 -1.000 12.016 -0.170 -3.000
***LDS2** 10.000 -0.170 -1.000 10.000 -0.170 5.000
***LDS3** 0.250 0 1 3 0 0BLLL -2EQUPPRESLIVE
***LDS1** -9.000 12.500 1.030 -7.000 12.500 1.030 -9.000
***LDS2** 7.000 1.030 -7.000 7.000 1.030 5.000
***LDS3** 0.250 0 1 3 0 0BLLL -2EQUPPRESLIVE
***LDS1** -11.000 12.016 1.030 -9.000 12.016 1.030 -11.000
***LDS2** 10.000 1.030 -9.000 10.000 1.030 5.000
***LDS3** 0.250 0 1 3 0 0BLLL -2EQUPPRESLIVE
*****************ARCHITECTURAL**************************************************
LOADCNCDAR
***LDS1** -12.419 -6.750 12.480 -5.420 -6.750 12.480 -12.419
***LDS2** -9.750 12.480 -5.420 -9.750 12.480 2.400
***LDS3** 0.250 0 1 3 0 0CDAR -2EQUPPRESWALL-BT
LOAD Z T5WI0288 -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z 0288T5IH -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z 0289T5II -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z 0290T5IJ -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z 0291T5IK -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z 0292T5WM -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z 0293T5WL -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z 0294T5RS -2.40000.58000-2.4000 GLOB UNIF WALL-BT
LOAD Z 0295T5WK -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z T5970295 -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z T5990292 -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z T5IHT599 -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z T5IIT6AC -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z T5IJ0294 -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z T5IKT597 -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z T5W60291 -1.2000 -1.2000 GLOB UNIF WALL-BT
LOAD Z T5WG0290 -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z T5WH0289 -2.4000 -2.4000 GLOB UNIF WALL-BT
***LDS1** -12.419 -6.750 12.480 -5.420 -6.750 12.480 -12.419
***LDS2** -9.750 12.480 -5.420 -9.750 12.480 0.614
***LDS3** 0.250 0 1 3 0 0CDAR -2EQUPPRESFL-BT
LOAD Z T5WI0288 -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z 0288T5IH -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z 0289T5II -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z 0290T5IJ -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z 0291T5IK -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z 0292T5WM -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z 0293T5WL -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z 0294T5RS -0.61400.58000-0.6140 GLOB UNIF FL-BT
LOAD Z 0295T5WK -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z T5970295 -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z T5990292 -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z T5IHT599 -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z T5IIT6AC -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z T5IJ0294 -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z T5IKT597 -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z T5W60291 -0.3070 -0.3070 GLOB UNIF FL-BT
LOAD Z T5WG0290 -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z T5WH0289 -0.6140 -0.6140 GLOB UNIF FL-BT
***LDS1** -10.446 5.750 12.480 -3.196 5.750 12.480 -10.446
***LDS2** -1.000 12.480 -3.196 -1.000 12.480 1.593
***LDS3** 0.250 0 1 3 0 0CDAR -2EQUPPRESWALL-MVL
LOAD Z 0072T67B -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z 0522T67C -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T59BT5VX -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T5NYT5WA -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T5WAT61H -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T5WCT59B -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z 0249T61G 0.55400-1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z 0258T5WF -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z 0236T5W8 0.55400-1.3939 -1.3939 GLOB UNIF WALL-MVL
LOAD Z 0238T5WB -1.3939 -1.3939 GLOB UNIF WALL-MVL
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B116 of 382

LOAD Z 0252T61L 0.55400-1.5930 -1.5930 GLOB UNIF WALL-MVL


LOAD Z 0253T61K 0.55400-1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z 0257T6AG -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z 0259T5VY -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z 0260T59C -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z 02610270 -1.59302.80400-1.5930 GLOB UNIF WALL-MVL
LOAD Z 02620271 -1.59302.80400-1.5930 GLOB UNIF WALL-MVL
LOAD Z T59CT5VZ -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T59DT5W0 -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T5W3T5WD -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T5W4T61N -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T5W5T61M -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T5W8T61J -1.3939 -1.3939 GLOB UNIF WALL-MVL
LOAD Z T5W90238 -1.3939 -1.3939 GLOB UNIF WALL-MVL
LOAD Z T5WBT5VW -1.3939 -1.3939 GLOB UNIF WALL-MVL
LOAD Z T5WDT61P -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T5ZCT5NY -0.5973 -0.5973 GLOB UNIF WALL-MVL
***LDS1** -10.446 5.750 12.480 -3.196 5.750 12.480 -10.446
***LDS2** -1.000 12.480 -3.196 -1.000 12.480 0.705
***LDS3** 0.250 0 1 3 0 0CDAR -2EQUPPRESFL-MVLV
LOAD Z 0072T67B -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z 0522T67C -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T59BT5VX -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T5NYT5WA -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T5WAT61H -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T5WCT59B -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z 0249T61G 0.55400-0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z 0258T5WF -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z 0236T5W8 0.55400-0.6168 -0.6168 GLOB UNIF FL-MVLV
LOAD Z 0238T5WB -0.6168 -0.6168 GLOB UNIF FL-MVLV
LOAD Z 0252T61L 0.55400-0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z 0253T61K 0.55400-0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z 0257T6AG -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z 0259T5VY -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z 0260T59C -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z 02610270 -0.70502.80400-0.7050 GLOB UNIF FL-MVLV
LOAD Z 02620271 -0.70502.80400-0.7050 GLOB UNIF FL-MVLV
LOAD Z T59CT5VZ -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T59DT5W0 -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T5W3T5WD -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T5W4T61N -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T5W5T61M -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T5W8T61J -0.6168 -0.6168 GLOB UNIF FL-MVLV
LOAD Z T5W90238 -0.6168 -0.6168 GLOB UNIF FL-MVLV
LOAD Z T5WBT5VW -0.6168 -0.6168 GLOB UNIF FL-MVLV
LOAD Z T5WDT61P -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T5ZCT5NY -0.2643 -0.2643 GLOB UNIF FL-MVLV
***LDS1** -12.419 -6.750 12.480 -5.420 -6.750 12.480 -12.419
***LDS2** -9.750 12.480 -5.420 -9.750 12.480 0.780
***LDS3** 0.250 0 1 3 0 0CDAR -2EQUPPRESCEL-BT
LOAD Z T5WI0288 -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z 0288T5IH -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z 0289T5II -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z 0290T5IJ -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z 0291T5IK -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z 0292T5WM -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z 0293T5WL -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z 0294T5RS -0.78000.58000-0.7800 GLOB UNIF CEL-BT
LOAD Z 0295T5WK -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z T5970295 -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z T5990292 -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z T5IHT599 -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z T5IIT6AC -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z T5IJ0294 -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z T5IKT597 -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z T5W60291 -0.3900 -0.3900 GLOB UNIF CEL-BT
LOAD Z T5WG0290 -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z T5WH0289 -0.7800 -0.7800 GLOB UNIF CEL-BT
***LDS1** -10.446 5.750 12.480 -3.196 5.750 12.480 -10.446
***LDS2** -1.000 12.480 -3.196 -1.000 12.480 0.591
***LDS3** 0.250 0 1 3 0 0CDAR -2EQUPPRESCEL-MVLV
LOAD Z 0072T67B -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z 0522T67C -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z T59BT5VX -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z T5NYT5WA -0.2216 -0.2216 GLOB UNIF CEL-MVLV
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B117 of 382

LOAD Z T5WAT61H -0.2216 -0.2216 GLOB UNIF CEL-MVLV


LOAD Z T5WCT59B -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z 0249T61G 0.55400-0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z 0258T5WF -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z 0236T5W8 0.55400-0.5171 -0.5171 GLOB UNIF CEL-MVLV
LOAD Z 0238T5WB -0.5171 -0.5171 GLOB UNIF CEL-MVLV
LOAD Z 0252T61L 0.55400-0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z 0253T61K 0.55400-0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z 0257T6AG -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z 0259T5VY -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z 0260T59C -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z 02610270 -0.59102.80400-0.5910 GLOB UNIF CEL-MVLV
LOAD Z 02620271 -0.59102.80400-0.5910 GLOB UNIF CEL-MVLV
LOAD Z T59CT5VZ -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T59DT5W0 -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z T5W3T5WD -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z T5W4T61N -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T5W5T61M -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T5W8T61J -0.5171 -0.5171 GLOB UNIF CEL-MVLV
LOAD Z T5W90238 -0.5171 -0.5171 GLOB UNIF CEL-MVLV
LOAD Z T5WBT5VW -0.5171 -0.5171 GLOB UNIF CEL-MVLV
LOAD Z T5WDT61P -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z T5ZCT5NY -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z T61DT59D -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T61DT59D -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T61DT59D -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z T61GT61O -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T61GT61O -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T61GT61O -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T61H0522 -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T61H0522 -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T61H0522 -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z T61JT5W9 -1.3939 -1.3939 GLOB UNIF WALL-MVL
LOAD Z T61JT5W9 -0.6168 -0.6168 GLOB UNIF FL-MVLV
LOAD Z T61JT5W9 -0.5171 -0.5171 GLOB UNIF CEL-MVLV
LOAD Z T61K0262 -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T61K0262 -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T61K0262 -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T61L0261 -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T61L0261 -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T61L0261 -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T61M0260 -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T61M0260 -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T61M0260 -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T61N0259 -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T61N0259 -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T61N0259 -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T61O0258 -1.5930 -1.5930 GLOB UNIF WALL-MVL
LOAD Z T61O0258 -0.7050 -0.7050 GLOB UNIF FL-MVLV
LOAD Z T61O0258 -0.5910 -0.5910 GLOB UNIF CEL-MVLV
LOAD Z T61PT6AD -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T61PT6AD -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T61PT6AD -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z T67BT5WC -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T67BT5WC -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T67BT5WC -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z T67C0072 -0.5973 -0.5973 GLOB UNIF WALL-MVL
LOAD Z T67C0072 -0.2643 -0.2643 GLOB UNIF FL-MVLV
LOAD Z T67C0072 -0.2216 -0.2216 GLOB UNIF CEL-MVLV
LOAD Z T6AC0293 -2.4000 -2.4000 GLOB UNIF WALL-BT
LOAD Z T6AC0293 -0.6140 -0.6140 GLOB UNIF FL-BT
LOAD Z T6AC0293 -0.7800 -0.7800 GLOB UNIF CEL-BT
LOAD Z T6AD0257 -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T6AD0257 -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T6AD0257 -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOAD Z T6AGT61D -0.7965 -0.7965 GLOB UNIF WALL-MVL
LOAD Z T6AGT61D -0.3525 -0.3525 GLOB UNIF FL-MVLV
LOAD Z T6AGT61D -0.2955 -0.2955 GLOB UNIF CEL-MVLV
LOADCNCDEL
***LDS1** -13.387 -9.750 12.480 -7.500 -9.750 12.480 -13.387
***LDS2** -12.750 12.480 -7.500 -12.750 12.480 5.100
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-1-CE
LOAD Z T598T5WI -2.5500 -2.5500 GLOB UNIF EL-1-CE
LOAD Z T5IBT5WH 0.61300-5.1000 -5.1000 GLOB UNIF EL-1-CE
LOAD Z T5ICT5WG 0.61300-5.1000 -5.1000 GLOB UNIF EL-1-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B118 of 382

LOAD Z 0288T5IH -2.5500 -2.5500 GLOB UNIF EL-1-CE


LOAD Z 0289T5II -5.1000 -5.1000 GLOB UNIF EL-1-CE
LOAD Z 0290T5IJ -5.1000 -5.1000 GLOB UNIF EL-1-CE
LOAD Z 0291T5IK -2.5500 -2.5500 GLOB UNIF EL-1-CE
LOAD Z T596T5W6 -2.5500 -2.5500 GLOB UNIF EL-1-CE
***LDS1** -11.000 2.750 12.480 -4.000 2.750 12.480 -11.000
***LDS2** -1.000 12.480 -4.000 -1.000 12.480 3.620
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-2-CE
LOAD Z 0049T5ZC -1.5733 -1.5733 GLOB UNIF EL-2-CE
LOAD Z 0072T67B -1.3575 -1.3575 GLOB UNIF EL-2-CE
LOAD Z 0522T67C -1.3575 -1.3575 GLOB UNIF EL-2-CE
LOAD Z 0236T5W8 -3.1675 -3.1675 GLOB UNIF EL-2-CE
LOAD Z 0238T5WB -3.1675 -3.1675 GLOB UNIF EL-2-CE
LOAD Z 0251T5W5 -1.8100 -1.8100 GLOB UNIF EL-2-CE
LOAD Z 0252T61L -3.6200 -3.6200 GLOB UNIF EL-2-CE
LOAD Z 0253T61K -3.6200 -3.6200 GLOB UNIF EL-2-CE
LOAD Z 0260T59C -1.8100 -1.8100 GLOB UNIF EL-2-CE
LOAD Z 02610270 -3.62002.00000-3.6200 GLOB UNIF EL-2-CE
LOAD Z 02620271 -3.62002.00000-3.6200 GLOB UNIF EL-2-CE
***LDS1** -11.000 -1.000 12.480 -4.000 -1.000 12.480 -11.000
***LDS2** -4.000 12.480 -4.000 -4.000 12.480 2.140
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-3-CE
LOAD Z 0248T5W3 -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z 0249T61G -2.1400 -2.1400 GLOB UNIF EL-3-CE
LOAD Z 0250T5W4 -2.1400 -2.1400 GLOB UNIF EL-3-CE
LOAD Z 0251T5W5 -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z 0257T6AG -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z 0258T5WF -2.14002.00000-2.1400 GLOB UNIF EL-3-CE
LOAD Z 0259T5VY -2.14002.00000-2.1400 GLOB UNIF EL-3-CE
LOAD Z 0260T59C -1.0700 -1.0700 GLOB UNIF EL-3-CE
***LDS1** -11.000 -1.000 12.480 -4.000 -1.000 12.480 -11.000
***LDS2** -4.000 12.480 -4.000 -4.000 12.480 0.952
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-4-CE
LOAD Z 0248T5W3 -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z 0249T61G -0.9520 -0.9520 GLOB UNIF EL-4-CE
LOAD Z 0250T5W4 -0.9520 -0.9520 GLOB UNIF EL-4-CE
LOAD Z 0251T5W5 -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z 0257T6AG -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z 0258T5WF -0.95202.00000-0.9520 GLOB UNIF EL-4-CE
LOAD Z 0259T5VY -0.95202.00000-0.9520 GLOB UNIF EL-4-CE
LOAD Z 0260T59C -0.4760 -0.4760 GLOB UNIF EL-4-CE
***LDS1** -11.000 -1.000 12.480 -4.000 -1.000 12.480 -11.000
***LDS2** -4.000 12.480 -4.000 -4.000 12.480 0.476
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-5-CE
LOAD Z 0248T5W3 -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z 0249T61G -0.4760 -0.4760 GLOB UNIF EL-5-CE
LOAD Z 0250T5W4 -0.4760 -0.4760 GLOB UNIF EL-5-CE
LOAD Z 0251T5W5 -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z 0257T6AG -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z 0258T5WF -0.47602.00000-0.4760 GLOB UNIF EL-5-CE
LOAD Z 0259T5VY -0.47602.00000-0.4760 GLOB UNIF EL-5-CE
LOAD Z 0260T59C -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z 0047T5ZN -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00480235 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0048T5IL -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00490281 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00540076 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0054T67I -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0055T674 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00570297 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00620288 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00660527 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0067T60Q -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00690311 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00690317 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00700314 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00710315 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00720282 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0073T66R -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00730237 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00740292 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0075T327 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0075T508 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00760299 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0077T68G -0.0039 -0.0039 GLOB UNIF EL-6-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B119 of 382

LOAD Z 01230303 -0.0039 -0.0039 GLOB UNIF EL-6-CE


LOAD Z 01240322 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02020203 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02030204 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02040071 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02050206 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02060207 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02070069 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02080209 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02090210 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02100313 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02110212 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02120213 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02130070 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02150524 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02160365 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02190360 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02200355 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02220362 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02230367 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02240219 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02250216 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02350245 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02360049 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0237T5WX -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02380072 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0245T494 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02460247 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02470248 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02480249 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02490250 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02500251 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0251T5VV -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0252T495 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0253T5VS -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02540255 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0255T5X0 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02560257 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02570258 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02580259 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02590260 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02600261 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02610262 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02620238 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02810065 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02820075 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02880289 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02890290 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02900291 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02910048 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02920293 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02930294 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02940295 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02950073 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02960298 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02970296 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02980300 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02990056 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03000077 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03030354 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03070313 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03080307 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03110308 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03130316 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03140124 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03150123 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03160363 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03170358 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03180046 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03190067 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03200066 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03210047 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03220323 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03230215 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03240325 -0.0039 -0.0039 GLOB UNIF EL-6-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B120 of 382

LOAD Z 03250326 -0.0039 -0.0039 GLOB UNIF EL-6-CE


LOAD Z 03260318 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03540220 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03550356 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03560357 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03570321 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03580359 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03590224 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03600361 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03610222 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03620320 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03630364 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03640225 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03650366 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03660223 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 03670319 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0518T66S -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 05240324 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 05270067 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T327T5AV -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T327T509 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T329T328 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T4940246 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T4950253 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T508T329 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T509T328 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T56V0208 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T56W0205 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0062T5IM -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0049T5ZC -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0055T68F -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0058T5IE -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00590049 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0072T67B -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0239T68E -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0240T600 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0263T64B -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0264T56W -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02650266 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0266T68A -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0267T689 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02680269 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0269T56V -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02700271 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0271T60E -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0522T67C -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T56V0270 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T56W0265 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59BT5VX -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0061T5I9 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0284T5IA -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T598T5WI -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0064T5AY -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0065T5NW -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0071T5ZW -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0202T5ZZ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0203T5ZY -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0204T5ZX -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0208T644 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0209T60C -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0210T610 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0216T60V -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0220T5ZS -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0235T5WP -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0236T5W8 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0237T5WR -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0238T5WB -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02430235 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02440236 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0245T59T -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0246T5WQ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0247T5W2 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0248T5W3 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0249T61G -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0250T5W4 -0.0039 -0.0039 GLOB UNIF EL-6-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B121 of 382

LOAD Z 0251T5W5 -0.0039 -0.0039 GLOB UNIF EL-6-CE


LOAD Z 0252T61L -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0253T61K -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0254T5WS -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0255T5WT -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0256T5WU -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0257T6AG -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0258T5WF -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0259T5VY -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0260T59C -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02610270 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02620271 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02720245 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02730246 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0274T59J -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02750248 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0276T59I -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02770250 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0278T59G -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02790252 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0280T59F -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0281T5NX -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0282T5BM -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0283T5B0 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0285T5IB -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0286T5IC -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0287T5ID -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0288T5IH -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0289T5II -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0290T5IJ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0291T5IK -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0292T5WM -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0293T5WL -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0294T5RS -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0295T5WK -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0303T5ZU -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0313T60Z -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0315T5ZV -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0316T60Y -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0319T60R -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0321T5ZO -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0354T5ZT -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0355T5ZR -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0356T5ZQ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0357T5ZP -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0363T60X -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0364T60W -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0365T60U -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0366T60T -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0367T60S -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T596T5W6 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5970295 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5990292 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59CT5VZ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02050208 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0206T648 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0207T647 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0058T68O -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00590283 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 00610284 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02430272 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0244T68M -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02720273 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02730274 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02740275 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02750276 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02760277 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02770278 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0278T5VU -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02790280 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0280T5VT -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02830064 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02840285 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02850286 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 02860287 -0.0039 -0.0039 GLOB UNIF EL-6-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B122 of 382

LOAD Z 0287T68N -0.0039 -0.0039 GLOB UNIF EL-6-CE


LOAD Z T508T509 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 05390055 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 05400054 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 05460267 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59DT5W0 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z 0047T5ZN -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00480235 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0048T5IL -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00490281 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00540076 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0054T67I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0055T674 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00570297 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00620288 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00660527 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0067T60Q -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00690311 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00690317 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00700314 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00710315 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00720282 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0073T66R -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00730237 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00740292 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0075T327 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0075T508 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00760299 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0077T68G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 01230303 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 01240322 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02020203 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02030204 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02040071 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02050206 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02060207 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02070069 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02080209 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02090210 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02100313 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02110212 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02120213 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02130070 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02150524 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02160365 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02190360 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02200355 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02220362 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02230367 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02240219 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02250216 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02350245 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02360049 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0237T5WX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02380072 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0245T494 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02460247 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02470248 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02480249 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02490250 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02500251 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0251T5VV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0252T495 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0253T5VS -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02540255 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0255T5X0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02560257 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02570258 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02580259 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02590260 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02600261 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02610262 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02620238 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02810065 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02820075 -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B123 of 382

LOAD Z 02880289 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z 02890290 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02900291 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02910048 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02920293 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02930294 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02940295 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02950073 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02960298 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02970296 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02980300 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02990056 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03000077 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03030354 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03070313 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03080307 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03110308 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03130316 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03140124 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03150123 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03160363 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03170358 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03180046 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03190067 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03200066 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03210047 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03220323 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03230215 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03240325 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03250326 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03260318 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03540220 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03550356 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03560357 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03570321 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03580359 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03590224 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03600361 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03610222 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03620320 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03630364 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03640225 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03650366 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03660223 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03670319 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0518T66S -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05240324 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05270067 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T327T5AV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T327T509 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T329T328 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T4940246 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T4950253 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T508T329 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T509T328 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T56V0208 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T56W0205 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0062T5IM -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0049T5ZC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0055T68F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0058T5IE -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00590049 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0072T67B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0239T68E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0240T600 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0263T64B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0264T56W -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02650266 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0266T68A -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0267T689 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02680269 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0269T56V -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02700271 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0271T60E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0522T67C -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B124 of 382

LOAD Z T56V0270 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T56W0265 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59BT5VX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0061T5I9 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0284T5IA -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T598T5WI -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0064T5AY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0065T5NW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0071T5ZW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0202T5ZZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0203T5ZY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0204T5ZX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0208T644 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0209T60C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0210T610 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0216T60V -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0220T5ZS -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0235T5WP -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0236T5W8 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0237T5WR -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0238T5WB -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02430235 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02440236 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0245T59T -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0246T5WQ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0247T5W2 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0248T5W3 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0249T61G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0250T5W4 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0251T5W5 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0252T61L -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0253T61K -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0254T5WS -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0255T5WT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0256T5WU -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0257T6AG -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0258T5WF -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0259T5VY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0260T59C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02610270 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02620271 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02720245 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02730246 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0274T59J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02750248 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0276T59I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02770250 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0278T59G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02790252 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0280T59F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0281T5NX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0282T5BM -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0283T5B0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0285T5IB -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0286T5IC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0287T5ID -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0288T5IH -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0289T5II -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0290T5IJ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0291T5IK -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0292T5WM -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0293T5WL -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0294T5RS -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0295T5WK -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0303T5ZU -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0313T60Z -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0315T5ZV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0316T60Y -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0319T60R -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0321T5ZO -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0354T5ZT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0355T5ZR -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0356T5ZQ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0357T5ZP -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0363T60X -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B125 of 382

LOAD Z 0364T60W -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z 0365T60U -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0366T60T -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0367T60S -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T596T5W6 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5970295 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5990292 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59CT5VZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02050208 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0206T648 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0207T647 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0058T68O -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00590283 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00610284 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02430272 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0244T68M -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02720273 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02730274 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02740275 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02750276 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02760277 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02770278 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0278T5VU -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02790280 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0280T5VT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02830064 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02840285 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02850286 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02860287 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0287T68N -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T508T509 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05390055 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05400054 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05460267 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59DT5W0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0047T5ZN -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00480235 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0048T5IL -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00490281 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00540076 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0054T67I -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0055T674 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00570297 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00620288 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00660527 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0067T60Q -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00690311 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00690317 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00700314 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00710315 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00720282 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0073T66R -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00730237 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00740292 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0075T327 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0075T508 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00760299 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0077T68G -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 01230303 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 01240322 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02020203 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02030204 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02040071 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02050206 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02060207 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02070069 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02080209 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02090210 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02100313 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02110212 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02120213 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02130070 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02150524 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02160365 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02190360 -0.0007 -0.0007 GLOB UNIF EL-7-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B126 of 382

LOAD Z 02200355 -0.0007 -0.0007 GLOB UNIF EL-7-CE


LOAD Z 02220362 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02230367 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02240219 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02250216 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02350245 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02360049 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0237T5WX -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02380072 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0245T494 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02460247 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02470248 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02480249 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02490250 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02500251 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0251T5VV -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0252T495 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0253T5VS -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02540255 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0255T5X0 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02560257 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02570258 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02580259 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02590260 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02600261 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02610262 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02620238 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02810065 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02820075 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02880289 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02890290 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02900291 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02910048 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02920293 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02930294 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02940295 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02950073 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02960298 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02970296 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02980300 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02990056 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03000077 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03030354 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03070313 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03080307 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03110308 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03130316 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03140124 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03150123 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03160363 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03170358 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03180046 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03190067 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03200066 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03210047 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03220323 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03230215 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03240325 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03250326 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03260318 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03540220 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03550356 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03560357 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03570321 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03580359 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03590224 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03600361 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03610222 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03620320 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03630364 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03640225 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03650366 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03660223 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 03670319 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0518T66S -0.0007 -0.0007 GLOB UNIF EL-7-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B127 of 382

LOAD Z 05240324 -0.0007 -0.0007 GLOB UNIF EL-7-CE


LOAD Z 05270067 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T327T5AV -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T327T509 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T329T328 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T4940246 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T4950253 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T508T329 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T509T328 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T56V0208 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T56W0205 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0062T5IM -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0049T5ZC -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0055T68F -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0058T5IE -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00590049 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0072T67B -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0239T68E -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0240T600 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0263T64B -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0264T56W -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02650266 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0266T68A -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0267T689 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02680269 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0269T56V -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02700271 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0271T60E -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0522T67C -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T56V0270 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T56W0265 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59BT5VX -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0061T5I9 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0284T5IA -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T598T5WI -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0064T5AY -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0065T5NW -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0071T5ZW -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0202T5ZZ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0203T5ZY -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0204T5ZX -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0208T644 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0209T60C -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0210T610 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0216T60V -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0220T5ZS -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0235T5WP -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0236T5W8 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0237T5WR -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0238T5WB -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02430235 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02440236 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0245T59T -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0246T5WQ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0247T5W2 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0248T5W3 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0249T61G -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0250T5W4 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0251T5W5 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0252T61L -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0253T61K -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0254T5WS -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0255T5WT -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0256T5WU -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0257T6AG -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0258T5WF -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0259T5VY -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0260T59C -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02610270 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02620271 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02720245 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02730246 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0274T59J -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02750248 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0276T59I -0.0007 -0.0007 GLOB UNIF EL-7-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B128 of 382

LOAD Z 02770250 -0.0007 -0.0007 GLOB UNIF EL-7-CE


LOAD Z 0278T59G -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02790252 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0280T59F -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0281T5NX -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0282T5BM -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0283T5B0 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0285T5IB -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0286T5IC -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0287T5ID -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0288T5IH -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0289T5II -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0290T5IJ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0291T5IK -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0292T5WM -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0293T5WL -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0294T5RS -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0295T5WK -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0303T5ZU -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0313T60Z -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0315T5ZV -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0316T60Y -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0319T60R -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0321T5ZO -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0354T5ZT -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0355T5ZR -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0356T5ZQ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0357T5ZP -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0363T60X -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0364T60W -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0365T60U -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0366T60T -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0367T60S -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T596T5W6 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5970295 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5990292 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59CT5VZ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02050208 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0206T648 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0207T647 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0058T68O -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00590283 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 00610284 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02430272 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0244T68M -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02720273 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02730274 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02740275 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02750276 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02760277 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02770278 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0278T5VU -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02790280 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0280T5VT -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02830064 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02840285 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02850286 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 02860287 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0287T68N -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T508T509 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 05390055 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 05400054 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 05460267 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59DT5W0 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z 0047T5ZN -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00480235 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0048T5IL -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00490281 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00540076 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0054T67I -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0055T674 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00570297 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00620288 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00660527 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0067T60Q -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B129 of 382

LOAD Z 00690311 -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z 00690317 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00700314 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00710315 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00720282 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0073T66R -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00730237 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00740292 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0075T327 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0075T508 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00760299 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0077T68G -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 01230303 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 01240322 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02020203 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02030204 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02040071 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02050206 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02060207 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02070069 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02080209 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02090210 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02100313 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02110212 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02120213 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02130070 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02150524 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02160365 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02190360 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02200355 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02220362 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02230367 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02240219 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02250216 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02350245 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02360049 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0237T5WX -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02380072 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0245T494 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02460247 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02470248 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02480249 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02490250 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02500251 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0251T5VV -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0252T495 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0253T5VS -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02540255 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0255T5X0 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02560257 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02570258 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02580259 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02590260 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02600261 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02610262 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02620238 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02810065 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02820075 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02880289 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02890290 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02900291 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02910048 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02920293 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02930294 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02940295 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02950073 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02960298 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02970296 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02980300 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02990056 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03000077 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03030354 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03070313 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03080307 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03110308 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B130 of 382

LOAD Z 03130316 -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z 03140124 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03150123 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03160363 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03170358 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03180046 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03190067 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03200066 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03210047 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03220323 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03230215 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03240325 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03250326 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03260318 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03540220 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03550356 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03560357 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03570321 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03580359 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03590224 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03600361 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03610222 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03620320 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03630364 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03640225 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03650366 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03660223 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 03670319 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0518T66S -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 05240324 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 05270067 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T327T5AV -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T327T509 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T329T328 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T4940246 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T4950253 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T508T329 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T509T328 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T56V0208 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T56W0205 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0062T5IM -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0049T5ZC -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0055T68F -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0058T5IE -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00590049 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0072T67B -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0239T68E -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0240T600 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0263T64B -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0264T56W -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02650266 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0266T68A -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0267T689 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02680269 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0269T56V -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02700271 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0271T60E -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0522T67C -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T56V0270 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T56W0265 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59BT5VX -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0061T5I9 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0284T5IA -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T598T5WI -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0064T5AY -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0065T5NW -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0071T5ZW -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0202T5ZZ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0203T5ZY -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0204T5ZX -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0208T644 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0209T60C -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0210T610 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0216T60V -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0220T5ZS -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B131 of 382

LOAD Z 0235T5WP -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z 0236T5W8 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0237T5WR -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0238T5WB -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02430235 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02440236 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0245T59T -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0246T5WQ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0247T5W2 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0248T5W3 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0249T61G -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0250T5W4 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0251T5W5 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0252T61L -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0253T61K -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0254T5WS -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0255T5WT -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0256T5WU -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0257T6AG -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0258T5WF -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0259T5VY -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0260T59C -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02610270 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02620271 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02720245 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02730246 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0274T59J -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02750248 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0276T59I -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02770250 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0278T59G -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02790252 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0280T59F -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0281T5NX -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0282T5BM -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0283T5B0 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0285T5IB -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0286T5IC -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0287T5ID -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0288T5IH -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0289T5II -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0290T5IJ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0291T5IK -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0292T5WM -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0293T5WL -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0294T5RS -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0295T5WK -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0303T5ZU -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0313T60Z -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0315T5ZV -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0316T60Y -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0319T60R -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0321T5ZO -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0354T5ZT -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0355T5ZR -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0356T5ZQ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0357T5ZP -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0363T60X -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0364T60W -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0365T60U -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0366T60T -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0367T60S -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T596T5W6 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5970295 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5990292 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59CT5VZ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02050208 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0206T648 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0207T647 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0058T68O -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00590283 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 00610284 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02430272 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0244T68M -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02720273 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B132 of 382

LOAD Z 02730274 -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z 02740275 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02750276 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02760277 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02770278 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0278T5VU -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02790280 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0280T5VT -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02830064 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02840285 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02850286 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 02860287 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0287T68N -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T508T509 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 05390055 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 05400054 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 05460267 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59DT5W0 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z 0047T5ZN -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00480235 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0048T5IL -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00490281 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00540076 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0054T67I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0055T674 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00570297 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00620288 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00660527 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0067T60Q -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00690311 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00690317 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00700314 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00710315 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00720282 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0073T66R -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00730237 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00740292 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0075T327 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0075T508 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00760299 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0077T68G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 01230303 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 01240322 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02020203 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02030204 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02040071 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02050206 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02060207 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02070069 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02080209 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02090210 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02100313 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02110212 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02120213 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02130070 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02150524 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02160365 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02190360 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02200355 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02220362 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02230367 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02240219 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02250216 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02350245 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02360049 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0237T5WX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02380072 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0245T494 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02460247 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02470248 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02480249 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02490250 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02500251 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0251T5VV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0252T495 -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B133 of 382

LOAD Z 0253T5VS -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z 02540255 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0255T5X0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02560257 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02570258 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02580259 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02590260 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02600261 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02610262 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02620238 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02810065 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02820075 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02880289 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02890290 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02900291 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02910048 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02920293 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02930294 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02940295 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02950073 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02960298 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02970296 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02980300 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02990056 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03000077 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03030354 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03070313 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03080307 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03110308 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03130316 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03140124 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03150123 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03160363 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03170358 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03180046 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03190067 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03200066 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03210047 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03220323 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03230215 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03240325 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03250326 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03260318 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03540220 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03550356 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03560357 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03570321 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03580359 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03590224 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03600361 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03610222 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03620320 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03630364 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03640225 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03650366 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03660223 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 03670319 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0518T66S -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05240324 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05270067 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T327T5AV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T327T509 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T329T328 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T4940246 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T4950253 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T508T329 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T509T328 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T56V0208 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T56W0205 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0062T5IM -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0049T5ZC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0055T68F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0058T5IE -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00590049 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0072T67B -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B134 of 382

LOAD Z 0239T68E -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z 0240T600 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0263T64B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0264T56W -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02650266 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0266T68A -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0267T689 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02680269 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0269T56V -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02700271 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0271T60E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0522T67C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T56V0270 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T56W0265 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59BT5VX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0061T5I9 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0284T5IA -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T598T5WI -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0064T5AY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0065T5NW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0071T5ZW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0202T5ZZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0203T5ZY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0204T5ZX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0208T644 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0209T60C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0210T610 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0216T60V -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0220T5ZS -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0235T5WP -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0236T5W8 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0237T5WR -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0238T5WB -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02430235 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02440236 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0245T59T -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0246T5WQ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0247T5W2 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0248T5W3 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0249T61G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0250T5W4 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0251T5W5 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0252T61L -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0253T61K -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0254T5WS -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0255T5WT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0256T5WU -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0257T6AG -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0258T5WF -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0259T5VY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0260T59C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02610270 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02620271 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02720245 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02730246 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0274T59J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02750248 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0276T59I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02770250 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0278T59G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02790252 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0280T59F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0281T5NX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0282T5BM -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0283T5B0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0285T5IB -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0286T5IC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0287T5ID -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0288T5IH -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0289T5II -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0290T5IJ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0291T5IK -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0292T5WM -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0293T5WL -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0294T5RS -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B135 of 382

LOAD Z 0295T5WK -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z 0303T5ZU -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0313T60Z -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0315T5ZV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0316T60Y -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0319T60R -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0321T5ZO -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0354T5ZT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0355T5ZR -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0356T5ZQ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0357T5ZP -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0363T60X -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0364T60W -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0365T60U -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0366T60T -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0367T60S -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T596T5W6 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5970295 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5990292 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59CT5VZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02050208 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0206T648 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0207T647 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0058T68O -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00590283 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 00610284 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02430272 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0244T68M -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02720273 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02730274 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02740275 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02750276 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02760277 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02770278 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0278T5VU -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02790280 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0280T5VT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02830064 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02840285 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02850286 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 02860287 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 0287T68N -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T508T509 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05390055 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05400054 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z 05460267 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59DT5W0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59E0253 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59E0253 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59E0253 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59E0253 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59E0253 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59FT59E -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59FT59E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59FT59E -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59FT59E -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59FT59E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59GT59H -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59GT59H -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59GT59H -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59GT59H -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59GT59H -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59H0251 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59H0251 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59H0251 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59H0251 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59H0251 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59IT59K -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59IT59K -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59IT59K -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59IT59K -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59IT59K -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59JT59L -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59JT59L -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59JT59L -0.0007 -0.0007 GLOB UNIF EL-7-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B136 of 382

LOAD Z T59JT59L -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z T59JT59L -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59K0249 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59K0249 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59K0249 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59K0249 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59K0249 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59L0247 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59L0247 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59L0247 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59L0247 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59L0247 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59TT61F -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59TT61F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59TT61F -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59TT61F -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59TT61F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59UT5WE -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59UT5WE -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59UT5WE -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59UT5WE -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59UT5WE -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59VT5W1 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59VT5W1 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59VT5W1 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59VT5W1 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59VT5W1 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59WT5S1 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T59WT5S1 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T59WT5S1 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T59WT5S1 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T59WT5S1 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AV0056 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5AV0056 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AV0056 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5AV0056 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5AV0056 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AWT67J -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5AWT67J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AWT67J -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5AWT67J -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5AWT67J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AXT675 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5AXT675 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AXT675 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5AXT675 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5AXT675 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AY0065 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5AY0065 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AY0065 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5AY0065 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5AY0065 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AZ0062 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5AZ0062 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5AZ0062 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5AZ0062 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5AZ0062 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B00281 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5B00281 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B00281 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5B00281 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5B00281 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B1T598 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5B1T598 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B1T598 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5B1T598 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5B1T598 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B20297 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5B20297 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B20297 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5B20297 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5B20297 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B3T615 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5B3T615 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B3T615 -0.0007 -0.0007 GLOB UNIF EL-7-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B137 of 382

LOAD Z T5B3T615 -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z T5B3T615 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B4T5RW -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5B4T5RW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5B4T5RW -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5B4T5RW -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5B4T5RW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BAT601 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5BAT601 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BAT601 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5BAT601 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5BAT601 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BBT60F -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5BBT60F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BBT60F -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5BBT60F -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5BBT60F -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BM0299 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5BM0299 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BM0299 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5BM0299 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5BM0299 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BNT5AW -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5BNT5AW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5BNT5AW -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5BNT5AW -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5BNT5AW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5I9T5AZ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5I9T5AZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5I9T5AZ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5I9T5AZ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5I9T5AZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IAT5B1 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IAT5B1 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IAT5B1 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IAT5B1 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IAT5B1 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IBT5WH -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IBT5WH -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IBT5WH -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IBT5WH -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IBT5WH -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ICT5WG -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ICT5WG -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ICT5WG -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ICT5WG -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ICT5WG -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IDT596 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IDT596 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IDT596 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IDT596 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IDT596 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IET5W7 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IET5W7 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IET5W7 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IET5W7 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IET5W7 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IHT599 -2.5500 -2.5500 GLOB UNIF EL-1-CE
LOAD Z T5IHT599 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IHT599 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IHT599 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IHT599 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IHT599 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IIT6AC -5.10001.50000-5.1000 GLOB UNIF EL-1-CE
LOAD Z T5IIT6AC -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IIT6AC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IIT6AC -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IIT6AC -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IIT6AC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IJ0294 -5.10001.50000-5.1000 GLOB UNIF EL-1-CE
LOAD Z T5IJ0294 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IJ0294 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IJ0294 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IJ0294 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IJ0294 -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B138 of 382

LOAD Z T5IKT597 -2.5500 -2.5500 GLOB UNIF EL-1-CE


LOAD Z T5IKT597 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IKT597 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IKT597 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IKT597 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IKT597 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IL0518 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IL0518 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IL0518 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IL0518 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IL0518 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IMT5ON -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5IMT5ON -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5IMT5ON -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5IMT5ON -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5IMT5ON -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5NW0075 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5NW0075 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5NW0075 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5NW0075 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5NW0075 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5NXT61I -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5NXT61I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5NXT61I -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5NXT61I -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5NXT61I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5NYT5WA -1.5733 -1.5733 GLOB UNIF EL-2-CE
LOAD Z T5NYT5WA -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5NYT5WA -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5NYT5WA -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5NYT5WA -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5NYT5WA -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ONT5OP -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ONT5OP -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ONT5OP -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ONT5OP -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ONT5OP -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5OP0074 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5OP0074 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5OP0074 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5OP0074 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5OP0074 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RTT617 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5RTT617 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RTT617 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5RTT617 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5RTT617 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RU0298 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5RU0298 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RU0298 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5RU0298 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5RU0298 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RV0296 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5RV0296 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RV0296 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5RV0296 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5RV0296 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RW0300 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5RW0300 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RW0300 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5RW0300 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5RW0300 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RZT5S2 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5RZT5S2 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5RZT5S2 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5RZT5S2 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5RZT5S2 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S1T5S4 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5S1T5S4 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S1T5S4 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5S1T5S4 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5S1T5S4 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S2T614 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5S2T614 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S2T614 -0.0007 -0.0007 GLOB UNIF EL-7-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B139 of 382

LOAD Z T5S2T614 -0.0039 -0.0039 GLOB UNIF EL-8-CE


LOAD Z T5S2T614 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S3T613 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5S3T613 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S3T613 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5S3T613 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5S3T613 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S4T612 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5S4T612 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5S4T612 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5S4T612 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5S4T612 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VS0236 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VS0236 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VS0236 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VS0236 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VS0236 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VT0244 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VT0244 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VT0244 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VT0244 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VT0244 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VU0279 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VU0279 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VU0279 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VU0279 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VU0279 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VV0252 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VV0252 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VV0252 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VV0252 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VV0252 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VW0239 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VW0239 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VW0239 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VW0239 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VW0239 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VXT5BN -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VXT5BN -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VXT5BN -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VXT5BN -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VXT5BN -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VY0268 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VY0268 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VY0268 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VY0268 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VY0268 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VZ0269 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5VZ0269 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5VZ0269 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5VZ0269 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5VZ0269 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W00266 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W00266 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W00266 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W00266 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W00266 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W10265 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W10265 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W10265 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W10265 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W10265 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W2T59U -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W2T59U -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W2T59U -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W2T59U -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W2T59U -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W3T5WD -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T5W3T5WD -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T5W3T5WD -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T5W3T5WD -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W3T5WD -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W3T5WD -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W3T5WD -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W3T5WD -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B140 of 382

LOAD Z T5W4T61N -2.1400 -2.1400 GLOB UNIF EL-3-CE


LOAD Z T5W4T61N -0.9520 -0.9520 GLOB UNIF EL-4-CE
LOAD Z T5W4T61N -0.4760 -0.4760 GLOB UNIF EL-5-CE
LOAD Z T5W4T61N -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W4T61N -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W4T61N -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W4T61N -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W4T61N -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W5T61M -1.8100 -1.8100 GLOB UNIF EL-2-CE
LOAD Z T5W5T61M -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T5W5T61M -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T5W5T61M -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T5W5T61M -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W5T61M -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W5T61M -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W5T61M -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W5T61M -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W60291 -2.5500 -2.5500 GLOB UNIF EL-1-CE
LOAD Z T5W60291 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W60291 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W60291 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W60291 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W60291 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W70048 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W70048 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W70048 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W70048 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W70048 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W8T61J -3.1675 -3.1675 GLOB UNIF EL-2-CE
LOAD Z T5W8T61J -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W8T61J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W8T61J -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W8T61J -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W8T61J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W90238 -3.1675 -3.1675 GLOB UNIF EL-2-CE
LOAD Z T5W90238 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5W90238 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5W90238 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5W90238 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5W90238 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WAT61H -1.5733 -1.5733 GLOB UNIF EL-2-CE
LOAD Z T5WAT61H -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WAT61H -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WAT61H -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WAT61H -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WAT61H -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WBT5VW -3.16750.45600-3.1675 GLOB UNIF EL-2-CE
LOAD Z T5WBT5VW -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WBT5VW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WBT5VW -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WBT5VW -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WBT5VW -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WCT59B -1.3575 -1.3575 GLOB UNIF EL-2-CE
LOAD Z T5WCT59B -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WCT59B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WCT59B -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WCT59B -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WCT59B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WDT61P -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T5WDT61P -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T5WDT61P -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T5WDT61P -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WDT61P -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WDT61P -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WDT61P -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WDT61P -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WET61Q -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WET61Q -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WET61Q -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WET61Q -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WET61Q -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WF0267 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WF0267 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WF0267 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WF0267 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B141 of 382

LOAD Z T5WF0267 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T5WG0290 -5.1000 -5.1000 GLOB UNIF EL-1-CE
LOAD Z T5WG0290 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WG0290 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WG0290 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WG0290 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WG0290 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WH0289 -5.1000 -5.1000 GLOB UNIF EL-1-CE
LOAD Z T5WH0289 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WH0289 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WH0289 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WH0289 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WH0289 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WI0288 -2.5500 -2.5500 GLOB UNIF EL-1-CE
LOAD Z T5WI0288 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WI0288 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WI0288 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WI0288 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WI0288 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WJT5RZ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WJT5RZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WJT5RZ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WJT5RZ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WJT5RZ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WKT5B3 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WKT5B3 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WKT5B3 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WKT5B3 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WKT5B3 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WLT5RT -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WLT5RT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WLT5RT -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WLT5RT -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WLT5RT -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WMT61B -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WMT61B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WMT61B -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WMT61B -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WMT61B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WPT61T -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WPT61T -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WPT61T -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WPT61T -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WPT61T -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WQT61E -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WQT61E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WQT61E -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WQT61E -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WQT61E -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WRT5S0 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WRT5S0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WRT5S0 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WRT5S0 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WRT5S0 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WST59W -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WST59W -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WST59W -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WST59W -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WST59W -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WTT61A -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WTT61A -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WTT61A -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WTT61A -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WTT61A -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WUT6AF -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WUT6AF -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WUT6AF -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WUT6AF -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WUT6AF -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WX0254 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5WX0254 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5WX0254 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5WX0254 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5WX0254 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5X00256 -0.0039 -0.0039 GLOB UNIF EL-6-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B142 of 382

LOAD Z T5X00256 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T5X00256 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5X00256 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5X00256 -0.0141 -0.0141 GLOB UNIF EL-9-CE
***LDS1** -12.800 4.450 13.480 -11.600 4.450 13.480 -12.800
***LDS2** 2.448 13.480 -11.600 2.448 13.480 11.238
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-10-C
***LDS1** -12.800 2.000 13.480 -11.600 2.000 13.480 -12.800
***LDS2** 13.480 -11.600 13.480 11.238
***LDS3** 0.250 0 1 3 0 0CDEL -2EQUPPRESEL-11-C
LOAD Z T5ZCT5NY -1.5733 -1.5733 GLOB UNIF EL-2-CE
LOAD Z T5ZCT5NY -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZCT5NY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZCT5NY -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZCT5NY -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZCT5NY -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZNT5BB -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZNT5BB -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZNT5BB -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZNT5BB -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZNT5BB -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZOT60G -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZOT60G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZOT60G -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZOT60G -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZOT60G -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZPT60H -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZPT60H -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZPT60H -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZPT60H -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZPT60H -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZQT60I -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZQT60I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZQT60I -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZQT60I -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZQT60I -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZRT60J -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZRT60J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZRT60J -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZRT60J -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZRT60J -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZST60K -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZST60K -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZST60K -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZST60K -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZST60K -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZTT60L -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZTT60L -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZTT60L -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZTT60L -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZTT60L -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZUT60M -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZUT60M -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZUT60M -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZUT60M -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZUT60M -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZVT60N -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZVT60N -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZVT60N -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZVT60N -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZVT60N -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZWT60O -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZWT60O -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZWT60O -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZWT60O -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZWT60O -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZXT60P -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZXT60P -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZXT60P -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZXT60P -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZXT60P -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZY0206 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZY0206 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZY0206 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZY0206 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B143 of 382

LOAD Z T5ZY0206 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T5ZZT64C -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T5ZZT64C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T5ZZT64C -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T5ZZT64C -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T5ZZT64C -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6000263 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6000263 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6000263 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6000263 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6000263 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6010046 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6010046 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6010046 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6010046 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6010046 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6020318 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6020318 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6020318 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6020318 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6020318 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6030326 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6030326 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6030326 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6030326 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6030326 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6040325 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6040325 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6040325 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6040325 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6040325 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6050324 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6050324 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6050324 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6050324 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6050324 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6060215 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6060215 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6060215 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6060215 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6060215 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6070323 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6070323 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6070323 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6070323 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6070323 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6080322 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6080322 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6080322 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6080322 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6080322 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6090314 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6090314 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6090314 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6090314 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6090314 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60A0070 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60A0070 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60A0070 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60A0070 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60A0070 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60B0213 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60B0213 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60B0213 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60B0213 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60B0213 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60C0212 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60C0212 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60C0212 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60C0212 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60C0212 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60D0211 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60D0211 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60D0211 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60D0211 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B144 of 382

LOAD Z T60D0211 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T60E0239 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60E0239 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60E0239 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60E0239 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60E0239 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60F0066 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60F0066 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60F0066 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60F0066 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60F0066 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60G0320 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60G0320 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60G0320 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60G0320 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60G0320 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60H0362 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60H0362 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60H0362 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60H0362 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60H0362 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60I0361 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60I0361 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60I0361 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60I0361 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60I0361 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60J0360 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60J0360 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60J0360 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60J0360 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60J0360 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60K0219 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60K0219 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60K0219 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60K0219 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60K0219 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60L0359 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60L0359 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60L0359 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60L0359 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60L0359 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60M0358 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60M0358 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60M0358 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60M0358 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60M0358 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60N0317 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60N0317 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60N0317 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60N0317 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60N0317 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60O0069 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60O0069 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60O0069 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60O0069 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60O0069 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60P0207 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60P0207 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60P0207 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60P0207 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60P0207 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60QT5BA -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60QT5BA -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60QT5BA -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60QT5BA -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60QT5BA -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60RT602 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60RT602 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60RT602 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60RT602 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60RT602 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60ST603 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60ST603 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60ST603 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60ST603 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B145 of 382

LOAD Z T60ST603 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T60TT604 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60TT604 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60TT604 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60TT604 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60TT604 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60UT605 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60UT605 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60UT605 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60UT605 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60UT605 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60VT606 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60VT606 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60VT606 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60VT606 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60VT606 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60WT607 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60WT607 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60WT607 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60WT607 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60WT607 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60XT608 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60XT608 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60XT608 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60XT608 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60XT608 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60YT609 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60YT609 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60YT609 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60YT609 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60YT609 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60ZT60A -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T60ZT60A -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T60ZT60A -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T60ZT60A -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T60ZT60A -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T610T60B -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T610T60B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T610T60B -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T610T60B -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T610T60B -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6110264 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6110264 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6110264 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6110264 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6110264 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6120263 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6120263 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6120263 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6120263 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6120263 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6130240 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6130240 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6130240 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6130240 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6130240 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T614T5AX -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T614T5AX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T614T5AX -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T614T5AX -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T614T5AX -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T615T5B4 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T615T5B4 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T615T5B4 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T615T5B4 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T615T5B4 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T617T5RV -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T617T5RV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T617T5RV -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T617T5RV -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T617T5RV -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T618T5B2 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T618T5B2 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T618T5B2 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T618T5B2 -0.0039 -0.0039 GLOB UNIF EL-8-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B146 of 382

LOAD Z T618T5B2 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T61AT611 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61AT611 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61AT611 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61AT611 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61AT611 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61BT618 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61BT618 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61BT618 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61BT618 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61BT618 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61DT59D -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T61DT59D -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T61DT59D -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T61DT59D -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61DT59D -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61DT59D -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61DT59D -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61DT59D -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61E0255 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61E0255 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61E0255 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61E0255 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61E0255 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61F0254 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61F0254 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61F0254 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61F0254 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61F0254 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61GT61O -2.1400 -2.1400 GLOB UNIF EL-3-CE
LOAD Z T61GT61O -0.9520 -0.9520 GLOB UNIF EL-4-CE
LOAD Z T61GT61O -0.4760 -0.4760 GLOB UNIF EL-5-CE
LOAD Z T61GT61O -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61GT61O -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61GT61O -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61GT61O -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61GT61O -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61H0522 -1.5733 -1.5733 GLOB UNIF EL-2-CE
LOAD Z T61H0522 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61H0522 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61H0522 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61H0522 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61H0522 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61I0282 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61I0282 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61I0282 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61I0282 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61I0282 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61JT5W9 -3.1675 -3.1675 GLOB UNIF EL-2-CE
LOAD Z T61JT5W9 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61JT5W9 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61JT5W9 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61JT5W9 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61JT5W9 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61K0262 -3.6200 -3.6200 GLOB UNIF EL-2-CE
LOAD Z T61K0262 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61K0262 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61K0262 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61K0262 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61K0262 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61L0261 -3.6200 -3.6200 GLOB UNIF EL-2-CE
LOAD Z T61L0261 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61L0261 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61L0261 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61L0261 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61L0261 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61M0260 -1.8100 -1.8100 GLOB UNIF EL-2-CE
LOAD Z T61M0260 -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T61M0260 -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T61M0260 -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T61M0260 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61M0260 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61M0260 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61M0260 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61M0260 -0.0141 -0.0141 GLOB UNIF EL-9-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B147 of 382

LOAD Z T61N0259 -2.1400 -2.1400 GLOB UNIF EL-3-CE


LOAD Z T61N0259 -0.9520 -0.9520 GLOB UNIF EL-4-CE
LOAD Z T61N0259 -0.4760 -0.4760 GLOB UNIF EL-5-CE
LOAD Z T61N0259 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61N0259 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61N0259 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61N0259 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61N0259 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61O0258 -2.1400 -2.1400 GLOB UNIF EL-3-CE
LOAD Z T61O0258 -0.9520 -0.9520 GLOB UNIF EL-4-CE
LOAD Z T61O0258 -0.4760 -0.4760 GLOB UNIF EL-5-CE
LOAD Z T61O0258 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61O0258 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61O0258 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61O0258 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61O0258 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61PT6AD -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T61PT6AD -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T61PT6AD -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T61PT6AD -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61PT6AD -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61PT6AD -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61PT6AD -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61PT6AD -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61QT6AE -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61QT6AE -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61QT6AE -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61QT6AE -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61QT6AE -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61T0237 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T61T0237 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T61T0237 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T61T0237 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T61T0237 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T644T60D -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T644T60D -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T644T60D -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T644T60D -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T644T60D -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6470210 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6470210 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6470210 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6470210 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6470210 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6480209 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6480209 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6480209 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6480209 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6480209 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T64B0264 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T64B0264 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T64B0264 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T64B0264 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T64B0264 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T64C0205 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T64C0205 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T64C0205 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T64C0205 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T64C0205 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T66RT5WJ -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T66RT5WJ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T66RT5WJ -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T66RT5WJ -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T66RT5WJ -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T66S0073 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T66S0073 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T66S0073 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T66S0073 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T66S0073 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6740202 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6740202 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6740202 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6740202 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6740202 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6750055 -0.0039 -0.0039 GLOB UNIF EL-6-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B148 of 382

LOAD Z T6750055 -0.0141 -0.0141 GLOB UNIF EL-9-CE


LOAD Z T6750055 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6750055 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6750055 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67BT5WC -1.3575 -1.3575 GLOB UNIF EL-2-CE
LOAD Z T67BT5WC -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T67BT5WC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67BT5WC -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T67BT5WC -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T67BT5WC -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67C0072 -1.3575 -1.3575 GLOB UNIF EL-2-CE
LOAD Z T67C0072 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T67C0072 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67C0072 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T67C0072 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T67C0072 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67I0211 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T67I0211 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67I0211 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T67I0211 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T67I0211 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67J0054 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T67J0054 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T67J0054 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T67J0054 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T67J0054 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6890268 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6890268 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6890268 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6890268 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6890268 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68A0267 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68A0267 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68A0267 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68A0267 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68A0267 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68E0054 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68E0054 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68E0054 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68E0054 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68E0054 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68F0240 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68F0240 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68F0240 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68F0240 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68F0240 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68G0055 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68G0055 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68G0055 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68G0055 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68G0055 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68M0059 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68M0059 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68M0059 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68M0059 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68M0059 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68N0058 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68N0058 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68N0058 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68N0058 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68N0058 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68O0243 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T68O0243 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T68O0243 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T68O0243 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T68O0243 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD T69Z -27.000 GLOB JOIN EL-10-CE
LOAD T69Y -27.000 GLOB JOIN EL-11-CE
LOAD Z T6AC0293 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6AC0293 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AC0293 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6AC0293 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6AC0293 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AD0257 -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T6AD0257 -0.4760 -0.4760 GLOB UNIF EL-4-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B149 of 382

LOAD Z T6AD0257 -0.2380 -0.2380 GLOB UNIF EL-5-CE


LOAD Z T6AD0257 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6AD0257 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AD0257 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6AD0257 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6AD0257 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AE0256 -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6AE0256 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AE0256 -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6AE0256 -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6AE0256 -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AFT59V -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6AFT59V -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AFT59V -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6AFT59V -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6AFT59V -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AGT61D -1.0700 -1.0700 GLOB UNIF EL-3-CE
LOAD Z T6AGT61D -0.4760 -0.4760 GLOB UNIF EL-4-CE
LOAD Z T6AGT61D -0.2380 -0.2380 GLOB UNIF EL-5-CE
LOAD Z T6AGT61D -0.0039 -0.0039 GLOB UNIF EL-6-CE
LOAD Z T6AGT61D -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOAD Z T6AGT61D -0.0007 -0.0007 GLOB UNIF EL-7-CE
LOAD Z T6AGT61D -0.0039 -0.0039 GLOB UNIF EL-8-CE
LOAD Z T6AGT61D -0.0141 -0.0141 GLOB UNIF EL-9-CE
LOADCNCDHV
LOAD Z 0047T5ZN -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00480235 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0048T5IL -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00490281 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0049T5ZC -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00540076 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0054T67I -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0055T674 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0055T68F -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00620288 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00660527 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0067T60Q -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00690311 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00690317 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00700314 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00710315 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00720282 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0072T67B -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0073T66R -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00740292 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0075T508 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00760299 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 01230303 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 01240322 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02020203 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02030204 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02040071 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02050206 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02060207 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02070069 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02080209 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02090210 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02100313 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02110212 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02120213 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02130070 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02150524 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02160365 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02190360 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02200355 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02220362 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02230367 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02240219 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02250216 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02350245 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02360049 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0239T68E -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0240T600 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0245T494 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02460247 -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B150 of 382

LOAD Z 02470248 -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z 02480249 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02490250 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02500251 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0251T5VV -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0252T495 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0253T5VS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0263T64B -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0264T56W -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02650266 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0266T68A -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0267T689 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02680269 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0269T56V -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02700271 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0271T60E -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02810065 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02820075 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02880289 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02890290 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02900291 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02910048 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02920293 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02930294 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02940295 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02950073 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02990056 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03030354 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03070313 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03080307 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03110308 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03130316 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03140124 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03150123 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03160363 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03170358 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03180046 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03190067 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03200066 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03210047 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03220323 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03230215 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03240325 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03250326 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03260318 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03540220 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03550356 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03560357 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03570321 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03580359 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03590224 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03600361 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03610222 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03620320 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03630364 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03640225 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03650366 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03660223 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03670319 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0518T66S -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0522T67C -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 05240324 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 05270067 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T4940246 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T4950253 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T508T329 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T56V0208 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T56V0270 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T56W0205 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T56W0265 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59BT5VX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5AWT67J -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5AXT675 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5BAT601 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5BBT60F -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B151 of 382

LOAD Z T5BNT5AW -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z T5IL0518 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5NYT5WA -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RZT5S2 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S2T614 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VS0236 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VV0252 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VXT5BN -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WAT61H -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WCT59B -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WJT5RZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0058T68O -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00590283 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00610284 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0062T5IM -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0064T5LM -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02430272 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0244T68M -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0249T61G -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0258T5WF -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02720273 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02730274 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02740275 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02750276 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02760277 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0276T59I -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02770278 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0278T5VU -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02790280 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0280T5VT -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02830064 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02840285 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02850286 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02860287 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0287T68N -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59IT59K -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59K0249 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5I9T5IF -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IAT5I9 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IBT5IA -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ICT5IB -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IDT5IC -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IET5ID -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IHT5IM -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IIT5IH -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IJT5II -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IKT5IJ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ILT5IK -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IMT5IG -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IMT5ON -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5NWT5LN -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5NXT5NW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5NYT5NX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ONT5OP -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OP0074 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VT0244 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VU0279 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WF0267 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00570297 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0058T5IE -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00590049 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 00730237 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0075T327 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0077T68G -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0237T5WX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02380072 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02540255 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0255T5X0 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02560257 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02570258 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02580259 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02590260 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02600261 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02610262 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02620238 -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B152 of 382

LOAD Z 02960298 -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z 02970296 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02980300 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 03000077 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T327T509 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T327T5AV -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T329T328 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T509T328 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5AV0056 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5BMT327 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5BNT5BM -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IET5W7 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W70048 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WX0254 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5X00256 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0284T5IA -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T598T5WI -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5B1T598 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IAT5B1 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VTT5XP -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VUT5XQ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WI0288 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5XNT5VS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5XOT5VV -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5XPT5XN -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5XQT5XO -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0064T5AY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0065T5NW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0071T5ZW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0202T5ZZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0203T5ZY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0204T5ZX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02050208 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0206T648 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0207T647 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0208T644 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0209T60C -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0210T610 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0216T60V -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0220T5ZS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0235T5WP -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0236T5W8 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0237T5WR -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0238T5WB -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02430235 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02440236 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0245T59T -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0246T5WQ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0247T5W2 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0248T5W3 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0250T5W4 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0251T5W5 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0252T61L -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0253T61K -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0254T5WS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0255T5WT -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0256T5WU -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0257T6AG -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0259T5VY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0260T59C -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02610270 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02620271 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02720245 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02730246 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0274T59J -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02750248 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02770250 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0278T59G -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 02790252 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0280T59F -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0281T5NX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0282T5BM -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0283T5B0 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0285T5IB -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0286T5IC -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B153 of 382

LOAD Z 0287T5ID -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z 0288T5IH -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0289T5II -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0290T5IJ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0291T5IK -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0292T5WM -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0293T5WL -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0294T5RS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0295T5WK -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0303T5ZU -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0313T60Z -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0315T5ZV -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0316T60Y -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0319T60R -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0321T5ZO -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0354T5ZT -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0355T5ZR -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0356T5ZQ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0357T5ZP -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0363T60X -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0364T60W -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0365T60U -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0366T60T -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0367T60S -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T596T5W6 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5970295 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5990292 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59CT5VZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59DT5W0 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59E0253 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59FT59E -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59GT59H -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59H0251 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59JT59L -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59L0247 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59TT61F -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59UT5WE -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59VT5W1 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T59WT5S1 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5AY0065 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5B00281 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5B20297 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5B3T615 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5B4T5RW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5BM0299 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IBT5WH -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ICT5WG -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IDT596 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IHT599 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IIT6AC -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IJ0294 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5IKT597 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5NW0075 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5NXT61I -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ORT5OQ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OST5OR -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RST5RX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RTT5RS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RTT617 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RU0298 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RUT5RY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RV0296 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RVT5RU -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RW0300 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RXT5B3 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RXT616 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RYT5RW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5RZT5S0 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S0T5S1 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S1T5S4 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S2T5S3 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S3T613 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S3T5S4 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5S4T612 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VW0239 -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B154 of 382

LOAD Z T5VWT5VX -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z T5VY0268 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VYT5VZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5VZ0269 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W00266 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W10265 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W1T5W0 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W2T59U -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W2T5W3 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W3T5WD -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W4T61N -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W4T5W5 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W5T61M -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W60291 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W6T5W7 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W8T61J -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W90238 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WBT5VW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WDT61P -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WET61Q -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WG0290 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WH0289 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WKT5B3 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WLT5RT -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WMT61B -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WPT61T -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WQT61E -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WRT5S0 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WST59W -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WTT61A -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WUT6AF -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 0061T5I9 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5AZ0062 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5I9T5AZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T508T509 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OLT5OQ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OMT5OO -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OMT5OS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OOT5OL -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OOT5OR -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OQ0074 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ORT5OP -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5OST5ON -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W0T5WF -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W8T5WA -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5W90522 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WBT5WC -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WET5WD -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WHT5WG -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WIT5WH -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WKT5WJ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WMT5WL -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WQT5WY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WRT5WW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WST5WT -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WTT5WZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WWT5WS -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WXT5WW -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WYT59U -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5WZT5WU -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5X0T5WZ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 05390055 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 05400054 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z 05460267 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZCT5NY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZNT5BB -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZOT60G -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZPT60H -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZQT60I -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZRT60J -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZST60K -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZTT60L -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZUT60M -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZVT60N -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZWT60O -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B155 of 382

LOAD Z T5ZXT60P -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z T5ZY0206 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T5ZZT64C -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6000263 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6010046 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6020318 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6030326 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6040325 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6050324 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6060215 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6070323 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6080322 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6090314 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60A0070 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60B0213 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60C0212 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60D0211 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60E0239 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60F0066 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60G0320 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60H0362 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60I0361 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60J0360 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60K0219 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60L0359 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60M0358 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60N0317 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60O0069 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60P0207 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60QT5BA -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60RT602 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60ST603 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60TT604 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60UT605 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60VT606 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60WT607 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60XT608 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60YT609 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T60ZT60A -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T610T60B -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6110264 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6120263 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6130240 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T614T5AX -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T615T5B4 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T616T5RY -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T617T5RV -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T618T5B2 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61AT611 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61BT618 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61DT59D -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61E0255 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61F0254 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61GT61O -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61H0522 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61I0282 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61JT5W9 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61K0262 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61L0261 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61M0260 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61N0259 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61O0258 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61PT6AD -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61QT6AE -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T61T0237 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T644T60D -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6470210 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6480209 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T64B0264 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T64C0205 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T66RT5WJ -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T66S0073 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6740202 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6750055 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T67BT5WC -0.0145 -0.0145 GLOB UNIF HAVC-CD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B156 of 382

LOAD Z T67C0072 -0.0145 -0.0145 GLOB UNIF HAVC-CD


LOAD Z T67I0211 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T67J0054 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6890268 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68A0267 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68E0054 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68F0240 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68G0055 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68M0059 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68N0058 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T68O0243 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6AC0293 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6AD0257 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6AE0256 -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6AFT59V -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOAD Z T6AGT61D -0.0145 -0.0145 GLOB UNIF HAVC-CD
LOADCNCDIN
LOAD T69W -38.500 GLOB JOIN HYD-POWE
LOAD Z 02950073 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 00730237 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 0237T5WX -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z T5WX0254 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02540255 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 0255T5X0 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z T5X00256 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02560257 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02570258 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02580259 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02590260 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02600261 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOAD Z 02610262 -0.2000 -0.2000 GLOB UNIF IN-CE-1
LOADCNCDMD
LOADCNCDMO
LOADCNCDPD
***LDS1** -1.000 4.533 12.480 -1.000 5.750 12.480 11.000
***LDS2** 4.533 12.480 11.000 5.750 12.480 9.758
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-1
LOAD Z 0239T68E -3.7568 -3.7568 GLOB UNIF PI-C-1
LOAD Z T6010046 0.45720-5.4704 -5.4704 GLOB UNIF PI-C-1
LOAD Z T6020318 -5.8060 -5.8060 GLOB UNIF PI-C-1
LOAD Z T6030326 -5.4645 -5.4645 GLOB UNIF PI-C-1
LOAD Z T6040325 -6.4891 -6.4891 GLOB UNIF PI-C-1
LOAD Z T6050324 -5.9768 -5.9768 GLOB UNIF PI-C-1
LOAD Z T6060215 -5.1229 -5.1229 GLOB UNIF PI-C-1
LOAD Z T6070323 -5.2937 -5.2937 GLOB UNIF PI-C-1
LOAD Z T6080322 -5.8060 -5.8060 GLOB UNIF PI-C-1
LOAD Z T6090314 -5.8060 -5.8060 GLOB UNIF PI-C-1
LOAD Z T60A0070 -6.4891 -6.4891 GLOB UNIF PI-C-1
LOAD Z T60B0213 -7.5137 -7.5137 GLOB UNIF PI-C-1
LOAD Z T60C0212 -7.5137 -7.5137 GLOB UNIF PI-C-1
LOAD Z T60D0211 -7.5137 -7.5137 GLOB UNIF PI-C-1
LOAD Z T60E0239 -3.7568 -3.7568 GLOB UNIF PI-C-1
***LDS1** -1.000 -5.750 12.480 -1.000 -4.533 12.480 11.000
***LDS2** -5.750 12.480 11.000 -4.533 12.480 9.758
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-1
LOAD Z 0047T5ZN -6.2995 -6.2995 GLOB UNIF PI-C-1
LOAD Z 0055T68F -3.7568 -3.7568 GLOB UNIF PI-C-1
LOAD Z 0240T600 -3.7568 -3.7568 GLOB UNIF PI-C-1
LOAD Z 0071T5ZW -6.4891 -6.4891 GLOB UNIF PI-C-1
LOAD Z 0202T5ZZ -7.5137 -7.5137 GLOB UNIF PI-C-1
LOAD Z 0203T5ZY -7.5137 -7.5137 GLOB UNIF PI-C-1
LOAD Z 0204T5ZX -7.5137 -7.5137 GLOB UNIF PI-C-1
LOAD Z 0220T5ZS -5.1229 -5.1229 GLOB UNIF PI-C-1
LOAD Z 0303T5ZU -5.8060 -5.8060 GLOB UNIF PI-C-1
LOAD Z 0315T5ZV -5.8060 -5.8060 GLOB UNIF PI-C-1
LOAD Z 0321T5ZO -5.8060 -5.8060 GLOB UNIF PI-C-1
LOAD Z 0354T5ZT -5.2937 -5.2937 GLOB UNIF PI-C-1
LOAD Z 0355T5ZR -5.9768 -5.9768 GLOB UNIF PI-C-1
LOAD Z 0356T5ZQ -6.4891 -6.4891 GLOB UNIF PI-C-1
LOAD Z 0357T5ZP -5.4645 -5.4645 GLOB UNIF PI-C-1
***LDS1** -1.000 4.533 12.480 0.100 4.533 12.480 -1.000
***LDS2** -4.533 12.480 0.100 -4.533 12.480 12.942
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-1
LOAD Z T56V0208 -41.066 -41.066 GLOB UNIF PI-C-1
LOAD Z T56W0205 -41.066 -41.066 GLOB UNIF PI-C-1
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B157 of 382

***LDS1** 2.300 -3.717 12.480 2.300 -2.500 12.480 11.000


***LDS2** -3.717 12.480 11.000 -2.500 12.480 10.400
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-2
LOAD Z T60F0066 -3.6400 -3.6400 GLOB UNIF PI-C-2
LOAD Z T60G0320 -6.1880 -6.1880 GLOB UNIF PI-C-2
LOAD Z T60H0362 -5.8240 -5.8240 GLOB UNIF PI-C-2
LOAD Z T60I0361 -6.9160 -6.9160 GLOB UNIF PI-C-2
LOAD Z T60J0360 -6.3700 -6.3700 GLOB UNIF PI-C-2
LOAD Z T60K0219 -5.4600 -5.4600 GLOB UNIF PI-C-2
LOAD Z T60L0359 -5.6420 -5.6420 GLOB UNIF PI-C-2
LOAD Z T60M0358 -6.1880 -6.1880 GLOB UNIF PI-C-2
LOAD Z T60N0317 -6.1880 -6.1880 GLOB UNIF PI-C-2
LOAD Z T60O0069 -6.9160 -6.9160 GLOB UNIF PI-C-2
LOAD Z T60P0207 -4.0040 -4.0040 GLOB UNIF PI-C-2
***LDS1** 2.300 2.500 12.480 2.300 3.717 12.480 11.000
***LDS2** 2.500 12.480 11.000 3.717 12.480 10.400
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-2
LOAD Z 0067T60Q -3.6400 -3.6400 GLOB UNIF PI-C-2
LOAD Z 0210T610 -4.0040 -4.0040 GLOB UNIF PI-C-2
LOAD Z 0216T60V -5.4600 -5.4600 GLOB UNIF PI-C-2
LOAD Z 0313T60Z -6.9160 -6.9160 GLOB UNIF PI-C-2
LOAD Z 0316T60Y -6.1880 -6.1880 GLOB UNIF PI-C-2
LOAD Z 0319T60R -6.1880 -6.1880 GLOB UNIF PI-C-2
LOAD Z 0363T60X -6.1880 -6.1880 GLOB UNIF PI-C-2
LOAD Z 0364T60W -5.6420 -5.6420 GLOB UNIF PI-C-2
LOAD Z 0365T60U -6.3700 -6.3700 GLOB UNIF PI-C-2
LOAD Z 0366T60T -6.9160 -6.9160 GLOB UNIF PI-C-2
LOAD Z 0367T60S -5.8240 -5.8240 GLOB UNIF PI-C-2
***LDS1** 2.300 2.500 12.480 3.400 2.500 12.480 2.300
***LDS2** -2.500 12.480 3.400 -2.500 12.480 17.858
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-2
LOAD Z 02070069 -31.252 -31.252 GLOB UNIF PI-C-2
LOAD Z 02100313 -31.252 -31.252 GLOB UNIF PI-C-2
***LDS1** -3.910 -8.750 12.480 -2.505 -8.750 12.480 -4.010
***LDS2** -11.000 12.480 -2.505 -11.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-3
LOAD Z T5RTT617 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T61BT618 0.05556-8.1829 -8.1829 GLOB UNIF PI-C-3
LOAD Z T61CT619 -4.5461 -4.5461 GLOB UNIF PI-C-3
***LDS1** -3.910 -6.750 12.480 -2.505 -6.750 12.480 -3.910
***LDS2** -8.750 12.480 -2.505 -8.750 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-3
LOAD Z T5B3T615 -2.5458 -2.5458 GLOB UNIF PI-C-3
LOAD Z T5RTT617 -4.7279 -4.7279 GLOB UNIF PI-C-3
LOAD Z T5RXT616 -7.2737 -7.2737 GLOB UNIF PI-C-3
***LDS1** -4.000 -5.750 12.480 -2.505 -5.750 12.480 -3.910
***LDS2** -6.750 12.480 -2.505 -6.750 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-3
LOAD Z T5RZT5S2 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T5S2T614 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T5B3T615 -3.6368 -3.6368 GLOB UNIF PI-C-3
***LDS1** -4.010 -3.000 12.480 -2.505 -3.000 12.480 -4.000
***LDS2** -4.000 12.480 -2.505 -4.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-3
LOAD Z T5S1T5S4 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T5S4T612 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T61AT611 -3.6368 -3.6368 GLOB UNIF PI-C-3
***LDS1** -4.000 -5.750 12.480 -4.000 -5.000 12.480 -2.505
***LDS2** -5.750 12.480 -2.505 -5.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-3
LOAD Z T5RZT5S0 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T5S2T5S3 -7.2373 -7.2373 GLOB UNIF PI-C-3
***LDS1** -4.000 -5.000 12.480 -4.000 -4.000 12.480 -2.505
***LDS2** -5.000 12.480 -2.505 -4.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-3
LOAD Z T5S0T5S1 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T5S3T5S4 -7.2373 -7.2373 GLOB UNIF PI-C-3
***LDS1** -4.385 -1.000 12.480 -1.000 -1.000 12.480 -4.385
***LDS2** -2.000 12.480 -1.000 -2.000 12.480 9.169
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-4
LOAD Z T59DT5W0 -3.2091 -3.2091 GLOB UNIF PI-C-4
LOAD Z T59VT5W1 -3.2091 -3.2091 GLOB UNIF PI-C-4
LOAD Z T5W00266 -3.2091 -3.2091 GLOB UNIF PI-C-4
LOAD Z T5W10265 -3.2091 -3.2091 GLOB UNIF PI-C-4
LOAD Z T61DT59D -3.2091 -3.2091 GLOB UNIF PI-C-4
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B158 of 382

***LDS1** -9.016 -3.000 12.480 -4.010 -3.000 12.480 -9.016


***LDS2** -4.000 12.480 -4.000 -4.000 12.480 12.580
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-5
LOAD Z 0254T5WS -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z 0255T5WT -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z T59WT5S1 -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z T5WST59W -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z T5WTT61A -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z T61E0255 -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z T61F0254 -4.4030 -4.4030 GLOB UNIF PI-C-5
LOAD Z T61GT61O -0.6776 -0.6776 GLOB UNIF PI-C-6
LOAD Z 0258T5WF -0.6776 -0.6776 GLOB UNIF PI-C-6
LOAD Z T5WF0267 -0.6776 -0.6776 GLOB UNIF PI-C-6
***LDS1** -15.000 -8.750 12.480 -9.000 -8.750 12.480 -15.000
***LDS2** -9.750 12.480 -9.000 -9.750 12.480 4.486
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-7
LOAD Z 0284T5IA -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z T598T5WI -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z T5B1T598 -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z T5IAT5B1 -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z T5WI0288 -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z 0285T5IB -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z 0288T5IH -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z 0289T5II -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z T5IBT5WH -1.5701 -1.5701 GLOB UNIF PI-C-7
LOAD Z T5WH0289 -1.5701 -1.5701 GLOB UNIF PI-C-7
***LDS1** -15.000 -5.000 12.480 -11.000 -5.000 12.480 -15.000
***LDS2** -5.750 12.480 -11.000 -5.750 12.480 8.195
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-8
LOAD Z 0058T5IE 0.16000-2.5609 -2.5609 GLOB UNIF PI-C-8
LOAD Z T5IET5W7 -1.9535 -1.9535 GLOB UNIF PI-C-8
LOAD Z T5W70048 -3.1738 -3.1738 GLOB UNIF PI-C-8
LOAD Z 02430235 -2.1512 -2.1512 GLOB UNIF PI-C-8
***LDS1** -15.000 6.750 12.480 -11.000 6.750 12.480 -15.000
***LDS2** 5.750 12.480 -11.000 5.750 12.480 0.683
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-9
LOAD Z 00590049 0.16000-0.2699 -0.2699 GLOB UNIF PI-C-9
LOAD Z 0283T5B0 -0.2390 -0.2390 GLOB UNIF PI-C-9
LOAD Z T5B00281 -0.2390 -0.2390 GLOB UNIF PI-C-9
***LDS1** -11.000 6.750 12.480 -9.000 6.750 12.480 -11.000
***LDS2** 5.750 12.480 -9.000 5.750 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0049T5ZC -8.7896 -8.7896 GLOB UNIF PI-C-10
LOAD Z T5NYT5WA -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5WAT61H -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5ZCT5NY -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0281T5NX -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5NXT61I -1.5358 -1.5358 GLOB UNIF PI-C-10
***LDS1** -11.000 -5.750 12.480 -9.000 -5.750 12.480 -11.000
***LDS2** -8.750 12.480 -9.000 -8.750 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0048T5IL -1.9909 -1.9909 GLOB UNIF PI-C-10
LOAD Z 0289T5II -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0290T5IJ -3.0716 -3.0716 GLOB UNIF PI-C-10
LOAD Z 0291T5IK -3.0716 -3.0716 GLOB UNIF PI-C-10
LOAD Z T61O0258 -0.6776 -0.6776 GLOB UNIF PI-C-6
***LDS1** -11.000 5.750 12.480 -9.000 5.750 12.480 -11.000
***LDS2** 2.000 12.480 -9.000 2.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0049T5ZC -6.5922 -6.5922 GLOB UNIF PI-C-10
LOAD Z T5NYT5WA -1.1518 -1.1518 GLOB UNIF PI-C-10
LOAD Z T5WAT61H -1.1518 -1.1518 GLOB UNIF PI-C-10
LOAD Z T5ZCT5NY -1.1518 -1.1518 GLOB UNIF PI-C-10
LOAD Z 0236T5W8 -2.6876 -2.6876 GLOB UNIF PI-C-10
LOAD Z 0251T5W5 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0252T61L -3.0716 -3.0716 GLOB UNIF PI-C-10
LOAD Z 0253T61K -3.0716 -3.0716 GLOB UNIF PI-C-10
LOAD Z T5W5T61M -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5W8T61J -2.6876 -2.6876 GLOB UNIF PI-C-10
***LDS1** -11.000 2.000 12.480 -9.000 2.000 12.480 -11.000
***LDS2** 1.000 12.480 -9.000 1.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0250T5W4 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0251T5W5 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5W4T61N -1.5358 -1.5358 GLOB UNIF PI-C-10
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B159 of 382

LOAD Z T5W5T61M -1.5358 -1.5358 GLOB UNIF PI-C-10


***LDS1** -11.000 1.000 12.480 -9.000 1.000 12.480 -11.000
***LDS2** -1.000 12.480 -9.000 -1.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0249T61G -3.0716 -3.0716 GLOB UNIF PI-C-10
LOAD Z 0248T5W3 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0250T5W4 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5W3T5WD -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5W4T61N -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5WDT61P -1.5358 -1.5358 GLOB UNIF PI-C-10
***LDS1** -11.000 -1.000 12.480 -9.000 -1.000 12.480 -11.000
***LDS2** -2.000 12.480 -9.000 -2.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0247T5W2 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0248T5W3 -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T59UT5WE -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5W2T59U -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5W3T5WD -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5WDT61P -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5WET61Q -1.5358 -1.5358 GLOB UNIF PI-C-10
***LDS1** -11.000 -3.000 12.480 -11.000 -2.000 12.480 -9.016
***LDS2** -3.000 12.480 -9.000 -2.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 02460247 -0.9214 -0.9214 GLOB UNIF PI-C-10
LOAD Z T5WQT5WY -5.1726 -5.1726 GLOB UNIF PI-C-10
LOAD Z T5WYT59U -5.1726 -5.1726 GLOB UNIF PI-C-10
***LDS1** -11.000 -3.000 12.480 -9.016 -3.000 12.480 -11.000
***LDS2** -4.000 12.480 -9.016 -4.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0245T59T -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z 0246T5WQ -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T59TT61F -1.5358 -1.5358 GLOB UNIF PI-C-10
LOAD Z T5WQT61E -1.5358 -1.5358 GLOB UNIF PI-C-10
***LDS1** -11.000 -5.000 12.480 -11.000 -4.000 12.480 -9.000
***LDS2** -5.000 12.480 -9.016 -4.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 02350245 -0.9214 -0.9214 GLOB UNIF PI-C-10
***LDS1** -11.000 -5.000 12.480 -9.000 -5.000 12.480 -11.000
***LDS2** -5.750 12.480 -9.000 -5.750 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPD -2EQUPPRESPI-C-10
LOAD Z 0048T5IL -1.4932 -1.4932 GLOB UNIF PI-C-10
LOAD Z 0235T5WP -1.1518 -1.1518 GLOB UNIF PI-C-10
LOAD Z T5WPT61T -1.1518 -1.1518 GLOB UNIF PI-C-10
LOAD Z T68E0054 -3.7568 -3.7568 GLOB UNIF PI-C-1
LOAD Z T68F0240 -3.7568 -3.7568 GLOB UNIF PI-C-1
LOADCNCDPO
***LDS1** -1.000 4.533 12.480 -1.000 5.750 12.480 11.000
***LDS2** 4.533 12.480 11.000 5.750 12.480 9.758
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-1
LOAD Z 0239T68E -5.3669 -5.3669 GLOB UNIF PI-C-1
LOAD Z T6010046 0.45720-7.8149 -7.8149 GLOB UNIF PI-C-1
LOAD Z T6020318 -8.2943 -8.2943 GLOB UNIF PI-C-1
LOAD Z T6030326 -7.8064 -7.8064 GLOB UNIF PI-C-1
LOAD Z T6040325 -9.2701 -9.2701 GLOB UNIF PI-C-1
LOAD Z T6050324 -8.5382 -8.5382 GLOB UNIF PI-C-1
LOAD Z T6060215 -7.3185 -7.3185 GLOB UNIF PI-C-1
LOAD Z T6070323 -7.5625 -7.5625 GLOB UNIF PI-C-1
LOAD Z T6080322 -8.2943 -8.2943 GLOB UNIF PI-C-1
LOAD Z T6090314 -8.2943 -8.2943 GLOB UNIF PI-C-1
LOAD Z T60A0070 -9.2701 -9.2701 GLOB UNIF PI-C-1
LOAD Z T60B0213 -10.734 -10.734 GLOB UNIF PI-C-1
LOAD Z T60C0212 -10.734 -10.734 GLOB UNIF PI-C-1
LOAD Z T60D0211 -10.734 -10.734 GLOB UNIF PI-C-1
LOAD Z T60E0239 -5.3669 -5.3669 GLOB UNIF PI-C-1
***LDS1** -1.000 -5.750 12.480 -1.000 -4.533 12.480 11.000
***LDS2** -5.750 12.480 11.000 -4.533 12.480 9.758
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-1
LOAD Z 0047T5ZN -8.9993 -8.9993 GLOB UNIF PI-C-1
LOAD Z 0055T68F -5.3669 -5.3669 GLOB UNIF PI-C-1
LOAD Z 0240T600 -5.3669 -5.3669 GLOB UNIF PI-C-1
LOAD Z 0071T5ZW -9.2701 -9.2701 GLOB UNIF PI-C-1
LOAD Z 0202T5ZZ -10.734 -10.734 GLOB UNIF PI-C-1
LOAD Z 0203T5ZY -10.734 -10.734 GLOB UNIF PI-C-1
LOAD Z 0204T5ZX -10.734 -10.734 GLOB UNIF PI-C-1
LOAD Z 0220T5ZS -7.3185 -7.3185 GLOB UNIF PI-C-1
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B160 of 382

LOAD Z 0303T5ZU -8.2943 -8.2943 GLOB UNIF PI-C-1


LOAD Z 0315T5ZV -8.2943 -8.2943 GLOB UNIF PI-C-1
LOAD Z 0321T5ZO -8.2943 -8.2943 GLOB UNIF PI-C-1
LOAD Z 0354T5ZT -7.5625 -7.5625 GLOB UNIF PI-C-1
LOAD Z 0355T5ZR -8.5382 -8.5382 GLOB UNIF PI-C-1
LOAD Z 0356T5ZQ -9.2701 -9.2701 GLOB UNIF PI-C-1
LOAD Z 0357T5ZP -7.8064 -7.8064 GLOB UNIF PI-C-1
***LDS1** -1.000 4.533 12.480 0.100 4.533 12.480 -1.000
***LDS2** -4.533 12.480 0.100 -4.533 12.480 12.942
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-1
LOAD Z T56V0208 -58.666 -58.666 GLOB UNIF PI-C-1
LOAD Z T56W0205 -58.666 -58.666 GLOB UNIF PI-C-1
***LDS1** 2.300 -3.717 12.480 2.300 -2.500 12.480 11.000
***LDS2** -3.717 12.480 11.000 -2.500 12.480 10.400
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-2
LOAD Z T60F0066 -5.2000 -5.2000 GLOB UNIF PI-C-2
LOAD Z T60G0320 -8.8400 -8.8400 GLOB UNIF PI-C-2
LOAD Z T60H0362 -8.3200 -8.3200 GLOB UNIF PI-C-2
LOAD Z T60I0361 -9.8800 -9.8800 GLOB UNIF PI-C-2
LOAD Z T60J0360 -9.1000 -9.1000 GLOB UNIF PI-C-2
LOAD Z T60K0219 -7.8000 -7.8000 GLOB UNIF PI-C-2
LOAD Z T60L0359 -8.0600 -8.0600 GLOB UNIF PI-C-2
LOAD Z T60M0358 -8.8400 -8.8400 GLOB UNIF PI-C-2
LOAD Z T60N0317 -8.8400 -8.8400 GLOB UNIF PI-C-2
LOAD Z T60O0069 -9.8800 -9.8800 GLOB UNIF PI-C-2
LOAD Z T60P0207 -5.7200 -5.7200 GLOB UNIF PI-C-2
***LDS1** 2.300 2.500 12.480 2.300 3.717 12.480 11.000
***LDS2** 2.500 12.480 11.000 3.717 12.480 10.400
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-2
LOAD Z 0067T60Q -5.2000 -5.2000 GLOB UNIF PI-C-2
LOAD Z 0210T610 -5.7200 -5.7200 GLOB UNIF PI-C-2
LOAD Z 0216T60V -7.8000 -7.8000 GLOB UNIF PI-C-2
LOAD Z 0313T60Z -9.8800 -9.8800 GLOB UNIF PI-C-2
LOAD Z 0316T60Y -8.8400 -8.8400 GLOB UNIF PI-C-2
LOAD Z 0319T60R -8.8400 -8.8400 GLOB UNIF PI-C-2
LOAD Z 0363T60X -8.8400 -8.8400 GLOB UNIF PI-C-2
LOAD Z 0364T60W -8.0600 -8.0600 GLOB UNIF PI-C-2
LOAD Z 0365T60U -9.1000 -9.1000 GLOB UNIF PI-C-2
LOAD Z 0366T60T -9.8800 -9.8800 GLOB UNIF PI-C-2
LOAD Z 0367T60S -8.3200 -8.3200 GLOB UNIF PI-C-2
***LDS1** 2.300 2.500 12.480 3.400 2.500 12.480 2.300
***LDS2** -2.500 12.480 3.400 -2.500 12.480 17.858
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-2
LOAD Z 02070069 -44.646 -44.646 GLOB UNIF PI-C-2
LOAD Z 02100313 -44.646 -44.646 GLOB UNIF PI-C-2
***LDS1** -3.910 -8.750 12.480 -2.505 -8.750 12.480 -4.010
***LDS2** -11.000 12.480 -2.505 -11.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-3
LOAD Z T5RTT617 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T61BT618 0.05556-11.690 -11.690 GLOB UNIF PI-C-3
LOAD Z T61CT619 -6.4944 -6.4944 GLOB UNIF PI-C-3
***LDS1** -3.910 -6.750 12.480 -2.505 -6.750 12.480 -3.910
***LDS2** -8.750 12.480 -2.505 -8.750 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-3
LOAD Z T5B3T615 -3.6368 -3.6368 GLOB UNIF PI-C-3
LOAD Z T5RTT617 -6.7542 -6.7542 GLOB UNIF PI-C-3
LOAD Z T5RXT616 -10.391 -10.391 GLOB UNIF PI-C-3
***LDS1** -4.000 -5.750 12.480 -2.505 -5.750 12.480 -3.910
***LDS2** -6.750 12.480 -2.505 -6.750 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-3
LOAD Z T5RZT5S2 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T5S2T614 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T5B3T615 -5.1955 -5.1955 GLOB UNIF PI-C-3
***LDS1** -4.010 -3.000 12.480 -2.505 -3.000 12.480 -4.000
***LDS2** -4.000 12.480 -2.505 -4.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-3
LOAD Z T5S1T5S4 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T5S4T612 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T61AT611 -5.1955 -5.1955 GLOB UNIF PI-C-3
***LDS1** -4.000 -5.750 12.480 -4.000 -5.000 12.480 -2.505
***LDS2** -5.750 12.480 -2.505 -5.000 12.480 10.391
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-3
LOAD Z T5RZT5S0 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T5S2T5S3 -10.339 -10.339 GLOB UNIF PI-C-3
***LDS1** -4.000 -5.000 12.480 -4.000 -4.000 12.480 -2.505
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B161 of 382

***LDS2** -5.000 12.480 -2.505 -4.000 12.480 10.391


***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-3
LOAD Z T5S0T5S1 -5.1955 -5.1955 GLOB UNIF PI-C-3
LOAD Z T5S3T5S4 -10.339 -10.339 GLOB UNIF PI-C-3
***LDS1** -4.385 -1.000 12.480 -1.000 -1.000 12.480 -4.385
***LDS2** -2.000 12.480 -1.000 -2.000 12.480 9.169
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-4
LOAD Z T59DT5W0 -4.5845 -4.5845 GLOB UNIF PI-C-4
LOAD Z T59VT5W1 -4.5845 -4.5845 GLOB UNIF PI-C-4
LOAD Z T5W00266 -4.5845 -4.5845 GLOB UNIF PI-C-4
LOAD Z T5W10265 -4.5845 -4.5845 GLOB UNIF PI-C-4
LOAD Z T61DT59D -4.5845 -4.5845 GLOB UNIF PI-C-4
***LDS1** -9.016 -3.000 12.480 -4.010 -3.000 12.480 -9.016
***LDS2** -4.000 12.480 -4.000 -4.000 12.480 12.580
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-5
LOAD Z 0254T5WS -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z 0255T5WT -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z T59WT5S1 -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z T5WST59W -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z T5WTT61A -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z T61E0255 -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z T61F0254 -6.2900 -6.2900 GLOB UNIF PI-C-5
LOAD Z T61GT61O -0.9680 -0.9680 GLOB UNIF PI-C-6
LOAD Z 0258T5WF -0.9680 -0.9680 GLOB UNIF PI-C-6
LOAD Z T5WF0267 -0.9680 -0.9680 GLOB UNIF PI-C-6
***LDS1** -15.000 -8.750 12.480 -9.000 -8.750 12.480 -15.000
***LDS2** -9.750 12.480 -9.000 -9.750 12.480 4.486
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-7
LOAD Z 0284T5IA -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z T598T5WI -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z T5B1T598 -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z T5IAT5B1 -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z T5WI0288 -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z 0285T5IB -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z 0288T5IH -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z 0289T5II -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z T5IBT5WH -2.2430 -2.2430 GLOB UNIF PI-C-7
LOAD Z T5WH0289 -2.2430 -2.2430 GLOB UNIF PI-C-7
***LDS1** -15.000 -5.000 12.480 -11.000 -5.000 12.480 -15.000
***LDS2** -5.750 12.480 -11.000 -5.750 12.480 8.195
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-8
LOAD Z 0058T5IE 0.16000-3.6585 -3.6585 GLOB UNIF PI-C-8
LOAD Z T5IET5W7 -2.7907 -2.7907 GLOB UNIF PI-C-8
LOAD Z T5W70048 -4.5340 -4.5340 GLOB UNIF PI-C-8
LOAD Z 02430235 -3.0731 -3.0731 GLOB UNIF PI-C-8
***LDS1** -15.000 6.750 12.480 -11.000 6.750 12.480 -15.000
***LDS2** 5.750 12.480 -11.000 5.750 12.480 0.683
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-9
LOAD Z 00590049 0.16000-0.3855 -0.3855 GLOB UNIF PI-C-9
LOAD Z 0283T5B0 -0.3415 -0.3415 GLOB UNIF PI-C-9
LOAD Z T5B00281 -0.3415 -0.3415 GLOB UNIF PI-C-9
***LDS1** -11.000 6.750 12.480 -9.000 6.750 12.480 -11.000
***LDS2** 5.750 12.480 -9.000 5.750 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0049T5ZC -12.557 -12.557 GLOB UNIF PI-C-10
LOAD Z T5NYT5WA -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5WAT61H -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5ZCT5NY -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0281T5NX -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5NXT61I -2.1940 -2.1940 GLOB UNIF PI-C-10
***LDS1** -11.000 -5.750 12.480 -9.000 -5.750 12.480 -11.000
***LDS2** -8.750 12.480 -9.000 -8.750 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0048T5IL -2.8442 -2.8442 GLOB UNIF PI-C-10
LOAD Z 0289T5II -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0290T5IJ -4.3880 -4.3880 GLOB UNIF PI-C-10
LOAD Z 0291T5IK -4.3880 -4.3880 GLOB UNIF PI-C-10
LOAD Z T61O0258 -0.9680 -0.9680 GLOB UNIF PI-C-6
***LDS1** -11.000 5.750 12.480 -9.000 5.750 12.480 -11.000
***LDS2** 2.000 12.480 -9.000 2.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0049T5ZC -9.4174 -9.4174 GLOB UNIF PI-C-10
LOAD Z T5NYT5WA -1.6455 -1.6455 GLOB UNIF PI-C-10
LOAD Z T5WAT61H -1.6455 -1.6455 GLOB UNIF PI-C-10
LOAD Z T5ZCT5NY -1.6455 -1.6455 GLOB UNIF PI-C-10
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B162 of 382

LOAD Z 0236T5W8 -3.8395 -3.8395 GLOB UNIF PI-C-10


LOAD Z 0251T5W5 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0252T61L -4.3880 -4.3880 GLOB UNIF PI-C-10
LOAD Z 0253T61K -4.3880 -4.3880 GLOB UNIF PI-C-10
LOAD Z T5W5T61M -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W8T61J -3.8395 -3.8395 GLOB UNIF PI-C-10
***LDS1** -11.000 2.000 12.480 -9.000 2.000 12.480 -11.000
***LDS2** 1.000 12.480 -9.000 1.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0250T5W4 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0251T5W5 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W4T61N -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W5T61M -2.1940 -2.1940 GLOB UNIF PI-C-10
***LDS1** -11.000 1.000 12.480 -9.000 1.000 12.480 -11.000
***LDS2** -1.000 12.480 -9.000 -1.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0249T61G -4.3880 -4.3880 GLOB UNIF PI-C-10
LOAD Z 0248T5W3 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0250T5W4 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W3T5WD -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W4T61N -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5WDT61P -2.1940 -2.1940 GLOB UNIF PI-C-10
***LDS1** -11.000 -1.000 12.480 -9.000 -1.000 12.480 -11.000
***LDS2** -2.000 12.480 -9.000 -2.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0247T5W2 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0248T5W3 -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T59UT5WE -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W2T59U -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5W3T5WD -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5WDT61P -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5WET61Q -2.1940 -2.1940 GLOB UNIF PI-C-10
***LDS1** -11.000 -3.000 12.480 -11.000 -2.000 12.480 -9.016
***LDS2** -3.000 12.480 -9.000 -2.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 02460247 -1.3164 -1.3164 GLOB UNIF PI-C-10
LOAD Z T5WQT5WY -7.3894 -7.3894 GLOB UNIF PI-C-10
LOAD Z T5WYT59U -7.3894 -7.3894 GLOB UNIF PI-C-10
***LDS1** -11.000 -3.000 12.480 -9.016 -3.000 12.480 -11.000
***LDS2** -4.000 12.480 -9.016 -4.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0245T59T -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z 0246T5WQ -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T59TT61F -2.1940 -2.1940 GLOB UNIF PI-C-10
LOAD Z T5WQT61E -2.1940 -2.1940 GLOB UNIF PI-C-10
***LDS1** -11.000 -5.000 12.480 -11.000 -4.000 12.480 -9.000
***LDS2** -5.000 12.480 -9.016 -4.000 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 02350245 -1.3164 -1.3164 GLOB UNIF PI-C-10
***LDS1** -11.000 -5.000 12.480 -9.000 -5.000 12.480 -11.000
***LDS2** -5.750 12.480 -9.000 -5.750 12.480 4.388
***LDS3** 0.250 0 1 3 0 0CDPO -2EQUPPRESPI-C-10
LOAD Z 0048T5IL -2.1331 -2.1331 GLOB UNIF PI-C-10
LOAD Z 0235T5WP -1.6455 -1.6455 GLOB UNIF PI-C-10
LOAD Z T5WPT61T -1.6455 -1.6455 GLOB UNIF PI-C-10
LOAD Z T68E0054 -5.3669 -5.3669 GLOB UNIF PI-C-1
LOAD Z T68F0240 -5.3669 -5.3669 GLOB UNIF PI-C-1
LOADCNCDSA
***LDS1** -10.000 6.750 12.480 -6.000 6.750 12.480 -10.000
***LDS2** 5.750 12.480 -6.000 5.750 12.480 1.275
***LDS3** 0.250 0 1 3 0 0CDSA -2EQUPPRESSA-1-C
LOAD Z 0522T67C -0.6375 -0.6375 GLOB UNIF SA-1-C
LOAD Z T5NYT5WA -0.6375 -0.6375 GLOB UNIF SA-1-C
LOAD Z T5WAT61H -0.6375 -0.6375 GLOB UNIF SA-1-C
LOAD Z T5NXT61I -0.6375 -0.6375 GLOB UNIF SA-1-C
***LDS1** -5.420 -8.750 12.480 -1.000 -8.750 12.480 -5.420
***LDS2** -9.750 12.480 -1.000 -9.750 12.480 1.275
***LDS3** 0.250 0 1 3 0 0CDSA -2EQUPPRESSA-2-C
LOAD Z T5B20297 -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T5RTT617 -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T5RV0296 -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T5WLT5RT -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T5WMT61B -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z 0209T60C 1.00000-1.5000 GLOB CONC SA-3-C
LOAD Z 0047T5ZN -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B163 of 382

LOAD Z 00480235 -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z 0048T5IL -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00490281 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0049T5ZC -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00540076 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0054T67I -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0055T674 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0055T68F -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00620288 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00660527 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0067T60Q -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00690311 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00690317 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00700314 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00710315 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00720282 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0072T67B -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0073T66R -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00740292 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0075T508 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00760299 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 01230303 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 01240322 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02020203 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02030204 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02040071 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02050206 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02060207 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02070069 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02080209 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02090210 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02100313 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02110212 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02120213 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02130070 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02150524 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02160365 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02190360 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02200355 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02220362 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02230367 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02240219 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02250216 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02350245 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02360049 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0239T68E -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0240T600 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0245T494 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02460247 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02470248 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02480249 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02490250 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02500251 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0251T5VV -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0252T495 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0253T5VS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0263T64B -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0264T56W -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02650266 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0266T68A -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0267T689 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02680269 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0269T56V -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02700271 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0271T60E -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02810065 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02820075 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02880289 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02890290 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02900291 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02910048 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02920293 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02930294 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02940295 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02950073 -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B164 of 382

LOAD Z 02990056 -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z 03030354 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03070313 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03080307 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03110308 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03130316 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03140124 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03150123 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03160363 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03170358 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03180046 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03190067 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03200066 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03210047 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03220323 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03230215 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03240325 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03250326 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03260318 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03540220 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03550356 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03560357 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03570321 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03580359 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03590224 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03600361 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03610222 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03620320 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03630364 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03640225 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03650366 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03660223 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03670319 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0518T66S -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0522T67C -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 05240324 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 05270067 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T4940246 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T4950253 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T508T329 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T56V0208 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T56V0270 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T56W0205 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T56W0265 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59BT5VX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5AWT67J -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5AXT675 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5BAT601 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5BBT60F -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5BNT5AW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IL0518 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5NYT5WA -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RZT5S2 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S2T614 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VS0236 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VV0252 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VXT5BN -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WAT61H -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WCT59B -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WJT5RZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0058T68O -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00590283 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00610284 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0062T5IM -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0064T5LM -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02430272 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0244T68M -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0249T61G -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0258T5WF -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02720273 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02730274 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02740275 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02750276 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02760277 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0276T59I -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B165 of 382

LOAD Z 02770278 -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z 0278T5VU -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02790280 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0280T5VT -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02830064 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02840285 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02850286 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02860287 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0287T68N -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59IT59K -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59K0249 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5I9T5IF -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IAT5I9 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IBT5IA -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ICT5IB -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IDT5IC -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IET5ID -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IHT5IM -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IIT5IH -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IJT5II -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IKT5IJ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ILT5IK -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IMT5IG -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IMT5ON -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5NWT5LN -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5NXT5NW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5NYT5NX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ONT5OP -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OP0074 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VT0244 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VU0279 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WF0267 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00570297 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0058T5IE -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00590049 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 00730237 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0075T327 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0077T68G -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0237T5WX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02380072 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02540255 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0255T5X0 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02560257 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02570258 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02580259 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02590260 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02600261 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02610262 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02620238 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02960298 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02970296 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02980300 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 03000077 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T327T509 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T327T5AV -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T329T328 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T509T328 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5AV0056 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5BMT327 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5BNT5BM -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IET5W7 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W70048 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WX0254 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5X00256 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0284T5IA -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T598T5WI -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5B1T598 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IAT5B1 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VTT5XP -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VUT5XQ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WI0288 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5XNT5VS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5XOT5VV -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5XPT5XN -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5XQT5XO -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B166 of 382

LOAD Z 0064T5AY -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z 0065T5NW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0071T5ZW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0202T5ZZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0203T5ZY -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0204T5ZX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02050208 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0206T648 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0207T647 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0208T644 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0209T60C -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0210T610 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0216T60V -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0220T5ZS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0235T5WP -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0236T5W8 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0237T5WR -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0238T5WB -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02430235 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02440236 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0245T59T -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0246T5WQ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0247T5W2 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0248T5W3 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0250T5W4 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0251T5W5 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0252T61L -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0253T61K -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0254T5WS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0255T5WT -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0256T5WU -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0257T6AG -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0259T5VY -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0260T59C -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02610270 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02620271 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02720245 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02730246 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0274T59J -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02750248 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02770250 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0278T59G -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 02790252 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0280T59F -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0281T5NX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0282T5BM -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0283T5B0 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0285T5IB -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0286T5IC -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0287T5ID -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0288T5IH -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0289T5II -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0290T5IJ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0291T5IK -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0292T5WM -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0293T5WL -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0294T5RS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0295T5WK -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0303T5ZU -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0313T60Z -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0315T5ZV -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0316T60Y -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0319T60R -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0321T5ZO -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0354T5ZT -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0355T5ZR -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0356T5ZQ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0357T5ZP -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0363T60X -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0364T60W -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0365T60U -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0366T60T -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0367T60S -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T596T5W6 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5970295 -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B167 of 382

LOAD Z T5990292 -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z T59CT5VZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59DT5W0 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59E0253 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59FT59E -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59GT59H -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59H0251 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59JT59L -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59L0247 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59TT61F -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59UT5WE -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59VT5W1 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T59WT5S1 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5AY0065 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5B00281 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5B20297 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5B3T615 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5B4T5RW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5BM0299 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IBT5WH -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ICT5WG -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IDT596 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IHT599 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IIT6AC -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IJ0294 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5IKT597 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5NW0075 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5NXT61I -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ORT5OQ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OST5OR -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RST5RX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RTT5RS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RTT617 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RU0298 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RUT5RY -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RV0296 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RVT5RU -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RW0300 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RXT5B3 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RXT616 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RYT5RW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5RZT5S0 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S0T5S1 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S1T5S4 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S2T5S3 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S3T613 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S3T5S4 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5S4T612 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VW0239 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VWT5VX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VY0268 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VYT5VZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5VZ0269 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W00266 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W10265 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W1T5W0 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W2T59U -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W2T5W3 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W3T5WD -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W4T61N -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W4T5W5 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W5T61M -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W60291 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W6T5W7 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W8T61J -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W90238 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WBT5VW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WDT61P -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WET61Q -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WG0290 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WH0289 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WKT5B3 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WLT5RT -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WMT61B -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WPT61T -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B168 of 382

LOAD Z T5WQT61E -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z T5WRT5S0 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WST59W -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WTT61A -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WUT6AF -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 0061T5I9 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5AZ0062 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5I9T5AZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T508T509 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OLT5OQ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OMT5OO -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OMT5OS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OOT5OL -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OOT5OR -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OQ0074 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ORT5OP -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5OST5ON -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W0T5WF -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W8T5WA -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5W90522 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WBT5WC -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WET5WD -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WHT5WG -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WIT5WH -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WKT5WJ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WMT5WL -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WQT5WY -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WRT5WW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WST5WT -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WTT5WZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WWT5WS -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WXT5WW -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WYT59U -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5WZT5WU -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5X0T5WZ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 05390055 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 05400054 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 05460267 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z 01610162 3.00000-1.0000 GLOB CONC SA-4-C
LOAD Z T5ZCT5NY -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZNT5BB -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZOT60G -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZPT60H -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZQT60I -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZRT60J -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZST60K -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZTT60L -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZUT60M -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZVT60N -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZWT60O -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZXT60P -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZY0206 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T5ZZT64C -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6000263 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6010046 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6020318 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6030326 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6040325 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6050324 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6060215 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6070323 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6080322 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6090314 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60A0070 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60B0213 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60C0212 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60D0211 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60E0239 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60F0066 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60G0320 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60H0362 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60I0361 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60J0360 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60K0219 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60L0359 -0.0164 -0.0164 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B169 of 382

LOAD Z T60M0358 -0.0164 -0.0164 GLOB UNIF SAF-BULK


LOAD Z T60N0317 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60O0069 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60P0207 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60QT5BA -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60RT602 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60ST603 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60TT604 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60UT605 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60VT606 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60WT607 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60XT608 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60YT609 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T60ZT60A -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T610T60B -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6110264 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6120263 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6130240 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T614T5AX -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T615T5B4 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T616T5RY -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T617T5RV -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T617T5RV -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T618T5B2 -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T618T5B2 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61AT611 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61BT618 -0.6375 -0.6375 GLOB UNIF SA-2-C
LOAD Z T61BT618 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61DT59D -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61E0255 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61F0254 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61GT61O -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61H0522 -0.6375 -0.6375 GLOB UNIF SA-1-C
LOAD Z T61H0522 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61I0282 -0.6375 -0.6375 GLOB UNIF SA-1-C
LOAD Z T61I0282 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61JT5W9 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61K0262 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61L0261 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61M0260 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61N0259 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61O0258 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61PT6AD -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61QT6AE -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T61T0237 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T644T60D -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6470210 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6480209 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T64B0264 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T64C0205 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T66RT5WJ -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T66S0073 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6740202 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6750055 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T67BT5WC -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T67C0072 -0.6375 -0.6375 GLOB UNIF SA-1-C
LOAD Z T67C0072 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T67I0211 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T67J0054 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6890268 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68A0267 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68E0054 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68F0240 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68G0055 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68M0059 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68N0058 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T68O0243 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6AC0293 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6AD0257 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6AE0256 -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6AFT59V -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOAD Z T6AGT61D -0.0164 -0.0164 GLOB UNIF SAF-BULK
LOADCNCDST
LOAD 0046 -8.0000 GLOB JOIN DIAM-CE
LOAD 0047 -8.0000 GLOB JOIN DIAM-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B170 of 382

LOAD 0049 -8.0000 GLOB JOIN DIAM-CE


LOAD 0048 -8.0000 GLOB JOIN DIAM-CE
LOAD 0056 -8.0000 GLOB JOIN DIAM-CE
LOAD 0527 -4.7000 GLOB JOIN WING-CE
LOAD 0303 -4.7000 GLOB JOIN WING-CE
LOAD 0322 -4.7000 GLOB JOIN WING-CE
LOAD 0054 -4.7000 GLOB JOIN WING-CE
LOAD 0055 -4.7000 GLOB JOIN WING-CE
LOAD 0267 -4.7000 GLOB JOIN WING-CE
LOAD 0057 -4.7000 GLOB JOIN WING-CE
LOAD 0072 -4.7000 GLOB JOIN WING-CE
LOAD 0073 -4.7000 GLOB JOIN WING-CE
LOAD 0074 -4.7000 GLOB JOIN WING-CE
LOAD T495 -4.7000 GLOB JOIN WING-CE
LOAD 0249 -4.7000 GLOB JOIN WING-CE
LOAD T494 -4.7000 GLOB JOIN WING-CE
LOAD 0062 -4.7000 GLOB JOIN WING-CE
LOAD 0061 -4.7000 GLOB JOIN WING-CE
LOAD 0058 -4.7000 GLOB JOIN WING-CE
LOAD 0276 -4.7000 GLOB JOIN WING-CE
LOAD 0059 -4.7000 GLOB JOIN WING-CE
***LDS1** -1.000 2.500 12.480 -1.000 5.750 12.480 11.000
***LDS2** 2.500 12.480 11.000 5.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0067T60Q -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0239T68E -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z 02700271 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z 0271T60E -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z T56V0270 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z T5BAT601 -2.2150 -2.2150 GLOB UNIF PL8
LOAD Z T6010046 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T60E0239 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z T60QT5BA -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0208T644 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z 0209T60C -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z 0210T610 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z 0216T60V -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0313T60Z -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z 0316T60Y -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z 0319T60R -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z 0363T60X -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z 0364T60W -0.4882 -0.4882 GLOB UNIF PL8
LOAD Z 0365T60U -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0366T60T -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z 0367T60S -0.5040 -0.5040 GLOB UNIF PL8
LOAD Z T6020318 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T6030326 -0.5040 -0.5040 GLOB UNIF PL8
LOAD Z T6040325 -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T6050324 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T6060215 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T6070323 -0.4882 -0.4882 GLOB UNIF PL8
LOAD Z T6080322 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T6090314 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60A0070 -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T60B0213 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T60C0212 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T60D0211 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T60RT602 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60ST603 -0.5040 -0.5040 GLOB UNIF PL8
LOAD Z T60TT604 -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T60UT605 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T60VT606 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T60WT607 -0.4882 -0.4882 GLOB UNIF PL8
LOAD Z T60XT608 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60YT609 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60ZT60A -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T610T60B -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T644T60D -0.6930 -0.6930 GLOB UNIF PL8
***LDS1** -1.000 -5.750 12.480 -1.000 -2.500 12.480 11.000
***LDS2** -5.750 12.480 11.000 -2.500 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0047T5ZN -0.5810 -0.5810 GLOB UNIF PL8
LOAD Z 0055T68F -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z 0240T600 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z 0263T64B -0.3465 -0.3465 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B171 of 382

LOAD Z 0264T56W -0.3465 -0.3465 GLOB UNIF PL8


LOAD Z T5BBT60F -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZNT5BB -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6000263 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z T60F0066 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T64B0264 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z 0071T5ZW -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z 0202T5ZZ -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z 0203T5ZY -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z 0204T5ZX -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z 0220T5ZS -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0303T5ZU -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z 0315T5ZV -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z 0321T5ZO -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z 0354T5ZT -0.4882 -0.4882 GLOB UNIF PL8
LOAD Z 0355T5ZR -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0356T5ZQ -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z 0357T5ZP -0.5040 -0.5040 GLOB UNIF PL8
LOAD Z T5ZOT60G -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T5ZPT60H -0.5040 -0.5040 GLOB UNIF PL8
LOAD Z T5ZQT60I -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T5ZRT60J -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5ZST60K -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5ZTT60L -0.4882 -0.4882 GLOB UNIF PL8
LOAD Z T5ZUT60M -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T5ZVT60N -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T5ZWT60O -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T5ZXT60P -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T5ZY0206 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T5ZZT64C -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T60G0320 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60H0362 -0.5040 -0.5040 GLOB UNIF PL8
LOAD Z T60I0361 -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T60J0360 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T60K0219 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T60L0359 -0.4882 -0.4882 GLOB UNIF PL8
LOAD Z T60M0358 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60N0317 -0.5355 -0.5355 GLOB UNIF PL8
LOAD Z T60O0069 -0.5985 -0.5985 GLOB UNIF PL8
LOAD Z T60P0207 -0.6930 -0.6930 GLOB UNIF PL8
LOAD Z T64C0205 -0.6930 -0.6930 GLOB UNIF PL8
***LDS1** -1.000 2.500 12.480 1.200 2.500 12.480 -1.000
***LDS2** -2.500 12.480 1.200 -2.500 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02050206 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 02080209 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T56V0208 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T56W0205 -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** 1.200 2.500 12.480 2.300 2.500 12.480 1.200
***LDS2** -2.500 12.480 2.300 -2.500 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02060207 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 02090210 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T648T649 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T649T647 -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** 2.300 2.500 12.480 3.400 2.500 12.480 2.300
***LDS2** -2.500 12.480 3.400 -2.500 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02070069 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 02100313 -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** -15.000 8.000 12.480 -1.000 8.000 12.480 -15.000
***LDS2** 5.750 12.480 -1.000 5.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0049T5ZC -1.8028 -1.8028 GLOB UNIF PL8
LOAD Z 0072T67B -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0522T67C -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T59BT5VX -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5AWT67J -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5BNT5AW -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5NYT5WA -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5VXT5BN -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WAT61H -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WCT59B -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZCT5NY -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61H0522 -0.3150 -0.3150 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B172 of 382

LOAD Z 00590049 0.16000-0.3556 -0.3556 GLOB UNIF PL8


LOAD Z 0075T327 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T327T5AV -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5AV0056 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0064T5AY -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0065T5NW -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0281T5NX -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0282T5BM -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0283T5B0 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5AY0065 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5B00281 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5BM0299 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5NW0075 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5NXT61I -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T61I0282 -0.7087 -0.7087 GLOB UNIF PL8
***LDS1** -15.000 5.750 12.480 -11.000 5.750 12.480 -15.000
***LDS2** -5.750 12.480 -11.000 -5.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0276T59I 0.16000-0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T59IT59K -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T59K0249 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0058T5IE 0.16000-0.2812 -0.2812 GLOB UNIF PL8
LOAD Z 00590049 0.16000-0.2667 -0.2667 GLOB UNIF PL8
LOAD Z T5IET5W7 -0.2145 -0.2145 GLOB UNIF PL8
LOAD Z T5W70048 -0.3485 -0.3485 GLOB UNIF PL8
LOAD Z T5VTT5XP -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5VUT5XQ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5XNT5VS -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5XOT5VV -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5XPT5XN -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5XQT5XO -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 02430235 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 02440236 -0.4095 -0.4095 GLOB UNIF PL8
LOAD Z 02720245 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 02730246 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0274T59J -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 02750248 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 02770250 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0278T59G -0.4561 -0.4561 GLOB UNIF PL8
LOAD Z 02790252 -0.4888 -0.4888 GLOB UNIF PL8
LOAD Z 0280T59F -0.4567 -0.4567 GLOB UNIF PL8
LOAD Z T59E0253 -0.4567 -0.4567 GLOB UNIF PL8
LOAD Z T59FT59E -0.4567 -0.4567 GLOB UNIF PL8
LOAD Z T59GT59H -0.4561 -0.4561 GLOB UNIF PL8
LOAD Z T59H0251 -0.4561 -0.4561 GLOB UNIF PL8
LOAD Z T59JT59L -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T59L0247 -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -11.000 5.750 12.480 -1.000 5.750 12.480 -11.000
***LDS2** 2.000 12.480 -1.000 2.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0049T5ZC -1.3521 -1.3521 GLOB UNIF PL8
LOAD Z 0072T67B -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0522T67C -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T59BT5VX -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5AWT67J -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5BNT5AW -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5NYT5WA -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5VXT5BN -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5WAT61H -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5WCT59B -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5ZCT5NY -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T61H0522 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0236T5W8 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0238T5WB -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0251T5W5 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0252T61L -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0253T61K -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0260T59C -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 02610270 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 02620271 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T59CT5VZ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5VW0239 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5VZ0269 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W5T61M -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W8T61J -0.5512 -0.5512 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B173 of 382

LOAD Z T5W90238 -0.5512 -0.5512 GLOB UNIF PL8


LOAD Z T5WBT5VW -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T61JT5W9 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T61K0262 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T61L0261 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T61M0260 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -10.446 2.000 12.480 -1.000 2.000 12.480 -11.000
***LDS2** 1.000 12.480 -1.000 1.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0250T5W4 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0259T5VY -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0260T59C -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T59CT5VZ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5VY0268 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5VZ0269 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W4T61N -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W5T61M -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61M0260 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61N0259 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -11.000 12.480 -11.000 1.000 12.480 -1.000
***LDS2** 12.480 -1.000 1.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02490250 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 0267T689 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 02580259 -3.1500 -3.1500 GLOB UNIF PL8
***LDS1** -6.000 12.480 -1.000 12.480 -6.000
***LDS2** -2.000 12.480 -1.000 -2.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0258T5WF -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WF0267 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0256T5WU -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0257T6AG -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T59DT5W0 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T59VT5W1 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W00266 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5W10265 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WUT6AF -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61DT59D -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -11.000 -1.000 12.480 -11.000 12.480 -6.000
***LDS2** -1.000 12.480 -6.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02480249 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 02570258 -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** -11.000 -1.000 12.480 -6.000 -1.000 12.480 -11.000
***LDS2** -2.000 12.480 -6.000 -2.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0247T5W2 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0248T5W3 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T59UT5WE -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W2T59U -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W3T5WD -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WDT61P -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WET61Q -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61PT6AD -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61QT6AE -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -11.000 -3.000 12.480 -11.000 -2.000 12.480 -6.000
***LDS2** -3.000 12.480 -6.000 -2.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02460247 -0.1890 -0.1890 GLOB UNIF PL8
LOAD Z 0255T5X0 -1.3860 -1.3860 GLOB UNIF PL8
LOAD Z T5X00256 -1.3860 -1.3860 GLOB UNIF PL8
LOAD Z T5WQT5WY -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T5WYT59U -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** -11.000 -4.000 12.480 -11.000 -3.000 12.480 -6.000
***LDS2** -4.000 12.480 -6.000 -3.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0245T494 -0.1890 -0.1890 GLOB UNIF PL8
LOAD Z T4940246 -0.1890 -0.1890 GLOB UNIF PL8
LOAD Z 02540255 -1.3860 -1.3860 GLOB UNIF PL8
***LDS1** -11.000 -5.000 12.480 -11.000 -4.000 12.480 -6.000
***LDS2** -5.000 12.480 -6.000 -4.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02350245 -0.1890 -0.1890 GLOB UNIF PL8
LOAD Z 0237T5WX -1.3860 -1.3860 GLOB UNIF PL8
LOAD Z T5WX0254 -1.3860 -1.3860 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B174 of 382

***LDS1** -6.000 -2.000 12.480 -5.400 -2.000 12.480 -6.000


***LDS2** -3.000 12.480 -5.400 -3.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0255T5WT -0.1575 -0.1575 GLOB UNIF PL8
LOAD Z 0256T5WU -0.1575 -0.1575 GLOB UNIF PL8
LOAD Z T5X0T5WZ -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -5.400 -2.000 12.480 -1.000 -2.000 12.480 -5.400
***LDS2** -3.000 12.480 -1.000 -3.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T59VT5W1 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W10265 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WTT61A -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WUT6AF -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6110264 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61AT611 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -6.000 -3.000 12.480 -1.000 -3.000 12.480 -6.000
***LDS2** -4.000 12.480 -1.000 -4.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0254T5WS -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0255T5WT -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T59WT5S1 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5S1T5S4 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5S4T612 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WST59W -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WTT61A -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6110264 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6120263 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T61AT611 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -6.000 -4.000 12.480 -5.400 -4.000 12.480 -6.000
***LDS2** -5.000 12.480 -5.400 -5.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0237T5WR -0.1575 -0.1575 GLOB UNIF PL8
LOAD Z 0254T5WS -0.1575 -0.1575 GLOB UNIF PL8
LOAD Z T5WXT5WW -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -5.400 -4.000 12.480 -4.000 -4.000 12.480 -5.400
***LDS2** -5.000 12.480 -4.000 -5.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T59WT5S1 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WRT5S0 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WST59W -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -6.000 -5.000 12.480 -4.000 -5.000 12.480 -6.000
***LDS2** -5.750 12.480 -4.000 -5.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0073T66R -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5WJT5RZ -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0237T5WR -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5WRT5S0 -0.2362 -0.2362 GLOB UNIF PL8
***LDS1** -3.000 -4.000 12.480 -1.000 -4.000 12.480 -3.000
***LDS2** -5.750 12.480 -1.000 -5.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T5AXT675 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5S2T614 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T614T5AX -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5S3T613 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5S4T612 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6120263 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6130240 -0.5512 -0.5512 GLOB UNIF PL8
***LDS1** -15.000 -5.750 12.480 -1.000 -5.750 12.480 -15.000
***LDS2** -6.750 12.480 -1.000 -6.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0048T5IL -0.4083 -0.4083 GLOB UNIF PL8
LOAD Z 0073T66R -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0518T66S -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5AXT675 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5IL0518 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RZT5S2 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5S2T614 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WJT5RZ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T614T5AX -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0058T5IE 0.16000-0.3750 -0.3750 GLOB UNIF PL8
LOAD Z T5IET5W7 -0.2860 -0.2860 GLOB UNIF PL8
LOAD Z T5W70048 -0.4647 -0.4647 GLOB UNIF PL8
LOAD Z 0287T5ID -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0291T5IK -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0295T5WK -0.3150 -0.3150 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B175 of 382

LOAD Z T596T5W6 -0.3150 -0.3150 GLOB UNIF PL8


LOAD Z T5970295 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5B3T615 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5B4T5RW -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5IDT596 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5IKT597 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RW0300 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W60291 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WKT5B3 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T615T5B4 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -15.000 -6.750 12.480 -9.000 -6.750 12.480 -15.000
***LDS2** -11.000 12.480 -9.000 -11.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0062T5IM -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0284T5IA -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T598T5WI -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5B1T598 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IAT5B1 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5WI0288 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0285T5IB -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0286T5IC -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0287T5ID -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0288T5IH -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0289T5II -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0290T5IJ -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0291T5IK -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T596T5W6 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5IBT5WH -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ICT5WG -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IDT596 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5W60291 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WG0290 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5WH0289 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0061T5I9 0.16000-0.4687 -0.4687 GLOB UNIF PL8
LOAD Z T5AZ0062 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5I9T5AZ -0.2187 -0.2187 GLOB UNIF PL8
***LDS1** -9.000 -6.750 12.480 -6.000 -6.750 12.480 -9.000
***LDS2** -11.000 12.480 -6.000 -11.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T5IMT5ON -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5ONT5OP -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5OP0074 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5970295 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5990292 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IHT599 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IIT6AC -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IJ0294 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IKT597 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -8.350 -11.000 12.480 -6.000 -11.000 12.480 -8.350
***LDS2** -13.000 12.480 -6.000 -13.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T5ONT5OP -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OP0074 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ORT5OQ -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5OST5OR -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5OMT5OO -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OOT5OL -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -6.000 -6.750 12.480 -3.910 -6.750 12.480 -6.000
***LDS2** -8.750 12.480 -3.910 -8.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0293T5WL -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0294T5RS -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0295T5WK -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WKT5B3 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WLT5RT -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -1.910 -6.750 12.480 -1.000 -6.750 12.480 -1.910
***LDS2** -8.750 12.480 -1.000 -8.750 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T5RU0298 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5RV0296 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RW0300 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -3.910 -6.750 12.480 -1.910 -6.750 12.480 -3.910
***LDS2** -7.450 12.480 -1.910 -7.450 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T5B3T615 -0.2205 -0.2205 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B176 of 382

LOAD Z T5B4T5RW -0.2205 -0.2205 GLOB UNIF PL8


LOAD Z T5RXT616 -0.2205 -0.2205 GLOB UNIF PL8
LOAD Z T615T5B4 -0.2205 -0.2205 GLOB UNIF PL8
LOAD Z T616T5RY -0.2205 -0.2205 GLOB UNIF PL8
***LDS1** -6.000 -8.750 12.480 -1.000 -8.750 12.480 -6.000
***LDS2** -11.000 12.480 -1.000 -11.000 12.480 0.630
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0074T61C -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 06490057 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T619T5AU -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T61CT619 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0292T5WM -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0293T5WL -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5B20297 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5RTT617 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RV0296 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WLT5RT -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5WMT61B -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T617T5RV -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T618T5B2 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T61BT618 -0.7087 -0.7087 GLOB UNIF PL8
***LDS1** -6.000 10.000 12.480 -3.000 10.000 12.480 -6.000
***LDS2** 8.000 12.480 -3.000 8.000 12.480 0.930
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL12
LOAD Z 0075T327 -0.4650 -0.4650 GLOB UNIF PL12
LOAD Z T329T328 -0.4650 -0.4650 GLOB UNIF PL12
LOAD Z T508T509 -0.9300 -0.9300 GLOB UNIF PL12
LOAD Z T6010046 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5BAT601 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T60QT5BA -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0067T60Q -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T60F0066 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5BBT60F -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5ZNT5BB -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0047T5ZN -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03210047 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03570321 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03560357 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03550356 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02200355 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03030354 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03540220 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03150123 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00710315 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02040071 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02030204 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02020203 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0055T674 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03180046 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03260318 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03250326 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03240325 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 05240324 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02150524 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03230215 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03220323 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 01240322 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03140124 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00700314 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02130070 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02120213 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02110212 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0054T67I -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00540076 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00760299 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02990056 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5AV0056 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T327T5AV -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T327T509 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T509T328 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T329T328 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T508T329 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0075T508 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5NW0075 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0065T5NW -0.3559 -0.3559 GLOB UNIF HRAIL-CE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B177 of 382

LOAD Z T5AY0065 -0.3559 -0.3559 GLOB UNIF HRAIL-CE


LOAD Z 0064T5AY -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02830064 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00590283 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0244T68M -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5VT0244 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0280T5VT -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02790280 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5VU0279 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0278T5VU -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02770278 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02760277 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02750276 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02740275 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02730274 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02720273 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02430272 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0058T68O -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0287T68N -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02860287 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02850286 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02840285 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00610284 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0061T5I9 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5I9T5AZ -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5AZ0062 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0062T5IM -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5IMT5ON -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5OST5ON -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5OMT5OS -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5OMT5OO -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5OOT5OL -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5OLT5OQ -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T5OQ0074 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0074T61C -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T61CT619 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T619T5AU -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 06490057 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 00570297 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02970296 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02960298 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 02980300 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03000077 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 0077T68G -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z 03190067 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03670319 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 02230367 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03660223 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03650366 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 02160365 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 02250216 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03640225 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03630364 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03160363 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03130316 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03070313 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03080307 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03110308 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 00690311 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 00690317 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03170358 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03580359 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03590224 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 02240219 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 02190360 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03600361 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03610222 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 02220362 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03620320 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
LOAD Z 03200066 -0.1485 -0.1485 GLOB UNIF HRAIL-CE
***LDS1** -3.910 -6.750 12.480 -1.910 -6.750 12.480 -3.910
***LDS2** -8.750 12.480 -1.910 -8.750 12.480 0.500
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESHATCH
LOAD Z T5B3T615 -0.1750 -0.1750 GLOB UNIF HATCH
LOAD Z T5B4T5RW -0.1750 -0.1750 GLOB UNIF HATCH
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B178 of 382

LOAD Z T5RTT617 -0.3250 -0.3250 GLOB UNIF HATCH


LOAD Z T5RXT616 -0.5000 -0.5000 GLOB UNIF HATCH
LOAD Z T615T5B4 -0.1750 -0.1750 GLOB UNIF HATCH
LOAD Z T616T5RY -0.5000 -0.5000 GLOB UNIF HATCH
LOAD Z T617T5RV -0.3250 -0.3250 GLOB UNIF HATCH
LOAD Z T5VU0279 -0.6000 -0.6000 GLOB UNIF NAME-PLT
LOAD Z 0278T5VU -0.6000 -0.6000 GLOB UNIF NAME-PLT
LOAD Z T66RT5WJ -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T66RT5WJ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T66S0073 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6740202 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T6750055 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6750055 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T67BT5WC -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T67BT5WC -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T67C0072 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T67C0072 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T67I0211 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T67J0054 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T67J0054 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6890268 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T68E0054 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z T68F0240 -0.3465 -0.3465 GLOB UNIF PL8
LOAD Z T68G0055 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T68M0059 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T68N0058 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T68O0243 -0.3559 -0.3559 GLOB UNIF HRAIL-CE
LOAD Z T6AC0293 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T6AD0257 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AE0256 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AFT59V -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AFT59V -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AGT61D -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -12.419 -6.750 10.080 -5.220 -6.750 10.080 -12.419
***LDS2** -9.750 10.080 -5.220 -9.750 10.080 2.110
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESBT-ROOM
LOAD Z T5WI0288 -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z 0288T5IH -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z 0289T5II -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z 0290T5IJ -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z 0291T5IK -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z 0292T5WM -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z 0293T5WL -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z 0294T5RS -2.11000.78000-2.1100 GLOB UNIF BT-ROOM
LOAD Z 0295T5WK -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z T5970295 -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z T5990292 -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z T5IHT599 -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z T5IIT6AC -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z T5IJ0294 -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z T5IKT597 -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z T5W60291 -1.0550 -1.0550 GLOB UNIF BT-ROOM
LOAD Z T5WG0290 -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z T5WH0289 -2.1100 -2.1100 GLOB UNIF BT-ROOM
LOAD Z T6AC0293 -2.1100 -2.1100 GLOB UNIF BT-ROOM
***LDS1** -11.000 5.750 10.080 -3.196 5.750 10.080 -11.000
***LDS2** 2.000 10.080 -2.996 2.000 10.080 1.810
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESMV-LV
LOAD Z 0049T5ZC -3.8846 -3.8846 GLOB UNIF MV-LV
LOAD Z 0522T67C -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T59BT5VX -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T5NYT5WA -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T5WAT61H -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T5WCT59B -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T5ZCT5NY -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T61H0522 -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T67BT5WC -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z 0072T67B -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z T67C0072 -0.6787 -0.6787 GLOB UNIF MV-LV
LOAD Z 0236T5W8 -1.5837 -1.5837 GLOB UNIF MV-LV
LOAD Z 0238T5WB -1.5837 -1.5837 GLOB UNIF MV-LV
LOAD Z 0251T5W5 -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z 0252T61L -1.8100 -1.8100 GLOB UNIF MV-LV
LOAD Z 0253T61K -1.8100 -1.8100 GLOB UNIF MV-LV
LOAD Z 0260T59C -0.9050 -0.9050 GLOB UNIF MV-LV
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B179 of 382

LOAD Z 02610270 -1.81002.95067-1.8100 GLOB UNIF MV-LV


LOAD Z 02620271 -1.81002.89733-1.8100 GLOB UNIF MV-LV
LOAD Z T59CT5VZ -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T5VW0239 -1.58370.04000-1.5837 GLOB UNIF MV-LV
LOAD Z T5W5T61M -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T5W8T61J -1.5837 -1.5837 GLOB UNIF MV-LV
LOAD Z T5W90238 -1.5837 -1.5837 GLOB UNIF MV-LV
LOAD Z T5WBT5VW -1.5837 -1.5837 GLOB UNIF MV-LV
LOAD Z T61JT5W9 -1.5837 -1.5837 GLOB UNIF MV-LV
LOAD Z T61K0262 -1.8100 -1.8100 GLOB UNIF MV-LV
LOAD Z T61L0261 -1.8100 -1.8100 GLOB UNIF MV-LV
LOAD Z T61M0260 -0.9050 -0.9050 GLOB UNIF MV-LV
***LDS1** -11.000 2.000 10.080 -2.996 2.000 10.080 -11.000
***LDS2** 1.000 10.080 -2.996 1.000 10.080 1.810
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESMV-LV
LOAD Z 0250T5W4 -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z 0251T5W5 -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z 0259T5VY -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z 0260T59C -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T59CT5VZ -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T5W4T61N -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T5W5T61M -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T61M0260 -0.9050 -0.9050 GLOB UNIF MV-LV
LOAD Z T61N0259 -0.9050 -0.9050 GLOB UNIF MV-LV
***LDS1** -11.000 10.080 -11.000 1.000 10.080 -2.996
***LDS2** 10.080 -2.996 1.000 10.080 1.810
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESMV-LV
LOAD Z 02490250 -4.5250 -4.5250 GLOB UNIF MV-LV
LOAD Z 02580259 -9.9622 -9.9622 GLOB UNIF MV-LV
***LDS1** -11.000 -1.000 10.080 -11.000 10.080 -2.996
***LDS2** -1.000 10.080 -2.996 10.080 1.810
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESMV-LV
LOAD Z 02480249 -4.5250 -4.5250 GLOB UNIF MV-LV
LOAD Z 02570258 -7.2436 -7.2436 GLOB UNIF MV-LV
LOAD Z T5W0T5WF -2.7186 -2.7186 GLOB UNIF MV-LV
***LDS1** -10.400 -2.000 10.080 -6.000 -2.000 10.080 -10.400
***LDS2** -3.000 10.080 -6.000 -3.000 10.080 0.628
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z T59UT5WE -0.1570 -0.1570 GLOB UNIF PL8
LOAD Z T5WET61Q -0.1570 -0.1570 GLOB UNIF PL8
LOAD Z T5WQT61E -0.1570 -0.1570 GLOB UNIF PL8
LOAD Z T61E0255 -0.1570 -0.1570 GLOB UNIF PL8
LOAD Z T61QT6AE -0.1570 -0.1570 GLOB UNIF PL8
LOAD Z T6AE0256 -0.1570 -0.1570 GLOB UNIF PL8
LOAD Z T5WYT5X0 -0.3140 -0.3140 GLOB UNIF PL8
***LDS1** -11.000 -3.000 10.080 -6.000 -3.000 10.080 -11.000
***LDS2** -5.750 10.080 -6.000 -5.750 10.080 0.628
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0048T5IL -0.3052 -0.3052 GLOB UNIF PL8
LOAD Z 0518T66S -0.2355 -0.2355 GLOB UNIF PL8
LOAD Z T5IL0518 -0.2355 -0.2355 GLOB UNIF PL8
LOAD Z T66S0073 -0.2355 -0.2355 GLOB UNIF PL8
LOAD Z 0235T5WP -0.5495 -0.5495 GLOB UNIF PL8
LOAD Z 0245T59T -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z 0246T5WQ -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T59TT61F -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z T5WPT61T -0.5495 -0.5495 GLOB UNIF PL8
LOAD Z T5WQT61E -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T61E0255 -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T61F0254 -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z T61T0237 -0.5495 -0.5495 GLOB UNIF PL8
***LDS1** -1.000 2.500 10.080 1.200 2.500 10.080 -1.000
***LDS2** -2.500 10.080 1.200 -2.500 10.080 0.628
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 02050206 -1.5700 -1.5700 GLOB UNIF PL8
LOAD Z 02080209 -1.5700 -1.5700 GLOB UNIF PL8
LOAD Z T56V0208 -1.5700 -1.5700 GLOB UNIF PL8
LOAD Z T56W0205 -1.5700 -1.5700 GLOB UNIF PL8
***LDS1** 1.200 -2.500 10.080 1.200 2.500 10.080 2.300
***LDS2** -2.500 10.080 2.300 2.500 10.080 0.628
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 0206T648 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z 0207T647 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z T6470210 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z T6480209 -0.3454 -0.3454 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B180 of 382

***LDS1** 2.300 -2.500 10.080 2.300 2.500 10.080 3.400


***LDS2** -2.500 10.080 3.400 2.500 10.080 0.628
***LDS3** 0.250 0 1 3 0 0CDST -2EQUPPRESPL8
LOAD Z 00690311 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z 03070313 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z 03080307 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z 03110308 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z 0207T647 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z T6470210 -0.3454 -0.3454 GLOB UNIF PL8
LOAD Z 0047T5ZN -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00480235 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0048T5IL -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00490281 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0049T5ZC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00540076 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0054T67I -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0055T674 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0055T68F -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00620288 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00660527 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0067T60Q -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00690311 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00690317 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00700314 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00710315 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00720282 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0073T66R -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00740292 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0075T508 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00760299 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 01230303 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 01240322 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02020203 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02030204 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02040071 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02050206 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02060207 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02070069 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02080209 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02090210 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02100313 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02110212 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02120213 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02130070 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02150524 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02160365 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02190360 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02200355 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02220362 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02230367 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02240219 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02250216 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02350245 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02360049 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0239T68E -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0240T600 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0245T494 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02460247 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02470248 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02480249 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02490250 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02500251 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0251T5VV -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0252T495 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0253T5VS -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0263T64B -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0264T56W -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02650266 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0266T68A -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0267T689 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02680269 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0269T56V -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02700271 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0271T60E -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02810065 -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B181 of 382

LOAD Z 02820075 -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z 02880289 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02890290 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02900291 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02910048 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02920293 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02930294 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02940295 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02950073 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02990056 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03030354 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03070313 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03080307 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03110308 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03130316 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03140124 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03150123 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03160363 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03170358 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03180046 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03190067 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03200066 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03210047 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03220323 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03230215 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03240325 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03250326 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03260318 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03540220 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03550356 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03560357 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03570321 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03580359 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03590224 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03600361 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03610222 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03620320 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03630364 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03640225 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03650366 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03660223 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03670319 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0518T66S -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0522T67C -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 05240324 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 05270067 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T4940246 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T4950253 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T508T329 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T56V0208 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T56V0270 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T56W0205 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T56W0265 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59BT5VX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5AWT67J -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5AXT675 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5BAT601 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5BBT60F -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5BNT5AW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IL0518 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5NYT5WA -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RZT5S2 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S2T614 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VS0236 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VV0252 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VXT5BN -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WAT61H -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WCT59B -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WJT5RZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZCT5NY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZNT5BB -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6000263 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6010046 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60E0239 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60F0066 -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B182 of 382

LOAD Z T60QT5BA -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z T614T5AX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61H0522 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T64B0264 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T66RT5WJ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T66S0073 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6740202 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6750055 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T67BT5WC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T67I0211 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T67J0054 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6890268 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68A0267 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68E0054 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68F0240 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0058T68O -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00590283 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00610284 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0062T5IM -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0064T5LM -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0074T61C -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02430272 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0244T68M -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0249T61G -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0258T5WF -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02720273 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02730274 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02740275 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02750276 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02760277 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0276T59I -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02770278 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0278T5VU -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02790280 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0280T5VT -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02830064 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02840285 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02850286 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02860287 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0287T68N -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 06490057 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59IT59K -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59K0249 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5I9T5IF -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IAT5I9 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IBT5IA -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ICT5IB -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IDT5IC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IET5ID -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IHT5IM -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IIT5IH -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IJT5II -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IKT5IJ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ILT5IK -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IMT5IG -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IMT5ON -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5NWT5LN -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5NXT5NW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5NYT5NX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ONT5OP -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OP0074 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VT0244 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VU0279 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WF0267 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T619T5AU -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61CT619 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61GT61O -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61O0258 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68M0059 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68N0058 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68O0243 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00570297 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0058T5IE -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00590049 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 00730237 -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B183 of 382

LOAD Z 0075T327 -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z 0077T68G -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0237T5WX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02380072 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02540255 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0255T5X0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02560257 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02570258 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02580259 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02590260 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02600261 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02610262 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02620238 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02960298 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02970296 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02980300 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 03000077 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T327T509 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T327T5AV -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T329T328 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T509T328 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5AV0056 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5BMT327 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5BNT5BM -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IET5W7 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W70048 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WX0254 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5X00256 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T68G0055 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0072T67B -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T67C0072 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0278T59G -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0284T5IA -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T598T5WI -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59GT59H -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59H0251 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5B1T598 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IAT5B1 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VTT5XP -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VUT5XQ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WI0288 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5XNT5VS -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5XOT5VV -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5XPT5XN -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5XQT5XO -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0064T5AY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0065T5NW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0071T5ZW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0202T5ZZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0203T5ZY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0204T5ZX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02050208 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0206T648 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0207T647 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0208T644 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0209T60C -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0210T610 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0216T60V -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0220T5ZS -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0235T5WP -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0236T5W8 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0237T5WR -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0238T5WB -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02430235 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02440236 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0245T59T -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0246T5WQ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0247T5W2 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0248T5W3 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0250T5W4 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0251T5W5 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0252T61L -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0253T61K -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0254T5WS -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0255T5WT -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B184 of 382

LOAD Z 0256T5WU -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z 0257T6AG -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0259T5VY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0260T59C -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02610270 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02620271 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02720245 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02730246 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0274T59J -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02750248 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02770250 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 02790252 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0280T59F -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0281T5NX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0282T5BM -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0283T5B0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0285T5IB -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0286T5IC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0287T5ID -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0288T5IH -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0289T5II -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0290T5IJ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0291T5IK -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0292T5WM -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0293T5WL -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0294T5RS -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0295T5WK -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0303T5ZU -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0313T60Z -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0315T5ZV -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0316T60Y -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0319T60R -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0321T5ZO -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0354T5ZT -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0355T5ZR -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0356T5ZQ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0357T5ZP -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0363T60X -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0364T60W -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0365T60U -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0366T60T -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0367T60S -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T596T5W6 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5970295 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5970518 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5990292 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T599T6AC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59CT5VZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59DT5W0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59E0253 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59FT59E -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59JT59L -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59L0247 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59TT61F -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59UT5WE -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59VT5W1 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T59WT5S1 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5AY0065 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5B00281 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5B20297 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5B3T615 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5B4T5RW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5BM0299 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IBT5WH -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ICT5WG -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IDT596 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IHT599 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IIT6AC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IJ0294 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5IKT597 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5NW0075 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5NXT61I -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ORT5OQ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OST5OR -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RST5RX -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B185 of 382

LOAD Z T5RTT5RS -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z T5RTT617 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RU0298 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RUT5RY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RV0296 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RVT5RU -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RW0300 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RXT5B3 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RXT616 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RYT5RW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5RZT5S0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S0T5S1 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S1T5S4 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S2T5S3 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S3T5S4 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S3T613 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5S4T612 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VW0239 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VWT5VX -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VY0268 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VYT5VZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5VZ0269 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W00266 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W10265 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W1T5W0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W2T59U -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W2T5W3 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W3T5WD -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W4T5W5 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W4T61N -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W5T61M -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W60291 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W6T5W7 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W8T61J -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W90238 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WBT5VW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WDT61P -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WET61Q -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WG0290 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WH0289 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WKT5B3 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WLT5RT -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WMT61B -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WPT61T -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WQT61E -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WRT5S0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WST59W -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WTT61A -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WUT6AF -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZOT60G -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZPT60H -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZQT60I -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZRT60J -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZST60K -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZTT60L -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZUT60M -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZVT60N -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZWT60O -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZXT60P -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZY0206 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ZZT64C -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6020318 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6030326 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6040325 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6050324 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6060215 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6070323 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6080322 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6090314 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60A0070 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60B0213 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60C0212 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60D0211 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60G0320 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60H0362 -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B186 of 382

LOAD Z T60I0361 -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z T60J0360 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60K0219 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60L0359 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60M0358 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60N0317 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60O0069 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60P0207 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60RT602 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60ST603 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60TT604 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60UT605 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60VT606 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60WT607 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60XT608 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60YT609 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T60ZT60A -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T610T60B -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6110264 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6120263 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6130240 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T615T5B4 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T616T5RY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T617T5RV -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T618T5B2 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61AT611 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61BT618 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61DT59D -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61E0255 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61F0254 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61I0282 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61JT5W9 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61K0262 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61L0261 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61M0260 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61N0259 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61PT6AD -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61QT6AE -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61T0237 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T644T60D -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6470210 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6480209 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T64C0205 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AC0293 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AD0257 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AE0256 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AFT59V -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AFT6AG -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AGT61D -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0061T5I9 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5AZ0062 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5I9T5AZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T508T509 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OLT5OQ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OMT5OO -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OMT5OS -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OOT5OL -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OOT5OR -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OQ0074 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5ORT5OP -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5OST5ON -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W0T5WF -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W8T5WA -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5W90522 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WBT5WC -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WET5WD -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WHT5WG -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WIT5WH -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WKT5WJ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WMT5WL -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WQT5WY -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WRT5WW -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WST5WT -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WTT5WZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WWT5WS -0.0398 -0.0398 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B187 of 382

LOAD Z T5WXT5WW -0.0398 -0.0398 GLOB UNIF EQ-SUP


LOAD Z T5WYT59U -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WYT5X0 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5WZT5WU -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T5X0T5WZ -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61FT61E -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T61TT61F -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T6AET6AD -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 0270T645 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T645T644 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T648T649 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T649T647 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T64BT64D -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z T64DT64C -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 05390055 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 05400054 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOAD Z 05460267 -0.0398 -0.0398 GLOB UNIF EQ-SUP
LOADCNCGX1
LOAD 619L 147.000 GLOB JOIN MY>0
LOAD 699L 147.000 GLOB JOIN MY>0
LOAD 601L -147.00 GLOB JOIN MY>0
LOAD 681L -147.00 GLOB JOIN MY>0
LOADCNCGY1
LOAD 601L 280.000 GLOB JOIN MX>0
LOAD 619L 280.000 GLOB JOIN MX>0
LOAD 681L -280.00 GLOB JOIN MX>0
LOAD 699L -280.00 GLOB JOIN MX>0
LOADCNCON1
***LDS1** 2.300 3.750 14.730 2.300 5.750 14.730 10.000
***LDS2** 3.750 14.730 10.000 5.750 14.730 17.110
***LDS3** 0.250 0 1 3 0 0CON1 -2EQUPPRESCON1
LOAD Z 00220455 -13.688 -13.688 GLOB UNIF CON1
LOAD Z 00380454 -18.393 -18.393 GLOB UNIF CON1
LOAD Z 00390453 -21.387 -21.387 GLOB UNIF CON1
LOAD Z 00500452 -17.538 -17.538 GLOB UNIF CON1
LOAD Z 00510451 -14.544 -14.544 GLOB UNIF CON1
LOAD Z 00600443 -14.543 -14.543 GLOB UNIF CON1
LOAD Z 01180098 -16.254 -16.254 GLOB UNIF CON1
LOAD Z 01350201 -9.4105 -9.4105 GLOB UNIF CON1
LOAD Z TTTU0447 -5.9885 -5.9885 GLOB UNIF CON1
LOADCNCON2
***LDS1** 2.300 14.730 2.300 2.000 14.730 11.000
***LDS2** 14.730 11.000 2.000 14.730 15.148
***LDS3** 0.250 0 1 3 0 0CON2 -2EQUPPRESCONCRETE
LOAD Z 0528T67W -17.799 -17.799 GLOB UNIF CONCRETE
LOAD Z T67W0018 -17.799 -17.799 GLOB UNIF CONCRETE
LOAD Z 04370021 -31.432 -31.432 GLOB UNIF CONCRETE
LOAD Z 04380437 -31.432 -31.432 GLOB UNIF CONCRETE
LOAD Z 02180020 -39.763 -39.763 GLOB UNIF CONCRETE
LOAD Z 02210017 -34.462 -34.462 GLOB UNIF CONCRETE
LOAD Z 01420140 -8.3314 -8.3314 GLOB UNIF CONCRETE
LOADCNDDEL
LOAD Z 0000T594 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0014T5OK -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5OK0000 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0005T142 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01090161 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0110T66P -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01610110 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T139T172 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T142T143 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T143T144 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T144T139 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T159T185 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T166T184 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T172T166 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T178T132 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T184T159 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T185T186 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T186T187 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T187T178 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T2090109 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T213T209 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T217T213 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5930005 -0.0367 -0.0367 GLOB UNIF EL-1-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B188 of 382

LOAD Z T594T5JT -0.0367 -0.0367 GLOB UNIF EL-1-D


LOAD Z T595T66Q -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JTT595 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RPT5RR -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RRT593 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00000195 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00040155 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0004T5O1 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00050186 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00060154 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0006T151 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0007T506 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00080162 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0026T5PY -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00270192 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01070153 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0107T679 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0108T325 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01100165 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01530108 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01540007 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01550015 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0162T68D -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01650167 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01660107 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01670168 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01680169 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01690170 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01700171 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0171T5Q4 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0172T5QH -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0173T5PZ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01740175 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01750166 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01760006 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01770176 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01780177 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0179T205 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0180T5QG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0181T687 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0182T688 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01830182 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0184T202 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01850184 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01860185 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01870004 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01880187 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01890188 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01900026 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01910190 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01920191 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01930027 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01940193 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01950194 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T132T5B7 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T135T199 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T136T5B6 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T137T169 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T137T174 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T138T171 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T145T146 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T146T147 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T147T137 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T148T149 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T149T150 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T150T170 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T151T152 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T152T153 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T153T138 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T155T181 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T156T195 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T158T190 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T160T192 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T161T197 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T162T158 -0.0367 -0.0367 GLOB UNIF EL-1-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B189 of 382

LOAD Z T163T156 -0.0367 -0.0367 GLOB UNIF EL-1-D


LOAD Z T167T170 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T168T167 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T169T168 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T170T173 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T171T179 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T173T193 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T174T188 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T175T131 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T176T136 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T177T135 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T179T180 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T180T155 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T181T182 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T182T183 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T183T175 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T188T189 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T189T162 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T190T191 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T191T160 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T192T177 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T193T194 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T194T163 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T195T196 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T196T161 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T197T176 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T199T136 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T2020183 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T202T145 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T205T148 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T205T5Q7 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T2080008 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T212T208 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T216T212 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T325T507 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T325T5B9 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T326T324 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T506T324 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T507T326 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5920006 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5B6T131 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5B7T135 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5B90007 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5BKT325 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5BLT592 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5BLT5BK -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5O1T5ZJ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PY0189 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PZT5Q6 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q40172 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q50180 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q60174 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q70178 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QG0179 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QH0173 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0016T56X -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01600000 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T2100016 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T214T210 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T218T214 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T56X0160 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00120164 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0012T571 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00130163 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0014T445 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0016T5JR -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0027T57V -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0044T440 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0045T443 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0109T577 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01630011 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01640014 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0169T57W -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0171T661 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0191T57L -0.0367 -0.0367 GLOB UNIF EL-1-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B190 of 382

LOAD Z T209T578 -0.0367 -0.0367 GLOB UNIF EL-1-D


LOAD Z T210T5JQ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T2110012 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T211T572 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T213T579 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T214T5JP -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T215T211 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T215T573 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T217T5B8 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T218T5JO -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T219T215 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T219T218 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T435T444 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4370191 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T437T442 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4380188 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T438T441 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T440T438 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4410013 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4420044 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T443T437 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4440045 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T445T435 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T56YT574 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T56ZT575 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T570T576 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5710016 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T572T210 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T573T214 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5740109 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T575T209 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T576T213 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5770008 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T578T208 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T579T212 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57LT57P -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57P0171 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57V0169 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57WT65V -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5B8T216 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JOT5JU -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JOT5PA -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JPT570 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JPT5JO -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JQT56Z -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JQT5JP -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JRT56Y -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JRT5JQ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JST5JR -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JTT5JS -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5NZT5LY -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5O0T5NZ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5O1T5O0 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PAT217 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00130004 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00110015 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0015T5NZ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0026T57J -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00440026 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 00450027 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0155T5O0 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0160T5JS -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01610162 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01630155 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 01640160 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0165T5RN -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0167T5RO -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0168T5QS -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0170T5QT -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0172T57D -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0173T57C -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0174T65X -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0175T65Y -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0187T5PB -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0188T5PC -0.0367 -0.0367 GLOB UNIF EL-1-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B191 of 382

LOAD Z 0189T5PD -0.0367 -0.0367 GLOB UNIF EL-1-D


LOAD Z 0190T57K -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0192T57M -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0193T5QQ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0194T5WO -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0195T5WN -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T139T137 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T142T145 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T143T146 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T144T147 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T145T69H -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T146T69G -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T147T69F -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T148T151 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T149T152 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T150T153 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T156T155 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T159T158 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T166T188 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T170T138 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T172T174 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T173T171 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T176T175 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T178T177 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T184T189 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T185T190 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T186T191 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T187T192 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T193T179 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T194T180 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T195T181 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T196T182 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T197T183 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4350194 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4400189 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4420190 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4430192 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4440193 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4450195 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57CT57E -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57DT57F -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57E0179 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57FT5ZF -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57JT57N -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57KT57O -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57MT5QR -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57N0173 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57O0172 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57Q0170 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5BK0154 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5HHT5HG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5HHT5PG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5JS0161 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5NZ0108 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5O00153 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PBT6BP -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PCT5PK -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PDT5PI -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PDT5Q3 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PET5ZK -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PFT5ZL -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PFT5PJ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PGT5PH -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PGT5ZM -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PHT5HG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PHT5PF -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PIT5HG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PIT5PC -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PJT5PE -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PKT5PB -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PKT5PL -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PLT5HG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PLT5PJ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q00174 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q3T5HH -0.0367 -0.0367 GLOB UNIF EL-1-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B192 of 382

LOAD Z T5QQ0168 -0.0367 -0.0367 GLOB UNIF EL-1-D


LOAD Z T5QRT57Q -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QST65U -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QTT65W -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RM0186 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RMT5RQ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RNT5RO -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ROT5RQ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RPT5RN -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RQ0185 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5RRT5RM -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5WN0165 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5WO0167 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0153T5BK -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0166T65Z -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T4410187 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T507T506 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T56ZT56Y -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T570T56Z -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T572T571 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T573T572 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T575T574 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T576T575 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T578T577 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T579T578 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57DT57C -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57FT57E -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57JT5Q2 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57KT57J -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57LT57K -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57NT5Q1 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57OT57N -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57PT57O -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5PYT5Q2 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q1T5PZ -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q2T5Q1 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q4T5Q9 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q9T57D -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5Q9T5QB -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QBT57F -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QBT5ZE -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57VT5QX -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T57WT5QW -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QQT5QU -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QST5QV -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QUT57V -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QVT57W -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QWT5QT -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5QXT5QR -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z 0000T594 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0014T5OK -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5OK0000 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0005T142 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01090161 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0110T66P -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01610110 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T139T172 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T142T143 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T143T144 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T144T139 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T159T185 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T166T184 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T172T166 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T178T132 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T184T159 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T185T186 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T186T187 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T187T178 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T2090109 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T213T209 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T217T213 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5930005 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T594T5JT -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T595T66Q -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JTT595 -0.0009 -0.0009 GLOB UNIF EL-2-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B193 of 382

LOAD Z T5RPT5RR -0.0009 -0.0009 GLOB UNIF EL-2-D


LOAD Z T5RRT593 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00000195 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00040155 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0004T5O1 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00050186 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00060154 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0006T151 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0007T506 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00080162 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0026T5PY -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00270192 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01070153 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0107T679 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0108T325 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01100165 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01530108 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01540007 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01550015 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0162T68D -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01650167 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01660107 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01670168 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01680169 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01690170 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01700171 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0171T5Q4 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0172T5QH -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0173T5PZ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01740175 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01750166 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01760006 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01770176 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01780177 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0179T205 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0180T5QG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0181T687 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0182T688 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01830182 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0184T202 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01850184 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01860185 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01870004 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01880187 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01890188 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01900026 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01910190 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01920191 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01930027 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01940193 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01950194 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T132T5B7 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T135T199 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T136T5B6 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T137T169 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T137T174 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T138T171 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T145T146 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T146T147 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T147T137 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T148T149 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T149T150 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T150T170 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T151T152 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T152T153 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T153T138 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T155T181 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T156T195 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T158T190 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T160T192 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T161T197 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T162T158 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T163T156 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T167T170 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T168T167 -0.0009 -0.0009 GLOB UNIF EL-2-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B194 of 382

LOAD Z T169T168 -0.0009 -0.0009 GLOB UNIF EL-2-D


LOAD Z T170T173 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T171T179 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T173T193 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T174T188 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T175T131 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T176T136 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T177T135 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T179T180 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T180T155 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T181T182 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T182T183 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T183T175 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T188T189 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T189T162 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T190T191 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T191T160 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T192T177 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T193T194 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T194T163 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T195T196 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T196T161 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T197T176 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T199T136 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T2020183 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T202T145 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T205T148 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T205T5Q7 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T2080008 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T212T208 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T216T212 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T325T507 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T325T5B9 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T326T324 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T506T324 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T507T326 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5920006 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5B6T131 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5B7T135 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5B90007 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5BKT325 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5BLT592 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5BLT5BK -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5O1T5ZJ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PY0189 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PZT5Q6 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q40172 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q50180 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q60174 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q70178 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QG0179 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QH0173 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0016T56X -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01600000 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T2100016 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T214T210 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T218T214 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T56X0160 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00120164 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0012T571 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00130163 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0014T445 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0016T5JR -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0027T57V -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0044T440 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0045T443 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0109T577 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01630011 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01640014 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0169T57W -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0171T661 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0191T57L -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T209T578 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T210T5JQ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T2110012 -0.0009 -0.0009 GLOB UNIF EL-2-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B195 of 382

LOAD Z T211T572 -0.0009 -0.0009 GLOB UNIF EL-2-D


LOAD Z T213T579 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T214T5JP -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T215T211 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T215T573 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T217T5B8 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T218T5JO -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T219T215 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T219T218 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T435T444 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4370191 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T437T442 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4380188 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T438T441 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T440T438 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4410013 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4420044 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T443T437 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4440045 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T445T435 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T56YT574 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T56ZT575 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T570T576 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5710016 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T572T210 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T573T214 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5740109 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T575T209 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T576T213 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5770008 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T578T208 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T579T212 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57LT57P -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57P0171 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57V0169 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57WT65V -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5B8T216 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JOT5JU -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JOT5PA -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JPT570 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JPT5JO -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JQT56Z -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JQT5JP -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JRT56Y -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JRT5JQ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JST5JR -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JTT5JS -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5NZT5LY -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5O0T5NZ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5O1T5O0 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PAT217 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00130004 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00110015 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0015T5NZ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0026T57J -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00440026 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 00450027 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0155T5O0 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0160T5JS -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01610162 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01630155 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 01640160 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0165T5RN -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0167T5RO -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0168T5QS -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0170T5QT -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0172T57D -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0173T57C -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0174T65X -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0175T65Y -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0187T5PB -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0188T5PC -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0189T5PD -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0190T57K -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0192T57M -0.0009 -0.0009 GLOB UNIF EL-2-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B196 of 382

LOAD Z 0193T5QQ -0.0009 -0.0009 GLOB UNIF EL-2-D


LOAD Z 0194T5WO -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0195T5WN -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T139T137 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T142T145 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T143T146 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T144T147 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T145T69H -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T146T69G -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T147T69F -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T148T151 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T149T152 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T150T153 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T156T155 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T159T158 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T166T188 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T170T138 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T172T174 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T173T171 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T176T175 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T178T177 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T184T189 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T185T190 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T186T191 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T187T192 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T193T179 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T194T180 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T195T181 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T196T182 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T197T183 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4350194 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4400189 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4420190 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4430192 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4440193 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4450195 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57CT57E -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57DT57F -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57E0179 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57FT5ZF -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57JT57N -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57KT57O -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57MT5QR -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57N0173 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57O0172 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57Q0170 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5BK0154 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5HHT5HG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5HHT5PG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5JS0161 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5NZ0108 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5O00153 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PBT6BP -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PCT5PK -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PDT5PI -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PDT5Q3 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PET5ZK -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PFT5ZL -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PFT5PJ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PGT5PH -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PGT5ZM -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PHT5HG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PHT5PF -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PIT5HG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PIT5PC -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PJT5PE -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PKT5PB -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PKT5PL -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PLT5HG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PLT5PJ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q00174 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q3T5HH -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QQ0168 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QRT57Q -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QST65U -0.0009 -0.0009 GLOB UNIF EL-2-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B197 of 382

LOAD Z T5QTT65W -0.0009 -0.0009 GLOB UNIF EL-2-D


LOAD Z T5RM0186 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5RMT5RQ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5RNT5RO -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ROT5RQ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5RPT5RN -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5RQ0185 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5RRT5RM -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5WN0165 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5WO0167 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0153T5BK -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0166T65Z -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T4410187 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T507T506 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T56ZT56Y -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T570T56Z -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T572T571 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T573T572 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T575T574 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T576T575 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T578T577 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T579T578 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57DT57C -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57FT57E -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57JT5Q2 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57KT57J -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57LT57K -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57NT5Q1 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57OT57N -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57PT57O -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5PYT5Q2 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q1T5PZ -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q2T5Q1 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q4T5Q9 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q9T57D -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5Q9T5QB -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QBT57F -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QBT5ZE -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57VT5QX -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T57WT5QW -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QQT5QU -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QST5QV -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QUT57V -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QVT57W -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QWT5QT -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5QXT5QR -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z 0000T594 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0014T5OK -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5OK0000 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0005T142 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01090161 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0110T66P -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01610110 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T139T172 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T142T143 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T143T144 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T144T139 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T159T185 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T166T184 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T172T166 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T178T132 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T184T159 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T185T186 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T186T187 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T187T178 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T2090109 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T213T209 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T217T213 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5930005 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T594T5JT -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T595T66Q -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JTT595 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RPT5RR -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RRT593 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00000195 -0.0285 -0.0285 GLOB UNIF EL-3-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B198 of 382

LOAD Z 00040155 -0.0285 -0.0285 GLOB UNIF EL-3-D


LOAD Z 0004T5O1 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00050186 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00060154 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0006T151 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0007T506 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00080162 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0026T5PY -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00270192 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01070153 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0107T679 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0108T325 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01100165 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01530108 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01540007 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01550015 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0162T68D -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01650167 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01660107 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01670168 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01680169 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01690170 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01700171 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0171T5Q4 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0172T5QH -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0173T5PZ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01740175 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01750166 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01760006 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01770176 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01780177 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0179T205 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0180T5QG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0181T687 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0182T688 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01830182 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0184T202 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01850184 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01860185 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01870004 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01880187 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01890188 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01900026 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01910190 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01920191 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01930027 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01940193 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01950194 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T132T5B7 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T135T199 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T136T5B6 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T137T169 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T137T174 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T138T171 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T145T146 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T146T147 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T147T137 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T148T149 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T149T150 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T150T170 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T151T152 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T152T153 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T153T138 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T155T181 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T156T195 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T158T190 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T160T192 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T161T197 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T162T158 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T163T156 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T167T170 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T168T167 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T169T168 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T170T173 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T171T179 -0.0285 -0.0285 GLOB UNIF EL-3-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B199 of 382

LOAD Z T173T193 -0.0285 -0.0285 GLOB UNIF EL-3-D


LOAD Z T174T188 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T175T131 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T176T136 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T177T135 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T179T180 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T180T155 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T181T182 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T182T183 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T183T175 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T188T189 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T189T162 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T190T191 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T191T160 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T192T177 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T193T194 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T194T163 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T195T196 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T196T161 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T197T176 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T199T136 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T2020183 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T202T145 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T205T148 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T205T5Q7 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T2080008 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T212T208 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T216T212 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T325T507 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T325T5B9 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T326T324 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T506T324 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T507T326 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5920006 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5B6T131 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5B7T135 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5B90007 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5BKT325 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5BLT592 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5BLT5BK -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5O1T5ZJ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PY0189 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PZT5Q6 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q40172 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q50180 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q60174 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q70178 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QG0179 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QH0173 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0016T56X -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01600000 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T2100016 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T214T210 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T218T214 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T56X0160 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00120164 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0012T571 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00130163 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0014T445 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0016T5JR -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0027T57V -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0044T440 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0045T443 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0109T577 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01630011 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01640014 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0169T57W -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0171T661 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0191T57L -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T209T578 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T210T5JQ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T2110012 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T211T572 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T213T579 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T214T5JP -0.0285 -0.0285 GLOB UNIF EL-3-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B200 of 382

LOAD Z T215T211 -0.0285 -0.0285 GLOB UNIF EL-3-D


LOAD Z T215T573 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T217T5B8 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T218T5JO -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T219T215 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T219T218 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T435T444 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4370191 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T437T442 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4380188 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T438T441 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T440T438 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4410013 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4420044 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T443T437 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4440045 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T445T435 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T56YT574 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T56ZT575 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T570T576 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5710016 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T572T210 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T573T214 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5740109 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T575T209 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T576T213 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5770008 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T578T208 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T579T212 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57LT57P -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57P0171 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57V0169 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57WT65V -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5B8T216 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JOT5JU -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JOT5PA -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JPT570 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JPT5JO -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JQT56Z -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JQT5JP -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JRT56Y -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JRT5JQ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JST5JR -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JTT5JS -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5NZT5LY -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5O0T5NZ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5O1T5O0 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PAT217 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00130004 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00110015 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0015T5NZ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0026T57J -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00440026 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 00450027 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0155T5O0 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0160T5JS -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01610162 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01630155 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 01640160 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0165T5RN -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0167T5RO -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0168T5QS -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0170T5QT -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0172T57D -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0173T57C -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0174T65X -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0175T65Y -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0187T5PB -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0188T5PC -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0189T5PD -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0190T57K -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0192T57M -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0193T5QQ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0194T5WO -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0195T5WN -0.0285 -0.0285 GLOB UNIF EL-3-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B201 of 382

LOAD Z T139T137 -0.0285 -0.0285 GLOB UNIF EL-3-D


LOAD Z T142T145 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T143T146 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T144T147 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T145T69H -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T146T69G -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T147T69F -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T148T151 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T149T152 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T150T153 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T156T155 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T159T158 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T166T188 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T170T138 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T172T174 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T173T171 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T176T175 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T178T177 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T184T189 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T185T190 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T186T191 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T187T192 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T193T179 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T194T180 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T195T181 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T196T182 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T197T183 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4350194 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4400189 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4420190 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4430192 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4440193 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4450195 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57CT57E -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57DT57F -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57E0179 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57FT5ZF -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57JT57N -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57KT57O -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57MT5QR -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57N0173 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57O0172 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57Q0170 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5BK0154 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5HHT5HG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5HHT5PG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5JS0161 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5NZ0108 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5O00153 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PBT6BP -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PCT5PK -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PDT5PI -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PDT5Q3 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PET5ZK -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PFT5ZL -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PFT5PJ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PGT5PH -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PGT5ZM -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PHT5HG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PHT5PF -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PIT5HG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PIT5PC -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PJT5PE -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PKT5PB -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PKT5PL -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PLT5HG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PLT5PJ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q00174 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q3T5HH -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QQ0168 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QRT57Q -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QST65U -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QTT65W -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RM0186 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RMT5RQ -0.0285 -0.0285 GLOB UNIF EL-3-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B202 of 382

LOAD Z T5RNT5RO -0.0285 -0.0285 GLOB UNIF EL-3-D


LOAD Z T5ROT5RQ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RPT5RN -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RQ0185 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5RRT5RM -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5WN0165 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5WO0167 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0153T5BK -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0166T65Z -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T4410187 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T507T506 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T56ZT56Y -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T570T56Z -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T572T571 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T573T572 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T575T574 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T576T575 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T578T577 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T579T578 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57DT57C -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57FT57E -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57JT5Q2 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57KT57J -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57LT57K -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57NT5Q1 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57OT57N -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57PT57O -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5PYT5Q2 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q1T5PZ -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q2T5Q1 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q4T5Q9 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q9T57D -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5Q9T5QB -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QBT57F -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QBT5ZE -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57VT5QX -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T57WT5QW -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QQT5QU -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QST5QV -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QUT57V -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QVT57W -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QWT5QT -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5QXT5QR -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z 0000T594 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0014T5OK -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5OK0000 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0005T142 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01090161 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0110T66P -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01610110 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T139T172 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T142T143 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T143T144 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T144T139 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T159T185 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T166T184 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T172T166 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T178T132 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T184T159 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T185T186 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T186T187 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T187T178 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T2090109 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T213T209 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T217T213 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5930005 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T594T5JT -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T595T66Q -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JTT595 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5RPT5RR -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5RRT593 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00000195 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00040155 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0004T5O1 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00050186 -0.0143 -0.0143 GLOB UNIF EL-4-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B203 of 382

LOAD Z 00060154 -0.0143 -0.0143 GLOB UNIF EL-4-D


LOAD Z 0006T151 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0007T506 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00080162 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0026T5PY -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00270192 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01070153 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0107T679 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0108T325 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01100165 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01530108 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01540007 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01550015 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0162T68D -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01650167 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01660107 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01670168 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01680169 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01690170 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01700171 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0171T5Q4 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0172T5QH -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0173T5PZ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01740175 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01750166 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01760006 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01770176 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01780177 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0179T205 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0180T5QG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0181T687 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0182T688 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01830182 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0184T202 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01850184 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01860185 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01870004 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01880187 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01890188 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01900026 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01910190 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01920191 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01930027 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01940193 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01950194 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T132T5B7 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T135T199 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T136T5B6 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T137T169 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T137T174 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T138T171 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T145T146 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T146T147 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T147T137 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T148T149 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T149T150 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T150T170 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T151T152 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T152T153 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T153T138 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T155T181 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T156T195 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T158T190 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T160T192 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T161T197 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T162T158 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T163T156 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T167T170 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T168T167 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T169T168 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T170T173 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T171T179 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T173T193 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T174T188 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T175T131 -0.0143 -0.0143 GLOB UNIF EL-4-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B204 of 382

LOAD Z T176T136 -0.0143 -0.0143 GLOB UNIF EL-4-D


LOAD Z T177T135 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T179T180 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T180T155 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T181T182 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T182T183 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T183T175 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T188T189 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T189T162 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T190T191 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T191T160 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T192T177 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T193T194 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T194T163 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T195T196 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T196T161 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T197T176 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T199T136 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T2020183 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T202T145 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T205T148 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T205T5Q7 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T2080008 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T212T208 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T216T212 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T325T507 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T325T5B9 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T326T324 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T506T324 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T507T326 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5920006 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5B6T131 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5B7T135 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5B90007 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5BKT325 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5BLT592 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5BLT5BK -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5O1T5ZJ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PY0189 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PZT5Q6 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q40172 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q50180 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q60174 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q70178 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QG0179 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QH0173 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0016T56X -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01600000 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T2100016 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T214T210 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T218T214 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T56X0160 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00120164 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0012T571 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00130163 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0014T445 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0016T5JR -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0027T57V -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0044T440 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0045T443 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0109T577 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01630011 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01640014 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0169T57W -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0171T661 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0191T57L -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T209T578 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T210T5JQ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T2110012 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T211T572 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T213T579 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T214T5JP -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T215T211 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T215T573 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T217T5B8 -0.0143 -0.0143 GLOB UNIF EL-4-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B205 of 382

LOAD Z T218T5JO -0.0143 -0.0143 GLOB UNIF EL-4-D


LOAD Z T219T215 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T219T218 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T435T444 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4370191 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T437T442 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4380188 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T438T441 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T440T438 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4410013 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4420044 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T443T437 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4440045 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T445T435 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T56YT574 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T56ZT575 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T570T576 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5710016 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T572T210 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T573T214 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5740109 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T575T209 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T576T213 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5770008 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T578T208 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T579T212 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57LT57P -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57P0171 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57V0169 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57WT65V -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5B8T216 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JOT5JU -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JOT5PA -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JPT570 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JPT5JO -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JQT56Z -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JQT5JP -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JRT56Y -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JRT5JQ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JST5JR -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JTT5JS -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5NZT5LY -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5O0T5NZ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5O1T5O0 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PAT217 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00130004 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00110015 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0015T5NZ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0026T57J -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00440026 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 00450027 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0155T5O0 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0160T5JS -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01610162 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01630155 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 01640160 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0165T5RN -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0167T5RO -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0168T5QS -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0170T5QT -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0172T57D -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0173T57C -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0174T65X -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0175T65Y -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0187T5PB -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0188T5PC -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0189T5PD -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0190T57K -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0192T57M -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0193T5QQ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0194T5WO -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0195T5WN -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T139T137 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T142T145 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T143T146 -0.0143 -0.0143 GLOB UNIF EL-4-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B206 of 382

LOAD Z T144T147 -0.0143 -0.0143 GLOB UNIF EL-4-D


LOAD Z T145T69H -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T146T69G -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T147T69F -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T148T151 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T149T152 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T150T153 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T156T155 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T159T158 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T166T188 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T170T138 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T172T174 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T173T171 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T176T175 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T178T177 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T184T189 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T185T190 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T186T191 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T187T192 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T193T179 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T194T180 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T195T181 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T196T182 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T197T183 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4350194 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4400189 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4420190 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4430192 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4440193 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4450195 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57CT57E -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57DT57F -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57E0179 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57FT5ZF -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57JT57N -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57KT57O -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57MT5QR -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57N0173 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57O0172 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57Q0170 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5BK0154 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5HHT5HG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5HHT5PG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5JS0161 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5NZ0108 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5O00153 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PBT6BP -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PCT5PK -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PDT5PI -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PDT5Q3 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PET5ZK -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PFT5ZL -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PFT5PJ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PGT5PH -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PGT5ZM -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PHT5HG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PHT5PF -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PIT5HG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PIT5PC -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PJT5PE -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PKT5PB -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PKT5PL -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PLT5HG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PLT5PJ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q00174 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q3T5HH -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QQ0168 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QRT57Q -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QST65U -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QTT65W -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5RM0186 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5RMT5RQ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5RNT5RO -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ROT5RQ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5RPT5RN -0.0143 -0.0143 GLOB UNIF EL-4-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B207 of 382

LOAD Z T5RQ0185 -0.0143 -0.0143 GLOB UNIF EL-4-D


LOAD Z T5RRT5RM -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5WN0165 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5WO0167 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0153T5BK -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z 0166T65Z -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T4410187 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T507T506 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T56ZT56Y -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T570T56Z -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T572T571 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T573T572 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T575T574 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T576T575 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T578T577 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T579T578 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57DT57C -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57FT57E -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57JT5Q2 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57KT57J -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57LT57K -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57NT5Q1 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57OT57N -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57PT57O -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5PYT5Q2 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q1T5PZ -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q2T5Q1 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q4T5Q9 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q9T57D -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5Q9T5QB -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QBT57F -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QBT5ZE -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57VT5QX -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T57WT5QW -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QQT5QU -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QST5QV -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QUT57V -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QVT57W -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QWT5QT -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5QXT5QR -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD T594 -8.0000 GLOB JOIN EL-5-D
LOAD T595 -8.0000 GLOB JOIN EL-5-D
LOAD Z T5ZD0181 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZD0181 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZD0181 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZD0181 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZET5Q5 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZET5Q5 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZET5Q5 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZET5Q5 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZF0180 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZF0180 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZF0180 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZF0180 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZG0182 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZG0182 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZG0182 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZG0182 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZH0183 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZH0183 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZH0183 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZH0183 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZI0184 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZI0184 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZI0184 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZI0184 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZJT67A -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZJT67A -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZJT67A -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZJT67A -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZK0166 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZK0166 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZK0166 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZK0166 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZL0175 -0.0367 -0.0367 GLOB UNIF EL-1-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B208 of 382

LOAD Z T5ZL0175 -0.0009 -0.0009 GLOB UNIF EL-2-D


LOAD Z T5ZL0175 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZL0175 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T5ZMT5Q0 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T5ZMT5Q0 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T5ZMT5Q0 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T5ZMT5Q0 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T65UT5ZI -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T65UT5ZI -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T65UT5ZI -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T65UT5ZI -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T65VT5ZH -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T65VT5ZH -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T65VT5ZH -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T65VT5ZH -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T65WT5ZG -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T65WT5ZG -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T65WT5ZG -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T65WT5ZG -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T65X0178 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T65X0178 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T65X0178 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T65X0178 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T65Y0177 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T65Y0177 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T65Y0177 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T65Y0177 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T65Z0176 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T65Z0176 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T65Z0176 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T65Z0176 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T660T678 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T660T678 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T660T678 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T660T678 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T661T5ZD -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T661T5ZD -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T661T5ZD -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T661T5ZD -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T66PT5RP -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T66PT5RP -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T66PT5RP -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T66PT5RP -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T66Q0110 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T66Q0110 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T66Q0110 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T66Q0110 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T678T5BL -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T678T5BL -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T678T5BL -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T678T5BL -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T679T660 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T679T660 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T679T660 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T679T660 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T67A0107 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T67A0107 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T67A0107 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T67A0107 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T687T5Q5 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T687T5Q5 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T687T5Q5 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T687T5Q5 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T6880181 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T6880181 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T6880181 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T6880181 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T68D0005 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T68D0005 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T68D0005 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T68D0005 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T69FT150 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T69FT150 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T69FT150 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T69FT150 -0.0143 -0.0143 GLOB UNIF EL-4-D
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B209 of 382

LOAD Z T69GT149 -0.0367 -0.0367 GLOB UNIF EL-1-D


LOAD Z T69GT149 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T69GT149 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T69GT149 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T69HT148 -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T69HT148 -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T69HT148 -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T69HT148 -0.0143 -0.0143 GLOB UNIF EL-4-D
LOAD Z T6BPT5PE -0.0367 -0.0367 GLOB UNIF EL-1-D
LOAD Z T6BPT5PE -0.0009 -0.0009 GLOB UNIF EL-2-D
LOAD Z T6BPT5PE -0.0285 -0.0285 GLOB UNIF EL-3-D
LOAD Z T6BPT5PE -0.0143 -0.0143 GLOB UNIF EL-4-D
************************MECHANICAL DRY***************************************
LOADCNDDMD
LOAD T69I -16.200 GLOB JOIN CD-BO-PU
LOAD T69J -52.180 GLOB JOIN CD-DRUM
LOAD T69K -10.000 GLOB JOIN CD-PU-SK
LOAD T69L -13.000 GLOB JOIN CO-IN-PK
LOAD T69M -20.000 GLOB JOIN MTL-PKG
************************MECHANICAL OPERATION**********************************
LOADCNDDMO
LOAD T69I -16.200 GLOB JOIN CD-BO-PU
LOAD T69J -122.84 GLOB JOIN CD-DRUM
LOAD T69K -11.000 GLOB JOIN CD-PU-SK
LOAD T69L -35.000 GLOB JOIN CO-IN-PK
LOAD T69M -30.000 GLOB JOIN MTL-PKG
LOADCNDDPD
***LDS1** -11.000 -5.750 8.930 -1.000 -5.750 8.930 -11.000
***LDS2** -7.750 8.930 -1.000 -7.750 8.930 1.746
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-1
LOAD Z 0000T594 -0.8556 -0.8556 GLOB UNIF PI-D-1
LOAD Z 0110T66P -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5930005 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T594T5JT -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T595T66Q -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5JTT595 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5RPT5RR -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5RRT593 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z 0016T5JR -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z 0109T577 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T56YT574 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5740109 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5770008 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T5JRT56Y -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z 0160T5JS -1.2222 -1.2222 GLOB UNIF PI-D-1
LOAD Z 01610162 -1.2222 -1.2222 GLOB UNIF PI-D-1
LOAD Z T5JS0161 -1.2222 -1.2222 GLOB UNIF PI-D-1
***LDS1** -11.000 1.000 8.930 -6.000 1.000 8.930 -11.000
***LDS2** -3.000 8.930 -6.000 -3.000 8.930 1.978
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-2
LOAD Z 0027T57V -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z 0191T57L -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T57LT57P -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T57P0171 -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T57V0169 -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z 0190T57K -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z 0192T57M -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z 0193T5QQ -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T57KT57O -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T57MT5QR -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T57O0172 -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T57Q0170 -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T5QQ0168 -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T5QRT57Q -1.3846 -1.3846 GLOB UNIF PI-D-2
***LDS1** -6.000 1.000 8.930 -2.508 1.000 8.930 -6.000
***LDS2** -3.000 8.930 -2.508 -3.000 8.930 1.978
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-2
LOAD Z 0169T57W -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z 0171T661 -1.0385 -1.0385 GLOB UNIF PI-D-2
LOAD Z T57WT65V -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z 0168T5QS -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z 0170T5QT -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z 0172T57D -0.3461 -0.3461 GLOB UNIF PI-D-2
LOAD Z T57DT57F -0.3461 -0.3461 GLOB UNIF PI-D-2
LOAD Z T57FT5ZF -0.3461 -0.3461 GLOB UNIF PI-D-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B210 of 382

LOAD Z T5QST65U -0.6923 -0.6923 GLOB UNIF PI-D-2


LOAD Z T5QTT65W -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T5Q4T5Q9 -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T5Q9T5QB -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T5QBT5ZE -0.6923 -0.6923 GLOB UNIF PI-D-2
***LDS1** -11.000 5.750 8.930 -9.140 5.750 8.930 -11.000
***LDS2** 5.000 8.930 -9.140 5.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-3
LOAD Z 0004T5O1 -0.3476 -0.3476 GLOB UNIF PI-D-3
LOAD Z T5O1T5ZJ -0.1887 -0.1887 GLOB UNIF PI-D-3
LOAD Z 0187T5PB -0.1887 -0.1887 GLOB UNIF PI-D-3
LOAD Z T5PBT6BP -0.1887 -0.1887 GLOB UNIF PI-D-3
LOAD Z T5PET5ZK -0.1887 -0.1887 GLOB UNIF PI-D-3
***LDS1** -11.000 5.000 8.930 -10.500 5.000 8.930 -11.000
***LDS2** 3.000 8.930 -10.500 3.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-3
LOAD Z 0187T5PB -0.2516 -0.2516 GLOB UNIF PI-D-3
LOAD Z 0188T5PC -0.5033 -0.5033 GLOB UNIF PI-D-3
LOAD Z 0189T5PD -0.2516 -0.2516 GLOB UNIF PI-D-3
***LDS1** -9.300 5.000 8.930 -9.140 5.000 8.930 -9.300
***LDS2** 3.000 8.930 -9.140 3.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-3
LOAD Z T5PET5ZK -0.2516 -0.2516 GLOB UNIF PI-D-3
LOAD Z T5PFT5ZL -0.5033 -0.5033 GLOB UNIF PI-D-3
LOAD Z T5PGT5ZM -0.2516 -0.2516 GLOB UNIF PI-D-3
***LDS1** -10.500 5.000 8.930 -9.300 5.000 8.930 -10.500
***LDS2** 3.000 8.930 -9.300 3.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPD -2EQUPPRESPI-D-3
LOAD Z T5HHT5PG -0.2138 -0.2138 GLOB UNIF PI-D-3
LOAD Z T5PBT6BP -0.1383 -0.1383 GLOB UNIF PI-D-3
LOAD Z T5PDT5Q3 -0.2138 -0.2138 GLOB UNIF PI-D-3
LOAD Z T5HGT5PH -0.9997 -0.9997 GLOB UNIF PI-D-3
LOAD Z T5PIT5HG -0.9996 -0.9996 GLOB UNIF PI-D-3
LOAD Z T5PKT5PL -0.2893 -0.2893 GLOB UNIF PI-D-3
LOAD Z T5PLT5PJ -0.2893 -0.2893 GLOB UNIF PI-D-3
LOAD Z T5Q3T5HH -0.2138 -0.2138 GLOB UNIF PI-D-3
LOAD Z T65UT5ZI -0.6923 -0.6923 GLOB UNIF PI-D-2
LOAD Z T65VT5ZH -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T65WT5ZG -1.3846 -1.3846 GLOB UNIF PI-D-2
LOAD Z T661T5ZD -1.0385 -1.0385 GLOB UNIF PI-D-2
LOAD Z T66PT5RP -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T66Q0110 -0.6111 -0.6111 GLOB UNIF PI-D-1
LOAD Z T6BPT5PE -0.1887 -0.1887 GLOB UNIF PI-D-3
LOAD Z T6BPT5PE -0.1383 -0.1383 GLOB UNIF PI-D-3
LOADCNDDPO
***LDS1** -11.000 -5.750 8.930 -1.000 -5.750 8.930 -11.000
***LDS2** -7.750 8.930 -1.000 -7.750 8.930 1.746
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-1
LOAD Z 0000T594 -1.2223 -1.2223 GLOB UNIF PI-D-1
LOAD Z 0110T66P -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5930005 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T594T5JT -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T595T66Q -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5JTT595 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5RPT5RR -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5RRT593 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z 0016T5JR -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z 0109T577 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T56YT574 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5740109 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5770008 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T5JRT56Y -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z 0160T5JS -1.7460 -1.7460 GLOB UNIF PI-D-1
LOAD Z 01610162 -1.7460 -1.7460 GLOB UNIF PI-D-1
LOAD Z T5JS0161 -1.7460 -1.7460 GLOB UNIF PI-D-1
***LDS1** -11.000 1.000 8.930 -6.000 1.000 8.930 -11.000
***LDS2** -3.000 8.930 -6.000 -3.000 8.930 1.978
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-2
LOAD Z 0027T57V -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z 0191T57L -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T57LT57P -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T57P0171 -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T57V0169 -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z 0190T57K -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z 0192T57M -1.9780 -1.9780 GLOB UNIF PI-D-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B211 of 382

LOAD Z 0193T5QQ -0.9890 -0.9890 GLOB UNIF PI-D-2


LOAD Z T57KT57O -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T57MT5QR -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T57O0172 -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T57Q0170 -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T5QQ0168 -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T5QRT57Q -1.9780 -1.9780 GLOB UNIF PI-D-2
***LDS1** -6.000 1.000 8.930 -2.508 1.000 8.930 -6.000
***LDS2** -3.000 8.930 -2.508 -3.000 8.930 1.978
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-2
LOAD Z 0169T57W -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z 0171T661 -1.4835 -1.4835 GLOB UNIF PI-D-2
LOAD Z T57WT65V -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z 0168T5QS -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z 0170T5QT -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z 0172T57D -0.4945 -0.4945 GLOB UNIF PI-D-2
LOAD Z T57DT57F -0.4945 -0.4945 GLOB UNIF PI-D-2
LOAD Z T57FT5ZF -0.4945 -0.4945 GLOB UNIF PI-D-2
LOAD Z T5QST65U -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T5QTT65W -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T5Q4T5Q9 -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T5Q9T5QB -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T5QBT5ZE -0.9890 -0.9890 GLOB UNIF PI-D-2
***LDS1** -11.000 5.750 8.930 -9.140 5.750 8.930 -11.000
***LDS2** 5.000 8.930 -9.140 5.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-3
LOAD Z 0004T5O1 -0.4967 -0.4967 GLOB UNIF PI-D-3
LOAD Z T5O1T5ZJ -0.2696 -0.2696 GLOB UNIF PI-D-3
LOAD Z 0187T5PB -0.2696 -0.2696 GLOB UNIF PI-D-3
LOAD Z T5PBT6BP -0.2696 -0.2696 GLOB UNIF PI-D-3
LOAD Z T5PET5ZK -0.2696 -0.2696 GLOB UNIF PI-D-3
***LDS1** -11.000 5.000 8.930 -10.500 5.000 8.930 -11.000
***LDS2** 3.000 8.930 -10.500 3.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-3
LOAD Z 0187T5PB -0.3595 -0.3595 GLOB UNIF PI-D-3
LOAD Z 0188T5PC -0.7190 -0.7190 GLOB UNIF PI-D-3
LOAD Z 0189T5PD -0.3595 -0.3595 GLOB UNIF PI-D-3
***LDS1** -9.300 5.000 8.930 -9.140 5.000 8.930 -9.300
***LDS2** 3.000 8.930 -9.140 3.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-3
LOAD Z T5PET5ZK -0.3595 -0.3595 GLOB UNIF PI-D-3
LOAD Z T5PFT5ZL -0.7190 -0.7190 GLOB UNIF PI-D-3
LOAD Z T5PGT5ZM -0.3595 -0.3595 GLOB UNIF PI-D-3
***LDS1** -10.500 5.000 8.930 -9.300 5.000 8.930 -10.500
***LDS2** 3.000 8.930 -9.300 3.000 8.930 0.719
***LDS3** 0.250 0 1 3 0 0DDPO -2EQUPPRESPI-D-3
LOAD Z T5HHT5PG -0.3055 -0.3055 GLOB UNIF PI-D-3
LOAD Z T5PBT6BP -0.1977 -0.1977 GLOB UNIF PI-D-3
LOAD Z T5PDT5Q3 -0.3055 -0.3055 GLOB UNIF PI-D-3
LOAD Z T5HGT5PH -1.4282 -1.4282 GLOB UNIF PI-D-3
LOAD Z T5PIT5HG -1.4281 -1.4281 GLOB UNIF PI-D-3
LOAD Z T5PKT5PL -0.4134 -0.4134 GLOB UNIF PI-D-3
LOAD Z T5PLT5PJ -0.4134 -0.4134 GLOB UNIF PI-D-3
LOAD Z T5Q3T5HH -0.3055 -0.3055 GLOB UNIF PI-D-3
LOAD Z T65UT5ZI -0.9890 -0.9890 GLOB UNIF PI-D-2
LOAD Z T65VT5ZH -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T65WT5ZG -1.9780 -1.9780 GLOB UNIF PI-D-2
LOAD Z T661T5ZD -1.4835 -1.4835 GLOB UNIF PI-D-2
LOAD Z T66PT5RP -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T66Q0110 -0.8730 -0.8730 GLOB UNIF PI-D-1
LOAD Z T6BPT5PE -0.2696 -0.2696 GLOB UNIF PI-D-3
LOAD Z T6BPT5PE -0.1977 -0.1977 GLOB UNIF PI-D-3
LOADCNDDSA
LOAD Z T65WT5ZG 0.20400-1.0000 GLOB CONC SA-1-D
LOAD 0189 -1.0000 GLOB JOIN SA-1-D
LOAD Z 0000T594 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0014T5OK -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5OK0000 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0005T142 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01090161 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0110T66P -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01610110 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T139T172 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T142T143 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T143T144 -0.0184 -0.0184 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B212 of 382

LOAD Z T144T139 -0.0184 -0.0184 GLOB UNIF SAF-BULK


LOAD Z T159T185 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T166T184 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T172T166 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T178T132 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T184T159 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T185T186 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T186T187 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T187T178 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T2090109 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T213T209 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T217T213 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5930005 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T594T5JT -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T595T66Q -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JTT595 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RPT5RR -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RRT593 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00000195 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00040155 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0004T5O1 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00050186 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00060154 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0006T151 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0007T506 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00080162 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0026T5PY -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00270192 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01070153 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0107T679 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0108T325 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01100165 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01530108 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01540007 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01550015 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0162T68D -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01650167 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01660107 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01670168 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01680169 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01690170 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01700171 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0171T5Q4 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0172T5QH -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0173T5PZ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01740175 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01750166 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01760006 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01770176 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01780177 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0179T205 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0180T5QG -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0181T687 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0182T688 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01830182 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0184T202 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01850184 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01860185 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01870004 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01880187 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01890188 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01900026 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01910190 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01920191 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01930027 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01940193 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01950194 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T132T5B7 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T135T199 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T136T5B6 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T137T169 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T137T174 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T138T171 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T145T146 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T146T147 -0.0184 -0.0184 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B213 of 382

LOAD Z T147T137 -0.0184 -0.0184 GLOB UNIF SAF-BULK


LOAD Z T148T149 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T149T150 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T150T170 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T151T152 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T152T153 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T153T138 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T155T181 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T156T195 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T158T190 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T160T192 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T161T197 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T162T158 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T163T156 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T167T170 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T168T167 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T169T168 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T170T173 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T171T179 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T173T193 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T174T188 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T175T131 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T176T136 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T177T135 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T179T180 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T180T155 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T181T182 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T182T183 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T183T175 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T188T189 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T189T162 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T190T191 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T191T160 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T192T177 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T193T194 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T194T163 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T195T196 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T196T161 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T197T176 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T199T136 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T2020183 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T202T145 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T205T148 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T205T5Q7 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T2080008 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T212T208 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T216T212 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T325T507 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T325T5B9 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T326T324 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T506T324 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T507T326 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5920006 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5B6T131 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5B7T135 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5B90007 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5BKT325 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5BLT592 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5BLT5BK -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5O1T5ZJ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PY0189 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PZT5Q6 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q40172 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q50180 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q60174 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q70178 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QG0179 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QH0173 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0016T56X -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01600000 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T2100016 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T214T210 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T218T214 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T56X0160 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00120164 -0.0184 -0.0184 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B214 of 382

LOAD Z 0012T571 -0.0184 -0.0184 GLOB UNIF SAF-BULK


LOAD Z 00130163 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0014T445 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0016T5JR -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0027T57V -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0044T440 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0045T443 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0109T577 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01630011 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01640014 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0169T57W -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0171T661 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0191T57L -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T209T578 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T210T5JQ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T2110012 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T211T572 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T213T579 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T214T5JP -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T215T211 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T215T573 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T217T5B8 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T218T5JO -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T219T215 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T219T218 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T435T444 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4370191 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T437T442 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4380188 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T438T441 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T440T438 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4410013 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4420044 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T443T437 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4440045 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T445T435 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T56YT574 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T56ZT575 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T570T576 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5710016 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T572T210 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T573T214 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5740109 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T575T209 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T576T213 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5770008 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T578T208 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T579T212 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57LT57P -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57P0171 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57V0169 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57WT65V -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5B8T216 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JOT5JU -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JOT5PA -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JPT570 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JPT5JO -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JQT56Z -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JQT5JP -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JRT56Y -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JRT5JQ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JST5JR -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JTT5JS -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5NZT5LY -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5O0T5NZ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5O1T5O0 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PAT217 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00130004 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00110015 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0015T5NZ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0026T57J -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00440026 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 00450027 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0155T5O0 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0160T5JS -0.0184 -0.0184 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B215 of 382

LOAD Z 01610162 -0.0184 -0.0184 GLOB UNIF SAF-BULK


LOAD Z 01630155 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 01640160 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0165T5RN -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0167T5RO -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0168T5QS -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0170T5QT -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0172T57D -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0173T57C -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0174T65X -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0175T65Y -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0187T5PB -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0188T5PC -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0189T5PD -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0190T57K -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0192T57M -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0193T5QQ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0194T5WO -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0195T5WN -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T139T137 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T142T145 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T143T146 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T144T147 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T145T69H -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T146T69G -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T147T69F -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T148T151 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T149T152 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T150T153 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T156T155 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T159T158 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T166T188 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T170T138 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T172T174 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T173T171 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T176T175 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T178T177 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T184T189 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T185T190 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T186T191 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T187T192 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T193T179 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T194T180 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T195T181 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T196T182 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T197T183 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4350194 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4400189 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4420190 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4430192 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4440193 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4450195 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57CT57E -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57DT57F -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57E0179 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57FT5ZF -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57JT57N -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57KT57O -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57MT5QR -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57N0173 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57O0172 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57Q0170 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5BK0154 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5HHT5HG -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5HHT5PG -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5JS0161 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5NZ0108 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5O00153 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PBT6BP -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PCT5PK -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PDT5PI -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PDT5Q3 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PET5ZK -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PFT5ZL -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PFT5PJ -0.0184 -0.0184 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B216 of 382

LOAD Z T5PGT5PH -0.0184 -0.0184 GLOB UNIF SAF-BULK


LOAD Z T5PGT5ZM -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PHT5HG -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PHT5PF -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PIT5HG -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PIT5PC -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PJT5PE -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PKT5PB -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PKT5PL -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PLT5HG -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PLT5PJ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q00174 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q3T5HH -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QQ0168 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QRT57Q -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QST65U -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QTT65W -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RM0186 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RMT5RQ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RNT5RO -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ROT5RQ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RPT5RN -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RQ0185 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5RRT5RM -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5WN0165 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5WO0167 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0153T5BK -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z 0166T65Z -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T4410187 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T507T506 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T56ZT56Y -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T570T56Z -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T572T571 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T573T572 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T575T574 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T576T575 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T578T577 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T579T578 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57DT57C -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57FT57E -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57JT5Q2 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57KT57J -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57LT57K -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57NT5Q1 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57OT57N -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57PT57O -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5PYT5Q2 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q1T5PZ -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q2T5Q1 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q4T5Q9 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q9T57D -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5Q9T5QB -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QBT57F -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QBT5ZE -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57VT5QX -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T57WT5QW -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QQT5QU -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QST5QV -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QUT57V -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QVT57W -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QWT5QT -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5QXT5QR -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZD0181 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZET5Q5 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZF0180 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZG0182 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZH0183 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZI0184 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZJT67A -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZK0166 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZL0175 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T5ZMT5Q0 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T65UT5ZI -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T65VT5ZH -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T65WT5ZG -0.0184 -0.0184 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B217 of 382

LOAD Z T65X0178 -0.0184 -0.0184 GLOB UNIF SAF-BULK


LOAD Z T65Y0177 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T65Z0176 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T660T678 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T661T5ZD -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T66PT5RP -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T66Q0110 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T678T5BL -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T679T660 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T67A0107 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T687T5Q5 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T6880181 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T68D0005 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T69FT150 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T69GT149 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T69HT148 -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOAD Z T6BPT5PE -0.0184 -0.0184 GLOB UNIF SAF-BULK
LOADCNDDST
LOAD T132 -8.0000 GLOB JOIN DIAM-DR
LOAD T131 -8.0000 GLOB JOIN DIAM-DR
LOAD 0004 -8.0000 GLOB JOIN DIAM-DR
LOAD 0000 -8.0000 GLOB JOIN DIAM-DR
LOAD 0005 -4.2000 GLOB JOIN WING-DR
LOAD 0181 -4.2000 GLOB JOIN WING-DR
LOAD 0006 -4.2000 GLOB JOIN WING-DR
LOAD 0107 -4.2000 GLOB JOIN WING-DR
LOAD 0110 -4.2000 GLOB JOIN WING-DR
LOAD T217 -4.2000 GLOB JOIN WING-DR
LOAD T218 -4.2000 GLOB JOIN WING-DR
LOAD T219 -4.2000 GLOB JOIN WING-DR
LOAD 0014 -4.2000 GLOB JOIN WING-DR
LOAD T437 -4.2000 GLOB JOIN WING-DR
LOAD 0013 -4.2000 GLOB JOIN WING-DR
LOAD 0191 -4.2000 GLOB JOIN WING-DR
***LDS1** -3.100 10.000 8.930 -1.000 10.000 8.930 -3.100
***LDS2** 8.000 8.930 -1.000 8.000 8.930 0.942
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL12
LOAD Z T325T5B9 -0.4710 -0.4710 GLOB UNIF PL12
LOAD Z T326T324 -0.4710 -0.4710 GLOB UNIF PL12
LOAD Z T5B90007 -0.4710 -0.4710 GLOB UNIF PL12
LOAD Z T507T506 -0.9420 -0.9420 GLOB UNIF PL12
LOAD Z T5B7T135 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T132T5B7 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T136T5B6 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T5B6T131 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T175T131 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T183T175 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T182T183 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T181T182 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T155T181 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T180T155 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T179T180 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T171T179 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T138T171 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T153T138 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T152T153 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T151T152 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0006T151 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 00060154 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 01540007 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0007T506 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T506T324 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T326T324 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T507T326 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T325T507 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0108T325 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T5NZ0108 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0015T5NZ -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 00110015 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 01630011 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 00130163 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T4410013 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T438T441 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T440T438 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0044T440 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B218 of 382

LOAD Z T4420044 -0.2983 -0.2983 GLOB UNIF HRAIL-DR


LOAD Z T437T442 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T443T437 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0045T443 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T4440045 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T435T444 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T445T435 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0014T445 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 01640014 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 00120164 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T2110012 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T215T211 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T219T215 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T219T218 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T218T5JO -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T5PAT217 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T5JOT5PA -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T217T5B8 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T216T212 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T5B8T216 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T212T208 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T2080008 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 00080162 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0162T68D -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0005T142 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T142T143 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T143T144 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T144T139 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T139T172 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T172T166 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T166T184 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T184T159 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T159T185 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T185T186 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T186T187 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T187T178 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T178T132 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T177T135 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T192T177 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T160T192 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T191T160 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T190T191 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T158T190 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T162T158 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T189T162 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T188T189 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T174T188 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T137T174 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T137T169 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T168T167 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T169T168 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T167T170 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T170T173 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T173T193 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T193T194 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T194T163 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T163T156 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T156T195 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T195T196 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T161T197 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T197T176 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z T176T136 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
***LDS1** -1.000 5.750 8.930 11.000 5.750 8.930 -1.000
***LDS2** 2.500 8.930 11.000 2.500 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0006T151 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T138T171 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T148T149 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T149T150 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T150T170 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T151T152 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T152T153 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T153T138 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T155T181 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T156T195 -1.0237 -1.0237 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B219 of 382

LOAD Z T161T197 -1.0237 -1.0237 GLOB UNIF PL8


LOAD Z T163T156 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T170T173 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T171T179 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T173T193 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T175T131 -1.8861 -1.8861 GLOB UNIF PL8
LOAD Z T176T136 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T179T180 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T180T155 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T181T182 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T182T183 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T183T175 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T193T194 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T194T163 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T195T196 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T196T161 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T197T176 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T205T148 -1.0237 -1.0237 GLOB UNIF PL8
***LDS1** -1.000 -2.500 8.930 11.000 -2.500 8.930 -1.000
***LDS2** -5.750 8.930 11.000 -5.750 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0005T142 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T139T172 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T142T143 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T143T144 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T144T139 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T159T185 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T166T184 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T172T166 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T178T132 -1.8861 -1.8861 GLOB UNIF PL8
LOAD Z T184T159 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T185T186 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T186T187 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T187T178 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T137T174 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T145T146 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T146T147 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T147T137 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T158T190 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T160T192 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T162T158 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T174T188 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T177T135 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T188T189 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T189T162 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T190T191 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T191T160 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T192T177 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T202T145 -1.0237 -1.0237 GLOB UNIF PL8
***LDS1** -1.000 2.500 8.930 3.400 2.500 8.930 -1.000
***LDS2** -2.500 8.930 3.400 -2.500 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z T145T146 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T146T147 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T147T137 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T148T149 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T149T150 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T150T170 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T202T145 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z T205T148 -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** -13.000 8.000 8.930 -1.000 8.000 8.930 -13.000
***LDS2** 5.750 8.930 -1.000 5.750 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0004T5O1 -0.5803 -0.5803 GLOB UNIF PL8
LOAD Z 0107T679 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0108T325 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T325T5B9 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5920006 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5B90007 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5BLT592 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5O1T5ZJ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZJT67A -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 00130004 0.16000-0.4083 -0.4083 GLOB UNIF PL8
LOAD Z 00110015 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0015T5NZ -0.3937 -0.3937 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B220 of 382

LOAD Z 0155T5O0 -0.7087 -0.7087 GLOB UNIF PL8


LOAD Z 01630155 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5BK0154 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5NZ0108 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5O00153 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0153T5BK -0.7087 -0.7087 GLOB UNIF PL8
***LDS1** -13.000 5.750 8.930 -11.000 5.750 8.930 -13.000
***LDS2** -5.750 8.930 -11.000 -5.750 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0014T5OK 0.16000-0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5OK0000 -0.5513 -0.5513 GLOB UNIF PL8
LOAD Z T4370191 0.16000-0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4380188 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 00130004 0.16000-0.3062 -0.3062 GLOB UNIF PL8
LOAD Z 00440026 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 00450027 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4350194 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4400189 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4420190 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4430192 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4440193 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T4450195 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T4410187 -0.5512 -0.5512 GLOB UNIF PL8
***LDS1** -13.000 -5.750 8.930 -11.000 -5.750 8.930 -13.000
***LDS2** -11.000 8.930 -11.000 -11.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0014T5OK 0.16000-0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OK0000 -0.7351 -0.7351 GLOB UNIF PL8
LOAD Z 0012T571 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T211T572 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T215T573 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T219T218 0.16000-0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5710016 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T572T210 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T573T214 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 01640160 -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -6.000 -5.750 8.930 -1.000 -5.750 8.930 -6.000
***LDS2** -11.000 8.930 -1.000 -11.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0110T66P -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5930005 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RPT5RR -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RRT593 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0109T577 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T209T578 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T213T579 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T217T5B8 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5770008 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T578T208 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T579T212 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5B8T216 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 01610162 -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -11.000 -5.750 8.930 -6.000 -5.750 8.930 -11.000
***LDS2** -11.000 8.930 -6.000 -11.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0000T594 -0.4410 -0.4410 GLOB UNIF PL8
LOAD Z T594T5JT -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T595T66Q -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5JTT595 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0016T5JR -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T210T5JQ -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T214T5JP -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T218T5JO -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T56YT574 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T56ZT575 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T570T576 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5740109 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T575T209 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T576T213 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5JOT5PA -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5JPT570 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5JQT56Z -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5JRT56Y -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5PAT217 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0160T5JS -0.6300 -0.6300 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B221 of 382

LOAD Z T5JS0161 -0.6300 -0.6300 GLOB UNIF PL8


***LDS1** -6.000 5.750 8.930 -1.000 5.750 8.930 -6.000
***LDS2** 2.000 8.930 -1.000 2.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0107T679 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5920006 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5BLT592 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0173T57C -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0174T65X -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0175T65Y -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57CT57E -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T57E0179 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0166T65Z -0.5512 -0.5512 GLOB UNIF PL8
***LDS1** -11.000 2.000 8.930 -6.000 2.000 8.930 -11.000
***LDS2** -5.750 8.930 -6.000 -5.750 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0000T594 -0.3307 -0.3307 GLOB UNIF PL8
LOAD Z T594T5JT -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T595T66Q -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5JTT595 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0027T57V -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0191T57L -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57LT57P -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57P0171 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57V0169 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0026T57J -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0190T57K -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0192T57M -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0193T5QQ -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0194T5WO -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0195T5WN -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T57JT57N -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T57KT57O -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57MT5QR -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57N0173 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T57O0172 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T57Q0170 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5QQ0168 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5QRT57Q -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5WN0165 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5WO0167 -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -6.000 2.000 8.930 -1.000 2.000 8.930 -6.000
***LDS2** -4.000 8.930 -1.000 -4.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0169T57W -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0171T661 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T57WT65V -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ZD0181 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5ZH0183 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0167T5RO -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0168T5QS -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0170T5QT -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0172T57D -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0173T57C -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T57CT57E -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T57DT57F -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T57E0179 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T57FT5ZF -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5QST65U -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5QTT65W -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ROT5RQ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5RQ0185 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZF0180 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5ZG0182 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ZI0184 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5Q4T5Q9 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5Q9T5QB -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5QBT5ZE -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZET5Q5 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -6.000 -4.000 8.930 -4.000 -4.000 8.930 -6.000
***LDS2** -5.750 8.930 -4.000 -5.750 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0110T66P -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0165T5RN -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0167T5RO -0.3150 -0.3150 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B222 of 382

***LDS1** -3.000 -4.000 8.930 -1.000 -4.000 8.930 -3.000


***LDS2** -5.750 8.930 -1.000 -5.750 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z T5930005 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5RRT593 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5RM0186 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5RQ0185 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -11.000 5.750 8.930 -6.000 5.750 8.930 -11.000
***LDS2** 5.000 8.930 -6.000 5.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0004T5O1 -0.4352 -0.4352 GLOB UNIF PL8
LOAD Z T5O1T5ZJ -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5ZJT67A -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0187T5PB -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5PBT6BP -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5PET5ZK -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5ZK0166 -0.2362 -0.2362 GLOB UNIF PL8
***LDS1** -11.000 3.000 8.930 -6.000 3.000 8.930 -11.000
***LDS2** 2.000 8.930 -6.000 2.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z 0026T57J -0.1102 -0.1102 GLOB UNIF PL8
LOAD Z 0189T5PD -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T57JT57N -0.1102 -0.1102 GLOB UNIF PL8
LOAD Z T57N0173 -0.1102 -0.1102 GLOB UNIF PL8
LOAD Z T5HHT5PG -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T5PDT5Q3 -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T5PGT5ZM -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T5Q00174 -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T5Q3T5HH -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T5ZMT5Q0 -0.2047 -0.2047 GLOB UNIF PL8
LOAD Z T5PYT5Q2 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5Q1T5PZ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5Q2T5Q1 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -9.300 5.000 8.930 -6.000 5.000 8.930 -9.300
***LDS2** 3.000 8.930 -6.000 3.000 8.930 0.630
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESPL8
LOAD Z T5PET5ZK -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5PFT5ZL -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5PGT5ZM -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5Q00174 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZK0166 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5ZL0175 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ZMT5Q0 -0.3150 -0.3150 GLOB UNIF PL8
***LDS1** -10.500 3.000 8.930 -10.500 4.450 8.930 -9.300
***LDS2** 3.000 8.930 -9.300 4.450 8.930 4.200
***LDS3** 0.250 0 1 3 0 0DDST -2EQUPPRESHATCH-CA
LOAD Z T5HHT5HG -4.5672 -4.5672 GLOB UNIF HATCH-CA
LOAD Z T5PCT5PK -1.2600 -1.2600 GLOB UNIF HATCH-CA
LOAD Z T5PDT5PI -1.2600 -1.2600 GLOB UNIF HATCH-CA
LOAD Z T5PFT5PJ -1.2600 -1.2600 GLOB UNIF HATCH-CA
LOAD Z T5PGT5PH -1.2600 -1.2600 GLOB UNIF HATCH-CA
LOAD Z T5PHT5PF -1.2600 -1.2600 GLOB UNIF HATCH-CA
LOAD Z T5PIT5PC -1.2600 -1.2600 GLOB UNIF HATCH-CA
LOAD Z T5HGT5PL -6.9041 -6.9041 GLOB UNIF HATCH-CA
LOAD Z T65UT5ZI -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T65VT5ZH -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T65WT5ZG -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T65X0178 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T65Y0177 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T65Z0176 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T660T678 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T660T678 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T661T5ZD -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T66PT5RP -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T66PT5RP -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T66Q0110 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T66Q0110 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T678T5BL -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T678T5BL -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T679T660 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T679T660 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T67A0107 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T67A0107 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T68D0005 -0.2983 -0.2983 GLOB UNIF HRAIL-DR
LOAD Z 0000T594 -0.0439 -0.0439 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B223 of 382

LOAD Z 0005T142 -0.0439 -0.0439 GLOB UNIF EQ-SUP


LOAD Z 01090161 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0110T66P -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01610110 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T139T172 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T142T143 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T143T144 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T144T139 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T159T185 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T166T184 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T172T166 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T178T132 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T184T159 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T185T186 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T186T187 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T187T178 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T2090109 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T213T209 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T217T213 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5930005 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T594T5JT -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T595T66Q -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JTT595 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RPT5RR -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RRT593 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T66PT5RP -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T66Q0110 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00000195 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00040155 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0004T5O1 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00050186 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00060154 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0006T151 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0007T506 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00080162 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0026T5PY -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00270192 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01070153 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0108T325 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01100165 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01530108 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01540007 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01550015 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0162T68D -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01650167 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01660107 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01670168 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01680169 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01690170 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01700171 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0171T5Q4 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0172T5QH -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0173T5PZ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01740175 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01750166 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01760006 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01770176 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01780177 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0179T205 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0180T5QG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0181T687 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0182T688 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01830182 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0184T202 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01850184 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01860185 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01870004 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01880187 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01890188 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01900026 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01910190 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01920191 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01930027 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01940193 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01950194 -0.0439 -0.0439 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B224 of 382

LOAD Z T132T5B7 -0.0439 -0.0439 GLOB UNIF EQ-SUP


LOAD Z T135T199 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T136T5B6 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T137T169 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T137T174 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T138T171 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T145T146 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T146T147 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T147T137 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T148T149 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T149T150 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T150T170 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T151T152 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T152T153 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T153T138 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T155T181 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T156T195 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T158T190 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T160T192 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T161T197 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T162T158 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T163T156 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T167T170 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T168T167 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T169T168 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T170T173 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T171T179 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T173T193 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T174T188 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T175T131 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T176T136 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T177T135 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T179T180 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T180T155 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T181T182 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T182T183 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T183T175 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T188T189 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T189T162 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T190T191 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T191T160 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T192T177 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T193T194 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T194T163 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T195T196 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T196T161 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T197T176 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T199T136 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T2020183 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T202T145 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T205T148 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T205T5Q7 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T2080008 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T212T208 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T216T212 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T325T507 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T325T5B9 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T326T324 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T506T324 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T507T326 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5920006 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5B6T131 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5B7T135 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5B90007 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5BKT325 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5BLT592 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5BLT5BK -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5O1T5ZJ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PY0189 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PZT5Q6 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q40172 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q50180 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q60174 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q70178 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QG0179 -0.0439 -0.0439 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B225 of 382

LOAD Z T5QH0173 -0.0439 -0.0439 GLOB UNIF EQ-SUP


LOAD Z T5ZJT67A -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T660T678 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T678T5BL -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T679T660 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T687T5Q5 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T6880181 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T68D0005 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0016T56X -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01600000 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T2100016 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T214T210 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T218T214 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T56X0160 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00120164 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0012T571 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00130163 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0014T445 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0016T5JR -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0027T57V -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0044T440 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0045T443 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0109T577 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01630011 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01640014 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0169T57W -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0171T661 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0191T57L -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T209T578 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T210T5JQ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T2110012 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T211T572 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T213T579 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T214T5JP -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T215T211 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T215T573 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T217T5B8 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T218T5JO -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T219T215 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T219T218 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T435T444 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4370191 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T437T442 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4380188 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T438T441 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T440T438 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4410013 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4420044 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T443T437 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4440045 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T445T435 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T56YT574 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T56ZT575 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T570T576 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5710016 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T572T210 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T573T214 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5740109 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T575T209 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T576T213 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5770008 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T578T208 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T579T212 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57LT57P -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57P0171 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57V0169 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57WT65V -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5B8T216 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JOT5JU -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JOT5PA -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JPT570 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JPT5JO -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JQT56Z -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JQT5JP -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JRT56Y -0.0439 -0.0439 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B226 of 382

LOAD Z T5JRT5JQ -0.0439 -0.0439 GLOB UNIF EQ-SUP


LOAD Z T5JST5JR -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JTT5JS -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5NZT5LY -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5O0T5NZ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5O1T5O0 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PAT217 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZD0181 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZH0183 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65VT5ZH -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T661T5ZD -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00040013 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0014T5OK -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5OK0000 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0107T679 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T67A0107 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00110015 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0015T5NZ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0026T57J -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00440026 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 00450027 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0155T5O0 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0160T5JS -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01610162 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01630155 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 01640160 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0165T5RN -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0167T5RO -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0173T57C -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0174T65X -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0175T65Y -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0187T5PB -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0188T5PC -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0189T5PD -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0194T5WO -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0195T5WN -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T139T137 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T142T145 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T143T146 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T144T147 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T148T151 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T149T152 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T150T153 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T156T155 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T159T158 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T166T188 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T168T69F -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T170T138 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T172T174 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T173T171 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T176T175 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T178T177 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T184T189 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T185T190 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T186T191 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T187T192 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T193T179 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T194T180 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T195T181 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T196T182 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T197T183 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4350194 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4400189 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4420190 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4430192 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4440193 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4450195 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57CT57E -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57E0179 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57JT57N -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57N0173 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5BK0154 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5HHT5HG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5HHT5PG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5JS0161 -0.0439 -0.0439 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B227 of 382

LOAD Z T5NZ0108 -0.0439 -0.0439 GLOB UNIF EQ-SUP


LOAD Z T5O00153 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PBT6BP -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PCT5PK -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PDT5PI -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PDT5Q3 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PET5ZK -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PFT5PJ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PFT5ZL -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PGT5PH -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PGT5ZM -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PHT5HG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PHT5PF -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PIT5HG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PIT5PC -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PJT5PE -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PKT5PB -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PKT5PL -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PLT5HG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PLT5PJ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q00174 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q3T5HH -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RM0186 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RNT5RO -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ROT5RQ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RPT5RN -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RQ0185 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5WN0165 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5WO0167 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZK0166 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZL0175 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZMT5Q0 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65X0178 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65Y0177 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T69FT69G -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T69GT69H -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T69H0181 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0153T5BK -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0166T65Z -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0168T5QS -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0170T5QT -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0172T57D -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0190T57K -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0192T57M -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z 0193T5QQ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T145T69H -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T146T69G -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T147T69F -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T4410187 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57DT57F -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57ET65X -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57FT5ZF -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57KT57O -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57MT5QR -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57O0172 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57Q0170 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QQ0168 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QRT57Q -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QST65U -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QTT65W -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RMT5RQ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RQT65U -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5RRT5RM -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZF0180 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZG0182 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZI0184 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65UT5ZI -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65UT65V -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65VT65W -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65WT5ZG -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65WT661 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65XT65Y -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65YT65Z -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65Z0176 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T65ZT660 -0.0439 -0.0439 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B228 of 382

LOAD Z T661T5QB -0.0439 -0.0439 GLOB UNIF EQ-SUP


LOAD Z T69FT150 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T69GT149 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T69HT148 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T507T506 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T56ZT56Y -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T570T56Z -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T572T571 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T573T572 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T575T574 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T576T575 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T578T577 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T579T578 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57DT57C -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57FT57E -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57JT5Q2 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57KT57J -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57LT57K -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57NT5Q1 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57OT57N -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57PT57O -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5PYT5Q2 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q1T5PZ -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q2T5Q1 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q4T5Q9 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q9T57D -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5Q9T5QB -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QBT57F -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QBT5ZE -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5ZET5Q5 -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57VT5QX -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T57WT5QW -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QQT5QU -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QST5QV -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QUT57V -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QVT57W -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QWT5QT -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T5QXT5QR -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOAD Z T6BPT5PE -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6BPT5PE -0.0439 -0.0439 GLOB UNIF EQ-SUP
LOADCNHDEL
LOAD Z 0136T280 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0147T67T -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0601T316 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0615T239 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0629T265 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T227T243 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T228T251 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T233T247 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T235T224 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T236T223 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T237T255 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T238T299 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T239T295 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T240T276 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T241T298 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T242T261 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T243T244 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T244T245 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T245T246 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T246T237 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T247T248 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T248T249 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T249T250 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T2500629 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T251T252 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T252T253 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T253T254 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T254T240 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T255T256 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T256T257 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T257T258 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T258T259 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T259T271 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T261T262 -0.0037 -0.0037 GLOB UNIF EL-1-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B229 of 382

LOAD Z T262T263 -0.0037 -0.0037 GLOB UNIF EL-1-H


LOAD Z T263T235 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T265T266 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T266T267 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T267T268 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T268T272 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T269T241 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T271T242 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T2720615 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T273T269 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T274T67U -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T276T277 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T277T278 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T278T279 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T279T273 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T280T281 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T281T282 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T282T283 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T283T274 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T2930601 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T294T293 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T295T294 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T296T236 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T297T296 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T298T297 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T299T229 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T3130136 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T314T313 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0136T221 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0147T270 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0615T5V0 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0629T66N -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T226T5UY -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T230T5US -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T233T501 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T237T66X -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T240T66V -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T269T67Y -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T271T682 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T501T228 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UST271 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UYT237 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V0T67Z -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V0T5V1 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V1T5V2 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V2T5V3 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V3T5V4 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V4T5V5 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V5T5V6 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0601T5V5 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T221T284 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T222T301 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T224T232 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T224T5VJ -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T225T230 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T225T5UR -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T227T233 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T227T311 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T228T312 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T229T304 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T230T288 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T231T223 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T232T235 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T232T303 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T2350601 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T236T67D -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T238T222 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T239T5V1 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T241T238 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T242T239 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T243T247 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T244T248 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T245T249 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T246T250 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T247T66J -0.0037 -0.0037 GLOB UNIF EL-1-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B230 of 382

LOAD Z T248T66K -0.0037 -0.0037 GLOB UNIF EL-1-H


LOAD Z T249T66L -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T250T66M -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T251T312 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T252T310 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T253T314 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T254T313 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T255T265 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T256T266 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T257T267 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T258T268 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T259T272 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T261T295 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T262T294 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T263T293 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T265T276 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T266T277 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T267T278 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T268T279 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T270T222 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T272T273 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T273T274 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T274T275 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T275T270 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T276T280 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T277T281 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T278T282 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T279T283 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T280T284 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T281T285 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T282T286 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T283T287 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T284T285 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T285T286 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T286T287 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T287T275 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T288T289 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T288T5UT -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T289T290 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T289T5UU -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T290T291 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T290T5UV -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T291T292 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T291T5UW -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T292T226 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T292T5UX -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T293T5V4 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T294T5V3 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T295T5V2 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T296T304 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T297T229 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T298T299 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T299T301 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T300T225 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T300T5UQ -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T301T229 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T302T262 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T302T300 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T303T263 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T303T302 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T304T231 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T305T226 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T305T5UZ -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T306T221 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T309T244 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T309T315 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T310T314 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T311T243 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T311T309 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T312T310 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T313T306 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T314T306 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T315T245 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T315T305 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T315T5UZ -0.0037 -0.0037 GLOB UNIF EL-1-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B231 of 382

LOAD Z T316T5VK -0.0037 -0.0037 GLOB UNIF EL-1-H


LOAD Z T5UQT261 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UQT302 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5URT242 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5URT5UQ -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UST5UR -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UTT259 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UTT5US -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UUT258 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UUT5UT -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UVT257 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UVT5UU -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UWT256 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UWT5UV -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UXT255 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UXT5UW -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UYT5UX -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UZT246 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5UZT5UY -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V1T241 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V2T298 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V3T297 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V4T296 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V5T67E -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5V6T223 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5VJT316 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T5VKT5V6 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z 0136T280 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0147T67T -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0601T316 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0615T239 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0629T265 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T227T243 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T228T251 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T233T247 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T235T224 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T236T223 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T237T255 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T238T299 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T239T295 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T240T276 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T241T298 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T242T261 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T243T244 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T244T245 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T245T246 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T246T237 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T247T248 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T248T249 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T249T250 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T2500629 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T251T252 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T252T253 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T253T254 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T254T240 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T255T256 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T256T257 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T257T258 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T258T259 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T259T271 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T261T262 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T262T263 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T263T235 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T265T266 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T266T267 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T267T268 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T268T272 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T269T241 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T271T242 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T2720615 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T273T269 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T274T67U -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T276T277 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T277T278 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T278T279 -0.0008 -0.0008 GLOB UNIF EL-2-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B232 of 382

LOAD Z T279T273 -0.0008 -0.0008 GLOB UNIF EL-2-H


LOAD Z T280T281 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T281T282 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T282T283 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T283T274 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T2930601 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T294T293 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T295T294 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T296T236 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T297T296 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T298T297 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T299T229 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T3130136 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T314T313 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0136T221 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0147T270 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0615T5V0 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0629T66N -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T226T5UY -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T230T5US -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T233T501 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T237T66X -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T240T66V -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T269T67Y -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T271T682 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T501T228 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UST271 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UYT237 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V0T67Z -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V0T5V1 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V1T5V2 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V2T5V3 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V3T5V4 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V4T5V5 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V5T5V6 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0601T5V5 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T221T284 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T222T301 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T224T232 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T224T5VJ -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T225T230 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T225T5UR -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T227T233 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T227T311 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T228T312 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T229T304 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T230T288 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T231T223 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T232T235 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T232T303 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T2350601 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T236T67D -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T238T222 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T239T5V1 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T241T238 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T242T239 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T243T247 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T244T248 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T245T249 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T246T250 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T247T66J -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T248T66K -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T249T66L -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T250T66M -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T251T312 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T252T310 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T253T314 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T254T313 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T255T265 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T256T266 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T257T267 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T258T268 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T259T272 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T261T295 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T262T294 -0.0008 -0.0008 GLOB UNIF EL-2-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B233 of 382

LOAD Z T263T293 -0.0008 -0.0008 GLOB UNIF EL-2-H


LOAD Z T265T276 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T266T277 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T267T278 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T268T279 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T270T222 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T272T273 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T273T274 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T274T275 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T275T270 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T276T280 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T277T281 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T278T282 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T279T283 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T280T284 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T281T285 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T282T286 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T283T287 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T284T285 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T285T286 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T286T287 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T287T275 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T288T289 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T288T5UT -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T289T290 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T289T5UU -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T290T291 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T290T5UV -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T291T292 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T291T5UW -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T292T226 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T292T5UX -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T293T5V4 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T294T5V3 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T295T5V2 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T296T304 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T297T229 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T298T299 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T299T301 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T300T225 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T300T5UQ -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T301T229 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T302T262 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T302T300 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T303T263 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T303T302 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T304T231 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T305T226 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T305T5UZ -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T306T221 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T309T244 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T309T315 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T310T314 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T311T243 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T311T309 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T312T310 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T313T306 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T314T306 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T315T245 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T315T305 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T315T5UZ -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T316T5VK -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UQT261 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UQT302 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5URT242 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5URT5UQ -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UST5UR -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UTT259 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UTT5US -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UUT258 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UUT5UT -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UVT257 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UVT5UU -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UWT256 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UWT5UV -0.0008 -0.0008 GLOB UNIF EL-2-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B234 of 382

LOAD Z T5UXT255 -0.0008 -0.0008 GLOB UNIF EL-2-H


LOAD Z T5UXT5UW -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UYT5UX -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UZT246 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5UZT5UY -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V1T241 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V2T298 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V3T297 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V4T296 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V5T67E -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5V6T223 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5VJT316 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T5VKT5V6 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z 0136T280 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0147T67T -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0601T316 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0615T239 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0629T265 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T227T243 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T228T251 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T233T247 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T235T224 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T236T223 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T237T255 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T238T299 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T239T295 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T240T276 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T241T298 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T242T261 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T243T244 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T244T245 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T245T246 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T246T237 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T247T248 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T248T249 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T249T250 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T2500629 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T251T252 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T252T253 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T253T254 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T254T240 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T255T256 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T256T257 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T257T258 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T258T259 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T259T271 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T261T262 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T262T263 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T263T235 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T265T266 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T266T267 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T267T268 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T268T272 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T269T241 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T271T242 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T2720615 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T273T269 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T274T67U -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T276T277 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T277T278 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T278T279 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T279T273 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T280T281 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T281T282 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T282T283 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T283T274 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T2930601 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T294T293 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T295T294 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T296T236 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T297T296 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T298T297 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T299T229 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T3130136 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T314T313 -0.0082 -0.0082 GLOB UNIF EL-3-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B235 of 382

LOAD Z 0136T221 -0.0082 -0.0082 GLOB UNIF EL-3-H


LOAD Z 0147T270 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0615T5V0 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0629T66N -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T226T5UY -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T230T5US -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T233T501 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T237T66X -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T240T66V -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T269T67Y -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T271T682 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T501T228 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UST271 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UYT237 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V0T67Z -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V0T5V1 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V1T5V2 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V2T5V3 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V3T5V4 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V4T5V5 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V5T5V6 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0601T5V5 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T221T284 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T222T301 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T224T232 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T224T5VJ -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T225T230 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T225T5UR -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T227T233 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T227T311 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T228T312 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T229T304 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T230T288 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T231T223 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T232T235 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T232T303 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T2350601 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T236T67D -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T238T222 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T239T5V1 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T241T238 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T242T239 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T243T247 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T244T248 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T245T249 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T246T250 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T247T66J -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T248T66K -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T249T66L -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T250T66M -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T251T312 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T252T310 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T253T314 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T254T313 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T255T265 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T256T266 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T257T267 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T258T268 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T259T272 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T261T295 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T262T294 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T263T293 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T265T276 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T266T277 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T267T278 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T268T279 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T270T222 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T272T273 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T273T274 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T274T275 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T275T270 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T276T280 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T277T281 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T278T282 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T279T283 -0.0082 -0.0082 GLOB UNIF EL-3-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B236 of 382

LOAD Z T280T284 -0.0082 -0.0082 GLOB UNIF EL-3-H


LOAD Z T281T285 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T282T286 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T283T287 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T284T285 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T285T286 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T286T287 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T287T275 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T288T289 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T288T5UT -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T289T290 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T289T5UU -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T290T291 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T290T5UV -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T291T292 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T291T5UW -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T292T226 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T292T5UX -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T293T5V4 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T294T5V3 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T295T5V2 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T296T304 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T297T229 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T298T299 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T299T301 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T300T225 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T300T5UQ -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T301T229 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T302T262 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T302T300 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T303T263 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T303T302 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T304T231 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T305T226 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T305T5UZ -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T306T221 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T309T244 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T309T315 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T310T314 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T311T243 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T311T309 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T312T310 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T313T306 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T314T306 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T315T245 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T315T305 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T315T5UZ -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T316T5VK -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UQT261 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UQT302 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5URT242 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5URT5UQ -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UST5UR -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UTT259 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UTT5US -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UUT258 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UUT5UT -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UVT257 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UVT5UU -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UWT256 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UWT5UV -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UXT255 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UXT5UW -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UYT5UX -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UZT246 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5UZT5UY -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V1T241 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V2T298 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V3T297 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V4T296 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V5T67E -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5V6T223 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5VJT316 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T5VKT5V6 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z 0136T280 -0.0123 -0.0123 GLOB UNIF EL-4-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B237 of 382

LOAD Z 0147T67T -0.0123 -0.0123 GLOB UNIF EL-4-H


LOAD Z 0601T316 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0615T239 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0629T265 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T227T243 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T228T251 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T233T247 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T235T224 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T236T223 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T237T255 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T238T299 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T239T295 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T240T276 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T241T298 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T242T261 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T243T244 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T244T245 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T245T246 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T246T237 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T247T248 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T248T249 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T249T250 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T2500629 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T251T252 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T252T253 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T253T254 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T254T240 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T255T256 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T256T257 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T257T258 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T258T259 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T259T271 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T261T262 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T262T263 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T263T235 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T265T266 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T266T267 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T267T268 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T268T272 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T269T241 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T271T242 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T2720615 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T273T269 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T274T67U -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T276T277 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T277T278 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T278T279 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T279T273 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T280T281 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T281T282 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T282T283 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T283T274 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T2930601 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T294T293 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T295T294 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T296T236 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T297T296 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T298T297 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T299T229 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T3130136 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T314T313 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0136T221 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0147T270 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0615T5V0 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0629T66N -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T226T5UY -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T230T5US -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T233T501 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T237T66X -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T240T66V -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T269T67Y -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T271T682 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T501T228 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UST271 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UYT237 -0.0123 -0.0123 GLOB UNIF EL-4-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B238 of 382

LOAD Z T5V0T67Z -0.0123 -0.0123 GLOB UNIF EL-4-H


LOAD Z T5V0T5V1 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V1T5V2 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V2T5V3 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V3T5V4 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V4T5V5 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V5T5V6 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0601T5V5 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T221T284 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T222T301 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T224T232 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T224T5VJ -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T225T230 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T225T5UR -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T227T233 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T227T311 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T228T312 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T229T304 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T230T288 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T231T223 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T232T235 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T232T303 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T2350601 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T236T67D -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T238T222 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T239T5V1 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T241T238 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T242T239 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T243T247 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T244T248 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T245T249 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T246T250 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T247T66J -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T248T66K -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T249T66L -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T250T66M -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T251T312 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T252T310 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T253T314 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T254T313 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T255T265 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T256T266 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T257T267 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T258T268 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T259T272 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T261T295 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T262T294 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T263T293 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T265T276 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T266T277 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T267T278 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T268T279 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T270T222 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T272T273 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T273T274 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T274T275 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T275T270 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T276T280 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T277T281 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T278T282 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T279T283 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T280T284 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T281T285 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T282T286 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T283T287 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T284T285 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T285T286 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T286T287 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T287T275 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T288T289 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T288T5UT -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T289T290 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T289T5UU -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T290T291 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T290T5UV -0.0123 -0.0123 GLOB UNIF EL-4-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B239 of 382

LOAD Z T291T292 -0.0123 -0.0123 GLOB UNIF EL-4-H


LOAD Z T291T5UW -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T292T226 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T292T5UX -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T293T5V4 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T294T5V3 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T295T5V2 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T296T304 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T297T229 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T298T299 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T299T301 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T300T225 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T300T5UQ -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T301T229 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T302T262 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T302T300 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T303T263 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T303T302 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T304T231 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T305T226 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T305T5UZ -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T306T221 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T309T244 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T309T315 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T310T314 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T311T243 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T311T309 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T312T310 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T313T306 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T314T306 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T315T245 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T315T305 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T315T5UZ -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T316T5VK -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UQT261 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UQT302 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5URT242 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5URT5UQ -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UST5UR -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UTT259 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UTT5US -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UUT258 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UUT5UT -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UVT257 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UVT5UU -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UWT256 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UWT5UV -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UXT255 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UXT5UW -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UYT5UX -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UZT246 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5UZT5UY -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V1T241 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V2T298 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V3T297 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V4T296 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V5T67E -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5V6T223 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5VJT316 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T5VKT5V6 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z 0136T280 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0147T67T -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0601T316 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0615T239 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0629T265 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T227T243 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T228T251 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T233T247 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T235T224 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T236T223 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T237T255 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T238T299 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T239T295 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T240T276 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T241T298 -0.0246 -0.0246 GLOB UNIF EL-5-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B240 of 382

LOAD Z T242T261 -0.0246 -0.0246 GLOB UNIF EL-5-H


LOAD Z T243T244 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T244T245 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T245T246 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T246T237 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T247T248 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T248T249 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T249T250 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T2500629 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T251T252 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T252T253 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T253T254 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T254T240 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T255T256 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T256T257 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T257T258 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T258T259 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T259T271 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T261T262 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T262T263 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T263T235 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T265T266 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T266T267 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T267T268 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T268T272 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T269T241 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T271T242 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T2720615 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T273T269 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T274T67U -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T276T277 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T277T278 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T278T279 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T279T273 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T280T281 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T281T282 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T282T283 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T283T274 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T2930601 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T294T293 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T295T294 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T296T236 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T297T296 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T298T297 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T299T229 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T3130136 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T314T313 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0136T221 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0147T270 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0615T5V0 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0629T66N -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T226T5UY -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T230T5US -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T233T501 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T237T66X -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T240T66V -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T269T67Y -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T271T682 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T501T228 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UST271 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UYT237 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V0T67Z -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V0T5V1 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V1T5V2 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V2T5V3 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V3T5V4 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V4T5V5 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V5T5V6 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0601T5V5 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T221T284 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T222T301 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T224T232 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T224T5VJ -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T225T230 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T225T5UR -0.0246 -0.0246 GLOB UNIF EL-5-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B241 of 382

LOAD Z T227T233 -0.0246 -0.0246 GLOB UNIF EL-5-H


LOAD Z T227T311 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T228T312 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T229T304 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T230T288 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T231T223 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T232T235 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T232T303 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T2350601 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T236T67D -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T238T222 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T239T5V1 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T241T238 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T242T239 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T243T247 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T244T248 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T245T249 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T246T250 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T247T66J -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T248T66K -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T249T66L -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T250T66M -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T251T312 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T252T310 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T253T314 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T254T313 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T255T265 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T256T266 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T257T267 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T258T268 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T259T272 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T261T295 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T262T294 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T263T293 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T265T276 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T266T277 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T267T278 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T268T279 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T270T222 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T272T273 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T273T274 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T274T275 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T275T270 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T276T280 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T277T281 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T278T282 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T279T283 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T280T284 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T281T285 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T282T286 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T283T287 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T284T285 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T285T286 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T286T287 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T287T275 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T288T289 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T288T5UT -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T289T290 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T289T5UU -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T290T291 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T290T5UV -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T291T292 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T291T5UW -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T292T226 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T292T5UX -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T293T5V4 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T294T5V3 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T295T5V2 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T296T304 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T297T229 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T298T299 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T299T301 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T300T225 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T300T5UQ -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T301T229 -0.0246 -0.0246 GLOB UNIF EL-5-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B242 of 382

LOAD Z T302T262 -0.0246 -0.0246 GLOB UNIF EL-5-H


LOAD Z T302T300 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T303T263 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T303T302 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T304T231 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T305T226 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T305T5UZ -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T306T221 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T309T244 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T309T315 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T310T314 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T311T243 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T311T309 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T312T310 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T313T306 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T314T306 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T315T245 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T315T305 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T315T5UZ -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T316T5VK -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UQT261 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UQT302 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5URT242 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5URT5UQ -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UST5UR -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UTT259 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UTT5US -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UUT258 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UUT5UT -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UVT257 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UVT5UU -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UWT256 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UWT5UV -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UXT255 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UXT5UW -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UYT5UX -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UZT246 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5UZT5UY -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V1T241 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V2T298 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V3T297 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V4T296 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V5T67E -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5V6T223 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5VJT316 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T5VKT5V6 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z 0136T280 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0147T67T -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0601T316 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0615T239 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0629T265 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T227T243 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T228T251 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T233T247 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T235T224 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T236T223 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T237T255 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T238T299 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T239T295 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T240T276 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T241T298 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T242T261 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T243T244 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T244T245 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T245T246 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T246T237 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T247T248 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T248T249 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T249T250 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T2500629 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T251T252 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T252T253 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T253T254 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T254T240 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T255T256 -0.0068 -0.0068 GLOB UNIF EL-6-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B243 of 382

LOAD Z T256T257 -0.0068 -0.0068 GLOB UNIF EL-6-H


LOAD Z T257T258 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T258T259 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T259T271 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T261T262 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T262T263 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T263T235 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T265T266 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T266T267 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T267T268 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T268T272 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T269T241 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T271T242 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T2720615 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T273T269 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T274T67U -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T276T277 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T277T278 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T278T279 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T279T273 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T280T281 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T281T282 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T282T283 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T283T274 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T2930601 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T294T293 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T295T294 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T296T236 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T297T296 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T298T297 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T299T229 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T3130136 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T314T313 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0136T221 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0147T270 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0615T5V0 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0629T66N -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T226T5UY -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T230T5US -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T233T501 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T237T66X -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T240T66V -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T269T67Y -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T271T682 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T501T228 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UST271 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UYT237 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V0T67Z -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V0T5V1 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V1T5V2 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V2T5V3 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V3T5V4 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V4T5V5 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V5T5V6 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z 0601T5V5 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T221T284 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T222T301 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T224T232 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T224T5VJ -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T225T230 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T225T5UR -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T227T233 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T227T311 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T228T312 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T229T304 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T230T288 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T231T223 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T232T235 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T232T303 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T2350601 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T236T67D -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T238T222 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T239T5V1 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T241T238 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T242T239 -0.0068 -0.0068 GLOB UNIF EL-6-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B244 of 382

LOAD Z T243T247 -0.0068 -0.0068 GLOB UNIF EL-6-H


LOAD Z T244T248 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T245T249 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T246T250 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T247T66J -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T248T66K -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T249T66L -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T250T66M -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T251T312 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T252T310 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T253T314 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T254T313 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T255T265 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T256T266 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T257T267 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T258T268 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T259T272 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T261T295 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T262T294 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T263T293 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T265T276 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T266T277 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T267T278 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T268T279 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T270T222 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T272T273 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T273T274 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T274T275 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T275T270 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T276T280 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T277T281 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T278T282 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T279T283 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T280T284 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T281T285 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T282T286 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T283T287 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T284T285 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T285T286 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T286T287 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T287T275 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T288T289 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T288T5UT -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T289T290 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T289T5UU -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T290T291 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T290T5UV -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T291T292 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T291T5UW -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T292T226 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T292T5UX -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T293T5V4 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T294T5V3 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T295T5V2 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T296T304 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T297T229 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T298T299 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T299T301 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T300T225 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T300T5UQ -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T301T229 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T302T262 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T302T300 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T303T263 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T303T302 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T304T231 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T305T226 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T305T5UZ -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T306T221 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T309T244 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T309T315 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T310T314 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T311T243 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T311T309 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T312T310 -0.0068 -0.0068 GLOB UNIF EL-6-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B245 of 382

LOAD Z T313T306 -0.0068 -0.0068 GLOB UNIF EL-6-H


LOAD Z T314T306 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T315T245 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T315T305 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T315T5UZ -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T316T5VK -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UQT261 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UQT302 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5URT242 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5URT5UQ -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UST5UR -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UTT259 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UTT5US -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UUT258 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UUT5UT -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UVT257 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UVT5UU -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UWT256 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UWT5UV -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UXT255 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UXT5UW -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UYT5UX -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UZT246 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5UZT5UY -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V1T241 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V2T298 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V3T297 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V4T296 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V5T67E -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5V6T223 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5VJT316 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T5VKT5V6 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66JT251 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66JT251 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66JT251 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66JT251 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66JT251 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66JT251 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66KT252 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66KT252 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66KT252 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66KT252 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66KT252 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66KT252 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66LT253 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66LT253 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66LT253 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66LT253 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66LT253 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66LT253 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66MT254 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66MT254 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66MT254 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66MT254 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66MT254 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66MT254 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66NT66W -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66NT66W -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66NT66W -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66NT66W -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66NT66W -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66NT66W -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66V0136 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66V0136 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66V0136 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66V0136 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66V0136 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66V0136 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66WT240 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T66WT240 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T66WT240 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66WT240 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66WT240 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66WT240 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T66X0629 -0.0037 -0.0037 GLOB UNIF EL-1-H
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B246 of 382

LOAD Z T66X0629 -0.0008 -0.0008 GLOB UNIF EL-2-H


LOAD Z T66X0629 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T66X0629 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T66X0629 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T66X0629 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T67DT231 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T67DT231 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T67DT231 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T67DT231 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T67DT231 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T67DT231 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T67ET236 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T67ET236 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T67ET236 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T67ET236 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T67ET236 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T67ET236 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T67TT238 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T67TT238 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T67TT238 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T67TT238 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T67TT238 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T67TT238 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T67U0147 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T67U0147 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T67U0147 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T67U0147 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T67U0147 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T67U0147 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T67Y0147 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T67Y0147 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T67Y0147 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T67Y0147 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T67Y0147 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T67Y0147 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T67ZT269 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T67ZT269 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T67ZT269 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T67ZT269 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T67ZT269 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T67ZT269 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOAD Z T6820615 -0.0037 -0.0037 GLOB UNIF EL-1-H
LOAD Z T6820615 -0.0008 -0.0008 GLOB UNIF EL-2-H
LOAD Z T6820615 -0.0082 -0.0082 GLOB UNIF EL-3-H
LOAD Z T6820615 -0.0123 -0.0123 GLOB UNIF EL-4-H
LOAD Z T6820615 -0.0246 -0.0246 GLOB UNIF EL-5-H
LOAD Z T6820615 -0.0068 -0.0068 GLOB UNIF EL-6-H
LOADCNHDSA
LOAD Z 0136T280 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0147T67T -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0601T316 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0615T239 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0629T265 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T224T5VE -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T227T243 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T228T251 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T233T247 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T235T224 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T236T223 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T237T255 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T238T299 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T239T295 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T240T276 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T241T298 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T242T261 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T243T244 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T244T245 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T245T246 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T246T237 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T247T248 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T248T249 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T249T250 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T2500629 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T251T252 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T252T253 -0.0263 -0.0263 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B247 of 382

LOAD Z T253T254 -0.0263 -0.0263 GLOB UNIF SAF-BULK


LOAD Z T254T240 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T255T256 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T256T257 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T257T258 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T258T259 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T259T271 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T261T262 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T262T263 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T263T235 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T265T266 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T266T267 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T267T268 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T268T272 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T269T241 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T271T242 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T2720615 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T273T269 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T274T67U -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T276T277 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T277T278 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T278T279 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T279T273 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T280T281 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T281T282 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T282T283 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T283T274 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T2930601 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T294T293 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T295T294 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T296T236 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T297T296 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T298T297 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T299T229 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T3130136 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T314T313 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VET5VF -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VFT5VG -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VGT5VD -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T67TT238 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T67U0147 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0136T221 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0147T270 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0615T5V0 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0629T66N -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T226T5UY -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T230T5US -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T233T501 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T237T66X -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T240T66V -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T269T67Y -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T271T682 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T501T228 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T501T66O -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UST271 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UYT237 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V0T5V1 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V0T67Z -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V1T5V2 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V2T5V3 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V3T5V4 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V4T5V5 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V5T5V6 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V6T5V8 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V8T5V9 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V9T5VC -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VAT5VB -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VBT5V7 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VCT5VA -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66JT501 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66KT66J -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66LT66K -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66MT66L -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66NT66M -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66NT66W -0.0263 -0.0263 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B248 of 382

LOAD Z T66V0136 -0.0263 -0.0263 GLOB UNIF SAF-BULK


LOAD Z T66WT240 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66X0629 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T67Y0147 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T67ZT269 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T6820615 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z 0601T5V5 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T221T284 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T222T301 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T224T232 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T224T5VJ -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T225T230 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T225T5UR -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T227T233 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T227T311 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T228T312 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T229T304 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T230T288 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T231T223 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T232T235 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T232T303 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T2350601 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T236T67D -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T238T222 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T239T5V1 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T241T238 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T242T239 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T243T247 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T244T248 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T245T249 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T246T250 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T247T66J -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T248T66K -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T249T66L -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T250T66M -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T251T312 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T252T310 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T253T314 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T254T313 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T255T265 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T256T266 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T257T267 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T258T268 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T259T272 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T261T295 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T262T294 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T263T293 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T265T276 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T266T277 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T267T278 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T268T279 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T270T222 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T272T273 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T273T274 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T274T275 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T275T270 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T276T280 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T277T281 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T278T282 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T279T283 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T280T284 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T281T285 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T282T286 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T283T287 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T284T285 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T285T286 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T286T287 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T287T275 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T288T289 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T288T5UT -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T289T290 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T289T5UU -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T290T291 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T290T5UV -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T291T292 -0.0263 -0.0263 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B249 of 382

LOAD Z T291T5UW -0.0263 -0.0263 GLOB UNIF SAF-BULK


LOAD Z T292T226 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T292T5UX -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T293T5V4 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T294T5V3 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T295T5V2 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T296T304 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T297T229 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T298T299 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T299T301 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T300T225 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T300T5UQ -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T301T229 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T302T262 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T302T300 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T303T263 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T303T302 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T304T231 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T305T226 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T305T5UZ -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T306T221 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T309T244 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T309T315 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T310T314 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T311T243 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T311T309 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T312T310 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T313T306 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T314T306 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T315T245 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T315T305 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T315T5UZ -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T316T5VK -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UQT261 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UQT302 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5URT242 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5URT5UQ -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UST5UR -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UTT259 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UTT5US -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UUT258 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UUT5UT -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UVT257 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UVT5UU -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UWT256 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UWT5UV -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UXT255 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UXT5UW -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UYT5UX -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UZT246 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5UZT5UY -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V1T241 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V2T298 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V3T297 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V4T296 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V5T67E -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5V6T223 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VJT316 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T5VKT5V6 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66JT251 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66KT252 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66LT253 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T66MT254 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T67DT231 -0.0263 -0.0263 GLOB UNIF SAF-BULK
LOAD Z T67ET236 -0.0263 -0.0263 GLOB UNIF SAF-BULK
***LDS1** -19.041 7.136 20.280 -17.020 7.136 20.280 -19.041
***LDS2** 6.271 20.280 -17.020 6.271 20.280 14.310
***LDS3** 0.250 0 1 3 0 0HDSA -2EQUPPRESSA-1-HE
LOAD Z T68UT697 -6.1891 -6.1891 GLOB UNIF SA-1-HE
LOAD Z T696T68U -6.1891 -6.1891 GLOB UNIF SA-1-HE
LOAD Z T698T699 -6.1891 -6.1891 GLOB UNIF SA-1-HE
LOADCNHDST
LOAD 0136 -8.0000 GLOB JOIN DIAM-HE
LOAD 0147 -3.0000 GLOB JOIN WING-HE
LOAD T240 -3.0000 GLOB JOIN WING-HE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B250 of 382

LOAD T269 -3.0000 GLOB JOIN WING-HE


LOAD 0601 -3.0000 GLOB JOIN WING-HE
LOAD T239 -3.0000 GLOB JOIN WING-HE
LOAD T236 -3.0000 GLOB JOIN WING-HE
LOAD 0615 -3.0000 GLOB JOIN WING-HE
LOAD T268 -3.0000 GLOB JOIN WING-HE
LOAD 0629 -3.0000 GLOB JOIN WING-HE
LOAD T233 -3.0000 GLOB JOIN WING-HE
LOAD T237 -3.0000 GLOB JOIN WING-HE
LOAD T271 -3.0000 GLOB JOIN WING-HE
LOAD T235 -3.0000 GLOB JOIN WING-HE
LOAD T230 -3.0000 GLOB JOIN WING-HE
LOAD T226 -3.0000 GLOB JOIN WING-HE
***LDS1** -26.040 1.292 24.180 -9.040 1.292 24.180 -26.040
***LDS2** -5.750 24.180 -9.040 -5.750 24.180 0.940
***LDS3** 0.250 0 1 3 0 0HDST -2EQUPPRESPL12
LOAD Z 0136T221 -0.6129 -0.6129 GLOB UNIF PL12
LOAD Z 0147T270 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z 0615T5V0 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z 0629T66N -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T226T5UY -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T230T5US -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T237T66X -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T240T66V -0.5538 -0.5538 GLOB UNIF PL12
LOAD Z T269T67Y -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T271T682 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T5UST271 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T5UYT237 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5V0T67Z -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T225T5UR -0.6072 -0.6072 GLOB UNIF PL12
LOAD Z T238T222 -0.6072 -0.6072 GLOB UNIF PL12
LOAD Z T239T5V1 -0.6072 -0.6072 GLOB UNIF PL12
LOAD Z T241T238 -0.6072 -0.6072 GLOB UNIF PL12
LOAD Z T242T239 -0.6072 -0.6072 GLOB UNIF PL12
LOAD Z T255T265 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T256T266 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T257T267 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T258T268 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T259T272 -0.8225 -0.8225 GLOB UNIF PL12
LOAD Z T265T276 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T266T277 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T267T278 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T268T279 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T272T273 -0.8225 -0.8225 GLOB UNIF PL12
LOAD Z T273T274 -0.8225 -0.8225 GLOB UNIF PL12
LOAD Z T274T275 -0.8225 -0.8225 GLOB UNIF PL12
LOAD Z T276T280 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T277T281 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T278T282 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T279T283 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T280T284 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T281T285 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T282T286 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T283T287 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T288T5UT -0.8225 -0.8225 GLOB UNIF PL12
LOAD Z T289T5UU -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T290T5UV -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T291T5UW -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T292T5UX -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5URT242 -0.6072 -0.6072 GLOB UNIF PL12
LOAD Z T5UTT259 -0.8225 -0.8225 GLOB UNIF PL12
LOAD Z T5UUT258 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5UVT257 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5UWT256 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5UXT255 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5V1T241 -0.6072 -0.6072 GLOB UNIF PL12
***LDS1** -23.040 4.292 24.180 -12.040 4.292 24.180 -26.040
***LDS2** 1.292 24.180 -9.040 1.292 24.180 0.940
***LDS3** 0.250 0 1 3 0 0HDST -2EQUPPRESPL12
LOAD Z T225T5UR -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T238T222 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T239T5V1 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T241T238 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T242T239 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T261T295 -0.9212 -0.9212 GLOB UNIF PL12
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B251 of 382

LOAD Z T262T294 -0.9400 -0.9400 GLOB UNIF PL12


LOAD Z T263T293 -0.4888 -0.4888 GLOB UNIF PL12
LOAD Z T293T5V4 -0.4888 -0.4888 GLOB UNIF PL12
LOAD Z T294T5V3 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T295T5V2 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T296T304 -0.4888 -0.4888 GLOB UNIF PL12
LOAD Z T297T229 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T298T299 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T299T301 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T300T5UQ -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T302T262 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T303T263 -0.4888 -0.4888 GLOB UNIF PL12
LOAD Z T5UQT261 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T5URT242 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5V1T241 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5V2T298 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T5V3T297 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5V4T296 -0.4888 -0.4888 GLOB UNIF PL12
***LDS1** -26.040 -5.750 24.180 -9.040 -5.750 24.180 -21.061
***LDS2** -10.729 24.180 -14.019 -10.729 24.180 0.940
***LDS3** 0.250 0 1 3 0 0HDST -2EQUPPRESPL12
LOAD Z 0136T221 -0.6001 -0.6001 GLOB UNIF PL12
LOAD Z 0629T66N -0.4601 -0.4601 GLOB UNIF PL12
LOAD Z T226T5UY -0.4601 -0.4601 GLOB UNIF PL12
LOAD Z T233T501 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T237T66X -0.4601 -0.4601 GLOB UNIF PL12
LOAD Z T240T66V -0.5422 -0.5422 GLOB UNIF PL12
LOAD Z T501T228 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5UYT237 -0.4601 -0.4601 GLOB UNIF PL12
LOAD Z T227T233 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T243T247 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T244T248 -0.9489 -0.9489 GLOB UNIF PL12
LOAD Z T245T249 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T246T250 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T247T66J -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T248T66K -0.9489 -0.9489 GLOB UNIF PL12
LOAD Z T249T66L -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T250T66M -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T251T312 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T252T310 -0.9489 -0.9489 GLOB UNIF PL12
LOAD Z T253T314 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T254T313 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T305T5UZ -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T309T244 -0.9489 -0.9489 GLOB UNIF PL12
LOAD Z T311T243 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T313T306 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T315T245 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5UZT246 -0.9212 -0.9212 GLOB UNIF PL12
***LDS1** -21.061 6.271 24.180 -14.019 6.271 24.180 -23.040
***LDS2** 4.292 24.180 -12.040 4.292 24.180 0.940
***LDS3** 0.250 0 1 3 0 0HDST -2EQUPPRESPL12
LOAD Z 0601T5V5 -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T224T5VJ -0.2448 -0.2448 GLOB UNIF PL12
LOAD Z T232T235 -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T2350601 -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T236T67D -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T263T293 -0.6852 -0.6852 GLOB UNIF PL12
LOAD Z T293T5V4 -0.6852 -0.6852 GLOB UNIF PL12
LOAD Z T296T304 -0.6852 -0.6852 GLOB UNIF PL12
LOAD Z T303T263 -0.6852 -0.6852 GLOB UNIF PL12
LOAD Z T316T5VK -0.2448 -0.2448 GLOB UNIF PL12
LOAD Z T5V4T296 -0.6852 -0.6852 GLOB UNIF PL12
LOAD Z T5V5T67E -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T5V6T223 -0.2448 -0.2448 GLOB UNIF PL12
LOAD Z T5VJT316 -0.2448 -0.2448 GLOB UNIF PL12
LOAD Z T5VKT5V6 -0.2448 -0.2448 GLOB UNIF PL12
LOAD Z T66JT251 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T66KT252 -0.9489 -0.9489 GLOB UNIF PL12
LOAD Z T66LT253 -0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T66MT254 -0.9212 -0.9212 GLOB UNIF PL12
LOAD Z T66NT66W -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T66NT66W -0.4601 -0.4601 GLOB UNIF PL12
LOAD Z T66V0136 -0.5538 -0.5538 GLOB UNIF PL12
LOAD Z T66V0136 -0.5422 -0.5422 GLOB UNIF PL12
LOAD Z T66WT240 -0.4700 -0.4700 GLOB UNIF PL12
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B252 of 382

LOAD Z T66WT240 -0.4601 -0.4601 GLOB UNIF PL12


LOAD Z T66X0629 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T66X0629 -0.4601 -0.4601 GLOB UNIF PL12
LOAD Z T67DT231 -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T67ET236 -0.9301 -0.9301 GLOB UNIF PL12
LOAD Z T67Y0147 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T67ZT269 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T6820615 -0.9597 -0.9597 GLOB UNIF PL12
LOAD Z T270T222 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T287T275 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T275T270 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T286T287 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T285T286 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T284T285 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T221T284 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T306T221 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T314T306 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T310T314 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T312T310 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T228T312 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T501T228 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T233T501 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T227T233 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T227T311 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T311T309 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T309T315 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T315T305 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T305T226 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T292T226 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T291T292 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T290T291 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T289T290 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T288T289 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T230T288 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T225T230 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T300T225 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T302T300 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T303T302 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T232T303 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T224T232 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T224T5VJ -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T5VJT316 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T316T5VK -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T5VKT5V6 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T5V6T223 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T231T223 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T304T231 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T229T304 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T301T229 -0.5325 -0.5325 GLOB UNIF NET-HE
LOAD Z T222T301 -0.5325 -0.5325 GLOB UNIF NET-HE
***LDS1** -21.061 10.001 20.280 -15.000 10.001 20.280 -21.061
***LDS2** 6.271 20.280 -15.000 6.271 20.280 0.628
***LDS3** 0.250 0 1 3 0 0HDST -2EQUPPRESPL8
LOAD Z T68TT696 -0.2716 -0.2716 GLOB UNIF PL8
LOAD Z T68UT697 -0.2716 -0.2716 GLOB UNIF PL8
LOAD Z T690T695 -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T694T6BM -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T695T694 -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T696T68U -0.2716 -0.2716 GLOB UNIF PL8
LOAD Z T697T68V -0.2716 -0.2716 GLOB UNIF PL8
LOAD Z T691T698 -0.5432 -0.5432 GLOB UNIF PL8
LOAD Z T692T69A -0.5856 -0.5856 GLOB UNIF PL8
LOAD Z T693T69C -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z T698T699 -0.5432 -0.5432 GLOB UNIF PL8
LOAD Z T699T68W -0.5432 -0.5432 GLOB UNIF PL8
LOAD Z T69AT69B -0.5856 -0.5856 GLOB UNIF PL8
LOAD Z T69BT6BO -0.5856 -0.5856 GLOB UNIF PL8
LOAD Z T69CT69D -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z T69DT6BN -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z T6BMT68Z -0.3140 -0.3140 GLOB UNIF PL8
LOAD Z T6BNT68Y -0.6280 -0.6280 GLOB UNIF PL8
LOAD Z T6BOT68X -0.5856 -0.5856 GLOB UNIF PL8
LOADCNHELI
LOAD T268 -26.500 GLOB JOIN HELICOP
LOAD T267 -26.500 GLOB JOIN HELICOP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B253 of 382

LOADCNMDAR
***LDS1** -15.000 2.750 17.130 -11.000 2.750 17.130 -15.000
***LDS2** -8.750 17.130 -11.000 -8.750 17.130 1.910
***LDS3** 0.250 0 1 3 0 0MDAR -2EQUPPRESWALL-LTR
LOAD Z 0400T5O9 1.50000-2.1488 -2.1488 GLOB UNIF WALL-LTR
LOAD Z 0404T5OC 1.50000-2.1488 -2.1488 GLOB UNIF WALL-LTR
LOAD Z T432T5IV -0.8086 -0.8086 GLOB UNIF WALL-LTR
LOAD Z T433T5X2 -0.8086 -0.8086 GLOB UNIF WALL-LTR
LOAD Z T5O60393 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5OFT5X1 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5O50411 -2.3875 -2.3875 GLOB UNIF WALL-LTR
LOAD Z T5O7T5X8 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5O8T5X7 -1.6712 -1.6712 GLOB UNIF WALL-LTR
LOAD Z T5OA0410 -2.3875 -2.3875 GLOB UNIF WALL-LTR
LOAD Z T5OB0412 -2.3875 -2.3875 GLOB UNIF WALL-LTR
LOAD Z T5OD0414 -1.6712 -1.6712 GLOB UNIF WALL-LTR
LOAD Z T5OE0415 -1.4325 -1.4325 GLOB UNIF WALL-LTR
***LDS1** -15.000 2.750 17.130 -11.000 2.750 17.130 -15.000
***LDS2** -8.750 17.130 -11.000 -8.750 17.130 0.730
***LDS3** 0.250 0 1 3 0 0MDAR -2EQUPPRESFL-LTR
LOAD Z 0400T5O9 1.50000-0.8212 -0.8212 GLOB UNIF FL-LTR
LOAD Z 0404T5OC 1.50000-0.8212 -0.8212 GLOB UNIF FL-LTR
LOAD Z T432T5IV -0.3090 -0.3090 GLOB UNIF FL-LTR
LOAD Z T433T5X2 -0.3090 -0.3090 GLOB UNIF FL-LTR
LOAD Z T5O60393 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T5OFT5X1 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T5O50411 -0.9125 -0.9125 GLOB UNIF FL-LTR
LOAD Z T5O7T5X8 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T5O8T5X7 -0.6387 -0.6387 GLOB UNIF FL-LTR
LOAD Z T5OA0410 -0.9125 -0.9125 GLOB UNIF FL-LTR
LOAD Z T5OB0412 -0.9125 -0.9125 GLOB UNIF FL-LTR
LOAD Z T5OD0414 -0.6387 -0.6387 GLOB UNIF FL-LTR
LOAD Z T5OE0415 -0.5475 -0.5475 GLOB UNIF FL-LTR
***LDS1** -14.900 -9.750 17.130 -8.700 -9.750 17.130 -14.900
***LDS2** -12.750 17.130 -8.700 -12.750 17.130 2.800
***LDS3** 0.250 0 1 3 0 0MDAR -2EQUPPRESWALL-ACO
LOAD Z T5AM0372 -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z 0372T5IW -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z 0375T5IZ -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z T5ALT6B2 -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z 0373T5IX -2.8000 -2.8000 GLOB UNIF WALL-ACO
LOAD Z 0374T5IY -2.8000 -2.8000 GLOB UNIF WALL-ACO
LOAD Z T5OIT5IS 0.10000-2.8000 -2.8000 GLOB UNIF WALL-ACO
LOAD Z T5OHT5IT 0.10000-2.8000 -2.8000 GLOB UNIF WALL-ACO
LOAD Z T5AQT5IU -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z T5ART5IR -1.4000 -1.4000 GLOB UNIF WALL-ACO
***LDS1** -14.900 -9.750 17.130 -8.700 -9.750 17.130 -14.900
***LDS2** -12.750 17.130 -8.700 -12.750 17.130 0.730
***LDS3** 0.250 0 1 3 0 0MDAR -2EQUPPRESFL-ACO
LOAD Z T5AM0372 -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z 0372T5IW -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z 0375T5IZ -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5ALT6B2 -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z 0373T5IX -0.7300 -0.7300 GLOB UNIF FL-ACO
LOAD Z 0374T5IY -0.7300 -0.7300 GLOB UNIF FL-ACO
LOAD Z T5OIT5IS 0.10000-0.7300 -0.7300 GLOB UNIF FL-ACO
LOAD Z T5OHT5IT 0.10000-0.7300 -0.7300 GLOB UNIF FL-ACO
LOAD Z T5AQT5IU -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5ART5IR -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5IRT5AM -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z T5IRT5AM -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5IS0373 -2.8000 -2.8000 GLOB UNIF WALL-ACO
LOAD Z T5IS0373 -0.7300 -0.7300 GLOB UNIF FL-ACO
LOAD Z T5IT0374 -2.8000 -2.8000 GLOB UNIF WALL-ACO
LOAD Z T5IT0374 -0.7300 -0.7300 GLOB UNIF FL-ACO
LOAD Z T5IUT5AL -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z T5IUT5AL -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5IVT6B3 -0.8086 -0.8086 GLOB UNIF WALL-LTR
LOAD Z T5IVT6B3 -0.3090 -0.3090 GLOB UNIF FL-LTR
LOAD Z T5IWT5AT -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z T5IWT5AT -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5IXT664 -2.80000.30000-2.8000 GLOB UNIF WALL-ACO
LOAD Z T5IXT664 -0.73000.30000-0.7300 GLOB UNIF FL-ACO
LOAD Z T5IYT665 -2.80000.30000-2.8000 GLOB UNIF WALL-ACO
LOAD Z T5IYT665 -0.73000.30000-0.7300 GLOB UNIF FL-ACO
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B254 of 382

LOAD Z T5IZT5AS -1.4000 -1.4000 GLOB UNIF WALL-ACO


LOAD Z T5IZT5AS -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T5O90409 -2.1488 -2.1488 GLOB UNIF WALL-LTR
LOAD Z T5O90409 -0.8212 -0.8212 GLOB UNIF FL-LTR
LOAD Z T5OC0413 -2.1488 -2.1488 GLOB UNIF WALL-LTR
LOAD Z T5OC0413 -0.8212 -0.8212 GLOB UNIF FL-LTR
LOAD Z T5X1T5X4 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5X1T5X4 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T5X2T5X3 -0.8086 -0.8086 GLOB UNIF WALL-LTR
LOAD Z T5X2T5X3 -0.3090 -0.3090 GLOB UNIF FL-LTR
LOAD Z T5X30081 -0.8086 -0.8086 GLOB UNIF WALL-LTR
LOAD Z T5X30081 -0.3090 -0.3090 GLOB UNIF FL-LTR
LOAD Z T5X40390 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5X40390 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T5X50408 -1.6712 -1.6712 GLOB UNIF WALL-LTR
LOAD Z T5X50408 -0.6387 -0.6387 GLOB UNIF FL-LTR
LOAD Z T5X60407 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5X60407 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T5X7T5X5 -1.6712 -1.6712 GLOB UNIF WALL-LTR
LOAD Z T5X7T5X5 -0.6387 -0.6387 GLOB UNIF FL-LTR
LOAD Z T5X8T5X6 -1.4325 -1.4325 GLOB UNIF WALL-LTR
LOAD Z T5X8T5X6 -0.5475 -0.5475 GLOB UNIF FL-LTR
LOAD Z T6B20375 -1.4000 -1.4000 GLOB UNIF WALL-ACO
LOAD Z T6B20375 -0.3650 -0.3650 GLOB UNIF FL-ACO
LOAD Z T6B30080 -0.8086 -0.8086 GLOB UNIF WALL-LTR
LOAD Z T6B30080 -0.3090 -0.3090 GLOB UNIF FL-LTR
LOADCNMDEL
LOAD Z T5X1T5X2 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X4T5X3 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X6T5X5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X8T5X7 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00680093 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0080T5J0 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00820068 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00930125 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00990446 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0100T66T -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01110466 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01250099 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0446T677 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04500079 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04660467 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04670468 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04680469 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04690470 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04700450 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0519T64R -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5J0T6AH -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0079T62B -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00800393 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0081T5NV -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0082T68H -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00910199 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0096T63J -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0097T67X -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00980443 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01020523 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01030380 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01040372 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01120451 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01990200 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02000201 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02010525 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03720373 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03730374 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03740375 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03750080 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03800381 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03810382 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03820383 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03830100 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03900081 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0392T68J -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03930407 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03950425 -0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B255 of 382

LOAD Z 04070408 -0.0489 -0.0489 GLOB UNIF EL-1-M


LOAD Z 04080409 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04090410 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0410T67P -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0411T67O -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04120413 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04130414 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04140415 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04150390 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04250426 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04260427 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04270428 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0428T68C -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0429T68B -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04300431 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04310432 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04320433 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04330392 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0443T67K -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04470078 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04510452 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04520453 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04530454 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04540455 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04550447 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0523T6B0 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 05250098 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0528T67W -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T498T6AO -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T499T6AL -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T59NT5BE -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BCT62M -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BDT63A -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BET62X -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BP0102 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NRT499 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NVT5NR -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00810368 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00830384 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0084T432 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0088T5NT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0091T68I -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00940440 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00940445 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01000394 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01020369 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0105T5NL -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0106T433 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01260127 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01270128 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01280094 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01960197 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01970198 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01980436 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02260465 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02270460 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02290463 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02300458 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03680088 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03690105 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03700092 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03840385 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03850386 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03860387 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03870082 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03910102 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0394T64P -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0400T5O9 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0404T5OC -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0409T64H -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0413T64F -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04160417 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04170418 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04180419 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0418T64W -0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B256 of 382

LOAD Z 04190420 -0.0489 -0.0489 GLOB UNIF EL-1-M


LOAD Z 04200421 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04210422 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04220423 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0422T581 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04230424 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04240391 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04270126 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04310196 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04360444 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04380437 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04400438 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04440456 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04450461 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04480096 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04490097 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04560457 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04570230 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04580459 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04590227 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04600448 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04610462 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04620229 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04630464 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04640226 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04650449 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T3300105 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T432T5IV -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T433T5OF -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T433T5X2 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T500T68P -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T581T6AS -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BOT330 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BPT5BO -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IVT6B3 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NLT5NM -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NNT5NM -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NOT5NN -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NPT330 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NPT5NO -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NQT5NP -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NRT5NQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NTT5NP -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O5T68Q -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O6T432 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O7T5O6 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O8T5O7 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O90409 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O9T5O8 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OAT5O9 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OBT68R -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OC0413 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OCT5OB -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5ODT5OC -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OET5OD -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OFT5OE -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OGT432 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OHT5OG -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OIT5OH -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OJT5OI -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5S7T5S8 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5S80422 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X2T5X3 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X30081 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0087T500 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02180221 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02210528 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02260221 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02290218 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0376T5OJ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0438T63S -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T500T5IP -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5AM0372 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5ART5IR -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IP0104 -0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B257 of 382

LOAD Z T5IRT5AM -0.0489 -0.0489 GLOB UNIF EL-1-M


LOAD Z T5OJT5AR -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0103T5OY -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01260196 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0371T5NS -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0372T5IW -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0375T5IZ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0379T5OG -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0380T6AK -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0381T587 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0382T58D -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0383T64S -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0390T6AM -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0391T6B1 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0393T5A3 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0394T6AZ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0402T5O5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04110420 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0415T5S5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0420T5SJ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0423T5SH -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5840391 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T587T58A -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T588T5SV -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5890385 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T58AT5ST -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T58B0386 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T58CT59O -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T58DT58B -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T58ET5SU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T59O0384 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5A0T584 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5A10394 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5A3T64L -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5ALT6B2 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5ANT643 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5AOT663 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5AQT5IU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5AST6AI -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5ATT662 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IUT5AL -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IWT5AT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IZT5AS -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NS0368 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O50411 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OGT5AQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OUT5OW -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OVT5OZ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OWT5UN -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OXT5P0 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OYT5OT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OZT5OU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5P0T5OW -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5S5T5S6 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5S60424 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SHT5SI -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SIT6AR -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SJT5SK -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SKT6AU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5STT588 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SUT5SW -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SVT589 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5SWT58C -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5UNT5OT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00840388 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00870376 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01050092 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01060371 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03710090 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03760377 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03770378 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03780379 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03790084 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03880398 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03890106 -0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B258 of 382

LOAD Z 03980399 -0.0489 -0.0489 GLOB UNIF EL-1-M


LOAD Z 03990400 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04000401 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04010402 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04020403 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04030404 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04040405 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04050406 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04060389 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T433T5NS -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5B5T5LQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IPT5J2 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IQT5J3 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IRT5IP -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IST5IR -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5ITT5IS -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IUT5IT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IVT5IU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IWT5IQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IXT5IW -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IYT5IX -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IZT5IY -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5J0T5IZ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NST5B5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NTT5LR -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NUT5NT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NVT5NU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0068T59Z -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0090T5B5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0093T62L -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0099T62J -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0104T5IQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0125T62K -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0368T5NU -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 03690370 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0373T5IX -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0374T5IY -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0377T5OI -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0378T5OH -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0388T5O6 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0389T5OF -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0398T5O7 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0399T5O8 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0401T5OA -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0403T5OB -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0405T5OD -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0406T5OE -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0407T64M -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0408T5A4 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0410T64I -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04120421 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0414T585 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0416T6AY -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0417T6AX -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0421T63Y -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0424T580 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0446T62I -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0450T62C -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0466T62H -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0467T62G -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0468T62F -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0469T62E -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0470T62D -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T580T6AQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5850423 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T59Z0126 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5A4T5A5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5A50417 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5B50088 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BO0369 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IQT5OV -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IS0373 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IT0374 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IXT664 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5IYT665 -0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B259 of 382

LOAD Z T5NOT5NL -0.0489 -0.0489 GLOB UNIF EL-1-M


LOAD Z T5NQT5BO -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5NUT5NQ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O60393 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O7T5X8 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5O8T5X7 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OA0410 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OB0412 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OD0414 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OE0415 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OFT5X1 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OHT5IT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OIT5IS -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OVT5OX -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OX0103 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5OZT5P0 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5P0T5OY -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X1T5X4 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X40390 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X50408 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X60407 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X7T5X5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X8T5X6 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01030532 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 0532T5BF -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 06480083 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5BF0648 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T5X1T5X2 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X4T5X3 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X6T5X5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X8T5X7 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00680093 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0080T5J0 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00820068 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00930125 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00990446 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0100T66T -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01110466 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01250099 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0446T677 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04500079 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04660467 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04670468 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04680469 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04690470 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04700450 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0519T64R -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5J0T6AH -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0079T62B -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00800393 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0081T5NV -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0082T68H -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00910199 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0096T63J -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0097T67X -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00980443 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01020523 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01030380 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01040372 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01120451 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01990200 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02000201 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02010525 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03720373 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03730374 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03740375 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03750080 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03800381 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03810382 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03820383 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03830100 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03900081 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0392T68J -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03930407 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03950425 -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B260 of 382

LOAD Z 04070408 -0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z 04080409 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04090410 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0410T67P -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0411T67O -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04120413 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04130414 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04140415 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04150390 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04250426 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04260427 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04270428 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0428T68C -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0429T68B -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04300431 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04310432 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04320433 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04330392 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0443T67K -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04470078 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04510452 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04520453 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04530454 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04540455 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04550447 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0523T6B0 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 05250098 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0528T67W -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T498T6AO -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T499T6AL -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T59NT5BE -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BCT62M -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BDT63A -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BET62X -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BP0102 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NRT499 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NVT5NR -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00810368 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00830384 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0084T432 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0088T5NT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0091T68I -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00940440 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00940445 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01000394 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01020369 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0105T5NL -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0106T433 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01260127 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01270128 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01280094 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01960197 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01970198 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01980436 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02260465 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02270460 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02290463 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02300458 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03680088 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03690105 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03700092 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03840385 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03850386 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03860387 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03870082 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03910102 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0394T64P -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0400T5O9 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0404T5OC -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0409T64H -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0413T64F -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04160417 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04170418 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04180419 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0418T64W -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B261 of 382

LOAD Z 04190420 -0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z 04200421 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04210422 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04220423 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0422T581 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04230424 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04240391 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04270126 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04310196 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04360444 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04380437 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04400438 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04440456 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04450461 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04480096 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04490097 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04560457 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04570230 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04580459 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04590227 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04600448 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04610462 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04620229 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04630464 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04640226 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04650449 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T3300105 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T432T5IV -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T433T5OF -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T433T5X2 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T500T68P -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T581T6AS -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BOT330 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BPT5BO -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IVT6B3 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NLT5NM -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NNT5NM -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NOT5NN -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NPT330 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NPT5NO -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NQT5NP -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NRT5NQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NTT5NP -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O5T68Q -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O6T432 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O7T5O6 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O8T5O7 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O90409 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O9T5O8 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OAT5O9 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OBT68R -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OC0413 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OCT5OB -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5ODT5OC -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OET5OD -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OFT5OE -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OGT432 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OHT5OG -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OIT5OH -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OJT5OI -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5S7T5S8 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5S80422 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X2T5X3 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X30081 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0087T500 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02180221 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02210528 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02260221 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02290218 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0376T5OJ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0438T63S -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T500T5IP -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5AM0372 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5ART5IR -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IP0104 -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B262 of 382

LOAD Z T5IRT5AM -0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z T5OJT5AR -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0103T5OY -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01260196 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0371T5NS -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0372T5IW -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0375T5IZ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0379T5OG -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0380T6AK -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0381T587 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0382T58D -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0383T64S -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0390T6AM -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0391T6B1 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0393T5A3 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0394T6AZ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0402T5O5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04110420 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0415T5S5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0420T5SJ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0423T5SH -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5840391 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T587T58A -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T588T5SV -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5890385 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T58AT5ST -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T58B0386 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T58CT59O -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T58DT58B -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T58ET5SU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T59O0384 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5A0T584 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5A10394 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5A3T64L -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5ALT6B2 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5ANT643 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5AOT663 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5AQT5IU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5AST6AI -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5ATT662 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IUT5AL -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IWT5AT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IZT5AS -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NS0368 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O50411 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OGT5AQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OUT5OW -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OVT5OZ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OWT5UN -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OXT5P0 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OYT5OT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OZT5OU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5P0T5OW -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5S5T5S6 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5S60424 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SHT5SI -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SIT6AR -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SJT5SK -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SKT6AU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5STT588 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SUT5SW -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SVT589 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5SWT58C -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5UNT5OT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00840388 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00870376 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01050092 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01060371 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03710090 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03760377 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03770378 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03780379 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03790084 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03880398 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03890106 -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B263 of 382

LOAD Z 03980399 -0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z 03990400 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04000401 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04010402 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04020403 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04030404 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04040405 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04050406 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04060389 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T433T5NS -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5B5T5LQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IPT5J2 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IQT5J3 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IRT5IP -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IST5IR -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5ITT5IS -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IUT5IT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IVT5IU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IWT5IQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IXT5IW -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IYT5IX -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IZT5IY -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5J0T5IZ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NST5B5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NTT5LR -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NUT5NT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NVT5NU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0068T59Z -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0090T5B5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0093T62L -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0099T62J -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0104T5IQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0125T62K -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0368T5NU -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 03690370 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0373T5IX -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0374T5IY -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0377T5OI -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0378T5OH -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0388T5O6 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0389T5OF -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0398T5O7 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0399T5O8 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0401T5OA -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0403T5OB -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0405T5OD -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0406T5OE -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0407T64M -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0408T5A4 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0410T64I -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04120421 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0414T585 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0416T6AY -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0417T6AX -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0421T63Y -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0424T580 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0446T62I -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0450T62C -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0466T62H -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0467T62G -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0468T62F -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0469T62E -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0470T62D -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T580T6AQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5850423 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T59Z0126 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5A4T5A5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5A50417 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5B50088 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BO0369 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IQT5OV -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IS0373 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IT0374 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IXT664 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5IYT665 -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B264 of 382

LOAD Z T5NOT5NL -0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z T5NQT5BO -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5NUT5NQ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O60393 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O7T5X8 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5O8T5X7 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OA0410 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OB0412 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OD0414 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OE0415 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OFT5X1 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OHT5IT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OIT5IS -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OVT5OX -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OX0103 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5OZT5P0 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5P0T5OY -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X1T5X4 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X40390 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X50408 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X60407 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X7T5X5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X8T5X6 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01030532 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 0532T5BF -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 06480083 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5BF0648 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T5X1T5X2 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X4T5X3 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X6T5X5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X8T5X7 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00680093 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0080T5J0 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00820068 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00930125 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00990446 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0100T66T -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01110466 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01250099 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0446T677 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04500079 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04660467 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04670468 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04680469 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04690470 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04700450 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0519T64R -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5J0T6AH -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0079T62B -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00800393 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0081T5NV -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0082T68H -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00910199 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0096T63J -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0097T67X -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00980443 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01020523 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01030380 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01040372 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01120451 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01990200 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02000201 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02010525 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03720373 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03730374 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03740375 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03750080 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03800381 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03810382 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03820383 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03830100 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03900081 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0392T68J -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03930407 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03950425 -0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B265 of 382

LOAD Z 04070408 -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z 04080409 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04090410 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0410T67P -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0411T67O -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04120413 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04130414 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04140415 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04150390 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04250426 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04260427 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04270428 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0428T68C -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0429T68B -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04300431 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04310432 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04320433 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04330392 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0443T67K -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04470078 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04510452 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04520453 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04530454 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04540455 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04550447 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0523T6B0 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 05250098 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0528T67W -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T498T6AO -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T499T6AL -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T59NT5BE -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BCT62M -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BDT63A -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BET62X -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BP0102 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NRT499 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NVT5NR -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00810368 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00830384 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0084T432 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0088T5NT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0091T68I -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00940440 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00940445 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01000394 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01020369 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0105T5NL -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0106T433 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01260127 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01270128 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01280094 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01960197 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01970198 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01980436 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02260465 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02270460 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02290463 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02300458 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03680088 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03690105 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03700092 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03840385 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03850386 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03860387 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03870082 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03910102 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0394T64P -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0400T5O9 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0404T5OC -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0409T64H -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0413T64F -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04160417 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04170418 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04180419 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0418T64W -0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B266 of 382

LOAD Z 04190420 -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z 04200421 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04210422 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04220423 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0422T581 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04230424 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04240391 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04270126 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04310196 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04360444 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04380437 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04400438 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04440456 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04450461 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04480096 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04490097 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04560457 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04570230 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04580459 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04590227 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04600448 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04610462 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04620229 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04630464 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04640226 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04650449 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T3300105 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T432T5IV -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T433T5OF -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T433T5X2 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T500T68P -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T581T6AS -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BOT330 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BPT5BO -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IVT6B3 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NLT5NM -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NNT5NM -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NOT5NN -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NPT330 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NPT5NO -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NQT5NP -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NRT5NQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NTT5NP -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O5T68Q -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O6T432 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O7T5O6 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O8T5O7 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O90409 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O9T5O8 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OAT5O9 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OBT68R -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OC0413 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OCT5OB -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5ODT5OC -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OET5OD -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OFT5OE -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OGT432 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OHT5OG -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OIT5OH -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OJT5OI -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5S7T5S8 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5S80422 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X2T5X3 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X30081 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0087T500 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02180221 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02210528 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02260221 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02290218 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0376T5OJ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0438T63S -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T500T5IP -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5AM0372 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5ART5IR -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IP0104 -0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B267 of 382

LOAD Z T5IRT5AM -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z T5OJT5AR -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0103T5OY -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01260196 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0371T5NS -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0372T5IW -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0375T5IZ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0379T5OG -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0380T6AK -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0381T587 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0382T58D -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0383T64S -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0390T6AM -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0391T6B1 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0393T5A3 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0394T6AZ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0402T5O5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04110420 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0415T5S5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0420T5SJ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0423T5SH -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5840391 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T587T58A -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T588T5SV -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5890385 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T58AT5ST -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T58B0386 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T58CT59O -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T58DT58B -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T58ET5SU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T59O0384 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5A0T584 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5A10394 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5A3T64L -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5ALT6B2 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5ANT643 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5AOT663 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5AQT5IU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5AST6AI -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5ATT662 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IUT5AL -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IWT5AT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IZT5AS -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NS0368 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O50411 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OGT5AQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OUT5OW -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OVT5OZ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OWT5UN -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OXT5P0 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OYT5OT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OZT5OU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5P0T5OW -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5S5T5S6 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5S60424 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SHT5SI -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SIT6AR -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SJT5SK -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SKT6AU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5STT588 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SUT5SW -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SVT589 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5SWT58C -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5UNT5OT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00840388 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00870376 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01050092 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01060371 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03710090 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03760377 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03770378 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03780379 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03790084 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03880398 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03890106 -0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B268 of 382

LOAD Z 03980399 -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z 03990400 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04000401 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04010402 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04020403 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04030404 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04040405 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04050406 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04060389 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T433T5NS -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5B5T5LQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IPT5J2 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IQT5J3 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IRT5IP -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IST5IR -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5ITT5IS -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IUT5IT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IVT5IU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IWT5IQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IXT5IW -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IYT5IX -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IZT5IY -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5J0T5IZ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NST5B5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NTT5LR -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NUT5NT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NVT5NU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0068T59Z -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0090T5B5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0093T62L -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0099T62J -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0104T5IQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0125T62K -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0368T5NU -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 03690370 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0373T5IX -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0374T5IY -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0377T5OI -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0378T5OH -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0388T5O6 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0389T5OF -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0398T5O7 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0399T5O8 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0401T5OA -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0403T5OB -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0405T5OD -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0406T5OE -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0407T64M -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0408T5A4 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0410T64I -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04120421 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0414T585 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0416T6AY -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0417T6AX -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0421T63Y -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0424T580 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0446T62I -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0450T62C -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0466T62H -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0467T62G -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0468T62F -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0469T62E -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0470T62D -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T580T6AQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5850423 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T59Z0126 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5A4T5A5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5A50417 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5B50088 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BO0369 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IQT5OV -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IS0373 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IT0374 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IXT664 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5IYT665 -0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B269 of 382

LOAD Z T5NOT5NL -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z T5NQT5BO -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5NUT5NQ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O60393 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O7T5X8 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5O8T5X7 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OA0410 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OB0412 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OD0414 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OE0415 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OFT5X1 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OHT5IT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OIT5IS -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OVT5OX -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OX0103 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5OZT5P0 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5P0T5OY -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X1T5X4 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X40390 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X50408 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X60407 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X7T5X5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X8T5X6 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01030532 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0532T5BF -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 06480083 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5BF0648 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T5X1T5X2 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X4T5X3 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X6T5X5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X8T5X7 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00680093 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0080T5J0 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00820068 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00930125 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00990446 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0100T66T -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01110466 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01250099 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0446T677 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04500079 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04660467 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04670468 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04680469 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04690470 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04700450 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0519T64R -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5J0T6AH -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0079T62B -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00800393 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0081T5NV -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0082T68H -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00910199 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0096T63J -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0097T67X -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00980443 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01020523 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01030380 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01040372 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01120451 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01990200 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02000201 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02010525 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03720373 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03730374 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03740375 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03750080 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03800381 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03810382 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03820383 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03830100 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03900081 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0392T68J -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03930407 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03950425 -0.0146 -0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B270 of 382

LOAD Z 04070408 -0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z 04080409 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04090410 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0410T67P -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0411T67O -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04120413 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04130414 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04140415 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04150390 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04250426 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04260427 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04270428 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0428T68C -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0429T68B -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04300431 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04310432 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04320433 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04330392 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0443T67K -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04470078 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04510452 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04520453 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04530454 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04540455 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04550447 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0523T6B0 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 05250098 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0528T67W -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T498T6AO -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T499T6AL -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T59NT5BE -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BCT62M -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BDT63A -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BET62X -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BP0102 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NRT499 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NVT5NR -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00810368 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00830384 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0084T432 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0088T5NT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0091T68I -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00940440 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00940445 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01000394 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01020369 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0105T5NL -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0106T433 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01260127 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01270128 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01280094 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01960197 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01970198 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01980436 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02260465 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02270460 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02290463 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02300458 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03680088 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03690105 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03700092 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03840385 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03850386 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03860387 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03870082 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03910102 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0394T64P -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0400T5O9 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0404T5OC -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0409T64H -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0413T64F -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04160417 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04170418 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04180419 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0418T64W -0.0146 -0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B271 of 382

LOAD Z 04190420 -0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z 04200421 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04210422 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04220423 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0422T581 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04230424 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04240391 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04270126 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04310196 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04360444 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04380437 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04400438 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04440456 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04450461 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04480096 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04490097 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04560457 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04570230 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04580459 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04590227 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04600448 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04610462 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04620229 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04630464 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04640226 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04650449 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T3300105 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T432T5IV -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T433T5OF -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T433T5X2 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T500T68P -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T581T6AS -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BOT330 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BPT5BO -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IVT6B3 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NLT5NM -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NNT5NM -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NOT5NN -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NPT330 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NPT5NO -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NQT5NP -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NRT5NQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NTT5NP -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O5T68Q -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O6T432 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O7T5O6 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O8T5O7 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O90409 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O9T5O8 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OAT5O9 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OBT68R -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OC0413 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OCT5OB -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5ODT5OC -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OET5OD -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OFT5OE -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OGT432 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OHT5OG -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OIT5OH -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OJT5OI -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5S7T5S8 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5S80422 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X2T5X3 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X30081 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0087T500 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02180221 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02210528 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02260221 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02290218 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0376T5OJ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0438T63S -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T500T5IP -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5AM0372 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5ART5IR -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IP0104 -0.0146 -0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B272 of 382

LOAD Z T5IRT5AM -0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z T5OJT5AR -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0103T5OY -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01260196 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0371T5NS -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0372T5IW -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0375T5IZ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0379T5OG -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0380T6AK -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0381T587 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0382T58D -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0383T64S -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0390T6AM -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0391T6B1 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0393T5A3 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0394T6AZ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0402T5O5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04110420 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0415T5S5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0420T5SJ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0423T5SH -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5840391 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T587T58A -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T588T5SV -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5890385 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T58AT5ST -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T58B0386 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T58CT59O -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T58DT58B -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T58ET5SU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T59O0384 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5A0T584 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5A10394 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5A3T64L -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5ALT6B2 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5ANT643 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5AOT663 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5AQT5IU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5AST6AI -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5ATT662 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IUT5AL -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IWT5AT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IZT5AS -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NS0368 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O50411 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OGT5AQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OUT5OW -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OVT5OZ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OWT5UN -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OXT5P0 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OYT5OT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OZT5OU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5P0T5OW -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5S5T5S6 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5S60424 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SHT5SI -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SIT6AR -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SJT5SK -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SKT6AU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5STT588 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SUT5SW -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SVT589 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5SWT58C -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5UNT5OT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00840388 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00870376 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01050092 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01060371 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03710090 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03760377 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03770378 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03780379 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03790084 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03880398 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03890106 -0.0146 -0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B273 of 382

LOAD Z 03980399 -0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z 03990400 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04000401 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04010402 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04020403 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04030404 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04040405 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04050406 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04060389 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T433T5NS -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5B5T5LQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IPT5J2 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IQT5J3 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IRT5IP -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IST5IR -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5ITT5IS -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IUT5IT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IVT5IU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IWT5IQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IXT5IW -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IYT5IX -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IZT5IY -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5J0T5IZ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NST5B5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NTT5LR -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NUT5NT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NVT5NU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0068T59Z -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0090T5B5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0093T62L -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0099T62J -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0104T5IQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0125T62K -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0368T5NU -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 03690370 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0373T5IX -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0374T5IY -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0377T5OI -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0378T5OH -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0388T5O6 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0389T5OF -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0398T5O7 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0399T5O8 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0401T5OA -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0403T5OB -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0405T5OD -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0406T5OE -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0407T64M -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0408T5A4 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0410T64I -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04120421 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0414T585 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0416T6AY -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0417T6AX -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0421T63Y -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0424T580 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0446T62I -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0450T62C -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0466T62H -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0467T62G -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0468T62F -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0469T62E -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0470T62D -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T580T6AQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5850423 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T59Z0126 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5A4T5A5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5A50417 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5B50088 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BO0369 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IQT5OV -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IS0373 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IT0374 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IXT664 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5IYT665 -0.0146 -0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B274 of 382

LOAD Z T5NOT5NL -0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z T5NQT5BO -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5NUT5NQ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O60393 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O7T5X8 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5O8T5X7 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OA0410 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OB0412 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OD0414 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OE0415 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OFT5X1 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OHT5IT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OIT5IS -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OVT5OX -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OX0103 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5OZT5P0 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5P0T5OY -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X1T5X4 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X40390 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X50408 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X60407 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X7T5X5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5X8T5X6 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01030532 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0532T5BF -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 06480083 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T5BF0648 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD 0447 -2.2000 GLOB JOIN EL-5-M
LOAD 0078 -0.5000 GLOB JOIN EL-6-M
LOAD 0079 -0.5000 GLOB JOIN EL-6-M
LOAD 0090 -0.5000 GLOB JOIN EL-6-M
LOAD 0087 -0.5000 GLOB JOIN EL-6-M
LOAD 0447 -1.0000 GLOB JOIN EL-7-M
LOAD Z T62BT5BD -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62BT5BD -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62BT5BD -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62BT5BD -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62CT63B -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62CT63B -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62CT63B -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62CT63B -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62DT63C -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62DT63C -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62DT63C -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62DT63C -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62ET63D -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62ET63D -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62ET63D -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62ET63D -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62FT63E -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62FT63E -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62FT63E -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62FT63E -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62GT63F -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62GT63F -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62GT63F -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62GT63F -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62HT63G -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62HT63G -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62HT63G -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62HT63G -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62IT63H -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62IT63H -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62IT63H -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62IT63H -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62JT63I -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62JT63I -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62JT63I -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62JT63I -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62K0128 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62K0128 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62K0128 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62K0128 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62L0127 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62L0127 -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B275 of 382

LOAD Z T62L0127 -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z T62L0127 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62M0078 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62M0078 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62M0078 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62M0078 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62X0091 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62X0091 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62X0091 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62X0091 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62Y0392 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62Y0392 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62Y0392 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62Y0392 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T62Z0433 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T62Z0433 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T62Z0433 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T62Z0433 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6300432 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6300432 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6300432 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6300432 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6310431 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6310431 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6310431 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6310431 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6320430 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6320430 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6320430 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6320430 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6330429 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6330429 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6330429 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6330429 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6340428 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6340428 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6340428 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6340428 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6350427 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6350427 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6350427 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6350427 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6360426 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6360426 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6360426 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6360426 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6370395 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6370395 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6370395 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6370395 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6380425 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6380425 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6380425 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6380425 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T639T676 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T639T676 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T639T676 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T639T676 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63A0097 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63A0097 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63A0097 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63A0097 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63B0449 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63B0449 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63B0449 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63B0449 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63C0465 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63C0465 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63C0465 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63C0465 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63D0464 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63D0464 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63D0464 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63D0464 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63E0463 -0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B276 of 382

LOAD Z T63E0463 -0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z T63E0463 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63E0463 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63F0462 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63F0462 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63F0462 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63F0462 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63G0461 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63G0461 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63G0461 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63G0461 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63H0445 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63H0445 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63H0445 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63H0445 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63I0094 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63I0094 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63I0094 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63I0094 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63JT5BC -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63JT5BC -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63JT5BC -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63JT5BC -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63S0218 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63S0218 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63S0218 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63S0218 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63TT6AP -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63TT6AP -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63TT6AP -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63TT6AP -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63UT62Y -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63UT62Y -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63UT62Y -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63UT62Y -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63VT630 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63VT630 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63VT630 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63VT630 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63WT62Z -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63WT62Z -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63WT62Z -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63WT62Z -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63XT631 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63XT631 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63XT631 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63XT631 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63YT6AT -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63YT6AT -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63YT6AT -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63YT6AT -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T63ZT632 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T63ZT632 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T63ZT632 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T63ZT632 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T640T633 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T640T633 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T640T633 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T640T633 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6410416 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6410416 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6410416 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6410416 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T642T66U -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T642T66U -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T642T66U -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T642T66U -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6430383 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6430383 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6430383 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6430383 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64FT5S7 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64FT5S7 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64FT5S7 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64FT5S7 -0.0146 -0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B277 of 382

LOAD Z T64H0418 -0.0489 -0.0489 GLOB UNIF EL-1-M


LOAD Z T64H0418 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64H0418 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64H0418 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64I0419 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64I0419 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64I0419 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64I0419 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64LT5A1 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64LT5A1 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64LT5A1 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64LT5A1 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64MT641 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64MT641 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64MT641 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64MT641 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64P0416 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64P0416 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64P0416 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64P0416 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64RT639 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64RT639 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64RT639 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64RT639 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64S0387 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64S0387 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64S0387 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64S0387 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64WT6AW -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64WT6AW -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64WT6AW -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64WT6AW -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T64XT6AV -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T64XT6AV -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T64XT6AV -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T64XT6AV -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T662T5AO -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T662T5AO -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T662T5AO -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T662T5AO -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6630380 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6630380 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6630380 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6630380 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T664T666 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T664T666 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T664T666 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T664T666 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T665T667 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T665T667 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T665T667 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T665T667 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6660381 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6660381 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6660381 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6660381 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6670382 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6670382 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6670382 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6670382 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T66T0519 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T66T0519 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T66T0519 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T66T0519 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T66U0100 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T66U0100 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T66U0100 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T66U0100 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6760082 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6760082 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6760082 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6760082 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6770111 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6770111 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6770111 -0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B278 of 382

LOAD Z T6770111 -0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z T67K0112 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T67K0112 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T67K0112 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T67K0112 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T67O0412 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T67O0412 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T67O0412 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T67O0412 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T67P0411 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T67P0411 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T67P0411 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T67P0411 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T67X0528 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T67X0528 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T67X0528 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T67X0528 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68B0430 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68B0430 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68B0430 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68B0430 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68C0429 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68C0429 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68C0429 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68C0429 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68H0395 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68H0395 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68H0395 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68H0395 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68I0370 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68I0370 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68I0370 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68I0370 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68J0091 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68J0091 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68J0091 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68J0091 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68PT5OJ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68PT5OJ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68PT5OJ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68PT5OJ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68QT5OA -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68QT5OA -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68QT5OA -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68QT5OA -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T68RT5O5 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T68RT5O5 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T68RT5O5 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T68RT5O5 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AHT6AJ -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AHT6AJ -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AHT6AJ -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AHT6AJ -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AIT5AN -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AIT5AN -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AIT5AN -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AIT5AN -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AJT642 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AJT642 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AJT642 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AJT642 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AKT58E -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AKT58E -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AKT58E -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AKT58E -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6ALT5BP -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6ALT5BP -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6ALT5BP -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6ALT5BP -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AMT6AN -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AMT6AN -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AMT6AN -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AMT6AN -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6ANT5A0 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6ANT5A0 -0.0011 -0.0011 GLOB UNIF EL-2-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B279 of 382

LOAD Z T6ANT5A0 -0.0310 -0.0310 GLOB UNIF EL-3-M


LOAD Z T6ANT5A0 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AOT59N -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AOT59N -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AOT59N -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AOT59N -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6APT63U -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6APT63U -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6APT63U -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6APT63U -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AQT63W -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AQT63W -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AQT63W -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AQT63W -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6ART63V -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6ART63V -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6ART63V -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6ART63V -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AST63X -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AST63X -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AST63X -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AST63X -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6ATT63Z -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6ATT63Z -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6ATT63Z -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6ATT63Z -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AUT640 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AUT640 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AUT640 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AUT640 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AVT634 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AVT634 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AVT634 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AVT634 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AWT635 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AWT635 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AWT635 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AWT635 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AXT636 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AXT636 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AXT636 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AXT636 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AYT638 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AYT638 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AYT638 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AYT638 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6AZT637 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6AZT637 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6AZT637 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6AZT637 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6B0T498 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6B0T498 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6B0T498 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6B0T498 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6B1T63T -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6B1T63T -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6B1T63T -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6B1T63T -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6B20375 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6B20375 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6B20375 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6B20375 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T6B30080 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T6B30080 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T6B30080 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T6B30080 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0448TTTU -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 0448TTTU -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 0448TTTU -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 0448TTTU -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z TTTU0447 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z TTTU0447 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z TTTU0447 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z TTTU0447 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 0448TTTU 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B280 of 382

LOAD Z 0448TTTU 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M


LOAD Z 0448TTTU 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 0448TTTU 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01960199 -0.04892.50000-0.0489 GLOB UNIF EL-1-M
LOAD Z 01960199 2.50000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01960199 -0.00112.50000-0.0011 GLOB UNIF EL-2-M
LOAD Z 01960199 2.50000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01960199 -0.03102.50000-0.0310 GLOB UNIF EL-3-M
LOAD Z 01960199 2.50000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01960199 -0.01462.50000-0.0146 GLOB UNIF EL-4-M
LOAD Z 01960199 2.50000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02210017 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02210017 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02210017 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02210017 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00170227 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00170227 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00170227 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00170227 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z T67W0018 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z T67W0018 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z T67W0018 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z T67W0018 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00180096 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00180096 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00180096 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00180096 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 02180020 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 02180020 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 02180020 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 02180020 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00200230 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00200230 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00200230 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00200230 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04370021 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04370021 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04370021 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04370021 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00210436 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00210436 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00210436 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00210436 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 04600022 -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 04600022 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04600022 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04600022 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04600022 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04600022 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04600022 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04600022 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00220455 0.50000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00220455 0.50000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00220455 0.50000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00220455 0.50000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00220455 -0.04890.50000-0.0489 GLOB UNIF EL-1-M
LOAD Z 00220455 -0.00110.50000-0.0011 GLOB UNIF EL-2-M
LOAD Z 00220455 -0.03100.50000-0.0310 GLOB UNIF EL-3-M
LOAD Z 00220455 -0.01460.50000-0.0146 GLOB UNIF EL-4-M
LOAD Z 04590038 -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 04590038 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04590038 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04590038 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04590038 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04590038 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04590038 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04590038 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00380454 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00380454 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00380454 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00380454 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00380454 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 00380454 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 00380454 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 00380454 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B281 of 382

LOAD Z 04580039 -0.04890.66800-0.0489 GLOB UNIF EL-1-M


LOAD Z 04580039 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04580039 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04580039 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04580039 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04580039 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04580039 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04580039 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00390453 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00390453 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00390453 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00390453 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00390453 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 00390453 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 00390453 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 00390453 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 04570050 -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 04570050 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04570050 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04570050 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04570050 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04570050 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04570050 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04570050 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00500452 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00500452 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00500452 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00500452 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00500452 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 00500452 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 00500452 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 00500452 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 04560051 -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 04560051 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04560051 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04560051 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04560051 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04560051 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04560051 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04560051 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00510451 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00510451 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00510451 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00510451 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00510451 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 00510451 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 00510451 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 00510451 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 04440060 -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 04440060 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04440060 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04440060 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04440060 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04440060 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04440060 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04440060 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00600443 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 00600443 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 00600443 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 00600443 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 00600443 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 00600443 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 00600443 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 00600443 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 04360118 -0.04890.66800-0.0489 GLOB UNIF EL-1-M
LOAD Z 04360118 -0.00110.66800-0.0011 GLOB UNIF EL-2-M
LOAD Z 04360118 -0.03100.66800-0.0310 GLOB UNIF EL-3-M
LOAD Z 04360118 -0.01460.66800-0.0146 GLOB UNIF EL-4-M
LOAD Z 04360118 0.66800-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 04360118 0.66800-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 04360118 0.66800-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 04360118 0.66800-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01180098 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01180098 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01180098 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B282 of 382

LOAD Z 01180098 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M


LOAD Z 01180098 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 01180098 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 01180098 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 01180098 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 01980135 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01980135 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01980135 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01980135 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01350201 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 01350201 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 01350201 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 01350201 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 01350201 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01350201 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01350201 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01350201 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01970139 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01970139 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01970139 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01970139 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01390200 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z 01390200 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z 01390200 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z 01390200 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOAD Z 01390200 1.25000-0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01390200 1.25000-0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01390200 1.25000-0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01390200 1.25000-0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01400198 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01400198 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01400198 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01400198 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01410197 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01410197 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01410197 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01410197 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01280142 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01280142 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01280142 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01280142 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01420140 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01420140 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01420140 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01420140 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01270143 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01270143 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01270143 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01270143 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z 01430141 -0.0489 -0.0489 GLOB UNIF EL-1-M
LOAD Z 01430141 -0.0011 -0.0011 GLOB UNIF EL-2-M
LOAD Z 01430141 -0.0310 -0.0310 GLOB UNIF EL-3-M
LOAD Z 01430141 -0.0146 -0.0146 GLOB UNIF EL-4-M
LOAD Z TTTU0447 -0.04891.25000-0.0489 GLOB UNIF EL-1-M
LOAD Z TTTU0447 -0.00111.25000-0.0011 GLOB UNIF EL-2-M
LOAD Z TTTU0447 -0.03101.25000-0.0310 GLOB UNIF EL-3-M
LOAD Z TTTU0447 -0.01461.25000-0.0146 GLOB UNIF EL-4-M
LOADCNMDHV
LOAD Z T5X1T5X2 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X4T5X3 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X6T5X5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X8T5X7 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00680093 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0080T5J0 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00820068 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00930125 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00990446 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0100T66T -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01110466 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01250099 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0446T677 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04500079 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04660467 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04670468 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04680469 -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B283 of 382

LOAD Z 04690470 -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z 04700450 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0519T64R -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5J0T6AH -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0079T62B -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00800393 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0081T5NV -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0082T68H -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00910199 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0096T63J -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0097T67X -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00980443 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01020523 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01030380 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01040372 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01120451 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01990200 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02000201 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02010525 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03720373 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03730374 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03740375 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03750080 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03800381 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03810382 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03820383 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03830100 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03900081 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0392T68J -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03930407 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03950425 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04070408 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04080409 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04090410 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0410T67P -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0411T67O -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04120413 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04130414 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04140415 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04150390 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04250426 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04260427 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04270428 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0428T68C -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0429T68B -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04300431 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04310432 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04320433 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04330392 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0443T67K -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04470078 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04510452 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04520453 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04530454 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04540455 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04550447 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0523T6B0 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 05250098 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0528T67W -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T498T6AO -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T499T6AL -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T59NT5BE -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BCT62M -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BDT63A -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BET62X -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BP0102 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NRT499 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NVT5NR -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00810368 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00830384 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0084T432 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0088T5NT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0091T68I -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00940440 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00940445 -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B284 of 382

LOAD Z 01000394 -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z 01020369 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0105T5NL -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0106T433 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01260127 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01270128 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01280094 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01960197 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01970198 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01980436 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02260465 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02270460 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02290463 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02300458 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03680088 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03690105 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03700092 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03840385 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03850386 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03860387 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03870082 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03910102 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0394T64P -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0400T5O9 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0404T5OC -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0409T64H -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0413T64F -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04160417 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04170418 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04180419 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0418T64W -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04190420 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04200421 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04210422 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04220423 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0422T581 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04230424 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04240391 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04270126 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04310196 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04360444 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04380437 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04400438 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04440456 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04450461 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04480096 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04490097 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04560457 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04570230 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04580459 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04590227 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04600448 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04610462 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04620229 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04630464 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04640226 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04650449 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T3300105 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T432T5IV -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T433T5OF -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T433T5X2 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T500T68P -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T581T6AS -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BOT330 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BPT5BO -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IVT6B3 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NLT5NM -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NNT5NM -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NOT5NN -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NPT330 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NPT5NO -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NQT5NP -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NRT5NQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NTT5NP -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O5T68Q -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B285 of 382

LOAD Z T5O6T432 -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z T5O7T5O6 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O8T5O7 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O90409 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O9T5O8 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OAT5O9 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OBT68R -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OC0413 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OCT5OB -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5ODT5OC -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OET5OD -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OFT5OE -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OGT432 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OHT5OG -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OIT5OH -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OJT5OI -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5S7T5S8 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5S80422 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X2T5X3 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X30081 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0087T500 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02180221 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02210528 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02260221 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02290218 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0376T5OJ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0438T63S -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T500T5IP -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5AM0372 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5ART5IR -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IP0104 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IRT5AM -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OJT5AR -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0103T5OY -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01260196 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0371T5NS -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0372T5IW -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0375T5IZ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0379T5OG -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0380T6AK -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0381T587 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0382T58D -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0383T64S -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0390T6AM -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0391T6B1 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0393T5A3 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0394T6AZ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0402T5O5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04110420 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0415T5S5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0420T5SJ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0423T5SH -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5840391 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T587T58A -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T588T5SV -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5890385 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T58AT5ST -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T58B0386 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T58CT59O -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T58DT58B -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T58ET5SU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T59O0384 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5A0T584 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5A10394 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5A3T64L -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5ALT6B2 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5ANT643 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5AOT663 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5AQT5IU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5AST6AI -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5ATT662 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IUT5AL -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IWT5AT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IZT5AS -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NS0368 -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B286 of 382

LOAD Z T5O50411 -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z T5OGT5AQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OUT5OW -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OVT5OZ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OWT5UN -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OXT5P0 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OYT5OT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OZT5OU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5P0T5OW -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5S5T5S6 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5S60424 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SHT5SI -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SIT6AR -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SJT5SK -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SKT6AU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5STT588 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SUT5SW -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SVT589 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5SWT58C -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5UNT5OT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00840388 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00870376 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01050092 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01060371 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03710090 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03760377 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03770378 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03780379 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03790084 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03880398 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03890106 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03980399 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03990400 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04000401 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04010402 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04020403 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04030404 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04040405 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04050406 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04060389 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T433T5NS -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5B5T5LQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IPT5J2 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IQT5J3 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IRT5IP -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IST5IR -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5ITT5IS -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IUT5IT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IVT5IU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IWT5IQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IXT5IW -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IYT5IX -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IZT5IY -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5J0T5IZ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NST5B5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NTT5LR -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NUT5NT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NVT5NU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0068T59Z -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0090T5B5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0093T62L -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0099T62J -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0104T5IQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0125T62K -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0368T5NU -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 03690370 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0373T5IX -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0374T5IY -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0377T5OI -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0378T5OH -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0388T5O6 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0389T5OF -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0398T5O7 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0399T5O8 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0401T5OA -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B287 of 382

LOAD Z 0403T5OB -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z 0405T5OD -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0406T5OE -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0407T64M -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0408T5A4 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0410T64I -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04120421 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0414T585 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0416T6AY -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0417T6AX -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0421T63Y -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0424T580 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0446T62I -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0450T62C -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0466T62H -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0467T62G -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0468T62F -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0469T62E -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0470T62D -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T580T6AQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5850423 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T59Z0126 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5A4T5A5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5A50417 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5B50088 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BO0369 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IQT5OV -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IS0373 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IT0374 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IXT664 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5IYT665 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NOT5NL -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NQT5BO -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5NUT5NQ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O60393 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O7T5X8 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5O8T5X7 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OA0410 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OB0412 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OD0414 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OE0415 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OFT5X1 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OHT5IT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OIT5IS -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OVT5OX -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OX0103 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5OZT5P0 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5P0T5OY -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X1T5X4 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X40390 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X50408 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X60407 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X7T5X5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5X8T5X6 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01030532 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0532T5BF -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 06480083 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T5BF0648 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62BT5BD -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62CT63B -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62DT63C -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62ET63D -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62FT63E -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62GT63F -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62HT63G -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62IT63H -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62JT63I -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62K0128 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62L0127 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62M0078 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62X0091 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62Y0392 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T62Z0433 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6300432 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6310431 -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B288 of 382

LOAD Z T6320430 -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z T6330429 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6340428 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6350427 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6360426 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6370395 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6380425 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T639T676 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63A0097 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63B0449 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63C0465 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63D0464 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63E0463 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63F0462 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63G0461 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63H0445 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63I0094 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63JT5BC -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63S0218 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63TT6AP -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63UT62Y -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63VT630 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63WT62Z -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63XT631 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63YT6AT -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T63ZT632 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T640T633 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6410416 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T642T66U -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6430383 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64FT5S7 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64H0418 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64I0419 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64LT5A1 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64MT641 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64P0416 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64RT639 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64S0387 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64WT6AW -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T64XT6AV -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T662T5AO -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6630380 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T664T666 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T665T667 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6660381 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6670382 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T66T0519 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T66U0100 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6760082 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6770111 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T67K0112 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T67O0412 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T67P0411 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T67X0528 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68B0430 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68C0429 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68H0395 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68I0370 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68J0091 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68PT5OJ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68QT5OA -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T68RT5O5 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AHT6AJ -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AIT5AN -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AJT642 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AKT58E -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6ALT5BP -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AMT6AN -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6ANT5A0 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AOT59N -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6APT63U -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AQT63W -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6ART63V -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AST63X -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6ATT63Z -0.0090 -0.0090 GLOB UNIF HAVC-MD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B289 of 382

LOAD Z T6AUT640 -0.0090 -0.0090 GLOB UNIF HAVC-MD


LOAD Z T6AVT634 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AWT635 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AXT636 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AYT638 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6AZT637 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6B0T498 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6B1T63T -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6B20375 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T6B30080 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0448TTTU -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z TTTU0447 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 0448TTTU 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01960199 -0.00902.50000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 01960199 2.50000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02210017 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00170227 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z T67W0018 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00180096 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 02180020 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00200230 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04370021 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00210436 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 04600022 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04600022 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00220455 0.50000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00220455 -0.00900.50000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04590038 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04590038 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00380454 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00380454 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04580039 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04580039 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00390453 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00390453 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04570050 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04570050 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00500452 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00500452 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04560051 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04560051 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00510451 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00510451 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04440060 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04440060 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00600443 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 00600443 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04360118 -0.00900.66800-0.0090 GLOB UNIF HAVC-MD
LOAD Z 04360118 0.66800-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01180098 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01180098 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 01980135 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01350201 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 01350201 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01970139 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01390200 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOAD Z 01390200 1.25000-0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01400198 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01410197 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01280142 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01420140 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01270143 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z 01430141 -0.0090 -0.0090 GLOB UNIF HAVC-MD
LOAD Z TTTU0447 -0.00901.25000-0.0090 GLOB UNIF HAVC-MD
LOADCNMDIN
***LDS1** -15.000 5.750 14.730 -11.000 5.750 14.730 -15.000
***LDS2** -5.750 14.730 -11.000 -5.750 14.730 1.000
***LDS3** 0.250 0 1 3 0 0MDIN -2EQUPPRESLER
LOAD Z T432T5IV -0.3750 -0.3750 GLOB UNIF LER
LOAD Z T433T5X2 -0.3750 -0.3750 GLOB UNIF LER
LOAD Z T5IVT6B3 -0.4424 -0.4424 GLOB UNIF LER
LOAD Z T5O90409 -1.1250 -1.1250 GLOB UNIF LER
LOAD Z T5OC0413 -1.1250 -1.1250 GLOB UNIF LER
LOAD Z T5X2T5X3 -0.3750 -0.3750 GLOB UNIF LER
LOAD Z T5X30081 -0.4814 -0.4814 GLOB UNIF LER
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B290 of 382

LOAD Z T5O50411 -1.2500 -1.2500 GLOB UNIF LER


LOAD Z T5O60393 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5O7T5X8 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5O8T5X7 -0.8750 -0.8750 GLOB UNIF LER
LOAD Z T5OA0410 -1.2500 -1.2500 GLOB UNIF LER
LOAD Z T5OB0412 -1.2500 -1.2500 GLOB UNIF LER
LOAD Z T5OD0414 -0.8750 -0.8750 GLOB UNIF LER
LOAD Z T5OE0415 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5OFT5X1 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5X1T5X4 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5X40390 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5X50408 -0.8750 -0.8750 GLOB UNIF LER
LOAD Z T5X60407 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z T5X7T5X5 -0.8750 -0.8750 GLOB UNIF LER
LOAD Z T5X8T5X6 -0.7500 -0.7500 GLOB UNIF LER
LOAD Z 01260196 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z T59Z0126 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 0068T59Z -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04480096 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04600448 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 02270460 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04590227 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04580459 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 02300458 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04570230 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04560457 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04440456 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04360444 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01980436 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01970198 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01960197 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01260127 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01270128 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01280094 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 00940445 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04450461 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04610462 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04620229 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 02290463 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04630464 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04640226 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 02260465 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04650449 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 04490097 -0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 02210528 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 02180221 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 0438T63S -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T5SKT6AU -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T5SJT5SK -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 0420T5SJ -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 04190420 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 04180419 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 04170418 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T5A50417 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T5A4T5A5 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 0408T5A4 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 01260196 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T5O90409 -0.2500 -0.2500 GLOB UNIF IN-ME-3
LOAD Z T5OAT5O9 -0.2500 -0.2500 GLOB UNIF IN-ME-3
LOAD Z T5O5T68Q -0.2500 -0.2500 GLOB UNIF IN-ME-3
***LDS1** -11.000 -3.500 17.130 -9.395 -3.500 17.130 -11.000
***LDS2** -5.000 17.130 -9.395 -5.000 17.130 2.492
***LDS3** 0.250 0 1 3 0 0MDIN -2EQUPPRESMULTI-PH
LOAD Z 0393T5A3 -0.9345 -0.9345 GLOB UNIF MULTI-PH
LOAD Z 0407T64M -1.86901.60500-1.8690 GLOB UNIF MULTI-PH
LOAD Z 0408T5A4 -0.9345 -0.9345 GLOB UNIF MULTI-PH
LOAD Z T6330429 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T63S0218 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T640T633 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T68QT5OA -0.2500 -0.2500 GLOB UNIF IN-ME-3
LOAD Z T6AUT640 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z T6B30080 -0.4424 -0.4424 GLOB UNIF LER
LOAD Z 01960199 -0.25002.50000-0.2500 GLOB UNIF IN-ME-1
LOAD Z 01960199 2.50000-0.2500 -0.2500 GLOB UNIF IN-ME-1
LOAD Z 01400198 -0.2500 -0.2500 GLOB UNIF IN-ME-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B291 of 382

LOAD Z 01410197 -0.2500 -0.2500 GLOB UNIF IN-ME-2


LOAD Z 01280142 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 01420140 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 01270143 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOAD Z 01430141 -0.2500 -0.2500 GLOB UNIF IN-ME-2
LOADCNMDMD
LOAD T69N -20.090 GLOB JOIN P-PIG-L
LOAD T69O -7.1100 GLOB JOIN T-PIG-L
LOAD T69P -10.000 GLOB JOIN W-S-VSL
LOADCNMDMO
LOAD T69N -29.480 GLOB JOIN P-PIG-L
LOAD T69O -8.3600 GLOB JOIN T-PIG-L
LOAD T69P -35.000 GLOB JOIN W-S-VSL
LOADCNMDPD
***LDS1** 1.200 5.000 17.130 1.200 5.750 17.130 11.000
***LDS2** 5.000 17.130 11.000 5.750 17.130 5.180
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-1
LOAD Z T62M0078 -4.6440 -4.6440 GLOB UNIF PI-M-1
***LDS1** 1.200 -5.750 17.130 1.200 -5.000 17.130 11.000
***LDS2** -5.750 17.130 11.000 -5.000 17.130 5.180
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-1
LOAD Z 0079T62B -4.64400.29280-4.6440 GLOB UNIF PI-M-1
LOAD Z 0093T62L -1.9943 -1.9943 GLOB UNIF PI-M-1
LOAD Z 0099T62J -3.4447 -3.4447 GLOB UNIF PI-M-1
LOAD Z 0125T62K -3.9886 -3.9886 GLOB UNIF PI-M-1
LOAD Z 0446T62I -3.0821 -3.0821 GLOB UNIF PI-M-1
LOAD Z 0450T62C -3.0821 -3.0821 GLOB UNIF PI-M-1
LOAD Z 0466T62H -3.0821 -3.0821 GLOB UNIF PI-M-1
LOAD Z 0467T62G -3.7166 -3.7166 GLOB UNIF PI-M-1
LOAD Z 0468T62F -4.5325 -4.5325 GLOB UNIF PI-M-1
LOAD Z 0469T62E -3.8980 -3.8980 GLOB UNIF PI-M-1
LOAD Z 0470T62D -2.9008 -2.9008 GLOB UNIF PI-M-1
***LDS1** -1.000 -5.750 17.130 -1.000 5.750 17.130 1.200
***LDS2** -5.750 17.130 1.200 5.750 17.130 6.000
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-1
LOAD Z 0082T68H -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 0392T68J -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 03950425 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04250426 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04260427 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04270428 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 0428T68C -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 0429T68B -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04300431 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04310432 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04320433 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 04330392 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 01260196 -4.6200 -4.6200 GLOB UNIF PI-M-1
LOAD Z 0068T59Z -4.6200 -4.6200 GLOB UNIF PI-M-1
LOAD Z 0093T62L -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z T59Z0126 -4.6200 -4.6200 GLOB UNIF PI-M-1
LOAD Z T62L0127 -2.3100 -2.3100 GLOB UNIF PI-M-1
***LDS1** -1.900 5.750 17.130 -1.000 5.750 17.130 -1.900
***LDS2** -5.750 17.130 -1.000 -5.750 17.130 6.000
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-1
LOAD Z T62X0091 -1.5750 -1.5750 GLOB UNIF PI-M-1
LOAD Z T62Y0392 -3.1500 -3.1500 GLOB UNIF PI-M-1
LOAD Z T62Z0433 -3.1500 -3.1500 GLOB UNIF PI-M-1
LOAD Z T6300432 -3.6750 -3.6750 GLOB UNIF PI-M-1
LOAD Z T6310431 -4.7250 -4.7250 GLOB UNIF PI-M-1
LOAD Z T6320430 -5.2500 -5.2500 GLOB UNIF PI-M-1
LOAD Z T6330429 -5.2500 -5.2500 GLOB UNIF PI-M-1
LOAD Z T6340428 -5.2500 -5.2500 GLOB UNIF PI-M-1
LOAD Z T6350427 -4.7250 -4.7250 GLOB UNIF PI-M-1
LOAD Z T6360426 -3.6750 -3.6750 GLOB UNIF PI-M-1
LOAD Z T6370395 -3.1500 -3.1500 GLOB UNIF PI-M-1
LOAD Z T6380425 -3.1500 -3.1500 GLOB UNIF PI-M-1
LOAD Z T639T676 -1.5750 -1.5750 GLOB UNIF PI-M-1
***LDS1** 3.400 2.500 17.130 3.400 3.168 17.130 11.000
***LDS2** 2.500 17.130 11.000 3.168 17.130 3.000
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-2
LOAD Z 0096T63J -1.0500 -1.0500 GLOB UNIF PI-M-2
***LDS1** 3.400 -3.168 17.130 3.400 -2.500 17.130 11.000
***LDS2** -3.168 17.130 11.000 -2.500 17.130 3.000
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B292 of 382

LOAD Z T63A0097 -1.0500 -1.0500 GLOB UNIF PI-M-2


LOAD Z T63B0449 -1.7850 -1.7850 GLOB UNIF PI-M-2
LOAD Z T63C0465 -1.6800 -1.6800 GLOB UNIF PI-M-2
LOAD Z T63D0464 -2.2575 -2.2575 GLOB UNIF PI-M-2
LOAD Z T63E0463 -2.6250 -2.6250 GLOB UNIF PI-M-2
LOAD Z T63F0462 -2.1525 -2.1525 GLOB UNIF PI-M-2
LOAD Z T63G0461 -1.7850 -1.7850 GLOB UNIF PI-M-2
LOAD Z T63H0445 -1.7850 -1.7850 GLOB UNIF PI-M-2
LOAD Z T63I0094 -0.8400 -0.8400 GLOB UNIF PI-M-2
***LDS1** 3.400 2.500 17.130 4.200 2.500 17.130 3.400
***LDS2** -2.500 17.130 4.200 -2.500 17.130 3.000
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-2
LOAD Z 00940445 -2.6250 -2.6250 GLOB UNIF PI-M-2
LOAD Z 04360444 -2.6250 -2.6250 GLOB UNIF PI-M-2
LOAD Z 0438T63S -5.2500 -5.2500 GLOB UNIF PI-M-2
***LDS1** -15.000 5.750 17.130 -1.000 5.750 17.130 -15.000
***LDS2** 5.000 17.130 -1.000 5.000 17.130 1.030
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-3
LOAD Z 0081T5NV -0.4981 -0.4981 GLOB UNIF PI-M-3
LOAD Z 01020523 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z 0523T6B0 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T498T6AO -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T499T6AL -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T59NT5BE -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5BET62X -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5BP0102 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5NRT499 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5NVT5NR -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T433T5X2 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5X2T5X3 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5X30081 -0.3471 -0.3471 GLOB UNIF PI-M-3
LOAD Z 0390T6AM -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z 0391T6B1 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5840391 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5A0T584 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5OFT5X1 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5X1T5X4 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T5X40390 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T62X0091 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T62Y0392 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z 04150390 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 03900081 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 04140415 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 04130414 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 04120413 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 0411T67O -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 0410T67P -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 04090410 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 04080409 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 04070408 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 03930407 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z 00800393 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z T63TT6AP -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T63UT62Y -0.2703 -0.2703 GLOB UNIF PI-M-3
***LDS1** -3.588 5.000 17.130 -2.608 5.000 17.130 -3.654
***LDS2** 17.130 -2.608 17.130 0.600
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-5
LOAD Z 0422T581 2.37900-0.4725 -0.4725 GLOB UNIF PI-M-5
LOAD Z T581T6AS -0.4725 -0.4725 GLOB UNIF PI-M-5
LOAD Z T5SIT6AR 0.04620-0.3675 -0.3675 GLOB UNIF PI-M-5
LOAD Z T5SKT6AU -0.2625 -0.2625 GLOB UNIF PI-M-5
LOAD Z 0421T63Y 2.36250-0.5250 -0.5250 GLOB UNIF PI-M-5
LOAD Z T580T6AQ -0.3150 -0.3150 GLOB UNIF PI-M-5
LOAD Z T63TT6AP -0.1575 -0.1575 GLOB UNIF PI-M-5
LOAD Z T63VT630 -0.36750.06600-0.3675 GLOB UNIF PI-M-5
LOAD Z T63YT6AT -0.5250 -0.5250 GLOB UNIF PI-M-5
***LDS1** -6.000 -5.750 17.130 -1.000 -5.750 17.130 -6.000
***LDS2** -6.750 17.130 -1.000 -6.750 17.130 5.040
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-6
LOAD Z 0100T66T -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z 0519T64R -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z 0383T64S -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z T639T676 -1.7640 -1.7640 GLOB UNIF PI-M-6
***LDS1** -7.100 -3.500 17.130 -6.000 -3.500 17.130 -7.100
***LDS2** -6.750 17.130 -6.000 -6.750 17.130 6.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B293 of 382

***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-6


LOAD Z T5A10394 -3.1500 -3.1500 GLOB UNIF PI-M-6
LOAD Z T5A50417 -1.5750 -1.5750 GLOB UNIF PI-M-6
LOAD Z T6410416 -3.1500 -3.1500 GLOB UNIF PI-M-6
LOAD Z T642T66U -3.6750 -3.6750 GLOB UNIF PI-M-6
LOAD Z T6430383 -2.1000 -2.1000 GLOB UNIF PI-M-6
***LDS1** -11.000 -4.250 17.130 -7.100 -4.250 17.130 -11.000
***LDS2** -5.000 17.130 -7.100 -5.000 17.130 1.800
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-4
LOAD Z 0393T5A3 -0.4725 -0.4725 GLOB UNIF PI-M-4
LOAD Z T5A3T64L -0.4725 -0.4725 GLOB UNIF PI-M-4
LOAD Z 0407T64M -0.4725 -0.4725 GLOB UNIF PI-M-4
LOAD Z 04170418 -0.8190 -0.8190 GLOB UNIF PI-M-7
LOAD Z 04180419 -0.8190 -0.8190 GLOB UNIF PI-M-7
LOAD Z 04190420 -0.8190 -0.8190 GLOB UNIF PI-M-7
LOAD Z 04200421 -0.8190 -0.8190 GLOB UNIF PI-M-7
LOAD Z 04210422 -0.8190 -0.8190 GLOB UNIF PI-M-7
***LDS1** -7.100 5.000 17.130 -6.000 5.000 17.130 -6.904
***LDS2** 2.500 17.130 -6.000 2.500 17.130 0.600
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-8
LOAD Z T5S7T5S8 -0.2100 -0.2100 GLOB UNIF PI-M-8
LOAD Z T5S80422 -0.2100 -0.2100 GLOB UNIF PI-M-8
LOAD Z 0415T5S5 3.95880-0.3150 -0.3150 GLOB UNIF PI-M-8
LOAD Z T5840391 -0.1575 -0.1575 GLOB UNIF PI-M-8
LOAD Z T5A0T584 -0.1575 -0.1575 GLOB UNIF PI-M-8
LOAD Z T5S5T5S6 -0.3150 -0.3150 GLOB UNIF PI-M-8
LOAD Z T5S60424 -0.3150 -0.3150 GLOB UNIF PI-M-8
LOAD Z 0414T585 4.01760-0.3675 -0.3675 GLOB UNIF PI-M-8
LOAD Z T5850423 -0.3675 -0.3675 GLOB UNIF PI-M-8
***LDS1** -16.500 -5.000 17.130 -15.000 -5.000 17.130 -16.500
***LDS2** -5.750 17.130 -15.000 -5.750 17.130 4.500
***LDS3** 0.250 0 1 3 0 0MDPD -2EQUPPRESPI-M-9
LOAD Z 0084T432 0.16000-1.1812 -1.1812 GLOB UNIF PI-M-9
LOAD Z 0388T5O6 -1.1812 -1.1812 GLOB UNIF PI-M-9
LOAD Z T64LT5A1 -0.4725 -0.4725 GLOB UNIF PI-M-4
LOAD Z T64MT641 -0.4725 -0.4725 GLOB UNIF PI-M-4
LOAD Z T64RT639 -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z T64S0387 -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z T66T0519 -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z T66U0100 -3.6750 -3.6750 GLOB UNIF PI-M-6
LOAD Z T6760082 -1.5750 -1.5750 GLOB UNIF PI-M-1
LOAD Z T6760082 -1.7640 -1.7640 GLOB UNIF PI-M-6
LOAD Z T67O0412 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z T67P0411 -0.4914 -0.4914 GLOB UNIF PI-M-4
LOAD Z T68B0430 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z T68C0429 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z T68H0395 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z T68J0091 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z T6ALT5BP -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T6AMT6AN -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T6ANT5A0 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T6AOT59N -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T6APT63U -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T6APT63U -0.1575 -0.1575 GLOB UNIF PI-M-5
LOAD Z T6AQT63W -0.3150 -0.3150 GLOB UNIF PI-M-5
LOAD Z T6ART63V -0.3675 -0.3675 GLOB UNIF PI-M-5
LOAD Z T6AST63X -0.4725 -0.4725 GLOB UNIF PI-M-5
LOAD Z T6ATT63Z -0.5250 -0.5250 GLOB UNIF PI-M-5
LOAD Z T6AUT640 -0.2625 -0.2625 GLOB UNIF PI-M-5
LOAD Z T6B0T498 -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z T6B1T63T -0.2703 -0.2703 GLOB UNIF PI-M-3
LOAD Z TTTU0447 1.25000-3.0821 -3.0821 GLOB UNIF PI-M-1
LOAD Z 0448TTTU -1.78500.66800-1.7850 GLOB UNIF PI-M-2
LOAD Z 01960199 -4.62002.50000-4.6200 GLOB UNIF PI-M-1
LOAD Z 01960199 2.50000-4.6200 -4.6200 GLOB UNIF PI-M-1
LOAD Z 04600022 -1.68000.66800-1.6800 GLOB UNIF PI-M-2
LOAD Z 00220455 0.50000-2.9008 -2.9008 GLOB UNIF PI-M-1
LOAD Z 04590038 -2.25750.66800-2.2575 GLOB UNIF PI-M-2
LOAD Z 00380454 1.25000-3.8980 -3.8980 GLOB UNIF PI-M-1
LOAD Z 04580039 -2.62500.66800-2.6250 GLOB UNIF PI-M-2
LOAD Z 00390453 1.25000-4.5325 -4.5325 GLOB UNIF PI-M-1
LOAD Z 04570050 -2.15250.66800-2.1525 GLOB UNIF PI-M-2
LOAD Z 00500452 1.25000-3.7166 -3.7166 GLOB UNIF PI-M-1
LOAD Z 04560051 -1.78500.66800-1.7850 GLOB UNIF PI-M-2
LOAD Z 00510451 1.25000-3.0821 -3.0821 GLOB UNIF PI-M-1
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B294 of 382

LOAD Z 04440060 -1.78500.66800-1.7850 GLOB UNIF PI-M-2


LOAD Z 00600443 1.25000-3.0821 -3.0821 GLOB UNIF PI-M-1
LOAD Z 04360118 -0.84000.66800-0.8400 GLOB UNIF PI-M-2
LOAD Z 01180098 1.25000-3.4447 -3.4447 GLOB UNIF PI-M-1
LOAD Z 01350201 1.25000-3.9886 -3.9886 GLOB UNIF PI-M-1
LOAD Z 01970139 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 01390200 1.25000-1.9943 -1.9943 GLOB UNIF PI-M-1
LOAD Z 01390200 -2.31001.25000-2.3100 GLOB UNIF PI-M-1
LOAD Z 01390200 1.25000-2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 01410197 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 01270143 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOAD Z 01430141 -2.3100 -2.3100 GLOB UNIF PI-M-1
LOADCNMDPO
***LDS1** 1.200 5.000 17.130 1.200 5.750 17.130 11.000
***LDS2** 5.000 17.130 11.000 5.750 17.130 5.180
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-1
LOAD Z T62M0078 -6.6342 -6.6342 GLOB UNIF PI-M-1
***LDS1** 1.200 -5.750 17.130 1.200 -5.000 17.130 11.000
***LDS2** -5.750 17.130 11.000 -5.000 17.130 5.180
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-1
LOAD Z 0079T62B -6.63420.29280-6.6342 GLOB UNIF PI-M-1
LOAD Z 0093T62L -2.8490 -2.8490 GLOB UNIF PI-M-1
LOAD Z 0099T62J -4.9210 -4.9210 GLOB UNIF PI-M-1
LOAD Z 0125T62K -5.6980 -5.6980 GLOB UNIF PI-M-1
LOAD Z 0446T62I -4.4030 -4.4030 GLOB UNIF PI-M-1
LOAD Z 0450T62C -4.4030 -4.4030 GLOB UNIF PI-M-1
LOAD Z 0466T62H -4.4030 -4.4030 GLOB UNIF PI-M-1
LOAD Z 0467T62G -5.3095 -5.3095 GLOB UNIF PI-M-1
LOAD Z 0468T62F -6.4750 -6.4750 GLOB UNIF PI-M-1
LOAD Z 0469T62E -5.5685 -5.5685 GLOB UNIF PI-M-1
LOAD Z 0470T62D -4.1440 -4.1440 GLOB UNIF PI-M-1
***LDS1** -1.000 -5.750 17.130 -1.000 5.750 17.130 1.200
***LDS2** -5.750 17.130 1.200 5.750 17.130 6.000
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-1
LOAD Z 0082T68H -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 0392T68J -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 03950425 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04250426 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04260427 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04270428 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 0428T68C -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 0429T68B -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04300431 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04310432 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04320433 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 04330392 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 01260196 -6.6000 -6.6000 GLOB UNIF PI-M-1
LOAD Z 0068T59Z -6.6000 -6.6000 GLOB UNIF PI-M-1
LOAD Z 0093T62L -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z T59Z0126 -6.6000 -6.6000 GLOB UNIF PI-M-1
LOAD Z T62L0127 -3.3000 -3.3000 GLOB UNIF PI-M-1
***LDS1** -1.900 5.750 17.130 -1.000 5.750 17.130 -1.900
***LDS2** -5.750 17.130 -1.000 -5.750 17.130 6.000
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-1
LOAD Z T62X0091 -2.2500 -2.2500 GLOB UNIF PI-M-1
LOAD Z T62Y0392 -4.5000 -4.5000 GLOB UNIF PI-M-1
LOAD Z T62Z0433 -4.5000 -4.5000 GLOB UNIF PI-M-1
LOAD Z T6300432 -5.2500 -5.2500 GLOB UNIF PI-M-1
LOAD Z T6310431 -6.7500 -6.7500 GLOB UNIF PI-M-1
LOAD Z T6320430 -7.5000 -7.5000 GLOB UNIF PI-M-1
LOAD Z T6330429 -7.5000 -7.5000 GLOB UNIF PI-M-1
LOAD Z T6340428 -7.5000 -7.5000 GLOB UNIF PI-M-1
LOAD Z T6350427 -6.7500 -6.7500 GLOB UNIF PI-M-1
LOAD Z T6360426 -5.2500 -5.2500 GLOB UNIF PI-M-1
LOAD Z T6370395 -4.5000 -4.5000 GLOB UNIF PI-M-1
LOAD Z T6380425 -4.5000 -4.5000 GLOB UNIF PI-M-1
LOAD Z T639T676 -2.2500 -2.2500 GLOB UNIF PI-M-1
***LDS1** 3.400 2.500 17.130 3.400 3.168 17.130 11.000
***LDS2** 2.500 17.130 11.000 3.168 17.130 3.000
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-2
LOAD Z 0096T63J -1.5000 -1.5000 GLOB UNIF PI-M-2
***LDS1** 3.400 -3.168 17.130 3.400 -2.500 17.130 11.000
***LDS2** -3.168 17.130 11.000 -2.500 17.130 3.000
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-2
LOAD Z T63A0097 -1.5000 -1.5000 GLOB UNIF PI-M-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B295 of 382

LOAD Z T63B0449 -2.5500 -2.5500 GLOB UNIF PI-M-2


LOAD Z T63C0465 -2.4000 -2.4000 GLOB UNIF PI-M-2
LOAD Z T63D0464 -3.2250 -3.2250 GLOB UNIF PI-M-2
LOAD Z T63E0463 -3.7500 -3.7500 GLOB UNIF PI-M-2
LOAD Z T63F0462 -3.0750 -3.0750 GLOB UNIF PI-M-2
LOAD Z T63G0461 -2.5500 -2.5500 GLOB UNIF PI-M-2
LOAD Z T63H0445 -2.5500 -2.5500 GLOB UNIF PI-M-2
LOAD Z T63I0094 -1.2000 -1.2000 GLOB UNIF PI-M-2
***LDS1** 3.400 2.500 17.130 4.200 2.500 17.130 3.400
***LDS2** -2.500 17.130 4.200 -2.500 17.130 3.000
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-2
LOAD Z 00940445 -3.7500 -3.7500 GLOB UNIF PI-M-2
LOAD Z 04360444 -3.7500 -3.7500 GLOB UNIF PI-M-2
LOAD Z 0438T63S -7.5000 -7.5000 GLOB UNIF PI-M-2
***LDS1** -15.000 5.750 17.130 -1.000 5.750 17.130 -15.000
***LDS2** 5.000 17.130 -1.000 5.000 17.130 1.030
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-3
LOAD Z 0081T5NV -0.7115 -0.7115 GLOB UNIF PI-M-3
LOAD Z 01020523 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z 0523T6B0 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T498T6AO -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T499T6AL -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T59NT5BE -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5BET62X -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5BP0102 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5NRT499 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5NVT5NR -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T433T5X2 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5X2T5X3 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5X30081 -0.4958 -0.4958 GLOB UNIF PI-M-3
LOAD Z 0390T6AM -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z 0391T6B1 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5840391 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5A0T584 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5OFT5X1 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5X1T5X4 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T5X40390 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T62X0091 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T62Y0392 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z 04150390 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 03900081 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 04140415 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 04130414 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 04120413 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 0411T67O -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 0410T67P -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 04090410 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 04080409 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 04070408 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 03930407 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z 00800393 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z T63TT6AP -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T63UT62Y -0.3862 -0.3862 GLOB UNIF PI-M-3
***LDS1** -3.588 5.000 17.130 -2.608 5.000 17.130 -3.654
***LDS2** 17.130 -2.608 17.130 0.600
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-5
LOAD Z 0422T581 2.37900-0.6750 -0.6750 GLOB UNIF PI-M-5
LOAD Z T581T6AS -0.6750 -0.6750 GLOB UNIF PI-M-5
LOAD Z T5SIT6AR 0.04620-0.5250 -0.5250 GLOB UNIF PI-M-5
LOAD Z T5SKT6AU -0.3750 -0.3750 GLOB UNIF PI-M-5
LOAD Z 0421T63Y 2.36250-0.7500 -0.7500 GLOB UNIF PI-M-5
LOAD Z T580T6AQ -0.4500 -0.4500 GLOB UNIF PI-M-5
LOAD Z T63TT6AP -0.2250 -0.2250 GLOB UNIF PI-M-5
LOAD Z T63VT630 -0.52500.06600-0.5250 GLOB UNIF PI-M-5
LOAD Z T63YT6AT -0.7500 -0.7500 GLOB UNIF PI-M-5
***LDS1** -6.000 -5.750 17.130 -1.000 -5.750 17.130 -6.000
***LDS2** -6.750 17.130 -1.000 -6.750 17.130 5.040
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-6
LOAD Z 0100T66T -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z 0519T64R -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z 0383T64S -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z T639T676 -2.5200 -2.5200 GLOB UNIF PI-M-6
***LDS1** -7.100 -3.500 17.130 -6.000 -3.500 17.130 -7.100
***LDS2** -6.750 17.130 -6.000 -6.750 17.130 6.000
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-6
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B296 of 382

LOAD Z T5A10394 -4.5000 -4.5000 GLOB UNIF PI-M-6


LOAD Z T5A50417 -2.2500 -2.2500 GLOB UNIF PI-M-6
LOAD Z T6410416 -4.5000 -4.5000 GLOB UNIF PI-M-6
LOAD Z T642T66U -5.2500 -5.2500 GLOB UNIF PI-M-6
LOAD Z T6430383 -3.0000 -3.0000 GLOB UNIF PI-M-6
***LDS1** -11.000 -4.250 17.130 -7.100 -4.250 17.130 -11.000
***LDS2** -5.000 17.130 -7.100 -5.000 17.130 1.800
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-4
LOAD Z 0393T5A3 -0.6750 -0.6750 GLOB UNIF PI-M-4
LOAD Z T5A3T64L -0.6750 -0.6750 GLOB UNIF PI-M-4
LOAD Z 0407T64M -0.6750 -0.6750 GLOB UNIF PI-M-4
LOAD Z 04170418 -1.1700 -1.1700 GLOB UNIF PI-M-7
LOAD Z 04180419 -1.1700 -1.1700 GLOB UNIF PI-M-7
LOAD Z 04190420 -1.1700 -1.1700 GLOB UNIF PI-M-7
LOAD Z 04200421 -1.1700 -1.1700 GLOB UNIF PI-M-7
LOAD Z 04210422 -1.1700 -1.1700 GLOB UNIF PI-M-7
***LDS1** -7.100 5.000 17.130 -6.000 5.000 17.130 -6.904
***LDS2** 2.500 17.130 -6.000 2.500 17.130 0.600
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-8
LOAD Z T5S7T5S8 -0.3000 -0.3000 GLOB UNIF PI-M-8
LOAD Z T5S80422 -0.3000 -0.3000 GLOB UNIF PI-M-8
LOAD Z 0415T5S5 3.95880-0.4500 -0.4500 GLOB UNIF PI-M-8
LOAD Z T5840391 -0.2250 -0.2250 GLOB UNIF PI-M-8
LOAD Z T5A0T584 -0.2250 -0.2250 GLOB UNIF PI-M-8
LOAD Z T5S5T5S6 -0.4500 -0.4500 GLOB UNIF PI-M-8
LOAD Z T5S60424 -0.4500 -0.4500 GLOB UNIF PI-M-8
LOAD Z 0414T585 4.01760-0.5250 -0.5250 GLOB UNIF PI-M-8
LOAD Z T5850423 -0.5250 -0.5250 GLOB UNIF PI-M-8
***LDS1** -16.500 -5.000 17.130 -15.000 -5.000 17.130 -16.500
***LDS2** -5.750 17.130 -15.000 -5.750 17.130 4.500
***LDS3** 0.250 0 1 3 0 0MDPO -2EQUPPRESPI-M-9
LOAD Z 0084T432 0.16000-1.6875 -1.6875 GLOB UNIF PI-M-9
LOAD Z 0388T5O6 -1.6875 -1.6875 GLOB UNIF PI-M-9
LOAD Z T64LT5A1 -0.6750 -0.6750 GLOB UNIF PI-M-4
LOAD Z T64MT641 -0.6750 -0.6750 GLOB UNIF PI-M-4
LOAD Z T64RT639 -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z T64S0387 -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z T66T0519 -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z T66U0100 -5.2500 -5.2500 GLOB UNIF PI-M-6
LOAD Z T6760082 -2.2500 -2.2500 GLOB UNIF PI-M-1
LOAD Z T6760082 -2.5200 -2.5200 GLOB UNIF PI-M-6
LOAD Z T67O0412 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z T67P0411 -0.7020 -0.7020 GLOB UNIF PI-M-4
LOAD Z T68B0430 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z T68C0429 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z T68H0395 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z T68J0091 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z T6ALT5BP -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T6AMT6AN -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T6ANT5A0 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T6AOT59N -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T6APT63U -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T6APT63U -0.2250 -0.2250 GLOB UNIF PI-M-5
LOAD Z T6AQT63W -0.4500 -0.4500 GLOB UNIF PI-M-5
LOAD Z T6ART63V -0.5250 -0.5250 GLOB UNIF PI-M-5
LOAD Z T6AST63X -0.6750 -0.6750 GLOB UNIF PI-M-5
LOAD Z T6ATT63Z -0.7500 -0.7500 GLOB UNIF PI-M-5
LOAD Z T6AUT640 -0.3750 -0.3750 GLOB UNIF PI-M-5
LOAD Z T6B0T498 -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z T6B1T63T -0.3862 -0.3862 GLOB UNIF PI-M-3
LOAD Z TTTU0447 1.25000-4.4030 -4.4030 GLOB UNIF PI-M-1
LOAD Z 0448TTTU -2.55000.66800-2.5500 GLOB UNIF PI-M-2
LOAD Z 01960199 -6.60002.50000-6.6000 GLOB UNIF PI-M-1
LOAD Z 01960199 2.50000-6.6000 -6.6000 GLOB UNIF PI-M-1
LOAD Z 04600022 -2.40000.66800-2.4000 GLOB UNIF PI-M-2
LOAD Z 00220455 0.50000-4.1440 -4.1440 GLOB UNIF PI-M-1
LOAD Z 04590038 -3.22500.66800-3.2250 GLOB UNIF PI-M-2
LOAD Z 00380454 1.25000-5.5685 -5.5685 GLOB UNIF PI-M-1
LOAD Z 04580039 -3.75000.66800-3.7500 GLOB UNIF PI-M-2
LOAD Z 00390453 1.25000-6.4750 -6.4750 GLOB UNIF PI-M-1
LOAD Z 04570050 -3.07500.66800-3.0750 GLOB UNIF PI-M-2
LOAD Z 00500452 1.25000-5.3095 -5.3095 GLOB UNIF PI-M-1
LOAD Z 04560051 -2.55000.66800-2.5500 GLOB UNIF PI-M-2
LOAD Z 00510451 1.25000-4.4030 -4.4030 GLOB UNIF PI-M-1
LOAD Z 04440060 -2.55000.66800-2.5500 GLOB UNIF PI-M-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B297 of 382

LOAD Z 00600443 1.25000-4.4030 -4.4030 GLOB UNIF PI-M-1


LOAD Z 04360118 -1.20000.66800-1.2000 GLOB UNIF PI-M-2
LOAD Z 01180098 1.25000-4.9210 -4.9210 GLOB UNIF PI-M-1
LOAD Z 01350201 1.25000-5.6980 -5.6980 GLOB UNIF PI-M-1
LOAD Z 01970139 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 01390200 1.25000-2.8490 -2.8490 GLOB UNIF PI-M-1
LOAD Z 01390200 -3.30001.25000-3.3000 GLOB UNIF PI-M-1
LOAD Z 01390200 1.25000-3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 01410197 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 01270143 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOAD Z 01430141 -3.3000 -3.3000 GLOB UNIF PI-M-1
LOADCNMDSA
LOAD Z 04120413 -2.7200 -2.7200 GLOB UNIF SA-1-M
LOAD Z 0411T67O -2.7200 -2.7200 GLOB UNIF SA-1-M
LOAD Z T5X1T5X2 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X4T5X3 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X6T5X5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X8T5X7 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00680093 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0080T5J0 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00820068 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00930125 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00990446 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0100T66T -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01110466 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01250099 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0446T677 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04500079 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04660467 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04670468 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04680469 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04690470 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04700450 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0519T64R -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5J0T6AH -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0079T62B -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00800393 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0081T5NV -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0082T68H -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00910199 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0096T63J -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0097T67X -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00980443 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01020523 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01030380 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01040372 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01120451 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01990200 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02000201 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02010525 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03720373 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03730374 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03740375 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03750080 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03800381 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03810382 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03820383 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03830100 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03900081 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0392T68J -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03930407 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03950425 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04070408 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04080409 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04090410 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0410T67P -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0411T67O -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04120413 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04130414 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04140415 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04150390 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04250426 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04260427 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04270428 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0428T68C -0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B298 of 382

LOAD Z 0429T68B -0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z 04300431 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04310432 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04320433 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04330392 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0443T67K -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04470078 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04510452 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04520453 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04530454 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04540455 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04550447 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0523T6B0 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 05250098 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0528T67W -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T498T6AO -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T499T6AL -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T59NT5BE -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BCT62M -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BDT63A -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BET62X -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BP0102 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NRT499 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NVT5NR -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00810368 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00830384 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0084T432 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0088T5NT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0091T68I -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00940440 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00940445 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01000394 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01020369 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0105T5NL -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0106T433 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01260127 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01270128 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01280094 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01960197 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01970198 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01980436 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02260465 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02270460 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02290463 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02300458 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03680088 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03690105 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03700092 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03840385 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03850386 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03860387 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03870082 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03910102 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0394T64P -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0400T5O9 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0404T5OC -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0409T64H -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0413T64F -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04160417 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04170418 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04180419 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0418T64W -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04190420 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04200421 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04210422 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04220423 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0422T581 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04230424 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04240391 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04270126 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04310196 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04360444 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04380437 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04400438 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04440456 -0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B299 of 382

LOAD Z 04450461 -0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z 04480096 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04490097 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04560457 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04570230 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04580459 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04590227 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04600448 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04610462 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04620229 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04630464 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04640226 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04650449 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T3300105 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T432T5IV -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T433T5OF -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T433T5X2 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T500T68P -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T581T6AS -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BOT330 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BPT5BO -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IVT6B3 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NLT5NM -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NNT5NM -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NOT5NN -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NPT330 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NPT5NO -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NQT5NP -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NRT5NQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NTT5NP -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O5T68Q -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O6T432 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O7T5O6 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O8T5O7 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O90409 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O9T5O8 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OAT5O9 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OBT68R -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OC0413 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OCT5OB -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5ODT5OC -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OET5OD -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OFT5OE -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OGT432 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OHT5OG -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OIT5OH -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OJT5OI -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5S7T5S8 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5S80422 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X2T5X3 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X30081 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0087T500 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02180221 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02210528 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02260221 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02290218 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0376T5OJ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0438T63S -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T500T5IP -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5AM0372 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5ART5IR -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IP0104 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IRT5AM -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OJT5AR -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0103T5OY -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01260196 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0371T5NS -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0372T5IW -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0375T5IZ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0379T5OG -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0380T6AK -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0381T587 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0382T58D -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0383T64S -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0390T6AM -0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B300 of 382

LOAD Z 0391T6B1 -0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z 0393T5A3 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0394T6AZ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0402T5O5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04110420 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0415T5S5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0420T5SJ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0423T5SH -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5840391 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T587T58A -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T588T5SV -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5890385 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T58AT5ST -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T58B0386 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T58CT59O -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T58DT58B -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T58ET5SU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T59O0384 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5A0T584 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5A10394 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5A3T64L -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5ALT6B2 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5ANT643 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5AOT663 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5AQT5IU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5AST6AI -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5ATT662 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IUT5AL -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IWT5AT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IZT5AS -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NS0368 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O50411 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OGT5AQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OUT5OW -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OVT5OZ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OWT5UN -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OXT5P0 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OYT5OT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OZT5OU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5P0T5OW -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5S5T5S6 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5S60424 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SHT5SI -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SIT6AR -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SJT5SK -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SKT6AU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5STT588 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SUT5SW -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SVT589 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5SWT58C -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5UNT5OT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00840388 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00870376 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01050092 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01060371 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03710090 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03760377 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03770378 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03780379 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03790084 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03880398 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03890106 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03980399 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03990400 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04000401 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04010402 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04020403 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04030404 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04040405 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04050406 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04060389 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T433T5NS -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5B5T5LQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IPT5J2 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IQT5J3 -0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B301 of 382

LOAD Z T5IRT5IP -0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z T5IST5IR -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5ITT5IS -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IUT5IT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IVT5IU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IWT5IQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IXT5IW -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IYT5IX -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IZT5IY -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5J0T5IZ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NST5B5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NTT5LR -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NUT5NT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NVT5NU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0068T59Z -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0090T5B5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0093T62L -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0099T62J -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0104T5IQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0125T62K -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0368T5NU -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 03690370 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0373T5IX -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0374T5IY -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0377T5OI -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0378T5OH -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0388T5O6 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0389T5OF -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0398T5O7 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0399T5O8 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0401T5OA -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0403T5OB -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0405T5OD -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0406T5OE -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0407T64M -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0408T5A4 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0410T64I -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04120421 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0414T585 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0416T6AY -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0417T6AX -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0421T63Y -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0424T580 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0446T62I -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0450T62C -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0466T62H -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0467T62G -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0468T62F -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0469T62E -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0470T62D -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T580T6AQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5850423 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T59Z0126 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5A4T5A5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5A50417 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5B50088 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BO0369 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IQT5OV -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IS0373 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IT0374 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IXT664 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5IYT665 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NOT5NL -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NQT5BO -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5NUT5NQ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O60393 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O7T5X8 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5O8T5X7 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OA0410 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OB0412 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OD0414 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OE0415 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OFT5X1 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OHT5IT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OIT5IS -0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B302 of 382

LOAD Z T5OVT5OX -0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z T5OX0103 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5OZT5P0 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5P0T5OY -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X1T5X4 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X40390 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X50408 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X60407 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X7T5X5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5X8T5X6 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01030532 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0532T5BF -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 06480083 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T5BF0648 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD 0127 -1.0000 GLOB JOIN SA-2-M
LOAD T5BO -1.0000 GLOB JOIN SA-2-M
LOAD Z T62BT5BD -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62CT63B -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62DT63C -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62ET63D -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62FT63E -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62GT63F -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62HT63G -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62IT63H -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62JT63I -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62K0128 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62L0127 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62M0078 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62X0091 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62Y0392 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T62Z0433 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6300432 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6310431 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6320430 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6330429 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6340428 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6350427 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6360426 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6370395 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6380425 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T639T676 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63A0097 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63B0449 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63C0465 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63D0464 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63E0463 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63F0462 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63G0461 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63H0445 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63I0094 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63JT5BC -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63S0218 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63TT6AP -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63UT62Y -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63VT630 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63WT62Z -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63XT631 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63YT6AT -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T63ZT632 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T640T633 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6410416 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T642T66U -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6430383 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64FT5S7 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64H0418 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64I0419 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64LT5A1 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64MT641 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64P0416 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64RT639 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64S0387 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64WT6AW -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T64XT6AV -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T662T5AO -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6630380 -0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B303 of 382

LOAD Z T664T666 -0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z T665T667 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6660381 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6670382 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T66T0519 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T66U0100 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6760082 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6770111 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T67K0112 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T67O0412 -2.7200 -2.7200 GLOB UNIF SA-1-M
LOAD Z T67O0412 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T67P0411 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T67X0528 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68B0430 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68C0429 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68H0395 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68I0370 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68J0091 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68PT5OJ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68QT5OA -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T68RT5O5 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AHT6AJ -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AIT5AN -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AJT642 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AKT58E -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6ALT5BP -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AMT6AN -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6ANT5A0 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AOT59N -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6APT63U -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AQT63W -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6ART63V -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AST63X -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6ATT63Z -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AUT640 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AVT634 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AWT635 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AXT636 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AYT638 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6AZT637 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6B0T498 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6B1T63T -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6B20375 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T6B30080 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0448TTTU -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z TTTU0447 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 0448TTTU 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01960199 -0.01632.50000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 01960199 2.50000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02210017 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00170227 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z T67W0018 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00180096 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 02180020 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00200230 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04370021 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00210436 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 04600022 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04600022 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00220455 0.50000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00220455 -0.01630.50000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04590038 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04590038 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00380454 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00380454 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04580039 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04580039 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00390453 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00390453 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04570050 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04570050 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00500452 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00500452 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04560051 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04560051 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B304 of 382

LOAD Z 00510451 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK


LOAD Z 00510451 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04440060 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04440060 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00600443 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 00600443 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04360118 -0.01630.66800-0.0163 GLOB UNIF SAF-BULK
LOAD Z 04360118 0.66800-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01180098 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01180098 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 01980135 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01350201 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 01350201 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01970139 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01390200 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOAD Z 01390200 1.25000-0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01400198 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01410197 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01280142 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01420140 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01270143 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z 01430141 -0.0163 -0.0163 GLOB UNIF SAF-BULK
LOAD Z TTTU0447 -0.01631.25000-0.0163 GLOB UNIF SAF-BULK
LOADCNMDST
LOAD 0081 -8.0000 GLOB JOIN DIAM-ME
LOAD 0080 -8.0000 GLOB JOIN DIAM-ME
LOAD 0079 -8.0000 GLOB JOIN DIAM-ME
LOAD 0078 -8.0000 GLOB JOIN DIAM-ME
LOAD 0092 -8.0000 GLOB JOIN DIAM-ME
LOAD 0528 -4.5000 GLOB JOIN WING-ME
LOAD 0466 -4.5000 GLOB JOIN WING-ME
LOAD 0451 -4.5000 GLOB JOIN WING-ME
LOAD 0091 -4.5000 GLOB JOIN WING-ME
LOAD 0429 -4.5000 GLOB JOIN WING-ME
LOAD 0082 -4.5000 GLOB JOIN WING-ME
LOAD 0083 -4.5000 GLOB JOIN WING-ME
LOAD 0532 -4.5000 GLOB JOIN WING-ME
LOAD 0103 -4.5000 GLOB JOIN WING-ME
LOAD 0104 -4.5000 GLOB JOIN WING-ME
LOAD T500 -4.5000 GLOB JOIN WING-ME
LOAD T432 -4.5000 GLOB JOIN WING-ME
LOAD 0100 -4.5000 GLOB JOIN WING-ME
LOAD 0411 -4.5000 GLOB JOIN WING-ME
LOAD T5O5 -4.5000 GLOB JOIN WING-ME
LOAD T433 -4.5000 GLOB JOIN WING-ME
LOAD T499 -4.5000 GLOB JOIN WING-ME
LOAD T498 -4.5000 GLOB JOIN WING-ME
LOAD 0102 -4.5000 GLOB JOIN WING-ME
***LDS1** -1.000 5.750 17.130 11.000 5.750 17.130 -1.000
***LDS2** 2.500 17.130 11.000 2.500 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 00910199 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 00980443 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01120451 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01990200 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 02000201 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 02010525 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 0443T67K -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04470078 -1.8861 -1.8861 GLOB UNIF PL8
LOAD Z 04510452 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04520453 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04530454 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04540455 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04550447 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 05250098 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01960197 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01970198 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01980436 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 02270460 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 02300458 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04310196 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04360444 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04440456 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04480096 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04560457 -1.0237 -1.0237 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B305 of 382

LOAD Z 04570230 -1.0237 -1.0237 GLOB UNIF PL8


LOAD Z 04580459 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04590227 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04600448 -1.0237 -1.0237 GLOB UNIF PL8
***LDS1** -1.000 -2.500 17.130 11.000 -2.500 17.130 -1.000
***LDS2** -5.750 17.130 11.000 -5.750 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 00680093 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 00820068 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 00930125 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 00990446 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01110466 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01250099 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 0446T677 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04500079 -1.8861 -1.8861 GLOB UNIF PL8
LOAD Z 04660467 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04670468 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04680469 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04690470 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04700450 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 00940445 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01260127 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01270128 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 01280094 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 02260465 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 02290463 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04270126 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04450461 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04490097 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04610462 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04620229 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04630464 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04640226 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z 04650449 -1.0237 -1.0237 GLOB UNIF PL8
***LDS1** -1.000 2.500 17.130 3.400 2.500 17.130 -1.000
***LDS2** -2.500 17.130 3.400 -2.500 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 01260127 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 01270128 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 01280094 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 01960197 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 01970198 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 01980436 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 04270126 -1.5750 -1.5750 GLOB UNIF PL8
LOAD Z 04310196 -1.5750 -1.5750 GLOB UNIF PL8
***LDS1** -16.500 8.000 17.130 -1.000 8.000 17.130 -16.500
***LDS2** 5.750 17.130 -1.000 5.750 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 0081T5NV -0.5803 -0.5803 GLOB UNIF PL8
LOAD Z 01020523 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0523T6B0 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T498T6AO -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T499T6AL -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T59NT5BE -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5BET62X -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5BP0102 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5NRT499 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5NVT5NR -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T62X0091 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0088T5NT -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0106T433 0.16000-0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T3300105 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T433T5X2 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5NPT330 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5NTT5NP -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5X2T5X3 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5X30081 -0.4044 -0.4044 GLOB UNIF PL8
LOAD Z 0371T5NS -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5NS0368 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 01050092 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0090T5B5 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0368T5NU -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 03690370 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5B50088 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5BO0369 -0.7087 -0.7087 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B306 of 382

LOAD Z T5NQT5BO -0.7087 -0.7087 GLOB UNIF PL8


LOAD Z T5NUT5NQ -0.7087 -0.7087 GLOB UNIF PL8
***LDS1** -16.500 5.750 17.130 -1.000 5.750 17.130 -16.500
***LDS2** 5.000 17.130 -1.000 5.000 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 0081T5NV -0.4352 -0.4352 GLOB UNIF PL8
LOAD Z 01020523 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0523T6B0 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T498T6AO -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T499T6AL -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T59NT5BE -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5BET62X -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5BP0102 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5NRT499 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5NVT5NR -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T62X0091 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0106T433 0.16000-0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T433T5X2 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X2T5X3 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X30081 -0.3033 -0.3033 GLOB UNIF PL8
LOAD Z 0390T6AM -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0391T6B1 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5840391 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5A0T584 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T62Y0392 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T63TT6AP -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T63UT62Y -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0389T5OF -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5OFT5X1 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X1T5X4 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X40390 -0.2362 -0.2362 GLOB UNIF PL8
***LDS1** -16.500 5.000 17.130 -1.000 5.000 17.130 -16.500
***LDS2** -5.750 17.130 -1.000 -5.750 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 0080T5J0 -0.3062 -0.3062 GLOB UNIF PL8
LOAD Z 0100T66T -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0519T64R -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5J0T6AH -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T639T676 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T642T66U -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T64RT639 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0084T432 0.16000-0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0400T5O9 0.16000-0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0404T5OC 0.16000-0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0409T64H -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0413T64F -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0418T64W -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0422T581 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T432T5IV -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T581T6AS -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IVT6B3 -0.2787 -0.2787 GLOB UNIF PL8
LOAD Z T5O90409 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5OC0413 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5S7T5S8 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5S80422 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T6310431 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T6350427 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T63XT631 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T64FT5S7 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T64H0418 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T64WT6AW -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0390T6AM -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0391T6B1 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0393T5A3 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0394T6AZ -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0402T5O5 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 04110420 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0415T5S5 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0420T5SJ -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0423T5SH -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5840391 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5A0T584 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5A10394 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5A3T64L -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5O50411 -0.7875 -0.7875 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B307 of 382

LOAD Z T5S5T5S6 -0.4725 -0.4725 GLOB UNIF PL8


LOAD Z T5S60424 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5SHT5SI -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5SIT6AR -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5SJT5SK -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T5SKT6AU -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T62Y0392 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6300432 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T6330429 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T6370395 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T63TT6AP -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T63UT62Y -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T63VT630 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T640T633 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T64LT5A1 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0388T5O6 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0389T5OF -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z 0398T5O7 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0399T5O8 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0401T5OA -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0403T5OB -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0405T5OD -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0406T5OE -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0407T64M -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0408T5A4 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0410T64I -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 04120421 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0414T585 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0416T6AY -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z 0417T6AX -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z 0419T64X -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0421T63Y -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z 0424T580 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T580T6AQ -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5850423 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5A4T5A5 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5A50417 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5O60393 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5O7T5X8 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5O8T5X7 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5OA0410 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T5OB0412 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T5OD0414 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5OE0415 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5OFT5X1 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X1T5X4 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X40390 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T5X50408 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5X60407 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T5X7T5X5 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T5X8T5X6 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T62Z0433 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T6320430 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T6340428 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T6360426 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T6380425 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T63WT62Z -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T63YT6AT -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T63ZT632 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T6410416 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T64I0419 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T64MT641 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T64XT6AV -0.7875 -0.7875 GLOB UNIF PL8
***LDS1** -16.500 -5.750 17.130 -1.000 -5.750 17.130 -16.500
***LDS2** -11.000 17.130 -1.000 -11.000 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z 0080T5J0 -0.4083 -0.4083 GLOB UNIF PL8
LOAD Z 0100T66T -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0519T64R -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5J0T6AH -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T639T676 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T642T66U -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T64RT639 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z 0084T432 0.16000-0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T432T5IV -0.3150 -0.3150 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B308 of 382

LOAD Z T5IVT6B3 -0.3716 -0.3716 GLOB UNIF PL8


LOAD Z 0087T500 0.16000-0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0376T5OJ -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T500T5IP -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5AM0372 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5ART5IR -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IP0104 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5IRT5AM -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5OJT5AR -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0372T5IW -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0375T5IZ -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0379T5OG -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0380T6AK -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z 0381T587 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0382T58D -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0383T64S -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T587T58A -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T588T5SV -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5890385 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T58AT5ST -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T58B0386 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T58CT59O -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T58DT58B -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T58ET5SU -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T59O0384 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5ALT6B2 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ANT643 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5AOT663 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5AQT5IU -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5AST6AI -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5ATT662 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IUT5AL -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IWT5AT -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5IZT5AS -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5OGT5AQ -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5STT588 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5SUT5SW -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T5SVT589 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5SWT58C -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T6430383 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T64S0387 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0104T5IQ -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0373T5IX -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0374T5IY -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0377T5OI -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z 0378T5OH -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IQT5OV -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5IS0373 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IT0374 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IXT664 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5IYT665 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5OHT5IT -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5OIT5IS -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5OVT5OX -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5OX0103 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 01030532 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 0532T5BF -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z 06480083 -0.3937 -0.3937 GLOB UNIF PL8
LOAD Z T5BF0648 -0.3937 -0.3937 GLOB UNIF PL8
***LDS1** -8.350 -11.000 17.130 -6.000 -11.000 17.130 -8.350
***LDS2** -13.000 17.130 -6.000 -13.000 17.130 0.630
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL8
LOAD Z T5OUT5OW -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OWT5UN -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5UNT5OT -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OVT5OX -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OX0103 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T5OZT5P0 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T5P0T5OY -0.6300 -0.6300 GLOB UNIF PL8
***LDS1** -9.500 10.000 17.130 -6.000 10.000 17.130 -9.500
***LDS2** 8.000 17.130 -6.000 8.000 17.130 0.940
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESPL12
LOAD Z T3300105 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5NNT5NM -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5NPT330 -0.4700 -0.4700 GLOB UNIF PL12
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B309 of 382

LOAD Z T5NOT5NL -0.9400 -0.9400 GLOB UNIF PL12


LOAD Z 0096T63J -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T63JT5BC -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5BCT62M -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T62M0078 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T63A0097 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5BDT63A -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04500079 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0079T62B -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T62BT5BD -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04700450 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04690470 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04680469 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04670468 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04660467 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0446T677 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00990446 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 01250099 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00930125 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00680093 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00820068 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03870082 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03860387 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03850386 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03840385 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00830384 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0528T67W -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0097T67X -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04470078 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04550447 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04540455 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04530454 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04520453 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04510452 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0443T67K -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00980443 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 05250098 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 02010525 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 02000201 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 01990200 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03700092 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00910199 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 01050092 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0105T5NL -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5NLT5NM -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5NNT5NM -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5NOT5NN -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5NPT5NO -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5NTT5NP -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0088T5NT -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5B50088 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0090T5B5 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03710090 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 01060371 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03890106 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04060389 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04050406 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04040405 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04030404 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04020403 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04010402 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 04000401 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03990400 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03980399 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03880398 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00840388 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03790084 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03780379 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03770378 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 03760377 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00870376 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0087T500 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T500T5IP -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5IP0104 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0104T5IQ -0.3240 -0.3240 GLOB UNIF HRAIL-ME
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B310 of 382

LOAD Z T5IQT5OV -0.3240 -0.3240 GLOB UNIF HRAIL-ME


LOAD Z T5OVT5OZ -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5OZT5OU -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5OUT5OW -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5OWT5UN -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5UNT5OT -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5OYT5OT -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0103T5OY -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 01030532 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 06480083 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T5BF0648 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 0532T5BF -0.3240 -0.3240 GLOB UNIF HRAIL-ME
***LDS1** 3.400 2.500 17.130 11.000 2.500 17.130 3.400
***LDS2** -2.500 17.130 11.000 -2.500 17.130 0.831
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESHATCH
LOAD Z 00940445 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 02260465 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 02270460 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 02290463 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 02300458 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04360444 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04440456 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04450461 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04480096 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04490097 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04560457 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04570230 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04580459 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04590227 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04600448 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04610462 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04620229 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04630464 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04640226 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 04650449 -1.0387 -1.0387 GLOB UNIF HATCH
LOAD Z 02180221 -2.0775 -2.0775 GLOB UNIF HATCH
LOAD Z 02210528 -2.0775 -2.0775 GLOB UNIF HATCH
LOAD Z 0438T63S -2.0775 -2.0775 GLOB UNIF HATCH
LOAD Z T63S0218 -2.0775 -2.0775 GLOB UNIF HATCH
LOAD Z T662T5AO -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T6630380 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T664T666 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T665T667 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T6660381 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T6670382 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T66T0519 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T66T0519 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T66U0100 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T66U0100 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6760082 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6760082 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6770111 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T6770111 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T67K0112 -1.0237 -1.0237 GLOB UNIF PL8
LOAD Z T67K0112 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T67X0528 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T6AHT6AJ -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6AHT6AJ -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AIT5AN -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T6AJT642 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6AJT642 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AKT58E -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T6ALT5BP -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6ALT5BP -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6AMT6AN -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6AMT6AN -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6ANT5A0 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6ANT5A0 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6AOT59N -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6AOT59N -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6APT63U -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6APT63U -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6AQT63W -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T6ART63V -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T6AST63X -0.7087 -0.7087 GLOB UNIF PL8
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B311 of 382

LOAD Z T6ATT63Z -0.7875 -0.7875 GLOB UNIF PL8


LOAD Z T6AUT640 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T6AVT634 -0.7875 -0.7875 GLOB UNIF PL8
LOAD Z T6AWT635 -0.7087 -0.7087 GLOB UNIF PL8
LOAD Z T6AXT636 -0.5512 -0.5512 GLOB UNIF PL8
LOAD Z T6AYT638 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T6AZT637 -0.4725 -0.4725 GLOB UNIF PL8
LOAD Z T6B0T498 -0.3150 -0.3150 GLOB UNIF PL8
LOAD Z T6B0T498 -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6B1T63T -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6B1T63T -0.2362 -0.2362 GLOB UNIF PL8
LOAD Z T6B20375 -0.6300 -0.6300 GLOB UNIF PL8
LOAD Z T6B30080 -0.2787 -0.2787 GLOB UNIF PL8
LOAD Z T6B30080 -0.3716 -0.3716 GLOB UNIF PL8
***LDS1** -15.000 5.750 14.730 -11.000 5.750 14.730 -15.000
***LDS2** -5.750 14.730 -11.000 -5.750 14.730 1.369
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESLER
LOAD Z T432T5IV -0.5133 -0.5133 GLOB UNIF LER
LOAD Z T433T5X2 -0.5133 -0.5133 GLOB UNIF LER
LOAD Z T5IVT6B3 -0.5133 -0.5133 GLOB UNIF LER
LOAD Z T5O90409 -1.5401 -1.5401 GLOB UNIF LER
LOAD Z T5OC0413 -1.5401 -1.5401 GLOB UNIF LER
LOAD Z T5X2T5X3 -0.5133 -0.5133 GLOB UNIF LER
LOAD Z T5X30081 -0.6590 -0.6590 GLOB UNIF LER
LOAD Z T6B30080 -0.9728 -0.9728 GLOB UNIF LER
LOAD Z T5O50411 -1.7112 -1.7112 GLOB UNIF LER
LOAD Z T5O60393 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5O7T5X8 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5O8T5X7 -1.1979 -1.1979 GLOB UNIF LER
LOAD Z T5OA0410 -1.7112 -1.7112 GLOB UNIF LER
LOAD Z T5OB0412 -1.7112 -1.7112 GLOB UNIF LER
LOAD Z T5OD0414 -1.1979 -1.1979 GLOB UNIF LER
LOAD Z T5OE0415 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5OFT5X1 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5X1T5X4 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5X40390 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5X50408 -1.1979 -1.1979 GLOB UNIF LER
LOAD Z T5X60407 -1.0267 -1.0267 GLOB UNIF LER
LOAD Z T5X7T5X5 -1.1979 -1.1979 GLOB UNIF LER
LOAD Z T5X8T5X6 -1.0267 -1.0267 GLOB UNIF LER
***LDS1** -15.000 -5.750 14.730 -9.000 -5.750 14.730 -15.000
***LDS2** -9.750 14.730 -9.000 -9.750 14.730 2.625
***LDS3** 0.250 0 1 3 0 0MDST -2EQUPPRESACCOM
LOAD Z 0080T5J0 -1.7015 -1.7015 GLOB UNIF ACCOM
LOAD Z T432T5IV -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z T5IVT6B3 -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z T6B30080 -2.4873 -2.4873 GLOB UNIF ACCOM
LOAD Z T5AM0372 -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z T5ART5IR -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z T5IRT5AM -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z T5OJT5AR -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z 0372T5IW -1.3125 -1.3125 GLOB UNIF ACCOM
LOAD Z 0375T5IZ -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5ALT6B2 -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5AQT5IU -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5IUT5AL -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5OGT5AQ -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T6B20375 -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z 0373T5IX -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z 0374T5IY -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5IS0373 -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5IT0374 -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5OHT5IT -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5OIT5IS -2.6250 -2.6250 GLOB UNIF ACCOM
LOAD Z T5ANT6AJ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X1T5X2 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X4T5X3 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X6T5X5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X8T5X7 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T662T668 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T663T669 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T664T66A -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T666T66B -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T668T664 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T668T669 -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B312 of 382

LOAD Z T669T666 -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z T66AT665 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T66AT66B -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T66BT667 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AIT6AH -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AKT587 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AMT6AL -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ANT5BP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6B1T6B0 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6B2T6B3 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00680093 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0080T5J0 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00820068 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00930125 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00990446 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0100T66T -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01250099 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0446T677 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04500079 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04660467 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04670468 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04680469 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04690470 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04700450 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0519T64R -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5J0T6AH -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T639T676 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T642T66U -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64RT639 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T66T0519 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T66U0100 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6760082 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AHT6AJ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AJT642 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0079T62B -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00800393 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0081T5NV -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0082T68H -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00910199 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0096T63J -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0097T67X -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00980443 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01020523 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01030380 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01040372 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01990200 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02000201 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02010525 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03720373 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03730374 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03740375 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03750080 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03800381 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03810382 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03820383 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03830100 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03900081 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0392T68J -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03930407 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03950425 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04070408 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04080409 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04090410 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0410T67P -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04120413 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04130414 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04140415 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04150390 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04250426 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04260427 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04270428 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0428T68C -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0429T68B -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04300431 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04310432 -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B313 of 382

LOAD Z 04320433 -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z 04330392 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0443T67K -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04470078 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04510452 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04520453 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04530454 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04540455 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04550447 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0523T6B0 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 05250098 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0528T67W -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T498T6AO -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T499T6AL -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T59NT5BE -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BCT62M -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BDT63A -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BET62X -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BP0102 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NRT499 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NVT5NR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62BT5BD -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62M0078 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62X0091 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63A0097 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63JT5BC -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T67O0412 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T67X0528 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68B0430 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68C0429 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68H0395 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68J0091 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ALT5BP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AOT59N -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6B0T498 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00810368 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00830384 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0084T432 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0088T5NT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00940440 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00940445 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01000394 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01020369 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0105T5NL -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0106T433 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01260127 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01270128 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01280094 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01960197 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01970198 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01980436 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02260465 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02270460 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02290463 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02300458 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03680088 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03690105 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03700092 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03840385 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03850386 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03860387 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03870082 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03910102 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0394T64P -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0400T5O9 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0404T5OC -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0409T64H -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0413T64F -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04160417 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04170418 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04180419 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0418T64W -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04190420 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04200421 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04210422 -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B314 of 382

LOAD Z 04220423 -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z 0422T581 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04230424 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04240391 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04270126 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04310196 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04360444 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04380437 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04400438 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04440456 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04450461 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04480096 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04490097 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04560457 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04570230 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04580459 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04590227 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04600448 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04610462 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04620229 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04630464 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04640226 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04650449 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T3300105 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T432T5IV -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T433T5OF -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T433T5X2 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T500T68P -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T581T6AS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BOT330 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BPT5BO -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IVT6B3 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NLT5NM -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NNT5NM -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NOT5NN -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NPT330 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NPT5NO -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NQT5NP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NRT5NQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NTT5NP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O5T68Q -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O6T432 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O7T5O6 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O8T5O7 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O90409 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O9T5O8 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OAT5O9 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OBT68R -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OC0413 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OCT5OB -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5ODT5OC -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OET5OD -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OFT5OE -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OGT432 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OHT5OG -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OIT5OH -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OJT5OI -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5S7T5S8 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5S80422 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X2T5X3 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X30081 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6310431 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6350427 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63XT631 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64FT5S7 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64H0418 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64P0416 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64WT6AW -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68I0370 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68PT5OJ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68QT5OA -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T68RT5O5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AST63X -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AWT635 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6B30080 -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B315 of 382

LOAD Z 0087T500 -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z 02180221 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02210528 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02260221 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02290218 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0376T5OJ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0438T63S -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T500T5IP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5AM0372 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5ART5IR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IP0104 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IRT5AM -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OJT5AR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63S0218 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6APT6AO -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AQT6AP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ART6AQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AST6AR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ATT6AS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AUT6AT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AVT6AU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AWT6AV -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01120451 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T67K0112 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01110466 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6770111 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0411T67O -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T67P0411 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0091T68I -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0103T5OY -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01260196 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0371T5NS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0372T5IW -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0375T5IZ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0379T5OG -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0380T6AK -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0381T587 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0382T58D -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0383T64S -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0390T6AM -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0391T6B1 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0393T5A3 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0394T6AZ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0402T5O5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04110420 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0415T5S5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0420T5SJ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0423T5SH -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0424T580 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T580T6AQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5840391 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T587T58A -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T588T5SV -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5890385 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T58AT5ST -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T58B0386 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T58CT59O -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T58DT58B -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T58ET5SU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T59O0384 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5A0T584 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5A10394 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5A3T64L -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5ALT6B2 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5ANT643 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5AOT663 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5AQT5IU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5AST6AI -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5ATT662 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IQT5OV -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IUT5AL -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IWT5AT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IZT5AS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NS0368 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O50411 -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B316 of 382

LOAD Z T5OGT5AQ -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z T5OUT5OW -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OVT5OX -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OVT5OZ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OWT5UN -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OX0103 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OXT5P0 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OYT5OT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OZT5OU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5P0T5OW -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5S5T5S6 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5S60424 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SHT5SI -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SIT6AR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SJT5SK -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SKT6AU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5STT588 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SUT5SW -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SVT589 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5SWT58C -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5UNT5OT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62Y0392 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62Z0433 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6300432 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6330429 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6370395 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63TT6AP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63UT62Y -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63VT630 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63WT62Z -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T640T633 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6430383 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64LT5A1 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64S0387 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T662T5AO -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6630380 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AIT5AN -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AKT58E -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AMT6AN -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ANT5A0 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6APT63U -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AQT63W -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ART63V -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AUT640 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AZT637 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6B1T63T -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6B20375 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00840388 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00870376 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01050092 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01060371 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03710090 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03760377 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03770378 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03780379 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03790084 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03880398 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03890106 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03980399 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03990400 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04000401 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04010402 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04020403 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04030404 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04040405 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04050406 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04060389 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T433T5NS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5B5T5LQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IPT5J2 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IQT5J3 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IRT5IP -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IST5IR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5ITT5IS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IUT5IT -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B317 of 382

LOAD Z T5IVT5IU -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z T5IWT5IQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IXT5IW -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IYT5IX -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IZT5IY -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5J0T5IZ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NST5B5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NTT5LR -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NUT5NT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NVT5NU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0068T59Z -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0090T5B5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0093T62L -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0099T62J -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0104T5IQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0125T62K -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0368T5NU -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 03690370 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0373T5IX -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0374T5IY -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0377T5OI -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0378T5OH -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0388T5O6 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0389T5OF -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0398T5O7 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0399T5O8 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0401T5OA -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0403T5OB -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0405T5OD -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0406T5OE -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0407T64M -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0408T5A4 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0410T64I -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04120421 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0414T585 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0416T6AY -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0417T6AX -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0419T64X -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0421T63Y -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0446T62I -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0450T62C -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0466T62H -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0467T62G -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0468T62F -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0469T62E -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0470T62D -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5850423 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T59Z0126 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5A4T5A5 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5A50417 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5B50088 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BO0369 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IS0373 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IT0374 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IXT664 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5IYT665 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NOT5NL -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NQT5BO -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5NUT5NQ -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O60393 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O7T5X8 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5O8T5X7 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OA0410 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OB0412 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OD0414 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OE0415 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OFT5X1 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OHT5IT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OIT5IS -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5OZT5P0 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5P0T5OY -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X1T5X4 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X40390 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X50408 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5X60407 -0.0446 -0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B318 of 382

LOAD Z T5X7T5X5 -0.0446 -0.0446 GLOB UNIF EQ-SUP


LOAD Z T5X8T5X6 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62CT63B -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62DT63C -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62ET63D -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62FT63E -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62GT63F -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62HT63G -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62IT63H -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62JT63I -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62K0128 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T62L0127 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6320430 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6340428 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6360426 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6380425 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63B0449 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63C0465 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63D0464 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63E0463 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63F0462 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63G0461 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63H0445 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63I0094 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63YT6AT -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T63ZT632 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6410416 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64I0419 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64MT641 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64XT6AV -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T664T666 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T665T667 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6660381 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6670382 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6ATT63Z -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AVT634 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AXT636 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T6AYT638 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01030532 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0532T5BF -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 06480083 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T5BF0648 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64HT64J -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64JT64I -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64LT64N -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64NT64M -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64WT64Y -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T64YT64X -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0448TTTU -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z TTTU0447 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 0448TTTU 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01960199 -0.04462.50000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 01960199 2.50000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02210017 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00170227 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z T67W0018 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z T67W0018 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00180096 -0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00180096 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 02180020 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00200230 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04370021 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00210436 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 04600022 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04600022 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00220455 0.50000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00220455 -0.04460.50000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04590038 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04590038 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00380454 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00380454 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04580039 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04580039 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00390453 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00390453 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B319 of 382

LOAD Z 04570050 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP


LOAD Z 04570050 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00500452 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00500452 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04560051 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04560051 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00510451 1.25000-0.3240 -0.3240 GLOB UNIF HRAIL-ME
LOAD Z 00510451 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00510451 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04440060 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04440060 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00600443 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 00600443 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04360118 -0.04460.66800-0.0446 GLOB UNIF EQ-SUP
LOAD Z 04360118 0.66800-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01180098 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01180098 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 01980135 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01350201 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 01350201 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01970139 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01390200 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
LOAD Z 01390200 1.25000-0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01400198 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01410197 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01280142 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01420140 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01270143 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z 01430141 -0.0446 -0.0446 GLOB UNIF EQ-SUP
LOAD Z TTTU0447 -0.04461.25000-0.0446 GLOB UNIF EQ-SUP
**********
LOADCNPCCD
LOAD T646 -18.660 GLOB JOIN PIP1
LOAD T64A -9.5140 GLOB JOIN PIP2
LOAD T64E -16.429 GLOB JOIN PIP3
LOADCNPCCO
LOAD T646 -4.92907.79500-27.909 GLOB JOIN PIP1
LOAD T64A 5.23500-2.4780-20.924 GLOB JOIN PIP2
LOAD T64E -3.8700-6.0330-21.465 GLOB JOIN PIP3
LOADCNPMCD
LOAD T64G -3.5300 GLOB JOIN PIP1
LOAD T64J -35.684 GLOB JOIN PIP2
LOAD T64N -17.550 GLOB JOIN PIP3
LOAD T64Q -52.295 GLOB JOIN PIP4
LOAD T64V -10.990 GLOB JOIN PIP5
LOAD T651 -52.647 GLOB JOIN PIP6
LOADCNPMCO
LOAD T64G -6.8840-2.9920-16.484 GLOB JOIN PIP1
LOAD T64J -33.292-10.597-48.790 GLOB JOIN PIP2
LOAD T64N -5.2520-5.0200-20.483 GLOB JOIN PIP3
LOAD T64Q 12.7910-32.835-64.120 GLOB JOIN PIP4
LOAD T64V 3.66200-7.6010-25.594 GLOB JOIN PIP5
LOAD T651 3.51400-5.8750-52.902 GLOB JOIN PIP6
LOADCNSKW0
LOADCNSLAM
LOAD Z 0000T594 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0014T5OK 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5OK0000 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0005T142 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01090161 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0110T66P 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01610110 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T139T172 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T142T143 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T143T144 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T144T139 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T159T185 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T166T184 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T172T166 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T178T132 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T184T159 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T185T186 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T186T187 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T187T178 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T2090109 3.56100 3.56100 GLOB UNIF SLAM
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B320 of 382

LOAD Z T213T209 3.56100 3.56100 GLOB UNIF SLAM


LOAD Z T217T213 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5930005 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T594T5JT 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T595T66Q 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JTT595 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RPT5RR 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RRT593 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00000195 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00040155 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0004T5O1 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00050186 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00060154 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0006T151 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0007T506 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00080162 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0026T5PY 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00270192 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01070153 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0107T679 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0108T325 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01100165 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01530108 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01540007 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01550015 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0162T68D 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01650167 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01660107 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01670168 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01680169 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01690170 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01700171 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0171T5Q4 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0172T5QH 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0173T5PZ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01740175 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01750166 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01760006 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01770176 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01780177 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0179T205 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0180T5QG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0181T687 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0182T688 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01830182 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0184T202 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01850184 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01860185 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01870004 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01880187 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01890188 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01900026 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01910190 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01920191 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01930027 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01940193 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01950194 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T132T5B7 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T135T199 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T136T5B6 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T137T169 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T137T174 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T138T171 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T145T146 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T146T147 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T147T137 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T148T149 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T149T150 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T150T170 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T151T152 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T152T153 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T153T138 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T155T181 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T156T195 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T158T190 3.56100 3.56100 GLOB UNIF SLAM
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B321 of 382

LOAD Z T160T192 3.56100 3.56100 GLOB UNIF SLAM


LOAD Z T161T197 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T162T158 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T163T156 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T167T170 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T168T167 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T169T168 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T170T173 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T171T179 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T173T193 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T174T188 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T175T131 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T176T136 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T177T135 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T179T180 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T180T155 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T181T182 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T182T183 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T183T175 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T188T189 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T189T162 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T190T191 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T191T160 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T192T177 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T193T194 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T194T163 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T195T196 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T196T161 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T197T176 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T199T136 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T2020183 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T202T145 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T205T148 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T205T5Q7 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T2080008 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T212T208 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T216T212 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T325T507 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T325T5B9 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T326T324 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T506T324 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T507T326 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5920006 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5B6T131 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5B7T135 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5B90007 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5BKT325 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5BLT592 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5BLT5BK 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5O1T5ZJ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PY0189 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PZT5Q6 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q40172 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q50180 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q60174 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q70178 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QG0179 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QH0173 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZJT67A 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T660T678 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0016T56X 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01600000 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T2100016 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T214T210 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T218T214 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T56X0160 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00120164 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0012T571 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00130163 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0014T445 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0016T5JR 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0027T57V 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0044T440 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0045T443 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0109T577 3.56100 3.56100 GLOB UNIF SLAM
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B322 of 382

LOAD Z 01630011 3.56100 3.56100 GLOB UNIF SLAM


LOAD Z 01640014 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0169T57W 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0171T661 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0191T57L 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T209T578 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T210T5JQ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T2110012 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T211T572 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T213T579 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T214T5JP 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T215T211 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T215T573 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T217T5B8 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T218T5JO 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T219T215 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T219T218 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T435T444 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4370191 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T437T442 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4380188 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T438T441 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T440T438 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4410013 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4420044 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T443T437 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4440045 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T445T435 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T56YT574 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T56ZT575 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T570T576 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5710016 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T572T210 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T573T214 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5740109 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T575T209 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T576T213 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5770008 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T578T208 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T579T212 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57LT57P 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57P0171 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57V0169 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57WT65V 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5B8T216 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JOT5JU 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JOT5PA 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JPT570 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JPT5JO 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JQT56Z 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JQT5JP 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JRT56Y 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JRT5JQ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JST5JR 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JTT5JS 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5NZT5LY 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5O0T5NZ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5O1T5O0 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PAT217 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZD0181 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZH0183 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65VT5ZH 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T661T5ZD 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00130004 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00110015 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0015T5NZ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0026T57J 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00440026 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 00450027 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0155T5O0 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0160T5JS 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01610162 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01630155 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 01640160 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0165T5RN 3.56100 3.56100 GLOB UNIF SLAM
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B323 of 382

LOAD Z 0167T5RO 3.56100 3.56100 GLOB UNIF SLAM


LOAD Z 0173T57C 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0174T65X 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0175T65Y 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0187T5PB 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0188T5PC 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0189T5PD 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0194T5WO 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0195T5WN 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T139T137 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T142T145 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T143T146 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T144T147 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T148T151 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T149T152 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T150T153 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T156T155 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T159T158 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T166T188 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T170T138 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T172T174 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T173T171 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T176T175 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T178T177 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T184T189 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T185T190 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T186T191 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T187T192 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T193T179 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T194T180 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T195T181 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T196T182 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T197T183 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4350194 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4400189 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4420190 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4430192 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4440193 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4450195 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57CT57E 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57E0179 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57JT57N 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57N0173 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5BK0154 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5HHT5HG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5HHT5PG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JS0161 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5NZ0108 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5O00153 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PBT6BP 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PCT5PK 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PDT5PI 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PDT5Q3 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PET5ZK 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PFT5PJ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PFT5ZL 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PGT5PH 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PGT5ZM 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PHT5HG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PHT5PF 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PIT5HG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PIT5PC 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PJT5PE 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PKT5PB 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PKT5PL 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PLT5HG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PLT5PJ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q00174 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q3T5HH 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RM0186 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RNT5RO 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ROT5RQ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RPT5RN 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RQ0185 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5WN0165 3.56100 3.56100 GLOB UNIF SLAM
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B324 of 382

LOAD Z T5WO0167 3.56100 3.56100 GLOB UNIF SLAM


LOAD Z T5ZK0166 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZL0175 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZMT5Q0 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65X0178 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65Y0177 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0153T5BK 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0166T65Z 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0168T5QS 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0170T5QT 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0172T57D 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0190T57K 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0192T57M 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z 0193T5QQ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T145T69H 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T146T69G 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T147T69F 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T4410187 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57DT57F 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57ET65X 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57FT5ZF 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57KT57O 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57MT5QR 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57O0172 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57Q0170 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QQ0168 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QRT57Q 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QST65U 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QTT65W 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RMT5RQ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RQT65U 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5RRT5RM 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZF0180 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZG0182 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZI0184 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65UT5ZI 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65UT65V 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65VT65W 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65WT5ZG 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65WT661 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65XT65Y 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65YT65Z 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65Z0176 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65ZT660 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T661T5QB 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T507T506 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T56ZT56Y 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T570T56Z 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T572T571 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T573T572 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T575T574 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T576T575 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T578T577 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T579T578 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57DT57C 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57FT57E 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57JT5Q2 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57KT57J 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57LT57K 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57NT5Q1 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57OT57N 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57PT57O 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5PYT5Q2 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q1T5PZ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q2T5Q1 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q4T5Q9 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q9T57D 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5Q9T5QB 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QBT57F 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QBT5ZE 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5ZET5Q5 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57VT5QX 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T57WT5QW 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QQT5QU 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QST5QV 3.56100 3.56100 GLOB UNIF SLAM
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B325 of 382

LOAD Z T5QUT57V 3.56100 3.56100 GLOB UNIF SLAM


LOAD Z T5QVT57W 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QWT5QT 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5QXT5QR 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JUT5KN 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JWT5JV 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JWT5KE 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5JXT655 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5KET5KM 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5KFT5JV 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5KMT5JX 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5KMT657 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5KNT5KF 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5LYT5MM 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5LYT65P 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5M0T5LZ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5M0T5ME 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5MET5ML 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5MFT5LZ 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5MLT5M1 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5MMT5MF 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T5MMT65B 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T655T656 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T656T5JU 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T657T655 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T657T658 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T658T5KN 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T658T656 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T659T65Q 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65AT5M1 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65BT659 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65BT65C 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65CT5ML 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65CT65A 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65PT659 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65QT65A 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65PT65T 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65QT65S 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T65TT65S 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T66PT5RP 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T66Q0110 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T678T5BL 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T679T660 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T67A0107 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T687T5Q5 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T6880181 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T68D0005 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T69FT150 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T69GT149 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T69HT148 3.56100 3.56100 GLOB UNIF SLAM
LOAD Z T6BPT5PE 3.56100 3.56100 GLOB UNIF SLAM
LOADCNSTST
***LDS1** -11.200 11.000 21.130 -10.000 11.000 21.130 -11.200
***LDS2** 8.400 21.130 -10.000 8.400 21.130 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5MRT5LX -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5MST5LV -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5MVT5MT -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5MWT5MU -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -15.000 11.000 19.130 -13.800 11.000 19.130 -15.000
***LDS2** 8.400 19.130 -13.800 8.400 19.130 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5MAT5MC -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5MBT5MD -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5NFT5NA -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5NIT5N9 -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -11.200 11.000 17.130 -10.000 11.000 17.130 -11.200
***LDS2** 8.400 17.130 -10.000 8.400 17.130 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5MPT5LT -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5MQT5LR -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5MXT5N0 -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5MYT5MZ -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -15.000 11.000 14.805 -13.800 11.000 14.805 -15.000
***LDS2** 8.400 14.805 -13.800 8.400 14.805 0.400
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B326 of 382

***LDS3** 0.250 0 1 3 00STST -2EQUPPRESGRATING


LOAD Z T5M6T5M8 -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5M7T5M9 -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5NGT5NC -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5NJT5NB -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -11.200 11.000 12.480 -10.000 11.000 12.480 -11.200
***LDS2** 8.400 12.480 -10.000 8.400 12.480 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5MNT5LP -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5MOT5LN -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5N3T5N1 -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5N4T5N2 -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -11.200 11.000 8.930 -10.000 11.000 8.930 -11.200
***LDS2** 8.400 8.930 -10.000 8.400 8.930 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5MMT5LY -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T5MLT5M1 -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T65BT659 -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T65CT65A -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -15.000 11.000 10.705 -13.800 11.000 10.705 -15.000
***LDS2** 8.400 10.705 -13.800 8.400 10.705 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5M2T5M4 -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T5M3T5M5 -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T65GT65E -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T65HT65F -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -10.200 -11.400 21.130 -9.000 -11.400 21.130 -10.200
***LDS2** -14.000 21.130 -9.000 -14.000 21.130 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5KST5JL -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5KTT5JJ -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5KWT5KU -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5KXT5KV -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -10.200 -11.400 17.130 -9.000 -11.400 17.130 -10.200
***LDS2** -14.000 17.130 -9.000 -14.000 17.130 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5KQT5J5 -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5KRT5J3 -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5KYT5L1 -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5KZT5L0 -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -14.000 -11.400 19.130 -12.800 -11.400 19.130 -14.000
***LDS2** -14.000 19.130 -12.800 -14.000 19.130 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5KAT5KC -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5KBT5KD -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5LGT5LB -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5LJT5LA -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -10.200 -11.400 12.480 -9.000 -11.400 12.480 -10.200
***LDS2** -14.000 12.480 -9.000 -14.000 12.480 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5KOT5IO -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5KPT5IG -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5L4T5L2 -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5L5T5L3 -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -10.200 -11.400 8.930 -9.000 -11.400 8.930 -10.200
***LDS2** -14.000 8.930 -9.000 -14.000 8.930 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5KNT5JU -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T5KMT5JX -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T657T655 -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T658T656 -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -14.000 -11.400 14.805 -12.800 -11.400 14.805 -14.000
***LDS2** -14.000 14.805 -12.800 -14.000 14.805 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5K6T5K8 -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5K7T5K9 -0.1734 -0.1734 GLOB UNIF GRATING
LOAD Z T5LHT5LD -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T5LKT5LC -0.3466 -0.3466 GLOB UNIF GRATING
***LDS1** -14.000 -11.400 10.705 -12.800 -11.400 10.705 -14.000
***LDS2** -14.000 10.705 -12.800 -14.000 10.705 0.400
***LDS3** 0.250 0 1 3 0 0STST -2EQUPPRESGRATING
LOAD Z T5JYT5K4 -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T5JZT5K5 -0.1733 -0.1733 GLOB UNIF GRATING
LOAD Z T65KT65I -0.3466 -0.3466 GLOB UNIF GRATING
LOAD Z T65LT65J -0.3466 -0.3466 GLOB UNIF GRATING
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B327 of 382

LOAD Z T65QT65S -0.3174 -0.3174 GLOB UNIF HRAIL-ST


LOAD Z T65PT65T -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LYT65P -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65AT5M1 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65QT65A -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LYT5MM -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MLT5M1 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5M3T5M5 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5M3T65G -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65GT65N -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65NT65H -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65HT5M2 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LPT5N1 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5N1T5N2 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5N2T5LN -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MOT5LN -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MNT5LP -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5M7T5M9 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5NGT5M7 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MJT5NG -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5NJT5MJ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5M6T5NJ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5M6T5M8 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MQT5LR -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LRT5MZ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MZT5N0 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5N0T5LT -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MPT5LT -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MUT5LV -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MTT5MU -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LXT5MT -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MRT5LX -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MST5LV -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MBT5MD -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5NFT5MB -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MKT5NF -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5NIT5MK -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MAT5NI -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5MAT5MC -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5JUT5KN -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T656T5JU -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T655T656 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5JXT655 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KMT5JX -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5JYT5K4 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5JYT65K -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65KT65M -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65MT65L -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5JZT5K5 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65LT5JZ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KPT5IG -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5L3T5IG -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5L2T5L3 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5IOT5L2 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KOT5IO -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5J3T5L0 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5L0T5L1 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5L1T5J5 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KQT5J5 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KRT5J3 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KST5JL -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5JLT5KU -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KUT5KV -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KVT5JJ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KTT5JJ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5K6T5K8 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KAT5KC -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KBT5KD -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5K7T5K9 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LHT5K7 -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T65OT5LH -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5K6T5LK -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LKT65O -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5KAT5LJ -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5LJT5KL -0.3174 -0.3174 GLOB UNIF HRAIL-ST
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B328 of 382

LOAD Z T5KLT5LG -0.3174 -0.3174 GLOB UNIF HRAIL-ST


LOAD Z T5LGT5KB -0.3174 -0.3174 GLOB UNIF HRAIL-ST
LOAD Z T5IFT5KP -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5INT5IF -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5INT5KO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5IOT5L2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J2T5J4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J2T5KI -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J3T5L0 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J4T5KH -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JIT5JK -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JIT5KT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JKT5KS -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JLT5KU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JUT5KN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JWT5JV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JWT5KE -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JXT655 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JYT5K4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JYT65K -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JZT5K5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K4T65I -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K6T5K8 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K6T5LK -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K7T5K9 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K8T5LC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KAT5KC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KAT5LJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KBT5KD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KCT5LA -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KET5KM -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KFT5JV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KHT5KQ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KIT5KR -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KLT5LG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KMT5JX -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KMT657 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KNT5KF -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KOT5IO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KOT5L4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KPT5IG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KQT5J5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KQT5KY -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KRT5J3 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KST5JL -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KST5KW -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KTT5JJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KUT5KV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KVT5JJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KWT5KU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KWT5KX -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KXT5KT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KXT5KV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KYT5KZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KYT5L1 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KZT5KR -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KZT5L0 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L0T5L1 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L1T5J5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L2T5L3 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L3T5IG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L4T5L2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L4T5L5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L5T5KP -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5L5T5L3 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LAT5LB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LBT5KD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LCT5LD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LDT5K9 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LGT5KB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LGT5LB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LHT5K7 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LHT5LD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LJT5KL -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LJT5LA -0.0957 -0.0957 GLOB UNIF MISC
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B329 of 382

LOAD Z T5LKT5LC -0.0957 -0.0957 GLOB UNIF MISC


LOAD Z T5LKT65O -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LMT5MO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LOT5LM -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LOT5MN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LPT5N1 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LQT5LS -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LQT5MH -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LRT5MZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LST5MG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LUT5LW -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LUT5MS -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LWT5MR -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LXT5MT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LYT5MM -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LYT65P -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M0T5LZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M0T5ME -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M2T5M4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M3T5M5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M3T65G -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M5T65E -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M6T5M8 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M6T5NJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M7T5M9 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M8T5NB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MAT5MC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MAT5NI -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MBT5MD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MCT5N9 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MET5ML -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MFT5LZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MGT5MP -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MHT5MQ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MJT5NG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MKT5NF -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MLT5M1 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MMT5MF -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MMT65B -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MNT5LP -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MNT5N3 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MOT5LN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MPT5LT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MPT5MX -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MQT5LR -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MRT5LX -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MRT5MV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MST5LV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MTT5MU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MUT5LV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MVT5MT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MVT5MW -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MWT5MS -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MWT5MU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MXT5MY -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MXT5N0 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MYT5MQ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MYT5MZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MZT5N0 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N0T5LT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N1T5N2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N2T5LN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N3T5N1 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N3T5N4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N4T5MO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N4T5N2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5N9T5NA -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NAT5MD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NBT5NC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NCT5M9 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NFT5MB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NFT5NA -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NGT5M7 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NGT5NC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NIT5MK -0.0957 -0.0957 GLOB UNIF MISC
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B330 of 382

LOAD Z T5NIT5N9 -0.0957 -0.0957 GLOB UNIF MISC


LOAD Z T5NJT5MJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5NJT5NB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T655T656 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T656T5JU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T657T655 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T657T658 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T658T5KN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T658T656 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T659T65Q -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65AT5M1 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65BT659 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65BT65C -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65CT5ML -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65CT65A -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65ET65F -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65FT5M4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65GT65E -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65GT65N -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65HT5M2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65HT65F -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65IT65J -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65JT5K5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65KT65I -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65KT65M -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65LT5JZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65LT65J -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65MT65L -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65NT65H -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65OT5LH -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65PT659 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65QT65A -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5IFT5K7 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5IGT5J3 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5INT5K6 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5IOT5J5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J2T5KB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J3T5JJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J4T5KA -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J5T5JL -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JUT5IG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JVT5JZ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JWT5JY -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JXT5IO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JYT5IN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JZT5IF -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K6T5J4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K7T5J2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KAT5JK -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KBT5JI -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LMT5M7 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LNT5LR -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LOT5M6 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LPT5LT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LQT5MB -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LRT5LV -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LST5MA -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LTT5LX -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LYT5LN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LZT5M3 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M0T5M2 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M1T5LP -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M2T5LO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M3T5LM -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M6T5LS -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M7T5LQ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MAT5LW -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MBT5LU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5INT5J5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J5T5JK -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JXT5IN -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LOT5LT -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LTT5LW -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M1T5LO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5IFT65O -0.0957 -0.0957 GLOB UNIF MISC
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B331 of 382

LOAD Z T5IOT5J3 -0.0957 -0.0957 GLOB UNIF MISC


LOAD Z T5J3T5JL -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5J4T5KL -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JUT5IO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5JWT65M -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K8T5KH -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5K9T5KI -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KET5K4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KFT5K5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KHT5KC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KIT5KD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5KLT5JI -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LMT5MJ -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LPT5LR -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LRT5LX -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LST5MK -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5LZT65N -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M8T5MG -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5M9T5MH -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MET5M4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MFT5M5 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MGT5MC -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MHT5MD -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MJT5LS -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T5MKT5LU -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65MT5IF -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65NT5LO -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65OT5J4 -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65PT65T -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65QT65S -0.0957 -0.0957 GLOB UNIF MISC
LOAD Z T65TT65S -0.0957 -0.0957 GLOB UNIF MISC
LOADCNVEST
***LDS1** -5.900 -13.350 21.530 -4.100 -13.350 21.530 -5.500
***LDS2** -23.750 23.130 -4.500 -23.750 23.130 0.400
***LDS3** 0.250 0 1 3 0 0VEST -2EQUPPRESGRAT
LOAD Y T473T474 -0.0800 -0.0800 GLOB UNIF GRAT
LOAD Z T473T474 -0.5200 -0.5200 GLOB UNIF GRAT
LOAD Y T475T476 -0.1600 -0.1600 GLOB UNIF GRAT
LOAD Z T475T476 -1.0400 -1.0400 GLOB UNIF GRAT
LOAD Y T477T478 -0.1600 -0.1600 GLOB UNIF GRAT
LOAD Z T477T478 -1.0400 -1.0400 GLOB UNIF GRAT
LOAD Y T479T480 -0.1600 -0.1600 GLOB UNIF GRAT
LOAD Z T479T480 -1.0400 -1.0400 GLOB UNIF GRAT
LOAD Y T482T481 -0.0800 -0.0800 GLOB UNIF GRAT
LOAD Z T482T481 -0.5200 -0.5200 GLOB UNIF GRAT
LOAD Y T483T482 -0.0800 -0.0800 GLOB UNIF GRAT
LOAD Z T483T482 -0.5200 -0.5200 GLOB UNIF GRAT
LOAD Z T474T476 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T476T478 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T478T480 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T480T481 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T482T481 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T483T482 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T479T483 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T477T479 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T475T477 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z T473T475 -0.2266 -0.2266 GLOB UNIF HRAIL-VE
LOAD Z 0134T473 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T473T475 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T474T476 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T475T477 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T476T478 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T477T479 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T478T480 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T479T483 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T480T481 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T484T485 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T485T486 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T486T487 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T487T488 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T488T489 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T492T474 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T473T474 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T475T476 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T477T478 -0.0527 -0.0527 GLOB UNIF MISC
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B332 of 382

LOAD Z T479T480 -0.0527 -0.0527 GLOB UNIF MISC


LOAD Z T482T481 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T483T482 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T484T473 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T484T474 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T485T473 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T485T474 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T485T475 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T485T476 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T486T475 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T486T476 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T486T477 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T486T478 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T487T477 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T487T478 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T487T479 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T487T480 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T488T479 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T488T480 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T488T481 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T488T483 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T489T481 -0.0527 -0.0527 GLOB UNIF MISC
LOAD Z T489T483 -0.0527 -0.0527 GLOB UNIF MISC
LOADCNWDAR
***LDS1** -14.000 -6.750 21.130 -11.000 -6.750 21.130 -14.000
***LDS2** -9.750 21.130 -11.000 -9.750 21.130 4.400
***LDS3** 0.250 0 1 3 0 0WDAR -2EQUPPRESWALL-WH
LOAD Z T5J70024 -2.2000 -2.2000 GLOB UNIF WALL-WH
LOAD Z T5J80025 -4.4000 -4.4000 GLOB UNIF WALL-WH
LOAD Z T5J90028 -4.4000 -4.4000 GLOB UNIF WALL-WH
LOAD Z T5JAT6BH -2.2000 -2.2000 GLOB UNIF WALL-WH
***LDS1** -14.000 -6.750 21.130 -11.000 -6.750 21.130 -14.000
***LDS2** -9.750 21.130 -11.000 -9.750 21.130 0.973
***LDS3** 0.250 0 1 3 0 0WDAR -2EQUPPRESFL-WH
LOAD Z T5J70024 -0.4866 -0.4866 GLOB UNIF FL-WH
LOAD Z T5J80025 -0.9733 -0.9733 GLOB UNIF FL-WH
LOAD Z T5J90028 -0.9733 -0.9733 GLOB UNIF FL-WH
LOAD Z T5JAT6BH -0.4866 -0.4866 GLOB UNIF FL-WH
***LDS1** -15.000 -9.750 21.130 -15.000 -6.750 21.130 -9.000
***LDS2** -9.750 21.130 -9.000 -6.750 21.130 0.262
***LDS3** 0.250 0 1 3 0 0WDAR -2EQUPPRESCEL-ACO
LOAD Z T58JT5U6 -0.2620 -0.2620 GLOB UNIF CEL-ACO
LOAD Z T5UAT58K -0.2620 -0.2620 GLOB UNIF CEL-ACO
LOAD Z 0024T5U2 -0.4585 -0.4585 GLOB UNIF CEL-ACO
LOAD Z 00250028 -0.4585 -0.4585 GLOB UNIF CEL-ACO
LOAD Z 0028T5U7 -0.4585 -0.4585 GLOB UNIF CEL-ACO
LOAD Z T5U20025 -0.4585 -0.4585 GLOB UNIF CEL-ACO
LOAD Z T5U70029 -0.4585 -0.4585 GLOB UNIF CEL-ACO
LOAD Z 00300031 -0.1310 -0.1310 GLOB UNIF CEL-ACO
LOAD Z 00310032 -0.1310 -0.1310 GLOB UNIF CEL-ACO
LOAD Z 00320033 -0.1310 -0.1310 GLOB UNIF CEL-ACO
LOAD Z T5J7T5J8 -0.5240 -0.5240 GLOB UNIF CEL-ACO
LOAD Z T5J8T5J9 -0.5240 -0.5240 GLOB UNIF CEL-ACO
LOAD Z T5J9T5JA -0.5240 -0.5240 GLOB UNIF CEL-ACO
LOAD Z T5U3T5JE -0.1965 -0.1965 GLOB UNIF CEL-ACO
LOAD Z T5JET5JF -0.1965 -0.1965 GLOB UNIF CEL-ACO
LOAD Z T5U8T5JG -0.1965 -0.1965 GLOB UNIF CEL-ACO
LOAD Z T5JDT5U3 -0.1965 -0.1965 GLOB UNIF CEL-ACO
LOAD Z T5JFT5U8 -0.1965 -0.1965 GLOB UNIF CEL-ACO
LOAD Z T58IT5UA -0.2620 -0.2620 GLOB UNIF CEL-ACO
LOAD Z T5U5T58I -0.2620 -0.2620 GLOB UNIF CEL-ACO
LOAD Z T5U6T5U5 -0.2620 -0.2620 GLOB UNIF CEL-ACO
LOAD Z 0063T59P -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T59P0085 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03310340 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0330T5XK -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5XKT5XJ -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5XJ0339 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5A70338 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5A9T5A7 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0329T5A9 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0328T5XB -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5XBT5XC -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5XC0337 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5A8T684 -0.2517 -0.2517 GLOB UNIF CEL-LTR
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B333 of 382

LOAD Z T5AAT5A8 -0.2517 -0.2517 GLOB UNIF CEL-LTR


LOAD Z 0327T5AA -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0304T5AF -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5AFT5AC -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5AC0335 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5X90334 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5XAT5X9 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0138T5XA -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0137T5AE -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5AET5AD -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T5AD0333 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 01010332 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 00420043 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 00420101 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 01010137 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 01370138 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0138T6BB -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03040327 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03270328 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0328T6B9 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03290330 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03300331 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0331T6B7 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03400085 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03390340 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T4970339 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0338T497 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03370338 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03360337 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03350336 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03340335 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T4960334 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 0333T496 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 03320333 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z 00430332 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T6840336 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T6B70063 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T6B90329 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T6BB0304 -0.2517 -0.2517 GLOB UNIF CEL-LTR
LOAD Z T6BH0029 -2.2000 -2.2000 GLOB UNIF WALL-WH
LOAD Z T6BH0029 -0.4866 -0.4866 GLOB UNIF FL-WH
LOADCNWDEL
LOAD Z T58JT5U6 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5A7T5XM -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5A8T5XI -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5A9T5XL -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AAT5XH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5ACT5XG -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5ADT5XD -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AET5XE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AFT5XF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5UAT58K -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5X9T5AC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XAT5AF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XBT5A9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XCT5A7 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XDT5X9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XET5XA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XET5XD -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XFT5AA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XFT5XG -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XGT5A8 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XHT5XB -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XHT5XI -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XIT5XC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XLT5XK -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XLT5XM -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XMT5XJ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00430332 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00850113 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01140043 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03320333 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0333T496 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03340335 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03350336 -0.0123 -0.0123 GLOB UNIF EL-1-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B334 of 382

LOAD Z 03360337 -0.0123 -0.0123 GLOB UNIF EL-1-W


LOAD Z 03370338 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0338T497 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03390340 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03400085 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T4960334 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T4970339 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00100116 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0024T5U2 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00250028 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0028T5U7 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00290114 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0034T5U4 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00350036 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0036T5U9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00370130 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00400041 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00410117 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00520341 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00530350 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00860129 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0089T68K -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0113T5O4 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0114T5JH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01150010 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0117T68L -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0122T59Q -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0129T61Y -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01300052 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0130T5TE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01330024 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01340034 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0327T5AA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03360345 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03410342 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03420343 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03430344 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03440345 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03450346 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0345T5BV -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03460347 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03470348 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03480349 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0349T6AB -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03500351 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03510352 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03520353 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03530471 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 04710472 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 04720473 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 04730474 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 04740475 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 04750089 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T317T66Y -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T317T66Z -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T319T67F -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T320T680 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T59Q0113 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5A8T684 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AAT5A8 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BVT622 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BW0471 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JHT6BI -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5O4T5T2 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T20129 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T4T67M -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TET5TF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TFT673 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U20025 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U40035 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U70029 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U90037 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5UPT681 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0003T5O3 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0030T5J7 -0.0123 -0.0123 GLOB UNIF EL-1-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B335 of 382

LOAD Z 0037T58P -0.0123 -0.0123 GLOB UNIF EL-1-W


LOAD Z 0333T5AK -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0334T5YC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0335T5AJ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0337T5AI -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0338T5Y4 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0339T5AH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58PT58Q -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58Q0041 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58T0009 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AH0348 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AI0346 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AJ0344 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AK0342 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J70024 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5O3T58T -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P2T5P5 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P3RRRR -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P4TTTT -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P5T5VR -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P6T5P9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z TTTTT5P1 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z RRRRT5P2 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P9T5P5 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5VRT5P1 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00030131 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00090132 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0009T61Z -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00190121 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00300031 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00310032 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00320033 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00330119 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0036T504 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00420043 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00420101 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0063T6B6 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0063T59P -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01010137 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01130003 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0119T6BF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01200030 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0120T5J6 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0121T5LU -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01220019 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01290009 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0132T620 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0134T493 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01370138 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0138T6BB -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03040327 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03270328 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0328T6B9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03290330 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03300331 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0331T6B7 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03310340 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T317T685 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T320T66F -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T492T502 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T493T492 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T502T503 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T503T504 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T504T5BJ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58U0010 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BH0133 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BI0116 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BJ0040 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J6T5BH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J6T5J7 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J6T5JI -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J7T5J8 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J8T5J9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J9T5JA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JAT5JB -0.0123 -0.0123 GLOB UNIF EL-1-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B336 of 382

LOAD Z T5JCT5JJ -0.0123 -0.0123 GLOB UNIF EL-1-W


LOAD Z T5JDT5JC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JET5U3 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JFT5JE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JGT5U8 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JHT5JG -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5O2T5LV -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5O3T5O2 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5O4T5O3 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U3T5JD -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U8T5JF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00190003 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0024T58J -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0025T5U5 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0028T58I -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0029T58K -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0031T5J8 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0032T5J9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0033T5JA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0034T502 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0035T503 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 00430052 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0052T58N -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0085T5T1 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0086T61X -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 01010332 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0121T5BG -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0131T5O2 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0133T5JC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0137T5AE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0138T5XA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0304T5AF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0328T5XB -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0329T5A9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0330T5XK -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 03320341 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0340T58V -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0341T58X -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0342T58Y -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0343T5TQ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0344T623 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0346T5BU -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0347T61U -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0348T5BR -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z 0349T61W -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58IT5JF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58IT5UA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58JT5JD -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58KT5JG -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58NT62A -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58NT5TG -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58O0053 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58OT5TH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58PT5TE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58QT5TF -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58V0349 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58VT6A9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58W0475 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58WT6AA -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58XT628 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58XT5TS -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58YT626 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58YT5TU -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58Z0350 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58ZT5TT -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5900351 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T590T5TV -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T59P0085 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5A70338 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5A9T5A7 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AC0335 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AD0333 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AET5AD -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5AFT5AC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BG0131 -0.0123 -0.0123 GLOB UNIF EL-1-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B337 of 382

LOAD Z T5BRT61V -0.0123 -0.0123 GLOB UNIF EL-1-W


LOAD Z T5BS0474 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BT0472 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5BUT621 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J80025 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5J90028 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JAT6BH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JCT5P3 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JDT6BL -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JET6BK -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JF0036 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5JGT6BJ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P3T5P6 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P40134 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P6T5P4 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z RRRRT5P9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5P9TTTT -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T10086 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T1T5T2 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T2T58T -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T30089 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T3T5T4 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5T4T58U -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TET58N -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TFT58O -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TGT58X -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TGT629 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5THT58Z -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TQT624 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TR0352 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TST58Y -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TST627 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TTT590 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TUT5TQ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TUT625 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5TVT5TR -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U5T58I -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U5T5JE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5U6T5U5 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5X90334 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XAT5X9 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XBT5XC -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XC0337 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XJ0339 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5XKT5XJ -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5O20132 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T58JT5U6 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5A7T5XM -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5A8T5XI -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5A9T5XL -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AAT5XH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5ACT5XG -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5ADT5XD -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AET5XE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AFT5XF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5UAT58K -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5X9T5AC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XAT5AF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XBT5A9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XCT5A7 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XDT5X9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XET5XA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XET5XD -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XFT5AA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XFT5XG -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XGT5A8 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XHT5XB -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XHT5XI -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XIT5XC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XLT5XK -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XLT5XM -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XMT5XJ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00430332 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00850113 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01140043 -0.0011 -0.0011 GLOB UNIF EL-2-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B338 of 382

LOAD Z 03320333 -0.0011 -0.0011 GLOB UNIF EL-2-W


LOAD Z 0333T496 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03340335 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03350336 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03360337 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03370338 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0338T497 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03390340 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03400085 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T4960334 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T4970339 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00100116 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0024T5U2 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00250028 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0028T5U7 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00290114 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0034T5U4 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00350036 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0036T5U9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00370130 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00400041 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00410117 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00520341 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00530350 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00860129 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0089T68K -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0113T5O4 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0114T5JH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01150010 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0117T68L -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0122T59Q -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0129T61Y -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01300052 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0130T5TE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01330024 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01340034 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0327T5AA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03360345 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03410342 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03420343 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03430344 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03440345 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03450346 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0345T5BV -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03460347 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03470348 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03480349 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0349T6AB -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03500351 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03510352 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03520353 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03530471 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 04710472 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 04720473 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 04730474 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 04740475 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 04750089 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T317T66Y -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T317T66Z -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T319T67F -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T320T680 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T59Q0113 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5A8T684 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AAT5A8 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BVT622 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BW0471 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JHT6BI -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5O4T5T2 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T20129 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T4T67M -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TET5TF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TFT673 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U20025 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U40035 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U70029 -0.0011 -0.0011 GLOB UNIF EL-2-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B339 of 382

LOAD Z T5U90037 -0.0011 -0.0011 GLOB UNIF EL-2-W


LOAD Z T5UPT681 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0003T5O3 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0030T5J7 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0037T58P -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0333T5AK -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0334T5YC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0335T5AJ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0337T5AI -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0338T5Y4 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0339T5AH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58PT58Q -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58Q0041 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58T0009 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AH0348 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AI0346 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AJ0344 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AK0342 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J70024 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5O3T58T -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P2T5P5 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P3RRRR -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P4TTTT -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P5T5VR -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P6T5P9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z TTTTT5P1 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z RRRRT5P2 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P9T5P5 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5VRT5P1 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00030131 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00090132 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0009T61Z -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00190121 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00300031 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00310032 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00320033 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00330119 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0036T504 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00420043 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00420101 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0063T6B6 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0063T59P -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01010137 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01130003 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0119T6BF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01200030 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0120T5J6 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0121T5LU -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01220019 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01290009 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0132T620 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0134T493 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01370138 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0138T6BB -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03040327 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03270328 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0328T6B9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03290330 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03300331 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0331T6B7 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03310340 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T317T685 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T320T66F -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T492T502 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T493T492 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T502T503 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T503T504 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T504T5BJ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58U0010 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BH0133 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BI0116 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BJ0040 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J6T5BH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J6T5J7 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J6T5JI -0.0011 -0.0011 GLOB UNIF EL-2-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B340 of 382

LOAD Z T5J7T5J8 -0.0011 -0.0011 GLOB UNIF EL-2-W


LOAD Z T5J8T5J9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J9T5JA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JAT5JB -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JCT5JJ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JDT5JC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JET5U3 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JFT5JE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JGT5U8 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JHT5JG -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5O2T5LV -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5O3T5O2 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5O4T5O3 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U3T5JD -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U8T5JF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00190003 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0024T58J -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0025T5U5 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0028T58I -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0029T58K -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0031T5J8 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0032T5J9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0033T5JA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0034T502 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0035T503 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 00430052 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0052T58N -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0085T5T1 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0086T61X -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 01010332 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0121T5BG -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0131T5O2 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0133T5JC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0137T5AE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0138T5XA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0304T5AF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0328T5XB -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0329T5A9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0330T5XK -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 03320341 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0340T58V -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0341T58X -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0342T58Y -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0343T5TQ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0344T623 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0346T5BU -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0347T61U -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0348T5BR -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z 0349T61W -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58IT5JF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58IT5UA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58JT5JD -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58KT5JG -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58NT62A -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58NT5TG -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58O0053 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58OT5TH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58PT5TE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58QT5TF -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58V0349 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58VT6A9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58W0475 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58WT6AA -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58XT628 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58XT5TS -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58YT626 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58YT5TU -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58Z0350 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58ZT5TT -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5900351 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T590T5TV -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T59P0085 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5A70338 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5A9T5A7 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AC0335 -0.0011 -0.0011 GLOB UNIF EL-2-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B341 of 382

LOAD Z T5AD0333 -0.0011 -0.0011 GLOB UNIF EL-2-W


LOAD Z T5AET5AD -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5AFT5AC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BG0131 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BRT61V -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BS0474 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BT0472 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5BUT621 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J80025 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5J90028 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JAT6BH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JCT5P3 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JDT6BL -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JET6BK -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JF0036 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5JGT6BJ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P3T5P6 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P40134 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P6T5P4 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z RRRRT5P9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5P9TTTT -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T10086 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T1T5T2 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T2T58T -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T30089 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T3T5T4 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5T4T58U -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TET58N -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TFT58O -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TGT58X -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TGT629 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5THT58Z -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TQT624 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TR0352 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TST58Y -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TST627 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TTT590 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TUT5TQ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TUT625 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5TVT5TR -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U5T58I -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U5T5JE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5U6T5U5 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5X90334 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XAT5X9 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XBT5XC -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XC0337 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XJ0339 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5XKT5XJ -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5O20132 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T58JT5U6 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5A7T5XM -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5A8T5XI -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5A9T5XL -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AAT5XH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5ACT5XG -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5ADT5XD -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AET5XE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AFT5XF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5UAT58K -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5X9T5AC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XAT5AF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XBT5A9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XCT5A7 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XDT5X9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XET5XA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XET5XD -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XFT5AA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XFT5XG -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XGT5A8 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XHT5XB -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XHT5XI -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XIT5XC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XLT5XK -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XLT5XM -0.0627 -0.0627 GLOB UNIF EL-3-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B342 of 382

LOAD Z T5XMT5XJ -0.0627 -0.0627 GLOB UNIF EL-3-W


LOAD Z 00430332 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00850113 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01140043 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03320333 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0333T496 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03340335 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03350336 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03360337 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03370338 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0338T497 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03390340 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03400085 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T4960334 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T4970339 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00100116 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0024T5U2 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00250028 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0028T5U7 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00290114 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0034T5U4 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00350036 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0036T5U9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00370130 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00400041 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00410117 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00520341 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00530350 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00860129 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0089T68K -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0113T5O4 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0114T5JH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01150010 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0117T68L -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0122T59Q -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0129T61Y -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01300052 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0130T5TE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01330024 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01340034 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0327T5AA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03360345 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03410342 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03420343 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03430344 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03440345 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03450346 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0345T5BV -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03460347 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03470348 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03480349 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0349T6AB -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03500351 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03510352 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03520353 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03530471 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 04710472 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 04720473 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 04730474 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 04740475 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 04750089 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T317T66Y -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T317T66Z -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T319T67F -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T320T680 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T59Q0113 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5A8T684 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AAT5A8 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BVT622 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BW0471 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JHT6BI -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5O4T5T2 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T20129 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T4T67M -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TET5TF -0.0627 -0.0627 GLOB UNIF EL-3-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B343 of 382

LOAD Z T5TFT673 -0.0627 -0.0627 GLOB UNIF EL-3-W


LOAD Z T5U20025 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U40035 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U70029 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U90037 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5UPT681 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0003T5O3 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0030T5J7 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0037T58P -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0333T5AK -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0334T5YC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0335T5AJ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0337T5AI -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0338T5Y4 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0339T5AH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58PT58Q -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58Q0041 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58T0009 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AH0348 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AI0346 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AJ0344 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AK0342 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J70024 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5O3T58T -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P2T5P5 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P3RRRR -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P4TTTT -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P5T5VR -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P6T5P9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z TTTTT5P1 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z RRRRT5P2 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P9T5P5 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5VRT5P1 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00030131 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00090132 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0009T61Z -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00190121 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00300031 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00310032 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00320033 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00330119 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0036T504 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00420043 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00420101 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0063T6B6 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0063T59P -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01010137 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01130003 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0119T6BF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01200030 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0120T5J6 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0121T5LU -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01220019 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01290009 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0132T620 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0134T493 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01370138 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0138T6BB -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03040327 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03270328 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0328T6B9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03290330 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03300331 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0331T6B7 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03310340 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T317T685 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T320T66F -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T492T502 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T493T492 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T502T503 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T503T504 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T504T5BJ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58U0010 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BH0133 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BI0116 -0.0627 -0.0627 GLOB UNIF EL-3-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B344 of 382

LOAD Z T5BJ0040 -0.0627 -0.0627 GLOB UNIF EL-3-W


LOAD Z T5J6T5BH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J6T5J7 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J6T5JI -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J7T5J8 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J8T5J9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J9T5JA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JAT5JB -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JCT5JJ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JDT5JC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JET5U3 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JFT5JE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JGT5U8 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JHT5JG -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5O2T5LV -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5O3T5O2 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5O4T5O3 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U3T5JD -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U8T5JF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00190003 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0024T58J -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0025T5U5 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0028T58I -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0029T58K -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0031T5J8 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0032T5J9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0033T5JA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0034T502 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0035T503 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 00430052 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0052T58N -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0085T5T1 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0086T61X -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 01010332 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0121T5BG -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0131T5O2 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0133T5JC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0137T5AE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0138T5XA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0304T5AF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0328T5XB -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0329T5A9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0330T5XK -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 03320341 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0340T58V -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0341T58X -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0342T58Y -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0343T5TQ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0344T623 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0346T5BU -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0347T61U -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0348T5BR -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z 0349T61W -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58IT5JF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58IT5UA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58JT5JD -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58KT5JG -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58NT62A -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58NT5TG -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58O0053 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58OT5TH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58PT5TE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58QT5TF -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58V0349 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58VT6A9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58W0475 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58WT6AA -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58XT628 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58XT5TS -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58YT626 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58YT5TU -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58Z0350 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58ZT5TT -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5900351 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T590T5TV -0.0627 -0.0627 GLOB UNIF EL-3-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B345 of 382

LOAD Z T59P0085 -0.0627 -0.0627 GLOB UNIF EL-3-W


LOAD Z T5A70338 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5A9T5A7 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AC0335 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AD0333 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AET5AD -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5AFT5AC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BG0131 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BRT61V -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BS0474 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BT0472 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5BUT621 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J80025 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5J90028 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JAT6BH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JCT5P3 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JDT6BL -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JET6BK -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JF0036 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5JGT6BJ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P3T5P6 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P40134 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P6T5P4 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z RRRRT5P9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5P9TTTT -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T10086 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T1T5T2 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T2T58T -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T30089 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T3T5T4 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5T4T58U -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TET58N -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TFT58O -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TGT58X -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TGT629 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5THT58Z -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TQT624 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TR0352 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TST58Y -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TST627 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TTT590 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TUT5TQ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TUT625 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5TVT5TR -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U5T58I -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U5T5JE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5U6T5U5 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5X90334 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XAT5X9 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XBT5XC -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XC0337 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XJ0339 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5XKT5XJ -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5O20132 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T58JT5U6 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5A7T5XM -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5A8T5XI -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5A9T5XL -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AAT5XH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5ACT5XG -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5ADT5XD -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AET5XE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AFT5XF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5UAT58K -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5X9T5AC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XAT5AF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XBT5A9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XCT5A7 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XDT5X9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XET5XA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XET5XD -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XFT5AA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XFT5XG -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XGT5A8 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XHT5XB -0.0089 -0.0089 GLOB UNIF EL-4-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B346 of 382

LOAD Z T5XHT5XI -0.0089 -0.0089 GLOB UNIF EL-4-W


LOAD Z T5XIT5XC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XLT5XK -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XLT5XM -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XMT5XJ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00430332 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00850113 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01140043 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03320333 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0333T496 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03340335 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03350336 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03360337 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03370338 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0338T497 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03390340 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03400085 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T4960334 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T4970339 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00100116 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0024T5U2 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00250028 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0028T5U7 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00290114 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0034T5U4 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00350036 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0036T5U9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00370130 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00400041 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00410117 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00520341 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00530350 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00860129 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0089T68K -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0113T5O4 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0114T5JH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01150010 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0117T68L -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0122T59Q -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0129T61Y -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01300052 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0130T5TE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01330024 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01340034 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0327T5AA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03360345 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03410342 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03420343 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03430344 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03440345 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03450346 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0345T5BV -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03460347 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03470348 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03480349 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0349T6AB -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03500351 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03510352 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03520353 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03530471 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 04710472 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 04720473 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 04730474 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 04740475 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 04750089 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T317T66Y -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T317T66Z -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T319T67F -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T320T680 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T59Q0113 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5A8T684 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AAT5A8 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BVT622 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BW0471 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JHT6BI -0.0089 -0.0089 GLOB UNIF EL-4-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B347 of 382

LOAD Z T5O4T5T2 -0.0089 -0.0089 GLOB UNIF EL-4-W


LOAD Z T5T20129 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T4T67M -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TET5TF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TFT673 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U20025 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U40035 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U70029 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U90037 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5UPT681 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0003T5O3 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0030T5J7 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0037T58P -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0333T5AK -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0334T5YC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0335T5AJ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0337T5AI -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0338T5Y4 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0339T5AH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58PT58Q -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58Q0041 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58T0009 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AH0348 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AI0346 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AJ0344 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AK0342 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J70024 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5O3T58T -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P2T5P5 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P3RRRR -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P4TTTT -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P5T5VR -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P6T5P9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z TTTTT5P1 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z RRRRT5P2 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P9T5P5 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5VRT5P1 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00030131 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00090132 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0009T61Z -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00190121 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00300031 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00310032 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00320033 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00330119 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0036T504 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00420043 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00420101 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0063T6B6 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0063T59P -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01010137 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01130003 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0119T6BF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01200030 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0120T5J6 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0121T5LU -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01220019 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01290009 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0132T620 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0134T493 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01370138 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0138T6BB -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03040327 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03270328 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0328T6B9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03290330 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03300331 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0331T6B7 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03310340 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T317T685 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T320T66F -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T492T502 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T493T492 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T502T503 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T503T504 -0.0089 -0.0089 GLOB UNIF EL-4-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B348 of 382

LOAD Z T504T5BJ -0.0089 -0.0089 GLOB UNIF EL-4-W


LOAD Z T58U0010 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BH0133 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BI0116 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BJ0040 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J6T5BH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J6T5J7 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J6T5JI -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J7T5J8 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J8T5J9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J9T5JA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JAT5JB -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JCT5JJ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JDT5JC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JET5U3 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JFT5JE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JGT5U8 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JHT5JG -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5O2T5LV -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5O3T5O2 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5O4T5O3 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U3T5JD -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U8T5JF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00190003 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0024T58J -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0025T5U5 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0028T58I -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0029T58K -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0031T5J8 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0032T5J9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0033T5JA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0034T502 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0035T503 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 00430052 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0052T58N -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0085T5T1 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0086T61X -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 01010332 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0121T5BG -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0131T5O2 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0133T5JC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0137T5AE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0138T5XA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0304T5AF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0328T5XB -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0329T5A9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0330T5XK -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 03320341 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0340T58V -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0341T58X -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0342T58Y -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0343T5TQ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0344T623 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0346T5BU -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0347T61U -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0348T5BR -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z 0349T61W -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58IT5JF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58IT5UA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58JT5JD -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58KT5JG -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58NT62A -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58NT5TG -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58O0053 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58OT5TH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58PT5TE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58QT5TF -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58V0349 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58VT6A9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58W0475 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58WT6AA -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58XT628 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58XT5TS -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58YT626 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T58YT5TU -0.0089 -0.0089 GLOB UNIF EL-4-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B349 of 382

LOAD Z T58Z0350 -0.0089 -0.0089 GLOB UNIF EL-4-W


LOAD Z T58ZT5TT -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5900351 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T590T5TV -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T59P0085 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5A70338 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5A9T5A7 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AC0335 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AD0333 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AET5AD -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5AFT5AC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BG0131 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BRT61V -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BS0474 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BT0472 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5BUT621 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J80025 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5J90028 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JAT6BH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JCT5P3 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JDT6BL -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JET6BK -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JF0036 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5JGT6BJ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P3T5P6 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P40134 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P6T5P4 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z RRRRT5P9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5P9TTTT -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T10086 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T1T5T2 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T2T58T -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T30089 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T3T5T4 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5T4T58U -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TET58N -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TFT58O -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TGT58X -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TGT629 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5THT58Z -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TQT624 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TR0352 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TST58Y -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TST627 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TTT590 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TUT5TQ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TUT625 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5TVT5TR -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U5T58I -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U5T5JE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5U6T5U5 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5X90334 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XAT5X9 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XBT5XC -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XC0337 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XJ0339 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5XKT5XJ -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5O20132 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5Y40347 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5Y40347 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5Y40347 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5Y40347 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T5YC0343 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T5YC0343 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T5YC0343 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T5YC0343 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T61U0473 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T61U0473 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T61U0473 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T61U0473 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T61VT5BS -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T61VT5BS -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T61VT5BS -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T61VT5BS -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T61WT58W -0.0123 -0.0123 GLOB UNIF EL-1-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B350 of 382

LOAD Z T61WT58W -0.0011 -0.0011 GLOB UNIF EL-2-W


LOAD Z T61WT58W -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T61WT58W -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T61XT5T3 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T61XT5T3 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T61XT5T3 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T61XT5T3 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T61YT5T4 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T61YT5T4 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T61YT5T4 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T61YT5T4 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T61ZT58U -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T61ZT58U -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T61ZT58U -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T61ZT58U -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T620T5BI -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T620T5BI -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T620T5BI -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T620T5BI -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T621T5BT -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T621T5BT -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T621T5BT -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T621T5BT -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T622T5BW -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T622T5BW -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T622T5BW -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T622T5BW -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6230353 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6230353 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6230353 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6230353 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T624T5TR -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T624T5TR -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T624T5TR -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T624T5TR -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T625T5TV -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T625T5TV -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T625T5TV -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T625T5TV -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T626T590 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T626T590 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T626T590 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T626T590 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T627T5TT -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T627T5TT -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T627T5TT -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T627T5TT -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T628T58Z -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T628T58Z -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T628T58Z -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T628T58Z -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T629T5TH -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T629T5TH -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T629T5TH -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T629T5TH -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T62AT58O -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T62AT58O -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T62AT58O -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T62AT58O -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T66C0122 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T66C0122 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66C0122 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66C0122 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T66D0327 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T66D0327 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66D0327 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66D0327 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T66E0119 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T66E0119 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66E0119 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66E0119 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T66FT319 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T66FT319 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66FT319 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66FT319 -0.0089 -0.0089 GLOB UNIF EL-4-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B351 of 382

LOAD Z T66GT320 -0.0123 -0.0123 GLOB UNIF EL-1-W


LOAD Z T66GT320 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66GT320 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66GT320 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T66YT66E -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T66YT66E -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66YT66E -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66YT66E -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T66ZT5UO -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T66ZT5UO -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T66ZT5UO -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T66ZT5UO -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6730117 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6730117 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6730117 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6730117 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T67FT66C -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T67FT66C -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T67FT66C -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T67FT66C -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T67M0115 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T67M0115 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T67M0115 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T67M0115 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T680T66D -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T680T66D -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T680T66D -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T680T66D -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T681T320 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T681T320 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T681T320 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T681T320 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6840336 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6840336 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6840336 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6840336 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T685T6BE -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T685T6BE -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T685T6BE -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T685T6BE -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T68L0053 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T68L0053 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T68L0053 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T68L0053 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6A9T5T1 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6A9T5T1 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6A9T5T1 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6A9T5T1 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6AAT5T3 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6AAT5T3 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6AAT5T3 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6AAT5T3 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6AB0086 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6AB0086 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6AB0086 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6AB0086 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6B60122 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6B60122 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6B60122 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6B60122 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6B70063 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6B70063 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6B70063 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6B70063 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6B90329 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6B90329 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6B90329 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6B90329 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BB0304 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BB0304 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BB0304 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BB0304 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BET66G -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BET66G -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BET66G -0.0627 -0.0627 GLOB UNIF EL-3-W
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B352 of 382

LOAD Z T6BET66G -0.0089 -0.0089 GLOB UNIF EL-4-W


LOAD Z T6BF0042 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BF0042 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BF0042 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BF0042 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BH0029 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BH0029 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BH0029 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BH0029 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BI0130 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BI0130 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BI0130 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BI0130 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BJ0037 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BJ0037 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BJ0037 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BJ0037 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BK0035 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BK0035 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BK0035 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BK0035 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOAD Z T6BL0034 -0.0123 -0.0123 GLOB UNIF EL-1-W
LOAD Z T6BL0034 -0.0011 -0.0011 GLOB UNIF EL-2-W
LOAD Z T6BL0034 -0.0627 -0.0627 GLOB UNIF EL-3-W
LOAD Z T6BL0034 -0.0089 -0.0089 GLOB UNIF EL-4-W
LOADCNWDHV
LOAD Z T58JT5U6 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5A7T5XM -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5A8T5XI -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5A9T5XL -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AAT5XH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5ACT5XG -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5ADT5XD -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AET5XE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AFT5XF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5UAT58K -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5X9T5AC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XAT5AF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XBT5A9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XCT5A7 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XDT5X9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XET5XA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XET5XD -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XFT5AA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XFT5XG -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XGT5A8 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XHT5XB -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XHT5XI -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XIT5XC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XLT5XK -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XLT5XM -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XMT5XJ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00430332 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00850113 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01140043 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03320333 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0333T496 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03340335 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03350336 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03360337 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03370338 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0338T497 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03390340 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03400085 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T4960334 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T4970339 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00100116 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0024T5U2 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00250028 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0028T5U7 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00290114 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0034T5U4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00350036 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0036T5U9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00370130 -0.0105 -0.0105 GLOB UNIF HVAC-WD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B353 of 382

LOAD Z 00400041 -0.0105 -0.0105 GLOB UNIF HVAC-WD


LOAD Z 00410117 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00520341 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00530350 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00860129 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0089T68K -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0113T5O4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0114T5JH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01150010 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0117T68L -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0122T59Q -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0129T61Y -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01300052 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0130T5TE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01330024 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01340034 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0327T5AA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03360345 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03410342 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03420343 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03430344 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03440345 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03450346 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0345T5BV -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03460347 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03470348 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03480349 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0349T6AB -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03500351 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03510352 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03520353 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03530471 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 04710472 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 04720473 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 04730474 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 04740475 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 04750089 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T317T66Z -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T317T66Y -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T319T67F -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T320T680 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T59Q0113 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5A8T684 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AAT5A8 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BVT622 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BW0471 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JHT6BI -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5O4T5T2 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T20129 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T4T67M -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TET5TF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TFT673 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U20025 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U40035 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U70029 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U90037 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5UPT681 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T61YT5T4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T622T5BW -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66C0122 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66D0327 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66E0119 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0003T5O3 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0030T5J7 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0037T58P -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0333T5AK -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0334T5YC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0335T5AJ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0337T5AI -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0338T5Y4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0339T5AH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58PT58Q -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58Q0041 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58T0009 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AH0348 -0.0105 -0.0105 GLOB UNIF HVAC-WD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B354 of 382

LOAD Z T5AI0346 -0.0105 -0.0105 GLOB UNIF HVAC-WD


LOAD Z T5AJ0344 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AK0342 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J70024 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5O3T58T -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P2T5P5 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P3RRRR -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P4TTTT -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P5T5VR -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P6T5P9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z TTTTT5P1 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z RRRRT5P2 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P9T5P5 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5VRT5P1 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5Y40347 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5YC0343 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00030131 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00090132 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0009T61Z -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00190121 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00300031 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00310032 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00320033 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00330119 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0036T504 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00420043 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00420101 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0063T6B6 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0063T59P -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01010137 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01130003 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0119T6BF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01200030 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0120T5J6 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0121T5LU -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01220019 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01290009 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0132T620 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0134T493 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01370138 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0138T6BB -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03040327 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03270328 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0328T6B9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03290330 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03300331 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0331T6B7 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03310340 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T317T685 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T320T66F -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T492T502 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T493T492 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T502T503 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T503T504 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T504T5BJ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58U0010 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BH0133 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BI0116 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BJ0040 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J6T5BH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J6T5J7 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J6T5JI -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J7T5J8 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J8T5J9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J9T5JA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JAT5JB -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JCT5JJ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JDT5JC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JET5U3 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JFT5JE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JGT5U8 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JHT5JG -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5O2T5LV -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5O3T5O2 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5O4T5O3 -0.0105 -0.0105 GLOB UNIF HVAC-WD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B355 of 382

LOAD Z T5U3T5JD -0.0105 -0.0105 GLOB UNIF HVAC-WD


LOAD Z T5U8T5JF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T61ZT58U -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T620T5BI -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66FT319 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66GT320 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00190003 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0024T58J -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0025T5U5 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0028T58I -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0029T58K -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0031T5J8 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0032T5J9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0033T5JA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0034T502 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0035T503 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 00430052 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0052T58N -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0085T5T1 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0086T61X -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 01010332 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0121T5BG -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0131T5O2 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0133T5JC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0137T5AE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0138T5XA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0304T5AF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0328T5XB -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0329T5A9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0330T5XK -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 03320341 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0340T58V -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0341T58X -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0342T58Y -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0343T5TQ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0344T623 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0346T5BU -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0347T61U -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0348T5BR -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z 0349T61W -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58IT5JF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58IT5UA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58JT5JD -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58KT5JG -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58NT5TG -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58NT62A -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58O0053 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58OT5TH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58PT5TE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58QT5TF -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58V0349 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58VT6A9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58W0475 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58WT6AA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58XT5TS -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58XT628 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58YT5TU -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58YT626 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58Z0350 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T58ZT5TT -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5900351 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T590T5TV -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T59P0085 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5A70338 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5A9T5A7 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AC0335 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AD0333 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AET5AD -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5AFT5AC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BG0131 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BRT61V -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BS0474 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BT0472 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5BUT621 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5J80025 -0.0105 -0.0105 GLOB UNIF HVAC-WD
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B356 of 382

LOAD Z T5J90028 -0.0105 -0.0105 GLOB UNIF HVAC-WD


LOAD Z T5JAT6BH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JCT5P3 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JDT6BL -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JET6BK -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JF0036 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5JGT6BJ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P3T5P6 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P40134 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P6T5P4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z RRRRT5P9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5P9TTTT -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T10086 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T1T5T2 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T2T58T -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T30089 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T3T5T4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5T4T58U -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TET58N -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TFT58O -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TGT58X -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TGT629 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5THT58Z -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TQT624 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TR0352 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TST58Y -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TST627 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TTT590 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TUT5TQ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TUT625 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5TVT5TR -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U5T58I -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U5T5JE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5U6T5U5 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5X90334 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XAT5X9 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XBT5XC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XC0337 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XJ0339 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5XKT5XJ -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T61U0473 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T61VT5BS -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T61WT58W -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T61XT5T3 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T621T5BT -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6230353 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T624T5TR -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T625T5TV -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T626T590 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T627T5TT -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T628T58Z -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T629T5TH -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T62AT58O -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66DT6B8 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66ET6BC -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66FT66H -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66GT66I -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66H0330 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66HT6B5 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66I0137 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66IT6BA -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T5O20132 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66YT66E -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T66ZT5UO -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6730117 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T67FT66C -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T67M0115 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T680T66D -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T681T320 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6840336 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T685T6BE -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T68L0053 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD T6A0 -25.000 GLOB JOIN AIR-HAND
LOAD T6A1 -25.000 GLOB JOIN AIR-HAND
LOAD T6A2 -35.000 GLOB JOIN AIR-COOL
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B357 of 382

LOAD T6A3 -35.000 GLOB JOIN AIR-COOL


LOAD Z T6A9T5T1 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6AAT5T3 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6AB0086 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6B4T66C -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6B5T6B4 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6B60122 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6B70063 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6B8T66H -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6B90329 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BAT66D -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BB0304 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BCT6BD -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BDT66I -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BET66G -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BF0042 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BH0029 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BI0130 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BJ0037 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BK0035 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOAD Z T6BL0034 -0.0105 -0.0105 GLOB UNIF HVAC-WD
LOADCNWDIN
LOAD Z 0117T68L -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 00530350 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03500351 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03510352 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03520353 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03530471 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 04710472 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 04720473 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 04730474 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 04740475 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 04750089 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0089T68K -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T5T30089 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0086T61X -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T5T10086 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0085T5T1 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T4970339 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0338T497 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03370338 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03360337 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03350336 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03340335 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T4960334 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0333T496 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03390340 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T5AD0333 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T5AET5AD -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0137T5AE -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 01370138 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 0138T6BB -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03040327 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03270328 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03320333 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 00430332 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 00430052 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z 03400085 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T61XT5T3 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T68L0053 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOAD Z T6BB0304 -0.2500 -0.2500 GLOB UNIF IN-WE-1
LOADCNWDMD
LOAD T69R -40.000 GLOB JOIN AIR-C-PA
LOAD T69T -2.0000 GLOB JOIN MET-BAR
LOAD T69U -20.000 GLOB JOIN N-ST-PAC
LOAD T69V -30.510 GLOB JOIN P-W-SKD
LOAD T69S -13.000 GLOB JOIN CO-IN-PK
LOADCNWDMO
LOAD T69R -60.000 GLOB JOIN AIR-C-PA
LOAD T69T -3.0000 GLOB JOIN MET-BAR
LOAD T69U -20.000 GLOB JOIN N-ST-PAC
LOAD T69V -96.400 GLOB JOIN P-W-SKD
LOAD T69S -34.980 GLOB JOIN CO-IN-PK
LOADCNWDPD
***LDS1** -3.384 8.000 21.130 -1.000 8.000 21.130 -3.384
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B358 of 382

***LDS2** 6.750 21.130 -1.000 6.750 21.130 3.360


***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-1
LOAD Z T58U0010 -1.4700 -1.4700 GLOB UNIF PI-W-1
LOAD Z T5BI0116 -1.4700 -1.4700 GLOB UNIF PI-W-1
LOAD Z T61ZT58U -1.4700 -1.4700 GLOB UNIF PI-W-1
LOAD Z T620T5BI -1.4700 -1.4700 GLOB UNIF PI-W-1
***LDS1** -3.384 6.750 21.130 -1.000 6.750 21.130 -3.384
***LDS2** 4.000 21.130 -1.000 4.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-1
LOAD Z T5T4T67M -2.0580 -2.0580 GLOB UNIF PI-W-1
LOAD Z T58U0010 -1.1760 -1.1760 GLOB UNIF PI-W-1
LOAD Z T58W0475 -1.1760 -1.1760 GLOB UNIF PI-W-1
LOAD Z T5T30089 -2.0580 -2.0580 GLOB UNIF PI-W-1
LOAD Z T61WT58W -1.1760 -1.1760 GLOB UNIF PI-W-1
LOAD Z T61XT5T3 -2.0580 -2.0580 GLOB UNIF PI-W-1
LOAD Z T61YT5T4 -2.0580 -2.0580 GLOB UNIF PI-W-1
LOAD Z T61ZT58U -1.1760 -1.1760 GLOB UNIF PI-W-1
***LDS1** -3.384 4.000 21.130 -1.000 4.000 21.130 -3.384
***LDS2** -2.000 21.130 -1.000 -2.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-1
LOAD Z T5BW0471 -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T58W0475 -1.1760 -1.1760 GLOB UNIF PI-W-1
LOAD Z T5BS0474 -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T5BT0472 -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T5TR0352 -1.1760 -1.1760 GLOB UNIF PI-W-1
LOAD Z T61U0473 -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T61VT5BS -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T61WT58W -1.1760 -1.1760 GLOB UNIF PI-W-1
LOAD Z T621T5BT -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T622T5BW -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T6230353 -2.3520 -2.3520 GLOB UNIF PI-W-1
LOAD Z T624T5TR -1.1760 -1.1760 GLOB UNIF PI-W-1
***LDS1** -3.384 -3.000 21.130 -3.384 -2.000 21.130 -1.000
***LDS2** -3.000 21.130 -1.000 -2.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-1
LOAD Z 03510352 -1.7052 -1.7052 GLOB UNIF PI-W-1
LOAD Z T590T5TV -3.9020 -3.9020 GLOB UNIF PI-W-1
LOAD Z T5TVT5TR -3.9020 -3.9020 GLOB UNIF PI-W-1
***LDS1** -3.384 -4.000 21.130 -3.384 -3.000 21.130 -1.000
***LDS2** -4.000 21.130 -1.000 -3.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-1
LOAD Z 03500351 -1.7052 -1.7052 GLOB UNIF PI-W-1
LOAD Z T58ZT5TT -3.9020 -3.9020 GLOB UNIF PI-W-1
LOAD Z T5TTT590 -3.9020 -3.9020 GLOB UNIF PI-W-1
***LDS1** -3.384 -5.000 21.130 -3.384 -4.000 21.130 -1.000
***LDS2** -5.000 21.130 -1.000 -4.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-1
LOAD Z 00530350 -1.7052 -1.7052 GLOB UNIF PI-W-1
LOAD Z T58OT5TH -3.9020 -3.9020 GLOB UNIF PI-W-1
LOAD Z T5THT58Z -3.9020 -3.9020 GLOB UNIF PI-W-1
***LDS1** -11.000 -5.000 21.130 -1.000 -5.000 21.130 -11.000
***LDS2** -5.750 21.130 -1.000 -5.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-2
LOAD Z 0114T5JH -1.1910 -1.1910 GLOB UNIF PI-W-2
LOAD Z 0130T5TE -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T5JHT6BI -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T5TET5TF -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T5TFT673 -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z 00430052 -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z 0052T58N -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T58NT62A -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T58O0053 -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T62AT58O -0.9187 -0.9187 GLOB UNIF PI-W-2
***LDS1** -11.000 -5.750 21.130 -1.000 -5.750 21.130 -11.000
***LDS2** -6.750 21.130 -1.000 -6.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-2
LOAD Z 0114T5JH -1.5880 -1.5880 GLOB UNIF PI-W-2
LOAD Z 0130T5TE -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T5JHT6BI -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T5TET5TF -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T5TFT673 -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z 0037T58P -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T58PT58Q -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T58Q0041 -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z 0029T58K -1.2250 -1.2250 GLOB UNIF PI-W-2
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B359 of 382

LOAD Z T58KT5JG -1.2250 -1.2250 GLOB UNIF PI-W-2


LOAD Z T5JGT6BJ -1.2250 -1.2250 GLOB UNIF PI-W-2
***LDS1** -6.000 -6.750 21.130 -1.000 -6.750 21.130 -6.000
***LDS2** -7.750 21.130 -1.000 -7.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-2
LOAD Z 0037T58P -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T58PT58Q -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T58Q0041 -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z 0036T504 -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T504T5BJ -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T5BJ0040 -1.2250 -1.2250 GLOB UNIF PI-W-2
***LDS1** -11.000 -7.750 21.130 -11.000 -6.750 21.130 -6.000
***LDS2** -7.750 21.130 -6.000 -6.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-2
LOAD Z T5UAT58K -2.4500 -2.4500 GLOB UNIF PI-W-2
LOAD Z 0028T5U7 -0.6125 -0.6125 GLOB UNIF PI-W-2
LOAD Z 0036T5U9 -3.6750 -3.6750 GLOB UNIF PI-W-2
LOAD Z T5U70029 -0.6125 -0.6125 GLOB UNIF PI-W-2
LOAD Z T5U90037 -3.6750 -3.6750 GLOB UNIF PI-W-2
LOAD Z T5U8T5JG -5.5125 -5.5125 GLOB UNIF PI-W-2
LOAD Z T5JFT5U8 -5.5125 -5.5125 GLOB UNIF PI-W-2
LOAD Z T58IT5UA -2.4500 -2.4500 GLOB UNIF PI-W-2
***LDS1** -11.000 3.000 21.130 -3.384 3.000 21.130 -11.000
***LDS2** -2.000 21.130 -3.384 -2.000 21.130 2.000
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-3
LOAD Z 03360345 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0345T5BV -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z T5BVT622 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0334T5YC -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z 0335T5AJ -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0337T5AI -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0338T5Y4 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0339T5AH -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z T5AH0348 -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z T5AI0346 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z T5AJ0344 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z T5Y40347 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z T5YC0343 -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z 0343T5TQ -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z 0344T623 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0346T5BU -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0347T61U -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z 0348T5BR -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z T5BRT61V -0.7000 -0.7000 GLOB UNIF PI-W-3
LOAD Z T5BUT621 -1.4000 -1.4000 GLOB UNIF PI-W-3
LOAD Z T5TQT624 -0.7000 -0.7000 GLOB UNIF PI-W-3
***LDS1** -15.000 6.750 21.130 -11.000 6.750 21.130 -15.000
***LDS2** 5.000 21.130 -11.000 5.000 21.130 0.700
***LDS3** 0.250 0 1 3 0 0WDPD -2EQUPPRESPI-W-4
LOAD Z 0122T59Q -0.6926 -0.6926 GLOB UNIF PI-W-4
LOAD Z T59Q0113 -0.4287 -0.4287 GLOB UNIF PI-W-4
LOAD Z 0063T59P -0.1837 -0.1837 GLOB UNIF PI-W-4
LOAD Z 00190003 -0.2450 -0.2450 GLOB UNIF PI-W-4
LOAD Z T59P0085 -0.1837 -0.1837 GLOB UNIF PI-W-4
LOAD Z T6730117 -0.91870.32900-0.9187 GLOB UNIF PI-W-2
LOAD Z T6730117 -1.22500.32900-1.2250 GLOB UNIF PI-W-2
LOAD Z T67M0115 -2.05800.42100-2.0580 GLOB UNIF PI-W-1
LOAD Z T6BI0130 -0.9187 -0.9187 GLOB UNIF PI-W-2
LOAD Z T6BI0130 -1.2250 -1.2250 GLOB UNIF PI-W-2
LOAD Z T6BJ0037 -1.2250 -1.2250 GLOB UNIF PI-W-2
LOADCNWDPO
***LDS1** -3.384 8.000 21.130 -1.000 8.000 21.130 -3.384
***LDS2** 6.750 21.130 -1.000 6.750 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-1
LOAD Z T58U0010 -2.1000 -2.1000 GLOB UNIF PI-W-1
LOAD Z T5BI0116 -2.1000 -2.1000 GLOB UNIF PI-W-1
LOAD Z T61ZT58U -2.1000 -2.1000 GLOB UNIF PI-W-1
LOAD Z T620T5BI -2.1000 -2.1000 GLOB UNIF PI-W-1
***LDS1** -3.384 6.750 21.130 -1.000 6.750 21.130 -3.384
***LDS2** 4.000 21.130 -1.000 4.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-1
LOAD Z T5T4T67M -2.9400 -2.9400 GLOB UNIF PI-W-1
LOAD Z T58U0010 -1.6800 -1.6800 GLOB UNIF PI-W-1
LOAD Z T58W0475 -1.6800 -1.6800 GLOB UNIF PI-W-1
LOAD Z T5T30089 -2.9400 -2.9400 GLOB UNIF PI-W-1
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B360 of 382

LOAD Z T61WT58W -1.6800 -1.6800 GLOB UNIF PI-W-1


LOAD Z T61XT5T3 -2.9400 -2.9400 GLOB UNIF PI-W-1
LOAD Z T61YT5T4 -2.9400 -2.9400 GLOB UNIF PI-W-1
LOAD Z T61ZT58U -1.6800 -1.6800 GLOB UNIF PI-W-1
***LDS1** -3.384 4.000 21.130 -1.000 4.000 21.130 -3.384
***LDS2** -2.000 21.130 -1.000 -2.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-1
LOAD Z T5BW0471 -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T58W0475 -1.6800 -1.6800 GLOB UNIF PI-W-1
LOAD Z T5BS0474 -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T5BT0472 -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T5TR0352 -1.6800 -1.6800 GLOB UNIF PI-W-1
LOAD Z T61U0473 -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T61VT5BS -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T61WT58W -1.6800 -1.6800 GLOB UNIF PI-W-1
LOAD Z T621T5BT -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T622T5BW -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T6230353 -3.3600 -3.3600 GLOB UNIF PI-W-1
LOAD Z T624T5TR -1.6800 -1.6800 GLOB UNIF PI-W-1
***LDS1** -3.384 -3.000 21.130 -3.384 -2.000 21.130 -1.000
***LDS2** -3.000 21.130 -1.000 -2.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-1
LOAD Z 03510352 -2.4360 -2.4360 GLOB UNIF PI-W-1
LOAD Z T590T5TV -5.5742 -5.5742 GLOB UNIF PI-W-1
LOAD Z T5TVT5TR -5.5742 -5.5742 GLOB UNIF PI-W-1
***LDS1** -3.384 -4.000 21.130 -3.384 -3.000 21.130 -1.000
***LDS2** -4.000 21.130 -1.000 -3.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-1
LOAD Z 03500351 -2.4360 -2.4360 GLOB UNIF PI-W-1
LOAD Z T58ZT5TT -5.5742 -5.5742 GLOB UNIF PI-W-1
LOAD Z T5TTT590 -5.5742 -5.5742 GLOB UNIF PI-W-1
***LDS1** -3.384 -5.000 21.130 -3.384 -4.000 21.130 -1.000
***LDS2** -5.000 21.130 -1.000 -4.000 21.130 3.360
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-1
LOAD Z 00530350 -2.4360 -2.4360 GLOB UNIF PI-W-1
LOAD Z T58OT5TH -5.5742 -5.5742 GLOB UNIF PI-W-1
LOAD Z T5THT58Z -5.5742 -5.5742 GLOB UNIF PI-W-1
***LDS1** -11.000 -5.000 21.130 -1.000 -5.000 21.130 -11.000
***LDS2** -5.750 21.130 -1.000 -5.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-2
LOAD Z 0114T5JH -1.7015 -1.7015 GLOB UNIF PI-W-2
LOAD Z 0130T5TE -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T5JHT6BI -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T5TET5TF -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T5TFT673 -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z 00430052 -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z 0052T58N -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T58NT62A -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T58O0053 -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T62AT58O -1.3125 -1.3125 GLOB UNIF PI-W-2
***LDS1** -11.000 -5.750 21.130 -1.000 -5.750 21.130 -11.000
***LDS2** -6.750 21.130 -1.000 -6.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-2
LOAD Z 0114T5JH -2.2686 -2.2686 GLOB UNIF PI-W-2
LOAD Z 0130T5TE -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T5JHT6BI -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T5TET5TF -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T5TFT673 -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z 0037T58P -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T58PT58Q -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T58Q0041 -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z 0029T58K -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T58KT5JG -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T5JGT6BJ -1.7500 -1.7500 GLOB UNIF PI-W-2
***LDS1** -6.000 -6.750 21.130 -1.000 -6.750 21.130 -6.000
***LDS2** -7.750 21.130 -1.000 -7.750 21.130 3.500
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-2
LOAD Z 0037T58P -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T58PT58Q -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T58Q0041 -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z 0036T504 -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T504T5BJ -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T5BJ0040 -1.7500 -1.7500 GLOB UNIF PI-W-2
***LDS1** -11.000 -7.750 21.130 -11.000 -6.750 21.130 -6.000
***LDS2** -7.750 21.130 -6.000 -6.750 21.130 3.500
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B361 of 382

***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-2


LOAD Z T5UAT58K -3.5000 -3.5000 GLOB UNIF PI-W-2
LOAD Z 0028T5U7 -0.8750 -0.8750 GLOB UNIF PI-W-2
LOAD Z 0036T5U9 -5.2500 -5.2500 GLOB UNIF PI-W-2
LOAD Z T5U70029 -0.8750 -0.8750 GLOB UNIF PI-W-2
LOAD Z T5U90037 -5.2500 -5.2500 GLOB UNIF PI-W-2
LOAD Z T5U8T5JG -7.8750 -7.8750 GLOB UNIF PI-W-2
LOAD Z T5JFT5U8 -7.8750 -7.8750 GLOB UNIF PI-W-2
LOAD Z T58IT5UA -3.5000 -3.5000 GLOB UNIF PI-W-2
***LDS1** -11.000 3.000 21.130 -3.384 3.000 21.130 -11.000
***LDS2** -2.000 21.130 -3.384 -2.000 21.130 2.000
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-3
LOAD Z 03360345 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0345T5BV -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z T5BVT622 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0334T5YC -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z 0335T5AJ -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0337T5AI -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0338T5Y4 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0339T5AH -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z T5AH0348 -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z T5AI0346 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z T5AJ0344 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z T5Y40347 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z T5YC0343 -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z 0343T5TQ -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z 0344T623 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0346T5BU -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0347T61U -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z 0348T5BR -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z T5BRT61V -1.0000 -1.0000 GLOB UNIF PI-W-3
LOAD Z T5BUT621 -2.0000 -2.0000 GLOB UNIF PI-W-3
LOAD Z T5TQT624 -1.0000 -1.0000 GLOB UNIF PI-W-3
***LDS1** -15.000 6.750 21.130 -11.000 6.750 21.130 -15.000
***LDS2** 5.000 21.130 -11.000 5.000 21.130 0.700
***LDS3** 0.250 0 1 3 0 0WDPO -2EQUPPRESPI-W-4
LOAD Z 0122T59Q -0.9895 -0.9895 GLOB UNIF PI-W-4
LOAD Z T59Q0113 -0.6125 -0.6125 GLOB UNIF PI-W-4
LOAD Z 0063T59P -0.2625 -0.2625 GLOB UNIF PI-W-4
LOAD Z 00190003 -0.3500 -0.3500 GLOB UNIF PI-W-4
LOAD Z T59P0085 -0.2625 -0.2625 GLOB UNIF PI-W-4
LOAD Z T6730117 -1.31250.32900-1.3125 GLOB UNIF PI-W-2
LOAD Z T6730117 -1.75000.32900-1.7500 GLOB UNIF PI-W-2
LOAD Z T67M0115 -2.94000.42100-2.9400 GLOB UNIF PI-W-1
LOAD Z T6BI0130 -1.3125 -1.3125 GLOB UNIF PI-W-2
LOAD Z T6BI0130 -1.7500 -1.7500 GLOB UNIF PI-W-2
LOAD Z T6BJ0037 -1.7500 -1.7500 GLOB UNIF PI-W-2
LOADCNWDSA
LOAD T5BW -1.5000 GLOB JOIN SA-1-W
LOAD Z T58JT5U6 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5A7T5XM -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5A8T5XI -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5A9T5XL -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AAT5XH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5ACT5XG -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5ADT5XD -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AET5XE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AFT5XF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5UAT58K -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5X9T5AC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XAT5AF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XBT5A9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XCT5A7 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XDT5X9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XET5XA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XET5XD -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XFT5AA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XFT5XG -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XGT5A8 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XHT5XB -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XHT5XI -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XIT5XC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XLT5XK -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XLT5XM -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XMT5XJ -0.0224 -0.0224 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B362 of 382

LOAD Z 00430332 -0.0224 -0.0224 GLOB UNIF SAF-BULK


LOAD Z 00850113 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01140043 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03320333 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0333T496 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03340335 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03350336 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03360337 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03370338 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0338T497 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03390340 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03400085 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T4960334 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T4970339 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00100116 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0024T5U2 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00250028 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0028T5U7 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00290114 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0034T5U4 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00350036 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0036T5U9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00370130 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00400041 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00410117 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00520341 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00530350 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00860129 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0089T68K -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0113T5O4 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0114T5JH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01150010 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0117T68L -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0122T59Q -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0129T61Y -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01300052 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0130T5TE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01330024 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01340034 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0327T5AA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03360345 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03410342 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03420343 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03430344 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03440345 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03450346 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0345T5BV -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03460347 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03470348 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03480349 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0349T6AB -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03500351 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03510352 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03520353 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03530471 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 04710472 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 04720473 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 04730474 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 04740475 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 04750089 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T317T66Y -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T317T66Z -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T319T67F -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T320T680 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T59Q0113 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5A8T684 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AAT5A8 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BVT622 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BW0471 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JHT6BI -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5O4T5T2 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T20129 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T4T67M -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TET5TF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TFT673 -0.0224 -0.0224 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B363 of 382

LOAD Z T5U20025 -0.0224 -0.0224 GLOB UNIF SAF-BULK


LOAD Z T5U40035 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U70029 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U90037 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5UPT681 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0003T5O3 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0030T5J7 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0037T58P -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0333T5AK -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0334T5YC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0335T5AJ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0337T5AI -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0338T5Y4 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0339T5AH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58PT58Q -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58Q0041 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58T0009 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AH0348 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AI0346 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AJ0344 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AK0342 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J70024 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5O3T58T -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P2T5P5 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P3RRRR -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P4TTTT -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P5T5VR -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P6T5P9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z TTTTT5P1 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z RRRRT5P2 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P9T5P5 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5VRT5P1 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5Y40347 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5YC0343 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00030131 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00090132 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0009T61Z -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00190121 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00300031 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00310032 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00320033 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00330119 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0036T504 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00420043 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00420101 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0063T6B6 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0063T59P -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01010137 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01130003 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0119T6BF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01200030 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0120T5J6 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0121T5LU -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01220019 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01290009 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0132T620 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0134T493 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01370138 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0138T6BB -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03040327 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03270328 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0328T6B9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03290330 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03300331 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0331T6B7 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03310340 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T317T685 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T320T66F -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T492T502 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T493T492 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T502T503 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T503T504 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T504T5BJ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58U0010 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BH0133 -0.0224 -0.0224 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B364 of 382

LOAD Z T5BI0116 -0.0224 -0.0224 GLOB UNIF SAF-BULK


LOAD Z T5BJ0040 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J6T5BH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J6T5J7 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J6T5JI -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J7T5J8 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J8T5J9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J9T5JA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JAT5JB -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JCT5JJ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JDT5JC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JET5U3 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JFT5JE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JGT5U8 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JHT5JG -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5O2T5LV -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5O3T5O2 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5O4T5O3 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U3T5JD -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U8T5JF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00190003 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0024T58J -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0025T5U5 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0028T58I -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0029T58K -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0031T5J8 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0032T5J9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0033T5JA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0034T502 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0035T503 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 00430052 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0052T58N -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0085T5T1 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0086T61X -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 01010332 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0121T5BG -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0131T5O2 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0133T5JC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0137T5AE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0138T5XA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0304T5AF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0328T5XB -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0329T5A9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0330T5XK -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 03320341 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0340T58V -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0341T58X -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0342T58Y -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0343T5TQ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0344T623 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0346T5BU -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0347T61U -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0348T5BR -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z 0349T61W -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58IT5JF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58IT5UA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58JT5JD -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58KT5JG -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58NT62A -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58NT5TG -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58O0053 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58OT5TH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58PT5TE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58QT5TF -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58V0349 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58VT6A9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58W0475 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58WT6AA -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58XT628 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58XT5TS -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58YT626 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58YT5TU -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58Z0350 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T58ZT5TT -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5900351 -0.0224 -0.0224 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B365 of 382

LOAD Z T590T5TV -0.0224 -0.0224 GLOB UNIF SAF-BULK


LOAD Z T59P0085 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5A70338 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5A9T5A7 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AC0335 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AD0333 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AET5AD -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5AFT5AC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BG0131 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BRT61V -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BS0474 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BT0472 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5BUT621 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J80025 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5J90028 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JAT6BH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JCT5P3 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JDT6BL -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JET6BK -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JF0036 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5JGT6BJ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P3T5P6 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P40134 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P6T5P4 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z RRRRT5P9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5P9TTTT -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T10086 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T1T5T2 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T2T58T -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T30089 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T3T5T4 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5T4T58U -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TET58N -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TFT58O -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TGT58X -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TGT629 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5THT58Z -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TQT624 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TR0352 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TST58Y -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TST627 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TTT590 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TUT5TQ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TUT625 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5TVT5TR -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U5T58I -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U5T5JE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5U6T5U5 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5X90334 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XAT5X9 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XBT5XC -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XC0337 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XJ0339 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5XKT5XJ -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T5O20132 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD T5O4 -1.0000 GLOB JOIN SA-2-W
LOAD Z T61U0473 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T61VT5BS -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T61WT58W -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T61XT5T3 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T61YT5T4 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T61ZT58U -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T620T5BI -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T621T5BT -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T622T5BW -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6230353 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T624T5TR -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T625T5TV -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T626T590 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T627T5TT -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T628T58Z -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T629T5TH -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T62AT58O -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T66C0122 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T66D0327 -0.0224 -0.0224 GLOB UNIF SAF-BULK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B366 of 382

LOAD Z T66E0119 -0.0224 -0.0224 GLOB UNIF SAF-BULK


LOAD Z T66FT319 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T66GT320 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T66YT66E -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T66ZT5UO -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6730117 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T67FT66C -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T67M0115 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T680T66D -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T681T320 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6840336 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T685T6BE -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T68L0053 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6A9T5T1 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6AAT5T3 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6AB0086 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6B60122 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6B70063 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6B90329 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BB0304 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BET66G -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BF0042 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BH0029 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BI0130 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BJ0037 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BK0035 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOAD Z T6BL0034 -0.0224 -0.0224 GLOB UNIF SAF-BULK
LOADCNWDST
LOAD 0113 -8.0000 GLOB JOIN DIAM-WE
LOAD 0114 -8.0000 GLOB JOIN DIAM-WE
LOAD 0116 -8.0000 GLOB JOIN DIAM-WE
LOAD 0115 -3.8000 GLOB JOIN WING-WE
LOAD 0471 -3.8000 GLOB JOIN WING-WE
LOAD 0117 -3.8000 GLOB JOIN WING-WE
LOAD 0130 -3.8000 GLOB JOIN WING-WE
LOAD 0129 -3.8000 GLOB JOIN WING-WE
LOAD 0336 -3.8000 GLOB JOIN WING-WE
LOAD T497 -3.8000 GLOB JOIN WING-WE
LOAD T496 -3.8000 GLOB JOIN WING-WE
LOAD 0133 -3.8000 GLOB JOIN WING-WE
LOAD 0120 -3.8000 GLOB JOIN WING-WE
LOAD 0119 -3.8000 GLOB JOIN WING-WE
LOAD 0327 -3.8000 GLOB JOIN WING-WE
LOAD 0122 -3.8000 GLOB JOIN WING-WE
LOAD T319 -3.8000 GLOB JOIN WING-WE
LOAD T320 -3.8000 GLOB JOIN WING-WE
LOAD T317 -3.8000 GLOB JOIN WING-WE
LOAD T5UO -3.8000 GLOB JOIN WING-WE
LOAD T5UP -3.8000 GLOB JOIN WING-WE
LOAD T493 -3.8000 GLOB JOIN WING-WE
***LDS1** -4.400 3.000 21.130 -2.200 3.000 21.130 -4.400
***LDS2** 1.000 21.130 -2.200 1.000 21.130 0.940
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL12
LOAD Z 0347T61U 1.60000-0.9400 -0.9400 GLOB UNIF PL12
LOAD Z T5BRT61V -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T5BUT621 -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T61U0473 -0.94001.18400-0.9400 GLOB UNIF PL12
LOAD Z T61VT5BS -0.4700 -0.4700 GLOB UNIF PL12
LOAD Z T621T5BT -0.4700 -0.4700 GLOB UNIF PL12
***LDS1** -15.000 8.000 21.130 -1.000 8.000 21.130 -15.000
***LDS2** 5.750 21.130 -1.000 5.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0113T5O4 -0.5803 -0.5803 GLOB UNIF PL6
LOAD Z 0122T59Q -0.5088 -0.5088 GLOB UNIF PL6
LOAD Z 0129T61Y -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T59Q0113 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5O4T5T2 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5T20129 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5T4T67M -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T61YT5T4 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0003T5O3 -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z T58T0009 -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z T5O3T58T -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z 0009T61Z -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z 0132T620 -0.3937 -0.3937 GLOB UNIF PL6
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B367 of 382

LOAD Z T58U0010 -0.7087 -0.7087 GLOB UNIF PL6


LOAD Z T5BI0116 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T61ZT58U -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z T620T5BI -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z 00190003 -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z 0121T5BG -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z 0131T5O2 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T5BG0131 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T5O20132 -0.3937 -0.3937 GLOB UNIF PL6
***LDS1** -15.000 5.750 21.130 -1.000 5.750 21.130 -15.000
***LDS2** 3.000 21.130 -1.000 3.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0113T5O4 -0.4352 -0.4352 GLOB UNIF PL6
LOAD Z 0122T59Q -0.3816 -0.3816 GLOB UNIF PL6
LOAD Z 0129T61Y -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T59Q0113 -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T5O4T5T2 -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T5T20129 -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T5T4T67M -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T61YT5T4 -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z 0339T5AH -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5AH0348 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0063T59P -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z 03310340 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0085T5T1 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z 0086T61X -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z 0330T5XK -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0340T58V -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0348T5BR -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0349T61W -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T58V0349 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T58W0475 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T59P0085 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z T5BRT61V -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BS0474 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5T10086 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z T5T30089 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z T5XJ0339 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5XKT5XJ -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T61VT5BS -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T61WT58W -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T61XT5T3 -0.5512 -0.5512 GLOB UNIF PL6
***LDS1** -17.540 5.750 21.130 -15.000 5.750 21.130 -17.540
***LDS2** -5.750 21.130 -15.000 -5.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T317T66Y -1.8112 -1.8112 GLOB UNIF PL6
LOAD Z T319T67F -1.8112 -1.8112 GLOB UNIF PL6
LOAD Z T320T680 -3.6225 -3.6225 GLOB UNIF PL6
***LDS1** -6.000 3.000 21.130 -4.400 3.000 21.130 -6.000
***LDS2** 21.130 -4.400 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0345T5BV -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0346T5BU -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0347T61U -0.63001.60000-0.6300 GLOB UNIF PL6
LOAD Z 0348T5BR -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -4.400 1.000 21.130 -1.000 1.000 21.130 -4.400
***LDS2** 21.130 -1.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T5BVT622 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BW0471 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T622T5BW -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BT0472 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BUT621 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T621T5BT -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -2.200 3.000 21.130 -1.000 3.000 21.130 -2.200
***LDS2** 1.000 21.130 -1.000 1.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T5BS0474 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BT0472 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T61U0473 1.18400-0.6300 -0.6300 GLOB UNIF PL6
***LDS1** -6.000 21.130 -1.000 21.130 -6.000
***LDS2** -2.000 21.130 -1.000 -2.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0345T5BV -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BVT622 -0.3150 -0.3150 GLOB UNIF PL6
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B368 of 382

LOAD Z T5BW0471 -0.3150 -0.3150 GLOB UNIF PL6


LOAD Z T622T5BW -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0343T5TQ -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0344T623 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5TQT624 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5TR0352 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T6230353 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T624T5TR -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -6.000 -5.750 21.130 -6.000 -2.000 21.130 -3.950
***LDS2** -5.750 21.130 -3.950 -2.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 00520341 -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z 01300052 -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z 03410342 -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z 03420343 -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T58NT5TG -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T58XT5TS -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T58YT5TU -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T5TET58N -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T5TGT58X -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T5TST58Y -0.6457 -0.6457 GLOB UNIF PL6
LOAD Z T5TUT5TQ -0.6457 -0.6457 GLOB UNIF PL6
***LDS1** -2.450 -2.000 21.130 -1.000 -2.000 21.130 -2.450
***LDS2** -5.750 21.130 -1.000 -5.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T5TFT673 -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T58O0053 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z T58Z0350 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5900351 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5TR0352 -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -3.950 -2.000 21.130 -2.450 -2.000 21.130 -3.950
***LDS2** -5.750 21.130 -2.450 -5.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T5TET5TF -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T58NT62A -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T58XT628 -0.3780 -0.3780 GLOB UNIF PL6
LOAD Z T58YT626 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5TGT629 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5TQT624 -0.1732 -0.1732 GLOB UNIF PL6
LOAD Z T5TST627 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5TUT625 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T624T5TR -0.1732 -0.1732 GLOB UNIF PL6
LOAD Z T625T5TV -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T626T590 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T627T5TT -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T628T58Z -0.3780 -0.3780 GLOB UNIF PL6
LOAD Z T629T5TH -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T62AT58O -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -11.000 3.000 21.130 -6.000 3.000 21.130 -11.000
***LDS2** -5.750 21.130 -6.000 -5.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0114T5JH -0.3062 -0.3062 GLOB UNIF PL6
LOAD Z 03360345 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5JHT6BI -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z 0333T5AK -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0334T5YC -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0335T5AJ -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0337T5AI -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0338T5Y4 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0339T5AH -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5AH0348 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5AI0346 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5AJ0344 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5AK0342 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5Y40347 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5YC0343 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 00430052 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z 03320341 -0.6300 -0.6300 GLOB UNIF PL6
***LDS1** -15.000 -5.750 21.130 -11.000 -5.750 21.130 -15.000
***LDS2** -11.000 21.130 -11.000 -11.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0030T5J7 -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z T5J70024 -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z 0120T5J6 0.16000-0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T5BH0133 -0.3937 -0.3937 GLOB UNIF PL6
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B369 of 382

LOAD Z T5J6T5BH -0.3937 -0.3937 GLOB UNIF PL6


LOAD Z 0031T5J8 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0032T5J9 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0033T5JA -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5J80025 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5J90028 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5JAT6BH -0.6300 -0.6300 GLOB UNIF PL6
***LDS1** -6.000 -5.750 21.130 -1.000 -5.750 21.130 -6.000
***LDS2** -7.750 21.130 -1.000 -7.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0130T5TE -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5TET5TF -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5TFT673 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0037T58P -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T58PT58Q -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T58Q0041 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0036T504 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T504T5BJ -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5BJ0040 -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -6.000 -7.750 21.130 -4.000 -7.750 21.130 -6.000
***LDS2** -11.000 21.130 -4.000 -11.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0036T504 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0134T493 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T493T492 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z 0034T502 -0.7087 -0.7087 GLOB UNIF PL6
LOAD Z 0035T503 -0.6300 -0.6300 GLOB UNIF PL6
***LDS1** -8.350 -11.000 21.130 -6.300 -11.000 21.130 -8.350
***LDS2** -13.000 21.130 -6.300 -13.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T5P2T5P5 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5P5T5VR -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5VRT5P1 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5P3T5P6 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5P6T5P4 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z RRRRT5P9 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T5P9TTTT -0.6300 -0.6300 GLOB UNIF PL6
***LDS1** -11.000 -5.750 21.130 -6.000 -5.750 21.130 -11.000
***LDS2** -6.750 21.130 -6.000 -6.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0114T5JH -0.4083 -0.4083 GLOB UNIF PL6
LOAD Z T5JHT6BI -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 0029T58K -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T58KT5JG -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5JGT6BJ -0.3150 -0.3150 GLOB UNIF PL6
***LDS1** -11.000 -9.750 21.130 -11.000 -6.750 21.130 -10.500
***LDS2** -9.750 21.130 -10.500 -6.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T58JT5U6 -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z T5UAT58K -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z 0024T5U2 -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z 00250028 -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z 0028T5U7 -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z T5U20025 -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z T5U70029 -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z T58IT5UA -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z T5U5T58I -0.1575 -0.1575 GLOB UNIF PL6
LOAD Z T5U6T5U5 -0.1575 -0.1575 GLOB UNIF PL6
***LDS1** -10.500 -6.750 21.130 -6.000 -6.750 21.130 -10.500
***LDS2** -9.750 21.130 -6.000 -9.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T58IT5JF -0.4410 -0.4410 GLOB UNIF PL6
LOAD Z T58JT5JD -0.1260 -0.1260 GLOB UNIF PL6
LOAD Z T58KT5JG -0.1890 -0.1890 GLOB UNIF PL6
LOAD Z T5JDT6BL -0.1260 -0.1260 GLOB UNIF PL6
LOAD Z T5JET6BK -0.5040 -0.5040 GLOB UNIF PL6
LOAD Z T5JF0036 -0.4410 -0.4410 GLOB UNIF PL6
LOAD Z T5JGT6BJ -0.1890 -0.1890 GLOB UNIF PL6
LOAD Z T5U5T5JE -0.5040 -0.5040 GLOB UNIF PL6
***LDS1** -11.000 -9.750 21.130 -6.000 -9.750 21.130 -11.000
***LDS2** -11.000 21.130 -6.000 -11.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0024T58J -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z 0133T5JC -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T58JT5JD -0.3937 -0.3937 GLOB UNIF PL6
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B370 of 382

LOAD Z T5JCT5P3 -0.3937 -0.3937 GLOB UNIF PL6


LOAD Z T5JDT6BL -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T5P3T5P6 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T5P40134 -0.3937 -0.3937 GLOB UNIF PL6
LOAD Z T5P6T5P4 -0.3937 -0.3937 GLOB UNIF PL6
***LDS1** -15.000 -3.000 21.130 -15.000 3.000 21.130 -11.000
***LDS2** -3.000 21.130 -11.000 3.000 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T5A7T5XM -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5A8T5XI -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5A9T5XL -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5AAT5XH -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5ACT5XG -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5ADT5XD -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5AET5XE -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5AFT5XF -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5X9T5AC -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5XAT5AF -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5XBT5A9 -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5XCT5A7 -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5XDT5X9 -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5XET5XA -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5XFT5AA -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5XGT5A8 -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5XHT5XB -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5XIT5XC -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z T5XLT5XK -0.9135 -0.9135 GLOB UNIF PL6
LOAD Z T5XMT5XJ -0.6615 -0.6615 GLOB UNIF PL6
LOAD Z 0333T496 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z 03340335 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z 03350336 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z 03360337 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z 03370338 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z 0338T497 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z T4960334 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z T4970339 -0.3465 -0.3465 GLOB UNIF PL6
LOAD Z 01370138 -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z 0138T6BB -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z 03040327 -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z 03270328 -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z 0328T6B9 -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z 03290330 -0.5985 -0.5985 GLOB UNIF PL6
***LDS1** -15.000 -3.000 21.130 -11.000 -3.000 21.130 -15.000
***LDS2** -5.750 21.130 -11.000 -5.750 21.130 0.630
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 00420043 -0.5512 -0.5512 GLOB UNIF PL6
LOAD Z 01010332 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z 0137T5AE -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5AD0333 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T5AET5AD -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z 00100116 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 01150010 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0089T68K -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 04750089 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 04740475 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 04730474 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 04720473 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 04710472 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 03530471 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 03520353 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 03510352 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 03500351 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00530350 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0117T68L -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00410117 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00400041 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5BJ0040 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T504T5BJ -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T503T504 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T502T503 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T492T502 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T493T492 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0134T493 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5P40134 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5P4TTTT -0.2930 -0.2930 GLOB UNIF HRAIL-WE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B371 of 382

LOAD Z TTTTT5P1 -0.2930 -0.2930 GLOB UNIF HRAIL-WE


LOAD Z T5VRT5P1 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5P5T5VR -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5P2T5P5 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z RRRRT5P2 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5P3RRRR -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5JCT5P3 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0133T5JC -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5BH0133 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0120T5J6 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 01200030 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00300031 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00310032 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00320033 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00330119 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T317T66Y -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T317T685 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T320T66F -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T319T67F -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 01220019 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 00190121 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0121T5BG -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5BG0131 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0131T5O2 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5O20132 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z 0132T620 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T620T5BI -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T5BI0116 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD 0531 -34.000 GLOB JOIN CR-ACSS
LOAD 0117 -20.000 GLOB JOIN BOOM-RE
LOAD Z T66C0122 -1.8112 -1.8112 GLOB UNIF PL6
LOAD Z T66C0122 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T66D0327 -3.6225 -3.6225 GLOB UNIF PL6
LOAD Z T66E0119 -1.8112 -1.8112 GLOB UNIF PL6
LOAD Z T66E0119 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T66FT319 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T66GT320 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T66YT66E -1.8112 -1.8112 GLOB UNIF PL6
LOAD Z T66YT66E -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T6730117 -0.23620.32900-0.2362 GLOB UNIF PL6
LOAD Z T6730117 -0.31500.32900-0.3150 GLOB UNIF PL6
LOAD Z T67FT66C -1.8112 -1.8112 GLOB UNIF PL6
LOAD Z T67FT66C -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T67M0115 -0.31500.42100-0.3150 GLOB UNIF PL6
LOAD Z T67M0115 -0.23620.42100-0.2362 GLOB UNIF PL6
LOAD Z T680T66D -3.6225 -3.6225 GLOB UNIF PL6
LOAD Z T685T6BE -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T68L0053 -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T6B90329 -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z T6BB0304 -0.5985 -0.5985 GLOB UNIF PL6
LOAD Z T6BET66G -0.2930 -0.2930 GLOB UNIF HRAIL-WE
LOAD Z T6BH0029 -0.6300 -0.6300 GLOB UNIF PL6
LOAD Z T6BI0130 -0.2362 -0.2362 GLOB UNIF PL6
LOAD Z T6BI0130 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T6BJ0037 -0.3150 -0.3150 GLOB UNIF PL6
LOAD Z T6BJ0037 -0.1890 -0.1890 GLOB UNIF PL6
LOAD Z T6BK0035 -0.5040 -0.5040 GLOB UNIF PL6
LOAD Z T6BL0034 -0.1260 -0.1260 GLOB UNIF PL6
LOAD Z T6BL0034 -0.3937 -0.3937 GLOB UNIF PL6
***LDS1** -15.000 -6.750 18.730 -9.000 -6.750 18.730 -15.000
***LDS2** -9.750 18.730 -9.000 -9.750 18.730 1.000
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESWARE-HOU
LOAD Z 0030T5J7 -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z T5J70024 -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z 0024T58J -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z 0025T5U5 -1.0000 -1.0000 GLOB UNIF WARE-HOU
LOAD Z 0028T58I -1.0000 -1.0000 GLOB UNIF WARE-HOU
LOAD Z 0029T58K -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z 0031T5J8 -1.0000 -1.0000 GLOB UNIF WARE-HOU
LOAD Z 0032T5J9 -1.0000 -1.0000 GLOB UNIF WARE-HOU
LOAD Z 0033T5JA -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z T58IT5JF -1.0000 -1.0000 GLOB UNIF WARE-HOU
LOAD Z T58JT5JD -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z T58KT5JG -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z T5J80025 -1.0000 -1.0000 GLOB UNIF WARE-HOU
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B372 of 382

LOAD Z T5J90028 -1.0000 -1.0000 GLOB UNIF WARE-HOU


LOAD Z T5JAT6BH -0.5000 -0.5000 GLOB UNIF WARE-HOU
LOAD Z T5U5T5JE -1.0000 -1.0000 GLOB UNIF WARE-HOU
LOAD Z T6BH0029 -0.5000 -0.5000 GLOB UNIF WARE-HOU
***LDS1** -17.540 3.000 18.730 -17.540 5.750 18.730 -15.000
***LDS2** 3.000 18.730 -15.000 5.750 18.730 0.628
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 0063T6B6 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z 03300331 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z 0331T6B7 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T66FT319 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6B60122 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6B70063 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T66HT6B5 -0.7975 -0.7975 GLOB UNIF PL6
LOAD Z T6B4T66C -0.7975 -0.7975 GLOB UNIF PL6
LOAD Z T6B5T6B4 -0.7975 -0.7975 GLOB UNIF PL6
***LDS1** -17.540 18.730 -17.540 3.000 18.730 -15.000
***LDS2** 18.730 -15.000 3.000 18.730 0.628
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 03270328 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z 0328T6B9 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z 03290330 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T320T66F -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6B90329 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T66DT6B8 -0.7975 -0.7975 GLOB UNIF PL6
LOAD Z T6B8T66H -0.7975 -0.7975 GLOB UNIF PL6
***LDS1** -17.540 -3.000 18.730 -17.540 18.730 -15.000
***LDS2** -3.000 18.730 -15.000 18.730 0.628
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z 01370138 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z 0138T6BB -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z 03040327 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T66GT320 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6BB0304 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T66IT6BA -0.7975 -0.7975 GLOB UNIF PL6
LOAD Z T6BAT66D -0.7975 -0.7975 GLOB UNIF PL6
***LDS1** -17.540 -5.750 18.730 -17.540 -3.000 18.730 -16.270
***LDS2** -5.750 18.730 -16.270 -3.000 18.730 0.628
***LDS3** 0.250 0 1 3 0 0WDST -2EQUPPRESPL6
LOAD Z T317T685 -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T685T6BE -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6BET66G -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T66ET6BC -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6BCT6BD -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T6BDT66I -0.3987 -0.3987 GLOB UNIF PL6
LOAD Z T58JT5U6 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5A7T5XM -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5A8T5XI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5A9T5XL -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AAT5XH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5ACT5XG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5ADT5XD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AET5XE -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AFT5XF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5UAT58K -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5X9T5AC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XAT5AF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XBT5A9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XCT5A7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XDT5X9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XET5XA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XET5XD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XFT5AA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XFT5XG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XGT5A8 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XHT5XB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XHT5XI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XIT5XC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XLT5XK -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XLT5XM -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XMT5XJ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00430332 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00850113 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01140043 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03320333 -0.0392 -0.0392 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B373 of 382

LOAD Z 0333T496 -0.0392 -0.0392 GLOB UNIF EQ-SUP


LOAD Z 03340335 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03350336 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03360337 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03370338 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0338T497 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03390340 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03400085 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T4960334 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T4970339 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00100116 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0024T5U2 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00250028 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0028T5U7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00290114 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0034T5U4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00350036 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0036T5U9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00370130 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00400041 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00410117 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00520341 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00530350 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00860129 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0089T68K -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0113T5O4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0114T5JH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01150010 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0117T68L -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0119T5JB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0122T59Q -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0129T61Y -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01300052 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0130T5TE -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01330024 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01340034 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0327T5AA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03360345 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03410342 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03420343 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03430344 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03440345 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03450346 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0345T5BV -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03460347 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03470348 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03480349 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0349T6AB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03500351 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03510352 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03520353 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03530471 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 04710472 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 04720473 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 04730474 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 04740475 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 04750089 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T317T66Y -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T317T66Z -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T319T67F -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T319T67H -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T320T680 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T59Q0113 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T59RT6BG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5A8T684 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AAT5A8 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BVT622 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BW0471 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JHT6BI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5O4T5T2 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T20129 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T4T67M -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TET5TF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TFT673 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U20025 -0.0392 -0.0392 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B374 of 382

LOAD Z T5U40035 -0.0392 -0.0392 GLOB UNIF EQ-SUP


LOAD Z T5U70029 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U90037 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5UOT671 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5UPT681 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T61YT5T4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T622T5BW -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66C0122 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66D0327 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66E0119 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66YT66E -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66ZT5UO -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T67FT66C -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T680T66D -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T681T320 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T683T5UP -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6840336 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T68K0115 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T68L0053 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6AB0086 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BG0114 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BI0130 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01130003 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0115T67L -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0117T672 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6730117 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T67M0115 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0003T5O3 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0030T5J7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0037T58P -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0333T5AK -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0334T5YC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0335T5AJ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0337T5AI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0338T5Y4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0339T5AH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58PT58Q -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58Q0041 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58T0009 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AH0348 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AI0346 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AJ0344 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AK0342 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J70024 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JCT5P3 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5O3T58T -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P2T5P5 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P3T5P6 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P3RRRR -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P40134 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P4TTTT -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P5T5VR -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P6T5P4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P6T5P9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z TTTTT5P1 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z RRRRT5P2 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P9T5P5 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5VRT5P1 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5Y40347 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5YC0343 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00030131 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00090132 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0009T61Z -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00190121 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00300031 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00310032 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00320033 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00330119 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0036T504 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00420043 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00420101 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0063T6B6 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01010137 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0119T6BF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01200030 -0.0392 -0.0392 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B375 of 382

LOAD Z 0120T5J6 -0.0392 -0.0392 GLOB UNIF EQ-SUP


LOAD Z 0121T5LU -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01220019 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01290009 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0132T620 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0134T493 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01370138 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0138T6BB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03040327 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03270328 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0328T6B9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03290330 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03300331 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03310340 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0331T6B7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T317T685 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T320T66F -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T492T502 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T493T492 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T502T503 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T503T504 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T504T5BJ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58U0010 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BH0133 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BI0116 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BJ0040 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J6T5BH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J6T5J7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J6T5JI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J7T5J8 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J8T5J9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J9T5JA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JAT5JB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JCT5JJ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JDT5JC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JET5U3 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JFT5JE -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JGT5U8 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JHT5JG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5O2T5LV -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5O3T5O2 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5O4T5O3 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U3T5JD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U8T5JF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T61ZT58U -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T620T5BI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66FT319 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66GT320 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T685T6BE -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T686T317 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B60122 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B70063 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B90329 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BB0304 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BET66G -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BF0042 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00190003 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0024T58J -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0025T5U5 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0028T58I -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0029T58K -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0031T5J8 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0032T5J9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0033T5JA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0034T502 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0035T503 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 00430052 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0052T58N -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0063T59P -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0085T5T1 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0086T61X -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 01010332 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0121T5BG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0133T5JC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0137T5AE -0.0392 -0.0392 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B376 of 382

LOAD Z 0138T5XA -0.0392 -0.0392 GLOB UNIF EQ-SUP


LOAD Z 0304T5AF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0328T5XB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0329T5A9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0330T5XK -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 03320341 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0340T58V -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0341T58X -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0342T58Y -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0343T5TQ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0344T623 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0346T5BU -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0347T61U -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0348T5BR -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0349T61W -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58IT5JF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58IT5UA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58JT5JD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58KT5JG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58NT5TG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58NT62A -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58O0053 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58OT5TH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58PT5TE -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58QT5TF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58V0349 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58VT6A9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58W0475 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58WT6AA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58XT5TS -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58XT628 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58YT5TU -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58YT626 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58Z0350 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T58ZT5TT -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5900351 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T590T5TV -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T59P0085 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5A70338 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5A9T5A7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AC0335 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AD0333 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AET5AD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5AFT5AC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BG0131 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BRT61V -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BS0474 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BT0472 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5BUT621 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J80025 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5J90028 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JAT6BH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JDT6BL -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JET6BK -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JF0036 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5JGT6BJ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z RRRRT5P9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5P9TTTT -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T10086 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T1T5T2 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T2T58T -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T30089 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T3T5T4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5T4T58U -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TET58N -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TFT58O -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TGT58X -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TGT629 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5THT58Z -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TQT624 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TR0352 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TST58Y -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TST627 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TTT590 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5TUT5TQ -0.0392 -0.0392 GLOB UNIF EQ-SUP
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B377 of 382

LOAD Z T5TUT625 -0.0392 -0.0392 GLOB UNIF EQ-SUP


LOAD Z T5TVT5TR -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U5T58I -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U5T5JE -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5U6T5U5 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5X90334 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XAT5X9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XBT5XC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XC0337 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XJ0339 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5XKT5XJ -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T61U0473 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T61VT5BS -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T61WT58W -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T61XT5T3 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T621T5BT -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6230353 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T624T5TR -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T625T5TV -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T626T590 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T627T5TT -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T628T58Z -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T629T5TH -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T62AT58O -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66DT6B8 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66ET6BC -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66FT66H -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66GT66I -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66H0330 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66HT6B5 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66I0137 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T66IT6BA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6A9T5T1 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6A9T6AB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6AAT5T3 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6ABT6AA -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B4T66C -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B4T6B6 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B5T6B4 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B5T6B7 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B8T66H -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6B8T6B9 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BAT66D -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BAT6BB -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BCT6BD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BCT6BF -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BD0101 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BDT66I -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BET6BD -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BH0029 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BHT6BG -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BJ0037 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BJT6BI -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BK0035 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BL0034 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T6BLT6BK -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z 0131T5O2 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LOAD Z T5O20132 -0.0392 -0.0392 GLOB UNIF EQ-SUP
LCOMB
*OPERATION LIVE LOADS
************************************************************************
*LCOMB
*LCOMB 805 DDLL 1.000CDLL 1.000MDLL 1.000WDLL 1.000HDLL0.5000STLL 1.000
*LCOMB 805 BLLL 1.000VELL 1.000
************************************************************************
*STORM LIVE LOADS
************************************************************************
*LCOMB 806 DDLL0.5000CDLL0.5000MDLL0.5000WDLL0.5000HDLL0.2500STLL0.5000
*LCOMB 806 BLLL0.5000VELL0.5000
*******************************
*OPERATIONAL STORM/MINIMUM FUNCTIONAL LOADS
************************************************************************
LCOMB ARCH CDAR1.0000MDAR1.0000WDAR1.0000
LCOMB ELCT DDEL1.0000CDEL1.0000MDEL1.0000WDEL1.0000HDEL1.0000
LCOMB HVAC WDHV1.0000CDHV1.0000MDHV1.0000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B378 of 382

LCOMB INST CDIN1.0000MDIN1.0000WDIN1.0000


LCOMB MCDR DDMD1.0000MDMD1.0000WDMD1.0000CDMD1.0000
LCOMB MCOP DDMO1.0000MDMO1.0000WDMO1.0000CDMO1.0000
LCOMB PIDR DDPD1.0000CDPD1.0000MDPD1.0000WDPD1.0000PCCD1.0000PMCD1.0000
LCOMB PIOP DDPO1.0000CDPO1.0000MDPO1.0000WDPO1.0000PCCO1.0000PMCO1.0000
LCOMB SFTY DDSA1.0000CDSA1.0000MDSA1.0000WDSA1.0000HDSA1.0000
LCOMB STRC DDST1.0000CDST1.0000MDST1.0000WDST1.0000HDST1.0000STST1.0000
LCOMB STRC VEST1.0000
************************************************************************
************************************************************************
LCOMB 111 STRC1.0700PIDR1.1000INST1.1000ELCT1.1000SFTY1.1000ARCH1.1000
LCOMB 111 HVAC1.1000MCDR1.10001 1.0700CR5 1.00008 1.1500
*********************
LCOMB GVT 111 0.9535
*********************
LCOMB WGVT GVT 1.0300CGX 1.0000CGY 1.0000
*****************************************
LCOMB DAF WGVT1.1500
LCOMB MEM DAF 1.1140
**=============
**************************************************************************
**=======================
** X = 0.000 Y = 0.000
** +++
** +*+
** +++
**=======================
**=======================
** X = 0.000 Y = 0.000
** +++
** +*+
** +++
**=======================
LCOMB 1001 MEM 1.0000
**=======================
** X = 0.500 Y = 0.500
** ++*
** +++
**=======================
LCOMB 1101 MEM 1.0000CGX11.0000CGY1-1.000
**=======================
** X = -0.500 Y =0.500
** *++
** +++
** +++
**=======================
LCOMB 1201 MEM 1.0000CGX1-1.000CGY1-1.000
**=======================
** X =-0.500 Y = -0.500
** +++
** +++
** *++
**=======================
LCOMB 1301 MEM 1.0000CGX1-1.000CGY11.0000
**=======================
** X = 0.500 Y = -0.500
** +++
** +++
** ++*
**=======================
LCOMB 1401 MEM 1.0000CGX11.0000CGY11.0000
END
**SVH1** 1 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 3 21.780 0.100
**SVH8** 1.0000000 857.480346
**SVH9** 7023.814452466.533692466.53369
**SVH1** 2 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 3 18.730 0.100
**SVH8** 1.0000000 737.401550
**SVH9** 6903.735832466.533692466.53369
**SVH1** 3 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 3 14.730 0.100
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B379 of 382

**SVH8** 1.0000000 579.921264


**SVH9** 6746.255372466.533692466.53369
**SVH1** 4 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 3 10.080 0.100
**SVH8** 1.0000000 396.850402
**SVH9** 6563.184572466.533692466.53369
**SVH1** 5 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 3 6.530 0.100
**SVH8** 1.0000000 257.086608
**SVH9** 6423.420892466.533692466.53369
**SVH1** 6 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 5 11.000 0.100
**SVH8** 1.0000000433.070861
**SVH9** 3983.29174 1420.088371420.08837
**SVH1** 7 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 5 -11.000 0.100
**SVH8** 1.0000000-433.07086
**SVH9** 5733.26318 2466.533692466.53369
**SVH1** 8 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 5 -1.000 0.100
**SVH8** 1.0000000-39.370079
**SVH9** 4053.48754 1637.143061637.14306
**SVH1** 9 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 4 -5.750 0.100
**SVH8** 1.0000000 -226.37796
**SVH9** -6392.7124 2466.533692466.53369
**SVH1** 10 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 4 5.750 0.100
**SVH8** 1.0000000 226.377960
**SVH9** -6392.7124 2466.533692466.53369
**SVH1** 11 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 5 -15.000 0.100
**SVH8** 1.0000000-590.55120
**SVH9** 3028.88623 1447.775021447.77502
**SVH1** 12 1
**SVH2** 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0
**SVH6** 0 2SW*
**SVH8** 1.0000000-590.55120 0.0196838559.251953
**SVH9** -348.53460-2640.4135792.1240231056.165401056.16540
**SVH1** 13 1
**SVH2** 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0
**SVH4** 0 3 20.280 0.100
**SVH8** 1.0000000 798.425231
**SVH9** 6964.759272466.533692466.53369
**=======================
** X = 0.500 Y = 0.500
** ++*
** +++
** +++
**=======================
*LCOMB 1101 MEM 1.0000CGX11.0000CGY1-1.000
**=======================
** X = -0.500 Y =0.500
** *++
** +++
** +++
**=======================
*LCOMB 1201 MEM 1.0000CGX1-1.000CGY1-1.000
**=======================
** X =-0.500 Y = -0.500
** +++
** +++
** *++
**=======================
*LCOMB 1301 MEM 1.0000CGX1-1.000CGY11.0000
**=======================
** X = 0.500 Y = -0.500
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B380 of 382

** +++
** +++
** ++*
**=======================
*LCOMB 1401 MEM 1.0000CGX11.0000CGY11.0000
**MSLF** euronew.sec
**JNCV** 0 0 0 0 0 0 1
END
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2

B381 of 382

APPENDIX B2
JOINT CAN INPUT FILE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 B382 of 382

JCNOPT API MN 5.0 7.5B1TC NID0.010 MAMX 1.75


UMOD 33.5 32.7 34.5 32.7 35.5 32.7
JSLC 01140080004800470055053900000004008101130049005405400046
*** flare joints***
JSLC T473T474T475T476T477T478T479T480T481T482T483T484T485T486T487T488T489T490
TCHORD 0047 4.8
END
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 116 PAGES

APPENDIX C
SACS OUTPUT FILES
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C1 of 116

APPENDIX C1
CENTER OF GRAVITY REPORT
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C2 of 116

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

** SEASTATE BASIC LOAD CASE DESCRIPTIONS **

LOAD LOAD ********** DESCRIPTION ***********


CASE LABEL

1 1 COMPUTER GENERATED SELF-WEIGHT


2 8 INSTALLATION AIDS
3 CGX USER GENERATED LOADS
4 CGY USER GENERATED LOADS
5 CR1 USER GENERATED LOADS
6 CR2 USER GENERATED LOADS
7 CR3 USER GENERATED LOADS
8 CR4 USER GENERATED LOADS
9 CR5 USER GENERATED LOADS
10 BLLL
11 CDAR USER GENERATED LOADS
12 CDEL USER GENERATED LOADS
13 CDHV USER GENERATED LOADS
14 CDIN USER GENERATED LOADS
15 CDMD
16 CDMO
17 CDPD USER GENERATED LOADS
18 CDPO USER GENERATED LOADS
19 CDSA USER GENERATED LOADS
20 CDST USER GENERATED LOADS
21 CGX1 USER GENERATED LOADS
22 CGY1 USER GENERATED LOADS
23 CON1 USER GENERATED LOADS
24 CON2 USER GENERATED LOADS
25 DDEL USER GENERATED LOADS
26 DDMD USER GENERATED LOADS
27 DDMO USER GENERATED LOADS
28 DDPD USER GENERATED LOADS
29 DDPO USER GENERATED LOADS
30 DDSA USER GENERATED LOADS
31 DDST USER GENERATED LOADS
32 HDEL USER GENERATED LOADS
33 HDSA USER GENERATED LOADS
34 HDST USER GENERATED LOADS
35 HELI USER GENERATED LOADS
36 MDAR USER GENERATED LOADS
37 MDEL USER GENERATED LOADS
38 MDHV USER GENERATED LOADS
39 MDIN USER GENERATED LOADS
40 MDMD USER GENERATED LOADS
41 MDMO USER GENERATED LOADS
42 MDPD USER GENERATED LOADS
43 MDPO USER GENERATED LOADS
44 MDSA USER GENERATED LOADS
45 MDST USER GENERATED LOADS

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

** SEASTATE BASIC LOAD CASE DESCRIPTIONS **

LOAD LOAD ********** DESCRIPTION ***********


CASE LABEL

46 PCCD USER GENERATED LOADS


47 PCCO USER GENERATED LOADS
48 PMCD USER GENERATED LOADS
49 PMCO USER GENERATED LOADS
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C3 of 116

50 SKW0
51 SKW1
52 SKW2
53 SKW3
54 SKW4
55 SLAM USER GENERATED LOADS
56 STST USER GENERATED LOADS
57 VEST USER GENERATED LOADS
58 WDAR USER GENERATED LOADS
59 WDEL USER GENERATED LOADS
60 WDHV USER GENERATED LOADS
61 WDIN USER GENERATED LOADS
62 WDMD USER GENERATED LOADS
63 WDMO USER GENERATED LOADS
64 WDPD USER GENERATED LOADS
65 WDPO USER GENERATED LOADS
66 WDSA USER GENERATED LOADS
67 WDST USER GENERATED LOADS

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

****** SEASTATE BASIC LOAD CASE SUMMARY ******


RELATIVE TO MUDLINE ELEVATION
LOAD LOAD FX FY FZ MX MY MZ DEAD LOAD BUO
CASE LABEL
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M) (KN) (

1 1 0.000 0.000 -3510.297 4562.241 -22518.975 0.000 3510.297


2 8 0.000 0.000 -258.100 0.000 0.000 0.000 0.000
3 CGX 0.000 0.000 0.000 0.000 -4444.000 0.000 0.000
4 CGY 0.000 0.000 0.000 -1403.000 0.000 0.000 0.000
5 CR1 0.000 0.000 -300.000 -2400.000 -300.000 0.000 0.000
6 CR2 0.000 0.000 0.000 2400.006 0.000 0.000 0.000
7 CR3 0.000 0.000 0.000 0.000 2400.006 0.000 0.000
8 CR4 0.000 0.000 -350.000 -2800.000 -350.000 0.000 0.000
9 CR5 0.000 0.000 -350.000 -2800.000 -350.000 0.000 0.000
10 BLLL 0.000 0.000 0.000 0.000 0.000 0.000 0.000
11 CDAR 0.000 0.000 -224.581 332.903 -1689.229 0.000 0.000
12 CDEL 0.000 0.000 -332.787 230.487 -2948.885 0.000 0.000
13 CDHV 0.000 0.000 -8.343 9.094 -37.485 0.000 0.000
14 CDIN 0.000 0.000 -40.650 147.331 -290.100 0.000 0.000
15 CDMD 0.000 0.000 0.000 0.000 0.000 0.000 0.000
16 CDMO 0.000 0.000 0.000 0.000 0.000 0.000 0.000
17 CDPD 0.000 0.000 -794.010 1115.398 125.768 0.000 0.000
18 CDPO 0.000 0.000 -1134.305 1593.431 179.662 0.000 0.000
19 CDSA 0.000 0.000 -22.416 29.680 -101.130 0.000 0.000
20 CDST 0.000 0.000 -585.475 602.502 -2968.752 0.000 0.000
21 CGX1 0.000 0.000 0.000 0.000 6468.000 0.000 0.000
22 CGY1 0.000 0.000 0.000 6440.001 0.000 0.000 0.000
23 CON1 0.000 0.000 -263.492 -1251.587 1620.477 0.000 0.000
24 CON2 0.000 0.000 -263.575 -263.575 1752.775 0.000 0.000
25 DDEL 0.000 0.000 -58.290 128.108 -279.001 0.000 0.000
26 DDMD 0.000 0.000 -111.380 366.793 -805.316 0.000 0.000
27 DDMO 0.000 0.000 -215.040 793.929 -1507.211 0.000 0.000
28 DDPD 0.000 0.000 -74.050 200.769 -489.970 0.000 0.000
29 DDPO 0.000 0.000 -105.786 286.810 -699.964 0.000 0.000
30 DDSA 0.000 0.000 -11.678 6.264 -47.423 0.000 0.000
31 DDST 0.000 0.000 -351.688 329.560 -1319.116 0.000 0.000
32 HDEL 0.000 0.000 -20.590 44.177 -360.923 0.000 0.000
33 HDSA 0.000 0.000 -35.005 -151.028 -625.917 0.000 0.000
34 HDST 0.000 0.000 -322.245 543.081 -5638.426 0.000 0.000
35 HELI 0.000 0.000 -53.000 119.250 -929.620 0.000 0.000
36 MDAR 0.000 0.000 -188.046 541.678 -2369.601 0.000 0.000
37 MDEL 0.000 0.000 -63.580 47.265 -273.723 0.000 0.000
38 MDHV 0.000 0.000 -5.496 6.041 -28.264 0.000 0.000
39 MDIN 0.000 0.000 -70.974 34.685 -653.523 0.000 0.000
40 MDMD 0.000 0.000 -37.200 33.346 -161.601 0.000 0.000
41 MDMO 0.000 0.000 -72.840 243.945 -296.277 0.000 0.000
42 MDPD 0.000 0.000 -295.675 165.767 68.385 0.000 0.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C4 of 116

43 MDPO 0.000 0.000 -422.394 236.805 97.679 0.000 0.000


44 MDSA 0.000 0.000 -18.754 -1.810 -132.289 0.000 0.000
45 MDST 0.000 0.000 -601.568 947.393 -3525.051 0.000 0.000

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

****** SEASTATE BASIC LOAD CASE SUMMARY ******


RELATIVE TO MUDLINE ELEVATION
LOAD LOAD FX FY FZ MX MY MZ DEAD LOAD BUO
CASE LABEL
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M) (KN) (

46 PCCD 0.000 0.000 -44.603 -2.290 7.905 0.000 0.000


47 PCCO -3.564 -0.716 -70.298 -4.490 -11.390 -3.697 0.000
48 PMCD 0.000 0.000 -172.696 580.268 -1097.922 0.000 0.000
49 PMCO -25.461 -64.920 -228.373 1735.838 -1883.676 443.234 0.000
50 SKW0 0.000 0.000 0.000 0.000 0.000 0.000 0.000
51 SKW1 0.000 0.000 0.000 0.000 0.000 0.000 0.000
52 SKW2 0.000 0.000 0.000 0.000 0.000 0.000 0.000
53 SKW3 0.000 0.000 0.000 0.000 0.000 0.000 0.000
54 SKW4 0.000 0.000 0.000 0.000 0.000 0.000 0.000
55 SLAM 0.000 0.000 2055.194 -1709.462 8292.207 0.000 0.000
56 STST 0.000 0.000 -81.426 127.316 -972.040 0.000 0.000
57 VEST 0.000 -0.896 -15.822 303.391 -79.112 4.480 0.000
58 WDAR 0.000 0.000 -69.224 437.872 -870.870 0.000 0.000
59 WDEL 0.000 0.000 -36.515 59.139 -321.713 0.000 0.000
60 WDHV 0.000 0.000 -124.685 7.305 -1180.073 0.000 0.000
61 WDIN 0.000 0.000 -11.048 -1.818 -83.923 0.000 0.000
62 WDMD 0.000 0.000 -105.510 184.457 -577.131 0.000 0.000
63 WDMO 0.000 0.000 -214.380 760.675 -1293.376 0.000 0.000
64 WDPD 0.000 0.000 -197.130 272.672 -989.598 0.000 0.000
65 WDPO 0.000 0.000 -281.615 389.536 -1413.726 0.000 0.000
66 WDSA 0.000 0.000 -12.123 9.835 -98.081 0.000 0.000
67 WDST 0.000 0.000 -403.147 318.224 -3512.469 0.000 0.000

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

***** SEASTATE COMBINED LOAD CASES *****

COMBINED BASIC PERCENT DESCRIPTION


LOAD LABEL LABEL
CASE

68 ARCH 1.0 * CDAR + 1.0 * MDAR + 1.0 * WDAR

CDAR 100.00 USER GENERATED LOADS


MDAR 100.00 USER GENERATED LOADS
WDAR 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

CDAR 0.000 0.000 -224.581 332.903 -1689.229 0.000


MDAR 0.000 0.000 -188.046 541.678 -2369.601 0.000
WDAR 0.000 0.000 -69.224 437.872 -870.870 0.000

TOTAL 0.000 0.000 -481.852 1312.454 -4929.700 0.000

69 ELCT 1.0 * DDEL + 1.0 * CDEL + 1.0 * MDEL + 1.0 * WDEL +

DDEL 100.00 USER GENERATED LOADS


CDEL 100.00 USER GENERATED LOADS
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C5 of 116

MDEL 100.00 USER GENERATED LOADS


WDEL 100.00 USER GENERATED LOADS
HDEL 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DDEL 0.000 0.000 -58.290 128.108 -279.001 0.000


CDEL 0.000 0.000 -332.787 230.487 -2948.885 0.000
MDEL 0.000 0.000 -63.580 47.265 -273.723 0.000
WDEL 0.000 0.000 -36.515 59.139 -321.713 0.000
HDEL 0.000 0.000 -20.590 44.177 -360.923 0.000

TOTAL 0.000 0.000 -511.762 509.175 -4184.245 0.000

70 HVAC 1.0 * WDHV + 1.0 * CDHV + 1.0 * MDHV

WDHV 100.00 USER GENERATED LOADS


CDHV 100.00 USER GENERATED LOADS
MDHV 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

WDHV 0.000 0.000 -124.685 7.305 -1180.073 0.000


CDHV 0.000 0.000 -8.343 9.094 -37.485 0.000
MDHV 0.000 0.000 -5.496 6.041 -28.264 0.000

TOTAL 0.000 0.000 -138.524 22.440 -1245.822 0.000

71 INST 1.0 * CDIN + 1.0 * MDIN + 1.0 * WDIN

CDIN 100.00 USER GENERATED LOADS


MDIN 100.00 USER GENERATED LOADS
WDIN 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

CDIN 0.000 0.000 -40.650 147.331 -290.100 0.000


MDIN 0.000 0.000 -70.974 34.685 -653.523 0.000
WDIN 0.000 0.000 -11.048 -1.818 -83.923 0.000

TOTAL 0.000 0.000 -122.672 180.199 -1027.546 0.000

72 MCDR 1.0 * DDMD + 1.0 * MDMD + 1.0 * WDMD + 1.0 * CDMD

DDMD 100.00 USER GENERATED LOADS


MDMD 100.00 USER GENERATED LOADS
WDMD 100.00 USER GENERATED LOADS
CDMD 100.00

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DDMD 0.000 0.000 -111.380 366.793 -805.316 0.000


MDMD 0.000 0.000 -37.200 33.346 -161.601 0.000
WDMD 0.000 0.000 -105.510 184.457 -577.131 0.000
CDMD 0.000 0.000 0.000 0.000 0.000 0.000

TOTAL 0.000 0.000 -254.090 584.597 -1544.048 0.000

73 MCOP 1.0 * DDMO + 1.0 * MDMO + 1.0 * WDMO + 1.0 * CDMO

DDMO 100.00 USER GENERATED LOADS


MDMO 100.00 USER GENERATED LOADS
WDMO 100.00 USER GENERATED LOADS
CDMO 100.00

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C6 of 116

DDMO 0.000 0.000 -215.040 793.929 -1507.211 0.000


MDMO 0.000 0.000 -72.840 243.945 -296.277 0.000
WDMO 0.000 0.000 -214.380 760.675 -1293.376 0.000
CDMO 0.000 0.000 0.000 0.000 0.000 0.000

TOTAL 0.000 0.000 -502.260 1798.549 -3096.864 0.000

74 PIDR 1.0 * DDPD + 1.0 * CDPD + 1.0 * MDPD + 1.0 * WDPD + +

DDPD 100.00 USER GENERATED LOADS


CDPD 100.00 USER GENERATED LOADS
MDPD 100.00 USER GENERATED LOADS
WDPD 100.00 USER GENERATED LOADS
PCCD 100.00 USER GENERATED LOADS
PMCD 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DDPD 0.000 0.000 -74.050 200.769 -489.970 0.000


CDPD 0.000 0.000 -794.010 1115.398 125.768 0.000
MDPD 0.000 0.000 -295.675 165.767 68.385 0.000
WDPD 0.000 0.000 -197.130 272.672 -989.598 0.000
PCCD 0.000 0.000 -44.603 -2.290 7.905 0.000
PMCD 0.000 0.000 -172.696 580.268 -1097.922 0.000

TOTAL 0.000 0.000 -1578.164 2332.586 -2375.432 0.000

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

***** SEASTATE COMBINED LOAD CASES *****

COMBINED BASIC PERCENT DESCRIPTION


LOAD LABEL LABEL
CASE

75 PIOP 1.0 * DDPO + 1.0 * CDPO + 1.0 * MDPO + 1.0 * WDPO + +

DDPO 100.00 USER GENERATED LOADS


CDPO 100.00 USER GENERATED LOADS
MDPO 100.00 USER GENERATED LOADS
WDPO 100.00 USER GENERATED LOADS
PCCO 100.00 USER GENERATED LOADS
PMCO 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DDPO 0.000 0.000 -105.786 286.810 -699.964 0.000


CDPO 0.000 0.000 -1134.305 1593.431 179.662 0.000
MDPO 0.000 0.000 -422.394 236.805 97.679 0.000
WDPO 0.000 0.000 -281.615 389.536 -1413.726 0.000
PCCO -3.564 -0.716 -70.298 -4.490 -11.390 -3.697
PMCO -25.461 -64.920 -228.373 1735.838 -1883.676 443.234

TOTAL -29.025 -65.636 -2242.772 4237.930 -3731.416 439.537

76 SFTY 1.0 * DDSA + 1.0 * CDSA + 1.0 * MDSA + 1.0 * WDSA +

DDSA 100.00 USER GENERATED LOADS


CDSA 100.00 USER GENERATED LOADS
MDSA 100.00 USER GENERATED LOADS
WDSA 100.00 USER GENERATED LOADS
HDSA 100.00 USER GENERATED LOADS
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C7 of 116

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DDSA 0.000 0.000 -11.678 6.264 -47.423 0.000


CDSA 0.000 0.000 -22.416 29.680 -101.130 0.000
MDSA 0.000 0.000 -18.754 -1.810 -132.289 0.000
WDSA 0.000 0.000 -12.123 9.835 -98.081 0.000
HDSA 0.000 0.000 -35.005 -151.028 -625.917 0.000

TOTAL 0.000 0.000 -99.976 -107.060 -1004.839 0.000

77 STRC 1.0 * DDST + 1.0 * CDST + 1.0 * MDST + 1.0 * WDST + + +

DDST 100.00 USER GENERATED LOADS


CDST 100.00 USER GENERATED LOADS
MDST 100.00 USER GENERATED LOADS
WDST 100.00 USER GENERATED LOADS
HDST 100.00 USER GENERATED LOADS
STST 100.00 USER GENERATED LOADS
VEST 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DDST 0.000 0.000 -351.688 329.560 -1319.116 0.000


CDST 0.000 0.000 -585.475 602.502 -2968.752 0.000
MDST 0.000 0.000 -601.568 947.393 -3525.051 0.000
WDST 0.000 0.000 -403.147 318.224 -3512.469 0.000
HDST 0.000 0.000 -322.245 543.081 -5638.426 0.000
STST 0.000 0.000 -81.426 127.316 -972.040 0.000
VEST 0.000 -0.896 -15.822 303.391 -79.112 4.480

TOTAL 0.000 -0.896 -2361.373 3171.466 -18014.967 4.480

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

***** SEASTATE COMBINED LOAD CASES *****

COMBINED BASIC PERCENT DESCRIPTION


LOAD LABEL LABEL
CASE

78 111 1.07 * STRC + 1.1 * PIDR + 1.1 * INST + 1.1 * ELCT + + + +

STRC 107.00 1.0 * DDST + 1.0 * CDST + 1.0 * MDST + 1.0 * WDST + + +
PIDR 110.00 1.0 * DDPD + 1.0 * CDPD + 1.0 * MDPD + 1.0 * WDPD + +
INST 110.00 1.0 * CDIN + 1.0 * MDIN + 1.0 * WDIN
ELCT 110.00 1.0 * DDEL + 1.0 * CDEL + 1.0 * MDEL + 1.0 * WDEL +
SFTY 110.00 1.0 * DDSA + 1.0 * CDSA + 1.0 * MDSA + 1.0 * WDSA +
ARCH 110.00 1.0 * CDAR + 1.0 * MDAR + 1.0 * WDAR
HVAC 110.00 1.0 * WDHV + 1.0 * CDHV + 1.0 * MDHV
MCDR 110.00 1.0 * DDMD + 1.0 * MDMD + 1.0 * WDMD + 1.0 * CDMD
1 107.00 COMPUTER GENERATED SELF-WEIGHT
CR5 100.00 USER GENERATED LOADS
8 115.00 INSTALLATION AIDS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

STRC 0.000 -0.959 -2526.669 3393.469 -19276.016 4.794


PIDR 0.000 0.000 -1735.980 2565.844 -2612.975 0.000
INST 0.000 0.000 -134.939 198.219 -1130.300 0.000
ELCT 0.000 0.000 -562.938 560.093 -4602.670 0.000
SFTY 0.000 0.000 -109.974 -117.766 -1105.323 0.000
ARCH 0.000 0.000 -530.037 1443.699 -5422.670 0.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C8 of 116

HVAC 0.000 0.000 -152.376 24.684 -1370.405 0.000


MCDR 0.000 0.000 -279.499 643.056 -1698.452 0.000
1 0.000 0.000 -3756.018 4881.598 -24095.305 0.000
CR5 0.000 0.000 -350.000 -2800.000 -350.000 0.000
8 0.000 0.000 -296.815 0.000 0.000 0.000

TOTAL 0.000 -0.959 -10435.245 10792.896 -61664.117 4.794

79 GVT 0.953 * 111

111 95.35 1.07 * STRC + 1.1 * PIDR + 1.1 * INST + 1.1 * ELCT + + + +

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

111 0.000 -0.914 -9950.006 10291.025 -58796.734 4.571

TOTAL 0.000 -0.914 -9950.006 10291.025 -58796.734 4.571

80 WGVT 1.03 * GVT + 1.0 * CGX + 1.0 * CGY

GVT 103.00 0.953 * 111


CGX 100.00 USER GENERATED LOADS
CGY 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

GVT 0.000 -0.942 -10248.506 10599.756 -60560.633 4.708


CGX 0.000 0.000 0.000 0.000 -4444.000 0.000
CGY 0.000 0.000 0.000 -1403.000 0.000 0.000

TOTAL 0.000 -0.942 -10248.506 9196.756 -65004.633 4.708

81 DAF 1.15 * WGVT

WGVT 115.00 1.03 * GVT + 1.0 * CGX + 1.0 * CGY

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

WGVT 0.000 -1.083 -11785.781 10576.269 -74755.328 5.414

TOTAL 0.000 -1.083 -11785.781 10576.269 -74755.328 5.414

82 MEM 1.114 * DAF

DAF 111.40 1.15 * WGVT

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

DAF 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031

TOTAL 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031

83 1001 1.0 * MEM

MEM 100.00 1.114 * DAF

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

MEM 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031

TOTAL 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031

84 1101 1.0 * MEM + 1.0 * CGX1 + -1.0 * CGY1


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C9 of 116

MEM 100.00 1.114 * DAF


CGX1 100.00 USER GENERATED LOADS
CGY1 -100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

MEM 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031


CGX1 0.000 0.000 0.000 0.000 6468.000 0.000
CGY1 0.000 0.000 0.000 -6440.001 0.000 0.000

TOTAL 0.000 -1.206 -13129.360 5341.962 -76809.430 6.031

85 1201 1.0 * MEM + -1.0 * CGX1 + -1.0 * CGY1

MEM 100.00 1.114 * DAF


CGX1 -100.00 USER GENERATED LOADS
CGY1 -100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

MEM 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031


CGX1 0.000 0.000 0.000 0.000 -6468.000 0.000
CGY1 0.000 0.000 0.000 -6440.001 0.000 0.000

TOTAL 0.000 -1.206 -13129.360 5341.962 -89745.430 6.031

86 1301 1.0 * MEM + -1.0 * CGX1 + 1.0 * CGY1

MEM 100.00 1.114 * DAF


CGX1 -100.00 USER GENERATED LOADS
CGY1 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

MEM 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031


CGX1 0.000 0.000 0.000 0.000 -6468.000 0.000
CGY1 0.000 0.000 0.000 6440.001 0.000 0.000

TOTAL 0.000 -1.206 -13129.360 18221.965 -89745.430 6.031

87 1401 1.0 * MEM + 1.0 * CGX1 + 1.0 * CGY1

MEM 100.00 1.114 * DAF


CGX1 100.00 USER GENERATED LOADS
CGY1 100.00 USER GENERATED LOADS

FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

MEM 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031


CGX1 0.000 0.000 0.000 0.000 6468.000 0.000
CGY1 0.000 0.000 0.000 6440.001 0.000 0.000

TOTAL 0.000 -1.206 -13129.360 18221.965 -76809.430 6.031

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

***** SEASTATE COMBINED LOAD CASE SUMMARY *****


RELATIVE TO MUDLINE ELEVATION
LOAD LOAD FX FY FZ MX MY MZ
CASE LABEL
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C10 of 116

(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)

68 ARCH 0.000 0.000 -481.852 1312.454 -4929.700 0.000


69 ELCT 0.000 0.000 -511.762 509.175 -4184.245 0.000
70 HVAC 0.000 0.000 -138.524 22.440 -1245.822 0.000
71 INST 0.000 0.000 -122.672 180.199 -1027.546 0.000
72 MCDR 0.000 0.000 -254.090 584.597 -1544.048 0.000
73 MCOP 0.000 0.000 -502.260 1798.549 -3096.864 0.000
74 PIDR 0.000 0.000 -1578.164 2332.586 -2375.432 0.000
75 PIOP -29.025 -65.636 -2242.772 4237.930 -3731.416 439.537
76 SFTY 0.000 0.000 -99.976 -107.060 -1004.839 0.000
77 STRC 0.000 -0.896 -2361.373 3171.466 -18014.967 4.480
78 111 0.000 -0.959 -10435.245 10792.896 -61664.117 4.794
79 GVT 0.000 -0.914 -9950.006 10291.025 -58796.734 4.571
80 WGVT 0.000 -0.942 -10248.506 9196.756 -65004.633 4.708
81 DAF 0.000 -1.083 -11785.781 10576.269 -74755.328 5.414
82 MEM 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031
83 1001 0.000 -1.206 -13129.360 11781.963 -83277.430 6.031
84 1101 0.000 -1.206 -13129.360 5341.962 -76809.430 6.031
85 1201 0.000 -1.206 -13129.360 5341.962 -89745.430 6.031
86 1301 0.000 -1.206 -13129.360 18221.965 -89745.430 6.031
87 1401 0.000 -1.206 -13129.360 18221.965 -76809.430 6.031

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

************* SEASTATE LOAD CASE CENTER REPORT *************


RELATIVE TO STRUCTURAL ORIGIN
LOAD LOAD ********* X - DIRECTION ********* ********* Y - DIRECTION ********* ********* Z - DIRE
CASE LABEL FORCE X Y Z FORCE X Y Z FORCE X
(KN) (M) (M) (M) (KN) (M) (M) (M) (KN) (M)

1 1 0.00 0.00 -3510.30 -6.42


2 8 0.00 0.00 -258.10 0.00
3 CGX 0.00 0.00 COUPLE 0.00
4 CGY 0.00 0.00 COUPLE 0.00
5 CR1 0.00 0.00 -300.00 -1.00
6 CR2 0.00 0.00 0.00
7 CR3 0.00 0.00 0.00
8 CR4 0.00 0.00 -350.00 -1.00
9 CR5 0.00 0.00 -350.00 -1.00
10 BLLL 0.00 0.00 0.00
11 CDAR 0.00 0.00 -224.58 -7.52
12 CDEL 0.00 0.00 -332.79 -8.86
13 CDHV 0.00 0.00 -8.34 -4.49
14 CDIN 0.00 0.00 -40.65 -7.14
15 CDMD 0.00 0.00 0.00
16 CDMO 0.00 0.00 0.00
17 CDPD 0.00 0.00 -794.01 0.16
18 CDPO 0.00 0.00 -1134.30 0.16
19 CDSA 0.00 0.00 -22.42 -4.51
20 CDST 0.00 0.00 -585.48 -5.07
21 CGX1 0.00 0.00 COUPLE 0.00
22 CGY1 0.00 0.00 COUPLE 0.00
23 CON1 0.00 0.00 -263.49 6.15
24 CON2 0.00 0.00 -263.57 6.65
25 DDEL 0.00 0.00 -58.29 -4.79
26 DDMD 0.00 0.00 -111.38 -7.23
27 DDMO 0.00 0.00 -215.04 -7.01
28 DDPD 0.00 0.00 -74.05 -6.62
29 DDPO 0.00 0.00 -105.79 -6.62
30 DDSA 0.00 0.00 -11.68 -4.06
31 DDST 0.00 0.00 -351.69 -3.75
32 HDEL 0.00 0.00 -20.59 -17.53
33 HDSA 0.00 0.00 -35.00 -17.88
34 HDST 0.00 0.00 -322.25 -17.50
35 HELI 0.00 0.00 -53.00 -17.54
36 MDAR 0.00 0.00 -188.05 -12.60
37 MDEL 0.00 0.00 -63.58 -4.31
38 MDHV 0.00 0.00 -5.50 -5.14
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C11 of 116

39 MDIN 0.00 0.00 -70.97 -9.21


40 MDMD 0.00 0.00 -37.20 -4.34
41 MDMO 0.00 0.00 -72.84 -4.07
42 MDPD 0.00 0.00 -295.68 0.23
43 MDPO 0.00 0.00 -422.39 0.23
44 MDSA 0.00 0.00 -18.75 -7.05
45 MDST 0.00 0.00 -601.57 -5.86

SACS Release 5.3 NN

SACS Release 5.3 NN


*********** EDI/SACS IV SEASTATE PROGRAM *********** DATE 02-NOV-2019 TIME 17:49:21 SE

SALMAN (S1) TOPSIDE

************* SEASTATE LOAD CASE CENTER REPORT *************


RELATIVE TO STRUCTURAL ORIGIN
LOAD LOAD ********* X - DIRECTION ********* ********* Y - DIRECTION ********* ********* Z - DIRE
CASE LABEL FORCE X Y Z FORCE X Y Z FORCE X
(KN) (M) (M) (M) (KN) (M) (M) (M) (KN) (M)

46 PCCD 0.00 0.00 -44.60 0.18


47 PCCO -3.56 -3.90 0.60 10.72 -0.72 8.15 -60.20 12.70 -70.30 0.38
48 PMCD 0.00 0.00 -172.70 -6.36
49 PMCO -25.46 -13.05 0.55 14.33 -64.92 -6.61 -3.98 15.35 -228.37 -6.65
50 SKW0 0.00 0.00 0.00
51 SKW1 0.00 0.00 0.00
52 SKW2 0.00 0.00 0.00
53 SKW3 0.00 0.00 0.00
54 SKW4 0.00 0.00 0.00
55 SLAM 0.00 0.00 2055.19 -4.03
56 STST 0.00 0.00 -81.43 -11.94
57 VEST 0.00 -0.90 -5.00 -17.99 19.84 -15.82 -5.00 -
58 WDAR 0.00 0.00 -69.22 -12.58
59 WDEL 0.00 0.00 -36.51 -8.81
60 WDHV 0.00 0.00 -124.68 -9.46
61 WDIN 0.00 0.00 -11.05 -7.60
62 WDMD 0.00 0.00 -105.51 -5.47
63 WDMO 0.00 0.00 -214.38 -6.03
64 WDPD 0.00 0.00 -197.13 -5.02
65 WDPO 0.00 0.00 -281.62 -5.02
66 WDSA 0.00 0.00 -12.12 -8.09
67 WDST 0.00 0.00 -403.15 -8.71
68 ARCH 0.00 0.00 -481.85 -10.23
69 ELCT 0.00 0.00 -511.76 -8.18
70 HVAC 0.00 0.00 -138.52 -8.99
71 INST 0.00 0.00 -122.67 -8.38
72 MCDR 0.00 0.00 -254.09 -6.08
73 MCOP 0.00 0.00 -502.26 -6.17
74 PIDR 0.00 0.00 -1578.16 -1.51
75 PIOP -29.03 -11.93 0.56 13.89 -65.64 -6.45 -4.60 15.32 -2242.77 -1.48
76 SFTY 0.00 0.00 -99.98 -10.05
77 STRC 0.00 -0.90 -2361.37 -7.63
78 111 0.00 -0.96 -10435.25 -5.91
79 GVT 0.00 -0.91 -9950.01 -5.91
80 WGVT 0.00 -0.94 -10248.51 -6.34
81 DAF 0.00 -1.08 -11785.78 -6.34
82 MEM 0.00 -1.21 -13129.36 -6.34
83 1001 0.00 -1.21 -13129.36 -6.34
84 1101 0.00 -1.21 -13129.36 -5.85
85 1201 0.00 -1.21 -13129.36 -6.84
86 1301 0.00 -1.21 -13129.36 -6.84
87 1401 0.00 -1.21 -13129.36 -5.85
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C12 of 116

APPENDIX C2
REACTION FORCE & MOMENT SUMMARY
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C13 of 116

DATE 3-NOV-2019 TIME 21:17:55


SALMAN (S1) TOPSIDE

REACTION FORCES AND MOMENTS

LOAD *************** kN **************** ************** kN-m **************


JOINT COND FORCE(X) FORCE(Y) FORCE(Z) MOMENT(X) MOMENT(Y) MOMENT(Z)

A001 1001 -161.143 -102.791 734.547 0.000 0.000 0.000


1101 -268.989 -171.584 1226.145 0.000 0.000 0.000
1201 -210.648 -134.369 960.204 0.000 0.000 0.000
1301 -53.297 -33.998 242.949 0.000 0.000 0.000
1401 -111.639 -71.213 508.890 0.000 0.000 0.000

A002 1001 -396.533 252.942 1807.532 0.000 0.000 0.000


1101 -343.817 219.315 1567.234 0.000 0.000 0.000
1201 -291.449 185.911 1328.525 0.000 0.000 0.000
1301 -449.249 286.569 2047.830 0.000 0.000 0.000
1401 -501.617 319.973 2286.541 0.000 0.000 0.000

J001 1001 319.762 -688.872 4238.186 0.000 0.000 0.000


1101 314.887 -678.370 4173.577 0.000 0.000 0.000
1201 335.644 -723.087 4448.686 0.000 0.000 0.000
1301 324.637 -699.374 4302.796 0.000 0.000 0.000
1401 303.880 -654.658 4027.687 0.000 0.000 0.000

J002 1001 348.074 749.807 4093.400 0.000 0.000 0.000


1101 332.199 715.610 3906.707 0.000 0.000 0.000
1201 351.717 757.656 4136.250 0.000 0.000 0.000
1301 363.949 784.005 4280.093 0.000 0.000 0.000
1401 344.430 741.958 4050.551 0.000 0.000 0.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C14 of 116

APPENDIX C3
SPRING FORCE & MOMENT
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C15 of 116

DATE 3-NOV-2019 TIME 21:18:53


SALMAN (S1) TOPSIDE

SPRING FORCES AND MOMENTS

LOAD *************** kN **************** ************** kN-m **************


JOINT COND FORCE(X) FORCE(Y) FORCE(Z) MOMENT(X) MOMENT(Y) MOMENT(Z)

601L 1001 35.398 58.976 0.000 1.236 -0.398 0.000


1101 16.501 27.352 0.000 0.637 -0.172 0.000
1201 53.955 28.168 0.000 0.645 -0.597 0.000
1301 54.296 90.600 0.000 1.836 -0.624 0.000
1401 16.842 89.784 0.000 1.827 -0.199 0.000

619L 1001 35.500 67.874 0.000 1.330 -0.480 0.000


1101 16.615 36.440 0.000 0.702 -0.258 0.000
1201 54.090 36.194 0.000 0.710 -0.690 0.000
1301 54.386 99.308 0.000 1.957 -0.702 0.000
1401 16.911 99.554 0.000 1.949 -0.270 0.000

681L 1001 30.901 58.940 0.000 1.220 -0.328 0.000


1101 11.865 27.316 0.000 0.621 -0.117 0.000
1201 49.885 28.131 0.000 0.629 -0.544 0.000
1301 49.937 90.564 0.000 1.819 -0.539 0.000
1401 11.917 89.748 0.000 1.811 -0.113 0.000

699L 1001 31.209 67.877 0.000 1.335 -0.504 0.000


1101 12.149 36.443 0.000 0.707 -0.285 0.000
1201 50.184 36.198 0.000 0.716 -0.717 0.000
1301 50.270 99.311 0.000 1.963 -0.724 0.000
1401 12.235 99.555 0.000 1.954 -0.291 0.000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C16 of 116

APPENDIX C4
SLING FORCE
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C17 of 116

DATE 3-NOV-2019 TIME


SALMAN (S1) TOPSIDE

MEMBER FORCES AND MOMENTS

******************** kN ********************* ******************* kN-m *************


MEMBER MEMBER GROUP LOAD FORCE(X) FORCE(Y) FORCE(Z) MOMENT(X) MOMENT(Y) MO
NUMBER END ID COND

PAD1-A001 PAD1 SL1 1001 916.4663 0.0000 0.0003 0.0000 0.0000


1101 1424.4388 0.0000 0.0003 0.0000 0.0000
1201 1149.6382 0.0000 0.0003 0.0000 0.0000
1301 408.4977 0.0000 0.0003 0.0000 0.0000
1401 683.2947 0.0000 0.0003 0.0000 0.0000
A001 1001 916.4689 0.0000 -0.0003 0.0000 0.0000
1101 1424.4414 0.0000 -0.0003 0.0000 0.0000
1201 1149.6407 0.0000 -0.0003 0.0000 0.0000
1301 408.5003 0.0000 -0.0003 0.0000 0.0000
1401 683.2972 0.0000 -0.0003 0.0000 0.0000

PAD2-A002 PAD2 SL1 1001 2255.1670 0.0000 0.0003 0.0000 0.0000


1101 2006.8676 0.0000 0.0003 0.0000 0.0000
1201 1760.2086 0.0000 0.0003 0.0000 0.0000
1301 2503.4656 0.0000 0.0003 0.0000 0.0000
1401 2750.1228 0.0000 0.0003 0.0000 0.0000
A002 1001 2255.1694 0.0000 -0.0003 0.0000 0.0000
1101 2006.8701 0.0000 -0.0003 0.0000 0.0000
1201 1760.2112 0.0000 -0.0003 0.0000 0.0000
1301 2503.4683 0.0000 -0.0003 0.0000 0.0000
1401 2750.1255 0.0000 -0.0003 0.0000 0.0000

PAD3-J001 PAD3 SL1 1001 5198.8677 0.0000 0.0019 0.0000 0.0000


1101 5133.2300 0.0000 0.0019 0.0000 0.0000
1201 5412.7207 0.0000 0.0019 0.0000 0.0000
1301 5264.5029 0.0000 0.0019 0.0000 0.0000
1401 4985.0117 0.0000 0.0019 0.0000 0.0000
J001 1001 5198.8887 0.0000 -0.0019 0.0000 0.0000
1101 5133.2515 0.0000 -0.0019 0.0000 0.0000
1201 5412.7417 0.0000 -0.0019 0.0000 0.0000
1301 5264.5234 0.0000 -0.0019 0.0000 0.0000
1401 4985.0322 0.0000 -0.0019 0.0000 0.0000

PAD4-J002 PAD4 SL1 1001 5042.3120 0.0000 0.0019 0.0000 0.0000


1101 4851.8506 0.0000 0.0019 0.0000 0.0000
1201 5086.0264 0.0000 0.0019 0.0000 0.0000
1301 5232.7700 0.0000 0.0019 0.0000 0.0000
1401 4998.5942 0.0000 0.0019 0.0000 0.0000
J002 1001 5042.3301 0.0000 -0.0019 0.0000 0.0000
1101 4851.8691 0.0000 -0.0019 0.0000 0.0000
1201 5086.0449 0.0000 -0.0019 0.0000 0.0000
1301 5232.7886 0.0000 -0.0019 0.0000 0.0000
1401 4998.6128 0.0000 -0.0019 0.0000 0.0000
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C18 of 116

APPENDIX C5
MEMBER UNITY CHECK SUMMARY
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C19 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0073-T66R CP1 0.335 1101 0.0 27.20 -3.98 -2.93 0.00 0.36 23.6 2.5 0.324 1201 0

T66S-0073 CP1 0.614 1101 0.0 28.22 -8.20 18.14 0.01 0.65 23.6 41.3 0.606 1201 0

0047-T5ZN CP2 0.201 1201 0.0 3.92 -37.21 4.46 0.00 0.09 27.1 44.7 0.200 1301 0

0048-0235 CP2 0.182 1201 0.0 -1.23 -26.64 -16.22 0.05 0.08 12.3 4.0 0.177 1101 0

0048-T5IL CP2 0.256 1101 0.0 -0.78 -33.76 22.45 -0.02 0.09 23.6 68.8 0.249 1401 0

0049-0281 CP2 0.175 1201 0.0 1.98 -23.00 -17.89 0.04 0.06 22.3 7.5 0.175 1101 0

0049-T5ZC CP2 0.307 1401 0.0 -13.79 -34.14 -24.10 0.06 0.04 23.6 13.8 0.293 1301 0

0054-0076 CP2 0.176 1201 0.0 0.50 -24.57 18.30 -0.02 0.09 10.6 13.8 0.176 1101 0

0054-T67I CP2 0.229 1401 0.0 1.18 -24.02 -4.12 0.00 0.24 28.3 4.0 0.210 1301 0

0055-T674 CP2 0.414 1301 0.0 60.34 20.65 10.44 -0.01 -0.35 28.3 4.0 0.391 1401 0

0055-T68F CP2 0.326 1101 0.0 5.59 -58.77 9.52 -0.01 0.34 27.1 3.4 0.326 1201 0

0062-0288 CP2 0.191 1101 0.0 0.20 43.36 -0.46 0.00 -0.07 24.8 19.4 0.191 1401 0

0066-0527 CP2 0.170 1201 0.0 -2.62 21.41 -9.74 0.01 -0.05 27.1 34.4 0.169 1301 0

0067-T60Q CP2 0.124 1201 0.0 0.82 22.61 -2.75 0.00 -0.05 27.1 44.7 0.122 1101 0

0069-0311 CP2 0.193 1301 0.0 13.67 -14.91 16.99 0.00 0.01 23.6 34.4 0.191 1401 0

0069-0317 CP2 0.550 1301 0.0 29.20 70.53 -29.04 0.03 0.00 56.6 11.0 0.548 1401 0

0070-0314 CP2 0.169 1201 0.0 7.42 16.20 14.99 -0.02 -0.03 28.3 11.0 0.162 1101 0

0071-0315 CP2 0.370 1301 0.0 30.99 26.39 -26.34 0.02 -0.02 28.3 11.0 0.361 1401 0

0072-0282 CP2 0.206 1401 0.0 -1.30 -42.72 -4.33 0.00 0.08 42.1 13.8 0.205 1301 0

0074-0292 CP2 0.248 1301 0.0 1.76 53.94 -1.78 0.00 -0.08 24.8 19.4 0.248 1401 0

0075-T508 CP2 0.053 1301 0.0 0.04 -5.16 7.61 -0.01 0.02 42.1 13.8 0.053 1401 0

0076-0299 CP2 0.082 1101 0.0 0.44 -8.94 2.90 -0.02 0.08 10.6 13.8 0.080 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0123-0303 CP2 0.371 1301 0.1 32.62 27.01 23.44 0.04 0.00 28.3 12.4 0.360 1401 0

0124-0322 CP2 0.162 1201 0.1 8.04 7.62 -21.72 -0.03 0.03 28.3 12.4 0.153 1101 0

0202-0203 CP2 0.284 1301 1.1 36.62 16.51 -6.49 -0.01 0.03 28.3 15.1 0.275 1401 0

0203-0204 CP2 0.339 1301 1.1 33.59 23.97 -18.05 -0.01 0.01 28.3 15.1 0.330 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C20 of 116

0204-0071 CP2 0.354 1301 1.1 30.88 26.55 -25.43 -0.01 -0.01 28.3 15.1 0.344 1401 0

0205-0206 CP2 0.318 1301 1.1 17.58 51.17 -3.81 0.00 0.10 56.6 15.1 0.317 1201 0

0206-0207 CP2 0.426 1201 1.1 21.21 69.72 -7.58 0.00 0.09 56.6 15.1 0.426 1301 0

0207-0069 CP2 0.488 1201 1.1 25.76 74.91 -10.98 0.00 0.02 56.6 15.1 0.487 1101 0

0208-0209 CP2 0.322 1301 1.1 11.62 59.41 2.16 0.01 0.11 56.6 15.1 0.321 1201 0

0209-0210 CP2 0.447 1301 1.1 12.25 83.04 8.26 0.01 0.09 56.6 15.1 0.447 1401 0

0210-0313 CP2 0.521 1301 1.1 11.96 95.47 15.03 0.01 0.02 56.6 15.1 0.520 1401 0

0211-0212 CP2 0.134 1201 1.1 12.45 10.53 4.87 0.01 0.02 28.3 15.1 0.128 1101 0

0212-0213 CP2 0.171 1201 1.1 9.74 15.87 13.19 0.01 0.00 28.3 15.1 0.164 1101 0

0213-0070 CP2 0.165 1201 0.0 7.64 18.78 12.77 0.00 -0.01 28.3 15.1 0.159 1101 0

0215-0524 CP2 0.103 1201 0.0 12.16 4.76 -6.65 0.00 -0.01 28.3 10.3 0.098 1101 0

0216-0365 CP2 0.420 1301 0.0 6.57 83.60 -8.08 0.00 -0.06 56.6 10.3 0.419 1401 0

0219-0360 CP2 0.413 1201 0.0 15.65 70.36 9.98 0.00 -0.06 56.6 10.3 0.413 1101 0

0220-0355 CP2 0.243 1301 0.0 42.14 3.48 7.80 0.00 -0.05 28.3 10.3 0.236 1401 0

0222-0362 CP2 0.256 1301 0.0 9.58 45.67 3.71 0.00 -0.09 56.6 8.9 0.256 1401 0

0223-0367 CP2 0.252 1301 0.0 3.95 53.85 0.55 0.00 -0.09 56.6 8.9 0.251 1401 0

0224-0219 CP2 0.420 1201 0.0 18.48 68.63 10.77 0.00 -0.05 56.6 2.8 0.420 1101 0

0225-0216 CP2 0.429 1301 0.0 7.67 84.29 -8.76 0.00 -0.05 56.6 2.8 0.428 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0235-0245 CP2 0.098 1201 0.0 -0.68 -21.66 -0.16 0.00 0.06 12.3 13.8 0.095 1101 0

0236-0049 CP2 0.328 1301 0.3 4.19 -39.05 -37.06 -0.08 -0.12 12.3 4.0 0.322 1401 0

0239-T68E CP2 0.236 1201 0.5 1.00 -33.77 21.87 0.03 -0.13 27.1 7.0 0.236 1101 0

0240-T600 CP2 0.161 1201 0.0 -9.31 -22.29 -3.58 -0.01 0.12 27.1 13.8 0.160 1101 0

0245-T494 CP2 0.043 1101 0.6 -0.74 -3.27 -5.66 -0.01 0.03 12.3 13.8 0.042 1201 0

0246-0247 CP2 0.070 1301 1.0 -2.29 6.72 7.76 0.00 0.01 14.8 13.8 0.070 1401 0

0247-0248 CP2 0.089 1101 1.0 -3.56 8.61 8.54 0.00 0.01 14.8 13.8 0.088 1201 0

0248-0249 CP2 0.170 1101 1.0 -4.58 4.41 -32.89 -0.04 -0.03 14.8 13.8 0.167 1201 0

0249-0250 CP2 0.181 1401 0.0 -4.41 7.71 -31.73 0.03 0.05 14.8 13.8 0.177 1301 0

0250-0251 CP2 0.122 1101 1.0 -3.32 15.84 8.97 0.00 0.00 14.8 13.8 0.122 1201 0

0251-T5VV CP2 0.100 1101 0.0 -1.71 13.58 8.89 -0.01 -0.05 14.8 6.2 0.100 1201 0

0252-T495 CP2 0.112 1401 0.4 -0.69 -14.21 2.21 0.00 -0.12 14.8 13.8 0.111 1301 0

0253-T5VS CP2 0.144 1301 0.4 3.58 -18.95 12.03 0.01 -0.07 12.3 6.2 0.143 1401 0

0263-T64B CP2 0.219 1101 0.7 -9.98 23.06 -10.64 0.01 0.10 27.1 10.1 0.219 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C21 of 116

0264-T56W CP2 0.532 1301 0.5 -11.85 37.45 71.84 0.13 0.06 27.1 6.9 0.523 1401 0

0265-0266 CP2 0.240 1301 0.0 -14.90 26.13 11.02 -0.02 -0.14 27.1 13.8 0.238 1201 0

0266-T68A CP2 0.292 1301 0.8 -17.51 -36.92 -9.31 0.00 -0.17 27.1 11.6 0.288 1401 0

0267-T689 CP2 0.206 1201 0.0 -5.70 -38.52 -2.41 0.00 0.11 27.1 2.2 0.204 1301 0

0268-0269 CP2 0.215 1201 1.0 -7.64 31.23 10.80 0.01 0.15 27.1 13.8 0.213 1101 0

0269-T56V CP2 0.429 1201 0.5 -6.32 45.32 47.16 0.06 0.14 27.1 6.9 0.422 1101 0

0270-0271 CP2 0.290 1301 0.0 1.85 31.20 -39.34 0.02 -0.10 27.1 13.8 0.290 1401 0

0271-T60E CP2 0.115 1201 0.0 1.18 8.08 -18.84 0.02 -0.11 27.1 13.8 0.113 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0281-0065 CP2 0.097 1401 0.0 0.72 -14.69 7.61 -0.01 0.05 22.3 19.4 0.095 1301 0

0282-0075 CP2 0.114 1401 0.0 -0.66 -24.86 0.83 0.00 0.07 42.1 17.2 0.113 1101 0

0288-0289 CP2 0.113 1401 0.0 -2.33 23.03 -0.45 0.00 -0.10 24.8 13.8 0.113 1101 0

0289-0290 CP2 0.174 1101 1.0 -5.28 -32.57 1.95 0.00 -0.15 24.8 13.8 0.173 1201 0

0290-0291 CP2 0.384 1101 1.0 -4.23 -79.82 -5.38 -0.01 -0.20 24.8 13.8 0.383 1401 0

0291-0048 CP2 0.519 1101 0.5 -2.11 -110.59 9.19 0.02 -0.22 24.8 7.5 0.515 1201 0

0292-0293 CP2 0.162 1301 0.0 -1.35 32.49 -4.27 0.00 -0.11 24.8 13.8 0.162 1401 0

0293-0294 CP2 0.144 1301 1.0 -2.62 -25.01 2.23 0.00 -0.15 24.8 13.8 0.144 1401 0

0294-0295 CP2 0.300 1101 1.0 -2.36 -65.37 -2.30 0.00 -0.17 24.8 13.8 0.299 1201 0

0295-0073 CP2 0.508 1301 1.0 -2.26 -112.37 4.01 0.00 -0.20 24.8 13.8 0.507 1401 0

0299-0056 CP2 0.080 1101 0.0 -0.38 -3.90 -0.74 -0.01 0.08 10.6 17.2 0.078 1201 0

0303-0354 CP2 0.354 1301 0.0 35.85 22.51 22.41 -0.01 -0.02 28.3 11.0 0.343 1401 0

0307-0313 CP2 0.156 1301 1.2 13.67 -16.53 -5.28 0.00 -0.01 23.6 34.4 0.154 1401 0

0308-0307 CP2 0.144 1301 0.0 13.67 -13.32 5.86 0.00 0.00 23.6 34.4 0.144 1201 0

0311-0308 CP2 0.166 1301 0.0 13.67 -13.52 11.43 0.00 0.00 23.6 34.4 0.164 1401 0

0313-0316 CP2 0.511 1201 0.0 12.93 94.07 12.47 -0.02 0.00 56.6 11.0 0.511 1101 0

0314-0124 CP2 0.141 1201 0.8 8.41 1.86 -19.58 -0.02 -0.04 28.3 12.4 0.134 1101 0

0315-0123 CP2 0.348 1301 0.8 33.75 12.04 28.92 0.04 -0.04 28.3 12.4 0.338 1401 0

0316-0363 CP2 0.491 1301 0.9 9.97 93.34 -11.37 -0.01 -0.02 56.6 12.4 0.490 1401 0

0317-0358 CP2 0.479 1201 0.9 24.42 72.47 13.23 0.01 -0.02 56.6 12.4 0.478 1101 0

0318-0046 CP2 0.316 1201 0.5 18.42 -39.67 14.24 0.01 -0.07 28.3 7.5 0.301 1101 0

0319-0067 CP2 0.154 1301 0.0 1.38 26.21 8.03 0.01 -0.12 56.6 13.8 0.153 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C22 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0320-0066 CP2 0.119 1101 0.0 2.46 24.40 -0.63 -0.01 -0.12 56.6 13.8 0.119 1201 0

0321-0047 CP2 0.666 1301 0.5 56.38 -85.09 -8.11 -0.01 -0.11 28.3 7.5 0.647 1401 0

0322-0323 CP2 0.151 1201 0.0 9.40 5.72 -21.06 0.01 0.02 28.3 11.0 0.142 1101 0

0323-0215 CP2 0.119 1201 0.0 10.83 6.43 -10.89 0.00 0.00 28.3 10.3 0.113 1101 0

0324-0325 CP2 0.092 1201 1.0 13.60 -5.63 -0.77 0.00 -0.03 28.3 13.8 0.083 1101 0

0325-0326 CP2 0.157 1201 0.9 15.34 -17.10 3.07 0.00 -0.04 28.3 12.4 0.146 1101 0

0326-0318 CP2 0.231 1201 0.7 16.85 -28.51 7.43 0.01 -0.06 28.3 9.6 0.218 1101 0

0354-0220 CP2 0.288 1301 0.0 39.07 13.94 11.49 0.00 -0.03 28.3 10.3 0.279 1401 0

0355-0356 CP2 0.332 1301 1.0 45.56 -24.51 3.47 0.00 -0.06 28.3 13.8 0.320 1401 0

0356-0357 CP2 0.434 1301 0.9 49.48 -46.67 -0.27 0.00 -0.08 28.3 12.4 0.420 1401 0

0357-0321 CP2 0.551 1301 0.7 52.88 -66.64 -4.21 0.00 -0.09 28.3 9.6 0.535 1401 0

0358-0359 CP2 0.478 1201 0.0 21.45 76.61 12.62 0.00 -0.03 56.6 11.0 0.477 1101 0

0359-0224 CP2 0.454 1201 0.0 18.48 74.58 12.91 0.00 -0.05 56.6 7.6 0.453 1101 0

0360-0361 CP2 0.363 1201 0.0 12.50 64.29 6.94 0.00 -0.07 56.6 13.8 0.363 1301 0

0361-0222 CP2 0.279 1301 0.0 9.58 50.95 4.26 0.00 -0.09 56.6 3.4 0.279 1401 0

0362-0320 CP2 0.195 1301 0.0 6.18 36.49 2.37 0.00 -0.10 56.6 9.6 0.195 1401 0

0363-0364 CP2 0.489 1301 0.0 8.86 94.88 -11.04 0.00 -0.03 56.6 11.0 0.489 1401 0

0364-0225 CP2 0.463 1301 0.0 7.67 90.29 -10.87 0.00 -0.05 56.6 7.6 0.462 1401 0

0365-0366 CP2 0.365 1301 0.0 5.39 74.72 -4.85 0.00 -0.07 56.6 13.8 0.365 1201 0

0366-0223 CP2 0.274 1201 0.0 4.63 58.26 -0.97 0.00 -0.09 56.6 3.4 0.274 1101 0

0367-0319 CP2 0.205 1301 0.0 2.69 41.64 3.65 0.00 -0.10 56.6 9.6 0.204 1401 0

0518-T66S CP2 0.106 1301 1.3 3.32 -6.57 11.64 0.01 -0.01 23.6 41.3 0.099 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0522-T67C CP2 0.231 1401 1.4 -13.61 -28.35 -4.40 0.00 -0.02 23.6 68.8 0.230 1301 0

0524-0324 CP2 0.094 1201 0.0 12.16 3.83 -5.43 0.00 -0.01 28.3 10.3 0.090 1101 0

0527-0067 CP2 0.227 1301 2.5 -2.40 26.04 -19.16 -0.01 0.07 27.1 34.4 0.227 1201 0

T494-0246 CP2 0.054 1101 0.0 -1.80 -5.77 1.30 0.00 0.06 14.8 13.8 0.052 1201 0

T495-0253 CP2 0.078 1301 0.6 2.14 -10.18 4.65 0.01 -0.02 12.3 13.8 0.078 1401 0

T508-T329 CP2 0.020 1201 1.2 -0.07 0.15 -4.65 0.00 0.01 42.1 16.0 0.020 1101 0

T56V-0208 CP2 0.214 1201 1.1 11.17 31.64 -6.87 0.01 0.10 56.6 15.1 0.213 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C23 of 116

T56V-0270 CP2 0.434 1201 0.0 0.80 36.09 69.59 -0.19 -0.03 27.1 6.9 0.426 1101 0

T56W-0205 CP2 0.196 1301 1.1 12.27 30.76 1.41 -0.01 0.12 56.6 15.1 0.195 1401 0

T56W-0265 CP2 0.500 1301 0.0 -12.15 37.50 62.83 -0.09 -0.13 27.1 6.9 0.492 1401 0

T59B-T5VX CP2 0.247 1201 0.8 27.27 19.14 9.67 0.01 -0.03 23.6 17.3 0.246 1101 0

T5AW-T67J CP2 0.182 1201 0.0 28.78 10.34 0.66 0.00 -0.03 23.6 27.5 0.181 1101 0

T5AX-T675 CP2 0.275 1301 0.0 43.57 6.94 7.97 -0.02 -0.02 23.6 27.5 0.273 1401 0

T5BA-T601 CP2 0.068 1401 0.5 0.33 -7.89 -1.34 0.00 -0.07 27.1 44.7 0.068 1301 0

T5BB-T60F CP2 0.092 1201 0.0 3.92 -14.09 2.66 0.00 0.08 27.1 44.7 0.091 1301 0

T5BN-T5AW CP2 0.223 1201 0.0 28.78 15.94 5.22 0.00 -0.03 23.6 27.5 0.222 1101 0

T5IL-0518 CP2 0.080 1301 0.0 3.36 -1.78 -13.97 0.01 0.00 23.6 41.3 0.079 1401 0

T5NY-T5WA CP2 0.232 1401 0.0 -13.61 -29.36 6.43 0.00 0.02 23.6 55.0 0.221 1301 0

T5RZ-T5S2 CP2 0.361 1301 1.0 44.12 10.44 22.86 0.02 -0.01 23.6 13.8 0.359 1401 0

T5S2-T614 CP2 0.343 1301 0.0 43.57 11.18 22.53 -0.02 -0.02 23.6 27.5 0.340 1401 0

T5VS-0236 CP2 0.186 1301 0.5 2.95 -28.89 -12.10 -0.04 -0.08 12.3 7.6 0.182 1401 0

T5VV-0252 CP2 0.074 1401 0.6 -2.16 -2.51 0.82 -0.01 -0.08 14.8 7.6 0.072 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5VX-T5BN CP2 0.246 1201 0.2 27.27 17.79 11.23 0.01 -0.03 23.6 2.7 0.245 1101 0

T5WA-T61H CP2 0.208 1401 0.0 -13.61 -27.57 5.21 0.00 0.02 23.6 26.1 0.199 1301 0

T5WC-T59B CP2 0.245 1201 0.5 27.27 24.17 3.57 0.01 -0.02 23.6 17.3 0.244 1101 0

T5WJ-T5RZ CP2 0.297 1301 1.2 42.62 12.92 -6.10 0.00 0.01 23.6 16.8 0.296 1401 0

T5ZC-T5NY CP2 0.281 1401 0.0 -13.79 -33.19 -17.75 0.06 0.04 23.6 13.8 0.268 1301 0

T5ZN-T5BB CP2 0.140 1201 0.0 3.92 -24.07 3.46 0.00 0.08 27.1 44.7 0.139 1301 0

T600-0263 CP2 0.157 1301 0.5 -8.77 5.15 -22.43 -0.02 0.11 27.1 13.8 0.153 1401 0

T601-0046 CP2 0.102 1401 0.8 0.33 -20.59 -1.08 0.00 -0.07 27.1 44.7 0.098 1301 0

T60E-0239 CP2 0.116 1301 0.5 1.28 -18.58 2.88 0.02 -0.12 27.1 13.8 0.116 1401 0

T60F-0066 CP2 0.089 1401 1.2 4.62 12.45 0.54 0.00 0.07 27.1 44.7 0.087 1301 0

T60Q-T5BA CP2 0.065 1401 0.3 0.33 0.60 -1.52 0.00 -0.07 27.1 44.7 0.064 1301 0

T614-T5AX CP2 0.296 1301 0.0 43.57 8.67 13.52 -0.02 -0.02 23.6 27.5 0.294 1401 0

T61H-0522 CP2 0.195 1401 0.0 -13.61 -25.93 3.56 0.00 0.01 23.6 26.1 0.188 1301 0

T64B-0264 CP2 0.233 1101 0.3 -10.01 27.61 -8.07 0.01 0.07 27.1 3.7 0.232 1201 0

T66R-T5WJ CP2 0.280 1301 0.6 42.65 10.01 -5.64 0.00 0.02 23.6 8.2 0.279 1401 0

T674-0202 CP2 0.252 1301 0.0 39.86 -3.69 9.56 -0.01 0.05 28.3 11.2 0.246 1401 0

T675-0055 CP2 0.279 1301 0.3 44.64 -1.90 -15.54 -0.02 -0.05 23.6 27.5 0.261 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C24 of 116

T67B-T5WC CP2 0.303 1301 0.0 25.87 33.53 -10.11 0.01 -0.01 23.6 68.8 0.302 1401 0

T67I-0211 CP2 0.128 1201 0.0 15.43 -5.99 -5.09 0.00 0.04 28.3 11.1 0.123 1101 0

T67J-0054 CP2 0.466 1401 0.0 -1.22 4.05 -5.01 0.00 0.48 23.6 27.5 0.441 1301 0

T689-0268 CP2 0.199 1201 0.0 -8.57 -34.27 -2.01 0.00 0.16 27.1 11.5 0.196 1101 0

T68A-0267 CP2 0.225 1301 0.0 -4.17 -37.46 -10.82 0.00 0.10 27.1 2.2 0.221 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T68E-0054 CP2 0.287 1201 0.2 0.20 -41.75 28.66 0.03 -0.13 27.1 3.4 0.286 1101 0

T68F-0240 CP2 0.238 1301 0.0 -6.45 -39.64 7.66 -0.02 0.12 27.1 7.0 0.237 1401 0

0059-0283 CP3 0.316 1401 0.0 -0.43 -55.32 -19.35 0.02 0.05 43.5 13.2 0.315 1301 0

0061-0284 CP3 0.057 1401 1.2 0.85 10.39 -2.21 0.00 0.01 40.4 16.5 0.057 1301 0

0062-T5IM CP3 0.341 1101 0.0 3.87 -71.56 -3.33 0.00 0.10 15.4 26.4 0.338 1201 0

0064-T5LM CP3 0.149 1401 0.4 -0.26 24.60 -9.40 -0.01 0.05 43.5 5.3 0.148 1201 0

0074-T61C CP3 0.181 1301 0.0 0.71 35.04 -6.97 0.00 -0.01 38.5 66.0 0.179 1401 0

0243-0272 CP3 0.071 1101 0.0 4.96 -6.99 4.29 0.00 0.01 44.3 13.2 0.070 1201 0

0244-T68M CP3 0.190 1301 0.5 12.73 -13.53 -18.24 -0.03 -0.02 44.3 6.3 0.188 1401 0

0249-T61G CP3 0.543 1401 0.0 13.50 -111.60 -0.49 0.00 0.09 38.5 66.0 0.541 1101 0

0258-T5WF CP3 0.427 1401 0.0 11.77 75.18 -4.80 0.00 -0.02 38.5 39.6 0.426 1301 0

0272-0273 CP3 0.038 1201 1.0 4.16 3.96 0.29 0.00 0.01 44.3 13.2 0.038 1101 0

0273-0274 CP3 0.042 1201 1.0 3.69 5.21 0.50 0.00 0.00 44.3 13.2 0.042 1101 0

0274-0275 CP3 0.051 1101 1.0 3.77 2.39 6.05 0.00 -0.01 44.3 13.2 0.051 1201 0

0275-0276 CP3 0.088 1301 1.0 3.80 -3.19 -14.33 -0.01 -0.01 44.3 13.2 0.088 1401 0

0276-0277 CP3 0.132 1101 0.0 4.32 -8.30 -19.77 0.02 0.02 44.3 13.2 0.131 1201 0

0276-T59I CP3 0.184 1101 0.0 1.97 39.57 -1.44 0.00 -0.03 30.8 52.8 0.182 1201 0

0277-0278 CP3 0.082 1301 1.0 6.05 12.10 0.62 0.00 0.02 44.3 13.2 0.082 1401 0

0278-T5VU CP3 0.088 1301 0.4 7.04 12.54 -0.27 0.00 0.01 44.3 5.9 0.087 1401 0

0279-0280 CP3 0.086 1301 0.0 9.36 8.62 1.21 0.00 -0.01 44.3 13.2 0.085 1401 0

0280-T5VT CP3 0.074 1301 0.0 10.86 2.27 3.43 0.00 -0.01 44.3 5.9 0.073 1401 0

0283-0064 CP3 0.136 1401 0.0 -0.18 -24.36 7.55 0.00 0.05 43.5 18.6 0.135 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C25 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0284-0285 CP3 0.059 1401 0.0 1.38 9.63 -2.70 0.00 0.00 40.4 13.2 0.058 1301 0

0285-0286 CP3 0.061 1401 1.0 1.71 10.63 1.61 0.00 0.00 40.4 13.2 0.060 1301 0

0286-0287 CP3 0.062 1401 1.0 4.63 2.72 6.85 0.00 -0.01 40.4 13.2 0.060 1301 0

0287-T68N CP3 0.108 1101 0.7 8.77 -8.36 -7.30 -0.01 -0.01 40.4 9.6 0.108 1201 0

0649-0057 CP3 0.089 1301 0.8 0.71 -13.28 7.52 0.00 -0.03 38.5 66.0 0.088 1401 0

T59I-T59K CP3 0.177 1101 0.7 2.04 -38.95 0.20 0.00 -0.06 30.8 52.8 0.177 1401 0

T59K-0249 CP3 0.311 1401 0.9 1.88 -70.41 -0.29 0.00 -0.06 30.8 52.8 0.311 1101 0

T5AU-0649 CP3 0.054 1301 0.4 0.71 -0.62 5.21 0.00 -0.03 3.1 5.3 0.054 1401 0

T5I9-T5IF CP3 0.084 1201 0.0 -1.25 -6.59 -7.03 0.00 0.04 91.6 5.3 0.084 1101 0

T5IA-T5I9 CP3 0.054 1101 0.0 -0.18 9.68 2.73 0.00 -0.02 91.6 16.5 0.054 1401 0

T5IB-T5IA CP3 0.087 1401 0.0 1.37 18.32 -0.51 0.00 -0.02 91.6 13.2 0.086 1301 0

T5IC-T5IB CP3 0.084 1401 0.0 4.30 14.24 -0.56 0.00 0.00 91.6 13.2 0.084 1301 0

T5ID-T5IC CP3 0.087 1401 0.0 2.88 9.07 -8.93 0.01 0.01 91.6 13.2 0.086 1301 0

T5IE-T5ID CP3 0.099 1401 1.0 -0.29 13.25 -9.51 -0.01 0.02 91.6 13.2 0.099 1101 0

T5IH-T5IM CP3 0.200 1101 0.0 1.64 39.11 5.66 -0.01 -0.07 91.6 16.5 0.200 1401 0

T5II-T5IH CP3 0.287 1101 0.0 6.84 57.65 1.85 0.00 -0.04 91.6 13.2 0.287 1401 0

T5IJ-T5II CP3 0.283 1401 1.0 9.27 54.51 1.66 0.00 0.00 91.6 13.2 0.282 1101 0

T5IK-T5IJ CP3 0.283 1301 1.0 4.05 60.22 -1.55 0.00 0.05 91.6 13.2 0.283 1401 0

T5IL-T5IK CP3 0.213 1101 1.0 -2.09 40.57 3.07 0.01 0.07 91.6 13.2 0.213 1201 0

T5IM-T5IG CP3 0.123 1401 0.0 -0.28 -10.66 -3.68 0.00 0.06 91.6 5.3 0.123 1301 0

T5IM-T5ON CP3 0.265 1101 0.0 5.22 45.88 -11.80 0.02 -0.03 23.1 8.6 0.264 1201 0

T5NW-T5LN CP3 0.091 1401 0.0 -0.70 1.61 -12.12 0.01 0.04 43.5 5.3 0.088 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5NX-T5NW CP3 0.066 1401 1.2 -1.82 3.11 -11.20 -0.01 0.00 43.5 16.5 0.063 1301 0

T5NY-T5NX CP3 0.070 1401 0.0 -3.87 -3.93 7.47 0.00 0.01 43.5 13.2 0.066 1301 0

T5ON-T5OP CP3 0.127 1301 0.0 5.14 16.99 8.10 0.00 0.00 23.1 15.5 0.127 1401 0

T5OP-0074 CP3 0.104 1101 0.0 4.85 14.73 3.76 0.00 -0.01 23.1 15.5 0.104 1201 0

T5VT-0244 CP3 0.124 1301 0.5 11.83 -7.57 9.42 0.00 -0.02 44.3 7.3 0.123 1401 0

T5VU-0279 CP3 0.087 1301 0.6 7.88 10.60 1.17 0.00 0.00 44.3 7.3 0.087 1401 0

T5WF-0267 CP3 0.382 1301 2.0 11.79 -63.51 7.37 0.00 -0.06 38.5 26.3 0.380 1401 0

T619-T5AU CP3 0.058 1301 0.0 0.71 9.83 3.16 0.00 -0.02 38.5 66.0 0.057 1401 0

T61C-T619 CP3 0.118 1301 0.0 0.71 25.43 -1.20 0.00 -0.01 38.5 66.0 0.117 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C26 of 116

T61G-T61O CP3 0.143 1401 0.0 13.50 -15.14 -0.05 0.00 0.07 38.5 66.0 0.143 1101 0

T61O-0258 CP3 0.384 1401 3.0 13.50 74.16 0.61 0.00 0.03 38.5 66.0 0.384 1301 0

T68M-0059 CP3 0.455 1301 0.3 -1.77 -62.14 -33.96 -0.03 -0.21 44.3 3.6 0.452 1401 0

T68O-0243 CP3 0.130 1101 0.0 5.79 -12.78 -11.72 0.02 0.02 44.3 6.2 0.129 1201 0

0057-0297 CP4 0.097 1301 0.0 4.83 1.40 -16.76 0.01 0.02 29.3 19.1 0.097 1401 0

0058-T5IE CP4 0.265 1101 0.0 12.12 42.16 5.73 0.00 -0.06 23.4 13.5 0.262 1201 0

0059-0049 CP4 0.402 1401 3.7 11.56 -72.94 1.35 0.00 -0.11 21.7 50.1 0.398 1301 0

0073-0237 CP4 0.745 1301 0.0 -3.76 -145.09 25.62 -0.02 0.20 67.3 10.1 0.742 1401 0

0075-T327 CP4 0.170 1401 3.0 1.11 29.79 9.04 0.00 0.03 29.3 40.6 0.169 1301 0

0077-T68G CP4 0.242 1301 0.4 9.54 -22.02 26.93 0.06 -0.05 29.3 13.5 0.239 1401 0

0237-T5WX CP4 0.426 1101 0.0 -2.96 -93.47 1.38 -0.02 0.19 67.3 6.8 0.425 1201 0

0238-0072 CP4 0.591 1301 0.7 -3.59 -122.90 -10.98 -0.01 -0.25 67.3 10.1 0.590 1401 0

0254-0255 CP4 0.240 1301 0.0 -1.88 -30.80 -23.88 0.02 0.14 67.3 13.5 0.239 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0255-T5X0 CP4 0.134 1301 0.5 1.71 24.03 6.30 0.00 0.07 67.3 6.8 0.134 1401 0

0256-0257 CP4 0.246 1201 1.0 6.38 49.60 -0.64 -0.01 0.05 67.3 13.5 0.245 1101 0

0257-0258 CP4 0.293 1301 1.0 9.81 49.34 -9.16 -0.01 0.01 67.3 13.5 0.292 1201 0

0258-0259 CP4 0.335 1201 1.0 10.77 66.02 -0.16 0.00 0.04 67.3 13.5 0.334 1101 0

0259-0260 CP4 0.345 1201 1.0 7.60 66.33 6.40 0.01 -0.01 67.3 13.5 0.344 1101 0

0260-0261 CP4 0.348 1201 0.0 3.52 71.93 6.28 0.00 -0.07 67.3 13.5 0.346 1101 0

0261-0262 CP4 0.230 1201 0.0 0.25 51.15 2.05 0.00 -0.13 67.3 13.5 0.229 1101 0

0262-0238 CP4 0.275 1401 1.0 -2.06 -60.45 0.05 0.00 -0.20 67.3 13.5 0.275 1301 0

0296-0298 CP4 0.126 1301 1.0 7.13 2.12 20.07 0.02 -0.02 29.3 13.5 0.125 1401 0

0297-0296 CP4 0.099 1301 0.0 6.40 9.03 -5.36 0.00 0.00 29.3 13.5 0.098 1401 0

0298-0300 CP4 0.189 1301 1.0 8.25 -10.04 -22.87 -0.03 -0.03 29.3 13.5 0.188 1401 0

0300-0077 CP4 0.182 1301 0.0 9.54 -11.85 -22.80 0.06 -0.05 29.3 13.5 0.180 1401 0

T327-T509 CP4 0.039 1101 0.0 -0.05 -5.70 3.01 0.00 0.01 24.6 13.5 0.039 1201 0

T327-T5AV CP4 0.162 1401 0.8 -1.11 34.95 1.82 0.00 0.01 29.3 27.0 0.160 1301 0

T329-T328 CP4 0.029 1401 3.0 -0.42 0.88 5.08 0.00 0.00 17.6 40.6 0.029 1301 0

T509-T328 CP4 0.027 1101 1.2 0.08 0.35 -5.92 0.00 0.00 24.6 15.7 0.027 1401 0

T5AV-0056 CP4 0.178 1401 1.2 -1.11 36.86 3.80 0.00 0.00 29.3 27.0 0.176 1301 0

T5BM-T327 CP4 0.049 1201 1.2 0.14 -5.72 -5.78 0.00 -0.01 13.2 16.9 0.049 1301 0

T5BN-T5BM CP4 0.033 1201 0.0 0.06 -1.09 7.00 -0.01 0.00 13.2 13.5 0.032 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C27 of 116

T5IE-T5W7 CP4 0.228 1101 1.7 11.64 -39.37 -0.23 0.00 -0.10 23.4 23.5 0.224 1201 0

T5W7-0048 CP4 0.389 1101 1.0 11.64 -75.31 2.70 0.00 -0.11 23.4 13.0 0.383 1201 0

T5WX-0254 CP4 0.323 1301 0.0 -3.30 -60.68 -10.87 -0.02 0.18 67.3 6.8 0.322 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5X0-0256 CP4 0.209 1301 0.5 1.72 36.46 11.07 0.01 0.07 67.3 6.8 0.207 1401 0

T68G-0055 CP4 0.333 1301 0.4 5.12 -42.17 33.40 0.05 -0.14 29.3 13.5 0.330 1401 0

0072-T67B CP5 0.388 1401 0.1 6.43 17.21 -8.01 0.01 0.80 25.5 77.0 0.383 1301 0

T67C-0072 CP5 0.609 1401 0.1 13.05 -0.66 -3.03 0.00 1.26 25.5 77.0 0.606 1301 0

0058-T68O CP6 0.454 1101 0.0 -11.42 -72.50 -20.86 0.02 0.25 44.3 3.7 0.453 1201 0

T68N-0058 CP6 0.491 1101 0.3 -11.82 -75.79 -13.19 -0.01 -0.31 40.4 3.6 0.487 1201 0

0278-T59G CS1 0.120 1201 2.5 5.39 19.37 -1.86 0.00 0.00 32.1 119.4 0.119 1101 0

0284-T5IA CS1 0.089 1401 1.0 -1.92 14.75 -4.05 0.00 0.01 8.0 29.9 0.089 1101 0

T598-T5WI CS1 0.113 1101 1.0 3.91 21.05 -0.56 0.00 0.00 24.1 47.2 0.113 1401 0

T59G-T59H CS1 0.115 1201 0.0 5.41 19.39 -1.86 0.00 0.00 32.1 119.4 0.115 1101 0

T59H-0251 CS1 0.116 1201 0.0 5.40 18.49 -1.74 0.00 -0.01 32.1 119.4 0.115 1101 0

T5B1-T598 CS1 0.084 1101 0.4 3.91 14.71 -0.46 0.00 0.01 24.1 47.2 0.084 1201 0

T5IA-T5B1 CS1 0.051 1101 0.2 7.70 3.29 0.27 0.00 0.01 24.1 47.2 0.051 1201 0

T5VT-T5XP CS1 0.066 1201 2.5 2.69 11.32 0.80 0.00 0.00 32.1 119.4 0.065 1101 0

T5VU-T5XQ CS1 0.121 1201 2.5 4.82 21.30 1.32 0.00 0.01 32.1 119.4 0.120 1101 0

T5WI-0288 CS1 0.114 1101 0.0 3.91 21.05 -0.56 0.00 0.00 24.1 89.6 0.114 1401 0

T5XN-T5VS CS1 0.160 1401 0.9 2.41 -27.49 7.40 0.00 -0.02 32.1 119.4 0.160 1301 0

T5XO-T5VV CS1 0.103 1201 0.0 4.82 17.03 1.17 0.00 -0.01 32.1 119.4 0.103 1101 0

T5XP-T5XN CS1 0.065 1201 0.0 2.77 11.39 0.80 0.00 -0.01 32.1 119.4 0.065 1101 0

T5XQ-T5XO CS1 0.119 1201 0.0 4.84 21.32 1.32 0.00 0.00 32.1 119.4 0.118 1101 0

0064-T5AY CS2 0.044 1401 0.0 -0.80 5.20 1.00 0.00 0.00 40.1 148.6 0.039 1301 0

0065-T5NW CS2 0.343 1401 0.0 6.18 -69.88 -3.78 0.00 0.04 10.0 37.1 0.335 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0071-T5ZW CS2 0.205 1301 1.2 19.89 26.19 0.00 0.00 0.00 32.6 120.7 0.204 1401 0

0202-T5ZZ CS2 0.112 1101 1.2 -1.59 18.91 -2.35 0.00 0.00 32.6 120.7 0.111 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C28 of 116

0203-T5ZY CS2 0.091 1201 1.2 0.72 20.52 0.00 0.00 0.00 32.6 120.7 0.091 1101 0

0204-T5ZX CS2 0.130 1201 1.2 4.62 25.26 0.00 0.00 0.00 32.6 120.7 0.129 1101 0

0205-0208 CS2 0.054 1101 2.5 -0.95 5.32 0.00 0.00 0.00 50.1 185.7 0.052 1201 0

0206-T648 CS2 0.128 1301 2.5 1.97 25.62 -2.45 0.00 0.00 50.1 185.7 0.128 1401 0

0207-T647 CS2 0.307 1301 2.5 6.55 62.70 -2.24 0.00 0.01 50.1 185.7 0.306 1401 0

0208-T644 CS2 0.238 1201 0.5 -1.87 -26.18 -26.49 0.00 -0.02 32.6 120.7 0.233 1101 0

0209-T60C CS2 0.102 1301 2.0 0.93 22.92 0.00 0.00 0.00 32.6 120.7 0.102 1401 0

0210-T610 CS2 0.121 1301 1.2 5.27 22.47 0.00 0.00 0.00 32.6 120.7 0.120 1401 0

0216-T60V CS2 0.095 1301 1.2 0.71 21.39 0.00 0.00 0.00 32.6 120.7 0.095 1401 0

0220-T5ZS CS2 0.093 1201 1.2 0.69 21.12 0.00 0.00 0.00 32.6 120.7 0.093 1101 0

0235-T5WP CS2 0.101 1301 0.6 3.68 18.70 0.95 0.00 0.01 50.1 22.3 0.099 1401 0

0236-T5W8 CS2 0.462 1201 1.4 4.45 102.61 0.89 0.00 0.01 50.1 52.6 0.461 1101 0

0237-T5WR CS2 0.089 1401 0.6 0.55 13.99 -7.22 0.00 0.01 20.1 22.3 0.089 1301 0

0238-T5WB CS2 0.326 1201 1.5 9.61 62.52 -3.68 0.00 0.00 50.1 57.3 0.324 1101 0

0243-0235 CS2 0.249 1101 4.0 8.79 -46.30 -2.49 0.00 -0.01 40.1 148.6 0.247 1201 0

0244-0236 CS2 0.170 1401 4.0 4.30 -30.70 4.87 0.00 -0.01 40.1 148.6 0.169 1301 0

0245-T59T CS2 0.206 1101 0.6 -2.63 26.95 0.74 0.00 0.01 50.1 185.7 0.198 1201 0

0246-T5WQ CS2 0.262 1301 0.6 4.61 44.52 -13.48 0.00 0.02 50.1 185.7 0.258 1401 0

0247-T5W2 CS2 0.172 1301 0.6 9.50 19.11 12.13 0.00 0.01 50.1 20.6 0.168 1401 0

0248-T5W3 CS2 0.184 1301 0.6 10.80 30.22 1.24 0.00 0.02 50.1 20.6 0.183 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0250-T5W4 CS2 0.269 1201 0.6 11.01 50.58 0.44 0.00 0.03 50.1 20.6 0.268 1101 0

0251-T5W5 CS2 0.286 1201 0.6 8.85 56.77 -0.44 0.00 0.03 50.1 20.6 0.284 1101 0

0252-T61L CS2 0.599 1201 2.0 6.19 133.43 0.00 0.00 0.00 50.1 185.7 0.597 1101 0

0253-T61K CS2 0.587 1201 2.0 3.83 133.43 0.00 0.00 0.00 50.1 185.7 0.586 1101 0

0254-T5WS CS2 0.299 1301 0.0 14.02 -51.62 -1.69 0.00 0.03 50.1 74.3 0.296 1401 0

0255-T5WT CS2 0.315 1301 0.6 15.81 56.32 -0.02 0.00 0.03 50.1 22.3 0.312 1401 0

0256-T5WU CS2 0.160 1301 0.6 16.40 16.13 -3.72 0.00 0.01 50.1 185.7 0.157 1401 0

0257-T6AG CS2 0.315 1301 1.5 10.19 62.18 0.33 0.00 0.01 50.1 104.0 0.313 1401 0

0259-T5VY CS2 0.307 1201 1.5 10.39 60.42 0.13 0.00 0.00 50.1 111.6 0.306 1101 0

0260-T59C CS2 0.385 1201 2.0 13.08 75.70 -0.17 0.00 0.00 50.1 104.0 0.383 1101 0

0261-0270 CS2 0.321 1201 2.5 6.28 68.20 0.00 0.00 0.00 50.1 185.7 0.318 1101 0

0262-0271 CS2 0.300 1201 2.5 2.22 67.79 0.00 0.00 -0.01 50.1 185.7 0.298 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C29 of 116

0272-0245 CS2 0.107 1101 4.0 4.32 -19.00 -1.56 0.00 0.00 40.1 148.6 0.106 1201 0

0273-0246 CS2 0.067 1301 0.0 5.58 -9.05 0.62 0.00 0.00 40.1 148.6 0.066 1401 0

0274-T59J CS2 0.078 1301 0.0 6.44 -10.66 -0.66 0.00 0.00 40.1 148.6 0.078 1401 0

0275-0248 CS2 0.123 1401 4.0 4.07 -19.85 5.12 0.00 0.00 40.1 148.6 0.123 1101 0

0277-0250 CS2 0.102 1101 4.0 3.07 -15.81 -5.14 0.00 0.00 40.1 148.6 0.101 1401 0

0279-0252 CS2 0.044 1201 2.0 2.42 7.45 0.25 0.00 0.00 40.1 148.6 0.043 1101 0

0280-T59F CS2 0.032 1201 0.0 2.36 -3.20 -1.78 0.00 0.00 40.1 148.6 0.031 1101 0

0281-T5NX CS2 0.021 1201 0.5 3.27 1.40 0.00 0.00 0.00 10.0 37.1 0.019 1101 0

0282-T5BM CS2 0.051 1201 1.5 6.06 5.23 0.00 0.00 0.00 30.1 111.4 0.049 1101 0

0283-T5B0 CS2 0.047 1201 0.0 4.79 3.08 2.68 0.00 0.00 40.1 148.6 0.047 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0285-T5IB CS2 0.050 1401 0.0 2.75 -3.93 5.26 0.00 0.00 10.0 37.1 0.050 1101 0

0286-T5IC CS2 0.110 1101 0.0 7.79 -12.42 5.08 0.00 0.00 10.0 37.1 0.109 1201 0

0287-T5ID CS2 0.191 1401 1.0 16.31 -21.56 5.51 0.00 0.00 10.0 37.1 0.190 1101 0

0288-T5IH CS2 0.103 1401 1.0 6.21 17.35 0.00 0.00 0.00 20.1 74.3 0.103 1301 0

0289-T5II CS2 0.160 1301 1.0 4.89 32.14 0.00 0.00 0.00 20.1 74.3 0.160 1401 0

0290-T5IJ CS2 0.172 1301 1.0 7.52 32.07 0.00 0.00 0.00 20.1 74.3 0.171 1401 0

0291-T5IK CS2 0.133 1301 1.0 9.84 20.39 0.00 0.00 0.00 20.1 74.3 0.131 1401 0

0292-T5WM CS2 0.180 1301 0.8 -0.64 32.80 4.88 0.00 0.01 50.1 185.7 0.179 1401 0

0293-T5WL CS2 0.202 1301 0.8 5.76 39.76 1.51 0.00 0.01 50.1 29.0 0.202 1401 0

0294-T5RS CS2 0.075 1301 1.0 11.46 5.05 0.00 0.00 0.00 21.0 77.6 0.075 1401 0

0295-T5WK CS2 0.266 1301 0.8 22.31 28.60 10.47 0.00 0.01 50.1 29.0 0.265 1401 0

0303-T5ZU CS2 0.130 1301 1.2 6.19 23.66 0.00 0.00 0.00 32.6 120.7 0.130 1401 0

0313-T60Z CS2 0.167 1201 1.2 11.51 26.53 0.00 0.00 0.00 32.6 120.7 0.167 1101 0

0315-T5ZV CS2 0.152 1301 1.2 10.83 23.66 0.00 0.00 0.00 32.6 120.7 0.151 1401 0

0316-T60Y CS2 0.130 1201 1.2 5.93 23.96 0.00 0.00 0.00 32.6 120.7 0.130 1101 0

0319-T60R CS2 0.106 1201 1.2 -0.23 23.96 0.00 0.00 0.00 32.6 120.7 0.104 1301 0

0321-T5ZO CS2 0.111 1101 1.2 2.07 23.66 0.00 0.00 0.00 32.6 120.7 0.110 1201 0

0354-T5ZT CS2 0.106 1301 1.2 2.87 21.76 0.00 0.00 0.00 32.6 120.7 0.106 1201 0

0355-T5ZR CS2 0.107 1401 1.2 -0.21 24.29 0.00 0.00 0.00 32.6 120.7 0.107 1301 0

0356-T5ZQ CS2 0.119 1301 1.2 -0.48 26.19 0.00 0.00 0.00 32.6 120.7 0.118 1401 0

0357-T5ZP CS2 0.096 1101 1.2 0.11 22.39 0.00 0.00 0.00 32.6 120.7 0.096 1201 0

0363-T60X CS2 0.121 1201 1.2 4.02 23.96 0.00 0.00 0.00 32.6 120.7 0.121 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C30 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0364-T60W CS2 0.105 1201 1.2 2.27 22.03 0.00 0.00 0.00 32.6 120.7 0.105 1301 0

0365-T60U CS2 0.105 1301 1.2 0.04 24.60 0.00 0.00 0.00 32.6 120.7 0.105 1401 0

0366-T60T CS2 0.115 1201 1.2 -0.14 26.53 0.00 0.00 0.00 32.6 120.7 0.115 1101 0

0367-T60S CS2 0.099 1201 1.2 -0.18 22.68 0.00 0.00 0.00 32.6 120.7 0.099 1101 0

T596-T5W6 CS2 0.134 1101 1.0 6.14 23.28 -1.61 0.00 0.00 30.1 58.7 0.134 1201 0

T597-0295 CS2 0.138 1301 0.0 6.06 22.70 -1.10 0.00 0.00 30.1 111.4 0.135 1401 0

T597-0518 CS2 0.079 1301 1.0 -0.03 -3.77 -15.36 0.00 0.00 10.0 37.1 0.078 1401 0

T599-0292 CS2 0.127 1401 0.0 2.41 25.95 -0.29 0.00 0.00 30.1 111.4 0.127 1301 0

T599-T6AC CS2 0.008 1101 1.0 0.00 0.04 -1.53 0.00 0.00 10.0 37.1 0.008 1201 0

T59C-T5VZ CS2 0.385 1201 0.0 13.08 75.70 -0.17 0.00 0.00 50.1 104.0 0.383 1101 0

T59D-T5W0 CS2 0.374 1301 0.5 10.19 75.81 0.80 0.00 0.00 50.1 104.0 0.373 1401 0

T59E-0253 CS2 0.036 1401 0.6 1.99 -4.42 2.09 0.00 0.00 40.1 148.6 0.035 1301 0

T59F-T59E CS2 0.029 1201 0.0 2.36 3.97 0.30 0.00 0.00 40.1 148.6 0.028 1101 0

T59J-T59L CS2 0.049 1301 0.6 6.44 3.95 0.44 0.00 0.00 40.1 148.6 0.047 1401 0

T59L-0247 CS2 0.044 1301 0.0 6.44 2.68 0.68 0.00 0.00 40.1 148.6 0.043 1401 0

T59T-T61F CS2 0.396 1101 1.4 -2.63 74.62 2.46 0.00 0.01 50.1 163.4 0.390 1201 0

T59U-T5WE CS2 0.163 1301 1.2 8.42 27.38 -0.48 0.00 0.00 50.1 185.7 0.161 1401 0

T59V-T5W1 CS2 0.295 1301 1.4 16.35 48.47 2.91 0.00 0.00 50.1 81.7 0.292 1401 0

T59W-T5S1 CS2 0.408 1301 0.4 14.21 63.09 -17.90 0.00 0.01 50.1 52.0 0.404 1401 0

T5AY-0065 CS2 0.255 1401 2.8 -0.80 -55.04 0.39 0.00 -0.01 40.1 148.6 0.245 1301 0

T5B0-0281 CS2 0.194 1401 2.8 4.92 -38.26 -1.61 0.00 -0.01 40.1 148.6 0.192 1301 0

T5B2-0297 CS2 0.237 1301 0.0 -0.56 51.33 0.47 0.00 -0.01 50.1 164.2 0.237 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5B3-T615 CS2 0.487 1301 0.0 38.28 56.15 11.49 0.00 0.01 50.1 74.3 0.485 1401 0

T5B4-T5RW CS2 0.454 1301 0.0 38.28 47.44 -13.73 0.00 -0.01 50.1 74.3 0.451 1401 0

T5BM-0299 CS2 0.036 1201 1.0 5.51 2.32 0.00 0.00 0.00 20.1 74.3 0.034 1101 0

T5IB-T5WH CS2 0.227 1301 1.6 3.35 49.24 0.23 0.00 0.00 30.1 58.7 0.226 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C31 of 116

T5IC-T5WG CS2 0.191 1301 1.6 2.97 41.14 0.37 0.00 0.00 30.1 58.7 0.191 1201 0

T5ID-T596 CS2 0.084 1101 0.6 6.14 12.29 -0.62 0.00 0.01 30.1 58.7 0.083 1201 0

T5IH-T599 CS2 0.125 1401 1.5 2.38 25.97 0.83 0.00 0.00 30.1 111.4 0.125 1301 0

T5II-T6AC CS2 0.218 1301 1.5 4.71 45.64 0.40 0.00 0.00 30.1 111.4 0.218 1401 0

T5IJ-0294 CS2 0.235 1301 1.5 8.98 45.17 0.00 0.00 0.00 30.1 111.4 0.234 1401 0

T5IK-T597 CS2 0.142 1301 1.5 5.81 22.65 4.89 0.00 0.00 30.1 111.4 0.140 1401 0

T5NW-0075 CS2 0.326 1201 4.0 4.89 -68.73 -2.01 0.00 -0.01 40.1 148.6 0.326 1101 0

T5NX-T61I CS2 0.074 1201 1.0 3.41 13.51 0.00 0.00 0.00 40.1 148.6 0.072 1101 0

T5OR-T5OQ CS2 0.042 1101 1.2 -1.66 3.82 -4.35 0.00 0.00 11.8 43.6 0.042 1201 0

T5OS-T5OR CS2 0.038 1401 0.0 -1.99 2.45 -4.17 0.00 0.00 11.8 43.6 0.037 1101 0

T5RS-T5RX CS2 0.669 1301 0.3 5.05 5.46 163.41 0.04 0.00 20.1 11.1 0.661 1401 0

T5RT-T5RS CS2 0.289 1301 1.0 -0.20 11.91 -63.16 0.00 0.00 20.1 37.1 0.286 1401 0

T5RT-T617 CS2 0.465 1301 0.0 0.55 93.14 14.68 0.00 0.01 50.1 74.3 0.464 1401 0

T5RU-0298 CS2 0.227 1301 0.9 -3.58 -27.66 23.06 0.00 -0.01 9.1 33.8 0.226 1401 0

T5RU-T5RY CS2 0.456 1301 0.3 -5.20 13.86 95.80 0.02 0.01 20.1 11.1 0.450 1401 0

T5RV-0296 CS2 0.285 1301 0.0 2.59 45.33 -20.27 0.00 -0.02 50.1 33.8 0.285 1401 0

T5RV-T5RU CS2 0.107 1301 1.0 0.46 -1.51 -26.18 0.00 0.00 20.1 37.1 0.106 1401 0

T5RW-0300 CS2 0.422 1301 0.0 40.63 35.77 -20.86 0.00 -0.01 50.1 33.8 0.419 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5RX-T5B3 CS2 0.436 1301 0.0 0.30 11.51 100.65 -0.01 -0.01 20.1 26.0 0.432 1401 0

T5RX-T616 CS2 0.282 1301 0.0 0.81 16.93 51.98 0.00 0.01 14.1 74.3 0.278 1401 0

T5RY-T5RW CS2 0.204 1301 0.0 -0.45 7.81 43.82 0.00 0.00 20.1 26.0 0.202 1401 0

T5RZ-T5S0 CS2 0.108 1301 0.7 3.94 8.86 -13.79 0.00 0.00 17.5 27.9 0.107 1401 0

T5S0-T5S1 CS2 0.115 1301 0.0 -0.77 15.49 -10.54 0.00 0.00 17.5 37.1 0.114 1401 0

T5S1-T5S4 CS2 0.540 1301 1.0 5.48 76.40 42.75 0.00 0.00 50.1 37.1 0.534 1401 0

T5S2-T5S3 CS2 0.205 1301 0.7 -13.08 22.65 10.89 0.00 0.01 17.5 27.9 0.203 1401 0

T5S3-T5S4 CS2 0.053 1201 0.0 0.92 3.31 8.32 0.00 0.00 17.5 37.1 0.053 1101 0

T5S3-T613 CS2 0.008 1301 0.5 0.31 1.49 0.00 0.00 0.00 5.0 74.3 0.008 1401 0

T5S4-T612 CS2 0.476 1301 0.0 8.51 71.81 34.46 0.00 -0.01 50.1 74.3 0.471 1401 0

T5VW-0239 CS2 0.293 1201 0.0 9.61 55.57 2.81 0.00 -0.01 50.1 81.6 0.291 1101 0

T5VW-T5VX CS2 0.001 1001 0.0 -0.08 0.00 0.00 0.00 0.00 7.5 27.9 0.001 1101 0

T5VY-0268 CS2 0.268 1201 0.0 10.39 51.09 0.25 0.00 -0.01 50.1 74.1 0.267 1101 0

T5VY-T5VZ CS2 0.001 1001 0.0 0.00 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C32 of 116

T5VZ-0269 CS2 0.326 1201 0.0 13.08 61.86 -0.25 0.00 -0.01 50.1 74.1 0.324 1101 0

T5W0-0266 CS2 0.364 1301 0.0 10.19 73.10 1.03 0.00 -0.01 50.1 185.7 0.363 1401 0

T5W1-0265 CS2 0.295 1301 0.0 16.35 48.47 2.91 0.00 0.00 50.1 185.7 0.292 1401 0

T5W1-T5W0 CS2 0.001 1001 0.0 -0.04 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T5W2-T59U CS2 0.182 1301 0.0 9.50 20.53 13.35 0.00 0.01 50.1 185.7 0.179 1401 0

T5W2-T5W3 CS2 0.001 1001 0.0 0.05 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T5W3-T5WD CS2 0.338 1301 1.2 10.80 65.86 -1.57 0.00 0.00 50.1 46.4 0.337 1401 0

T5W4-T5W5 CS2 0.001 1001 0.0 -0.01 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5W4-T61N CS2 0.556 1201 1.4 11.01 117.82 0.30 0.00 0.00 50.1 165.3 0.555 1101 0

T5W5-T61M CS2 0.611 1201 1.4 8.85 133.23 -0.30 0.00 0.00 50.1 165.3 0.610 1101 0

T5W6-0291 CS2 0.134 1101 0.0 6.14 23.28 -1.61 0.00 0.00 30.1 52.7 0.134 1201 0

T5W6-T5W7 CS2 0.001 1001 0.0 0.03 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T5W8-T61J CS2 0.526 1201 0.6 4.45 118.27 -0.03 0.00 0.00 50.1 70.6 0.524 1101 0

T5W9-0238 CS2 0.479 1201 0.0 4.45 105.49 -2.10 0.00 -0.01 50.1 62.6 0.477 1101 0

T5WB-T5VW CS2 0.326 1201 0.0 9.61 62.52 -3.68 0.00 0.00 50.1 46.8 0.324 1101 0

T5WD-T61P CS2 0.342 1301 0.2 10.80 67.08 -1.45 0.00 0.00 50.1 118.8 0.341 1401 0

T5WE-T61Q CS2 0.159 1301 0.0 8.42 27.38 -0.48 0.00 0.00 50.1 118.8 0.157 1401 0

T5WG-0290 CS2 0.191 1301 0.0 2.97 41.14 0.37 0.00 0.00 30.1 52.7 0.191 1201 0

T5WH-0289 CS2 0.227 1301 0.0 3.35 49.24 0.23 0.00 0.00 30.1 52.7 0.226 1401 0

T5WK-T5B3 CS2 0.497 1301 1.3 22.50 81.61 8.09 0.00 0.01 50.1 48.7 0.494 1401 0

T5WL-T5RT CS2 0.437 1301 1.3 5.68 84.60 9.54 0.00 0.01 50.1 48.7 0.436 1401 0

T5WM-T61B CS2 0.316 1301 1.2 -0.56 69.20 1.18 0.00 0.01 50.1 164.2 0.316 1401 0

T5WP-T61T CS2 0.242 1301 1.4 3.68 49.86 3.18 0.00 0.01 50.1 163.4 0.240 1401 0

T5WQ-T61E CS2 0.510 1301 1.4 3.60 108.49 2.58 0.00 0.01 50.1 163.4 0.509 1401 0

T5WR-T5S0 CS2 0.099 1401 0.0 0.38 13.42 -7.22 0.00 0.00 20.1 52.0 0.099 1301 0

T5WS-T59W CS2 0.330 1301 1.0 14.21 48.40 -12.40 0.00 0.01 50.1 52.0 0.328 1401 0

T5WT-T61A CS2 0.397 1301 1.4 15.25 76.09 -0.02 0.00 0.00 50.1 163.4 0.394 1401 0

T5WU-T6AF CS2 0.237 1301 0.9 16.35 36.55 -1.09 0.00 0.01 50.1 81.7 0.234 1401 0

T5ZO-T60G CS2 0.113 1101 0.4 2.07 24.14 0.00 0.00 0.00 32.6 120.7 0.112 1201 0

T5ZP-T60H CS2 0.098 1101 0.4 0.11 22.85 0.00 0.00 0.00 32.6 120.7 0.098 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C33 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5ZQ-T60I CS2 0.121 1301 0.4 -0.48 26.71 0.00 0.00 0.00 32.6 120.7 0.121 1401 0

T5ZR-T60J CS2 0.109 1401 0.4 -0.21 24.78 0.00 0.00 0.00 32.6 120.7 0.109 1301 0

T5ZS-T60K CS2 0.095 1201 0.4 0.69 21.56 0.00 0.00 0.00 32.6 120.7 0.095 1101 0

T5ZT-T60L CS2 0.108 1301 0.4 2.87 22.21 0.00 0.00 0.00 32.6 120.7 0.108 1201 0

T5ZU-T60M CS2 0.132 1301 0.4 6.19 24.14 0.00 0.00 0.00 32.6 120.7 0.132 1401 0

T5ZV-T60N CS2 0.154 1301 0.4 10.83 24.14 0.00 0.00 0.00 32.6 120.7 0.153 1401 0

T5ZW-T60O CS2 0.207 1301 0.4 19.89 26.71 0.00 0.00 0.00 32.6 120.7 0.206 1401 0

T5ZX-T60P CS2 0.130 1201 0.0 4.62 25.26 0.00 0.00 0.00 32.6 120.7 0.129 1101 0

T5ZY-0206 CS2 0.091 1201 0.0 0.72 20.52 0.00 0.00 0.00 32.6 120.7 0.091 1101 0

T5ZZ-T64C CS2 0.112 1101 0.0 -1.59 18.91 -2.35 0.00 0.00 32.6 120.7 0.111 1201 0

T602-0318 CS2 0.104 1201 0.0 -0.23 23.66 0.00 0.00 0.00 32.6 120.7 0.102 1301 0

T603-0326 CS2 0.098 1201 0.0 -0.18 22.39 0.00 0.00 0.00 32.6 120.7 0.097 1101 0

T604-0325 CS2 0.114 1201 0.0 -0.14 26.19 0.00 0.00 0.00 32.6 120.7 0.114 1101 0

T605-0324 CS2 0.104 1301 0.0 0.04 24.29 0.00 0.00 0.00 32.6 120.7 0.104 1401 0

T606-0215 CS2 0.093 1301 0.0 0.71 21.12 0.00 0.00 0.00 32.6 120.7 0.093 1401 0

T607-0323 CS2 0.104 1201 0.0 2.27 21.76 0.00 0.00 0.00 32.6 120.7 0.103 1301 0

T608-0322 CS2 0.120 1201 0.0 4.02 23.66 0.00 0.00 0.00 32.6 120.7 0.120 1101 0

T609-0314 CS2 0.129 1201 0.0 5.93 23.66 0.00 0.00 0.00 32.6 120.7 0.129 1101 0

T60A-0070 CS2 0.166 1201 0.0 11.51 26.19 0.00 0.00 0.00 32.6 120.7 0.166 1101 0

T60B-0213 CS2 0.133 1301 0.0 5.27 25.26 0.00 0.00 0.00 32.6 120.7 0.132 1401 0

T60C-0212 CS2 0.102 1301 0.0 0.93 22.92 0.00 0.00 0.00 32.6 120.7 0.102 1401 0

T60D-0211 CS2 0.082 1101 0.0 -2.20 6.01 -4.76 0.00 0.01 32.6 120.7 0.082 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T60G-0320 CS2 0.112 1101 0.0 2.07 23.96 0.00 0.00 0.00 32.6 120.7 0.112 1201 0

T60H-0362 CS2 0.097 1101 0.0 0.11 22.68 0.00 0.00 0.00 32.6 120.7 0.097 1201 0

T60I-0361 CS2 0.120 1301 0.0 -0.48 26.53 0.00 0.00 0.00 32.6 120.7 0.120 1401 0

T60J-0360 CS2 0.108 1401 0.0 -0.21 24.60 0.00 0.00 0.00 32.6 120.7 0.108 1301 0

T60K-0219 CS2 0.095 1201 0.0 0.69 21.39 0.00 0.00 0.00 32.6 120.7 0.094 1101 0

T60L-0359 CS2 0.108 1301 0.0 2.87 22.03 0.00 0.00 0.00 32.6 120.7 0.107 1201 0

T60M-0358 CS2 0.131 1301 0.0 6.19 23.96 0.00 0.00 0.00 32.6 120.7 0.131 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C34 of 116

T60N-0317 CS2 0.153 1301 0.0 10.83 23.96 0.00 0.00 0.00 32.6 120.7 0.153 1401 0

T60O-0069 CS2 0.207 1301 0.0 19.89 26.53 0.00 0.00 0.00 32.6 120.7 0.206 1401 0

T60P-0207 CS2 0.118 1201 0.0 4.62 22.47 0.00 0.00 0.00 32.6 120.7 0.117 1101 0

T60R-T602 CS2 0.106 1201 0.4 -0.23 24.14 0.00 0.00 0.00 32.6 120.7 0.104 1301 0

T60S-T603 CS2 0.100 1201 0.4 -0.18 22.85 0.00 0.00 0.00 32.6 120.7 0.099 1101 0

T60T-T604 CS2 0.116 1201 0.4 -0.14 26.71 0.00 0.00 0.00 32.6 120.7 0.116 1101 0

T60U-T605 CS2 0.106 1301 0.4 0.04 24.78 0.00 0.00 0.00 32.6 120.7 0.106 1401 0

T60V-T606 CS2 0.095 1301 0.4 0.71 21.56 0.00 0.00 0.00 32.6 120.7 0.095 1401 0

T60W-T607 CS2 0.105 1201 0.4 2.27 22.21 0.00 0.00 0.00 32.6 120.7 0.105 1301 0

T60X-T608 CS2 0.122 1201 0.4 4.02 24.14 0.00 0.00 0.00 32.6 120.7 0.122 1101 0

T60Y-T609 CS2 0.131 1201 0.4 5.93 24.14 0.00 0.00 0.00 32.6 120.7 0.131 1101 0

T60Z-T60A CS2 0.168 1201 0.4 11.51 26.71 0.00 0.00 0.00 32.6 120.7 0.168 1101 0

T610-T60B CS2 0.133 1301 0.8 5.27 25.26 0.00 0.00 0.00 32.6 120.7 0.132 1401 0

T611-0264 CS2 0.293 1301 0.0 15.25 51.72 -0.01 0.00 -0.01 50.1 163.4 0.291 1401 0

T612-0263 CS2 0.347 1301 0.0 8.51 55.91 18.10 0.00 -0.01 50.1 74.3 0.342 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T613-0240 CS2 0.009 1301 0.8 0.31 1.87 0.00 0.00 0.00 15.1 74.3 0.009 1401 0

T615-T5B4 CS2 0.471 1301 0.0 38.28 54.64 -9.23 0.00 -0.01 50.1 74.3 0.468 1401 0

T616-T5RY CS2 0.215 1301 0.6 0.81 -9.75 -44.76 0.00 -0.01 6.0 74.3 0.211 1401 0

T617-T5RV CS2 0.367 1301 0.0 0.55 74.76 -10.82 0.00 -0.01 50.1 74.3 0.367 1401 0

T618-T5B2 CS2 0.285 1301 0.0 -0.56 62.69 0.59 0.00 -0.01 50.1 164.2 0.285 1401 0

T61A-T611 CS2 0.397 1301 0.0 15.25 76.09 -0.02 0.00 0.00 50.1 163.4 0.395 1401 0

T61B-T618 CS2 0.350 1301 0.8 -0.56 77.89 0.88 0.00 0.00 50.1 164.2 0.350 1401 0

T61D-T59D CS2 0.359 1301 0.4 10.19 72.42 0.57 0.00 0.00 50.1 104.0 0.358 1401 0

T61E-0255 CS2 0.495 1301 0.0 4.00 109.06 2.29 0.00 0.00 50.1 163.4 0.494 1401 0

T61F-0254 CS2 0.396 1101 0.0 -2.72 74.61 1.19 0.00 0.00 50.1 163.4 0.390 1201 0

T61I-0282 CS2 0.080 1201 1.5 3.41 15.04 0.00 0.00 0.00 40.1 148.6 0.078 1101 0

T61J-T5W9 CS2 0.535 1201 0.7 4.45 119.42 -1.07 0.00 0.00 50.1 70.6 0.533 1101 0

T61K-0262 CS2 0.587 1201 0.0 3.83 133.43 0.00 0.00 0.00 50.1 185.7 0.586 1101 0

T61L-0261 CS2 0.599 1201 0.0 6.19 133.43 0.00 0.00 0.00 50.1 185.7 0.597 1101 0

T61M-0260 CS2 0.611 1201 0.0 8.85 133.23 -0.30 0.00 0.00 50.1 165.3 0.610 1101 0

T61N-0259 CS2 0.556 1201 0.0 11.01 117.82 0.30 0.00 0.00 50.1 165.3 0.555 1101 0

T61P-T6AD CS2 0.342 1301 0.0 10.80 67.08 -1.45 0.00 0.00 50.1 118.8 0.341 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C35 of 116

T61Q-T6AE CS2 0.161 1301 0.0 8.42 26.97 -0.48 0.00 0.00 50.1 118.8 0.160 1401 0

T61T-0237 CS2 0.242 1301 0.0 4.25 50.67 0.28 0.00 0.00 50.1 163.4 0.240 1401 0

T644-T60D CS2 0.193 1201 0.0 -2.18 -26.59 -10.86 0.00 0.01 32.6 120.7 0.191 1101 0

T647-0210 CS2 0.313 1301 0.0 6.45 62.53 2.58 0.00 -0.01 50.1 185.7 0.313 1401 0

T648-0209 CS2 0.131 1301 0.0 2.07 25.79 2.12 0.00 0.00 50.1 185.7 0.131 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T64C-0205 CS2 0.106 1301 0.0 -1.19 5.96 -16.52 0.00 0.00 32.6 120.7 0.104 1401 0

T6AC-0293 CS2 0.225 1301 0.0 4.68 45.66 -0.94 0.00 0.00 30.1 111.4 0.225 1401 0

T6AD-0257 CS2 0.288 1301 0.0 10.80 55.06 -0.56 0.00 -0.01 50.1 118.8 0.287 1401 0

T6AE-0256 CS2 0.128 1301 0.0 8.42 19.00 -0.47 0.00 0.00 50.1 118.8 0.126 1401 0

T6AF-T59V CS2 0.245 1301 0.1 16.35 38.78 -0.79 0.00 0.01 50.1 81.7 0.242 1401 0

T6AF-T6AG CS2 0.001 1001 0.0 0.00 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T6AG-T61D CS2 0.327 1301 0.1 10.19 65.13 0.39 0.00 0.01 50.1 104.0 0.326 1401 0

0061-T5I9 CS3 0.138 1201 0.0 -0.49 -25.72 6.51 -0.01 0.06 7.7 13.2 0.136 1101 0

T5AZ-0062 CS3 0.103 1401 2.8 1.90 -19.21 -2.56 0.00 -0.02 23.1 39.6 0.102 1301 0

T5I9-T5AZ CS3 0.055 1401 0.0 1.90 9.93 0.77 0.00 -0.01 23.1 39.6 0.054 1301 0

T508-T509 CS4 0.080 1401 0.0 -1.72 -4.81 -4.04 0.00 0.00 32.9 121.1 0.079 1301 0

T5OL-T5OQ CS5 0.201 1401 1.0 8.25 31.14 -6.19 0.00 0.01 16.0 29.9 0.200 1301 0

T5OM-T5OO CS5 0.072 1101 0.0 0.08 -7.93 9.55 0.00 0.01 18.9 35.1 0.069 1201 0

T5OM-T5OS CS5 0.104 1101 0.0 3.80 6.63 14.44 0.00 0.00 16.0 29.9 0.101 1201 0

T5OO-T5OL CS5 0.021 1301 0.0 0.46 1.61 -2.91 0.00 0.00 18.9 35.1 0.021 1401 0

T5OO-T5OR CS5 0.046 1301 1.0 -1.14 5.91 -3.52 0.00 0.00 8.0 29.9 0.046 1401 0

T5OQ-0074 CS5 0.326 1301 1.0 8.91 51.46 14.40 0.00 0.01 16.0 29.9 0.326 1401 0

T5OR-T5OP CS5 0.060 1301 0.0 -1.87 6.84 -4.88 0.00 0.00 8.0 29.9 0.060 1401 0

T5OS-T5ON CS5 0.070 1101 1.0 3.91 -5.85 -6.45 0.00 0.00 16.0 29.9 0.070 1201 0

0000-T594 DP1 0.587 1101 0.0 -27.28 -77.67 27.66 -0.03 0.16 19.9 28.3 0.557 1201 0

0005-T142 DP1 0.217 1301 0.0 0.79 40.96 7.78 0.00 -0.02 47.7 15.5 0.211 1401 0

0109-0161 DP1 0.199 1301 1.0 -4.53 -40.25 0.75 0.00 -0.12 20.9 14.1 0.199 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C36 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0110-T66P DP1 0.077 1101 0.1 1.78 12.13 3.80 0.00 0.09 19.9 70.6 0.073 1201 0

0161-0110 DP1 0.344 1101 1.0 -3.42 -65.09 -12.63 -0.01 -0.14 20.9 14.1 0.343 1401 0

T139-T172 DP1 0.147 1301 0.0 -1.11 18.36 -16.47 0.00 -0.05 47.7 11.3 0.140 1401 0

T142-T143 DP1 0.189 1301 0.0 0.37 37.05 4.50 0.00 -0.03 47.7 15.5 0.185 1401 0

T143-T144 DP1 0.156 1301 1.1 -0.35 25.48 -8.64 -0.01 -0.04 47.7 15.5 0.154 1401 0

T144-T139 DP1 0.160 1301 1.1 -1.39 18.70 -16.79 -0.01 -0.04 47.7 15.5 0.152 1401 0

T159-T185 DP1 0.178 1301 0.7 6.58 -30.43 2.58 0.00 -0.07 47.7 10.6 0.175 1401 0

T166-T184 DP1 0.071 1401 0.8 4.12 -7.88 -2.96 0.01 -0.06 47.7 11.3 0.071 1301 0

T172-T166 DP1 0.108 1401 0.0 2.08 9.70 -14.01 0.01 -0.05 47.7 12.7 0.102 1101 0

T178-T132 DP1 0.529 1301 0.5 14.92 -83.24 27.62 0.02 -0.09 47.7 7.7 0.517 1401 0

T184-T159 DP1 0.114 1301 0.7 4.76 -19.55 0.12 0.00 -0.06 47.7 10.6 0.112 1401 0

T185-T186 DP1 0.267 1301 1.0 8.64 -45.41 5.88 0.00 -0.07 47.7 14.1 0.260 1401 0

T186-T187 DP1 0.355 1301 0.9 10.94 -60.29 10.09 0.01 -0.08 47.7 12.7 0.346 1401 0

T187-T178 DP1 0.438 1301 0.7 12.91 -72.67 16.74 0.01 -0.08 47.7 9.9 0.427 1401 0

T209-0109 DP1 0.126 1401 1.0 -4.60 -18.54 6.30 0.00 -0.10 20.9 14.1 0.125 1101 0

T213-T209 DP1 0.079 1201 0.0 -4.17 12.23 -1.55 0.00 -0.08 20.9 14.1 0.079 1101 0

T217-T213 DP1 0.143 1401 0.0 -3.73 26.78 -2.68 0.00 -0.06 20.9 19.9 0.143 1301 0

T593-0005 DP1 0.102 1101 1.5 7.93 6.04 9.31 0.00 -0.02 19.9 28.3 0.098 1201 0

T594-T5JT DP1 0.391 1101 0.4 -27.28 -35.06 -25.81 -0.03 0.15 19.9 28.3 0.369 1201 0

T595-T66Q DP1 0.241 1101 1.2 -25.13 14.99 8.75 0.01 0.09 19.9 42.4 0.229 1401 0

T5JT-T595 DP1 0.351 1101 0.0 -25.13 -37.30 -12.08 0.01 0.11 19.9 42.4 0.330 1201 0

T5RP-T5RR DP1 0.101 1101 0.0 5.59 13.66 -3.24 0.00 0.00 19.9 70.6 0.093 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5RR-T593 DP1 0.093 1101 0.9 7.93 9.60 3.18 0.00 -0.01 19.9 28.3 0.087 1201 0

T66P-T5RP DP1 0.097 1101 1.5 5.61 13.64 -3.20 0.00 0.00 19.9 70.6 0.089 1201 0

T66Q-0110 DP1 0.412 1101 0.0 -1.78 13.66 12.85 0.01 0.54 19.9 42.4 0.384 1201 0

0000-0195 DP2 0.184 1101 0.0 -4.42 -36.98 -0.42 0.01 0.08 33.7 4.0 0.184 1201 0

0004-0155 DP2 0.108 1301 0.0 -1.82 -19.18 -3.80 0.01 0.04 27.7 7.3 0.107 1401 0

0004-T5O1 DP2 0.475 1401 0.0 -39.93 -38.30 -32.00 0.06 0.02 15.9 7.3 0.448 1301 0

0005-0186 DP2 0.196 1301 0.0 -3.81 -33.76 -8.21 0.00 0.04 33.7 10.1 0.196 1401 0

0006-0154 DP2 0.192 1401 0.0 -1.00 -29.56 15.40 -0.01 0.04 52.2 13.5 0.190 1301 0

0006-T151 DP2 0.152 1401 0.0 20.00 -8.18 -4.75 0.00 0.02 70.3 14.9 0.133 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C37 of 116

0007-T506 DP2 0.034 1401 0.0 -0.09 -4.43 3.45 0.00 0.01 52.2 13.5 0.034 1301 0

0008-0162 DP2 0.198 1301 1.0 1.32 -38.79 6.70 0.00 -0.05 65.0 13.5 0.197 1401 0

0026-T5PY DP2 0.039 1101 0.0 3.43 4.46 1.04 0.00 0.00 33.7 4.7 0.039 1201 0

0027-0192 DP2 0.122 1401 1.0 -0.61 15.09 -14.05 -0.01 -0.02 33.7 13.5 0.122 1101 0

0107-0153 DP2 0.246 1401 0.0 1.93 -27.99 -30.49 0.03 0.04 27.7 13.5 0.238 1301 0

0108-T325 DP2 0.072 1401 2.9 -1.36 12.55 2.76 0.00 0.01 17.0 39.2 0.071 1101 0

0110-0165 DP2 0.536 1101 0.0 -6.30 -111.65 -4.49 0.01 0.12 67.3 10.1 0.534 1401 0

0153-0108 DP2 0.097 1401 0.0 0.53 -13.47 9.85 -0.01 0.03 27.7 19.1 0.095 1301 0

0154-0007 DP2 0.091 1401 0.0 -0.50 -17.49 -3.04 0.00 0.03 52.2 16.9 0.090 1301 0

0155-0015 DP2 0.090 1401 0.0 -0.85 -13.53 5.87 0.00 0.03 27.7 19.1 0.089 1101 0

0162-T68D DP2 0.280 1201 0.7 1.73 -51.72 12.16 0.01 -0.06 65.0 9.1 0.279 1101 0

0165-0167 DP2 0.407 1301 0.0 -8.38 -78.20 4.61 0.00 0.12 67.3 13.5 0.406 1401 0

0166-0107 DP2 0.424 1401 0.7 5.02 -54.80 -42.52 -0.05 -0.08 67.3 10.1 0.415 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0167-0168 DP2 0.219 1301 0.0 -7.87 -37.58 1.23 0.00 0.11 67.3 13.5 0.219 1401 0

0168-0169 DP2 0.129 1301 1.0 -4.54 22.63 -0.50 0.00 0.07 67.3 13.5 0.127 1401 0

0169-0170 DP2 0.190 1401 1.0 -1.87 36.48 -5.57 -0.01 0.05 67.3 13.5 0.190 1301 0

0170-0171 DP2 0.209 1101 1.0 0.75 43.20 4.64 0.01 0.03 67.3 13.5 0.208 1401 0

0171-T5Q4 DP2 0.205 1101 0.0 0.58 43.34 4.23 0.00 -0.01 67.3 6.8 0.205 1401 0

0172-T5QH DP2 0.188 1301 0.0 1.08 38.91 3.89 0.00 -0.02 67.3 13.5 0.187 1201 0

0173-T5PZ DP2 0.143 1101 0.0 0.66 31.95 -0.81 0.00 -0.04 67.3 4.7 0.142 1201 0

0174-0175 DP2 0.082 1401 1.0 -0.13 -5.85 7.08 0.00 -0.06 67.3 13.5 0.082 1301 0

0175-0166 DP2 0.178 1401 1.0 2.37 -32.01 7.20 0.00 -0.07 67.3 13.5 0.176 1301 0

0176-0006 DP2 0.150 1401 0.7 -2.72 -19.39 12.84 0.02 -0.04 33.7 10.1 0.149 1301 0

0177-0176 DP2 0.079 1401 1.0 -0.36 -10.87 -7.03 0.00 -0.04 33.7 13.5 0.078 1301 0

0178-0177 DP2 0.068 1301 0.0 2.58 11.25 -1.22 0.00 -0.03 33.7 13.5 0.066 1401 0

0179-T205 DP2 0.169 1301 0.5 0.35 18.36 -21.86 -0.02 0.01 33.7 6.8 0.164 1401 0

0180-T5QG DP2 0.106 1301 0.0 3.59 8.41 12.40 -0.01 0.02 33.7 13.5 0.104 1401 0

0181-T687 DP2 0.149 1301 0.0 6.60 -4.65 -24.97 0.07 0.04 33.7 2.4 0.146 1401 0

0182-T688 DP2 0.187 1201 0.8 -12.28 -13.48 -15.60 -0.03 -0.04 33.7 11.2 0.183 1101 0

0183-0182 DP2 0.138 1401 0.0 -10.62 8.45 -11.78 0.02 -0.03 33.7 13.5 0.137 1301 0

0184-T202 DP2 0.193 1401 0.5 -8.83 8.42 26.82 0.05 0.02 33.7 6.8 0.188 1301 0

0185-0184 DP2 0.087 1301 1.0 -7.71 2.87 -7.65 0.00 0.03 33.7 13.5 0.087 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C38 of 116

0186-0185 DP2 0.140 1301 0.0 -6.15 -21.41 -4.27 0.00 0.04 33.7 13.5 0.140 1401 0

0187-0004 DP2 0.264 1401 0.3 6.57 -27.27 -29.72 -0.07 -0.05 33.7 4.0 0.264 1301 0

0188-0187 DP2 0.133 1401 1.0 5.89 -21.32 -3.40 -0.01 -0.03 33.7 13.5 0.132 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0189-0188 DP2 0.080 1401 1.0 5.80 -9.87 2.61 0.00 -0.03 33.7 13.5 0.079 1301 0

0190-0026 DP2 0.038 1101 1.0 2.01 5.92 0.88 0.00 0.01 33.7 13.5 0.037 1401 0

0191-0190 DP2 0.051 1101 0.0 0.89 -4.33 6.81 0.00 0.02 33.7 13.5 0.050 1201 0

0192-0191 DP2 0.133 1101 0.0 -0.12 14.77 -15.74 0.02 -0.06 33.7 13.5 0.132 1401 0

0193-0027 DP2 0.112 1401 1.0 -0.52 21.61 -3.90 0.00 0.02 33.7 13.5 0.111 1301 0

0194-0193 DP2 0.091 1401 1.0 -0.65 13.17 -6.84 -0.01 0.05 33.7 13.5 0.090 1301 0

0195-0194 DP2 0.154 1101 0.0 -1.73 -31.98 2.00 0.00 0.07 33.7 13.5 0.153 1201 0

T132-T5B7 DP2 0.243 1301 0.0 5.64 -34.69 -16.11 0.01 0.05 67.3 43.9 0.239 1401 0

T135-T199 DP2 0.113 1301 0.0 0.53 12.92 13.89 0.00 0.00 67.3 33.8 0.112 1401 0

T136-T5B6 DP2 0.125 1301 0.0 -1.94 13.04 -12.29 0.01 -0.04 67.3 43.9 0.125 1401 0

T137-T169 DP2 0.151 1301 0.0 10.12 -8.23 17.36 -0.01 0.01 29.3 33.8 0.150 1401 0

T137-T174 DP2 0.272 1401 0.0 23.16 18.39 -21.91 0.02 0.00 70.3 10.8 0.272 1301 0

T138-T171 DP2 0.141 1401 0.0 15.82 10.33 -6.02 0.00 0.00 70.3 10.8 0.136 1301 0

T145-T146 DP2 0.132 1401 1.1 11.22 17.08 1.42 0.00 0.02 70.3 14.9 0.131 1301 0

T146-T147 DP2 0.165 1401 1.1 15.35 20.72 -1.27 0.00 0.02 70.3 14.9 0.164 1301 0

T147-T137 DP2 0.204 1401 1.1 20.89 20.35 -4.66 0.00 0.01 70.3 14.9 0.203 1301 0

T148-T149 DP2 0.144 1301 1.1 -2.54 25.72 3.06 0.00 0.03 70.3 14.9 0.139 1401 0

T149-T150 DP2 0.213 1301 1.1 -5.44 38.21 2.95 0.00 0.02 70.3 14.9 0.207 1401 0

T150-T170 DP2 0.290 1301 1.1 -9.20 49.18 -4.46 0.00 0.02 70.3 14.9 0.283 1401 0

T151-T152 DP2 0.121 1401 1.1 18.26 4.84 3.18 0.00 0.01 70.3 14.9 0.119 1301 0

T152-T153 DP2 0.120 1401 1.1 17.13 8.53 0.35 0.00 0.00 70.3 14.9 0.118 1301 0

T153-T138 DP2 0.146 1401 1.1 16.49 9.65 -6.13 0.00 0.00 70.3 14.9 0.141 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T155-T181 DP2 0.080 1401 0.0 10.70 4.38 -2.16 0.00 -0.02 70.3 10.1 0.067 1301 0

T156-T195 DP2 0.225 1301 0.0 -5.73 41.46 -1.98 0.00 -0.01 70.3 10.1 0.221 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C39 of 116

T158-T190 DP2 0.165 1401 0.0 12.61 23.61 0.75 0.00 -0.01 70.3 10.1 0.164 1301 0

T160-T192 DP2 0.126 1401 0.0 6.62 16.75 6.27 0.00 -0.02 70.3 8.8 0.126 1301 0

T161-T197 DP2 0.136 1301 0.0 -2.61 26.20 1.62 0.00 -0.02 70.3 8.8 0.134 1401 0

T162-T158 DP2 0.168 1401 0.0 15.10 21.93 0.72 0.00 -0.01 70.3 2.7 0.167 1301 0

T163-T156 DP2 0.242 1301 0.0 -7.00 43.56 -2.03 0.00 -0.01 70.3 2.7 0.237 1401 0

T167-T170 DP2 0.039 1401 1.2 1.07 -1.93 -6.96 0.00 -0.01 29.3 33.8 0.039 1301 0

T168-T167 DP2 0.034 1101 0.0 2.65 2.41 -2.81 0.00 0.00 29.3 33.8 0.033 1201 0

T169-T168 DP2 0.101 1301 0.0 10.12 -6.01 6.64 -0.01 0.00 29.3 33.8 0.100 1401 0

T170-T173 DP2 0.340 1301 0.0 -11.15 51.12 -11.77 0.01 0.00 70.3 10.8 0.331 1401 0

T171-T179 DP2 0.139 1401 0.0 14.45 10.74 -6.23 0.00 -0.01 70.3 12.2 0.132 1301 0

T173-T193 DP2 0.302 1301 0.0 -9.71 50.39 -5.36 0.00 0.00 70.3 12.2 0.295 1401 0

T174-T188 DP2 0.206 1401 0.0 20.45 21.56 -4.53 0.00 0.00 70.3 12.2 0.206 1301 0

T175-T131 DP2 0.251 1301 0.5 3.30 -31.65 24.04 0.02 -0.04 70.3 7.3 0.249 1201 0

T176-T136 DP2 0.078 1301 0.0 -0.06 11.52 5.24 0.00 -0.03 70.3 13.5 0.076 1401 0

T177-T135 DP2 0.085 1401 0.0 1.17 9.61 8.81 -0.01 -0.03 70.3 13.5 0.085 1301 0

T179-T180 DP2 0.122 1401 0.0 13.13 9.60 -4.45 0.00 -0.01 70.3 10.8 0.112 1301 0

T180-T155 DP2 0.102 1401 0.0 11.91 7.43 -3.09 0.00 -0.01 70.3 10.1 0.091 1301 0

T181-T182 DP2 0.096 1101 1.0 8.99 -12.04 -0.52 0.00 -0.03 70.3 13.5 0.096 1201 0

T182-T183 DP2 0.137 1201 0.9 6.50 -23.48 1.31 0.00 -0.03 70.3 12.2 0.135 1101 0

T183-T175 DP2 0.184 1201 0.7 5.98 -31.81 4.75 0.00 -0.04 70.3 9.5 0.181 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T188-T189 DP2 0.188 1401 0.0 17.67 23.47 -0.89 0.00 -0.01 70.3 10.8 0.188 1301 0

T189-T162 DP2 0.176 1401 0.0 15.10 24.05 -0.17 0.00 -0.01 70.3 7.4 0.175 1301 0

T190-T191 DP2 0.152 1401 0.0 9.78 22.49 2.24 0.00 -0.02 70.3 13.5 0.152 1301 0

T191-T160 DP2 0.131 1401 0.0 6.62 18.79 5.34 0.00 -0.02 70.3 3.4 0.131 1301 0

T192-T177 DP2 0.112 1301 0.0 3.89 13.78 8.77 0.00 -0.03 70.3 9.5 0.112 1401 0

T193-T194 DP2 0.277 1301 0.0 -8.31 48.43 -3.36 0.00 0.00 70.3 10.8 0.272 1401 0

T194-T163 DP2 0.252 1301 0.0 -7.00 45.41 -2.64 0.00 -0.01 70.3 7.4 0.248 1401 0

T195-T196 DP2 0.188 1301 0.0 -4.17 36.18 -1.08 0.00 -0.02 70.3 13.5 0.185 1401 0

T196-T161 DP2 0.142 1301 0.0 -2.61 28.11 0.92 0.00 -0.02 70.3 3.4 0.139 1401 0

T197-T176 DP2 0.109 1301 0.0 -1.35 19.53 3.55 0.00 -0.03 70.3 9.5 0.107 1401 0

T199-T136 DP2 0.115 1301 2.5 0.53 10.27 -17.50 0.00 -0.01 67.3 33.8 0.114 1401 0

T202-0183 DP2 0.215 1401 0.0 -7.59 7.65 35.07 -0.07 -0.01 33.7 6.8 0.210 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C40 of 116

T202-T145 DP2 0.098 1401 1.1 8.17 9.86 3.71 0.01 0.03 70.3 14.9 0.097 1301 0

T205-T148 DP2 0.066 1301 0.0 -1.08 -1.04 -13.79 0.01 0.04 70.3 14.9 0.065 1401 0

T205-T5Q7 DP2 0.116 1301 0.0 6.15 12.93 -7.97 0.01 -0.03 33.7 6.8 0.111 1401 0

T208-0008 DP2 0.114 1301 1.0 1.04 -22.91 2.51 0.00 -0.03 65.0 13.5 0.114 1401 0

T212-T208 DP2 0.058 1401 1.0 0.60 -11.23 1.38 0.00 -0.02 65.0 13.5 0.058 1301 0

T216-T212 DP2 0.021 1201 1.4 0.16 -3.67 -1.08 0.00 -0.01 65.0 19.1 0.021 1101 0

T325-T507 DP2 0.056 1401 0.0 0.09 -5.99 7.72 -0.01 0.01 52.2 13.5 0.055 1301 0

T325-T5B9 DP2 0.069 1401 0.0 -0.04 11.56 -4.81 0.00 -0.01 12.3 28.4 0.068 1301 0

T326-T324 DP2 0.024 1401 2.1 -0.11 0.38 4.84 0.00 0.00 12.3 28.4 0.023 1301 0

T506-T324 DP2 0.025 1401 1.2 0.08 0.29 -5.76 0.00 0.00 52.2 15.7 0.025 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T507-T326 DP2 0.023 1401 1.2 -0.08 0.09 -5.40 0.00 0.00 52.2 15.7 0.022 1301 0

T592-0006 DP2 0.175 1401 0.0 21.37 17.11 -0.27 0.00 -0.04 29.3 28.4 0.167 1301 0

T5B6-T131 DP2 0.210 1401 1.3 -1.91 -30.66 15.40 0.01 -0.05 67.3 43.9 0.207 1301 0

T5B7-T135 DP2 0.129 1301 1.5 5.64 7.07 17.09 0.01 0.04 67.3 43.9 0.127 1401 0

T5B9-0007 DP2 0.034 1401 0.0 -0.04 7.20 -0.15 0.00 -0.02 12.3 28.4 0.033 1301 0

T5BK-T325 DP2 0.032 1401 1.2 0.47 -6.58 0.12 0.00 -0.01 52.2 16.9 0.032 1201 0

T5BL-T592 DP2 0.209 1401 0.0 21.37 25.04 -0.47 0.00 -0.03 29.3 28.4 0.200 1301 0

T5BL-T5BK DP2 0.026 1301 0.0 0.44 -0.63 5.19 0.00 0.00 52.2 13.5 0.026 1401 0

T5O1-T5ZJ DP2 0.357 1401 0.0 -36.34 -37.08 -0.07 0.00 0.01 29.3 54.1 0.335 1301 0

T5PY-0189 DP2 0.038 1101 0.0 4.70 3.36 -0.09 0.00 0.00 33.7 8.8 0.037 1201 0

T5PZ-T5Q6 DP2 0.133 1401 0.0 -1.01 28.12 1.45 0.00 -0.05 67.3 8.8 0.133 1301 0

T5Q4-0172 DP2 0.197 1101 0.0 1.51 41.06 3.84 0.00 -0.01 67.3 6.8 0.196 1201 0

T5Q5-0180 DP2 0.118 1301 0.0 5.35 2.73 21.22 -0.01 0.02 33.7 6.8 0.116 1401 0

T5Q6-0174 DP2 0.091 1401 0.0 -1.01 19.12 0.66 0.00 -0.05 67.3 8.8 0.090 1101 0

T5Q7-0178 DP2 0.081 1301 0.0 6.15 9.20 -3.25 0.01 -0.03 33.7 6.8 0.079 1401 0

T5QG-0179 DP2 0.099 1401 0.1 3.76 13.41 -6.15 -0.01 0.01 33.7 13.5 0.099 1301 0

T5QH-0173 DP2 0.146 1101 0.0 1.20 32.60 -0.37 0.00 -0.02 67.3 13.5 0.146 1201 0

T5ZJ-T67A DP2 0.349 1401 0.0 -36.34 -34.17 0.45 0.00 0.01 29.3 54.1 0.328 1301 0

T660-T678 DP2 0.233 1401 0.0 22.38 26.92 3.37 0.00 -0.04 29.3 2.5 0.222 1301 0

T678-T5BL DP2 0.226 1401 0.0 22.38 24.53 4.30 0.00 -0.04 29.3 0.9 0.216 1301 0

T679-T660 DP2 0.335 1401 0.0 29.22 40.85 -6.17 0.00 -0.02 29.3 33.3 0.318 1301 0

T687-T5Q5 DP2 0.118 1301 0.3 6.98 1.05 21.26 0.07 0.03 33.7 4.4 0.116 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C41 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T688-0181 DP2 0.202 1101 0.0 3.51 -5.68 -16.05 -0.03 0.15 33.7 2.4 0.201 1201 0

T68D-0005 DP2 0.338 1301 0.3 -3.15 -66.03 -9.38 0.00 -0.12 65.0 4.4 0.336 1401 0

0016-T56X DP3 0.256 1401 0.3 -8.30 -48.27 2.08 0.00 -0.12 24.8 13.8 0.253 1101 0

0160-0000 DP3 0.410 1401 0.5 -6.06 -87.04 1.02 -0.01 -0.13 24.8 7.5 0.406 1101 0

T210-0016 DP3 0.233 1401 1.0 -8.08 -40.18 4.93 0.01 -0.11 24.8 13.8 0.230 1101 0

T214-T210 DP3 0.127 1401 1.0 -6.01 -17.49 4.96 0.01 -0.10 24.8 13.8 0.126 1101 0

T218-T214 DP3 0.202 1401 0.0 -3.51 29.68 -13.55 0.01 -0.08 24.8 19.4 0.201 1101 0

T56X-0160 DP3 0.354 1401 0.7 -8.30 -68.10 5.70 0.00 -0.12 24.8 13.8 0.351 1101 0

0012-0164 DP4 0.084 1101 1.0 3.12 -9.37 7.38 0.00 -0.01 40.4 13.2 0.083 1201 0

0012-T571 DP4 0.037 1401 0.0 -1.52 1.38 5.60 0.00 0.00 15.4 17.2 0.036 1301 0

0013-0163 DP4 0.028 1401 0.0 3.30 0.94 1.75 0.00 0.00 36.4 13.2 0.028 1101 0

0014-T445 DP4 0.082 1201 0.0 0.22 -14.21 -5.14 0.01 0.00 44.3 9.9 0.082 1101 0

0016-T5JR DP4 0.015 1101 1.0 -2.09 1.02 0.00 0.00 0.00 15.4 26.4 0.015 1401 0

0027-T57V DP4 0.108 1401 0.0 2.71 -19.29 -2.53 0.00 0.03 38.5 27.1 0.107 1101 0

0044-T440 DP4 0.055 1401 0.0 2.42 9.57 0.40 0.00 -0.01 44.3 13.2 0.054 1301 0

0045-T443 DP4 0.049 1401 0.0 -1.04 -7.01 -3.25 0.00 0.02 44.3 13.2 0.048 1301 0

0109-T577 DP4 0.034 1201 3.2 0.11 7.52 0.47 0.00 0.00 38.5 42.2 0.034 1101 0

0163-0011 DP4 0.019 1101 0.0 1.20 1.58 1.74 0.00 0.00 36.4 18.6 0.019 1401 0

0164-0014 DP4 0.123 1101 1.0 1.65 -17.00 -10.99 -0.01 -0.02 40.4 13.2 0.122 1201 0

0169-T57W DP4 0.092 1401 0.9 3.34 16.65 -1.03 0.00 0.01 38.5 66.0 0.090 1301 0

0171-T661 DP4 0.076 1201 2.6 -0.84 16.36 0.32 0.00 0.01 38.5 66.0 0.076 1101 0

0191-T57L DP4 0.053 1301 1.0 -1.81 8.91 1.26 0.00 0.01 38.5 13.8 0.052 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T209-T578 DP4 0.033 1401 3.2 -0.11 7.49 0.08 0.00 0.00 38.5 42.2 0.033 1101 0

T210-T5JQ DP4 0.006 1001 0.0 -0.07 0.00 0.00 0.00 0.00 15.4 26.4 0.006 1101 0

T211-0012 DP4 0.049 1101 0.0 2.96 4.68 -3.35 0.00 -0.01 40.4 13.2 0.048 1201 0

T211-T572 DP4 0.044 1401 0.0 -0.62 0.68 9.23 -0.01 0.00 15.4 17.2 0.043 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C42 of 116

T213-T579 DP4 0.033 1401 3.2 0.34 7.10 0.18 0.00 0.00 38.5 42.2 0.033 1101 0

T214-T5JP DP4 0.008 1101 1.0 1.04 0.80 0.00 0.00 0.00 15.4 26.4 0.008 1201 0

T215-T211 DP4 0.068 1101 0.0 1.63 8.59 -5.47 0.01 0.00 40.4 13.2 0.068 1401 0

T215-T573 DP4 0.050 1101 0.0 0.94 -1.04 9.87 -0.01 0.01 15.4 17.2 0.050 1201 0

T217-T5B8 DP4 0.019 1301 1.9 0.40 3.68 -0.31 0.00 0.00 38.5 66.0 0.018 1101 0

T218-T5JO DP4 0.232 1101 0.0 3.59 -44.88 5.61 0.00 0.06 15.4 26.4 0.229 1201 0

T219-T215 DP4 0.065 1401 1.2 -0.08 10.55 4.42 0.00 0.00 40.4 16.5 0.064 1301 0

T219-T218 DP4 0.113 1101 0.0 2.12 -13.73 10.45 -0.01 0.01 15.4 26.4 0.112 1201 0

T435-T444 DP4 0.060 1401 1.0 -2.56 -9.23 -1.61 0.00 0.00 44.3 13.2 0.060 1301 0

T437-0191 DP4 0.192 1401 0.0 -1.84 38.11 4.78 0.00 -0.05 16.6 28.5 0.192 1301 0

T437-T442 DP4 0.093 1101 0.0 1.02 12.27 -8.68 0.01 0.00 44.3 13.2 0.092 1201 0

T438-0188 DP4 0.032 1301 2.0 0.48 -1.42 6.13 0.00 0.00 15.4 26.4 0.032 1401 0

T438-T441 DP4 0.067 1301 1.0 5.48 -9.04 0.50 0.00 -0.01 44.3 13.2 0.066 1401 0

T440-T438 DP4 0.043 1401 0.0 3.35 4.89 1.58 0.00 -0.01 44.3 13.2 0.043 1101 0

T441-0013 DP4 0.130 1301 0.7 5.52 -13.01 -12.67 -0.01 -0.01 44.3 9.9 0.128 1401 0

T442-0044 DP4 0.075 1401 0.0 2.15 11.75 3.65 0.00 0.00 44.3 13.2 0.074 1301 0

T443-T437 DP4 0.113 1101 1.0 0.03 21.19 4.91 0.00 0.03 44.3 13.2 0.112 1201 0

T444-0045 DP4 0.059 1401 0.0 -2.05 -9.67 -1.41 0.00 0.01 44.3 13.2 0.059 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T445-T435 DP4 0.076 1301 0.0 -2.29 -10.59 4.54 0.00 0.00 44.3 13.2 0.075 1401 0

T56Y-T574 DP4 0.041 1101 0.0 -1.71 7.47 -0.06 0.00 0.00 23.1 11.9 0.041 1401 0

T56Z-T575 DP4 0.012 1301 0.9 -0.09 1.66 -1.00 0.00 0.00 23.1 11.9 0.012 1401 0

T570-T576 DP4 0.030 1101 0.0 0.96 5.31 -0.52 0.00 0.00 23.1 11.9 0.030 1201 0

T571-0016 DP4 0.035 1401 0.7 -1.35 -0.94 -6.34 0.00 -0.01 15.4 9.2 0.035 1101 0

T572-T210 DP4 0.040 1401 0.7 -0.61 0.27 -9.22 0.00 -0.01 15.4 9.2 0.040 1101 0

T573-T214 DP4 0.068 1401 0.7 0.84 -0.92 -15.70 -0.01 -0.01 15.4 9.2 0.068 1101 0

T574-0109 DP4 0.035 1401 0.0 -1.62 5.57 -0.67 0.00 -0.01 23.1 10.6 0.035 1101 0

T575-T209 DP4 0.011 1301 0.0 -0.07 1.66 -0.90 0.00 0.00 23.1 10.6 0.011 1401 0

T576-T213 DP4 0.025 1101 0.0 0.94 4.00 0.78 0.00 -0.01 23.1 10.6 0.025 1201 0

T577-0008 DP4 0.036 1201 0.0 0.12 7.50 0.70 0.00 0.00 38.5 23.8 0.036 1101 0

T578-T208 DP4 0.035 1401 0.0 -0.10 7.49 0.57 0.00 0.00 38.5 23.8 0.035 1101 0

T579-T212 DP4 0.033 1401 0.0 0.24 7.01 0.48 0.00 0.00 38.5 23.8 0.033 1101 0

T57L-T57P DP4 0.062 1301 1.5 -1.65 12.08 0.41 0.00 0.00 38.5 39.6 0.062 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C43 of 116

T57P-0171 DP4 0.051 1301 0.0 -1.68 8.92 -0.47 0.00 -0.01 38.5 12.5 0.051 1401 0

T57V-0169 DP4 0.056 1401 1.5 2.65 10.17 0.06 0.00 0.00 38.5 38.9 0.056 1301 0

T57W-T65V DP4 0.110 1401 1.7 3.31 19.96 1.45 0.00 0.00 38.5 22.4 0.109 1301 0

T5B8-T216 DP4 0.017 1301 0.0 0.40 3.04 -0.39 0.00 0.00 38.5 66.0 0.017 1401 0

T5JO-T5JU DP4 0.143 1101 0.0 -0.31 11.52 -23.14 0.02 0.00 91.6 5.3 0.142 1201 0

T5JO-T5PA DP4 0.234 1101 0.6 2.69 44.47 -7.49 -0.02 0.04 23.1 39.6 0.232 1201 0

T5JP-T570 DP4 0.030 1101 1.3 1.00 5.33 -0.76 0.00 0.01 23.1 17.2 0.030 1201 0

T5JP-T5JO DP4 0.109 1401 0.0 -0.52 23.63 -0.26 0.00 -0.02 91.6 16.5 0.109 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5JQ-T56Z DP4 0.009 1301 1.3 -0.10 1.51 -0.56 0.00 0.00 23.1 17.2 0.009 1401 0

T5JQ-T5JP DP4 0.118 1101 0.0 2.33 23.96 -0.83 0.00 0.00 91.6 13.2 0.118 1401 0

T5JR-T56Y DP4 0.041 1101 1.3 -1.51 7.74 -0.13 0.00 0.01 23.1 17.2 0.041 1401 0

T5JR-T5JQ DP4 0.118 1101 1.0 4.28 22.21 -0.62 0.00 0.00 91.6 13.2 0.118 1401 0

T5JS-T5JR DP4 0.119 1101 1.0 4.01 20.33 -3.05 -0.01 0.02 91.6 13.2 0.119 1401 0

T5JT-T5JS DP4 0.115 1101 0.0 0.54 -7.27 -21.37 0.02 0.03 91.6 13.2 0.112 1201 0

T5NZ-T5LY DP4 0.152 1101 0.0 -0.65 3.11 -33.87 0.02 0.03 43.5 5.3 0.152 1401 0

T5O0-T5NZ DP4 0.144 1401 1.2 -1.64 4.55 -30.20 -0.01 0.00 43.5 16.5 0.143 1101 0

T5O1-T5O0 DP4 0.113 1401 0.0 -3.48 -2.89 19.91 -0.01 0.01 43.5 13.2 0.108 1301 0

T5PA-T217 DP4 0.148 1301 0.0 3.10 29.56 -0.39 0.00 -0.02 23.1 39.6 0.147 1401 0

T5ZD-0181 DP4 0.063 1301 0.0 -1.58 11.77 0.14 0.00 -0.01 38.5 66.0 0.062 1201 0

T5ZH-0183 DP4 0.098 1401 0.0 5.43 13.71 2.36 0.00 -0.01 38.5 31.0 0.096 1301 0

T65V-T5ZH DP4 0.110 1401 0.0 5.43 18.11 1.21 0.00 -0.01 38.5 31.0 0.110 1301 0

T661-T5ZD DP4 0.083 1301 0.0 -1.58 16.65 0.23 0.00 -0.01 38.5 66.0 0.083 1201 0

0004-0013 DP5 0.457 1301 0.4 -8.66 -93.86 -0.20 0.00 0.58 10.6 18.0 0.453 1401 0

0014-T5OK DP6 0.557 1101 1.4 -8.80 -114.43 2.52 0.01 -0.84 9.6 13.5 0.553 1201 0

T5OK-0000 DP7 0.509 1101 0.3 -6.97 -103.64 5.05 0.01 -0.85 9.0 3.8 0.506 1201 0

0107-T679 DP8 0.304 1401 0.0 -4.67 -6.02 -5.95 0.00 0.50 29.3 2.5 0.289 1301 0

T67A-0107 DP8 0.386 1401 0.0 8.08 -9.06 4.52 0.00 0.64 29.3 54.1 0.367 1301 0

0011-0015 DS1 0.241 1401 2.0 5.66 -46.75 3.43 0.00 -0.01 20.1 74.3 0.233 1101 0

0015-T5NZ DS1 0.342 1401 0.0 17.70 -59.53 -0.80 0.00 0.02 10.0 37.1 0.329 1301 0

0026-T57J DS1 0.091 1401 1.0 -1.94 14.78 4.49 0.00 0.00 50.1 39.0 0.091 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C44 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0044-0026 DS1 0.020 1301 2.0 -1.48 -1.76 0.36 0.00 0.00 20.1 74.3 0.019 1401 0

0045-0027 DS1 0.410 1101 2.0 -2.38 -91.48 0.25 0.00 -0.02 20.1 74.3 0.403 1201 0

0155-T5O0 DS1 0.051 1101 0.5 -8.96 0.60 0.00 0.00 0.00 10.0 37.1 0.048 1201 0

0160-T5JS DS1 0.030 1201 1.0 1.90 4.84 0.00 0.00 0.00 20.1 74.3 0.029 1101 0

0161-0162 DS1 0.188 1301 2.5 -1.21 34.53 0.00 0.00 0.00 50.1 185.7 0.183 1401 0

0163-0155 DS1 0.087 1401 2.0 2.01 -17.31 0.51 0.00 0.00 20.1 74.3 0.087 1301 0

0164-0160 DS1 0.067 1101 2.0 3.80 -11.41 -0.05 0.00 0.00 20.1 74.3 0.066 1201 0

0165-T5RN DS1 0.007 1301 0.8 -0.14 1.39 0.00 0.00 0.00 16.4 60.9 0.007 1401 0

0167-T5RO DS1 0.052 1301 1.6 -3.24 5.88 -1.79 0.00 0.00 26.6 60.9 0.051 1401 0

0173-T57C DS1 0.073 1401 0.6 -5.59 10.32 -0.16 0.00 0.00 26.6 24.1 0.073 1301 0

0174-T65X DS1 0.076 1301 1.3 -6.17 3.92 0.00 0.00 0.00 26.6 98.4 0.074 1401 0

0175-T65Y DS1 0.034 1301 1.3 -1.81 3.92 0.00 0.00 0.00 26.6 98.4 0.034 1401 0

0187-T5PB DS1 0.146 1401 0.5 -8.14 13.81 -10.67 0.00 0.01 50.1 18.6 0.142 1301 0

0188-T5PC DS1 0.006 1101 0.2 -1.06 0.13 0.00 0.00 0.00 5.0 18.6 0.005 1201 0

0189-T5PD DS1 0.247 1401 0.5 -13.39 16.12 -26.75 0.00 0.01 50.1 18.6 0.246 1301 0

0194-T5WO DS1 0.177 1101 0.5 -4.75 5.03 0.00 0.00 0.00 50.1 185.7 0.176 1401 0

0195-T5WN DS1 0.222 1101 0.5 -6.11 4.66 0.00 0.00 0.00 50.1 185.7 0.210 1401 0

T139-T137 DS1 0.077 1301 1.6 14.11 2.45 0.00 0.00 0.00 32.6 120.7 0.076 1401 0

T142-T145 DS1 0.042 1301 1.6 -2.23 2.45 0.00 0.00 0.00 32.6 120.7 0.038 1401 0

T143-T146 DS1 0.051 1301 1.6 -2.87 2.45 0.00 0.00 0.00 32.6 120.7 0.048 1401 0

T144-T147 DS1 0.018 1101 1.6 1.64 2.45 0.00 0.00 0.00 32.6 120.7 0.018 1201 0

T148-T151 DS1 0.022 1401 1.6 2.45 2.45 0.00 0.00 0.00 32.6 120.7 0.021 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T149-T152 DS1 0.023 1401 1.6 2.70 2.45 0.00 0.00 0.00 32.6 120.7 0.023 1301 0

T150-T153 DS1 0.020 1401 1.6 2.04 2.45 0.00 0.00 0.00 32.6 120.7 0.020 1301 0

T156-T155 DS1 0.011 1301 1.6 0.08 2.45 0.00 0.00 0.00 32.6 120.7 0.011 1401 0

T159-T158 DS1 0.015 1301 1.6 -0.35 2.45 0.00 0.00 0.00 32.6 120.7 0.015 1401 0

T166-T188 DS1 0.015 1301 1.6 0.97 2.45 0.00 0.00 0.00 32.6 120.7 0.015 1401 0

T168-T69F DS1 0.099 1401 1.1 0.44 13.56 9.87 0.00 0.00 11.0 40.9 0.098 1301 0

T170-T138 DS1 0.059 1301 1.6 -3.42 2.45 0.00 0.00 0.00 32.6 120.7 0.056 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C45 of 116

T172-T174 DS1 0.037 1301 1.6 5.72 2.45 0.00 0.00 0.00 32.6 120.7 0.037 1401 0

T173-T171 DS1 0.033 1301 1.6 -1.57 2.45 0.00 0.00 0.00 32.6 120.7 0.032 1401 0

T176-T175 DS1 0.039 1301 1.6 -2.03 2.45 0.00 0.00 0.00 32.6 120.7 0.039 1401 0

T178-T177 DS1 0.036 1301 1.6 5.35 2.45 0.00 0.00 0.00 32.6 120.7 0.035 1401 0

T184-T189 DS1 0.014 1401 1.6 -0.24 2.45 0.00 0.00 0.00 32.6 120.7 0.014 1301 0

T185-T190 DS1 0.013 1201 1.6 -0.19 2.45 0.00 0.00 0.00 32.6 120.7 0.013 1101 0

T186-T191 DS1 0.013 1301 1.6 0.48 2.45 0.00 0.00 0.00 32.6 120.7 0.013 1401 0

T187-T192 DS1 0.021 1301 1.6 2.34 2.45 0.00 0.00 0.00 32.6 120.7 0.021 1401 0

T193-T179 DS1 0.015 1301 1.6 -0.29 2.45 0.00 0.00 0.00 32.6 120.7 0.015 1401 0

T194-T180 DS1 0.011 1101 1.6 -0.02 2.45 0.00 0.00 0.00 32.6 120.7 0.011 1301 0

T195-T181 DS1 0.011 1301 1.6 0.04 2.45 0.00 0.00 0.00 32.6 120.7 0.011 1401 0

T196-T182 DS1 0.015 1301 1.6 -0.29 2.45 0.00 0.00 0.00 32.6 120.7 0.015 1401 0

T197-T183 DS1 0.027 1301 1.6 -1.17 2.45 0.00 0.00 0.00 32.6 120.7 0.027 1401 0

T435-0194 DS1 0.125 1101 2.0 6.98 -17.81 3.93 0.00 0.00 20.1 74.3 0.124 1401 0

T440-0189 DS1 0.085 1301 2.0 3.95 -14.65 0.99 0.00 0.00 20.1 74.3 0.085 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T442-0190 DS1 0.048 1401 0.0 -2.65 5.11 1.65 0.00 0.00 20.1 74.3 0.048 1301 0

T443-0192 DS1 0.473 1101 2.0 -7.48 -92.71 -5.73 0.00 -0.02 20.1 74.3 0.470 1401 0

T444-0193 DS1 0.295 1101 2.0 0.99 -64.32 4.22 0.00 -0.01 20.1 74.3 0.290 1201 0

T445-0195 DS1 0.128 1201 2.0 11.26 -17.03 -0.43 0.00 0.00 20.1 74.3 0.128 1101 0

T57C-T57E DS1 0.122 1401 2.0 -5.71 15.52 3.80 0.00 0.00 26.6 74.3 0.120 1301 0

T57E-0179 DS1 0.122 1301 0.0 -6.64 15.14 -0.45 0.00 0.00 23.6 87.3 0.117 1401 0

T57J-T57N DS1 0.107 1301 1.5 -2.17 18.80 -0.07 0.00 0.00 50.1 111.4 0.107 1401 0

T57N-0173 DS1 0.106 1301 0.0 -1.99 14.67 -7.57 0.00 0.00 50.1 35.3 0.106 1401 0

T5BK-0154 DS1 0.047 1401 1.0 7.66 2.64 0.00 0.00 0.00 21.1 78.0 0.046 1301 0

T5HH-T5HG DS1 0.464 1401 0.5 -0.30 -0.37 -122.44 -0.02 0.00 4.7 17.4 0.460 1301 0

T5HH-T5PG DS1 0.347 1401 0.0 -6.29 28.73 -44.78 0.01 0.01 50.1 44.6 0.346 1301 0

T5JS-0161 DS1 0.132 1101 1.5 -7.11 10.90 0.00 0.00 0.00 30.1 111.4 0.128 1401 0

T5NZ-0108 DS1 0.289 1101 4.0 -5.58 -36.59 -3.06 0.00 -0.01 40.1 148.6 0.280 1201 0

T5O0-0153 DS1 0.244 1101 2.0 -9.76 9.59 0.00 0.00 0.00 40.1 148.6 0.242 1401 0

T5PB-T6BP DS1 0.152 1401 0.0 -9.09 13.80 -10.67 0.00 0.00 50.1 18.6 0.148 1301 0

T5PC-T5PK DS1 0.129 1401 0.0 -1.68 10.65 17.02 0.00 0.00 20.1 16.7 0.126 1301 0

T5PD-T5PI DS1 0.163 1401 0.8 2.09 4.04 -36.20 0.00 0.00 20.1 31.6 0.161 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C46 of 116

T5PD-T5Q3 DS1 0.359 1401 0.5 -11.90 27.66 43.83 0.01 0.01 50.1 44.6 0.357 1301 0

T5PE-T5ZK DS1 0.348 1401 0.0 -14.62 30.32 4.93 0.00 0.00 50.1 122.6 0.337 1301 0

T5PF-T5PJ DS1 0.152 1401 0.0 0.99 7.49 -30.35 0.01 0.00 20.1 16.7 0.150 1301 0

T5PF-T5ZL DS1 0.036 1401 0.2 -5.85 1.15 0.00 0.00 0.00 33.1 5.9 0.035 1301 0

T5PG-T5PH DS1 0.141 1401 0.8 -0.90 13.11 -21.29 0.00 0.00 20.1 31.6 0.140 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5PG-T5ZM DS1 0.206 1401 0.0 -1.96 34.78 7.49 0.00 0.00 50.1 122.6 0.206 1301 0

T5PH-T5HG DS1 0.238 1401 0.0 -4.17 0.18 -57.57 0.02 0.00 2.2 8.1 0.234 1301 0

T5PH-T5PF DS1 0.228 1401 0.0 -6.60 13.14 36.28 -0.02 0.00 20.1 5.6 0.225 1301 0

T5PI-T5HG DS1 0.229 1401 0.2 -2.08 1.81 55.99 0.02 0.00 2.2 8.1 0.227 1301 0

T5PI-T5PC DS1 0.125 1401 0.1 7.09 3.24 18.00 0.01 0.00 20.1 5.6 0.122 1301 0

T5PJ-T5PE DS1 0.237 1401 0.0 0.19 5.34 56.13 0.00 0.00 20.1 20.4 0.235 1301 0

T5PK-T5PB DS1 0.196 1401 0.0 -0.50 6.98 43.43 0.00 0.00 20.1 20.4 0.195 1301 0

T5PK-T5PL DS1 0.146 1401 0.0 0.66 0.23 -37.54 0.00 0.00 12.0 44.6 0.144 1301 0

T5PL-T5HG DS1 0.136 1401 0.0 0.40 0.01 35.44 -0.01 0.00 2.2 8.1 0.135 1301 0

T5PL-T5PJ DS1 0.113 1401 0.6 -2.87 0.09 25.40 0.00 0.00 12.0 44.6 0.112 1301 0

T5Q0-0174 DS1 0.103 1301 0.0 -1.96 14.50 2.14 0.00 0.00 50.1 122.6 0.103 1401 0

T5Q3-T5HH DS1 0.382 1401 0.1 -11.90 28.76 50.50 0.01 0.01 50.1 44.6 0.381 1301 0

T5RM-0186 DS1 0.018 1301 1.2 -0.69 2.86 0.00 0.00 0.00 23.6 87.3 0.018 1401 0

T5RN-T5RO DS1 0.030 1301 0.0 0.09 3.19 3.16 0.00 0.00 17.5 37.1 0.030 1401 0

T5RO-T5RQ DS1 0.067 1301 0.0 -3.29 5.85 -3.28 0.00 0.00 26.6 37.5 0.064 1401 0

T5RP-T5RN DS1 0.028 1301 0.7 2.25 1.37 3.09 0.00 0.00 17.5 27.9 0.028 1401 0

T5RQ-0185 DS1 0.029 1301 1.2 -1.97 3.09 0.00 0.00 0.00 23.6 87.3 0.029 1401 0

T5WN-0165 DS1 0.252 1101 2.2 -6.11 12.81 0.00 0.00 0.00 50.1 185.7 0.240 1401 0

T5WO-0167 DS1 0.210 1101 2.2 -4.75 13.83 0.00 0.00 0.00 50.1 185.7 0.208 1401 0

T5ZK-0166 DS1 0.355 1401 0.0 -14.62 29.91 4.69 0.00 0.00 50.1 122.6 0.343 1301 0

T5ZL-0175 DS1 0.103 1401 1.6 -5.85 6.08 0.00 0.00 0.00 33.1 116.6 0.101 1301 0

T5ZM-T5Q0 DS1 0.209 1401 0.0 -1.96 34.12 7.13 0.00 0.00 50.1 122.6 0.208 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C47 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T65X-0178 DS1 0.060 1301 1.2 -5.68 3.09 0.00 0.00 0.00 23.6 87.3 0.058 1401 0

T65Y-0177 DS1 0.026 1301 1.2 -1.54 3.09 0.00 0.00 0.00 23.6 87.3 0.025 1401 0

T69F-T69G DS1 0.095 1301 0.0 -0.51 15.87 -6.17 0.00 0.00 11.0 40.9 0.093 1401 0

T69G-T69H DS1 0.142 1301 0.0 -4.53 19.71 -8.25 0.00 -0.01 11.0 40.9 0.138 1401 0

T69H-0181 DS1 0.308 1301 1.1 -8.14 -56.24 5.90 0.00 -0.02 11.0 40.9 0.308 1401 0

T6BP-T5PE DS1 0.215 1401 0.7 -9.09 26.64 12.92 0.00 0.00 50.1 26.0 0.211 1301 0

0153-T5BK DS2 0.040 1401 1.4 5.55 3.22 0.00 0.00 0.00 23.3 86.6 0.039 1301 0

0166-T65Z DS2 0.043 1401 1.3 7.05 2.35 0.00 0.00 0.00 21.3 79.1 0.042 1301 0

0168-T5QS DS2 0.125 1301 0.0 -2.71 -18.25 -8.48 0.00 0.03 21.3 28.4 0.123 1401 0

0170-T5QT DS2 0.154 1401 0.9 7.08 26.91 -1.46 0.00 0.01 21.3 28.4 0.153 1301 0

0172-T57D DS2 0.027 1401 0.6 -1.99 1.97 2.11 0.00 0.00 21.3 19.4 0.026 1301 0

0190-T57K DS2 0.088 1301 1.0 -3.54 12.40 3.96 0.00 0.01 40.1 31.3 0.088 1401 0

0192-T57M DS2 0.336 1401 0.0 2.68 -70.03 5.98 0.00 0.03 40.1 47.8 0.335 1101 0

0193-T5QQ DS2 0.202 1101 0.0 -1.24 -39.50 -6.36 0.00 0.02 40.1 61.2 0.198 1201 0

T145-T69H DS2 0.069 1301 2.5 -4.09 -7.53 -1.91 0.00 0.00 20.1 74.6 0.069 1401 0

T146-T69G DS2 0.055 1301 2.5 -1.80 -7.78 -2.42 0.00 0.00 20.1 74.6 0.055 1401 0

T147-T69F DS2 0.046 1401 2.5 0.85 -6.96 -3.15 0.00 0.00 20.1 74.6 0.045 1301 0

T441-0187 DS2 0.128 1301 2.0 -4.38 -17.92 5.85 0.00 -0.01 16.0 59.7 0.127 1401 0

T57D-T57F DS2 0.118 1401 2.0 -2.05 19.97 4.74 0.00 0.00 21.3 59.7 0.117 1301 0

T57E-T65X DS2 0.096 1101 1.0 1.13 15.97 4.48 0.00 0.00 46.1 29.9 0.094 1201 0

T57F-T5ZF DS2 0.091 1301 0.0 -0.82 18.44 -1.73 0.00 0.00 18.9 70.2 0.090 1401 0

T57K-T57O DS2 0.090 1301 1.5 -3.37 14.33 -0.08 0.00 0.00 40.1 89.6 0.090 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T57M-T5QR DS2 0.118 1401 0.0 2.68 -23.01 1.56 0.00 0.02 40.1 47.8 0.117 1101 0

T57O-0172 DS2 0.058 1301 0.0 -3.26 5.92 -3.66 0.00 0.00 40.1 28.4 0.058 1401 0

T57Q-0170 DS2 0.105 1401 0.0 2.68 21.40 0.11 0.00 0.00 40.1 101.5 0.104 1301 0

T5QQ-0168 DS2 0.095 1301 2.9 -1.04 -17.87 1.98 0.00 -0.01 40.1 88.1 0.093 1401 0

T5QR-T57Q DS2 0.108 1401 1.0 2.68 21.54 -0.94 0.00 0.00 40.1 101.5 0.108 1301 0

T5QS-T65U DS2 0.145 1301 1.7 -2.49 24.86 6.02 0.00 0.00 21.3 50.7 0.144 1401 0

T5QT-T65W DS2 0.167 1401 0.0 6.95 26.92 -4.77 0.00 0.00 21.3 50.7 0.167 1301 0

T5RM-T5RQ DS2 0.099 1301 1.0 11.22 2.14 8.42 0.00 0.00 30.1 29.9 0.096 1401 0

T5RQ-T65U DS2 0.107 1301 0.0 10.12 3.25 10.41 0.00 0.00 30.1 29.9 0.104 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C48 of 116

T5RR-T5RM DS2 0.054 1301 0.7 2.61 6.20 -4.10 0.00 0.00 30.1 22.4 0.052 1401 0

T5ZF-0180 DS2 0.068 1301 0.0 -0.82 13.61 -1.11 0.00 0.00 18.9 70.2 0.067 1401 0

T5ZG-0182 DS2 0.093 1301 1.5 2.27 -14.98 4.89 0.00 -0.01 18.9 70.2 0.093 1401 0

T5ZI-0184 DS2 0.097 1401 0.0 7.92 13.21 -0.68 0.00 0.00 18.9 45.0 0.094 1301 0

T65U-T5ZI DS2 0.107 1401 0.0 7.92 14.93 1.56 0.00 0.00 18.9 25.2 0.104 1301 0

T65U-T65V DS2 0.051 1301 0.0 0.85 7.75 -3.69 0.00 0.00 30.1 29.9 0.050 1401 0

T65V-T65W DS2 0.016 1301 1.0 0.19 2.55 -1.16 0.00 0.00 16.0 29.9 0.015 1401 0

T65W-T5ZG DS2 0.084 1401 0.0 2.39 14.91 -2.35 0.00 0.00 18.9 70.2 0.083 1301 0

T65W-T661 DS2 0.092 1301 0.0 -6.54 9.03 4.83 0.00 0.00 16.0 29.9 0.092 1401 0

T65X-T65Y DS2 0.097 1101 0.0 6.45 10.84 4.65 0.00 0.00 46.1 29.9 0.095 1401 0

T65Y-T65Z DS2 0.101 1401 0.0 3.65 13.93 5.09 0.00 0.00 46.1 29.9 0.101 1101 0

T65Z-0176 DS2 0.040 1401 1.2 6.75 1.85 0.00 0.00 0.00 18.9 70.2 0.038 1301 0

T65Z-T660 DS2 0.061 1301 0.0 -0.27 10.88 -3.26 0.00 -0.01 46.1 22.4 0.060 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T661-T5QB DS2 0.092 1101 0.5 -6.78 7.24 5.68 0.00 0.01 46.1 14.9 0.092 1401 0

T69F-T150 DS2 0.064 1301 0.0 2.77 -8.58 3.42 0.00 0.00 20.1 74.6 0.064 1401 0

T69G-T149 DS2 0.078 1301 0.0 2.34 -11.86 3.74 0.00 0.00 20.1 74.6 0.078 1401 0

T69H-T148 DS2 0.091 1401 0.0 2.75 -14.12 3.94 0.00 0.00 20.1 74.6 0.090 1301 0

T507-T506 DS3 0.028 1401 0.0 -1.02 -0.38 -4.13 0.00 0.00 21.1 78.0 0.027 1301 0

T56Z-T56Y E1 0.025 1201 0.0 0.18 2.93 -1.05 0.00 0.00 10.0 37.1 0.025 1101 0

T570-T56Z E1 0.036 1401 1.0 0.24 2.93 2.96 0.00 0.00 10.0 37.1 0.036 1301 0

T572-T571 E1 0.057 1401 0.0 -0.09 -4.05 -5.30 0.00 0.00 10.0 37.1 0.056 1301 0

T573-T572 E1 0.074 1401 1.0 -0.70 -4.35 7.07 0.00 0.00 10.0 37.1 0.073 1301 0

T575-T574 E1 0.014 1401 0.0 -0.06 -1.33 0.99 0.00 0.00 10.0 37.1 0.014 1301 0

T576-T575 E1 0.023 1401 1.0 -0.34 -1.47 2.05 0.00 0.00 10.0 37.1 0.023 1301 0

T578-T577 E1 0.049 1201 0.0 0.11 -5.72 -2.44 0.00 0.00 10.0 37.1 0.049 1101 0

T579-T578 E1 0.057 1401 1.0 0.15 -5.72 3.83 0.00 0.00 10.0 37.1 0.056 1301 0

T57D-T57C E1 0.074 1401 0.0 -0.05 6.44 5.77 0.00 0.00 10.0 37.1 0.073 1301 0

T57F-T57E E1 0.225 1401 1.0 -8.26 20.89 -5.24 0.00 0.00 57.7 37.1 0.224 1301 0

T57J-T5Q2 E1 0.030 1101 0.0 0.25 -1.89 -2.97 0.00 0.00 3.5 13.0 0.029 1201 0

T57K-T57J E1 0.078 1401 0.0 0.28 -3.45 9.98 0.00 0.00 10.0 37.1 0.078 1301 0

T57L-T57K E1 0.036 1101 1.0 0.35 -3.45 2.28 0.00 0.00 10.0 37.1 0.036 1201 0

T57N-T5Q1 E1 0.047 1301 0.3 0.40 1.08 -6.77 0.00 0.00 3.5 13.0 0.047 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C49 of 116

T57O-T57N E1 0.079 1401 0.0 0.32 5.75 7.32 0.00 0.00 10.0 37.1 0.079 1301 0

T57P-T57O E1 0.040 1101 1.0 0.26 5.75 0.62 0.00 0.00 10.0 37.1 0.040 1201 0

T58J-T5U6 E1 0.015 1201 0.4 1.90 0.44 0.00 0.00 0.00 10.0 14.9 0.015 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5A7-T5XM E1 0.061 1301 0.2 -0.90 5.61 -3.73 0.00 0.01 10.0 9.3 0.060 1401 0

T5A8-T5XI E1 0.062 1201 0.7 -0.59 6.33 -3.47 0.00 0.00 10.0 27.9 0.061 1101 0

T5A9-T5XL E1 0.057 1201 0.2 -0.76 5.15 3.75 0.00 0.01 10.0 9.3 0.056 1101 0

T5AA-T5XH E1 0.059 1301 0.7 0.13 7.44 2.38 0.00 0.00 10.0 27.9 0.059 1401 0

T5AC-T5XG E1 0.038 1401 0.2 -0.66 3.68 -2.08 0.00 0.00 10.0 9.3 0.038 1301 0

T5AD-T5XD E1 0.058 1201 0.7 -0.23 8.04 -1.33 0.00 0.00 10.0 27.9 0.058 1101 0

T5AE-T5XE E1 0.039 1401 0.7 0.03 5.18 1.28 0.00 0.00 10.0 27.9 0.038 1101 0

T5AF-T5XF E1 0.065 1201 0.0 -0.67 0.00 0.00 0.00 0.01 10.0 9.3 0.065 1101 0

T5AN-T6AJ E1 0.002 1001 0.0 0.07 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T5PY-T5Q2 E1 0.136 1401 1.0 -2.49 17.14 2.16 0.00 0.00 50.1 39.0 0.136 1301 0

T5Q1-T5PZ E1 0.199 1301 0.0 -3.32 21.68 -6.42 0.00 -0.01 50.1 35.3 0.199 1401 0

T5Q2-T5Q1 E1 0.175 1301 1.5 -2.82 22.74 0.01 0.00 0.00 50.1 111.4 0.175 1401 0

T5Q4-T5Q9 E1 0.086 1401 0.6 0.16 10.46 3.98 0.00 0.00 26.6 24.1 0.086 1301 0

T5Q9-T57D E1 0.063 1301 0.5 -0.07 6.40 -4.33 0.00 0.00 5.0 18.6 0.062 1401 0

T5Q9-T5QB E1 0.078 1401 0.0 0.36 10.47 -0.49 0.00 0.00 26.6 74.3 0.078 1101 0

T5QB-T57F E1 0.161 1401 0.0 -7.21 7.14 10.47 0.00 0.00 57.7 18.6 0.160 1301 0

T5QB-T5ZE E1 0.076 1301 0.8 0.50 -11.77 0.07 0.00 -0.01 23.6 87.3 0.074 1401 0

T5UA-T58K E1 0.032 1201 0.0 3.28 1.70 0.00 0.00 0.00 10.0 22.3 0.032 1101 0

T5W0-T5WF E1 0.014 1001 0.0 -0.06 0.00 0.00 0.00 0.00 10.0 37.1 0.014 1101 0

T5W8-T5WA E1 0.001 1001 0.0 -0.03 0.00 0.00 0.00 0.00 7.5 27.9 0.001 1101 0

T5W9-0522 E1 0.001 1001 0.0 0.03 0.00 0.00 0.00 0.00 7.5 27.9 0.001 1101 0

T5WB-T5WC E1 0.001 1301 0.4 0.09 0.11 0.00 0.00 0.00 7.5 27.9 0.001 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5WE-T5WD E1 0.002 1001 0.0 -0.03 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T5WH-T5WG E1 0.002 1001 0.0 0.01 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C50 of 116

T5WI-T5WH E1 0.002 1001 0.0 0.01 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T5WK-T5WJ E1 0.140 1401 1.0 -0.11 -13.90 -7.35 0.00 0.00 10.0 37.1 0.140 1301 0

T5WM-T5WL E1 0.025 1301 1.0 -0.08 0.10 -3.22 0.00 0.00 10.0 37.1 0.025 1401 0

T5WQ-T5WY E1 0.217 1301 0.5 0.29 5.49 28.02 0.00 0.00 10.0 18.6 0.210 1401 0

T5WR-T5WW E1 0.046 1301 0.5 0.14 0.41 -7.92 0.00 0.00 10.0 18.6 0.045 1401 0

T5WS-T5WT E1 0.002 1301 0.5 -0.11 0.19 0.00 0.00 0.00 10.0 37.1 0.002 1401 0

T5WT-T5WZ E1 0.016 1201 0.5 -0.08 0.41 2.47 0.00 0.00 10.0 18.6 0.016 1101 0

T5WW-T5WS E1 0.046 1301 0.0 0.14 0.41 -7.92 0.00 0.00 10.0 18.6 0.045 1401 0

T5WX-T5WW E1 0.003 1301 0.3 0.38 0.13 0.00 0.00 0.00 6.0 22.3 0.003 1401 0

T5WY-T59U E1 0.194 1301 0.0 0.28 5.53 27.40 0.00 0.00 10.0 18.6 0.187 1401 0

T5WY-T5X0 E1 0.098 1301 2.2 2.09 8.76 -0.52 0.00 0.00 44.1 163.4 0.097 1401 0

T5WZ-T5WU E1 0.016 1201 0.0 -0.08 0.41 2.47 0.00 0.00 10.0 18.6 0.016 1101 0

T5X0-T5WZ E1 0.002 1001 0.0 -0.11 0.00 0.00 0.00 0.00 6.0 22.3 0.002 1101 0

T5X1-T5X2 E1 0.049 1101 0.0 -0.11 -0.07 6.62 0.00 0.00 7.5 27.9 0.048 1201 0

T5X4-T5X3 E1 0.058 1301 0.7 -0.03 -5.10 4.64 0.00 0.00 7.5 27.9 0.057 1401 0

T5X6-T5X5 E1 0.006 1201 0.0 0.02 -0.02 0.90 0.00 0.00 7.5 27.9 0.006 1101 0

T5X8-T5X7 E1 0.006 1101 0.7 -0.01 0.00 -1.12 0.00 0.00 7.5 27.9 0.006 1201 0

T5X9-T5AC E1 0.009 1201 0.5 -0.74 0.58 0.00 0.00 0.00 10.0 37.1 0.009 1301 0

T5XA-T5AF E1 0.009 1401 0.5 -0.68 0.71 0.00 0.00 0.00 10.0 37.1 0.009 1101 0

T5XB-T5A9 E1 0.010 1401 0.5 -0.71 0.71 0.00 0.00 0.00 10.0 37.1 0.010 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5XC-T5A7 E1 0.012 1201 0.5 -1.18 0.58 0.00 0.00 0.00 10.0 37.1 0.012 1301 0

T5XD-T5X9 E1 0.066 1201 0.2 -0.54 0.00 0.00 0.00 -0.01 10.0 9.3 0.066 1101 0

T5XE-T5XA E1 0.034 1401 0.0 -0.73 3.54 1.28 0.00 0.00 10.0 9.3 0.034 1301 0

T5XE-T5XD E1 0.002 1001 0.0 0.08 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T5XF-T5AA E1 0.069 1201 0.0 0.09 8.88 2.17 0.00 0.00 10.0 27.9 0.069 1101 0

T5XF-T5XG E1 0.002 1201 0.5 0.15 0.24 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T5XG-T5A8 E1 0.043 1401 0.0 -0.34 4.37 -2.08 0.00 0.00 10.0 27.9 0.043 1301 0

T5XH-T5XB E1 0.052 1301 0.0 -0.74 5.55 2.38 0.00 -0.01 10.0 9.3 0.052 1401 0

T5XH-T5XI E1 0.003 1201 0.5 0.23 0.24 0.00 0.00 0.00 10.0 37.1 0.003 1101 0

T5XI-T5XC E1 0.059 1201 0.0 -1.08 5.26 -3.47 0.00 -0.01 10.0 9.3 0.058 1101 0

T5XL-T5XK E1 0.066 1201 0.0 0.11 7.04 3.75 0.00 0.00 10.0 27.9 0.065 1101 0

T5XL-T5XM E1 0.003 1201 0.5 0.25 0.24 0.00 0.00 0.00 10.0 37.1 0.003 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C51 of 116

T5XM-T5XJ E1 0.065 1301 0.0 -0.42 6.66 -3.73 0.00 0.00 10.0 27.9 0.064 1201 0

T5ZE-T5Q5 E1 0.251 1301 1.5 0.50 -40.31 0.20 0.00 -0.01 23.6 87.3 0.245 1401 0

T61F-T61E E1 0.061 1201 0.0 0.25 -7.15 -1.99 0.00 0.00 10.0 37.1 0.061 1301 0

T61T-T61F E1 0.072 1301 1.0 0.27 -7.08 -3.73 0.00 0.00 10.0 37.1 0.072 1401 0

T662-T668 E1 0.019 1401 0.3 0.01 0.46 -3.03 0.00 0.00 10.0 13.0 0.019 1101 0

T663-T669 E1 0.019 1401 0.3 -0.05 0.46 3.03 0.00 0.00 10.0 13.0 0.019 1101 0

T664-T66A E1 0.018 1401 0.5 0.00 0.50 -2.79 0.00 0.00 10.0 20.4 0.018 1101 0

T666-T66B E1 0.018 1401 0.5 -0.03 0.50 2.79 0.00 0.00 10.0 20.4 0.018 1101 0

T668-T664 E1 0.019 1401 0.0 0.01 0.46 -3.03 0.00 0.00 10.0 24.1 0.019 1101 0

T668-T669 E1 0.005 1401 0.9 -0.16 0.58 0.00 0.00 0.00 18.0 66.8 0.005 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T669-T666 E1 0.019 1401 0.0 -0.05 0.46 3.03 0.00 0.00 10.0 24.1 0.019 1101 0

T66A-T665 E1 0.018 1401 0.0 0.00 0.50 -2.79 0.00 0.00 10.0 16.7 0.018 1101 0

T66A-T66B E1 0.005 1401 0.9 -0.14 0.58 0.00 0.00 0.00 18.0 66.8 0.005 1101 0

T66B-T667 E1 0.018 1401 0.0 -0.03 0.50 2.79 0.00 0.00 10.0 16.7 0.018 1101 0

T6AE-T6AD E1 0.002 1001 0.0 0.00 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T6AI-T6AH E1 0.002 1001 0.0 -0.04 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T6AK-T587 E1 0.002 1001 0.0 -0.02 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T6AM-T6AL E1 0.002 1101 0.4 -0.13 0.10 0.00 0.00 0.00 7.5 27.9 0.002 1201 0

T6AN-T5BP E1 0.002 1101 0.4 0.16 0.10 0.00 0.00 0.00 7.5 27.9 0.002 1201 0

T6B1-T6B0 E1 0.001 1001 0.0 0.07 0.00 0.00 0.00 0.00 7.5 27.9 0.001 1101 0

T6B2-T6B3 E1 0.002 1001 0.0 0.06 0.00 0.00 0.00 0.00 10.0 37.1 0.002 1101 0

T57V-T5QX E2 0.051 1401 0.6 0.06 10.45 0.76 0.00 0.01 8.0 29.9 0.051 1301 0

T57W-T5QW E2 0.045 1301 0.0 0.00 5.25 5.47 0.00 0.00 8.0 29.9 0.044 1401 0

T5QQ-T5QU E2 0.050 1101 0.0 -0.06 0.00 4.62 0.00 0.01 8.0 29.9 0.049 1201 0

T5QS-T5QV E2 0.067 1301 0.0 -0.11 0.00 7.44 0.00 0.02 8.0 29.9 0.067 1401 0

T5QU-T57V E2 0.040 1401 0.8 0.08 3.16 -6.48 0.00 0.00 8.0 29.9 0.040 1301 0

T5QV-T57W E2 0.050 1301 0.0 0.02 7.21 4.54 0.00 0.00 8.0 29.9 0.050 1401 0

T5QW-T5QT E2 0.042 1301 0.4 -0.13 0.02 -3.48 0.00 -0.01 8.0 29.9 0.042 1401 0

T5QX-T5QR E2 0.049 1401 0.0 -0.08 10.25 0.76 0.00 -0.01 8.0 29.9 0.049 1301 0

0009-T6A4 EQ1 0.004 1301 0.6 -0.02 0.12 0.75 0.00 0.00 10.7 10.7 0.004 1401 0

0034-T5UF EQ1 0.020 1101 0.6 -0.60 2.65 1.28 0.00 0.00 10.7 10.7 0.020 1201 0

0037-T5UI EQ1 0.021 1301 0.6 -0.29 -0.41 -3.39 0.00 0.00 10.7 10.7 0.020 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C52 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0173-T5QK EQ1 0.010 1101 0.6 -0.33 0.04 1.41 0.00 0.00 10.7 10.7 0.009 1201 0

0342-T5YD EQ1 0.012 1401 0.6 -0.50 1.03 -1.06 0.00 0.00 10.7 10.7 0.012 1301 0

0344-T5YF EQ1 0.012 1201 0.6 -0.53 -1.08 -0.94 0.00 0.00 10.7 10.7 0.012 1101 0

0346-T5Y8 EQ1 0.015 1301 0.6 -0.53 1.07 -1.66 0.00 0.00 10.7 10.7 0.014 1401 0

0348-T5Y6 EQ1 0.010 1201 0.6 -0.51 -0.93 -0.70 0.00 0.00 10.7 10.7 0.010 1101 0

T56Y-T5RJ EQ1 0.016 1101 0.6 -0.37 -0.32 -2.43 0.00 0.00 10.7 10.7 0.016 1201 0

T570-T5RL EQ1 0.003 1401 0.6 -0.22 -0.09 -0.24 0.00 0.00 10.7 10.7 0.003 1301 0

T571-T5RG EQ1 0.010 1101 0.6 -0.21 -0.17 1.58 0.00 0.00 10.7 10.7 0.010 1401 0

T573-T5RI EQ1 0.009 1201 0.6 -0.38 0.61 1.05 0.00 0.00 10.7 10.7 0.009 1301 0

T574-T5RC EQ1 0.009 1401 0.6 -0.22 -0.50 1.24 0.00 0.00 10.7 10.7 0.009 1301 0

T576-T5RA EQ1 0.002 1401 0.6 -0.16 -0.07 -0.19 0.00 0.00 10.7 10.7 0.002 1301 0

T577-T5RD EQ1 0.002 1201 0.6 -0.17 -0.09 -0.14 0.00 0.00 10.7 10.7 0.002 1301 0

T579-T5RF EQ1 0.008 1401 0.6 -0.22 0.63 -0.95 0.00 0.00 10.7 10.7 0.008 1101 0

T57E-T5QL EQ1 0.003 1101 0.6 0.04 0.18 -0.50 0.00 0.00 10.7 10.7 0.003 1401 0

T57L-T5PQ EQ1 0.017 1301 0.6 -0.27 1.91 1.99 0.00 0.00 10.7 10.7 0.017 1401 0

T57P-T5PT EQ1 0.005 1101 0.6 -0.20 0.36 -0.51 0.00 0.00 10.7 10.7 0.005 1201 0

T58J-T5UB EQ1 0.027 1201 0.6 -0.29 1.31 -4.38 -0.01 0.00 10.7 10.7 0.027 1101 0

T58K-T5UE EQ1 0.044 1301 0.6 -0.60 -3.46 6.46 0.01 0.00 10.7 10.7 0.044 1401 0

T58P-T5TI EQ1 0.005 1101 0.6 0.27 -0.02 -0.57 0.00 0.00 10.7 10.7 0.005 1201 0

T58Q-T5TJ EQ1 0.003 1101 0.6 0.05 -0.11 0.52 0.00 0.00 10.7 10.7 0.003 1201 0

T58T-T5T6 EQ1 0.025 1301 0.6 -0.62 -3.27 1.84 0.00 0.00 10.7 10.7 0.025 1201 0

T58U-T5TD EQ1 0.007 1101 0.6 -0.54 -0.42 -0.33 0.00 0.00 10.7 10.7 0.007 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T59G-T5XX EQ1 0.002 1101 0.6 -0.21 -0.11 0.07 0.00 0.00 10.7 10.7 0.002 1201 0

T59H-T5XY EQ1 0.006 1301 0.6 -0.61 -0.32 -0.07 0.00 0.00 10.7 10.7 0.006 1401 0

T59I-T5XV EQ1 0.009 1401 0.6 -0.62 0.09 0.77 0.00 0.00 10.7 10.7 0.009 1301 0

T59K-T5XW EQ1 0.006 1101 0.6 -0.20 0.36 -0.78 0.00 0.00 10.7 10.7 0.006 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C53 of 116

T5AH-T5YB EQ1 0.009 1101 0.6 -0.52 -0.08 0.87 0.00 0.00 10.7 10.7 0.009 1201 0

T5AI-T5Y9 EQ1 0.012 1201 0.6 -0.51 -0.04 1.49 0.00 0.00 10.7 10.7 0.012 1101 0

T5AJ-T5YI EQ1 0.009 1401 0.6 -0.50 -0.01 0.94 0.00 0.00 10.7 10.7 0.009 1101 0

T5AK-T5YG EQ1 0.010 1401 0.6 -0.53 0.01 1.06 0.00 0.00 10.7 10.7 0.009 1101 0

T5PQ-T5PT EQ1 0.007 1201 3.0 0.63 0.55 -0.02 0.00 0.00 53.7 53.7 0.007 1101 0

T5PQ-T5PW EQ1 0.006 1201 2.3 0.48 0.56 0.06 0.00 0.00 42.0 42.0 0.006 1101 0

T5PQ-T69I EQ1 0.023 1201 1.9 -0.97 2.12 -0.02 0.00 0.00 34.8 34.8 0.023 1101 0

T5PT-T5PX EQ1 0.007 1201 0.0 0.50 0.66 -0.09 0.00 0.00 42.0 42.0 0.007 1101 0

T5PT-T69I EQ1 0.019 1401 1.9 -0.86 1.52 -0.01 0.00 0.00 34.8 34.8 0.019 1301 0

T5PW-T5PX EQ1 0.008 1201 0.0 0.72 0.67 0.03 0.00 0.00 53.7 53.7 0.008 1101 0

T5PW-T69I EQ1 0.019 1401 1.9 -0.86 1.54 0.04 0.00 0.00 34.8 34.8 0.019 1301 0

T5Q1-T5PX EQ1 0.011 1301 0.6 -0.27 -1.53 -0.49 0.00 0.00 10.7 10.7 0.011 1401 0

T5Q2-T5PW EQ1 0.008 1301 0.6 -0.20 -0.70 -1.05 0.00 0.00 10.7 10.7 0.008 1401 0

T5Q4-T5QO EQ1 0.003 1101 0.6 0.04 -0.55 -0.13 0.00 0.00 10.7 10.7 0.003 1201 0

T5QB-T5QP EQ1 0.007 1101 0.6 -0.33 0.33 -0.77 0.00 0.00 10.7 10.7 0.007 1201 0

T5QK-T5QL EQ1 0.012 1401 0.0 0.34 -0.77 -0.28 0.00 0.00 47.4 47.4 0.012 1301 0

T5QO-T5QK EQ1 0.017 1401 0.0 0.23 2.80 0.65 0.00 0.00 26.8 26.8 0.017 1301 0

T5QO-T5QP EQ1 0.011 1301 2.6 0.37 -0.74 0.28 0.00 0.00 47.4 47.4 0.011 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5QO-T69K EQ1 0.008 1301 1.6 -0.41 -0.56 0.30 0.00 0.00 28.2 28.2 0.008 1401 0

T5QP-T5QL EQ1 0.017 1401 1.5 0.21 2.77 -0.66 0.00 0.00 26.8 26.8 0.017 1301 0

T5QP-T69K EQ1 0.018 1401 1.6 -0.52 2.31 0.24 0.00 0.00 28.1 28.1 0.018 1301 0

T5QU-T5QY EQ1 0.008 1201 0.6 -0.67 0.60 -0.03 0.00 0.00 10.7 10.7 0.008 1101 0

T5QV-T5R1 EQ1 0.010 1301 0.6 -0.88 0.57 0.00 0.00 0.00 10.7 10.7 0.010 1401 0

T5QW-T5R3 EQ1 0.008 1101 0.6 -0.67 -0.58 0.00 0.00 0.00 10.7 10.7 0.008 1201 0

T5QX-T5R0 EQ1 0.010 1301 0.6 -0.88 -0.62 0.04 0.00 0.00 10.7 10.7 0.010 1401 0

T5QY-T5R0 EQ1 0.015 1301 0.0 0.57 2.02 0.76 0.00 0.00 25.0 25.0 0.015 1401 0

T5QY-T5R1 EQ1 0.016 1301 0.0 1.68 0.76 -0.21 0.00 0.00 69.8 69.8 0.016 1401 0

T5QY-T69J EQ1 0.036 1101 2.2 -1.91 1.05 0.26 0.00 0.00 40.1 40.1 0.036 1201 0

T5R0-T5R3 EQ1 0.016 1301 3.9 1.68 0.76 0.21 0.00 0.00 69.8 69.8 0.016 1401 0

T5R0-T69J EQ1 0.042 1301 2.2 -1.98 2.01 0.35 0.00 0.00 40.1 40.1 0.042 1401 0

T5R1-T5R3 EQ1 0.015 1301 1.4 0.57 2.03 -0.77 0.00 0.00 25.0 25.0 0.015 1401 0

T5R1-T69J EQ1 0.042 1301 2.2 -1.98 2.01 0.35 0.00 0.00 40.1 40.1 0.042 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C54 of 116

T5RA-T5RC EQ1 0.003 1401 2.0 0.19 -0.32 -0.06 0.00 0.00 35.8 35.8 0.003 1301 0

T5RA-T5RF EQ1 0.003 1401 4.0 0.39 -0.14 0.03 0.00 0.00 71.6 71.6 0.003 1301 0

T5RA-T69L EQ1 0.011 1201 2.4 -0.46 0.45 0.03 0.00 0.00 42.8 42.8 0.011 1101 0

T5RC-T5RD EQ1 0.003 1401 0.0 0.38 -0.15 -0.03 0.00 0.00 71.6 71.6 0.003 1301 0

T5RC-T69L EQ1 0.014 1401 0.0 -0.54 -0.77 0.00 0.00 0.00 42.8 42.8 0.014 1301 0

T5RD-T69L EQ1 0.011 1201 0.0 -0.46 -0.47 -0.01 0.00 0.00 42.8 42.8 0.011 1101 0

T5RF-T5RD EQ1 0.003 1401 0.0 0.19 -0.35 0.06 0.00 0.00 35.8 35.8 0.003 1301 0

T5RF-T69L EQ1 0.014 1401 0.0 -0.54 -0.74 -0.02 0.00 0.00 42.8 42.8 0.013 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5RG-T5RJ EQ1 0.007 1201 4.0 0.52 -0.56 -0.19 0.00 0.00 71.6 71.6 0.007 1101 0

T5RI-T5RG EQ1 0.010 1201 0.0 0.29 -1.45 -0.50 0.00 0.00 35.8 35.8 0.010 1101 0

T5RI-T5RL EQ1 0.007 1201 0.0 0.59 -0.50 0.19 0.00 0.00 71.6 71.6 0.007 1101 0

T5RI-T69M EQ1 0.023 1201 2.4 -0.80 1.61 -0.17 0.00 0.00 42.8 42.8 0.023 1101 0

T5RL-T5RJ EQ1 0.010 1201 0.0 0.31 1.38 -0.45 0.00 0.00 35.8 35.8 0.010 1101 0

T5RL-T69M EQ1 0.016 1401 0.0 -0.71 -0.60 0.19 0.00 0.00 42.8 42.8 0.016 1101 0

T5S5-T5S9 EQ1 0.004 1401 0.6 0.51 0.04 -0.04 0.00 0.00 10.7 10.7 0.004 1101 0

T5S6-T5SA EQ1 0.006 1401 0.6 -0.72 -0.04 0.03 0.00 0.00 10.7 10.7 0.006 1101 0

T5S7-T5SB EQ1 0.006 1401 0.6 -0.72 0.00 0.06 0.00 0.00 10.7 10.7 0.006 1101 0

T5S8-T5SC EQ1 0.004 1401 0.6 0.51 0.00 -0.05 0.00 0.00 10.7 10.7 0.004 1101 0

T5S9-T5SA EQ1 0.013 1401 0.0 0.02 2.30 0.53 0.00 -0.01 4.9 4.9 0.013 1101 0

T5S9-T69O EQ1 0.003 1401 1.1 -0.03 0.01 0.42 0.00 0.00 19.1 19.1 0.003 1101 0

T5SB-T5S9 EQ1 0.009 1401 0.0 0.14 -0.09 -0.16 0.00 0.00 31.3 31.3 0.009 1101 0

T5SB-T5SC EQ1 0.013 1401 0.3 0.02 2.27 -0.53 0.00 0.01 4.9 4.9 0.013 1101 0

T5SB-T69O EQ1 0.006 1401 1.1 -0.33 0.31 0.42 0.00 0.00 19.1 19.1 0.006 1101 0

T5SC-T5SA EQ1 0.009 1401 1.7 0.14 -0.09 0.16 0.00 0.00 31.3 31.3 0.009 1101 0

T5SC-T69O EQ1 0.004 1401 1.1 -0.03 0.01 0.42 0.00 0.00 19.1 19.1 0.004 1101 0

T5SH-T5SN EQ1 0.004 1301 0.6 -0.50 0.00 0.01 0.00 0.00 10.7 10.7 0.004 1401 0

T5SI-T5SO EQ1 0.001 1101 0.6 -0.12 -0.01 -0.04 0.00 0.00 10.7 10.7 0.001 1201 0

T5SJ-T5SL EQ1 0.002 1101 0.6 -0.12 0.00 -0.18 0.00 0.00 10.7 10.7 0.002 1201 0

T5SK-T5SM EQ1 0.005 1301 0.6 -0.50 0.00 0.18 0.00 0.00 10.7 10.7 0.005 1401 0

T5SL-T5SM EQ1 0.009 1301 0.0 0.10 1.44 -0.28 0.00 0.00 7.3 7.3 0.008 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C55 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5SM-T69N EQ1 0.016 1301 1.9 -0.89 1.01 -0.17 0.00 0.00 33.3 33.3 0.016 1401 0

T5SN-T5SL EQ1 0.007 1301 3.5 0.79 0.37 -0.04 0.00 0.00 62.6 62.6 0.007 1401 0

T5SN-T5SO EQ1 0.008 1301 0.4 0.09 1.37 0.28 0.00 0.00 7.3 7.3 0.008 1401 0

T5SN-T69N EQ1 0.016 1301 1.9 -0.89 1.00 -0.17 0.00 0.00 33.3 33.3 0.016 1401 0

T5SO-T5SM EQ1 0.007 1301 0.0 0.79 0.36 0.04 0.00 0.00 62.6 62.6 0.007 1401 0

T5SO-T69N EQ1 0.014 1101 1.9 -0.82 0.88 -0.16 0.00 0.00 33.3 33.3 0.014 1201 0

T5ST-T5SX EQ1 0.021 1301 0.0 -0.50 0.16 -3.28 0.00 0.00 10.7 10.7 0.021 1401 0

T5SU-T5SY EQ1 0.010 1401 0.0 0.20 0.17 -1.57 0.00 0.00 10.7 10.7 0.010 1301 0

T5SV-T5SZ EQ1 0.010 1101 0.0 0.20 -0.18 1.63 0.00 0.00 10.7 10.7 0.010 1201 0

T5SW-T5T0 EQ1 0.021 1401 0.0 -0.49 -0.18 3.27 0.00 0.00 10.7 10.7 0.021 1301 0

T5SX-T5SZ EQ1 0.007 1301 0.0 -0.08 -0.79 -0.80 0.00 0.00 19.0 19.0 0.007 1401 0

T5SX-T69P EQ1 0.006 1301 1.5 -0.44 0.32 0.00 0.00 0.00 27.4 27.4 0.006 1401 0

T5SY-T5SX EQ1 0.008 1301 0.0 0.05 1.01 0.90 0.00 0.00 17.9 17.9 0.008 1401 0

T5SY-T5T0 EQ1 0.007 1301 1.1 -0.07 -0.76 0.81 0.00 0.00 19.0 19.0 0.007 1401 0

T5SY-T69P EQ1 0.002 1301 1.5 0.10 -0.23 0.02 0.00 0.00 27.4 27.4 0.002 1401 0

T5SZ-T69P EQ1 0.002 1301 1.5 0.10 -0.22 0.02 0.00 0.00 27.4 27.4 0.002 1401 0

T5T0-T5SZ EQ1 0.008 1301 1.0 0.05 1.00 -0.89 0.00 0.00 17.9 17.9 0.008 1401 0

T5T0-T69P EQ1 0.006 1301 1.5 -0.44 0.31 0.01 0.00 0.00 27.4 27.4 0.006 1401 0

T5T6-T69R EQ1 0.081 1301 0.0 -1.77 -2.96 -0.18 0.00 0.00 61.4 61.4 0.081 1201 0

T5T6-T6A4 EQ1 0.012 1401 2.4 1.45 -0.49 -0.14 0.00 0.00 43.8 43.8 0.012 1101 0

T5T9-T5T6 EQ1 0.008 1301 2.5 0.47 -0.96 0.11 0.00 0.00 44.7 44.7 0.008 1401 0

T5T9-T69R EQ1 0.076 1101 0.0 -1.63 -3.04 0.00 0.00 0.00 61.4 61.4 0.076 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5T9-T6A5 EQ1 0.026 1401 2.4 1.36 -3.10 -0.14 0.00 0.00 43.8 43.8 0.026 1301 0

T5TC-T5TD EQ1 0.007 1301 0.0 0.57 -0.54 0.03 0.00 0.00 44.7 44.7 0.007 1401 0

T5TC-T69R EQ1 0.080 1301 0.0 -1.77 -2.86 0.07 0.00 0.00 61.4 61.4 0.080 1401 0

T5TE-T5TK EQ1 0.013 1301 0.6 -0.73 -1.27 0.75 0.00 0.00 10.7 10.7 0.013 1401 0

T5TF-T5TL EQ1 0.015 1301 0.6 -1.12 0.75 -1.09 0.00 0.00 10.7 10.7 0.015 1401 0

T5TG-T5TO EQ1 0.006 1301 0.6 0.02 1.10 0.10 0.00 0.00 10.7 10.7 0.006 1401 0

T5TH-T5TP EQ1 0.007 1301 0.6 0.62 -0.45 0.22 0.00 0.00 10.7 10.7 0.007 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C56 of 116

T5TI-T5TJ EQ1 0.006 1401 1.5 0.11 -0.87 0.24 0.00 0.00 26.8 26.8 0.006 1101 0

T5TI-T5TK EQ1 0.028 1101 1.0 0.04 -5.23 -0.35 0.00 -0.01 17.9 17.9 0.028 1201 0

T5TI-T69S EQ1 0.013 1101 1.0 -0.05 -0.62 0.29 0.00 0.00 17.6 17.6 0.013 1201 0

T5TJ-T5TL EQ1 0.024 1401 1.0 0.05 -4.35 0.14 0.00 0.00 17.9 17.9 0.024 1101 0

T5TJ-T69S EQ1 0.009 1101 0.0 -0.12 -1.26 -0.20 0.00 0.00 17.6 17.6 0.009 1201 0

T5TK-T5TL EQ1 0.009 1401 1.5 0.10 -0.63 0.44 0.00 0.00 26.8 26.8 0.009 1301 0

T5TK-T5TO EQ1 0.016 1101 0.0 -0.05 -2.86 0.55 0.00 0.00 17.9 17.9 0.016 1201 0

T5TK-T69T EQ1 0.027 1101 0.0 0.10 -3.11 1.41 0.00 0.00 17.6 17.6 0.027 1201 0

T5TL-T5TP EQ1 0.039 1401 0.0 -0.16 -6.91 1.12 0.00 0.01 17.9 17.9 0.039 1301 0

T5TL-T69S EQ1 0.029 1101 0.0 -0.31 -4.48 1.36 0.00 0.01 17.6 17.6 0.029 1201 0

T5TL-T69T EQ1 0.029 1101 0.0 -0.07 -4.01 -1.89 0.00 0.01 17.6 17.6 0.029 1201 0

T5TO-T5TP EQ1 0.014 1301 0.0 -0.15 -1.49 -0.60 0.00 0.00 26.8 26.8 0.014 1401 0

T5TS-T5TW EQ1 0.033 1201 0.6 1.77 3.84 -0.96 0.00 0.00 10.7 10.7 0.033 1101 0

T5TT-T5TX EQ1 0.151 1201 0.6 -2.35 24.89 -0.38 0.00 0.03 10.7 10.7 0.151 1101 0

T5TU-T5U0 EQ1 0.043 1201 0.6 -2.35 -4.74 -0.96 0.00 -0.01 10.7 10.7 0.043 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5TV-T5U1 EQ1 0.141 1201 0.6 1.77 -23.99 2.30 0.00 -0.03 10.7 10.7 0.141 1101 0

T5TW-T5TX EQ1 0.052 1401 1.5 0.16 -7.86 3.89 0.00 -0.01 26.8 26.8 0.052 1301 0

T5TW-T5U0 EQ1 0.102 1401 1.0 -0.24 -17.74 -5.78 -0.01 -0.02 17.9 17.9 0.102 1301 0

T5TW-T69U EQ1 0.067 1201 1.0 0.51 -6.94 1.29 0.00 -0.01 17.6 17.6 0.067 1101 0

T5TX-T5U1 EQ1 0.124 1401 0.0 -1.39 -20.24 5.70 -0.01 0.02 17.9 17.9 0.124 1301 0

T5TX-T69U EQ1 0.081 1201 0.0 -0.90 -12.88 -4.76 0.01 0.02 17.6 17.6 0.081 1101 0

T5U0-T5U1 EQ1 0.120 1401 0.0 0.24 -7.20 -4.13 0.00 0.01 26.8 26.8 0.120 1301 0

T5U0-T69U EQ1 0.082 1401 1.0 -0.97 13.52 2.77 0.00 0.02 17.6 17.6 0.082 1301 0

T5U1-T69U EQ1 0.084 1201 1.0 0.57 -8.55 -0.01 0.00 -0.01 17.6 17.6 0.084 1101 0

T5UB-T5UF EQ1 0.022 1101 0.0 1.52 2.07 -0.33 0.00 0.00 75.1 75.1 0.022 1201 0

T5UB-T69V EQ1 0.038 1301 2.6 -1.62 0.43 -0.01 0.00 0.00 47.4 47.4 0.038 1401 0

T5UE-T5UB EQ1 0.021 1201 0.0 0.85 -2.71 0.47 0.00 0.00 53.7 53.7 0.020 1101 0

T5UE-T5UI EQ1 0.016 1301 0.0 1.11 -1.58 -0.37 0.00 0.00 75.1 75.1 0.016 1201 0

T5UE-T69V EQ1 0.065 1101 2.6 -1.87 4.49 0.12 0.00 0.00 47.4 47.4 0.065 1201 0

T5UF-T69V EQ1 0.066 1201 2.6 -1.87 4.75 0.32 0.00 0.00 47.4 47.4 0.066 1101 0

T5UI-T5UF EQ1 0.026 1301 3.0 0.90 -2.91 -0.64 0.00 0.00 53.7 53.7 0.026 1401 0

T5WR-T5Z3 EQ1 0.009 1101 0.6 -0.38 -0.20 -1.20 0.00 0.00 10.7 10.7 0.009 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C57 of 116

T5WT-T5Z0 EQ1 0.014 1101 0.6 -0.75 -0.01 -1.65 0.00 0.00 10.7 10.7 0.014 1201 0

T5XD-T5YP EQ1 0.009 1401 0.6 -0.50 -1.01 0.02 0.00 0.00 10.7 10.7 0.009 1301 0

T5XE-T5YQ EQ1 0.015 1401 0.6 -0.24 -2.42 -0.02 0.00 0.00 10.7 10.7 0.015 1101 0

T5XF-T5YO EQ1 0.017 1101 0.6 -0.51 2.42 0.03 0.00 0.00 10.7 10.7 0.017 1201 0

T5XG-T5YN EQ1 0.007 1401 0.6 -0.24 1.02 -0.04 0.00 0.00 10.7 10.7 0.007 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5XH-T5YM EQ1 0.018 1301 0.6 -0.39 -2.77 0.00 0.00 0.00 10.7 10.7 0.018 1401 0

T5XI-T5YL EQ1 0.011 1201 0.6 -0.36 -1.57 -0.01 0.00 0.00 10.7 10.7 0.011 1101 0

T5XL-T5YJ EQ1 0.018 1201 0.6 -0.36 2.76 0.02 0.00 0.00 10.7 10.7 0.017 1101 0

T5XM-T5YK EQ1 0.011 1201 0.6 -0.37 1.58 -0.01 0.00 0.00 10.7 10.7 0.011 1101 0

T5XN-T5XS EQ1 0.005 1301 0.6 -0.34 -0.32 -0.36 0.00 0.00 10.7 10.7 0.005 1401 0

T5XO-T5XT EQ1 0.005 1101 0.6 -0.44 0.22 -0.10 0.00 0.00 10.7 10.7 0.004 1201 0

T5XP-T5XR EQ1 0.005 1401 0.6 -0.45 0.02 0.33 0.00 0.00 10.7 10.7 0.005 1301 0

T5XQ-T5XU EQ1 0.003 1301 0.6 -0.36 0.09 0.13 0.00 0.00 10.7 10.7 0.003 1401 0

T5XR-T5XS EQ1 0.006 1101 0.7 0.26 0.70 0.18 0.00 0.00 12.0 12.0 0.006 1401 0

T5XR-T69Z EQ1 0.017 1101 1.1 -0.97 1.65 -0.03 0.00 0.00 20.2 20.2 0.017 1401 0

T5XS-T69Z EQ1 0.016 1301 1.1 -0.93 1.45 -0.06 0.00 0.00 20.2 20.2 0.016 1201 0

T5XT-T5XS EQ1 0.008 1101 2.0 0.80 0.50 -0.03 0.00 0.00 35.8 35.8 0.008 1401 0

T5XT-T69Z EQ1 0.017 1101 1.1 -0.95 1.67 -0.06 0.00 0.00 20.2 20.2 0.017 1401 0

T5XU-T5XR EQ1 0.008 1101 0.0 0.83 0.52 0.02 0.00 0.00 35.8 35.8 0.008 1401 0

T5XU-T5XT EQ1 0.006 1101 0.0 0.27 0.70 -0.19 0.00 0.00 12.0 12.0 0.006 1401 0

T5XV-T5XW EQ1 0.013 1301 0.7 0.23 1.97 -0.63 0.00 0.00 12.0 12.0 0.013 1401 0

T5XV-T5XX EQ1 0.009 1301 2.0 0.82 0.72 0.15 0.00 0.00 35.8 35.8 0.009 1401 0

T5XV-T69Y EQ1 0.020 1301 1.1 -1.02 2.01 0.29 0.00 0.00 20.2 20.2 0.020 1401 0

T5XW-T5XY EQ1 0.009 1301 0.0 0.79 0.68 -0.15 0.00 0.00 35.8 35.8 0.009 1401 0

T5XW-T69Y EQ1 0.014 1101 1.1 -0.88 1.15 0.23 0.00 0.00 20.2 20.2 0.014 1201 0

T5XX-T5XY EQ1 0.013 1301 0.0 0.27 2.06 0.62 0.00 0.00 12.0 12.0 0.013 1401 0

T5XY-T69Y EQ1 0.020 1301 1.1 -1.00 2.07 0.29 0.00 0.00 20.2 20.2 0.020 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C58 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5Y8-T5Y6 EQ1 0.006 1401 2.0 0.71 0.29 -0.03 0.00 0.00 35.8 35.8 0.006 1301 0

T5Y9-T5Y8 EQ1 0.007 1401 0.0 0.86 0.21 -0.03 0.00 0.00 44.7 44.7 0.007 1301 0

T5Y9-T5YB EQ1 0.007 1401 0.0 0.76 0.42 0.06 0.00 0.00 35.8 35.8 0.007 1301 0

T5Y9-T6A2 EQ1 0.023 1201 1.7 -1.30 1.68 0.11 0.00 0.00 30.6 30.6 0.023 1101 0

T5YB-T5Y6 EQ1 0.008 1401 2.5 0.91 0.27 0.05 0.00 0.00 44.7 44.7 0.008 1301 0

T5YB-T6A2 EQ1 0.024 1401 1.7 -1.33 1.88 -0.04 0.00 0.00 30.6 30.6 0.024 1301 0

T5YF-T5YD EQ1 0.007 1201 2.0 0.70 0.38 0.09 0.00 0.00 35.8 35.8 0.007 1101 0

T5YF-T6A3 EQ1 0.024 1201 1.7 -1.32 1.83 -0.02 0.00 0.00 30.6 30.6 0.024 1101 0

T5YG-T5YD EQ1 0.008 1201 2.5 0.90 0.31 -0.07 0.00 0.00 44.7 44.7 0.008 1101 0

T5YG-T6A3 EQ1 0.025 1201 1.7 -1.33 1.91 0.05 0.00 0.00 30.6 30.6 0.025 1101 0

T5YI-T5YF EQ1 0.008 1201 0.0 0.90 0.33 0.05 0.00 0.00 44.7 44.7 0.008 1101 0

T5YI-T5YG EQ1 0.008 1201 0.0 0.76 0.49 -0.09 0.00 0.00 35.8 35.8 0.008 1101 0

T5YJ-T5YK EQ1 0.005 1401 0.0 0.32 0.43 0.15 0.00 0.00 17.9 17.9 0.005 1301 0

T5YJ-T6A0 EQ1 0.012 1301 0.0 -0.70 1.12 0.47 0.00 0.00 19.4 19.4 0.012 1401 0

T5YL-T5YK EQ1 0.008 1301 0.0 0.59 0.77 0.01 0.00 0.00 26.8 26.8 0.008 1401 0

T5YL-T6A0 EQ1 0.012 1301 0.0 -0.69 0.98 0.40 0.00 0.00 19.4 19.4 0.011 1201 0

T5YM-T5YJ EQ1 0.009 1401 1.5 0.66 0.85 -0.01 0.00 0.00 26.8 26.8 0.009 1301 0

T5YM-T5YL EQ1 0.005 1401 1.0 0.32 0.46 -0.20 0.00 0.00 17.9 17.9 0.005 1301 0

T5YM-T6A0 EQ1 0.012 1201 0.0 -0.71 1.06 -0.49 0.00 0.00 19.4 19.4 0.012 1101 0

T5YN-T6A1 EQ1 0.011 1201 0.0 -0.62 1.05 -0.23 0.00 0.00 19.4 19.4 0.011 1101 0

T5YO-T5YN EQ1 0.010 1201 1.0 0.31 1.26 0.68 0.00 0.00 17.9 17.9 0.010 1101 0

T5YO-T6A1 EQ1 0.011 1201 1.1 -0.76 0.72 -0.35 0.00 0.00 19.4 19.4 0.011 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5YP-T5YN EQ1 0.010 1201 1.5 0.54 1.06 -0.33 0.00 0.00 26.8 26.8 0.010 1101 0

T5YP-T6A1 EQ1 0.011 1201 1.1 -0.75 0.74 -0.27 0.00 0.00 19.4 19.4 0.010 1101 0

T5YQ-T5YO EQ1 0.011 1201 0.0 0.62 1.15 0.32 0.00 0.00 26.8 26.8 0.011 1101 0

T5YQ-T5YP EQ1 0.010 1201 0.0 0.31 1.24 -0.63 0.00 0.00 17.9 17.9 0.009 1101 0

T5YQ-T6A1 EQ1 0.012 1201 0.0 -0.63 1.22 -0.31 0.00 0.00 19.4 19.4 0.012 1101 0

T5Z3-T5Z0 EQ1 0.009 1201 0.0 0.58 0.94 -0.26 0.00 0.00 35.8 35.8 0.009 1101 0

T5Z3-T69W EQ1 0.024 1101 0.0 -1.07 -1.01 0.15 0.00 0.00 42.0 42.0 0.024 1401 0

T5Z4-T5Z0 EQ1 0.010 1201 3.6 1.30 -0.19 -0.12 0.00 0.00 64.4 64.4 0.010 1101 0

T5Z7-T5Z3 EQ1 0.007 1201 0.0 0.76 -0.29 0.10 0.00 0.00 64.4 64.4 0.007 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C59 of 116

T5Z7-T5Z4 EQ1 0.007 1201 2.0 0.54 0.54 0.24 0.00 0.00 35.8 35.8 0.007 1101 0

T5Z7-T69W EQ1 0.028 1201 2.4 -1.12 1.63 -0.10 0.00 0.00 42.0 42.0 0.028 1101 0

T61E-T5Z4 EQ1 0.013 1101 0.6 -0.67 -0.71 1.27 0.00 0.00 10.7 10.7 0.013 1201 0

T61T-T5Z7 EQ1 0.013 1101 0.6 -0.47 0.92 1.58 0.00 0.00 10.7 10.7 0.013 1201 0

T69I-T5PX EQ1 0.024 1201 0.0 -0.97 2.21 0.05 0.00 0.00 34.8 34.8 0.024 1101 0

T69J-T5R3 EQ1 0.036 1101 0.0 -1.91 1.05 -0.26 0.00 0.00 40.1 40.1 0.036 1201 0

T69K-T5QK EQ1 0.018 1401 0.0 -0.52 2.36 -0.21 0.00 0.00 28.2 28.2 0.018 1301 0

T69K-T5QL EQ1 0.008 1301 0.0 -0.41 -0.60 -0.29 0.00 0.00 28.1 28.1 0.008 1401 0

T69M-T5RG EQ1 0.017 1401 2.4 -0.71 -0.78 -0.20 0.00 0.00 42.8 42.8 0.017 1101 0

T69M-T5RJ EQ1 0.024 1101 2.4 -0.80 -1.74 0.03 0.00 0.00 42.8 42.8 0.023 1201 0

T69N-T5SL EQ1 0.014 1101 0.0 -0.82 0.89 0.17 0.00 0.00 33.3 33.3 0.014 1201 0

T69O-T5SA EQ1 0.006 1401 0.0 -0.33 0.32 -0.42 0.00 0.00 19.1 19.1 0.006 1101 0

T69R-T5TD EQ1 0.073 1101 3.4 -1.64 -2.35 -0.04 0.00 0.00 61.4 61.4 0.072 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T69S-T5TK EQ1 0.029 1101 1.0 -0.32 -3.72 1.95 0.00 -0.01 17.6 17.6 0.029 1201 0

T69T-T5TO EQ1 0.009 1301 1.0 0.13 -1.43 0.19 0.00 0.00 17.6 17.6 0.009 1401 0

T69T-T5TP EQ1 0.017 1101 0.0 0.35 -2.14 -0.34 0.00 0.00 17.6 17.6 0.017 1401 0

T69V-T5UI EQ1 0.040 1301 2.6 -1.61 -0.92 0.09 0.00 0.00 47.4 47.4 0.040 1401 0

T69W-T5Z0 EQ1 0.035 1201 0.0 -1.67 2.06 -0.06 0.00 0.00 38.1 38.1 0.035 1101 0

T69W-T5Z4 EQ1 0.031 1101 2.1 -1.62 -1.40 -0.16 0.00 0.00 38.1 38.1 0.031 1401 0

T69Y-T5XX EQ1 0.014 1101 0.0 -0.90 1.21 -0.31 0.00 0.00 20.2 20.2 0.014 1201 0

T69Z-T5XU EQ1 0.016 1301 0.0 -0.95 1.47 0.11 0.00 0.00 20.2 20.2 0.016 1201 0

T6A0-T5YK EQ1 0.011 1201 1.1 -0.71 0.92 0.43 0.00 0.00 19.4 19.4 0.011 1101 0

T6A2-T5Y6 EQ1 0.023 1201 0.0 -1.30 1.62 -0.01 0.00 0.00 30.6 30.6 0.023 1101 0

T6A2-T5Y8 EQ1 0.024 1401 0.0 -1.32 1.78 0.03 0.00 0.00 30.6 30.6 0.024 1301 0

T6A3-T5YD EQ1 0.022 1401 0.0 -1.31 1.49 0.03 0.00 0.00 30.6 30.6 0.022 1301 0

T6A3-T5YI EQ1 0.023 1401 0.0 -1.31 1.57 0.08 0.00 0.00 30.6 30.6 0.023 1301 0

T6A4-T5TD EQ1 0.016 1401 0.0 1.41 -1.21 -0.14 0.00 0.00 63.5 63.5 0.016 1301 0

T6A5-T5TC EQ1 0.022 1101 0.0 1.40 -2.28 -0.14 0.00 0.00 63.5 63.5 0.022 1401 0

T6A9-T5T9 EQ1 0.016 1201 0.6 -0.49 2.13 0.95 0.00 0.00 10.7 10.7 0.016 1301 0

T6AA-T5TC EQ1 0.019 1301 0.6 -0.59 1.27 -2.43 0.00 0.00 10.7 10.7 0.019 1401 0

T6AB-T6A5 EQ1 0.005 1301 0.6 -0.10 0.13 -0.86 0.00 0.00 10.7 10.7 0.005 1401 0

0532-T484 FL1 0.329 1301 2.0 -3.30 -82.86 8.54 -0.03 -0.19 14.0 14.0 0.329 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C60 of 116

T493-T484 FL1 0.257 1201 2.0 1.10 -66.41 -9.87 -0.03 -0.14 14.0 14.0 0.257 1101 0

0134-T473 FL2 0.164 1101 0.0 17.28 7.91 -20.58 0.01 0.00 25.9 25.9 0.164 1401 0

T473-T475 FL2 0.085 1101 0.0 12.97 -4.82 4.02 0.00 0.00 28.6 28.6 0.084 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T474-T476 FL2 0.079 1201 0.0 13.30 -3.17 -2.97 0.00 0.00 28.6 28.6 0.079 1101 0

T475-T477 FL2 0.058 1301 0.0 7.98 -5.45 -0.02 0.00 0.00 28.6 28.6 0.058 1401 0

T476-T478 FL2 0.059 1401 0.0 7.95 -5.86 0.02 0.00 0.00 28.6 28.6 0.059 1301 0

T477-T479 FL2 0.032 1101 0.0 4.02 -3.58 0.50 0.00 0.00 28.6 28.6 0.032 1201 0

T478-T480 FL2 0.032 1201 0.0 4.02 -3.53 -0.48 0.00 0.00 28.6 28.6 0.032 1101 0

T479-T483 FL2 0.014 1301 0.0 1.12 -2.26 0.22 0.00 0.00 28.6 28.6 0.014 1401 0

T480-T481 FL2 0.014 1401 0.0 1.12 -2.26 -0.22 0.00 0.00 28.6 28.6 0.014 1301 0

T484-T485 FL2 0.403 1401 0.0 -28.08 -65.12 -22.65 0.01 0.02 26.3 26.3 0.402 1301 0

T485-T486 FL2 0.102 1101 2.7 -16.36 -4.61 -0.58 0.00 0.00 28.9 28.9 0.102 1201 0

T486-T487 FL2 0.060 1101 0.0 -8.62 -4.05 -0.19 0.00 0.00 28.9 28.9 0.060 1201 0

T487-T488 FL2 0.024 1301 0.0 -2.72 -2.55 0.01 0.00 0.00 28.9 28.9 0.024 1401 0

T488-T489 FL2 0.006 1101 0.0 -0.03 -1.48 0.00 0.00 0.00 28.9 28.9 0.006 1201 0

T492-T474 FL2 0.152 1301 0.0 15.07 -6.82 20.41 -0.01 0.00 25.9 25.9 0.152 1401 0

T473-T474 FL3 0.022 1301 0.0 -0.43 -2.94 4.46 0.00 0.00 24.6 24.6 0.022 1401 0

T475-T476 FL3 0.009 1401 0.8 0.67 1.57 0.11 0.00 0.00 21.9 21.9 0.009 1301 0

T477-T478 FL3 0.007 1101 0.7 0.40 1.24 0.51 0.00 0.00 19.1 19.1 0.007 1401 0

T479-T480 FL3 0.006 1401 0.6 0.42 0.91 0.35 0.00 0.00 16.4 16.4 0.006 1301 0

T482-T481 FL3 0.003 1101 0.0 0.30 0.34 0.00 0.00 0.00 6.8 6.8 0.003 1201 0

T483-T482 FL3 0.003 1101 0.5 0.30 0.34 0.00 0.00 0.00 6.8 6.8 0.003 1201 0

T484-T473 FL3 0.186 1101 0.0 -8.13 -37.24 -0.36 0.00 0.01 47.6 47.6 0.186 1201 0

T484-T474 FL3 0.181 1101 0.0 -3.25 -37.99 -20.67 0.00 0.01 47.6 47.6 0.181 1201 0

T485-T473 FL3 0.052 1301 0.0 3.50 1.42 -9.42 0.00 0.00 27.5 27.5 0.052 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T485-T474 FL3 0.055 1401 0.0 1.27 -0.95 13.00 0.00 0.00 27.5 27.5 0.055 1101 0

T485-T475 FL3 0.064 1201 3.5 -7.92 -4.84 1.01 0.00 0.00 47.9 47.9 0.064 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C61 of 116

T485-T476 FL3 0.068 1101 3.5 -8.51 -4.63 -1.96 0.00 0.00 47.9 47.9 0.068 1401 0

T486-T475 FL3 0.028 1101 1.8 3.50 0.94 2.99 0.00 0.00 24.5 24.5 0.028 1201 0

T486-T476 FL3 0.027 1201 1.8 3.70 0.72 -2.42 0.00 0.00 24.5 24.5 0.027 1101 0

T486-T477 FL3 0.046 1101 0.0 -6.18 -3.00 -0.23 0.00 0.00 45.9 45.9 0.046 1201 0

T486-T478 FL3 0.046 1101 0.0 -6.13 -2.96 -0.02 0.00 0.00 45.9 45.9 0.046 1201 0

T487-T477 FL3 0.024 1301 1.6 2.30 0.72 3.54 0.00 0.00 21.4 21.4 0.024 1401 0

T487-T478 FL3 0.025 1401 1.6 2.29 0.71 -3.62 0.00 0.00 21.4 21.4 0.025 1301 0

T487-T479 FL3 0.032 1301 0.0 -4.31 -2.22 -0.11 0.00 0.00 44.0 44.0 0.032 1401 0

T487-T480 FL3 0.033 1401 0.0 -4.31 -2.23 0.13 0.00 0.00 44.0 44.0 0.033 1301 0

T488-T479 FL3 0.016 1401 0.0 1.01 -0.40 -2.97 0.00 0.00 18.4 18.4 0.016 1301 0

T488-T480 FL3 0.016 1201 0.0 1.01 -0.40 2.97 0.00 0.00 18.4 18.4 0.016 1301 0

T488-T481 FL3 0.017 1101 0.0 -1.81 -1.78 0.09 0.00 0.00 42.3 42.3 0.017 1201 0

T488-T483 FL3 0.017 1101 0.0 -1.82 -1.78 -0.09 0.00 0.00 42.3 42.3 0.017 1201 0

T489-T481 FL3 0.002 1101 1.1 0.22 0.31 0.17 0.00 0.00 15.3 15.3 0.002 1201 0

T489-T483 FL3 0.002 1101 1.1 0.22 0.31 -0.18 0.00 0.00 15.3 15.3 0.002 1401 0

T481-T490 FL4 0.002 1401 0.4 -0.22 0.16 0.00 0.00 0.00 18.9 18.9 0.002 1101 0

T482-T490 FL4 0.001 1401 0.5 0.18 -0.01 0.00 0.00 0.00 13.3 13.3 0.001 1301 0

T483-T490 FL4 0.002 1401 0.4 -0.22 0.16 0.00 0.00 0.00 18.9 18.9 0.002 1301 0

T490-T491 FL4 0.000 1001 0.0 -0.06 0.00 0.00 0.00 0.00 14.7 14.7 0.000 1101 0

0136-T280 HP0 0.508 1301 0.0 -24.21 37.13 59.83 -0.11 -0.01 27.1 7.5 0.501 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0147-T67T HP0 0.683 1301 0.2 -18.59 -21.42 -2.91 0.00 -0.70 32.2 2.9 0.659 1401 0

0601-T316 HP0 0.055 1201 0.0 -0.21 -0.12 -13.57 0.02 0.00 5.2 7.2 0.055 1101 0

0615-T239 HP0 0.103 1301 1.3 -1.88 15.33 7.26 0.01 0.06 6.1 17.8 0.102 1401 0

0629-T265 HP0 0.063 1201 0.0 2.24 -7.72 -4.93 0.01 0.01 18.9 13.8 0.062 1101 0

T224-T5VE HP0 0.124 1101 0.0 -0.12 -16.35 13.12 0.00 0.04 20.1 15.1 0.124 1201 0

T227-T243 HP0 0.015 1401 1.0 -1.09 -0.82 1.18 0.00 -0.01 49.5 13.8 0.015 1301 0

T228-T251 HP0 0.022 1201 0.0 -0.98 -0.07 -3.89 0.00 -0.01 49.5 13.8 0.020 1101 0

T233-T247 HP0 0.036 1201 1.0 3.03 3.93 1.26 0.00 0.02 23.5 13.8 0.035 1101 0

T235-T224 HP0 0.163 1301 0.0 -1.15 -19.60 -19.31 0.05 0.03 20.1 7.2 0.163 1401 0

T236-T223 HP0 0.076 1201 0.0 -0.42 4.85 13.88 -0.03 -0.05 29.6 7.2 0.076 1101 0

T237-T255 HP0 0.147 1301 0.0 -0.27 -25.60 -9.48 0.01 0.05 27.1 13.8 0.147 1401 0

T238-T299 HP0 0.033 1301 0.0 2.80 -3.14 -1.82 0.00 0.01 32.2 13.8 0.033 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C62 of 116

T239-T295 HP0 0.074 1301 0.0 -2.25 10.92 -4.07 0.00 0.00 21.0 13.8 0.073 1401 0

T240-T276 HP0 0.102 1201 0.0 -10.26 -7.91 3.60 -0.01 0.04 27.1 13.8 0.099 1301 0

T241-T298 HP0 0.047 1201 1.0 -0.27 10.20 0.49 0.00 0.02 29.6 13.8 0.046 1101 0

T242-T261 HP0 0.027 1301 0.0 -0.84 3.86 1.34 0.00 0.00 29.6 13.8 0.027 1401 0

T243-T244 HP0 0.026 1401 1.0 -1.19 -3.47 -0.96 0.00 -0.01 49.5 13.8 0.026 1301 0

T244-T245 HP0 0.046 1401 1.0 -0.98 -8.44 -0.96 0.00 -0.02 49.5 14.0 0.046 1301 0

T245-T246 HP0 0.077 1401 1.0 -0.87 -15.53 1.48 0.00 -0.03 49.5 13.5 0.077 1301 0

T246-T237 HP0 0.144 1401 1.0 -0.79 -25.10 -8.27 -0.01 -0.04 49.5 13.5 0.143 1301 0

T247-T248 HP0 0.037 1201 1.0 3.18 4.95 0.20 0.00 0.00 23.5 13.8 0.036 1101 0

T248-T249 HP0 0.038 1201 0.0 3.13 5.01 0.46 0.00 -0.01 23.5 14.0 0.037 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T249-T250 HP0 0.031 1201 0.0 2.88 3.55 0.52 0.00 -0.02 23.5 13.5 0.030 1101 0

T250-0629 HP0 0.077 1201 1.0 2.88 -8.18 -7.23 -0.01 -0.03 23.5 13.5 0.075 1101 0

T251-T252 HP0 0.041 1201 1.0 -1.26 -4.90 3.25 0.00 -0.02 49.5 13.8 0.039 1301 0

T252-T253 HP0 0.049 1201 1.0 -1.16 -8.43 1.74 0.00 -0.02 49.5 14.0 0.047 1301 0

T253-T254 HP0 0.066 1201 1.0 -3.52 -9.97 0.83 0.00 -0.02 49.5 13.5 0.063 1301 0

T254-T240 HP0 0.105 1201 1.0 -7.61 -11.48 -3.15 0.00 -0.03 49.5 13.5 0.101 1301 0

T255-T256 HP0 0.081 1301 0.0 0.49 -16.27 2.15 0.00 0.03 27.1 13.8 0.080 1201 0

T256-T257 HP0 0.045 1301 0.0 1.05 -9.23 -0.03 0.00 0.02 27.1 13.8 0.044 1201 0

T257-T258 HP0 0.025 1301 0.0 1.34 -4.25 0.01 0.00 0.02 27.1 13.8 0.025 1401 0

T258-T259 HP0 0.017 1301 1.0 1.15 0.64 2.33 0.00 0.00 27.1 13.8 0.017 1201 0

T259-T271 HP0 0.020 1301 0.7 0.63 0.96 -3.29 -0.01 0.00 27.1 10.3 0.020 1401 0

T261-T262 HP0 0.029 1301 0.0 -1.35 4.62 -0.47 0.00 -0.01 29.6 13.2 0.029 1401 0

T262-T263 HP0 0.043 1401 1.0 -1.63 -3.45 5.16 0.00 -0.03 29.6 14.3 0.043 1101 0

T263-T235 HP0 0.115 1401 1.5 -1.23 -16.42 -9.94 -0.01 -0.04 29.6 20.0 0.115 1301 0

T265-T266 HP0 0.027 1201 1.0 1.15 -4.79 -0.28 0.00 0.00 18.9 13.8 0.027 1101 0

T266-T267 HP0 0.035 1201 1.0 0.66 -7.16 0.35 0.00 -0.01 18.9 13.8 0.035 1101 0

T267-T268 HP0 0.074 1201 1.0 0.70 -13.01 -4.04 0.00 -0.03 18.9 13.8 0.074 1101 0

T268-T272 HP0 0.096 1301 0.0 -4.54 -16.72 0.46 0.00 0.06 8.3 13.8 0.095 1201 0

T269-T241 HP0 0.044 1301 1.3 -2.18 7.19 0.36 0.00 0.03 29.6 17.8 0.043 1201 0

T271-T242 HP0 0.039 1201 0.0 -0.21 -1.10 -8.57 0.01 0.01 29.6 17.8 0.039 1101 0

T272-0615 HP0 0.056 1301 0.7 -3.42 5.68 -4.05 -0.01 0.05 8.3 10.3 0.055 1201 0

T273-T269 HP0 0.043 1301 0.0 -4.76 2.28 -2.31 0.01 -0.01 27.1 10.3 0.041 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C63 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T274-T67U HP0 0.205 1301 0.0 -27.33 10.10 -5.01 0.02 -0.05 27.1 7.4 0.199 1401 0

T276-T277 HP0 0.081 1301 1.0 -9.95 5.13 -1.96 0.00 0.02 27.1 13.8 0.079 1401 0

T277-T278 HP0 0.079 1301 1.0 -8.74 6.52 -1.64 0.00 0.01 27.1 13.8 0.076 1401 0

T278-T279 HP0 0.071 1301 1.0 -7.41 6.14 -1.77 0.00 0.01 27.1 13.8 0.067 1401 0

T279-T273 HP0 0.058 1301 0.0 -6.17 4.41 -1.92 0.00 0.00 27.1 13.8 0.055 1401 0

T280-T281 HP0 0.269 1301 0.0 -21.32 31.31 -6.40 0.00 -0.02 27.1 13.8 0.261 1201 0

T281-T282 HP0 0.239 1301 0.0 -20.96 26.23 -5.26 0.00 -0.02 27.1 13.8 0.231 1401 0

T282-T283 HP0 0.219 1301 0.0 -22.17 21.82 -3.07 0.00 -0.03 27.1 13.8 0.212 1401 0

T283-T274 HP0 0.210 1301 0.0 -24.39 16.60 -3.21 0.00 -0.04 27.1 13.8 0.203 1401 0

T293-0601 HP0 0.046 1201 1.5 -0.33 -0.32 -11.54 -0.01 -0.02 21.0 20.0 0.046 1101 0

T294-T293 HP0 0.041 1301 1.0 -0.39 5.91 3.52 0.00 -0.01 21.0 14.3 0.041 1201 0

T295-T294 HP0 0.048 1301 0.0 -1.00 9.81 -0.18 0.00 0.00 21.0 13.2 0.048 1201 0

T296-T236 HP0 0.078 1201 1.5 0.00 5.05 14.58 0.01 -0.02 29.6 20.0 0.078 1101 0

T297-T296 HP0 0.071 1201 1.0 -0.33 11.57 -5.22 0.00 -0.01 29.6 14.3 0.071 1101 0

T298-T297 HP0 0.054 1201 1.0 0.16 11.79 -0.56 0.00 0.01 29.6 13.2 0.053 1101 0

T299-T229 HP0 0.010 1201 0.0 0.40 1.06 0.90 0.00 0.00 32.2 13.2 0.010 1301 0

T313-0136 HP0 0.189 1201 0.5 6.34 -22.98 -16.01 -0.02 -0.04 19.8 7.2 0.185 1301 0

T314-T313 HP0 0.095 1201 1.0 3.42 -13.85 -4.55 -0.01 -0.04 19.8 13.5 0.093 1301 0

T5VE-T5VF HP0 0.090 1201 0.0 0.04 -4.72 18.55 0.00 0.01 20.1 14.2 0.090 1101 0

T5VF-T5VG HP0 0.059 1201 0.0 0.04 -2.52 12.63 0.00 0.01 20.1 19.3 0.059 1101 0

T5VG-T5VD HP0 0.020 1201 0.0 0.04 -0.52 4.59 0.00 0.00 20.1 16.5 0.020 1101 0

T67T-T238 HP0 0.121 1301 0.0 6.32 -12.67 9.35 -0.01 0.02 32.2 14.8 0.120 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T67U-0147 HP0 0.376 1301 0.2 -15.73 -9.17 4.11 0.01 -0.39 27.1 2.9 0.365 1401 0

0136-T221 HP1 0.056 1201 0.0 -4.32 3.85 4.25 0.00 0.01 24.3 19.8 0.055 1301 0

0147-T270 HP1 0.133 1301 0.0 -0.71 -17.96 13.14 -0.01 0.02 31.7 25.9 0.131 1201 0

0615-T5V0 HP1 0.042 1201 2.5 6.25 -2.18 0.57 0.00 -0.01 27.1 33.5 0.041 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C64 of 116

0629-T66N HP1 0.088 1301 2.5 5.24 12.43 2.47 0.00 0.00 27.1 33.5 0.086 1401 0

T226-T5UY HP1 0.057 1201 0.0 2.49 6.96 -3.63 0.00 0.00 38.3 25.9 0.056 1301 0

T230-T5US HP1 0.047 1201 2.0 2.91 6.75 0.97 0.00 0.00 38.3 25.9 0.047 1101 0

T233-T501 HP1 0.043 1201 0.0 2.28 -6.23 -1.53 0.00 0.01 27.1 33.5 0.042 1101 0

T237-T66X HP1 0.458 1401 0.2 -8.27 -19.55 -0.62 0.00 -0.21 27.1 46.4 0.457 1301 0

T269-T67Y HP1 0.057 1301 0.0 5.30 5.28 -2.06 0.00 0.00 2.4 4.1 0.057 1201 0

T271-T682 HP1 0.307 1101 0.2 -4.17 -14.28 0.89 0.00 -0.14 1.2 2.1 0.306 1201 0

T501-T228 HP1 0.049 1201 0.0 1.36 5.33 4.86 -0.01 0.00 27.1 12.9 0.043 1301 0

T501-T66O HP1 0.099 1201 0.3 0.95 10.85 -11.69 -0.02 0.02 40.4 3.6 0.092 1101 0

T5US-T271 HP1 0.050 1201 0.0 0.63 9.77 1.21 0.00 -0.01 38.3 39.8 0.050 1101 0

T5UY-T237 HP1 0.065 1401 0.0 -0.95 13.33 0.60 0.00 -0.01 38.3 39.8 0.065 1301 0

T5V0-T5V1 HP1 0.063 1301 1.3 -1.35 4.55 1.48 0.00 0.00 169.3 17.0 0.062 1201 0

T5V0-T67Z HP1 0.100 1201 0.7 8.27 -10.06 -4.75 -0.01 -0.01 27.1 8.9 0.099 1301 0

T5V1-T5V2 HP1 0.089 1201 1.0 -2.11 6.87 0.22 0.00 0.00 169.3 13.2 0.089 1301 0

T5V2-T5V3 HP1 0.086 1201 1.0 -1.84 7.76 -0.33 0.00 0.00 169.3 12.7 0.085 1301 0

T5V3-T5V4 HP1 0.077 1201 1.0 -1.14 9.53 -1.07 0.00 0.00 169.3 13.7 0.075 1101 0

T5V4-T5V5 HP1 0.095 1201 1.5 -1.14 11.86 3.16 0.00 0.00 169.3 19.2 0.094 1101 0

T5V5-T5V6 HP1 0.176 1201 0.5 -2.57 9.70 16.68 0.01 -0.01 169.3 6.9 0.175 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5V6-T5V8 HP1 0.196 1201 0.0 -0.97 24.62 16.78 0.00 -0.04 169.3 11.4 0.195 1101 0

T5V8-T5V9 HP1 0.115 1201 0.9 -0.97 -18.23 2.48 0.00 -0.04 169.3 11.4 0.114 1101 0

T5V9-T5VC HP1 0.152 1201 0.4 -0.97 -28.51 -0.82 0.00 -0.04 169.3 5.3 0.151 1101 0

T5VA-T5VB HP1 0.077 1301 0.0 -0.11 -16.92 -0.43 0.00 0.01 169.3 13.2 0.077 1401 0

T5VB-T5V7 HP1 0.048 1201 0.0 -0.20 -9.22 -0.67 0.00 0.01 169.3 13.2 0.047 1101 0

T5VC-T5VA HP1 0.099 1401 0.0 -0.08 -22.34 -0.28 0.00 0.02 169.3 7.9 0.098 1301 0

T66J-T501 HP1 0.046 1201 1.0 1.00 7.64 2.11 0.00 0.01 40.4 13.2 0.041 1101 0

T66K-T66J HP1 0.015 1201 0.0 0.60 -1.49 -1.48 0.00 0.01 40.4 13.2 0.013 1101 0

T66L-T66K HP1 0.017 1201 0.0 -0.35 -2.92 -0.55 0.00 0.01 40.4 13.4 0.016 1301 0

T66M-T66L HP1 0.029 1201 0.0 -0.54 -2.98 -3.34 0.00 0.00 40.4 12.9 0.028 1301 0

T66N-T66M HP1 0.033 1201 1.0 -0.25 -3.32 -4.47 -0.01 -0.01 40.4 12.9 0.032 1301 0

T66N-T66W HP1 0.093 1301 0.0 4.78 12.42 -4.72 0.01 0.01 27.1 8.8 0.092 1401 0

T66V-0136 HP1 0.303 1201 0.0 36.61 -24.75 6.39 0.00 0.01 17.5 30.0 0.302 1301 0

T66X-0629 HP1 0.094 1101 3.4 7.79 -11.92 0.46 0.00 -0.01 27.1 46.4 0.094 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C65 of 116

T67Y-0147 HP1 0.092 1101 0.0 4.58 -14.87 1.18 0.00 0.02 20.9 35.8 0.092 1401 0

T67Z-T269 HP1 0.101 1201 0.0 5.09 -4.05 -3.05 -0.01 0.05 27.1 4.1 0.100 1301 0

T682-0615 HP1 0.094 1201 3.4 6.71 -10.90 -2.48 0.00 -0.01 25.9 44.3 0.094 1101 0

T240-T66V HP2 0.311 1201 0.3 15.33 -49.57 -4.41 0.00 -0.36 2.2 3.8 0.309 1301 0

T66W-T240 HP2 0.359 1301 0.0 25.20 50.94 3.27 0.01 -0.28 27.1 4.1 0.356 1201 0

0601-T5V5 HS1 0.149 1201 0.0 15.10 13.32 5.17 0.00 0.00 28.2 75.8 0.148 1101 0

T221-T284 HS1 0.069 1301 0.0 -4.35 3.67 6.52 0.00 0.00 56.5 29.9 0.063 1201 0

T222-T301 HS1 0.138 1301 0.0 -8.08 -18.07 3.41 0.00 0.01 22.2 42.2 0.134 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T224-T232 HS1 0.108 1401 0.7 5.82 -17.82 0.99 0.00 -0.02 56.5 22.0 0.108 1301 0

T224-T5VJ HS1 0.125 1201 0.0 11.88 11.70 4.72 0.00 0.00 56.5 60.3 0.125 1301 0

T225-T230 HS1 0.184 1301 1.3 4.91 -28.61 10.00 0.00 -0.01 56.5 38.6 0.183 1201 0

T225-T5UR HS1 0.059 1301 2.0 -2.10 8.04 -2.66 0.00 0.00 40.0 58.5 0.059 1201 0

T227-T233 HS1 0.117 1201 3.5 3.74 -21.46 1.73 0.00 -0.01 28.2 105.1 0.115 1101 0

T227-T311 HS1 0.076 1401 1.4 6.97 9.48 -0.55 0.00 0.00 56.5 42.2 0.075 1301 0

T228-T312 HS1 0.078 1201 1.4 6.29 11.05 0.18 0.00 0.00 34.3 42.2 0.073 1301 0

T229-T304 HS1 0.074 1201 0.0 -1.80 13.33 -1.36 0.00 0.00 11.8 43.9 0.073 1101 0

T230-T288 HS1 0.146 1301 0.0 5.85 -22.69 -5.73 0.00 0.01 56.5 22.4 0.145 1201 0

T231-T223 HS1 0.075 1301 0.0 0.11 -13.62 -3.07 0.00 0.02 5.9 22.0 0.075 1201 0

T232-T235 HS1 0.112 1401 0.5 -1.09 -21.18 4.03 0.00 -0.02 8.8 15.6 0.111 1301 0

T232-T303 HS1 0.112 1401 0.0 4.98 -17.16 3.98 0.00 0.01 56.5 61.6 0.112 1301 0

T235-0601 HS1 0.177 1301 3.5 10.31 -26.01 -4.17 0.00 -0.01 28.3 105.1 0.177 1201 0

T236-T67D HS1 0.758 1201 0.3 24.46 90.51 -66.60 -0.02 0.08 2.3 8.4 0.747 1101 0

T238-T222 HS1 0.100 1301 2.0 2.95 16.35 -3.78 0.00 0.00 33.0 58.5 0.097 1401 0

T239-T5V1 HS1 0.052 1201 2.5 6.77 -4.26 -0.39 0.00 0.00 28.2 75.8 0.052 1301 0

T241-T238 HS1 0.043 1101 0.0 3.46 -5.27 -0.90 0.00 0.00 24.2 90.1 0.042 1201 0

T242-T239 HS1 0.079 1301 0.0 6.21 -9.56 2.23 0.00 0.00 28.3 105.1 0.079 1401 0

T243-T247 HS1 0.069 1201 3.5 4.19 -10.48 1.03 0.00 0.00 28.3 105.1 0.068 1101 0

T244-T248 HS1 0.068 1301 0.0 5.96 -7.27 -1.97 0.00 0.00 28.3 105.1 0.067 1201 0

T245-T249 HS1 0.076 1301 0.0 6.97 -8.43 -1.74 0.00 0.00 28.3 105.1 0.076 1201 0

T246-T250 HS1 0.068 1301 0.0 6.88 -6.08 -2.37 0.00 0.00 28.3 105.1 0.067 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C66 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T247-T66J HS1 0.069 1201 2.5 5.30 9.42 -0.86 0.00 0.00 20.4 75.8 0.065 1101 0

T248-T66K HS1 0.096 1201 2.5 8.65 12.82 -0.07 0.00 0.00 20.4 75.8 0.092 1301 0

T249-T66L HS1 0.113 1201 2.5 10.33 14.47 0.77 0.00 0.00 20.4 75.8 0.111 1301 0

T250-T66M HS1 0.114 1201 2.5 10.22 12.90 2.85 0.00 0.00 20.4 75.8 0.114 1301 0

T251-T312 HS1 0.056 1201 0.0 2.40 4.71 6.18 0.00 0.00 8.0 29.9 0.051 1301 0

T252-T310 HS1 0.112 1201 2.0 9.40 -13.58 -2.28 0.00 -0.01 16.0 59.7 0.111 1301 0

T253-T314 HS1 0.137 1301 3.0 11.95 -16.54 2.19 0.00 -0.01 24.2 90.1 0.136 1201 0

T254-T313 HS1 0.185 1201 3.0 16.61 -23.30 1.46 0.00 -0.01 24.2 90.1 0.185 1301 0

T255-T265 HS1 0.050 1201 3.5 3.43 -6.46 -1.60 0.00 0.00 28.3 105.1 0.050 1101 0

T256-T266 HS1 0.038 1101 0.0 1.30 -6.23 1.19 0.00 0.00 28.3 105.1 0.038 1201 0

T257-T267 HS1 0.050 1301 3.5 0.12 -10.66 -0.91 0.00 0.00 28.3 105.1 0.050 1401 0

T258-T268 HS1 0.072 1301 3.5 0.62 -14.37 -1.93 0.00 -0.01 28.3 105.1 0.072 1201 0

T259-T272 HS1 0.066 1301 3.5 3.49 -10.92 -0.80 0.00 0.00 28.3 105.1 0.066 1401 0

T261-T295 HS1 0.085 1301 0.0 5.19 -12.18 2.15 0.00 0.01 28.3 105.1 0.085 1401 0

T262-T294 HS1 0.090 1301 0.0 4.92 -13.56 1.99 0.00 0.01 28.3 105.1 0.089 1401 0

T263-T293 HS1 0.068 1401 0.0 5.51 -9.55 -0.15 0.00 0.00 28.3 105.1 0.068 1301 0

T265-T276 HS1 0.044 1401 1.8 4.02 5.48 0.54 0.00 0.00 28.3 105.1 0.044 1301 0

T266-T277 HS1 0.040 1401 0.0 1.46 -7.57 -0.15 0.00 0.00 28.3 105.1 0.039 1101 0

T267-T278 HS1 0.041 1401 0.0 0.49 -9.04 -0.14 0.00 0.00 28.3 105.1 0.041 1101 0

T268-T279 HS1 0.046 1201 0.0 1.11 -8.48 0.96 0.00 0.00 28.3 105.1 0.046 1101 0

T270-T222 HS1 0.180 1301 0.0 -10.78 -15.44 -11.95 0.00 0.01 56.5 38.6 0.176 1401 0

T272-T273 HS1 0.045 1201 0.0 3.11 -6.47 0.54 0.00 0.00 28.3 105.1 0.044 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T273-T274 HS1 0.068 1301 0.0 4.08 -9.76 1.69 0.00 0.00 24.2 90.1 0.068 1401 0

T274-T275 HS1 0.098 1301 0.0 2.78 -9.89 10.67 0.00 0.00 33.0 58.5 0.096 1401 0

T275-T270 HS1 0.201 1301 0.7 -18.87 -5.22 16.80 0.00 -0.01 56.5 22.4 0.196 1401 0

T276-T280 HS1 0.232 1201 0.0 22.40 -25.43 -4.41 0.00 0.01 24.2 90.1 0.230 1301 0

T277-T281 HS1 0.122 1201 0.0 11.22 -14.28 -2.03 0.00 0.00 24.2 90.1 0.120 1301 0

T278-T282 HS1 0.094 1301 3.0 6.37 -14.15 0.88 0.00 0.00 24.2 90.1 0.093 1401 0

T279-T283 HS1 0.073 1301 3.0 4.40 -11.73 -0.48 0.00 0.00 24.2 90.1 0.073 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C67 of 116

T280-T284 HS1 0.115 1301 0.0 1.20 -14.31 -12.45 0.00 0.01 33.0 58.5 0.113 1401 0

T281-T285 HS1 0.077 1301 2.0 5.70 -8.08 3.93 0.00 0.00 33.0 58.5 0.075 1201 0

T282-T286 HS1 0.066 1301 0.0 3.79 -9.98 1.51 0.00 0.00 33.0 58.5 0.065 1401 0

T283-T287 HS1 0.080 1301 0.0 3.20 -9.89 5.71 0.00 0.00 33.0 58.5 0.078 1401 0

T284-T285 HS1 0.230 1301 1.0 -16.69 25.95 -4.53 0.00 0.00 56.5 29.9 0.222 1401 0

T285-T286 HS1 0.289 1301 0.0 -22.92 34.89 -0.11 0.00 0.00 56.5 29.9 0.279 1401 0

T286-T287 HS1 0.298 1301 0.0 -24.43 32.36 -2.93 0.00 0.00 56.5 29.9 0.289 1401 0

T287-T275 HS1 0.248 1301 0.0 -22.77 21.80 -3.99 0.00 -0.01 56.5 29.9 0.240 1401 0

T288-T289 HS1 0.054 1301 0.0 5.65 -5.94 0.67 0.00 0.01 56.5 29.9 0.054 1401 0

T288-T5UT HS1 0.037 1301 2.0 0.90 7.38 -0.43 0.00 0.00 40.0 58.5 0.037 1201 0

T289-T290 HS1 0.066 1301 1.0 5.94 8.76 0.13 0.00 0.00 56.5 29.9 0.066 1401 0

T289-T5UU HS1 0.027 1201 2.0 0.35 5.68 -0.37 0.00 0.00 40.0 58.5 0.027 1101 0

T290-T291 HS1 0.070 1301 0.0 6.29 8.29 -1.25 0.00 0.00 56.5 29.9 0.070 1401 0

T290-T5UV HS1 0.027 1301 2.0 -0.09 4.99 -1.14 0.00 0.00 40.0 58.5 0.027 1201 0

T291-T292 HS1 0.079 1301 1.0 6.42 -10.86 -0.36 0.00 -0.01 56.5 29.9 0.078 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T291-T5UW HS1 0.033 1301 2.0 -0.38 5.35 -1.90 0.00 0.00 40.0 58.5 0.033 1201 0

T292-T226 HS1 0.208 1301 1.0 6.07 -33.19 9.82 0.00 -0.01 56.5 29.9 0.207 1201 0

T292-T5UX HS1 0.044 1201 2.0 -0.24 7.25 -2.84 0.00 0.00 40.0 58.5 0.044 1301 0

T293-T5V4 HS1 0.074 1201 2.5 9.03 -5.67 -1.70 0.00 0.00 28.2 75.8 0.073 1101 0

T294-T5V3 HS1 0.058 1201 2.5 7.16 -4.30 -1.44 0.00 0.00 28.2 75.8 0.058 1301 0

T295-T5V2 HS1 0.057 1201 2.5 7.46 -4.17 -1.04 0.00 0.00 28.2 75.8 0.057 1301 0

T296-T304 HS1 0.072 1201 0.0 1.48 -11.23 4.45 0.00 0.00 15.9 59.1 0.071 1101 0

T297-T229 HS1 0.041 1301 3.0 0.73 -7.98 0.88 0.00 0.00 24.2 90.1 0.041 1201 0

T298-T299 HS1 0.033 1101 0.0 1.73 -5.23 -0.58 0.00 0.00 24.2 90.1 0.032 1201 0

T299-T301 HS1 0.031 1301 0.0 -2.15 2.75 2.02 0.00 0.00 16.2 28.7 0.030 1401 0

T300-T225 HS1 0.098 1301 0.0 6.64 15.18 -0.54 0.00 0.00 56.5 42.2 0.098 1201 0

T300-T5UQ HS1 0.046 1201 1.0 -1.56 5.33 -3.67 0.00 0.00 31.9 28.7 0.046 1101 0

T301-T229 HS1 0.072 1301 1.4 -5.75 8.32 0.85 0.00 0.00 22.2 40.5 0.069 1201 0

T302-T262 HS1 0.037 1301 3.0 0.52 -5.95 -2.19 0.00 0.00 50.9 90.1 0.037 1401 0

T302-T300 HS1 0.101 1301 0.7 8.16 14.19 0.61 0.00 0.00 56.5 40.5 0.101 1201 0

T303-T263 HS1 0.039 1401 2.0 0.27 -8.03 0.90 0.00 0.00 33.3 59.1 0.039 1301 0

T303-T302 HS1 0.108 1301 1.5 6.74 17.12 -0.56 0.00 0.00 56.5 43.9 0.107 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C68 of 116

T304-T231 HS1 0.161 1201 2.1 -5.14 -20.81 9.66 0.00 -0.01 16.5 61.6 0.158 1101 0

T305-T226 HS1 0.188 1301 1.4 6.05 -34.19 2.88 0.00 -0.01 56.5 41.3 0.188 1401 0

T305-T5UZ HS1 0.049 1401 1.0 -0.02 10.30 1.08 0.00 0.00 32.1 29.3 0.049 1301 0

T306-T221 HS1 0.058 1201 0.0 0.80 -10.56 2.17 0.00 0.00 22.2 41.3 0.056 1101 0

T309-T244 HS1 0.026 1301 0.0 1.31 -1.86 -2.70 0.00 0.00 33.7 59.7 0.025 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T309-T315 HS1 0.081 1401 0.0 8.82 7.98 1.04 0.00 0.00 56.5 43.0 0.080 1301 0

T310-T314 HS1 0.284 1201 1.4 8.68 -52.83 4.05 0.00 -0.02 34.3 43.0 0.274 1301 0

T311-T243 HS1 0.035 1301 1.0 1.12 -1.75 5.85 0.00 0.00 16.9 29.9 0.035 1401 0

T311-T309 HS1 0.082 1401 0.0 8.07 8.24 2.50 0.00 0.00 56.5 42.2 0.082 1301 0

T312-T310 HS1 0.092 1201 0.0 7.49 9.74 -3.87 0.00 -0.01 34.3 42.2 0.086 1301 0

T313-T306 HS1 0.070 1201 1.0 5.58 -8.38 2.05 0.00 -0.01 16.5 29.3 0.067 1301 0

T314-T306 HS1 0.160 1201 0.0 -1.83 -31.39 -3.82 0.00 0.01 22.2 41.4 0.154 1301 0

T315-T245 HS1 0.032 1401 1.5 2.42 4.80 0.16 0.00 0.00 50.9 90.1 0.032 1301 0

T315-T305 HS1 0.068 1401 0.0 7.51 7.18 -0.34 0.00 0.00 56.5 41.4 0.068 1301 0

T315-T5UZ HS1 0.105 1301 1.0 3.38 -18.68 -2.46 0.00 0.00 7.9 29.3 0.105 1401 0

T316-T5VK HS1 0.082 1201 0.0 7.28 6.24 5.57 0.00 0.00 28.2 15.5 0.081 1101 0

T5UQ-T261 HS1 0.038 1301 3.0 1.07 -5.30 -2.33 0.00 0.00 31.9 90.1 0.038 1401 0

T5UQ-T302 HS1 0.033 1301 0.0 -1.14 3.23 -2.97 0.00 0.00 54.8 28.7 0.033 1401 0

T5UR-T242 HS1 0.044 1401 3.0 1.27 -6.01 -2.88 0.00 0.00 40.0 90.1 0.044 1301 0

T5UR-T5UQ HS1 0.020 1201 0.0 0.63 -1.14 -3.11 0.00 0.00 8.0 29.9 0.020 1301 0

T5US-T5UR HS1 0.056 1301 0.0 2.66 -7.66 -2.70 0.00 0.00 10.4 38.6 0.056 1201 0

T5UT-T259 HS1 0.035 1201 0.0 2.21 5.52 0.10 0.00 0.00 40.0 90.1 0.035 1101 0

T5UT-T5US HS1 0.055 1301 0.7 3.58 -8.46 -0.56 0.00 0.00 6.0 22.4 0.055 1401 0

T5UU-T258 HS1 0.029 1101 1.5 1.77 4.71 -0.15 0.00 0.00 40.0 90.1 0.029 1201 0

T5UU-T5UT HS1 0.031 1301 1.0 3.52 -3.19 0.08 0.00 0.00 8.0 29.9 0.030 1401 0

T5UV-T257 HS1 0.025 1201 3.0 0.66 -3.71 -1.42 0.00 0.00 40.0 90.1 0.025 1101 0

T5UV-T5UU HS1 0.031 1301 0.0 3.55 2.88 -0.62 0.00 0.00 8.0 29.9 0.031 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C69 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5UW-T256 HS1 0.027 1201 0.0 0.27 4.52 1.36 0.00 0.00 40.0 90.1 0.026 1101 0

T5UW-T5UV HS1 0.035 1301 1.0 3.98 2.24 1.69 0.00 0.00 8.0 29.9 0.035 1201 0

T5UX-T255 HS1 0.037 1201 0.0 0.12 6.75 1.79 0.00 0.00 40.0 90.1 0.037 1101 0

T5UX-T5UW HS1 0.084 1301 0.0 4.98 -12.07 -2.25 0.00 0.01 8.0 29.9 0.083 1401 0

T5UY-T5UX HS1 0.155 1301 0.0 6.86 -25.90 -3.12 0.00 0.01 8.0 29.9 0.154 1401 0

T5UZ-T246 HS1 0.046 1401 0.0 2.27 6.93 -1.47 0.00 0.00 32.1 90.1 0.046 1301 0

T5UZ-T5UY HS1 0.158 1301 1.0 7.79 -26.94 -1.56 0.00 0.00 7.9 29.2 0.157 1401 0

T5V1-T241 HS1 0.084 1301 1.0 6.67 -9.20 -3.50 0.00 0.00 28.2 29.3 0.084 1201 0

T5V2-T298 HS1 0.090 1301 1.0 6.47 -12.29 -1.92 0.00 -0.01 28.2 29.3 0.090 1201 0

T5V3-T297 HS1 0.090 1301 1.0 5.30 -13.97 -1.36 0.00 -0.01 28.2 29.3 0.090 1201 0

T5V4-T296 HS1 0.100 1201 1.0 6.25 -10.92 -6.29 0.00 -0.01 28.2 29.3 0.099 1101 0

T5V5-T67E HS1 0.195 1101 0.0 18.55 -22.08 -2.74 0.00 0.01 28.2 19.8 0.194 1201 0

T5V6-T223 HS1 0.224 1101 0.0 5.70 -31.16 -16.83 0.00 0.03 28.2 29.3 0.224 1201 0

T5VJ-T316 HS1 0.133 1301 1.5 11.86 -12.28 -6.26 0.00 -0.01 56.5 44.8 0.133 1201 0

T5VK-T5V6 HS1 0.133 1201 2.0 7.28 -22.31 -0.48 0.00 -0.01 28.2 60.3 0.132 1101 0

T66J-T251 HS1 0.089 1201 0.0 3.95 11.52 5.47 0.00 0.00 7.9 29.3 0.081 1301 0

T66K-T252 HS1 0.106 1201 0.0 10.96 9.84 3.22 0.00 0.00 7.9 29.3 0.100 1301 0

T66L-T253 HS1 0.107 1201 0.0 12.39 11.03 0.56 0.00 0.00 7.9 29.3 0.104 1301 0

T66M-T254 HS1 0.133 1201 0.0 7.38 19.23 -4.32 0.00 -0.01 7.9 29.3 0.133 1301 0

T67D-T231 HS1 0.505 1201 0.0 3.47 -28.87 95.11 -0.04 0.03 1.9 7.2 0.486 1101 0

T67E-T236 HS1 0.296 1401 0.3 11.61 49.30 7.72 0.00 0.06 28.2 9.5 0.296 1301 0

T68T-T691 HS1 0.127 1401 1.1 0.07 -21.07 -8.71 0.00 -0.01 34.1 32.8 0.127 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T68T-T696 HS1 0.164 1401 2.0 0.20 34.12 4.02 0.00 0.01 56.5 60.3 0.164 1101 0

T68U-T697 HS1 0.189 1101 0.0 0.49 38.92 5.36 0.00 -0.01 28.2 15.5 0.189 1401 0

T68V-T68W HS1 0.326 1201 0.0 -5.09 39.32 0.58 0.00 -0.03 176.5 32.8 0.319 1101 0

T68W-T68X HS1 0.491 1201 1.0 -4.97 -69.54 12.64 0.00 -0.03 176.5 30.7 0.488 1101 0

T68Y-T68Z HS1 0.150 1201 1.2 -0.69 -6.60 -25.32 0.00 0.00 176.5 35.8 0.148 1101 0

T690-T695 HS1 0.129 1101 0.0 -0.76 13.08 -17.21 0.00 0.00 48.6 60.3 0.129 1201 0

T691-T692 HS1 0.099 1201 0.0 -0.58 -14.97 -8.34 0.00 0.01 34.1 30.7 0.098 1101 0

T692-T693 HS1 0.087 1401 0.0 -0.51 -1.93 19.21 0.00 0.00 34.1 41.8 0.087 1301 0

T693-T690 HS1 0.035 1201 0.0 -0.36 3.58 -4.24 0.00 0.00 34.1 35.8 0.035 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C70 of 116

T694-T6BM HS1 0.146 1201 1.0 -1.32 -29.89 -2.61 0.00 -0.01 48.6 30.2 0.145 1101 0

T695-T694 HS1 0.108 1101 2.0 -1.05 -15.29 9.15 0.00 -0.01 48.6 60.3 0.108 1201 0

T696-T68U HS1 0.190 1101 1.5 0.49 38.92 5.36 0.00 -0.01 56.5 44.8 0.190 1201 0

T696-T698 HS1 0.050 1401 1.1 0.05 -1.34 -11.61 0.00 0.00 59.9 32.8 0.050 1301 0

T697-T68V HS1 0.190 1201 0.0 0.43 31.65 13.92 0.00 -0.01 28.2 60.3 0.189 1101 0

T697-T699 HS1 0.039 1401 1.1 -0.34 7.45 -1.13 0.00 0.00 59.9 32.8 0.039 1101 0

T698-T69A HS1 0.054 1201 1.0 0.07 0.88 12.44 0.00 0.00 59.9 30.7 0.053 1301 0

T699-T69B HS1 0.076 1301 1.0 -0.50 -6.94 11.18 0.00 -0.01 59.9 30.7 0.075 1401 0

T69A-T69C HS1 0.091 1401 0.0 0.07 0.90 22.45 0.00 0.00 59.9 41.8 0.091 1301 0

T69B-T69D HS1 0.133 1401 0.0 -0.14 -7.04 27.14 0.00 0.00 59.9 41.8 0.133 1301 0

T69C-T695 HS1 0.068 1401 1.2 0.08 -0.01 -17.50 0.00 0.00 59.9 35.8 0.068 1301 0

T69D-T694 HS1 0.055 1401 1.2 0.09 -0.02 -14.38 0.00 0.00 59.9 35.8 0.054 1301 0

T69D-T6BN HS1 0.086 1201 0.0 -0.84 2.47 -18.79 0.00 0.00 8.1 30.2 0.086 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T6BM-T68Z HS1 0.303 1201 1.0 -1.73 -45.99 24.74 0.00 -0.01 48.6 30.2 0.302 1101 0

T6BN-T68Y HS1 0.104 1201 0.0 -0.63 3.56 -21.83 0.00 0.00 8.1 30.2 0.102 1101 0

T691-T698 HS2 0.194 1401 0.0 1.58 -39.24 -2.60 0.00 0.01 20.3 75.0 0.194 1301 0

T692-T69A HS2 0.123 1401 2.0 0.93 18.43 8.45 0.00 0.00 20.3 75.0 0.122 1101 0

T693-T69C HS2 0.129 1401 2.0 -0.67 10.98 18.39 0.00 0.00 20.3 75.0 0.128 1301 0

T698-T699 HS2 0.168 1301 1.0 0.76 37.30 0.04 0.00 0.00 20.3 75.1 0.168 1201 0

T699-T68W HS2 0.125 1201 0.0 0.45 14.50 14.92 0.00 0.00 20.3 75.0 0.124 1301 0

T69A-T69B HS2 0.160 1401 2.0 1.89 25.86 9.00 0.00 0.00 20.3 75.1 0.159 1301 0

T69B-T6BO HS2 0.203 1401 0.0 2.97 26.27 -18.43 0.00 -0.01 10.1 37.5 0.202 1301 0

T69C-T69D HS2 0.131 1401 0.0 -0.82 10.93 -19.48 0.00 0.00 20.3 75.1 0.130 1301 0

T6BN-T6BM HS2 0.120 1201 1.2 -0.86 -0.05 -28.96 0.00 0.00 12.0 44.6 0.120 1101 0

T6BO-T68X HS2 0.399 1201 1.0 3.24 -56.46 -34.68 0.00 -0.01 10.1 37.5 0.398 1301 0

T6BO-T6BN HS2 0.102 1401 1.4 -1.25 1.21 -22.71 0.00 0.00 14.0 52.0 0.099 1201 0

0068-0093 MP0 0.196 1401 1.1 -18.93 18.11 4.78 0.00 0.01 23.8 15.5 0.196 1301 0

0080-T5J0 MP0 0.385 1101 0.0 -31.14 -30.94 24.33 -0.03 0.09 19.9 21.8 0.382 1201 0

0082-0068 MP0 0.182 1401 0.0 -17.14 7.52 -15.92 0.01 0.03 23.8 15.5 0.181 1301 0

0093-0125 MP0 0.226 1301 1.1 -20.39 20.69 8.23 0.00 0.00 23.8 15.5 0.225 1401 0

0099-0446 MP0 0.268 1301 0.0 -24.18 23.24 11.16 -0.01 -0.02 23.8 11.3 0.267 1401 0

0100-T66T MP0 0.172 1101 0.0 -9.07 9.34 -2.09 0.00 0.23 19.9 70.6 0.168 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C71 of 116

0125-0099 MP0 0.240 1301 1.1 -22.01 20.67 10.75 0.00 -0.01 23.8 15.5 0.239 1401 0

0446-T677 MP0 0.264 1301 0.0 -27.43 24.44 3.89 -0.01 -0.02 23.8 12.7 0.263 1401 0

0450-0079 MP0 0.235 1401 0.5 -17.75 -16.00 -18.85 -0.02 -0.07 23.8 7.7 0.226 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0466-0467 MP0 0.056 1301 0.0 3.71 6.61 2.13 0.00 -0.03 23.8 11.3 0.047 1201 0

0467-0468 MP0 0.052 1401 0.0 -2.76 8.00 0.36 0.00 -0.03 23.8 17.7 0.048 1101 0

0468-0469 MP0 0.067 1401 0.0 -7.53 5.90 0.76 0.00 -0.04 23.8 17.7 0.053 1301 0

0469-0470 MP0 0.105 1401 0.9 -11.53 -8.60 -2.58 0.00 -0.06 23.8 12.7 0.099 1301 0

0470-0450 MP0 0.163 1401 0.7 -14.54 -12.96 -8.57 -0.01 -0.07 23.8 9.9 0.155 1301 0

0519-T64R MP0 0.067 1401 0.0 -0.59 13.17 -1.50 0.00 -0.01 19.9 70.6 0.067 1301 0

T5J0-T6AH MP0 0.242 1101 0.0 -30.76 -8.95 -10.61 0.01 0.04 19.9 42.4 0.239 1201 0

T639-T676 MP0 0.029 1401 0.0 -0.59 3.46 2.04 0.00 -0.03 19.9 70.6 0.029 1301 0

T642-T66U MP0 0.234 1101 1.0 -30.76 8.23 8.51 0.01 0.02 19.9 42.4 0.232 1201 0

T64R-T639 MP0 0.074 1401 0.0 -0.59 13.04 -1.34 0.00 -0.02 19.9 70.6 0.074 1301 0

T66T-0519 MP0 0.085 1401 0.0 -0.59 13.52 -3.57 0.00 0.00 19.9 70.6 0.084 1301 0

T66U-0100 MP0 0.455 1101 0.0 -4.91 10.38 9.26 0.01 0.60 19.9 42.4 0.455 1201 0

T676-0082 MP0 0.224 1101 0.0 -12.00 1.72 1.89 0.00 0.30 19.9 70.6 0.215 1201 0

T6AH-T6AJ MP0 0.218 1101 0.0 -30.76 -5.31 -7.15 0.01 0.04 19.9 42.4 0.216 1201 0

T6AJ-T642 MP0 0.191 1101 0.4 -30.76 3.26 2.03 0.01 0.03 19.9 42.4 0.190 1201 0

0018-0096 MP1 0.335 1401 0.5 -16.50 16.56 46.07 0.04 0.03 27.1 6.9 0.331 1301 0

0079-T62B MP1 0.129 1401 0.0 -10.31 -14.88 1.54 0.00 0.04 27.1 44.7 0.127 1301 0

0080-0393 MP1 0.383 1201 0.0 5.91 -56.23 29.97 -0.07 0.18 27.1 4.0 0.379 1101 0

0081-T5NV MP1 0.444 1401 0.0 -4.60 -74.13 -26.28 0.07 0.19 11.5 33.6 0.439 1301 0

0082-T68H MP1 0.396 1301 0.0 1.87 -60.68 -5.19 0.01 0.41 27.1 2.5 0.396 1401 0

0091-0199 MP1 0.160 1401 0.0 -14.55 -8.49 12.47 -0.01 0.04 28.3 15.1 0.157 1301 0

0096-T63J MP1 0.218 1401 0.0 -10.56 10.36 29.64 -0.02 -0.02 27.1 44.7 0.214 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0097-T67X MP1 0.135 1401 0.0 -3.48 2.40 -23.76 0.01 0.00 27.1 32.4 0.130 1301 0

0098-0443 MP1 0.178 1301 0.0 -12.94 11.73 14.78 -0.01 0.00 28.3 11.0 0.176 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C72 of 116

0102-0523 MP1 0.046 1201 0.0 -3.30 4.52 0.80 0.00 -0.01 12.1 68.8 0.045 1101 0

0103-0380 MP1 0.447 1101 0.0 -5.46 35.91 -68.48 0.04 -0.05 24.8 19.4 0.447 1201 0

0104-0372 MP1 0.213 1401 0.0 -1.20 44.54 3.65 0.00 -0.08 24.8 19.4 0.212 1301 0

0199-0200 MP1 0.132 1101 1.1 -15.27 9.30 -3.09 0.00 0.02 28.3 15.1 0.131 1201 0

0200-0201 MP1 0.148 1301 1.1 -13.99 11.97 5.19 0.01 0.01 28.3 15.1 0.146 1401 0

0201-0525 MP1 0.173 1301 0.7 -14.07 13.04 10.99 0.01 0.00 28.3 15.1 0.171 1401 0

0372-0373 MP1 0.105 1401 1.0 -2.71 -7.10 -4.93 0.00 -0.11 24.8 13.8 0.104 1101 0

0373-0374 MP1 0.203 1401 1.0 -3.56 -37.35 -6.60 0.00 -0.14 24.8 13.8 0.203 1101 0

0374-0375 MP1 0.343 1401 1.0 -2.36 -76.30 0.70 0.01 -0.16 24.8 13.8 0.343 1101 0

0375-0080 MP1 0.569 1101 0.5 0.31 -102.09 34.64 0.05 -0.18 24.8 7.5 0.566 1401 0

0380-0381 MP1 0.137 1301 0.0 -5.46 17.59 -7.92 0.01 -0.07 24.8 13.8 0.137 1401 0

0381-0382 MP1 0.132 1201 1.0 -5.35 -18.56 5.90 0.00 -0.09 24.8 13.8 0.132 1101 0

0382-0383 MP1 0.237 1201 1.0 -4.56 -41.43 9.51 0.00 -0.10 24.8 13.8 0.236 1101 0

0383-0100 MP1 0.393 1101 1.0 -3.68 -69.50 -19.74 -0.03 -0.12 24.8 13.8 0.393 1201 0

0390-0081 MP1 0.306 1301 0.3 21.39 -45.70 2.54 0.01 -0.12 27.1 4.0 0.301 1401 0

0392-T68J MP1 0.193 1101 0.4 -12.02 -26.59 -4.31 -0.02 -0.12 27.1 6.1 0.193 1201 0

0393-0407 MP1 0.227 1201 0.0 4.78 -42.90 5.20 -0.01 0.15 27.1 10.3 0.222 1101 0

0395-0425 MP1 0.193 1401 0.0 -11.47 -25.93 6.02 0.00 0.12 27.1 10.3 0.193 1301 0

0407-0408 MP1 0.119 1201 0.0 4.98 -17.77 -5.12 0.00 0.12 27.1 10.3 0.115 1101 0

0408-0409 MP1 0.142 1201 1.0 5.21 24.37 3.14 0.01 0.09 27.1 13.8 0.141 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0409-0410 MP1 0.144 1201 0.0 5.53 24.24 3.77 0.00 -0.03 27.1 17.2 0.144 1101 0

0410-T67P MP1 0.098 1201 0.0 6.21 14.14 -2.07 0.00 -0.07 27.1 14.0 0.095 1101 0

0412-0413 MP1 0.162 1301 1.2 15.82 17.65 3.21 0.00 0.04 27.1 17.2 0.160 1401 0

0413-0414 MP1 0.163 1301 0.0 16.82 16.57 3.16 0.00 -0.06 27.1 13.8 0.162 1401 0

0414-0415 MP1 0.167 1301 0.7 18.28 -15.33 -4.03 0.00 -0.09 27.1 10.3 0.164 1401 0

0415-0390 MP1 0.248 1301 0.7 19.71 -35.33 -1.13 0.00 -0.11 27.1 10.3 0.242 1401 0

0425-0426 MP1 0.126 1101 0.7 -11.67 12.85 2.22 -0.01 0.10 27.1 10.3 0.126 1201 0

0426-0427 MP1 0.288 1401 1.0 -12.23 33.68 -20.45 -0.02 0.09 27.1 13.8 0.287 1301 0

0427-0428 MP1 0.391 1301 0.0 -23.58 46.77 -17.75 0.01 -0.14 27.1 17.2 0.390 1401 0

0428-T68C MP1 0.308 1301 1.1 -23.25 -35.27 9.14 0.01 -0.16 27.1 15.4 0.307 1401 0

0429-T68B MP1 0.153 1401 0.0 0.55 -28.12 8.10 0.00 0.12 27.1 1.8 0.153 1301 0

0430-0431 MP1 0.159 1101 1.2 -0.79 31.73 -4.66 0.00 0.09 27.1 17.2 0.155 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C73 of 116

0431-0432 MP1 0.235 1101 0.0 -7.22 38.47 -8.09 0.01 -0.09 27.1 13.8 0.232 1201 0

0432-0433 MP1 0.136 1301 0.0 -9.64 19.58 -0.37 0.00 -0.09 27.1 10.3 0.136 1401 0

0433-0392 MP1 0.139 1101 0.7 -10.41 -16.13 4.20 0.00 -0.11 27.1 10.3 0.138 1201 0

0443-T67K MP1 0.134 1201 0.7 -13.93 7.30 -6.79 -0.01 -0.02 28.3 12.4 0.132 1101 0

0447-0078 MP1 0.119 1101 0.5 -12.53 -8.89 -3.45 0.00 -0.03 28.3 7.5 0.114 1401 0

0451-0452 MP1 0.140 1401 0.8 -22.46 4.09 -1.26 0.00 0.03 28.3 11.0 0.129 1301 0

0452-0453 MP1 0.129 1401 1.2 -19.08 6.45 0.34 0.00 0.02 28.3 17.2 0.124 1101 0

0453-0454 MP1 0.113 1101 1.2 -16.79 3.98 -2.13 0.00 0.00 28.3 17.2 0.108 1401 0

0454-0455 MP1 0.094 1101 0.0 -15.04 2.04 -2.06 0.00 -0.01 28.3 12.4 0.079 1401 0

0455-0447 MP1 0.104 1101 0.7 -13.80 -3.82 -4.14 0.00 -0.02 28.3 9.6 0.096 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0523-T6B0 MP1 0.035 1401 0.1 -3.15 -2.95 -0.23 0.00 -0.02 12.1 68.8 0.034 1101 0

0525-0098 MP1 0.185 1301 0.4 -14.07 13.17 14.43 0.01 0.00 28.3 15.1 0.183 1401 0

0528-T67W MP1 0.168 1401 0.0 -16.26 -1.03 -18.68 0.02 0.04 27.1 2.0 0.164 1301 0

T498-T6AO MP1 0.149 1401 0.0 -6.91 -21.05 -2.70 0.00 0.14 11.5 68.8 0.147 1301 0

T499-T6AL MP1 0.104 1201 0.0 -5.30 -15.83 1.94 0.00 0.08 12.1 27.5 0.102 1301 0

T59N-T5BE MP1 0.139 1101 0.5 -9.22 17.76 -0.25 0.00 0.12 11.5 68.8 0.138 1201 0

T5BC-T62M MP1 0.184 1101 0.7 -12.98 -6.36 -21.22 -0.02 -0.03 27.1 44.7 0.181 1401 0

T5BD-T63A MP1 0.096 1401 1.1 -10.31 4.46 -2.89 0.00 0.04 27.1 44.7 0.088 1301 0

T5BE-T62X MP1 0.179 1401 0.3 -8.60 26.98 1.41 0.00 0.12 11.5 68.8 0.178 1101 0

T5BP-0102 MP1 0.149 1401 1.5 -3.67 28.94 -0.94 0.00 0.06 12.1 35.2 0.149 1301 0

T5NR-T499 MP1 0.175 1401 0.0 -2.64 -30.52 0.24 0.00 0.18 11.5 27.5 0.169 1301 0

T5NV-T5NR MP1 0.254 1401 0.0 -4.22 -49.91 4.84 0.01 0.18 11.5 33.6 0.251 1301 0

T62B-T5BD MP1 0.118 1401 0.0 -10.31 -11.96 0.93 0.00 0.04 27.1 44.7 0.115 1301 0

T62M-0078 MP1 0.212 1401 0.3 -10.56 -8.20 -30.93 -0.02 -0.03 27.1 44.7 0.212 1101 0

T62X-0091 MP1 0.307 1401 0.9 -8.60 52.23 6.56 0.00 0.12 11.5 68.8 0.303 1301 0

T63A-0097 MP1 0.121 1401 0.7 -10.31 9.76 -4.29 0.00 0.03 27.1 44.7 0.114 1301 0

T63J-T5BC MP1 0.153 1101 0.0 -12.98 6.91 11.89 -0.02 -0.03 27.1 44.7 0.149 1401 0

T67O-0412 MP1 0.134 1401 0.0 15.45 -13.67 -0.76 0.00 0.08 27.1 14.0 0.133 1301 0

T67W-0018 MP1 0.221 1401 1.9 -16.50 13.51 19.90 0.02 0.03 27.1 25.5 0.216 1301 0

T67X-0528 MP1 0.249 1301 0.0 -15.69 -5.88 14.51 0.01 0.26 27.1 2.0 0.245 1401 0

T68B-0430 MP1 0.143 1101 0.0 -1.30 -25.75 6.30 -0.01 0.12 27.1 15.4 0.140 1201 0

T68C-0429 MP1 0.250 1301 0.0 -0.10 -29.38 9.35 0.01 0.26 27.1 1.8 0.247 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C74 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T68H-0395 MP1 0.255 1301 0.0 -11.46 -42.38 -4.14 0.01 0.13 27.1 7.8 0.255 1401 0

T68J-0091 MP1 0.256 1101 0.3 -9.12 -40.64 -9.22 -0.02 -0.19 27.1 4.2 0.255 1201 0

T6AL-T5BP MP1 0.077 1401 0.9 -5.74 8.40 2.40 0.00 0.07 12.1 27.5 0.075 1301 0

T6AO-T59N MP1 0.123 1401 0.0 -8.60 -3.95 -4.67 0.00 0.13 11.5 68.8 0.122 1301 0

T6B0-T498 MP1 0.055 1401 0.8 -3.15 -6.74 -1.16 0.00 -0.02 12.1 68.8 0.054 1101 0

0021-0436 MP2 0.136 1301 0.0 0.45 5.42 25.28 -0.01 -0.02 29.3 33.8 0.134 1401 0

0081-0368 MP2 0.236 1301 0.0 -4.99 -32.21 19.27 -0.02 0.06 27.7 7.3 0.235 1201 0

0083-0384 MP2 0.096 1201 0.0 3.17 3.26 17.79 -0.01 0.01 30.7 19.1 0.096 1101 0

0084-T432 MP2 0.065 1401 1.7 0.10 -12.72 2.68 0.00 -0.03 18.4 22.4 0.065 1301 0

0088-T5NT MP2 0.152 1301 0.0 8.01 -16.55 -11.24 0.01 0.04 5.9 13.5 0.150 1401 0

0094-0440 MP2 0.080 1301 0.0 1.10 -3.34 -14.97 0.01 0.02 29.3 33.8 0.076 1401 0

0094-0445 MP2 0.570 1301 0.0 -35.06 64.61 21.34 -0.02 0.02 64.4 10.8 0.569 1401 0

0100-0394 MP2 0.378 1201 0.0 -4.28 -77.39 -5.16 0.00 0.16 67.3 10.1 0.377 1101 0

0102-0369 MP2 0.158 1301 0.0 0.72 -35.03 1.24 0.00 0.04 52.3 13.5 0.158 1401 0

0105-T5NL MP2 0.042 1401 0.0 -0.02 -6.95 3.16 0.00 0.01 52.3 13.5 0.042 1301 0

0106-T433 MP2 0.097 1401 1.7 -1.41 -16.54 -4.46 0.00 -0.04 18.4 22.4 0.097 1301 0

0126-0127 MP2 0.264 1401 0.0 -27.87 -17.38 3.92 0.00 0.09 64.4 14.9 0.262 1301 0

0127-0128 MP2 0.378 1401 1.1 -30.94 41.62 -0.95 0.00 0.06 64.4 14.9 0.378 1301 0

0128-0094 MP2 0.517 1401 1.1 -34.63 64.28 5.62 0.00 0.05 64.4 14.9 0.516 1301 0

0196-0197 MP2 0.131 1301 1.1 10.12 18.99 0.28 0.00 0.06 70.3 14.9 0.126 1401 0

0197-0198 MP2 0.216 1301 1.1 15.91 28.97 -4.41 0.00 0.04 70.3 14.9 0.212 1401 0

0198-0436 MP2 0.290 1301 1.1 21.96 33.94 10.46 0.01 0.03 70.3 14.9 0.286 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0226-0465 MP2 0.291 1401 0.0 -10.25 32.11 23.26 -0.02 -0.02 64.4 8.8 0.286 1301 0

0227-0460 MP2 0.177 1301 0.0 5.18 22.00 15.48 -0.01 -0.03 70.3 8.8 0.171 1401 0

0229-0463 MP2 0.414 1401 0.0 -21.24 54.32 10.97 -0.01 0.00 64.4 9.5 0.412 1301 0

0230-0458 MP2 0.277 1301 0.0 13.50 33.02 19.12 -0.01 -0.02 70.3 9.5 0.272 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C75 of 116

0368-0088 MP2 0.131 1201 0.0 -2.60 -22.97 3.88 -0.01 0.06 27.7 16.9 0.130 1301 0

0369-0105 MP2 0.092 1401 0.0 -0.18 -20.38 0.75 0.00 0.03 52.3 19.1 0.092 1301 0

0370-0092 MP2 0.195 1201 0.8 -3.23 22.21 21.99 0.02 0.08 13.2 10.7 0.195 1101 0

0384-0385 MP2 0.051 1301 0.0 3.26 6.89 -1.61 0.00 0.00 30.7 13.5 0.051 1401 0

0385-0386 MP2 0.040 1301 0.0 3.20 5.08 0.53 0.00 -0.01 30.7 13.5 0.040 1401 0

0386-0387 MP2 0.060 1101 1.0 2.65 -6.86 3.33 0.00 -0.02 30.7 13.5 0.060 1201 0

0387-0082 MP2 0.183 1401 1.0 2.43 -18.43 -23.03 -0.02 -0.04 30.7 13.5 0.182 1301 0

0391-0102 MP2 0.192 1301 0.7 0.97 -39.01 5.27 0.01 -0.05 67.3 10.1 0.191 1401 0

0394-T64P MP2 0.198 1201 0.0 -4.47 -36.68 -3.09 0.01 0.13 67.3 10.1 0.197 1101 0

0400-T5O9 MP2 0.042 1101 1.7 -1.20 5.71 2.37 0.00 0.01 67.9 22.4 0.042 1201 0

0404-T5OC MP2 0.042 1401 1.7 -0.37 4.09 -5.31 0.00 0.00 67.9 22.4 0.041 1301 0

0409-T64H MP2 0.265 1101 0.0 -11.17 -39.79 -1.10 0.00 0.06 29.3 67.6 0.262 1201 0

0413-T64F MP2 0.239 1401 0.0 -5.91 -41.74 -1.13 0.00 0.04 29.3 67.6 0.237 1301 0

0416-0417 MP2 0.125 1301 0.0 -5.71 -17.31 3.42 0.00 0.04 67.3 10.1 0.125 1401 0

0417-0418 MP2 0.073 1401 0.0 -5.86 -6.72 1.01 0.00 0.03 67.3 13.5 0.073 1301 0

0418-0419 MP2 0.135 1301 1.2 -4.91 15.28 -9.01 -0.01 0.03 67.3 16.9 0.135 1401 0

0418-T64W MP2 0.190 1401 0.0 -16.98 10.16 -5.88 0.00 0.00 17.8 67.6 0.189 1301 0

0419-0420 MP2 0.122 1301 0.0 -3.89 14.24 -8.75 0.01 0.01 67.3 16.9 0.122 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0420-0421 MP2 0.104 1201 0.0 -2.71 16.68 4.00 0.00 -0.01 67.3 16.9 0.104 1101 0

0421-0422 MP2 0.061 1301 0.0 -1.83 10.69 0.36 0.00 -0.02 67.3 16.9 0.060 1401 0

0422-0423 MP2 0.049 1101 1.0 -1.14 -6.20 -3.76 -0.01 -0.02 67.3 13.5 0.048 1201 0

0422-T581 MP2 0.072 1101 0.0 -4.99 6.18 -2.48 0.00 0.00 17.8 67.6 0.069 1201 0

0423-0424 MP2 0.072 1101 0.7 -0.56 -13.54 -2.62 0.00 -0.03 67.3 10.1 0.071 1201 0

0424-0391 MP2 0.115 1301 0.7 0.39 -25.22 -1.35 0.00 -0.04 67.3 10.1 0.114 1401 0

0427-0126 MP2 0.469 1401 0.0 -25.31 -67.35 -9.45 0.01 0.13 64.4 14.9 0.467 1301 0

0431-0196 MP2 0.242 1101 0.0 -0.81 -47.04 9.08 -0.01 0.11 70.3 14.9 0.236 1301 0

0436-0444 MP2 0.358 1301 0.0 23.40 31.47 29.98 -0.03 0.01 70.3 10.8 0.352 1401 0

0437-0021 MP2 0.124 1301 0.7 0.45 5.42 25.28 0.02 -0.02 29.3 33.8 0.122 1401 0

0438-0437 MP2 0.166 1301 0.0 0.45 15.90 -24.02 0.02 -0.01 29.3 33.8 0.165 1401 0

0440-0438 MP2 0.094 1301 1.2 1.10 15.67 4.86 0.01 0.02 29.3 33.8 0.093 1401 0

0444-0456 MP2 0.262 1301 0.9 20.23 33.40 -5.93 -0.01 -0.01 70.3 12.2 0.258 1401 0

0445-0461 MP2 0.482 1401 0.9 -30.78 66.34 -1.40 0.00 0.00 64.4 12.2 0.481 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C76 of 116

0448-0096 MP2 0.100 1301 1.0 -1.23 -3.78 -19.54 -0.01 -0.05 70.3 13.5 0.098 1401 0

0449-0097 MP2 0.112 1301 1.0 -1.67 2.28 -22.47 -0.01 -0.03 64.4 13.5 0.111 1401 0

0456-0457 MP2 0.258 1301 0.0 16.86 36.86 -5.68 0.00 -0.01 70.3 10.8 0.254 1401 0

0457-0230 MP2 0.255 1401 0.5 11.88 33.74 -13.20 -0.01 -0.02 70.3 7.4 0.255 1301 0

0458-0459 MP2 0.205 1301 0.0 8.44 33.44 5.91 -0.01 -0.03 70.3 16.9 0.203 1401 0

0459-0227 MP2 0.194 1401 0.2 3.74 22.51 -19.98 -0.02 -0.04 70.3 3.4 0.191 1301 0

0460-0448 MP2 0.112 1301 0.0 2.04 18.21 6.39 -0.01 -0.04 70.3 9.5 0.111 1401 0

0461-0462 MP2 0.439 1401 0.8 -26.16 61.37 -5.72 0.00 0.00 64.4 10.8 0.437 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0462-0229 MP2 0.440 1301 0.5 -20.26 54.03 -18.83 -0.02 -0.01 64.4 7.4 0.437 1401 0

0463-0464 MP2 0.317 1401 0.0 -14.73 46.06 5.88 -0.01 -0.01 64.4 16.9 0.317 1301 0

0464-0226 MP2 0.252 1301 0.2 -9.09 31.70 -14.38 -0.01 -0.02 64.4 3.4 0.248 1401 0

0465-0449 MP2 0.160 1301 0.0 -6.01 23.79 5.12 -0.01 -0.02 64.4 9.5 0.159 1401 0

T330-0105 MP2 0.062 1401 0.0 5.10 7.48 -1.16 0.00 -0.01 20.5 20.3 0.062 1301 0

T432-T5IV MP2 0.262 1101 0.0 0.67 45.20 15.23 -0.02 -0.08 23.4 54.1 0.260 1401 0

T433-T5OF MP2 0.122 1301 0.0 3.54 -23.32 -1.62 0.00 0.05 19.0 10.1 0.121 1401 0

T433-T5X2 MP2 0.087 1401 0.0 -0.82 12.42 5.28 0.00 -0.06 23.4 8.0 0.087 1301 0

T500-T68P MP2 0.380 1101 0.2 -3.79 -13.05 -3.06 0.00 -0.29 30.7 3.3 0.380 1401 0

T581-T6AS MP2 0.056 1101 0.0 -4.99 4.15 0.82 0.00 -0.01 17.8 67.6 0.054 1201 0

T5BO-T330 MP2 0.020 1301 0.0 0.50 0.63 -3.68 0.00 0.00 13.2 16.9 0.020 1401 0

T5BP-T5BO MP2 0.026 1401 0.0 0.58 -0.77 4.95 -0.01 0.00 13.2 13.5 0.026 1301 0

T5IV-T6B3 MP2 0.333 1101 2.0 0.80 -74.63 1.35 0.00 -0.14 23.4 54.1 0.329 1201 0

T5NL-T5NM MP2 0.016 1101 0.0 0.01 -2.45 1.01 0.00 0.01 52.3 13.5 0.016 1201 0

T5NN-T5NM MP2 0.010 1301 1.7 0.14 1.71 0.57 0.00 0.00 20.5 47.3 0.010 1401 0

T5NO-T5NN MP2 0.015 1101 0.0 -0.01 -2.56 -0.89 0.00 0.01 52.3 13.5 0.015 1201 0

T5NP-T330 MP2 0.060 1301 2.0 6.65 5.83 -1.03 0.00 0.00 20.5 27.0 0.060 1401 0

T5NP-T5NO MP2 0.037 1101 0.0 0.02 -7.24 1.59 0.00 0.01 52.3 13.5 0.037 1401 0

T5NQ-T5NP MP2 0.045 1201 1.2 -0.46 -6.03 -4.08 0.00 -0.01 52.3 16.9 0.045 1101 0

T5NR-T5NQ MP2 0.050 1201 0.0 -0.88 -0.30 11.13 -0.01 0.00 52.3 13.5 0.050 1301 0

T5NT-T5NP MP2 0.079 1201 0.5 7.72 4.07 6.31 0.01 0.03 2.9 6.8 0.078 1301 0

T5O5-T68Q MP2 0.276 1201 0.2 -1.86 -6.86 6.56 -0.01 -0.21 14.6 2.9 0.275 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C77 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5O6-T432 MP2 0.152 1201 0.7 9.26 -20.58 5.46 0.01 -0.05 19.0 10.1 0.151 1101 0

T5O7-T5O6 MP2 0.104 1201 0.7 10.44 -9.25 -4.03 0.00 -0.03 19.0 10.1 0.103 1101 0

T5O8-T5O7 MP2 0.060 1201 0.0 10.37 2.30 0.38 0.00 -0.01 19.0 10.1 0.060 1101 0

T5O9-0409 MP2 0.258 1101 4.0 -6.24 -45.73 -0.22 0.00 -0.06 67.9 54.1 0.255 1201 0

T5O9-T5O8 MP2 0.063 1201 0.0 10.28 0.84 2.98 0.00 0.01 19.0 13.5 0.062 1101 0

T5OA-T5O9 MP2 0.095 1201 0.0 10.57 7.24 -3.37 0.00 -0.01 14.6 16.9 0.095 1101 0

T5OB-T68R MP2 0.090 1401 1.0 9.31 3.69 7.22 0.01 -0.01 14.6 14.0 0.090 1301 0

T5OC-0413 MP2 0.237 1401 4.0 -4.07 -44.19 -1.36 0.00 -0.06 23.4 54.1 0.235 1301 0

T5OC-T5OB MP2 0.085 1301 1.2 8.91 6.58 -3.40 0.00 0.02 14.6 16.9 0.085 1401 0

T5OD-T5OC MP2 0.056 1401 1.0 7.90 -0.27 4.57 0.00 0.00 19.0 13.5 0.056 1301 0

T5OE-T5OD MP2 0.058 1301 0.0 6.86 -4.82 -1.10 0.00 0.02 19.0 10.1 0.057 1401 0

T5OF-T5OE MP2 0.093 1301 0.0 5.52 -12.52 -3.35 0.00 0.04 19.0 10.1 0.092 1401 0

T5OG-T432 MP2 0.140 1401 1.0 6.29 -19.88 6.83 0.00 -0.03 30.7 13.5 0.140 1301 0

T5OH-T5OG MP2 0.057 1101 1.0 4.62 -7.00 1.04 0.00 -0.02 30.7 13.5 0.057 1201 0

T5OI-T5OH MP2 0.050 1101 0.0 4.97 5.56 -0.47 0.00 -0.01 30.7 13.5 0.050 1401 0

T5OJ-T5OI MP2 0.065 1401 0.0 7.05 6.19 -1.05 0.00 -0.01 30.7 13.5 0.064 1301 0

T5S7-T5S8 MP2 0.061 1401 0.3 -5.90 4.28 0.47 0.00 0.01 29.3 67.6 0.061 1301 0

T5S8-0422 MP2 0.080 1401 0.6 -5.91 8.13 0.71 0.00 0.02 29.3 67.6 0.080 1301 0

T5X2-T5X3 MP2 0.158 1401 1.3 -0.84 -31.16 -2.27 0.00 -0.07 23.4 18.1 0.157 1301 0

T5X3-0081 MP2 0.375 1401 1.6 -0.82 -75.46 -7.71 0.00 -0.08 23.4 21.8 0.373 1301 0

T631-0431 MP2 0.249 1101 0.9 -4.26 -42.59 5.11 0.00 -0.07 11.5 67.6 0.242 1201 0

T635-0427 MP2 0.487 1401 0.9 -18.80 -71.50 -6.69 -0.01 -0.10 11.5 67.6 0.486 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T63X-T631 MP2 0.133 1101 0.7 -4.26 -21.26 1.11 0.00 -0.06 11.5 67.6 0.128 1201 0

T64F-T5S7 MP2 0.202 1401 0.0 -5.91 -33.93 -0.93 0.00 0.04 29.3 67.6 0.199 1301 0

T64H-0418 MP2 0.147 1101 0.0 -11.12 -12.13 -1.23 0.00 0.02 29.3 67.6 0.145 1201 0

T64P-0416 MP2 0.171 1201 0.0 -4.47 -31.18 -1.94 0.01 0.06 67.3 10.1 0.170 1101 0

T64W-T6AW MP2 0.188 1401 0.9 -16.99 -11.35 4.46 0.00 -0.06 17.8 67.6 0.187 1301 0

T68I-0370 MP2 0.114 1401 0.0 -4.13 -13.57 -9.12 0.02 0.08 13.2 7.3 0.114 1301 0

T68P-T5OJ MP2 0.072 1401 0.0 11.48 1.01 -3.28 0.00 0.00 30.7 13.6 0.071 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C78 of 116

T68Q-T5OA MP2 0.099 1201 1.0 11.16 6.63 -4.00 -0.01 0.01 14.6 14.0 0.099 1101 0

T68R-T5O5 MP2 0.231 1301 0.0 -1.56 -5.42 6.72 0.01 0.18 14.6 2.9 0.230 1401 0

T6AS-T63X MP2 0.080 1101 0.4 -4.26 -5.84 -2.04 0.00 -0.06 11.5 67.6 0.079 1201 0

T6AW-T635 MP2 0.329 1401 1.1 -18.80 -42.11 1.05 -0.01 -0.09 11.5 67.6 0.327 1301 0

T6B3-0080 MP2 0.442 1101 0.5 0.80 -99.64 2.85 0.00 -0.14 23.4 54.1 0.436 1201 0

0017-0227 MP3 0.173 1301 0.5 -0.61 0.50 43.96 0.02 0.01 3.8 6.6 0.170 1401 0

0020-0230 MP3 0.158 1301 0.5 0.53 0.70 40.30 0.02 0.00 3.8 6.6 0.156 1401 0

0087-T500 MP3 0.067 1101 1.7 1.94 -11.26 2.33 0.00 -0.01 24.2 21.9 0.067 1201 0

0218-0020 MP3 0.186 1301 0.0 0.53 -10.64 -36.41 0.02 0.01 15.4 26.4 0.183 1401 0

0218-0221 MP3 0.287 1301 0.0 -0.95 34.77 34.72 -0.02 -0.01 58.5 29.0 0.285 1401 0

0221-0017 MP3 0.213 1301 0.0 -0.61 -14.94 -37.34 0.02 0.01 15.4 26.4 0.211 1401 0

0221-0528 MP3 0.406 1301 2.3 -0.85 -51.37 -47.27 -0.02 -0.05 58.5 31.0 0.401 1401 0

0226-0221 MP3 0.216 1301 2.5 -0.37 -14.95 39.21 0.02 -0.01 19.2 33.0 0.216 1401 0

0229-0218 MP3 0.167 1301 2.5 0.87 -10.66 30.77 0.02 -0.01 19.2 33.0 0.164 1401 0

0376-T5OJ MP3 0.025 1101 1.5 -1.00 -1.12 -3.59 0.00 0.00 11.5 19.8 0.024 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0438-T63S MP3 0.144 1301 0.0 -0.81 -0.44 36.50 -0.01 0.03 58.5 40.2 0.142 1401 0

T500-T5IP MP3 0.194 1301 0.0 2.35 -33.78 10.01 -0.01 0.08 7.7 13.2 0.193 1201 0

T5AM-0372 MP3 0.027 1101 1.2 -1.44 4.46 0.00 0.00 0.00 23.1 39.6 0.027 1401 0

T5AR-T5IR MP3 0.011 1101 0.4 -1.91 0.51 0.00 0.00 0.00 7.7 13.2 0.011 1201 0

T5IP-0104 MP3 0.067 1101 0.0 1.94 11.26 -1.38 0.00 0.00 23.1 39.6 0.066 1401 0

T5IR-T5AM MP3 0.022 1001 0.0 -1.42 0.00 0.00 0.00 0.01 23.1 39.6 0.022 1101 0

T5OJ-T5AR MP3 0.010 1101 0.1 -1.91 0.18 0.00 0.00 0.00 7.7 13.2 0.010 1201 0

T63S-0218 MP3 0.276 1301 2.2 -0.81 34.77 -32.46 -0.01 0.01 58.5 40.2 0.274 1401 0

T6AP-T6AO MP3 0.027 1401 0.0 -1.14 3.10 -1.60 0.00 -0.01 63.5 9.9 0.027 1301 0

T6AQ-T6AP MP3 0.044 1301 0.4 -2.63 4.81 -1.65 0.00 0.00 63.5 9.9 0.044 1401 0

T6AR-T6AQ MP3 0.060 1301 0.7 -4.06 6.35 -1.61 0.00 0.00 63.5 9.9 0.060 1401 0

T6AS-T6AR MP3 0.079 1101 0.0 -5.78 -9.21 0.58 0.00 0.03 63.5 13.2 0.078 1201 0

T6AT-T6AS MP3 0.101 1101 1.2 -5.50 -9.70 -6.05 0.00 -0.03 63.5 16.5 0.100 1201 0

T6AU-T6AT MP3 0.111 1401 0.0 -2.86 20.37 1.00 0.00 -0.02 63.5 16.5 0.111 1301 0

T6AV-T6AU MP3 0.122 1401 0.0 -2.03 22.64 3.12 0.00 0.00 63.5 16.5 0.122 1301 0

T6AW-T6AV MP3 0.127 1301 1.2 -1.84 22.43 4.40 0.01 0.03 63.5 16.5 0.127 1401 0

0112-0451 MP4 0.241 1201 0.1 -37.16 -5.51 -5.44 -0.01 -0.47 30.6 13.9 0.241 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C79 of 116

T67K-0112 MP4 0.146 1401 0.1 -16.22 5.72 -8.63 -0.02 0.18 30.6 13.9 0.143 1301 0

0111-0466 MP5 0.628 1301 0.1 -51.46 4.89 1.58 -0.02 -1.56 25.7 14.3 0.610 1401 0

T677-0111 MP5 0.176 1301 0.1 -7.37 13.43 -4.34 -0.01 -0.44 25.7 14.3 0.166 1401 0

0411-T67O MP6 0.195 1401 0.2 1.06 -19.70 -2.48 0.00 -0.40 29.4 3.5 0.192 1301 0

T67P-0411 MP6 0.048 1301 0.2 1.67 -3.35 -2.87 0.00 -0.10 29.4 3.5 0.044 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0091-T68I MP7 0.221 1101 0.0 -2.98 -27.77 -21.54 0.02 0.08 13.2 6.3 0.221 1201 0

0103-T5OY MS1 0.676 1301 0.0 2.62 77.47 -88.33 0.01 -0.02 16.0 29.9 0.676 1401 0

0126-0196 MS1 0.329 1401 2.5 -6.48 44.15 0.00 0.00 0.00 40.1 149.3 0.328 1301 0

0127-0143 MS1 0.147 1301 2.5 -1.99 24.28 0.00 0.00 0.00 40.1 149.3 0.147 1401 0

0128-0142 MS1 0.028 1301 2.5 0.29 6.34 0.00 0.00 0.00 40.1 149.3 0.028 1401 0

0140-0198 MS1 0.011 1301 0.0 0.29 2.28 0.00 0.00 0.00 40.1 149.3 0.011 1401 0

0141-0197 MS1 0.080 1301 0.0 -1.99 8.74 0.00 0.00 -0.01 40.1 149.3 0.080 1401 0

0142-0140 MS1 0.028 1301 0.0 0.29 6.34 0.00 0.00 0.00 40.1 149.3 0.028 1401 0

0143-0141 MS1 0.147 1301 0.0 -1.99 24.28 0.00 0.00 0.00 40.1 149.3 0.147 1401 0

0371-T5NS MS1 0.031 1401 1.5 1.51 2.31 -3.63 0.00 0.00 12.0 44.8 0.031 1301 0

0372-T5IW MS1 0.048 1101 1.0 -3.86 5.34 0.00 0.00 0.00 16.0 59.7 0.048 1401 0

0375-T5IZ MS1 0.120 1101 1.0 -14.65 6.83 0.00 0.00 0.00 16.0 59.7 0.120 1201 0

0379-T5OG MS1 0.026 1101 1.5 -0.01 3.09 -3.05 0.00 0.00 12.0 44.8 0.025 1201 0

0380-T6AK MS1 0.053 1201 0.8 3.40 7.76 -1.07 0.00 0.00 40.1 149.3 0.053 1101 0

0381-T587 MS1 0.063 1301 0.8 0.27 12.87 -1.87 0.00 0.01 40.1 149.3 0.063 1401 0

0382-T58D MS1 0.085 1401 1.6 -2.31 8.10 0.00 0.00 0.00 40.1 149.3 0.085 1101 0

0383-T64S MS1 0.260 1401 1.8 -4.93 34.42 1.67 0.00 0.01 40.1 149.3 0.259 1301 0

0390-T6AM MS1 0.085 1101 2.6 -1.49 10.81 1.72 0.00 0.00 40.1 149.3 0.082 1201 0

0391-T6B1 MS1 0.090 1101 1.8 -3.20 3.46 -1.47 0.00 0.00 24.4 149.3 0.088 1201 0

0393-T5A3 MS1 0.321 1101 1.6 -18.95 47.14 0.47 0.00 0.01 40.1 59.7 0.320 1201 0

0394-T6AZ MS1 0.086 1401 3.0 -5.19 9.53 0.00 0.00 0.00 24.4 90.7 0.085 1301 0

0402-T5O5 MS1 0.310 1401 1.5 -1.78 -68.13 -2.22 0.00 -0.03 12.0 44.8 0.309 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C80 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0411-0420 MS1 0.120 1101 2.5 -3.52 10.35 0.00 0.00 0.00 40.1 149.3 0.119 1401 0

0415-T5S5 MS1 0.081 1101 2.0 -2.20 7.79 0.08 0.00 0.00 40.1 149.3 0.079 1201 0

0420-T5SJ MS1 0.123 1401 1.9 -0.52 26.01 0.08 0.00 0.01 24.4 149.3 0.121 1101 0

0423-T5SH MS1 0.120 1101 1.9 -2.76 13.94 0.32 0.00 0.00 24.4 149.3 0.117 1201 0

0424-T580 MS1 0.070 1101 2.4 -2.46 3.63 0.25 0.00 0.00 24.4 149.3 0.068 1201 0

T580-T6AQ MS1 0.070 1101 0.0 -2.46 3.63 0.25 0.00 0.00 24.4 149.3 0.068 1201 0

T584-0391 MS1 0.063 1101 0.0 -1.49 5.71 -1.66 0.00 0.00 40.1 149.3 0.060 1201 0

T587-T58A MS1 0.119 1301 0.9 0.27 24.75 -3.26 0.00 0.01 40.1 149.3 0.119 1401 0

T588-T5SV MS1 0.086 1301 0.0 1.01 18.86 0.06 0.00 -0.01 40.1 149.3 0.086 1401 0

T589-0385 MS1 0.076 1101 0.0 0.54 13.39 3.46 0.00 0.00 40.1 149.3 0.076 1201 0

T58A-T5ST MS1 0.132 1301 0.2 0.27 27.42 -3.61 0.00 0.01 40.1 149.3 0.132 1401 0

T58B-0386 MS1 0.086 1401 0.0 -2.31 8.54 0.00 0.00 0.00 40.1 149.3 0.086 1101 0

T58C-T59O MS1 0.141 1301 0.0 3.05 26.63 3.48 0.00 -0.01 40.1 149.3 0.141 1201 0

T58D-T58B MS1 0.089 1401 0.8 -2.31 9.15 0.00 0.00 0.00 40.1 149.3 0.089 1101 0

T58E-T5SU MS1 0.093 1201 0.2 3.40 14.96 -3.40 0.00 0.00 40.1 149.3 0.093 1101 0

T59O-0384 MS1 0.133 1301 0.0 3.05 24.36 3.12 0.00 -0.01 40.1 149.3 0.133 1201 0

T5A0-T584 MS1 0.073 1101 0.0 -1.49 7.52 -2.38 0.00 0.00 40.1 149.3 0.071 1201 0

T5A1-0394 MS1 0.245 1101 0.0 -18.88 29.42 -0.50 0.00 -0.01 40.1 59.7 0.245 1201 0

T5A3-T64L MS1 0.377 1101 0.6 -18.95 60.24 0.63 0.00 0.01 40.1 59.7 0.377 1201 0

T5AL-T6B2 MS1 0.084 1101 0.7 2.84 15.33 -1.29 0.00 0.00 24.1 89.6 0.083 1201 0

T5AN-T643 MS1 0.153 1101 0.0 -16.31 5.40 -1.83 0.00 0.00 24.1 80.6 0.153 1201 0

T5AO-T663 MS1 0.050 1401 0.0 -4.80 4.13 0.42 0.00 0.00 24.1 53.7 0.050 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5AQ-T5IU MS1 0.019 1101 0.4 2.46 1.68 0.00 0.00 0.00 8.0 29.9 0.019 1201 0

T5AS-T6AI MS1 0.136 1101 0.2 -16.31 2.91 0.02 0.00 0.00 24.1 80.6 0.135 1201 0

T5AT-T662 MS1 0.040 1401 0.4 -4.88 3.33 0.01 0.00 0.00 24.1 21.8 0.040 1101 0

T5IQ-T5OV MS1 0.242 1201 0.6 5.64 45.35 5.36 0.00 0.00 5.2 89.6 0.240 1101 0

T5IU-T5AL MS1 0.059 1101 0.6 2.84 10.08 -0.60 0.00 0.01 24.1 89.6 0.058 1201 0

T5IW-T5AT MS1 0.033 1401 0.3 -4.88 1.69 0.01 0.00 0.00 24.1 21.8 0.033 1101 0

T5IZ-T5AS MS1 0.131 1101 0.3 -16.31 1.85 0.01 0.00 0.00 24.1 80.6 0.130 1201 0

T5NS-0368 MS1 0.059 1301 2.0 6.99 6.24 0.00 0.00 0.00 32.1 119.4 0.059 1401 0

T5O5-0411 MS1 0.162 1201 2.0 -0.11 37.50 0.00 0.00 0.00 32.1 119.4 0.161 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C81 of 116

T5OG-T5AQ MS1 0.014 1101 0.1 2.46 0.59 0.00 0.00 0.00 8.0 29.9 0.014 1201 0

T5OU-T5OW MS1 0.060 1101 0.0 0.90 -9.61 3.93 0.00 0.01 13.2 35.1 0.060 1201 0

T5OV-T5OX MS1 0.134 1301 1.2 6.34 13.29 -12.67 0.00 0.00 18.9 89.6 0.133 1201 0

T5OV-T5OZ MS1 0.046 1201 0.0 0.48 -5.05 5.88 0.00 0.00 16.0 29.9 0.046 1101 0

T5OW-T5UN MS1 0.051 1101 0.5 0.46 8.78 -2.76 0.00 0.00 13.2 35.2 0.051 1201 0

T5OX-0103 MS1 0.332 1301 1.2 6.07 10.22 68.12 0.01 0.00 18.9 89.6 0.331 1201 0

T5OX-T5P0 MS1 0.054 1401 0.0 -3.22 1.77 7.56 0.00 0.00 16.0 29.9 0.054 1301 0

T5OY-T5OT MS1 0.232 1301 0.0 0.97 35.57 20.08 0.00 -0.02 16.0 29.9 0.232 1401 0

T5OZ-T5OU MS1 0.043 1101 1.0 0.44 3.63 -6.61 0.00 0.00 16.0 29.9 0.042 1201 0

T5P0-T5OW MS1 0.032 1401 0.0 -1.58 5.23 -0.26 0.00 0.00 16.0 29.9 0.032 1301 0

T5S5-T5S6 MS1 0.088 1101 0.3 -2.21 9.42 -0.02 0.00 0.01 40.1 149.3 0.086 1201 0

T5S6-0424 MS1 0.088 1101 0.0 -2.20 9.43 -0.02 0.00 -0.01 40.1 149.3 0.085 1201 0

T5SH-T5SI MS1 0.120 1101 0.0 -2.75 13.95 0.32 0.00 -0.01 24.4 149.3 0.117 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5SI-T6AR MS1 0.097 1101 0.7 -2.76 -8.28 0.42 0.00 -0.01 24.4 149.3 0.092 1201 0

T5SJ-T5SK MS1 0.131 1401 0.4 -0.56 27.86 0.09 0.00 0.00 24.4 149.3 0.129 1301 0

T5SK-T6AU MS1 0.131 1401 0.0 -0.52 27.92 0.09 0.00 -0.01 24.4 149.3 0.129 1301 0

T5ST-T588 MS1 0.124 1301 0.0 1.01 24.15 -4.30 0.00 -0.01 40.1 149.3 0.124 1401 0

T5SU-T5SW MS1 0.144 1301 1.1 3.75 25.79 4.33 0.00 0.01 40.1 149.3 0.144 1401 0

T5SV-T589 MS1 0.079 1101 0.0 0.54 14.32 3.88 0.00 0.00 40.1 149.3 0.079 1201 0

T5SW-T58C MS1 0.154 1301 0.0 3.05 29.10 3.90 0.00 -0.01 40.1 149.3 0.154 1401 0

T5UN-T5OT MS1 0.025 1201 0.0 0.87 1.57 3.43 0.00 0.00 5.6 35.2 0.025 1101 0

T62Y-0392 MS1 0.145 1101 0.0 -5.87 4.01 -0.26 0.00 0.00 15.7 149.3 0.145 1201 0

T62Z-0433 MS1 0.039 1101 0.0 -1.09 3.17 -0.54 0.00 0.00 15.7 149.3 0.039 1201 0

T630-0432 MS1 0.040 1101 0.0 -1.56 -0.90 -0.53 0.00 0.00 15.7 149.3 0.036 1201 0

T633-0429 MS1 0.052 1301 0.0 0.87 11.02 -0.32 0.00 0.00 15.7 149.3 0.052 1401 0

T637-0395 MS1 0.059 1401 0.0 -5.19 7.31 0.00 0.00 0.00 7.2 26.9 0.059 1301 0

T63T-T6AP MS1 0.081 1101 0.6 -3.20 -0.77 1.95 0.00 0.00 24.4 149.3 0.079 1201 0

T63U-T62Y MS1 0.145 1101 0.7 -5.87 4.01 -0.26 0.00 0.00 15.7 149.3 0.145 1201 0

T63V-T630 MS1 0.066 1101 0.0 -1.56 -6.64 -0.99 0.00 0.00 15.7 149.3 0.062 1201 0

T63W-T62Z MS1 0.039 1101 0.7 -1.09 3.17 -0.54 0.00 0.00 15.7 149.3 0.039 1201 0

T640-T633 MS1 0.063 1301 0.0 0.87 13.29 -0.56 0.00 0.00 15.7 149.3 0.063 1401 0

T643-0383 MS1 0.152 1101 0.0 -16.31 5.45 -1.34 0.00 0.00 24.1 80.6 0.151 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C82 of 116

T64L-T5A1 MS1 0.381 1101 0.0 -18.88 60.33 -1.29 0.00 -0.01 40.1 59.7 0.380 1201 0

T64S-0387 MS1 0.265 1401 0.0 -4.93 34.41 1.66 0.00 0.00 40.1 149.3 0.265 1301 0

T662-T5AO MS1 0.050 1401 0.8 -4.80 4.13 0.42 0.00 0.00 24.1 53.7 0.050 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T663-0380 MS1 0.055 1401 0.0 -4.88 2.37 0.96 0.00 0.00 24.1 89.6 0.055 1101 0

T6AI-T5AN MS1 0.154 1101 1.0 -16.31 5.40 -1.83 0.00 0.00 24.1 80.6 0.153 1201 0

T6AK-T58E MS1 0.086 1201 0.9 3.40 13.80 -2.93 0.00 0.00 40.1 149.3 0.086 1101 0

T6AM-T6AN MS1 0.087 1101 0.0 -1.49 10.81 1.72 0.00 0.00 40.1 149.3 0.084 1201 0

T6AN-T5A0 MS1 0.084 1101 0.0 -1.49 9.20 -3.25 0.00 0.00 40.1 149.3 0.081 1201 0

T6AP-T63U MS1 0.141 1101 0.4 -5.87 2.84 -0.46 0.00 0.00 15.7 149.3 0.140 1201 0

T6AQ-T63W MS1 0.034 1101 0.4 -1.09 1.71 -0.97 0.00 0.00 15.7 149.3 0.034 1201 0

T6AR-T63V MS1 0.077 1101 0.0 -1.56 -9.24 -1.16 0.00 0.01 15.7 149.3 0.073 1201 0

T6AU-T640 MS1 0.065 1301 0.0 0.87 13.64 -0.69 0.00 0.00 15.7 149.3 0.064 1401 0

T6AZ-T637 MS1 0.069 1401 0.0 -5.19 9.53 0.00 0.00 0.00 8.5 31.7 0.069 1301 0

T6B1-T63T MS1 0.090 1101 0.0 -3.20 3.46 -1.47 0.00 0.00 24.4 149.3 0.089 1201 0

T6B2-0375 MS1 0.080 1101 0.0 2.84 13.71 -1.97 0.00 0.00 24.1 89.6 0.080 1201 0

0084-0388 MS2 0.060 1201 0.0 6.69 -5.54 1.41 0.00 0.01 25.0 9.9 0.060 1101 0

0087-0376 MS2 0.027 1201 1.2 2.02 2.78 1.10 0.00 0.00 40.4 16.5 0.027 1101 0

0105-0092 MS2 0.078 1401 0.0 4.55 9.84 -3.20 0.00 0.00 38.5 66.0 0.078 1301 0

0106-0371 MS2 0.102 1401 0.0 2.51 -17.46 -4.06 0.00 0.02 36.4 13.2 0.102 1301 0

0371-0090 MS2 0.045 1401 0.0 0.79 -7.57 2.19 0.00 0.01 36.4 18.6 0.045 1301 0

0376-0377 MS2 0.034 1101 1.0 4.28 2.88 -0.23 0.00 0.00 40.4 13.2 0.034 1201 0

0377-0378 MS2 0.037 1101 1.0 5.36 2.20 -0.27 0.00 0.00 40.4 13.2 0.037 1201 0

0378-0379 MS2 0.038 1101 0.0 6.03 1.60 -0.50 0.00 0.00 40.4 13.2 0.038 1201 0

0379-0084 MS2 0.058 1201 1.0 6.37 -5.36 1.14 0.00 -0.01 40.4 13.2 0.058 1101 0

0388-0398 MS2 0.050 1201 0.0 7.43 -1.45 2.20 0.00 0.01 25.0 9.9 0.049 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0389-0106 MS2 0.098 1401 0.7 3.31 -17.73 1.45 0.00 -0.02 25.0 9.9 0.098 1301 0

0398-0399 MS2 0.058 1101 0.7 8.55 3.95 -0.15 0.00 0.01 25.0 9.9 0.058 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C83 of 116

0399-0400 MS2 0.075 1101 1.0 9.61 5.16 -2.10 0.00 0.00 25.0 13.2 0.075 1201 0

0400-0401 MS2 0.070 1101 0.0 9.25 5.69 0.42 0.00 -0.01 38.5 16.5 0.070 1201 0

0401-0402 MS2 0.088 1101 1.2 7.30 -9.91 -2.96 0.00 -0.01 38.5 16.5 0.087 1401 0

0402-0403 MS2 0.077 1401 0.0 5.78 -8.80 -3.27 0.00 0.01 38.5 16.5 0.076 1101 0

0403-0404 MS2 0.047 1101 1.2 5.33 2.27 2.90 0.00 0.00 38.5 16.5 0.047 1401 0

0404-0405 MS2 0.043 1101 0.0 4.47 2.58 -2.58 0.00 -0.01 25.0 13.2 0.042 1401 0

0405-0406 MS2 0.045 1301 0.7 3.75 -5.44 0.84 0.00 -0.01 25.0 9.9 0.045 1401 0

0406-0389 MS2 0.067 1401 0.7 3.29 -10.68 1.38 0.00 -0.01 25.0 9.9 0.067 1301 0

T433-T5NS MS2 0.217 1301 0.0 2.17 -41.11 -7.95 0.01 0.04 42.8 13.2 0.217 1401 0

T5B5-T5LQ MS2 0.129 1201 0.4 -1.31 23.02 3.16 0.02 0.04 42.8 5.3 0.128 1101 0

T5IP-T5J2 MS2 0.083 1201 0.0 -1.11 -9.21 6.04 -0.01 0.04 91.6 5.3 0.082 1301 0

T5IQ-T5J3 MS2 0.070 1201 0.4 0.85 11.69 3.30 0.01 0.00 91.6 5.3 0.070 1101 0

T5IR-T5IP MS2 0.091 1201 1.2 2.02 -11.61 8.12 0.00 -0.04 91.6 16.5 0.090 1101 0

T5IS-T5IR MS2 0.151 1101 0.0 6.84 25.97 2.06 0.00 -0.02 91.6 13.2 0.151 1401 0

T5IT-T5IS MS2 0.155 1101 1.0 9.63 23.49 2.10 0.00 0.00 91.6 13.2 0.155 1401 0

T5IU-T5IT MS2 0.158 1401 1.0 8.54 24.86 1.83 0.00 0.02 91.6 13.2 0.158 1101 0

T5IV-T5IU MS2 0.103 1101 1.0 3.06 17.40 -3.41 0.00 0.04 91.6 13.2 0.103 1201 0

T5IW-T5IQ MS2 0.136 1201 0.0 0.78 27.44 3.77 0.00 -0.02 91.6 16.5 0.136 1101 0

T5IX-T5IW MS2 0.152 1201 0.0 1.94 31.70 1.29 0.00 -0.01 91.6 13.2 0.152 1101 0

T5IY-T5IX MS2 0.153 1201 1.0 2.73 31.00 1.49 0.00 0.01 91.6 13.2 0.153 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5IZ-T5IY MS2 0.128 1101 1.0 0.78 28.45 0.15 0.00 0.02 91.6 13.2 0.128 1401 0

T5J0-T5IZ MS2 0.106 1201 1.0 -2.15 17.46 2.45 0.01 0.04 91.6 13.2 0.106 1101 0

T5NS-T5B5 MS2 0.101 1301 1.2 0.57 10.92 -13.33 -0.01 0.03 42.8 16.5 0.100 1401 0

T5NT-T5LR MS2 0.081 1201 0.0 -3.14 7.48 5.93 -0.01 0.02 42.8 5.3 0.079 1301 0

T5NU-T5NT MS2 0.061 1301 1.2 -1.42 6.52 -6.28 0.00 0.01 42.8 16.5 0.061 1401 0

T5NV-T5NU MS2 0.110 1201 0.0 -2.60 -5.44 18.69 -0.01 0.01 42.8 13.2 0.108 1101 0

0017-0020 MS3 0.036 1301 1.1 6.98 0.76 0.00 0.00 0.00 22.1 81.7 0.036 1401 0

0018-0017 MS3 0.034 1301 1.2 6.33 0.86 0.00 0.00 0.00 23.6 87.3 0.033 1401 0

0020-0021 MS3 0.039 1301 1.5 6.83 1.45 0.00 0.00 0.00 30.6 113.3 0.038 1401 0

0022-0455 MS3 0.052 1301 1.0 1.20 10.78 0.00 0.00 0.00 32.6 120.7 0.051 1101 0

0038-0454 MS3 0.039 1101 1.0 -0.91 6.10 0.00 0.00 0.00 32.6 120.7 0.036 1401 0

0039-0453 MS3 0.038 1301 1.0 1.96 6.73 0.00 0.00 0.00 32.6 120.7 0.037 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C84 of 116

0050-0452 MS3 0.028 1301 1.0 0.56 5.91 0.00 0.00 0.00 32.6 120.7 0.027 1201 0

0051-0451 MS3 0.037 1301 1.0 2.84 5.54 0.00 0.00 0.00 32.6 120.7 0.036 1401 0

0060-0443 MS3 0.069 1301 1.0 9.88 5.28 0.00 0.00 0.00 32.6 120.7 0.068 1401 0

0068-T59Z MS3 0.184 1101 0.7 -6.60 21.31 0.00 0.00 0.01 32.6 120.7 0.184 1201 0

0090-T5B5 MS3 0.141 1301 1.5 3.70 22.58 -7.18 0.00 0.00 15.0 55.7 0.140 1401 0

0093-T62L MS3 0.094 1101 0.7 -2.74 12.91 0.00 0.00 0.00 32.6 120.7 0.093 1201 0

0099-T62J MS3 0.198 1401 0.7 -12.67 5.19 0.00 0.00 0.00 32.6 120.7 0.198 1301 0

0104-T5IQ MS3 0.492 1101 0.0 6.20 -104.68 -3.54 0.00 0.03 20.1 74.3 0.491 1201 0

0118-0098 MS3 0.116 1301 1.0 19.93 5.30 0.00 0.00 0.00 32.6 120.7 0.114 1401 0

0125-T62K MS3 0.060 1401 0.7 -2.58 5.51 0.00 0.00 0.00 32.6 120.7 0.059 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0135-0201 MS3 0.067 1401 1.0 -3.10 5.51 0.00 0.00 0.00 32.6 120.7 0.067 1301 0

0139-0200 MS3 0.153 1301 0.0 -6.12 15.68 0.00 0.00 0.00 32.6 120.7 0.153 1401 0

0196-0199 MS3 0.365 1301 1.6 -8.80 30.02 0.00 0.00 0.00 32.6 120.7 0.365 1401 0

0197-0139 MS3 0.153 1301 1.2 -6.12 15.68 0.00 0.00 0.00 32.6 120.7 0.153 1401 0

0198-0135 MS3 0.062 1401 1.2 -3.10 4.28 0.00 0.00 0.00 32.6 120.7 0.061 1301 0

0368-T5NU MS3 0.070 1301 1.0 7.90 2.58 5.92 0.00 0.00 10.0 37.1 0.070 1401 0

0369-0370 MS3 0.177 1101 2.5 -3.33 15.29 0.00 0.00 0.00 50.1 185.7 0.175 1201 0

0373-T5IX MS3 0.089 1401 1.0 -3.33 15.26 0.00 0.00 0.00 20.1 74.3 0.088 1301 0

0374-T5IY MS3 0.113 1101 1.0 -6.82 15.26 0.00 0.00 0.00 20.1 74.3 0.113 1201 0

0377-T5OI MS3 0.023 1101 1.5 -1.21 1.14 -2.43 0.00 0.00 15.0 55.7 0.023 1201 0

0378-T5OH MS3 0.031 1101 1.5 -1.23 2.78 -2.73 0.00 0.00 15.0 55.7 0.031 1401 0

0388-T5O6 MS3 0.048 1101 1.5 2.39 -7.88 0.72 0.00 0.00 15.0 55.7 0.047 1201 0

0389-T5OF MS3 0.030 1301 0.0 2.24 -1.75 2.80 0.00 0.00 15.0 55.7 0.030 1201 0

0398-T5O7 MS3 0.020 1201 1.5 0.26 -1.97 2.61 0.00 0.00 15.0 55.7 0.020 1101 0

0399-T5O8 MS3 0.026 1101 1.5 -1.40 -1.53 2.81 0.00 0.00 15.0 55.7 0.026 1201 0

0401-T5OA MS3 0.051 1101 1.5 1.36 -8.05 2.67 0.00 0.00 15.0 55.7 0.051 1201 0

0403-T5OB MS3 0.067 1401 1.5 2.90 -7.12 -5.76 0.00 0.00 15.0 55.7 0.066 1301 0

0405-T5OD MS3 0.024 1301 1.5 0.41 -0.83 -4.66 0.00 0.00 15.0 55.7 0.024 1401 0

0406-T5OE MS3 0.031 1301 0.0 1.72 -1.54 3.85 0.00 0.00 15.0 55.7 0.030 1401 0

0407-T64M MS3 0.280 1401 2.2 -12.30 43.96 1.35 0.00 0.00 50.1 74.3 0.279 1301 0

0408-T5A4 MS3 0.391 1401 1.6 -9.55 19.25 0.00 0.00 0.00 50.1 185.7 0.390 1301 0

0410-T64I MS3 0.448 1401 1.4 -6.12 60.99 4.62 0.00 0.01 50.1 185.7 0.447 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C85 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0412-0421 MS3 0.134 1101 2.5 -1.91 16.31 0.00 0.00 0.00 50.1 185.7 0.131 1201 0

0414-T585 MS3 0.101 1101 2.1 -1.31 13.26 0.00 0.00 0.00 50.1 185.7 0.098 1201 0

0416-T6AY MS3 0.156 1401 3.0 -7.44 14.97 0.00 0.00 0.00 30.5 112.9 0.155 1301 0

0417-T6AX MS3 0.192 1401 3.0 -9.84 16.49 0.00 0.00 0.00 30.5 112.9 0.191 1301 0

0419-T64X MS3 0.378 1401 2.1 -5.88 45.28 3.52 0.00 0.01 30.5 185.7 0.374 1301 0

0421-T63Y MS3 0.159 1101 2.4 -3.48 9.30 0.85 0.00 0.00 30.5 185.7 0.152 1201 0

0436-0118 MS3 0.113 1301 1.2 19.93 4.52 0.00 0.00 0.00 32.6 120.7 0.110 1401 0

0444-0060 MS3 0.067 1301 1.2 9.88 4.91 0.00 0.00 0.00 32.6 120.7 0.066 1401 0

0446-T62I MS3 0.107 1301 0.7 -6.07 5.07 0.00 0.00 0.00 32.6 120.7 0.107 1401 0

0448-TTTU MS3 0.070 1101 1.2 -3.45 4.91 0.00 0.00 0.00 32.6 120.7 0.063 1201 0

0450-T62C MS3 0.070 1401 0.7 -3.41 5.07 0.00 0.00 0.00 32.6 120.7 0.063 1301 0

0456-0051 MS3 0.035 1301 1.2 2.84 5.05 0.00 0.00 0.00 32.6 120.7 0.034 1401 0

0457-0050 MS3 0.026 1301 1.2 0.56 5.42 0.00 0.00 0.00 32.6 120.7 0.025 1201 0

0458-0039 MS3 0.035 1301 1.2 1.96 6.07 0.00 0.00 0.00 32.6 120.7 0.034 1401 0

0459-0038 MS3 0.037 1101 1.2 -0.91 5.56 0.00 0.00 0.00 32.6 120.7 0.034 1401 0

0460-0022 MS3 0.043 1301 1.2 1.20 8.78 0.00 0.00 0.00 32.6 120.7 0.043 1101 0

0466-T62H MS3 0.025 1401 0.7 -0.23 5.07 0.00 0.00 0.00 32.6 120.7 0.024 1301 0

0467-T62G MS3 0.036 1301 0.7 2.49 5.73 0.00 0.00 0.00 32.6 120.7 0.035 1401 0

0468-T62F MS3 0.030 1401 0.7 -0.10 6.59 0.00 0.00 0.00 32.6 120.7 0.030 1201 0

0469-T62E MS3 0.042 1401 0.7 -1.15 5.92 0.00 0.00 0.00 32.6 120.7 0.041 1101 0

0470-T62D MS3 0.074 1401 0.7 -3.77 4.88 0.00 0.00 0.00 32.6 120.7 0.069 1301 0

T585-0423 MS3 0.076 1101 0.0 -1.31 7.49 0.00 0.00 0.00 50.1 185.7 0.073 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T59Z-0126 MS3 0.215 1101 1.2 -6.60 28.42 0.00 0.00 0.00 32.6 120.7 0.214 1201 0

T5A4-T5A5 MS3 0.398 1401 1.1 -9.55 20.96 0.00 0.00 0.00 50.1 185.7 0.396 1301 0

T5A5-0417 MS3 0.378 1401 0.0 -9.55 15.68 0.00 0.00 0.00 50.1 185.7 0.377 1301 0

T5B5-0088 MS3 0.421 1401 4.0 13.65 -81.19 -2.63 0.00 -0.01 40.1 148.6 0.420 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C86 of 116

T5BO-0369 MS3 0.026 1401 0.7 -3.36 1.38 0.00 0.00 0.00 15.0 55.7 0.026 1101 0

T5IS-0373 MS3 0.158 1401 1.5 -0.95 34.34 0.00 0.00 0.00 30.1 111.4 0.158 1301 0

T5IT-0374 MS3 0.148 1101 1.5 0.27 34.34 0.00 0.00 0.00 30.1 111.4 0.148 1201 0

T5IX-T664 MS3 0.042 1401 0.7 -3.18 5.92 0.13 0.00 0.00 30.1 27.1 0.042 1101 0

T5IY-T665 MS3 0.054 1401 0.7 -6.00 5.23 -0.15 0.00 0.00 30.1 27.1 0.054 1101 0

T5NO-T5NL MS3 0.038 1301 1.7 1.84 6.70 0.20 0.00 0.00 35.1 130.0 0.038 1401 0

T5NQ-T5BO MS3 0.020 1301 1.0 2.06 2.45 0.00 0.00 0.00 20.1 74.3 0.020 1201 0

T5NU-T5NQ MS3 0.035 1301 0.2 7.21 0.15 0.00 0.00 0.00 5.0 18.6 0.034 1401 0

T5O6-0393 MS3 0.175 1201 2.0 -0.25 39.65 0.00 0.00 0.00 40.1 148.6 0.174 1101 0

T5O7-T5X8 MS3 0.195 1201 2.3 -2.80 39.61 0.80 0.00 0.00 40.1 86.3 0.194 1101 0

T5O8-T5X7 MS3 0.221 1201 2.3 -2.94 45.35 0.93 0.00 0.00 40.1 86.3 0.221 1101 0

T5OA-0410 MS3 0.315 1201 2.0 -2.08 63.48 0.00 0.00 0.00 40.1 148.6 0.315 1101 0

T5OB-0412 MS3 0.281 1301 2.0 -0.47 63.48 0.00 0.00 0.00 40.1 148.6 0.280 1401 0

T5OD-0414 MS3 0.200 1101 2.0 1.19 45.61 0.00 0.00 0.00 40.1 148.6 0.200 1201 0

T5OE-0415 MS3 0.177 1101 2.0 1.69 39.65 0.00 0.00 0.00 40.1 148.6 0.177 1401 0

T5OF-T5X1 MS3 0.124 1101 0.6 4.36 18.58 6.58 0.00 0.01 40.1 22.1 0.124 1401 0

T5OH-T5IT MS3 0.024 1101 0.5 1.74 3.78 0.00 0.00 0.00 10.0 37.1 0.024 1201 0

T5OI-T5IS MS3 0.023 1001 1.0 0.30 0.00 0.00 0.00 0.00 10.0 37.1 0.023 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5OZ-T5P0 MS3 0.025 1401 1.2 -0.98 -1.57 3.28 0.00 0.00 11.8 43.6 0.025 1301 0

T5P0-T5OY MS3 0.069 1301 1.2 0.18 3.54 -14.09 0.00 0.00 11.8 43.6 0.069 1401 0

T5X1-T5X4 MS3 0.188 1101 1.3 4.46 35.17 2.06 0.00 0.00 40.1 49.7 0.187 1401 0

T5X4-0390 MS3 0.194 1401 0.0 4.50 35.08 2.76 0.00 0.00 40.1 76.8 0.194 1101 0

T5X5-0408 MS3 0.123 1201 0.0 -2.98 24.22 0.61 0.00 -0.01 40.1 22.7 0.123 1101 0

T5X6-0407 MS3 0.111 1201 0.0 -2.75 21.19 -1.07 0.00 -0.01 40.1 22.7 0.111 1101 0

T5X7-T5X5 MS3 0.211 1201 0.0 -2.97 45.35 -0.19 0.00 0.00 40.1 39.6 0.211 1101 0

T5X8-T5X6 MS3 0.185 1201 0.0 -2.77 39.61 -0.05 0.00 0.00 40.1 39.6 0.185 1101 0

T62C-T63B MS3 0.071 1401 0.9 -3.41 5.25 0.00 0.00 0.00 32.6 120.7 0.063 1301 0

T62D-T63C MS3 0.075 1401 0.9 -3.77 5.09 0.00 0.00 0.00 32.6 120.7 0.070 1301 0

T62E-T63D MS3 0.042 1401 0.9 -1.15 5.96 0.00 0.00 0.00 32.6 120.7 0.041 1101 0

T62F-T63E MS3 0.030 1401 0.0 -0.10 6.59 0.00 0.00 0.00 32.6 120.7 0.030 1201 0

T62G-T63F MS3 0.036 1301 0.9 2.49 5.80 0.00 0.00 0.00 32.6 120.7 0.035 1401 0

T62H-T63G MS3 0.026 1401 0.9 -0.23 5.25 0.00 0.00 0.00 32.6 120.7 0.024 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C87 of 116

T62I-T63H MS3 0.108 1301 0.9 -6.07 5.25 0.00 0.00 0.00 32.6 120.7 0.108 1401 0

T62J-T63I MS3 0.198 1401 0.0 -12.67 5.19 0.00 0.00 0.00 32.6 120.7 0.198 1301 0

T62K-0128 MS3 0.060 1401 0.0 -2.58 5.51 0.00 0.00 0.00 32.6 120.7 0.059 1301 0

T62L-0127 MS3 0.106 1101 1.2 -2.74 15.68 0.00 0.00 0.00 32.6 120.7 0.105 1201 0

T632-0430 MS3 0.058 1301 0.0 3.01 9.67 -0.36 0.00 0.00 19.7 185.7 0.057 1401 0

T634-0428 MS3 0.153 1401 0.4 -4.27 2.08 0.30 0.00 0.00 19.7 185.7 0.150 1301 0

T636-0426 MS3 0.108 1401 0.0 -9.84 13.03 0.00 0.00 0.00 9.0 33.4 0.107 1301 0

T638-0425 MS3 0.089 1401 0.0 -7.44 11.68 0.00 0.00 0.00 9.0 33.4 0.089 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T63B-0449 MS3 0.064 1401 0.0 -3.41 3.79 0.00 0.00 0.00 32.6 120.7 0.057 1301 0

T63C-0465 MS3 0.069 1401 0.0 -3.77 3.67 0.00 0.00 0.00 32.6 120.7 0.064 1301 0

T63D-0464 MS3 0.035 1401 0.0 -1.15 4.35 0.00 0.00 0.00 32.6 120.7 0.034 1101 0

T63E-0463 MS3 0.022 1401 0.0 -0.10 4.79 0.00 0.00 0.00 32.6 120.7 0.022 1201 0

T63F-0462 MS3 0.030 1301 0.0 2.49 4.23 0.00 0.00 0.00 32.6 120.7 0.029 1401 0

T63G-0461 MS3 0.019 1401 0.0 -0.23 3.79 0.00 0.00 0.00 32.6 120.7 0.018 1301 0

T63H-0445 MS3 0.102 1301 0.0 -6.07 3.79 0.00 0.00 0.00 32.6 120.7 0.102 1401 0

T63I-0094 MS3 0.191 1401 0.0 -12.67 3.17 0.00 0.00 0.00 32.6 120.7 0.191 1301 0

T63Y-T6AT MS3 0.159 1101 0.0 -3.48 9.30 0.85 0.00 0.00 30.5 185.7 0.152 1201 0

T63Z-T632 MS3 0.058 1301 0.7 3.01 9.67 -0.36 0.00 0.00 19.7 185.7 0.057 1401 0

T641-0416 MS3 0.204 1401 0.0 -12.39 26.87 -0.43 0.00 0.00 50.1 74.3 0.204 1301 0

T64I-0419 MS3 0.459 1401 0.0 -6.36 60.40 -4.37 0.00 0.00 50.1 185.7 0.458 1301 0

T64M-T641 MS3 0.279 1401 0.0 -12.39 43.77 -1.10 0.00 0.00 50.1 74.3 0.278 1301 0

T64X-T6AV MS3 0.394 1401 0.0 -5.81 45.43 8.21 0.00 -0.02 30.5 185.7 0.389 1301 0

T664-T666 MS3 0.051 1401 0.9 -3.06 6.87 -0.33 0.00 0.00 30.1 66.8 0.051 1101 0

T665-T667 MS3 0.068 1401 0.9 -5.92 6.25 -0.50 0.00 0.00 30.1 66.8 0.068 1101 0

T666-0381 MS3 0.059 1401 0.0 -3.18 4.12 -0.79 0.00 0.00 30.1 111.4 0.058 1101 0

T667-0382 MS3 0.091 1401 0.0 -6.00 3.58 -0.86 0.00 0.00 30.1 111.4 0.090 1101 0

T6AT-T63Z MS3 0.048 1301 0.4 3.01 7.17 -0.65 0.00 0.00 19.7 185.7 0.046 1401 0

T6AV-T634 MS3 0.232 1401 0.0 -4.27 -19.23 1.33 0.00 0.01 19.7 185.7 0.229 1301 0

T6AX-T636 MS3 0.124 1401 0.0 -9.84 16.49 0.00 0.00 0.00 10.6 39.4 0.124 1301 0

T6AY-T638 MS3 0.105 1401 0.0 -7.44 14.97 0.00 0.00 0.00 10.6 39.4 0.104 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C88 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

TTTU-0447 MS3 0.071 1101 1.0 -3.45 5.28 0.00 0.00 0.00 32.6 120.7 0.064 1201 0

0103-0532 MS4 0.684 1401 1.0 0.68 39.06 -133.67 -0.17 0.09 5.9 67.6 0.684 1301 0

0532-T5BF MS4 0.543 1301 0.0 -0.59 69.14 -64.54 0.02 -0.05 23.4 54.1 0.541 1401 0

0648-0083 MS4 0.200 1301 1.0 -0.59 -10.30 40.44 0.02 -0.06 23.4 54.1 0.200 1401 0

T5BF-0648 MS4 0.105 1301 0.2 -0.59 11.24 14.20 0.02 -0.06 23.4 54.1 0.105 1401 0

0270-T645 P1 0.678 1201 0.0 0.69 -140.95 -12.91 0.00 0.05 6.6 24.3 0.668 1101 0

T645-T644 P1 0.181 1201 0.0 0.69 -35.91 4.09 0.00 0.03 4.5 16.5 0.178 1101 0

T645-T646 P1 0.039 1001 0.0 -6.73 0.00 0.00 0.00 0.00 12.3 45.7 0.039 1101 0

T648-T649 P1 0.048 1301 0.9 0.00 8.13 2.99 0.00 0.00 8.9 32.9 0.048 1401 0

T649-T647 P1 0.061 1301 0.2 0.00 0.04 4.82 0.00 -0.01 2.1 7.9 0.061 1401 0

T649-T64A P1 0.023 1001 0.0 -3.53 0.00 0.00 0.00 0.00 16.4 60.6 0.023 1101 0

T64B-T64D P1 0.307 1301 0.0 0.29 -56.67 13.83 0.00 0.03 6.7 24.7 0.300 1401 0

T64D-T64C P1 0.049 1301 0.4 0.29 -0.47 -11.22 0.00 0.00 4.4 16.2 0.046 1401 0

T64D-T64E P1 0.034 1001 0.0 -5.94 0.00 0.00 0.00 0.00 12.3 45.7 0.034 1101 0

T64F-T64G P1 0.007 1001 0.0 -1.34 0.00 0.00 0.00 0.00 8.5 31.3 0.007 1101 0

T64H-T64J P1 0.209 1101 0.4 0.03 39.53 8.38 0.00 0.03 4.0 14.9 0.209 1201 0

T64J-T64I P1 0.212 1101 0.0 0.03 39.53 8.38 0.00 -0.01 8.5 31.5 0.212 1201 0

T64J-T64K P1 0.001 1001 0.0 -0.13 0.00 0.00 0.00 0.00 13.0 48.3 0.001 1101 0

T64L-T64N P1 0.100 1301 0.0 0.00 -0.01 3.01 0.00 0.02 1.3 4.8 0.100 1401 0

T64N-T64M P1 0.045 1101 0.0 0.00 8.24 2.24 0.00 0.00 6.2 23.0 0.045 1201 0

T64N-T64O P1 0.001 1001 0.0 -0.11 0.00 0.00 0.00 0.00 10.7 39.6 0.001 1101 0

T64P-T64Q P1 0.104 1001 0.0 -18.61 0.00 0.00 0.00 0.00 10.7 39.6 0.104 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T64T-T64R P1 0.033 1101 0.6 2.45 4.63 -0.05 0.00 0.00 6.1 22.6 0.033 1201 0

T64U-T64S P1 0.009 1401 0.0 1.60 0.32 0.06 0.00 0.00 6.1 22.6 0.009 1301 0

T64U-T64V P1 0.044 1301 0.5 -0.03 9.84 -0.01 0.00 0.01 5.0 18.6 0.044 1401 0

T64V-T64T P1 0.046 1101 0.5 -0.03 -4.42 -0.02 0.00 -0.01 5.0 18.6 0.045 1201 0

T64W-T64Y P1 0.298 1101 0.5 0.28 66.72 0.80 0.00 0.04 5.1 18.9 0.298 1201 0

T64Y-T64X P1 0.298 1101 0.0 0.28 66.72 0.80 0.00 -0.03 7.4 27.6 0.298 1201 0

T64Y-T651 P1 0.110 1001 0.0 -18.76 0.00 0.00 0.00 0.00 12.9 47.7 0.110 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C89 of 116

T5IF-T5KP SW1 0.292 1201 0.0 0.10 -27.75 8.28 0.00 0.00 38.1 141.1 0.291 1101 0

T5IN-T5IF SW1 0.113 1201 2.6 -0.63 5.00 19.55 0.00 0.00 26.1 96.6 0.113 1101 0

T5IN-T5KO SW1 0.086 1201 3.8 0.44 3.71 -13.41 0.00 0.00 38.1 141.1 0.085 1101 0

T5IO-T5L2 SW1 0.047 1201 0.0 -2.38 1.02 -7.99 0.00 0.00 8.7 32.2 0.046 1101 0

T5J2-T5J4 SW1 0.129 1401 0.0 -6.12 -5.88 8.87 0.00 0.00 26.1 96.6 0.128 1301 0

T5J2-T5KI SW1 0.092 1301 0.0 1.19 -11.60 9.34 0.00 0.00 12.0 44.6 0.092 1401 0

T5J3-T5L0 SW1 0.143 1201 0.0 -0.29 13.99 21.14 0.00 0.00 8.7 32.2 0.142 1101 0

T5J4-T5KH SW1 0.046 1201 0.0 0.46 -9.19 -0.79 0.00 0.00 12.0 44.6 0.046 1101 0

T5JI-T5JK SW1 0.236 1201 0.0 0.46 -3.51 56.18 0.00 0.00 26.1 96.6 0.234 1301 0

T5JI-T5KT SW1 0.405 1301 0.0 -2.02 -29.90 -22.88 0.00 0.00 38.1 141.1 0.402 1401 0

T5JK-T5KS SW1 0.203 1201 3.8 -1.66 3.25 37.36 0.00 0.00 38.1 141.1 0.202 1301 0

T5JL-T5KU SW1 0.188 1201 0.0 -0.84 -9.64 37.83 0.00 0.01 8.7 32.2 0.188 1301 0

T5JU-T5KN SW1 0.260 1101 0.0 2.48 17.29 -45.64 0.00 0.00 12.0 44.6 0.259 1201 0

T5JW-T5JV SW1 0.124 1101 2.6 0.38 -1.54 29.92 0.00 0.00 26.1 96.6 0.124 1201 0

T5JW-T5KE SW1 0.095 1101 0.0 -0.20 -2.83 21.17 0.00 0.00 12.0 44.6 0.095 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5JX-T655 SW1 0.202 1101 0.0 0.10 -8.40 -44.02 0.00 0.01 8.7 32.2 0.202 1201 0

T5JY-T5K4 SW1 0.082 1201 0.0 0.44 -10.35 -9.21 0.00 0.00 12.0 44.6 0.082 1101 0

T5JY-T65K SW1 0.101 1201 0.0 0.52 -3.70 -21.95 0.00 0.00 8.7 32.2 0.100 1101 0

T5JZ-T5K5 SW1 0.157 1101 0.0 0.61 -22.25 -15.35 0.00 0.01 12.0 44.6 0.156 1201 0

T5K4-T65I SW1 0.066 1201 0.0 -0.30 -2.75 -13.76 0.00 0.00 8.7 32.2 0.065 1101 0

T5K6-T5K8 SW1 0.018 1101 0.0 -0.05 -3.67 0.26 0.00 0.00 12.0 44.6 0.017 1201 0

T5K6-T5LK SW1 0.036 1201 0.0 -0.29 2.75 -6.03 0.00 0.00 8.7 32.2 0.035 1101 0

T5K7-T5K9 SW1 0.082 1201 0.0 -0.49 -17.25 -1.19 0.00 0.01 12.0 44.6 0.081 1101 0

T5K8-T5LC SW1 0.028 1201 0.9 -0.04 3.47 3.27 0.00 0.00 8.7 32.2 0.028 1301 0

T5KA-T5KC SW1 0.037 1301 1.2 -0.18 2.69 6.22 0.00 0.00 12.0 44.6 0.037 1401 0

T5KA-T5LJ SW1 0.132 1301 0.0 0.35 7.35 26.18 0.00 0.00 8.7 32.2 0.131 1401 0

T5KB-T5KD SW1 0.161 1301 0.0 0.69 -24.41 13.90 0.00 0.01 12.0 44.6 0.160 1401 0

T5KC-T5LA SW1 0.091 1201 0.0 0.19 5.14 18.11 0.00 0.00 8.7 32.2 0.090 1101 0

T5KE-T5KM SW1 0.174 1201 2.6 -0.03 3.61 -39.71 0.00 0.00 26.1 96.6 0.174 1101 0

T5KF-T5JV SW1 0.129 1101 1.2 1.40 -10.80 -19.61 0.00 0.00 12.0 44.6 0.128 1201 0

T5KH-T5KQ SW1 0.102 1201 2.6 0.56 5.47 17.47 0.00 0.00 26.1 96.6 0.101 1101 0

T5KI-T5KR SW1 0.230 1201 0.0 1.47 -26.72 -15.38 0.00 0.01 26.1 96.6 0.228 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C90 of 116

T5KL-T5LG SW1 0.037 1401 0.4 0.20 -1.69 -6.94 0.00 0.00 4.3 16.1 0.037 1301 0

T5KM-T5JX SW1 0.077 1101 1.2 -0.61 -5.35 13.31 0.00 0.00 12.0 44.6 0.077 1201 0

T5KM-T657 SW1 0.121 1201 0.0 0.52 0.00 -31.31 0.00 0.00 8.7 32.2 0.120 1101 0

T5KN-T5KF SW1 0.228 1101 2.6 2.27 -21.90 -22.94 0.00 0.00 26.1 96.6 0.227 1201 0

T5KO-T5IO SW1 0.030 1101 1.2 0.18 -5.07 -1.89 0.00 0.00 12.0 44.6 0.030 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5KO-T5L4 SW1 0.049 1201 0.0 0.07 -0.01 -12.89 0.00 0.00 8.7 32.2 0.048 1101 0

T5KP-T5IG SW1 0.146 1201 1.2 0.10 16.50 19.95 0.00 0.00 12.0 44.6 0.145 1101 0

T5KQ-T5J5 SW1 0.040 1201 0.0 0.83 5.47 3.19 0.00 0.00 12.0 44.6 0.040 1101 0

T5KQ-T5KY SW1 0.055 1201 0.0 -0.21 0.01 14.28 0.00 0.00 8.7 32.2 0.055 1101 0

T5KR-T5J3 SW1 0.153 1201 1.2 1.31 22.91 -12.83 0.00 0.00 12.0 44.6 0.151 1101 0

T5KS-T5JL SW1 0.061 1301 1.2 -1.04 -6.35 -7.43 0.00 0.00 12.0 44.6 0.061 1401 0

T5KS-T5KW SW1 0.123 1201 0.0 -0.34 0.00 32.19 0.00 0.00 8.7 32.2 0.122 1101 0

T5KT-T5JJ SW1 0.303 1301 1.2 -2.03 15.77 -58.82 0.00 0.00 12.0 44.6 0.303 1201 0

T5KU-T5KV SW1 0.168 1201 0.9 -1.59 21.28 -18.12 0.00 0.00 8.7 32.2 0.167 1301 0

T5KV-T5JJ SW1 0.448 1201 0.9 -2.24 31.04 -80.16 -0.01 0.00 8.7 32.2 0.445 1301 0

T5KW-T5KU SW1 0.144 1201 0.0 0.21 0.00 -37.89 0.00 0.00 12.0 44.6 0.143 1301 0

T5KW-T5KX SW1 0.141 1201 0.9 0.41 2.89 -33.73 0.00 0.00 8.7 32.2 0.141 1301 0

T5KX-T5KT SW1 0.035 1201 0.0 1.06 2.88 -4.82 0.00 0.00 8.7 32.2 0.035 1101 0

T5KX-T5KV SW1 0.138 1201 1.2 -0.82 0.03 35.49 0.00 0.00 12.0 44.6 0.138 1301 0

T5KY-T5KZ SW1 0.054 1201 0.9 0.08 2.86 -10.86 0.00 0.00 8.7 32.2 0.053 1101 0

T5KY-T5L1 SW1 0.056 1201 0.0 0.01 0.00 -14.72 0.00 0.00 12.0 44.6 0.055 1101 0

T5KZ-T5KR SW1 0.038 1201 0.9 0.36 0.00 -9.36 0.00 0.00 8.7 32.2 0.038 1101 0

T5KZ-T5L0 SW1 0.054 1201 1.2 -0.12 0.03 14.06 0.00 0.00 12.0 44.6 0.053 1101 0

T5L0-T5L1 SW1 0.080 1101 0.0 -0.02 11.14 8.61 0.00 0.00 8.7 32.2 0.080 1201 0

T5L1-T5J5 SW1 0.078 1201 0.9 0.27 -6.23 -13.17 0.00 0.00 8.7 32.2 0.078 1101 0

T5L2-T5L3 SW1 0.048 1201 0.0 -2.13 2.41 -7.04 0.00 0.00 8.7 32.2 0.048 1101 0

T5L3-T5IG SW1 0.132 1201 0.9 -1.94 -6.32 24.93 0.00 0.00 8.7 32.2 0.129 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C91 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5L4-T5L2 SW1 0.047 1201 0.0 0.01 0.00 12.36 0.00 0.00 12.0 44.6 0.046 1101 0

T5L4-T5L5 SW1 0.052 1201 0.9 -0.17 2.84 10.21 0.00 0.00 8.7 32.2 0.051 1301 0

T5L5-T5KP SW1 0.021 1201 0.0 -0.37 2.84 1.51 0.00 0.00 8.7 32.2 0.021 1101 0

T5L5-T5L3 SW1 0.042 1201 1.2 0.24 0.01 -10.81 0.00 0.00 12.0 44.6 0.041 1301 0

T5LA-T5LB SW1 0.057 1201 0.0 -0.29 3.92 10.09 0.00 0.00 8.7 32.2 0.056 1101 0

T5LB-T5KD SW1 0.049 1201 0.9 -0.58 -6.89 -4.27 0.00 0.00 8.7 32.2 0.049 1101 0

T5LC-T5LD SW1 0.021 1301 0.0 0.06 3.45 -1.50 0.00 0.00 8.7 32.2 0.021 1401 0

T5LD-T5K9 SW1 0.019 1301 0.9 0.09 -2.98 1.26 0.00 0.00 8.7 32.2 0.018 1401 0

T5LG-T5KB SW1 0.140 1101 0.9 0.48 -8.26 -26.86 0.00 0.00 8.7 32.2 0.140 1201 0

T5LG-T5LB SW1 0.060 1201 0.0 0.29 -0.08 -15.21 0.00 0.00 12.0 44.6 0.059 1101 0

T5LH-T5K7 SW1 0.039 1201 0.9 -0.25 -7.35 1.18 0.00 0.00 8.7 32.2 0.038 1101 0

T5LH-T5LD SW1 0.008 1301 1.2 -0.05 0.00 -1.93 0.00 0.00 12.0 44.6 0.008 1401 0

T5LJ-T5KL SW1 0.067 1301 0.4 0.82 -3.11 -12.44 0.00 0.00 4.3 16.1 0.067 1401 0

T5LJ-T5LA SW1 0.093 1201 0.0 0.09 -0.07 -24.38 0.00 0.00 12.0 44.6 0.092 1101 0

T5LK-T5LC SW1 0.021 1301 0.0 -0.05 -0.04 5.36 0.00 0.00 12.0 44.6 0.021 1201 0

T5LK-T65O SW1 0.023 1201 0.0 -0.39 2.59 -2.27 0.00 0.00 4.3 16.1 0.023 1101 0

T5LM-T5MO SW1 0.261 1101 0.0 -1.48 17.81 17.22 0.00 0.00 38.1 141.1 0.261 1201 0

T5LO-T5LM SW1 0.367 1101 2.6 -1.16 36.93 31.81 0.00 0.01 26.1 96.6 0.367 1201 0

T5LO-T5MN SW1 0.126 1401 3.8 -0.98 0.98 -26.03 0.00 0.00 38.1 141.1 0.126 1101 0

T5LP-T5N1 SW1 0.103 1401 0.0 -2.96 -4.62 -18.05 0.00 0.00 8.7 32.2 0.101 1301 0

T5LQ-T5LS SW1 0.266 1201 0.0 -4.52 33.51 1.89 0.00 -0.01 26.1 96.6 0.258 1101 0

T5LQ-T5MH SW1 0.135 1401 1.2 3.68 26.03 -1.35 0.00 0.01 12.0 44.6 0.134 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5LR-T5MZ SW1 0.093 1201 0.0 0.16 18.81 2.69 0.00 0.00 8.7 32.2 0.089 1101 0

T5LS-T5MG SW1 0.035 1401 1.2 -0.38 6.25 -0.93 0.00 0.00 12.0 44.6 0.035 1301 0

T5LU-T5LW SW1 0.444 1201 0.0 2.32 46.56 38.80 0.00 -0.01 26.1 96.6 0.441 1101 0

T5LU-T5MS SW1 0.333 1201 3.8 -4.55 -11.86 35.44 0.00 0.00 38.1 141.1 0.330 1301 0

T5LW-T5MR SW1 0.198 1201 0.0 1.06 -8.52 -31.46 0.00 0.00 38.1 141.1 0.196 1101 0

T5LX-T5MT SW1 0.286 1201 0.0 12.65 16.73 40.78 0.00 0.00 8.7 32.2 0.282 1101 0

T5LY-T5MM SW1 0.378 1201 0.0 -2.67 -33.03 -58.70 0.00 0.01 12.0 44.6 0.375 1101 0

T5M0-T5LZ SW1 0.172 1201 0.0 -0.30 2.54 -40.08 0.00 0.00 26.1 96.6 0.171 1101 0

T5M0-T5ME SW1 0.153 1201 0.0 1.04 -5.23 32.56 0.00 0.00 12.0 44.6 0.153 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C92 of 116

T5M2-T5M4 SW1 0.062 1201 0.0 -0.27 -4.10 -10.99 0.00 0.00 12.0 44.6 0.062 1101 0

T5M3-T5M5 SW1 0.104 1201 0.0 -0.38 8.95 -16.86 0.00 0.00 12.0 44.6 0.103 1101 0

T5M3-T65G SW1 0.171 1101 0.0 3.23 -7.22 -32.99 0.00 0.00 8.7 32.2 0.171 1201 0

T5M5-T65E SW1 0.102 1101 0.0 -0.57 -5.55 -19.87 0.00 0.00 8.7 32.2 0.102 1201 0

T5M6-T5M8 SW1 0.079 1401 0.0 -0.37 -13.78 -4.37 0.00 0.00 12.0 44.6 0.078 1301 0

T5M6-T5NJ SW1 0.086 1201 0.0 0.03 -3.05 -18.87 0.00 0.00 8.7 32.2 0.086 1101 0

T5M7-T5M9 SW1 0.097 1401 0.0 0.19 -14.93 -8.63 0.00 0.00 12.0 44.6 0.096 1301 0

T5M8-T5NB SW1 0.064 1401 0.0 0.24 -5.03 -10.75 0.00 0.00 8.7 32.2 0.064 1301 0

T5MA-T5MC SW1 0.055 1201 0.0 0.36 -9.06 3.60 0.00 0.00 12.0 44.6 0.055 1101 0

T5MA-T5NI SW1 0.122 1401 0.0 0.29 -2.90 28.39 0.00 0.00 8.7 32.2 0.120 1301 0

T5MB-T5MD SW1 0.192 1301 0.0 -1.04 32.01 13.15 0.00 -0.01 12.0 44.6 0.192 1401 0

T5MC-T5N9 SW1 0.080 1101 0.0 -0.22 -5.41 14.73 0.00 0.00 8.7 32.2 0.080 1201 0

T5ME-T5ML SW1 0.282 1201 2.6 1.28 6.03 -63.94 0.00 0.00 26.1 96.6 0.281 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5MF-T5LZ SW1 0.162 1201 1.2 -1.44 7.30 -31.60 0.00 0.00 12.0 44.6 0.160 1101 0

T5MG-T5MP SW1 0.044 1301 1.3 -0.50 5.60 -0.91 0.00 0.00 26.1 96.6 0.044 1401 0

T5MH-T5MQ SW1 0.259 1101 0.0 2.47 40.22 -0.33 0.00 -0.01 26.1 96.6 0.259 1401 0

T5MJ-T5NG SW1 0.041 1401 0.0 0.33 5.15 -4.32 0.00 -0.01 4.3 16.1 0.041 1301 0

T5MK-T5NF SW1 0.085 1301 0.0 0.38 10.23 -10.21 0.00 -0.01 4.3 16.1 0.085 1201 0

T5ML-T5M1 SW1 0.080 1201 0.0 2.31 6.03 -11.49 0.00 0.00 12.0 44.6 0.080 1101 0

T5MM-T5MF SW1 0.386 1201 2.6 -2.19 31.96 -42.17 0.00 0.00 26.1 96.6 0.384 1101 0

T5MM-T65B SW1 0.120 1201 0.0 1.44 0.00 -29.71 0.00 0.00 8.7 32.2 0.120 1101 0

T5MN-T5LP SW1 0.047 1101 1.2 -0.53 -9.65 0.63 0.00 0.00 12.0 44.6 0.047 1401 0

T5MN-T5N3 SW1 0.088 1401 0.0 -0.19 0.01 -22.99 0.00 0.00 8.7 32.2 0.088 1101 0

T5MO-T5LN SW1 0.278 1101 1.2 -1.52 -32.35 34.77 0.00 -0.01 12.0 44.6 0.278 1201 0

T5MP-T5LT SW1 0.042 1301 1.2 -0.51 -6.65 2.73 0.00 0.00 12.0 44.6 0.041 1201 0

T5MP-T5MX SW1 0.015 1201 0.9 -0.02 2.85 -0.77 0.00 0.00 8.7 32.2 0.015 1101 0

T5MQ-T5LR SW1 0.209 1201 1.2 2.56 -43.52 -2.41 0.00 -0.01 12.0 44.6 0.208 1101 0

T5MR-T5LX SW1 0.086 1401 1.2 0.52 -6.31 -14.13 0.00 0.00 12.0 44.6 0.085 1301 0

T5MR-T5MV SW1 0.110 1201 0.0 0.44 0.03 28.04 0.00 0.00 8.7 32.2 0.109 1301 0

T5MS-T5LV SW1 0.321 1201 1.2 -4.40 -26.77 -48.00 0.00 0.00 12.0 44.6 0.321 1301 0

T5MT-T5MU SW1 0.222 1201 0.0 13.37 19.83 19.57 0.00 0.00 8.7 32.2 0.217 1101 0

T5MU-T5LV SW1 0.390 1201 0.9 14.02 14.62 -69.32 0.00 0.00 8.7 32.2 0.385 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C93 of 116

T5MV-T5MT SW1 0.137 1301 1.2 -0.25 0.01 35.69 0.00 0.00 12.0 44.6 0.137 1201 0

T5MV-T5MW SW1 0.131 1201 0.9 -0.28 2.89 -31.16 0.00 0.00 8.7 32.2 0.131 1301 0

T5MW-T5MS SW1 0.054 1301 0.9 -0.92 0.02 -12.42 0.00 0.00 8.7 32.2 0.053 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5MW-T5MU SW1 0.133 1301 1.2 0.63 -0.01 34.54 0.00 0.00 12.0 44.6 0.133 1201 0

T5MX-T5MY SW1 0.016 1401 0.0 -0.02 2.85 -1.11 0.00 0.00 8.7 32.2 0.016 1301 0

T5MX-T5N0 SW1 0.005 1401 1.2 0.03 0.00 -1.15 0.00 0.00 12.0 44.6 0.004 1301 0

T5MY-T5MQ SW1 0.019 1201 0.0 -0.03 2.86 -1.07 0.00 0.00 8.7 32.2 0.018 1101 0

T5MY-T5MZ SW1 0.006 1401 0.0 0.02 -0.03 1.44 0.00 0.00 12.0 44.6 0.006 1301 0

T5MZ-T5N0 SW1 0.061 1301 0.0 0.16 13.22 -0.90 0.00 0.00 8.7 32.2 0.060 1201 0

T5N0-T5LT SW1 0.046 1301 0.9 0.17 -7.74 3.10 0.00 -0.01 8.7 32.2 0.045 1401 0

T5N1-T5N2 SW1 0.105 1401 0.9 -3.42 10.07 11.64 0.00 0.00 8.7 32.2 0.102 1301 0

T5N2-T5LN SW1 0.246 1401 0.9 -3.81 11.67 46.37 0.00 0.00 8.7 32.2 0.243 1301 0

T5N3-T5N1 SW1 0.089 1101 0.0 0.03 0.00 23.39 0.00 0.00 12.0 44.6 0.089 1401 0

T5N3-T5N4 SW1 0.088 1401 0.9 0.26 2.86 19.85 0.00 0.00 8.7 32.2 0.088 1101 0

T5N4-T5MO SW1 0.026 1401 0.0 0.65 2.86 2.36 0.00 0.00 8.7 32.2 0.026 1301 0

T5N4-T5N2 SW1 0.083 1401 1.2 -0.44 -0.02 -21.28 0.00 0.00 12.0 44.6 0.083 1101 0

T5N9-T5NA SW1 0.075 1201 0.9 0.22 4.14 -14.55 0.00 0.00 8.7 32.2 0.075 1301 0

T5NA-T5MD SW1 0.038 1301 0.0 0.42 4.18 -4.50 0.00 0.00 8.7 32.2 0.038 1401 0

T5NB-T5NC SW1 0.046 1401 0.9 -0.04 3.60 7.76 0.00 0.00 8.7 32.2 0.046 1301 0

T5NC-T5M9 SW1 0.043 1301 0.9 -0.25 3.69 6.67 0.00 0.00 8.7 32.2 0.043 1201 0

T5NF-T5MB SW1 0.182 1201 0.9 0.17 -26.49 -17.50 0.00 -0.01 8.7 32.2 0.179 1101 0

T5NF-T5NA SW1 0.042 1201 1.2 -0.39 0.00 10.16 0.00 0.00 12.0 44.6 0.042 1101 0

T5NG-T5M7 SW1 0.154 1401 0.9 0.54 -19.64 18.01 0.00 -0.01 8.7 32.2 0.152 1301 0

T5NG-T5NC SW1 0.043 1401 0.0 0.07 -0.03 11.01 0.00 0.00 12.0 44.6 0.043 1301 0

T5NI-T5MK SW1 0.057 1201 0.0 -0.13 3.22 10.84 0.00 0.00 4.3 16.1 0.057 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5NI-T5N9 SW1 0.087 1401 0.0 0.01 0.03 -22.86 0.00 0.00 12.0 44.6 0.087 1301 0

T5NJ-T5MJ SW1 0.043 1401 0.4 0.37 1.50 9.11 0.00 0.00 4.3 16.1 0.042 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C94 of 116

T5NJ-T5NB SW1 0.056 1401 0.0 0.04 -0.02 14.34 0.00 0.00 12.0 44.6 0.055 1301 0

T655-T656 SW1 0.167 1101 0.9 0.87 19.96 20.47 0.00 0.00 8.7 32.2 0.166 1201 0

T656-T5JU SW1 0.394 1101 0.9 1.59 28.44 69.97 0.00 0.00 8.7 32.2 0.392 1201 0

T657-T655 SW1 0.148 1201 1.2 -0.25 0.00 -38.83 0.00 0.00 12.0 44.6 0.148 1101 0

T657-T658 SW1 0.137 1201 0.9 -0.26 2.88 32.66 0.00 0.00 8.7 32.2 0.137 1101 0

T658-T5KN SW1 0.062 1201 0.9 -0.98 0.03 15.11 0.00 0.00 8.7 32.2 0.062 1101 0

T658-T656 SW1 0.145 1201 1.2 0.63 0.03 -37.87 0.00 0.00 12.0 44.6 0.145 1101 0

T65B-T659 SW1 0.212 1201 1.2 -0.56 -1.73 -53.58 0.00 0.00 12.0 44.6 0.211 1101 0

T65B-T65C SW1 0.163 1201 0.0 0.44 1.80 -40.71 0.00 0.00 8.7 32.2 0.162 1101 0

T65C-T5ML SW1 0.201 1201 0.9 -0.70 0.02 52.45 0.00 0.00 8.7 32.2 0.200 1101 0

T65C-T65A SW1 0.223 1201 1.2 0.01 -0.93 -58.28 0.00 0.00 12.0 44.6 0.222 1101 0

T65E-T65F SW1 0.073 1101 0.9 -0.11 4.08 14.25 0.00 0.00 8.7 32.2 0.073 1201 0

T65F-T5M4 SW1 0.118 1201 0.9 0.43 4.60 25.26 0.00 0.00 8.7 32.2 0.118 1101 0

T65G-T65E SW1 0.090 1101 0.0 0.06 0.03 23.55 0.00 0.00 12.0 44.6 0.090 1201 0

T65G-T65N SW1 0.082 1201 0.0 2.77 -4.37 -13.30 0.00 0.00 4.3 16.1 0.082 1101 0

T65H-T5M2 SW1 0.141 1201 0.9 1.16 1.85 33.51 0.00 0.00 8.7 32.2 0.140 1101 0

T65H-T65F SW1 0.105 1201 0.0 0.09 0.02 27.41 0.00 0.00 12.0 44.6 0.105 1101 0

T65I-T65J SW1 0.052 1201 0.9 0.01 3.33 9.75 0.00 0.00 8.7 32.2 0.051 1101 0

T65J-T5K5 SW1 0.059 1201 0.9 0.35 2.13 12.68 0.00 0.00 8.7 32.2 0.059 1101 0

T65K-T65I SW1 0.060 1201 0.0 0.00 -0.01 15.70 0.00 0.00 12.0 44.6 0.059 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T65K-T65M SW1 0.039 1201 0.4 0.21 2.18 7.45 0.00 0.00 4.3 16.1 0.038 1101 0

T65L-T5JZ SW1 0.126 1201 0.9 -0.24 -2.61 29.79 0.00 0.00 8.7 32.2 0.126 1101 0

T65L-T65J SW1 0.067 1201 0.0 -0.01 -0.02 17.65 0.00 0.00 12.0 44.6 0.067 1101 0

T65M-T65L SW1 0.052 1101 0.0 0.10 2.22 -11.20 0.00 0.00 4.3 16.1 0.052 1201 0

T65N-T65H SW1 0.074 1201 0.0 1.70 -4.58 -11.96 0.00 0.00 4.3 16.1 0.074 1101 0

T65O-T5LH SW1 0.024 1201 0.0 -0.22 3.44 1.93 0.00 0.00 4.3 16.1 0.024 1101 0

T5IF-T5K7 SW2 0.059 1201 0.0 0.29 8.08 -12.97 0.00 0.00 31.5 31.5 0.057 1101 0

T5IG-T5J3 SW2 0.096 1101 4.6 -5.83 -13.42 8.13 0.00 0.00 62.9 62.9 0.096 1201 0

T5IN-T5K6 SW2 0.041 1201 0.0 5.82 2.07 -2.85 0.00 0.00 31.5 31.5 0.040 1101 0

T5IO-T5J5 SW2 0.029 1201 0.0 -2.10 -0.01 4.15 0.00 0.00 62.9 62.9 0.029 1301 0

T5J2-T5KB SW2 0.054 1401 0.0 -3.60 4.94 -8.18 0.00 0.00 27.1 27.1 0.054 1301 0

T5J3-T5JJ SW2 0.146 1401 4.0 -2.04 -31.77 16.22 0.00 0.00 54.1 54.1 0.146 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C95 of 116

T5J4-T5KA SW2 0.045 1401 0.0 -2.10 6.81 -6.05 0.00 0.00 27.1 27.1 0.044 1301 0

T5J5-T5JL SW2 0.052 1201 0.0 -2.78 -6.73 6.51 0.00 0.00 54.1 54.1 0.051 1301 0

T5JU-T5IG SW2 0.117 1401 0.0 1.33 26.23 -13.59 0.00 0.00 48.0 48.0 0.117 1101 0

T5JV-T5JZ SW2 0.049 1101 0.0 0.09 1.93 -12.78 0.00 0.00 24.0 24.0 0.049 1201 0

T5JW-T5JY SW2 0.017 1401 0.0 0.82 -0.65 -3.50 0.00 0.00 24.0 24.0 0.017 1301 0

T5JX-T5IO SW2 0.035 1401 0.0 1.01 -4.94 6.21 0.00 0.00 48.0 48.0 0.034 1301 0

T5JY-T5IN SW2 0.056 1201 1.8 2.20 3.60 11.55 0.00 0.00 24.0 24.0 0.056 1101 0

T5JZ-T5IF SW2 0.064 1101 1.8 2.15 -3.93 13.74 0.00 0.00 24.0 24.0 0.062 1201 0

T5K6-T5J4 SW2 0.051 1401 2.3 6.66 -4.65 2.23 0.00 0.00 31.5 31.5 0.051 1101 0

T5K7-T5J2 SW2 0.034 1201 0.0 2.14 3.69 -5.11 0.00 0.00 31.5 31.5 0.033 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5KA-T5JK SW2 0.028 1301 0.0 -1.75 2.74 4.12 0.00 0.00 27.1 27.1 0.027 1401 0

T5KB-T5JI SW2 0.091 1401 2.0 -1.25 -9.87 20.31 0.01 0.00 27.1 27.1 0.091 1301 0

T5LM-T5M7 SW2 0.166 1201 0.0 -7.37 -33.77 1.54 0.00 0.01 31.5 31.5 0.165 1101 0

T5LN-T5LR SW2 0.129 1401 4.6 -6.73 19.27 -12.41 0.00 0.00 62.9 62.9 0.127 1101 0

T5LO-T5M6 SW2 0.058 1201 0.0 -1.11 3.57 -13.42 0.00 0.00 31.5 31.5 0.058 1101 0

T5LP-T5LT SW2 0.039 1201 4.6 2.79 -3.96 -5.79 0.00 0.00 62.9 62.9 0.038 1101 0

T5LQ-T5MB SW2 0.246 1201 0.0 -11.27 -44.16 23.90 -0.01 0.01 27.1 27.1 0.243 1101 0

T5LR-T5LV SW2 0.218 1201 0.0 7.03 -41.43 26.62 0.00 0.01 54.1 54.1 0.214 1301 0

T5LS-T5MA SW2 0.028 1201 2.0 -1.45 3.21 -4.49 0.00 0.00 27.1 27.1 0.027 1101 0

T5LT-T5LX SW2 0.095 1201 4.0 10.85 -11.25 -3.66 0.00 0.00 54.1 54.1 0.093 1101 0

T5LU-T68X SW2 0.474 1201 1.5 -15.25 -100.32 -33.76 0.01 -0.04 21.0 21.0 0.467 1101 0

T5LW-T68Z SW2 0.291 1201 1.5 -0.71 -13.62 -75.33 -0.01 -0.01 21.0 21.0 0.290 1101 0

T5LY-T5LN SW2 0.164 1401 0.0 -2.42 -27.97 28.41 0.00 0.01 48.0 48.0 0.161 1101 0

T5LZ-T5M3 SW2 0.048 1201 1.8 1.15 -4.43 -10.47 0.00 0.00 24.0 24.0 0.048 1101 0

T5M0-T5M2 SW2 0.042 1201 1.8 0.50 7.70 7.33 0.00 0.00 24.0 24.0 0.042 1101 0

T5M1-T5LP SW2 0.051 1301 0.0 2.78 2.28 9.72 0.00 0.00 48.0 48.0 0.051 1401 0

T5M2-T5LO SW2 0.045 1401 1.8 0.96 -10.64 -1.72 0.00 0.00 24.0 24.0 0.045 1301 0

T5M3-T5LM SW2 0.189 1201 1.8 1.08 46.44 -15.19 0.00 0.01 24.0 24.0 0.188 1101 0

T5M6-T5LS SW2 0.031 1401 2.3 0.49 -5.75 4.93 0.00 0.00 31.5 31.5 0.031 1301 0

T5M7-T5LQ SW2 0.178 1201 2.3 -5.16 37.65 13.97 0.00 0.01 31.5 31.5 0.177 1101 0

T5MA-T5LW SW2 0.055 1201 0.0 -0.72 3.23 -13.23 0.00 0.00 27.1 27.1 0.054 1101 0

T5MB-T5LU SW2 0.355 1201 2.0 -10.89 50.24 -61.76 -0.01 0.01 27.1 27.1 0.351 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C96 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T68V-T5V6 SW2 0.293 1201 0.0 -1.47 65.02 39.73 0.00 -0.03 20.3 20.3 0.289 1101 0

T68X-T5VC SW2 0.178 1201 1.5 -8.40 -36.09 1.58 0.00 -0.01 20.3 20.3 0.173 1101 0

T68Z-T5V7 SW2 0.066 1201 1.5 1.34 -15.82 0.01 0.00 0.00 20.3 20.3 0.060 1101 0

T690-T5VD SW2 0.082 1201 0.0 0.04 -0.42 21.64 0.00 0.00 20.3 20.3 0.081 1101 0

T691-T5VE SW2 0.171 1301 0.0 4.52 10.24 -38.52 0.01 0.00 20.3 20.3 0.171 1401 0

T5IN-T5J5 SW3 0.095 1201 0.0 -4.00 -9.75 2.23 0.00 0.00 121.4 121.4 0.094 1101 0

T5J5-T5JK SW3 0.053 1201 6.4 2.67 -7.91 7.50 0.00 0.00 113.9 113.9 0.053 1101 0

T5JX-T5IN SW3 0.063 1201 0.0 1.55 -7.65 12.63 0.00 0.00 109.0 109.0 0.063 1101 0

T5LO-T5LT SW3 0.075 1201 0.0 6.42 -9.75 6.85 0.00 0.00 121.4 121.4 0.075 1101 0

T5LT-T5LW SW3 0.122 1201 6.4 -5.38 -13.83 4.38 0.00 0.00 113.9 113.9 0.122 1301 0

T5M1-T5LO SW3 0.126 1201 0.0 -3.78 -5.51 21.11 0.00 0.00 109.0 109.0 0.125 1101 0

T5IF-T65O SW4 0.074 1201 2.7 -7.20 -4.14 6.89 0.00 0.00 56.7 56.7 0.072 1101 0

T5IO-T5J3 SW4 0.073 1201 0.0 7.31 -9.00 5.24 0.00 0.00 113.4 113.4 0.073 1101 0

T5J3-T5JL SW4 0.030 1201 0.0 1.01 -0.35 6.73 0.00 0.00 101.6 101.6 0.028 1101 0

T5J4-T5KL SW4 0.122 1401 2.4 16.01 3.32 11.92 0.00 0.00 50.8 50.8 0.121 1301 0

T5JU-T5IO SW4 0.088 1301 0.0 -3.18 9.14 -13.03 0.00 0.00 93.7 93.7 0.087 1401 0

T5JW-T65M SW4 0.022 1101 2.2 -0.84 -0.69 4.65 0.00 0.00 46.8 46.8 0.022 1201 0

T5K8-T5KH SW4 0.034 1201 0.0 -0.05 7.19 -5.26 0.00 0.00 49.5 49.5 0.033 1101 0

T5K9-T5KI SW4 0.086 1201 2.3 -0.67 4.10 21.56 0.00 0.00 49.5 49.5 0.085 1101 0

T5KE-T5K4 SW4 0.038 1201 1.8 0.20 7.86 5.76 0.00 0.00 37.8 37.8 0.037 1101 0

T5KF-T5K5 SW4 0.118 1101 0.0 1.63 -0.77 -29.38 0.00 0.00 37.8 37.8 0.117 1201 0

T5KH-T5KC SW4 0.064 1201 2.0 0.37 -14.65 7.70 0.00 0.00 42.6 42.6 0.064 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5KI-T5KD SW4 0.111 1301 2.0 1.38 -19.34 20.01 0.00 0.00 42.6 42.6 0.110 1401 0

T5KL-T5JI SW4 0.155 1401 2.4 17.17 4.89 -19.22 0.00 0.00 50.8 50.8 0.154 1301 0

T5LM-T5MJ SW4 0.101 1401 0.0 -2.11 21.91 -8.78 0.00 0.00 56.7 56.7 0.098 1301 0

T5LP-T5LR SW4 0.066 1401 0.0 6.28 -8.32 5.18 0.00 0.00 113.4 113.4 0.063 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C97 of 116

T5LR-T5LX SW4 0.296 1201 2.4 -25.90 7.49 3.19 0.00 0.00 101.6 101.6 0.288 1101 0

T5LS-T5MK SW4 0.084 1201 2.4 8.13 2.66 12.00 0.00 0.00 50.8 50.8 0.081 1101 0

T5LZ-T65N SW4 0.035 1201 0.0 -0.05 2.73 -8.94 0.00 0.00 46.8 46.8 0.035 1101 0

T5M8-T5MG SW4 0.061 1201 0.0 -0.32 14.62 -5.92 0.00 0.00 49.5 49.5 0.061 1101 0

T5M9-T5MH SW4 0.046 1201 0.0 -0.82 10.85 -0.82 0.00 0.00 49.5 49.5 0.045 1101 0

T5ME-T5M4 SW4 0.058 1101 1.8 0.35 13.26 7.09 0.00 0.00 37.8 37.8 0.058 1201 0

T5MF-T5M5 SW4 0.115 1201 0.0 -2.28 -1.95 27.38 0.00 0.00 37.8 37.8 0.114 1101 0

T5MG-T5MC SW4 0.060 1401 2.0 -0.18 -15.64 1.58 0.00 0.00 42.6 42.6 0.060 1301 0

T5MH-T5MD SW4 0.174 1401 0.0 -3.74 0.99 40.71 0.00 0.00 42.6 42.6 0.174 1301 0

T5MJ-T5LS SW4 0.043 1401 0.0 -3.01 -1.92 6.22 0.00 0.00 56.7 56.7 0.040 1301 0

T5MK-T5LU SW4 0.202 1201 2.4 6.27 30.86 -34.19 0.00 0.00 50.8 50.8 0.198 1101 0

T65M-T5IF SW4 0.040 1101 0.0 -0.91 -0.75 9.22 0.00 0.00 46.8 46.8 0.039 1201 0

T65N-T5LO SW4 0.056 1201 2.2 1.78 5.12 11.49 0.00 0.00 46.8 46.8 0.056 1101 0

T65O-T5J4 SW4 0.073 1201 0.0 -7.15 3.21 7.15 0.00 0.00 56.7 56.7 0.071 1101 0

T5LY-T65P SW5 0.474 1101 0.0 -1.56 12.55 -101.45 0.01 0.00 2.8 10.3 0.473 1401 0

T659-T65Q SW5 0.166 1401 0.0 -0.31 14.07 -21.48 0.01 0.00 3.8 14.0 0.164 1101 0

T65A-T5M1 SW5 0.217 1201 0.9 0.00 2.02 53.63 0.01 0.00 7.0 25.9 0.215 1101 0

T65P-T659 SW5 0.241 1401 0.0 -1.02 14.78 -39.13 0.01 0.00 4.2 15.6 0.239 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T65P-T65T SW5 0.106 1201 0.0 0.11 -1.02 -26.13 0.00 0.00 6.0 22.4 0.106 1101 0

T65Q-T65A SW5 0.149 1101 0.4 -0.84 9.58 21.41 0.01 0.00 3.2 11.9 0.149 1401 0

T65Q-T65S SW5 0.078 1201 0.0 -0.11 -1.02 18.69 0.00 0.00 6.0 22.4 0.078 1101 0

T65T-T65S SW5 0.031 1201 1.0 -0.52 0.01 7.17 0.00 0.00 7.9 29.5 0.031 1101 0

0056-0092 TC1 0.036 1401 4.6 -0.12 -1.02 9.12 0.07 0.01 14.9 14.9 0.035 1301 0

0092-0116 TC1 0.052 1301 4.0 -0.22 13.07 1.86 -0.04 0.10 12.9 12.9 0.052 1401 0

0116-T505 TC1 0.060 1301 0.0 -4.37 9.89 0.69 -0.01 -0.06 8.4 8.4 0.060 1401 0

T505-0531 TC1 0.027 1301 0.0 -4.10 1.78 -0.15 -0.01 -0.06 1.4 1.4 0.027 1401 0

0005-0539 TD1 0.158 1301 3.5 3.89 7.40 -35.22 -0.13 -0.01 16.9 16.9 0.149 1401 0

0006-0540 TD1 0.049 1401 3.5 3.61 -2.56 7.70 0.02 0.00 16.9 16.9 0.041 1301 0

0054-0091 TD1 0.149 1401 0.0 3.02 11.71 -32.80 0.09 -0.03 22.5 22.5 0.148 1301 0

0055-0082 TD1 0.121 1101 4.6 8.30 10.02 18.35 0.05 0.03 22.5 22.5 0.119 1201 0

0082-0117 TD1 0.179 1301 4.0 13.65 22.13 -19.08 -0.05 0.08 19.3 19.3 0.175 1401 0

0091-0115 TD1 0.197 1401 4.0 15.40 5.00 31.24 0.07 0.01 19.3 19.3 0.196 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C98 of 116

0539-0055 TD1 0.162 1301 0.0 3.90 7.29 -36.20 -0.13 -0.01 0.2 0.2 0.152 1401 0

0540-0054 TD1 0.049 1401 0.0 3.61 -2.54 7.88 0.02 0.00 0.2 0.2 0.042 1301 0

T5P7-0005 TD1 0.001 1001 0.5 0.10 0.00 0.00 0.00 0.00 2.4 2.4 0.001 1101 0

T5P8-0006 TD1 0.001 1001 0.5 0.10 0.00 0.00 0.00 0.00 2.4 2.4 0.001 1101 0

T6A6-T5P7 TD1 0.000 1001 0.5 0.05 0.00 0.00 0.00 0.00 2.4 2.4 0.000 1101 0

T6A7-T5P8 TD1 0.000 1001 0.5 0.05 0.00 0.00 0.00 0.00 2.4 2.4 0.000 1101 0

0000-0048 TL1 0.150 1301 3.5 17.64 -12.52 -9.29 -0.35 -0.12 12.7 12.7 0.136 1401 0

0004-0049 TL1 0.155 1201 3.5 18.35 3.21 -15.70 -0.33 0.02 12.7 12.7 0.140 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

601L-T131 TL2 0.060 1301 1.7 -4.79 -7.61 -4.54 -0.05 -0.09 8.2 9.8 0.039 1401 0

619L-0004 TL2 0.055 1201 1.7 6.72 -3.04 -4.52 -0.05 -0.04 8.2 9.8 0.045 1401 0

681L-T132 TL2 0.052 1201 1.7 -6.40 -2.37 -4.17 -0.05 -0.03 8.2 9.8 0.042 1401 0

699L-0000 TL2 0.063 1301 1.7 5.10 -8.34 -4.21 -0.05 -0.10 8.2 9.8 0.044 1401 0

T131-0002 TL3 0.075 1101 1.5 7.14 2.66 -9.24 -0.17 0.00 16.5 16.5 0.068 1301 0

T132-0001 TL3 0.119 1301 0.6 1.32 -15.10 9.59 -0.48 0.14 4.6 4.6 0.118 1401 0

0001-0047 TL4 0.260 1401 2.0 4.19 8.75 -59.41 -0.48 0.14 19.9 19.9 0.255 1301 0

0002-0046 TL4 0.120 1101 2.0 5.33 2.40 -23.40 -0.17 0.00 19.9 19.9 0.113 1201 0

0078-PAD1 TL5 0.105 1101 0.0 13.23 -5.75 -9.01 0.30 0.19 2.0 2.0 0.084 1201 0

0079-PAD2 TL5 0.208 1401 0.0 26.50 11.09 -17.39 0.58 -0.37 2.0 2.0 0.189 1301 0

0049-0081 TL6 0.213 1201 4.6 27.95 -10.07 15.65 0.12 -0.08 17.2 17.2 0.204 1301 0

0081-0113 TL7 0.398 1201 4.0 39.38 -49.29 12.11 0.02 -0.25 14.3 14.3 0.386 1301 0

0113-PAD3 TL8 0.459 1201 1.1 74.79 -22.34 10.37 -0.40 0.87 4.1 4.1 0.446 1301 0

0046-0078 TL9 0.116 1101 4.6 12.41 -8.19 -11.03 0.01 -0.08 17.2 17.2 0.097 1201 0

0047-0079 TL9 0.231 1401 4.0 25.10 10.34 -24.59 0.06 0.07 17.2 17.2 0.215 1301 0

0048-0080 TLA 0.199 1301 4.6 27.22 -10.54 12.09 0.07 -0.08 17.2 17.2 0.191 1201 0

0080-0114 TLB 0.483 1201 4.0 37.24 21.56 -71.55 -0.47 0.12 14.5 14.5 0.481 1301 0

0114-0136 TLC 0.385 1301 2.5 51.45 32.09 -5.31 0.62 -0.12 10.9 10.9 0.377 1201 0

0136-PAD4 TLD 0.454 1301 0.6 71.95 24.24 11.25 -0.44 -0.94 2.7 2.7 0.441 1201 0

PAD3-T322 TLE 0.001 1001 0.0 -0.10 0.00 0.00 0.00 0.00 3.2 3.2 0.001 1101 0

PAD4-0662 TLE 0.001 1001 0.0 -0.10 0.00 0.00 0.00 0.00 3.2 3.2 0.001 1101 0

T217-T5OL TMU 0.181 1301 0.0 -4.88 38.82 0.45 0.00 -0.01 58.2 58.2 0.181 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C99 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5OL-T5OT TMU 0.048 1301 0.0 -2.55 -8.03 0.85 0.00 0.00 66.4 66.4 0.048 1401 0

T5OM-T5OU TMU 0.024 1101 4.6 -1.53 -3.48 0.99 0.00 0.00 66.4 66.4 0.024 1201 0

T5ON-T5OV TMU 0.074 1201 0.0 1.02 3.70 -17.61 0.00 0.00 66.4 66.4 0.074 1101 0

T5OU-T5P2 TMU 0.039 1401 0.0 -1.05 -0.44 -8.44 0.00 0.00 57.1 57.1 0.039 1301 0

T5OV-T5P3 TMU 0.095 1401 4.0 2.19 -1.25 21.84 0.01 0.00 57.1 57.1 0.095 1301 0

T5PA-T5OM TMU 0.079 1101 0.0 -3.02 1.02 -15.58 0.00 0.00 58.2 58.2 0.077 1201 0

T5PA-T5ON TMU 0.134 1101 0.0 -1.95 4.59 -31.33 0.01 0.00 50.7 50.7 0.130 1201 0

T5UN-T5VR TMU 0.030 1401 0.0 -0.32 -0.04 -7.33 0.00 0.00 57.1 57.1 0.030 1301 0

0058-T432 TS1 0.318 1101 4.6 -18.67 -3.70 -56.95 -0.03 0.00 42.7 42.7 0.316 1401 0

0059-T433 TS1 0.400 1401 4.6 -24.05 6.73 -70.55 -0.03 0.00 42.7 42.7 0.399 1101 0

0062-0104 TS1 0.276 1101 4.6 3.75 -67.38 13.26 0.01 -0.03 42.7 42.7 0.275 1201 0

0072-0102 TS1 0.393 1401 0.0 -8.11 48.97 -78.64 0.03 -0.01 42.7 42.7 0.391 1301 0

0073-0100 TS1 0.213 1101 4.6 -3.55 -37.33 35.47 0.02 -0.02 42.7 42.7 0.210 1201 0

0074-0103 TS1 0.322 1301 4.6 -1.45 -81.72 -17.11 -0.01 -0.04 42.7 42.7 0.321 1401 0

0100-0130 TS1 0.237 1401 4.0 -9.29 -20.65 45.40 0.02 -0.01 36.7 36.7 0.236 1301 0

0102-0129 TS1 0.189 1301 4.0 -5.69 -22.87 35.31 0.02 0.00 36.7 36.7 0.189 1401 0

0104-0133 TS1 0.391 1301 4.0 1.90 -100.27 17.22 0.01 -0.05 36.7 36.7 0.390 1401 0

0107-0072 TS1 0.560 1401 3.5 -0.46 -90.49 117.52 0.08 -0.05 32.6 32.6 0.547 1301 0

0110-0073 TS1 0.312 1101 0.0 -11.74 49.01 -45.05 0.03 -0.02 32.6 32.6 0.300 1201 0

0123-0111 TS1 0.235 1301 0.0 2.24 17.07 57.24 -0.03 -0.01 42.7 42.7 0.228 1401 0

0124-0112 TS1 0.107 1201 0.0 5.05 -11.62 18.91 -0.01 0.00 42.7 42.7 0.103 1101 0

0181-0546 TS1 0.190 1301 3.8 -4.36 14.77 -41.91 -0.01 0.01 34.9 34.9 0.190 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0191-0249 TS1 0.221 1401 0.0 10.71 19.58 40.95 -0.01 -0.01 32.6 32.6 0.221 1301 0

0249-0411 TS1 0.210 1301 0.0 27.15 7.94 -20.62 0.01 -0.01 42.7 42.7 0.209 1401 0

0267-0429 TS1 0.094 1301 0.0 0.75 -9.05 22.18 0.00 0.00 42.7 42.7 0.094 1401 0

0276-T5O5 TS1 0.056 1101 4.6 -3.53 1.76 9.47 0.00 0.00 42.7 42.7 0.056 1201 0

0336-0147 TS1 0.517 1301 0.0 19.53 46.00 -103.41 0.05 -0.04 28.0 28.0 0.513 1201 0

0411-0336 TS1 0.171 1201 4.0 10.54 23.48 -22.36 -0.01 0.01 36.7 36.7 0.164 1101 0

0429-0471 TS1 0.139 1301 4.3 -6.09 12.61 -25.06 -0.01 0.01 39.5 39.5 0.136 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C100 of 116

0527-0528 TS1 0.293 1301 4.6 9.74 13.55 -64.55 -0.02 0.01 42.7 42.7 0.293 1201 0

0546-0267 TS1 0.190 1201 0.0 -4.20 15.69 -42.54 -0.01 0.01 0.5 0.5 0.190 1301 0

T217-0074 TS1 0.412 1301 0.0 2.61 105.97 8.52 -0.01 -0.06 32.6 32.6 0.411 1401 0

T218-0062 TS1 0.427 1101 0.0 -0.79 98.95 -53.65 0.03 -0.06 32.6 32.6 0.423 1401 0

T432-0119 TS1 0.571 1101 4.0 -15.94 0.38 -129.21 -0.07 0.00 36.7 36.7 0.563 1401 0

T433-0122 TS1 0.105 1101 0.0 -19.48 0.00 0.00 0.00 0.00 36.7 36.7 0.104 1201 0

T5O5-0327 TS1 0.594 1101 4.0 -22.43 4.09 -125.96 -0.05 0.00 36.7 36.7 0.593 1401 0

0013-0059 TS2 0.489 1401 0.0 -33.24 83.51 -15.56 0.01 -0.05 34.2 34.2 0.487 1301 0

0014-0058 TS2 0.254 1101 2.0 -45.79 1.32 0.00 0.00 0.00 34.2 34.2 0.252 1201 0

0061-T500 TS2 0.075 1201 4.6 5.59 -4.90 11.41 0.01 0.00 39.0 39.0 0.073 1101 0

0120-T66O TS2 0.166 1101 0.0 0.26 15.05 -39.91 0.02 -0.01 25.6 25.6 0.164 1201 0

T219-0061 TS2 0.074 1101 0.0 1.28 -15.18 -8.81 0.00 0.01 34.2 34.2 0.074 1201 0

T437-0276 TS2 0.205 1101 0.0 -4.88 45.04 9.71 -0.01 -0.03 34.2 34.2 0.204 1201 0

T500-0120 TS2 0.092 1401 0.0 -4.41 12.74 -12.06 0.01 -0.01 33.6 33.6 0.091 1301 0

0046-0451 TV1 0.323 1201 0.0 -45.40 -15.59 1.62 0.00 0.01 51.4 51.4 0.305 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0112-0115 TV1 0.299 1201 3.4 -44.87 10.19 -1.07 0.00 0.00 50.8 50.8 0.293 1101 0

0046-T67W TV2 0.051 1301 6.7 1.08 -0.47 -12.10 0.00 0.00 58.8 58.8 0.049 1401 0

0047-T67X TV2 0.236 1301 0.0 -33.12 -7.14 5.19 0.00 0.00 58.8 58.8 0.236 1201 0

0048-T66Q TV2 0.330 1101 5.5 60.57 -9.70 7.15 0.00 0.00 48.2 48.2 0.309 1201 0

0049-T67A TV2 0.528 1401 5.4 84.72 -34.67 2.72 0.00 -0.01 47.8 47.8 0.503 1301 0

0080-T496 TV2 0.190 1301 4.4 14.19 -11.22 30.94 0.01 0.00 38.4 38.4 0.189 1401 0

0080-T66S TV2 0.390 1101 6.1 74.30 -10.60 3.10 0.00 0.00 53.7 53.7 0.386 1201 0

0081-T497 TV2 0.500 1301 4.4 -67.33 5.84 -37.83 -0.01 0.00 38.4 38.4 0.491 1401 0

0091-0116 TV2 0.174 1301 0.0 -30.88 -2.81 -3.15 0.00 0.00 29.8 29.8 0.174 1401 0

0113-T499 TV2 0.592 1301 0.0 106.13 10.32 -22.69 0.01 -0.01 32.4 32.4 0.585 1401 0

0113-T67D TV2 0.659 1201 0.0 8.63 -157.75 -47.45 0.01 0.05 30.3 30.3 0.655 1301 0

0114-T66U TV2 0.485 1101 0.0 70.97 -40.32 1.75 0.00 0.01 50.4 50.4 0.484 1201 0

0114-T66V TV2 0.312 1201 0.0 -38.09 -32.33 -11.82 0.00 0.01 30.3 30.3 0.311 1101 0

0115-0531 TV2 0.131 1401 0.0 -9.06 -14.35 17.42 -0.01 0.01 26.3 26.3 0.131 1301 0

T317-0629 TV2 0.218 1101 0.0 -5.69 -7.79 49.79 -0.02 0.00 26.8 26.8 0.218 1401 0

T319-0601 TV2 0.322 1201 0.0 -3.07 -3.50 81.58 -0.03 0.00 26.8 26.8 0.322 1101 0

T319-T239 TV2 0.135 1101 0.0 5.54 -10.48 27.18 -0.01 0.01 46.2 46.2 0.135 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C101 of 116

T320-0615 TV2 0.205 1101 0.0 -2.41 -17.04 48.52 -0.02 0.01 26.8 26.8 0.205 1401 0

T496-T67U TV2 0.312 1301 0.0 33.49 -28.41 29.88 -0.01 0.01 34.1 34.1 0.305 1401 0

T497-T67T TV2 0.592 1301 0.0 -73.27 48.01 -33.60 0.01 -0.02 34.1 34.1 0.573 1401 0

T498-T67M TV2 0.404 1401 3.9 -55.81 -31.56 0.45 0.00 -0.01 34.2 34.2 0.398 1301 0

T499-T67C TV2 0.745 1401 5.3 114.07 -55.54 6.16 0.00 -0.02 46.6 46.6 0.741 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T66P-T675 TV2 0.085 1101 0.0 -10.33 2.36 6.48 0.00 0.00 47.9 47.9 0.061 1201 0

T66R-T676 TV2 0.255 1101 0.0 -36.73 9.38 4.29 0.00 0.00 53.6 53.6 0.246 1201 0

T66T-T673 TV2 0.176 1101 2.8 -25.73 6.84 1.83 0.00 0.00 49.9 49.9 0.172 1201 0

T66W-T66Y TV2 0.347 1201 4.2 32.19 -52.20 -0.60 0.00 -0.02 36.6 36.6 0.347 1301 0

T674-T677 TV2 0.271 1301 6.9 49.66 7.92 6.08 0.00 0.00 60.6 60.6 0.255 1401 0

T679-T67J TV2 0.503 1401 0.0 -66.31 33.20 1.49 0.00 0.00 47.3 47.3 0.475 1301 0

T67B-T498 TV2 0.600 1401 0.0 -71.29 52.27 7.33 0.00 -0.01 45.6 45.6 0.591 1301 0

T67E-T67F TV2 0.274 1101 4.2 -5.77 -64.68 -0.58 0.00 -0.02 36.5 36.5 0.274 1201 0

T67H-T235 TV2 0.262 1201 0.0 -12.48 51.29 7.23 0.00 -0.01 38.7 38.7 0.262 1101 0

T67I-T67K TV2 0.173 1401 3.4 -23.94 6.28 2.22 0.00 0.00 60.6 60.6 0.160 1301 0

T67Z-T680 TV2 0.193 1201 4.2 -6.27 -42.45 -1.03 0.00 -0.01 36.6 36.6 0.192 1101 0

T681-T682 TV2 0.202 1101 0.0 -17.09 29.14 1.56 0.00 -0.01 37.6 37.6 0.201 1201 0

T684-T67Y TV2 0.318 1101 0.0 -1.42 -82.65 0.48 0.00 0.03 31.6 31.6 0.318 1401 0

T685-T268 TV2 0.134 1301 4.8 -13.76 -13.53 7.51 0.00 -0.01 42.0 42.0 0.134 1201 0

T686-T233 TV2 0.090 1201 0.0 -6.79 -11.14 7.63 0.00 0.01 49.3 49.3 0.089 1301 0

T689-T68J TV2 0.054 1101 3.3 7.25 5.13 -1.48 0.00 0.00 58.5 58.5 0.054 1201 0

T68B-T68K TV2 0.054 1101 6.6 4.49 -8.62 0.77 0.00 0.00 58.4 58.4 0.051 1201 0

T68D-0057 TV2 0.168 1301 5.5 -8.01 -6.88 -31.73 -0.01 -0.01 48.4 48.4 0.166 1401 0

T68E-T687 TV2 0.033 1101 3.2 -1.77 6.03 0.38 0.00 0.00 56.3 56.3 0.033 1201 0

T68F-T688 TV2 0.173 1101 6.4 28.50 -10.41 -0.14 0.00 0.00 56.3 56.3 0.173 1201 0

T68G-0083 TV2 0.214 1301 6.7 -9.19 -1.87 -41.66 -0.01 0.00 59.2 59.2 0.213 1401 0

T68H-T68A TV2 0.176 1301 0.0 33.09 -5.32 1.21 0.00 0.00 59.3 59.3 0.175 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C102 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T68L-T68C TV2 0.278 1301 0.0 54.22 -4.51 4.25 0.00 0.00 55.1 55.1 0.275 1401 0

T68M-T68R TV2 0.160 1301 7.0 -22.22 -5.30 0.13 0.00 0.00 61.7 61.7 0.159 1401 0

T68N-T68P TV2 0.237 1401 6.6 -33.06 -9.34 -0.09 0.00 0.00 58.3 58.3 0.236 1101 0

T68Q-T68O TV2 0.194 1201 7.0 -27.05 -6.48 0.21 0.00 0.00 61.7 61.7 0.194 1101 0

T5UO-T237 TV3 0.064 1401 3.0 6.83 -0.98 -8.34 0.00 0.00 27.1 27.1 0.063 1301 0

T5UP-T271 TV3 0.085 1201 3.0 6.96 12.41 -6.40 0.00 0.00 27.1 27.1 0.085 1301 0

T66Z-T66X TV3 0.226 1101 0.0 -21.21 29.46 1.30 0.00 -0.01 38.0 38.0 0.225 1401 0

T671-T226 TV3 0.070 1101 0.0 -4.87 -10.95 1.45 0.00 0.01 51.1 51.1 0.070 1401 0

T683-T230 TV3 0.067 1101 0.0 -5.05 -9.87 -1.16 0.00 0.01 51.1 51.1 0.067 1201 0

0000-T494 TV4 0.171 1101 0.0 -13.06 -1.50 -25.20 0.01 0.00 39.9 39.9 0.161 1201 0

0004-T495 TV4 0.281 1401 0.0 -36.86 1.15 21.29 -0.01 0.00 39.9 39.9 0.273 1301 0

T494-T67P TV4 0.092 1101 0.0 -10.78 1.60 5.13 0.00 0.00 63.7 63.7 0.087 1201 0

T495-T67O TV4 0.248 1401 5.6 -29.88 -13.90 1.45 0.00 -0.01 63.7 63.7 0.246 1301 0

0111-T672 TV5 0.639 1301 0.0 -93.19 25.96 3.04 0.00 -0.01 44.1 44.1 0.625 1401 0

0043-0332 WP1 0.089 1201 0.0 -5.86 12.36 1.60 0.00 -0.08 13.1 14.1 0.083 1101 0

0085-0113 WP1 0.192 1201 0.0 -31.94 7.56 -1.53 -0.02 -0.11 13.1 4.1 0.190 1401 0

0114-0043 WP1 0.264 1201 0.0 -6.12 15.69 -44.28 0.15 -0.06 13.1 4.1 0.256 1101 0

0332-0333 WP1 0.105 1201 1.0 -6.59 -16.68 -0.08 0.00 -0.09 13.1 14.1 0.100 1101 0

0333-T496 WP1 0.140 1201 0.4 -6.97 -23.67 -0.72 0.00 -0.11 13.1 14.1 0.133 1101 0

0334-0335 WP1 0.155 1201 0.0 -14.05 -11.46 9.39 0.00 0.07 9.8 14.1 0.149 1101 0

0335-0336 WP1 0.206 1201 1.0 -14.99 8.76 -23.95 -0.03 0.04 9.8 14.1 0.201 1101 0

0336-0337 WP1 0.251 1301 0.0 -16.45 15.37 -26.83 0.03 0.04 9.8 14.1 0.245 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0337-0338 WP1 0.232 1201 1.0 -17.57 27.22 7.45 0.00 0.02 9.8 14.1 0.222 1101 0

0338-T497 WP1 0.252 1201 0.0 -19.48 29.47 7.94 -0.02 0.00 9.8 14.1 0.242 1101 0

0339-0340 WP1 0.277 1201 0.0 -24.76 32.61 -4.43 0.01 -0.09 13.1 14.1 0.262 1101 0

0340-0085 WP1 0.245 1201 0.0 -27.75 20.37 5.03 -0.01 -0.10 13.1 14.1 0.233 1101 0

T496-0334 WP1 0.168 1201 0.0 -13.96 -21.50 -1.10 0.02 0.09 9.8 14.1 0.160 1101 0

T497-0339 WP1 0.285 1201 0.0 -22.45 34.83 -7.09 0.00 -0.07 13.1 14.1 0.271 1101 0

0010-0116 WP2 0.178 1301 0.8 15.97 17.55 -7.34 -0.02 0.07 11.8 10.8 0.176 1401 0

0024-T5U2 WP2 0.103 1301 0.4 -1.14 0.14 1.07 0.00 -0.09 27.4 5.5 0.103 1201 0

0025-0028 WP2 0.241 1301 1.0 -2.49 -45.63 -8.73 -0.01 -0.11 27.4 13.6 0.241 1201 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C103 of 116

0028-T5U7 WP2 0.283 1301 0.4 -2.58 -60.93 -2.20 0.01 -0.14 27.4 5.5 0.283 1201 0

0029-0114 WP2 0.561 1201 0.5 2.47 -114.56 15.74 0.01 -0.16 27.4 7.4 0.561 1301 0

0034-T5U4 WP2 0.049 1201 0.4 4.95 -3.15 2.97 0.00 -0.04 57.5 5.5 0.049 1301 0

0035-0036 WP2 0.160 1301 1.0 6.67 -23.33 -6.52 -0.01 -0.04 57.5 13.6 0.159 1401 0

0036-T5U9 WP2 0.206 1301 0.4 7.98 -32.23 -7.74 0.00 -0.07 57.5 5.5 0.204 1401 0

0037-0130 WP2 0.437 1301 1.0 9.51 -72.65 19.67 0.02 -0.10 57.5 13.6 0.434 1401 0

0040-0041 WP2 0.065 1301 1.2 -0.02 -4.68 11.58 0.01 -0.02 21.9 15.8 0.064 1401 0

0041-0117 WP2 0.219 1301 1.0 -0.82 -11.99 -42.69 -0.04 -0.03 21.9 13.6 0.215 1401 0

0052-0341 WP2 0.231 1301 0.0 4.65 -41.32 -8.33 0.00 0.08 30.0 13.6 0.230 1401 0

0053-0350 WP2 0.236 1301 0.0 -22.82 -16.87 -8.04 0.02 0.07 30.0 13.6 0.233 1401 0

0086-0129 WP2 0.175 1301 0.7 -0.65 -32.80 -7.49 -0.01 -0.09 30.0 10.2 0.172 1401 0

0089-T68K WP2 0.172 1201 0.4 8.61 -15.70 -16.40 -0.03 -0.04 30.0 6.0 0.171 1301 0

0113-T5O4 WP2 0.350 1301 0.0 -27.50 -43.92 -3.34 0.02 0.09 26.1 13.6 0.348 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0114-T5JH WP2 0.569 1401 0.0 -22.63 -85.10 14.70 -0.02 0.13 52.2 21.0 0.569 1301 0

0115-0010 WP2 0.265 1201 0.0 14.10 -26.40 -22.18 0.03 0.10 11.8 13.6 0.261 1101 0

0117-T68L WP2 0.555 1301 0.0 -2.57 -56.37 -62.55 0.06 0.50 30.0 4.2 0.550 1401 0

0119-T5JB WP2 0.357 1401 0.0 -24.41 -28.66 21.37 -0.03 0.03 34.2 54.6 0.356 1101 0

0122-T59Q WP2 0.451 1201 0.0 -9.56 -81.13 -2.82 0.00 0.01 34.2 54.6 0.450 1101 0

0129-T61Y WP2 0.120 1201 0.0 -11.51 9.35 -2.28 0.00 -0.01 26.1 48.4 0.117 1101 0

0130-0052 WP2 0.381 1301 0.0 9.15 -65.26 15.59 -0.02 0.09 30.0 10.2 0.380 1401 0

0130-T5TE WP2 0.306 1301 0.0 -33.49 21.81 6.46 0.00 0.01 52.2 28.0 0.298 1401 0

0133-0024 WP2 0.180 1401 0.0 1.02 37.73 -3.19 0.00 -0.07 27.4 19.2 0.180 1301 0

0134-0034 WP2 0.118 1201 0.0 4.72 7.89 -14.90 0.01 -0.02 57.5 19.2 0.118 1101 0

0327-T5AA WP2 0.305 1201 0.0 -11.45 -54.25 -0.89 0.00 0.04 34.2 54.6 0.304 1101 0

0336-0345 WP2 0.392 1401 0.0 -3.94 -77.82 0.08 0.00 0.10 52.2 68.2 0.391 1101 0

0341-0342 WP2 0.102 1401 0.0 1.71 -16.44 -5.42 0.01 0.07 30.0 13.6 0.101 1301 0

0342-0343 WP2 0.082 1301 1.0 -0.79 14.44 4.23 0.00 0.03 30.0 13.6 0.082 1201 0

0343-0344 WP2 0.103 1201 0.0 -3.03 16.20 4.11 0.00 0.01 30.0 13.6 0.102 1301 0

0344-0345 WP2 0.108 1201 0.0 -4.15 18.96 -0.78 0.00 -0.03 30.0 13.6 0.105 1301 0

0345-0346 WP2 0.148 1201 1.0 -5.21 24.69 -3.72 0.00 0.05 30.0 13.6 0.144 1301 0

0345-T5BV WP2 0.181 1201 0.0 -0.73 37.00 -0.44 0.00 -0.02 52.2 68.2 0.180 1301 0

0346-0347 WP2 0.163 1201 1.0 -6.09 28.65 -2.09 0.00 0.01 30.0 13.6 0.159 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C104 of 116

0347-0348 WP2 0.166 1201 0.0 -5.93 28.47 -2.81 0.00 -0.01 30.0 13.6 0.162 1101 0

0348-0349 WP2 0.140 1201 0.0 -5.17 24.56 -1.25 0.01 -0.04 30.0 13.6 0.137 1101 0

0349-T6AB WP2 0.096 1301 0.0 -3.18 9.58 9.50 0.00 -0.06 30.0 13.6 0.095 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0350-0351 WP2 0.200 1301 1.0 -17.89 10.06 15.41 0.00 0.04 30.0 13.6 0.197 1401 0

0351-0352 WP2 0.158 1301 1.0 -13.43 10.46 10.44 0.00 0.02 30.0 13.6 0.156 1401 0

0352-0353 WP2 0.127 1301 0.0 -9.24 5.96 11.21 -0.01 0.01 30.0 13.6 0.125 1401 0

0353-0471 WP2 0.141 1301 1.0 -5.28 4.18 -22.60 -0.02 0.00 30.0 13.6 0.139 1401 0

0471-0472 WP2 0.103 1201 0.0 -2.57 -2.57 -20.27 0.02 0.03 30.0 13.6 0.102 1301 0

0472-0473 WP2 0.068 1301 1.0 1.14 9.37 4.93 0.00 0.02 30.0 13.6 0.067 1401 0

0473-0474 WP2 0.082 1301 1.0 4.14 7.99 7.02 0.00 0.00 30.0 13.6 0.080 1401 0

0474-0475 WP2 0.082 1301 0.0 7.05 4.87 6.90 0.00 -0.01 30.0 13.6 0.080 1401 0

0475-0089 WP2 0.088 1301 1.0 9.82 -7.58 -0.63 -0.01 -0.03 30.0 13.6 0.086 1401 0

T317-T66Y WP2 0.468 1201 0.2 -14.46 21.32 -6.63 0.01 -0.42 34.2 2.4 0.467 1301 0

T317-T66Z WP2 0.263 1101 0.2 -13.81 39.84 6.15 0.00 0.18 18.4 2.3 0.262 1201 0

T319-T67F WP2 0.215 1201 0.0 -6.50 26.32 -18.04 0.01 -0.11 34.2 2.4 0.214 1101 0

T319-T67H WP2 0.112 1401 0.0 -5.79 4.61 9.62 0.00 0.10 0.8 2.0 0.112 1301 0

T320-T680 WP2 0.288 1201 0.0 -11.10 46.29 -8.44 0.01 -0.15 34.2 2.4 0.288 1101 0

T59Q-0113 WP2 0.400 1301 2.3 -9.39 -76.95 3.45 0.00 0.00 34.2 54.6 0.396 1401 0

T59R-T6BG WP2 0.260 1401 0.0 -21.95 -23.66 -7.08 0.00 -0.01 34.2 54.6 0.260 1101 0

T5A8-T684 WP2 0.177 1401 0.0 -11.67 -26.07 0.73 0.00 0.02 34.2 12.3 0.177 1101 0

T5AA-T5A8 WP2 0.202 1401 0.0 -11.69 -32.60 0.18 0.00 0.02 34.2 13.6 0.202 1101 0

T5BV-T622 WP2 0.137 1201 0.0 -0.73 28.13 -0.06 0.00 -0.02 52.2 68.2 0.137 1301 0

T5BW-0471 WP2 0.053 1201 1.2 -0.73 -5.08 0.75 0.00 -0.05 52.2 68.2 0.052 1301 0

T5JB-T59R WP2 0.235 1401 0.0 -21.95 -23.30 -8.35 0.00 -0.01 1.0 2.7 0.235 1101 0

T5JH-T6BI WP2 0.300 1301 0.0 -21.74 -34.09 -6.35 0.00 0.08 52.2 7.2 0.299 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5O4-T5T2 WP2 0.305 1301 0.0 -27.38 -30.57 7.59 0.00 0.07 26.1 21.1 0.303 1201 0

T5T2-0129 WP2 0.231 1201 2.4 -17.93 29.41 -2.36 0.00 0.06 26.1 33.4 0.231 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C105 of 116

T5T4-T67M WP2 0.130 1201 1.0 -11.51 -11.84 0.22 0.00 -0.03 26.1 68.2 0.126 1101 0

T5TE-T5TF WP2 0.291 1301 0.0 -33.45 23.07 0.31 0.00 -0.02 52.2 20.5 0.284 1401 0

T5TF-T673 WP2 0.246 1301 0.0 -33.51 11.82 -0.20 0.00 -0.06 52.2 15.3 0.240 1401 0

T5U2-0025 WP2 0.105 1301 0.6 -1.14 -15.62 4.69 0.00 -0.09 27.4 8.2 0.105 1201 0

T5U4-0035 WP2 0.074 1201 0.6 4.95 -9.65 2.00 0.00 -0.04 57.5 8.2 0.074 1101 0

T5U7-0029 WP2 0.407 1201 0.6 -2.25 -84.95 8.16 0.01 -0.14 27.4 8.2 0.405 1301 0

T5U9-0037 WP2 0.265 1301 0.6 7.98 -44.25 -9.67 0.00 -0.07 57.5 8.2 0.264 1401 0

T5UO-T671 WP2 0.051 1301 0.0 -2.71 -5.34 2.40 0.00 0.05 0.5 1.4 0.051 1201 0

T5UP-T681 WP2 0.263 1201 3.4 -2.95 38.40 -17.28 -0.01 0.04 18.4 45.8 0.262 1301 0

T61Y-T5T4 WP2 0.089 1201 0.9 -11.51 -4.45 0.31 0.00 -0.02 26.1 48.4 0.086 1101 0

T622-T5BW WP2 0.102 1301 0.0 -0.75 20.50 0.28 0.00 -0.03 52.2 68.2 0.102 1201 0

T66C-0122 WP2 0.421 1201 1.3 -4.68 -86.42 -7.13 -0.01 -0.19 34.2 17.3 0.420 1101 0

T66D-0327 WP2 0.483 1101 1.3 -10.28 -98.04 -2.59 0.00 -0.23 34.2 17.3 0.482 1201 0

T66E-0119 WP2 0.455 1101 1.3 -27.49 -71.42 -0.90 0.00 -0.15 34.2 17.3 0.451 1401 0

T66Y-T66E WP2 0.295 1101 0.0 -28.07 27.37 -7.65 0.01 -0.14 34.2 14.9 0.294 1401 0

T66Z-T5UO WP2 0.212 1101 0.0 -2.88 37.81 4.83 0.00 -0.04 18.4 45.8 0.212 1201 0

T67F-T66C WP2 0.237 1201 0.0 -4.75 35.62 -15.72 0.01 -0.18 34.2 14.9 0.236 1101 0

T680-T66D WP2 0.291 1201 0.0 -8.92 49.26 -8.35 0.01 -0.22 34.2 14.9 0.290 1101 0

T681-T320 WP2 0.299 1201 0.0 -10.40 41.11 -18.97 -0.01 -0.11 18.4 2.3 0.298 1301 0

T683-T5UP WP2 0.052 1101 0.1 -2.84 -5.15 0.23 0.00 -0.05 0.5 1.4 0.052 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T684-0336 WP2 0.254 1401 0.2 -11.27 -44.35 -0.95 0.00 -0.02 34.2 2.7 0.249 1101 0

T68K-0115 WP2 0.251 1201 0.3 10.36 -23.73 -26.48 -0.03 -0.08 30.0 4.2 0.248 1101 0

T68L-0053 WP2 0.395 1301 0.0 -27.91 -20.31 -41.24 0.06 0.07 30.0 6.0 0.389 1401 0

T6AB-0086 WP2 0.085 1301 0.7 -3.17 -10.84 4.69 0.00 -0.08 30.0 13.6 0.085 1401 0

T6BG-0114 WP2 0.307 1201 1.0 -21.83 -31.71 7.86 0.01 -0.02 34.2 54.6 0.306 1301 0

T6BI-0130 WP2 0.257 1201 2.5 -20.90 23.95 5.23 0.00 0.06 52.2 33.7 0.254 1301 0

0113-0003 WP3 0.395 1201 0.0 6.46 -55.46 21.99 -0.05 0.08 37.6 6.6 0.385 1101 0

0115-T67L WP4 0.001 1001 0.0 0.00 -0.04 0.00 0.00 0.00 1.9 5.1 0.001 1101 0

0117-T672 WP4 0.573 1301 0.3 -55.72 -33.96 9.76 0.00 -1.07 1.9 5.1 0.561 1401 0

T673-0117 WP4 0.278 1301 0.0 -34.79 -10.06 -5.36 0.00 0.13 56.6 5.0 0.274 1401 0

T67M-0115 WP4 0.370 1401 0.4 -18.15 51.54 2.08 0.00 0.61 28.3 76.4 0.367 1301 0

0003-T5O3 WS1 0.124 1201 0.5 -23.64 0.39 0.00 0.00 0.00 8.0 29.9 0.119 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C106 of 116

0030-T5J7 WS1 0.021 1201 1.0 1.03 -1.41 -2.62 0.00 0.00 8.0 29.9 0.020 1101 0

0037-T58P WS1 0.170 1301 2.0 -18.00 13.27 -0.05 0.00 0.00 40.1 61.2 0.167 1401 0

0333-T5AK WS1 0.308 1301 2.5 -6.91 36.87 0.28 0.00 0.01 40.1 149.3 0.304 1401 0

0334-T5YC WS1 0.152 1301 2.5 -4.14 14.53 0.00 0.00 0.00 40.1 149.3 0.150 1401 0

0335-T5AJ WS1 0.241 1301 2.5 -1.97 46.22 -0.26 0.00 0.01 40.1 149.3 0.240 1401 0

0337-T5AI WS1 0.214 1301 2.5 -0.60 46.11 -1.08 0.00 0.01 40.1 149.3 0.214 1401 0

0338-T5Y4 WS1 0.100 1401 2.5 -0.66 19.97 0.00 0.00 0.00 40.1 149.3 0.100 1101 0

0339-T5AH WS1 0.194 1301 2.5 1.26 42.37 -1.81 0.00 0.01 40.1 149.3 0.193 1401 0

RRRR-T5P2 WS1 0.045 1101 1.0 0.33 0.53 -10.85 0.00 0.00 16.0 29.9 0.044 1201 0

T58P-T58Q WS1 0.174 1301 0.7 -18.11 16.49 -0.51 0.00 0.00 40.1 44.8 0.171 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T58Q-0041 WS1 0.173 1301 0.0 -17.99 14.97 -0.96 0.00 0.00 40.1 43.3 0.170 1401 0

T58T-0009 WS1 0.379 1201 0.0 -18.94 28.29 1.90 0.00 0.00 32.1 119.4 0.368 1101 0

T5AH-0348 WS1 0.201 1301 0.0 1.42 42.61 -1.81 0.00 -0.01 40.1 149.3 0.201 1401 0

T5AI-0346 WS1 0.212 1301 0.0 -0.27 46.60 -1.08 0.00 -0.01 40.1 149.3 0.212 1401 0

T5AJ-0344 WS1 0.238 1301 0.0 -1.76 46.53 -0.26 0.00 -0.01 40.1 149.3 0.237 1401 0

T5AK-0342 WS1 0.305 1301 0.0 -6.67 37.21 0.28 0.00 -0.01 40.1 149.3 0.301 1401 0

T5J7-0024 WS1 0.054 1101 1.5 0.26 12.36 0.00 0.00 0.00 24.1 89.6 0.054 1401 0

T5JC-T5P3 WS1 0.342 1201 0.6 -4.75 56.08 15.59 0.00 0.02 5.2 89.6 0.341 1301 0

T5O3-T58T WS1 0.475 1201 1.5 -24.74 32.83 2.07 0.00 0.01 32.1 119.4 0.459 1101 0

T5P2-T5P5 WS1 0.089 1301 0.0 -0.21 -9.42 -12.51 0.00 0.01 16.5 30.6 0.089 1401 0

T5P3-RRRR WS1 0.071 1101 0.0 0.67 -2.08 15.55 0.00 0.00 16.0 29.9 0.071 1401 0

T5P3-T5P6 WS1 0.200 1201 0.0 -6.29 30.22 -4.45 0.00 -0.01 18.9 89.6 0.199 1301 0

T5P4-0134 WS1 0.230 1201 0.3 -6.83 -22.95 18.25 0.00 -0.02 18.9 89.6 0.230 1301 0

T5P4-TTTT WS1 0.039 1401 0.0 -0.61 0.38 8.98 0.00 0.00 16.0 29.9 0.039 1301 0

T5P5-T5VR WS1 0.057 1401 0.6 0.22 7.35 6.60 0.00 0.00 16.5 30.5 0.057 1301 0

T5P6-T5P4 WS1 0.156 1201 1.0 -6.62 -14.12 10.15 0.00 -0.01 18.9 89.6 0.154 1301 0

T5P6-T5P9 WS1 0.055 1301 0.0 -0.08 0.03 14.29 0.00 0.00 16.0 29.9 0.055 1401 0

T5P9-T5P5 WS1 0.065 1401 1.0 0.00 0.00 -17.12 0.00 0.00 16.0 29.9 0.065 1301 0

T5VR-T5P1 WS1 0.035 1401 0.4 -0.21 0.00 8.87 0.00 0.00 16.5 30.5 0.035 1301 0

T5Y4-0347 WS1 0.100 1401 0.0 -0.66 19.97 0.00 0.00 0.00 40.1 149.3 0.100 1101 0

T5YC-0343 WS1 0.152 1301 0.0 -4.14 14.53 0.00 0.00 0.00 40.1 149.3 0.150 1401 0

TTTT-T5P1 WS1 0.035 1401 1.0 -0.33 0.01 -8.87 0.00 0.00 16.0 29.9 0.035 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C107 of 116

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0003-0131 WS2 0.321 1201 0.0 4.02 -58.86 4.19 0.00 0.08 36.4 18.6 0.315 1301 0

0009-0132 WS2 0.114 1301 0.0 0.50 -22.91 3.19 0.00 0.03 36.4 18.6 0.112 1401 0

0009-T61Z WS2 0.105 1201 2.6 -6.26 14.21 0.72 0.00 0.01 38.5 46.8 0.104 1101 0

0019-0121 WS2 0.193 1201 1.4 2.67 8.94 37.83 0.02 0.03 42.8 18.6 0.189 1101 0

0030-0031 WS2 0.065 1201 0.0 -2.64 11.45 0.38 0.00 -0.01 40.4 13.2 0.064 1101 0

0031-0032 WS2 0.060 1201 0.0 -3.94 7.36 -1.38 0.00 -0.01 40.4 13.2 0.059 1101 0

0032-0033 WS2 0.091 1201 1.0 -4.35 -9.20 -6.23 0.00 -0.02 40.4 13.2 0.090 1101 0

0033-0119 WS2 0.240 1201 1.0 -2.48 -23.68 31.58 0.02 -0.02 40.4 13.2 0.238 1101 0

0036-T504 WS2 0.135 1301 2.0 -1.60 18.16 13.09 0.00 0.01 38.5 26.4 0.133 1401 0

0042-0043 WS2 0.140 1301 4.0 -6.79 -18.94 -4.81 0.00 -0.01 30.8 52.8 0.138 1401 0

0042-0101 WS2 0.134 1201 0.0 -4.02 -10.73 -16.37 0.01 0.03 44.3 13.2 0.132 1101 0

0063-T6B6 WS2 0.138 1301 0.1 -5.02 -19.77 4.31 0.03 -0.04 44.3 1.8 0.136 1401 0

0101-0137 WS2 0.064 1201 1.0 -2.19 11.16 0.77 0.00 0.01 44.3 13.2 0.063 1101 0

0119-T6BF WS2 0.144 1201 0.0 -3.91 -26.88 1.47 0.00 0.04 44.3 9.1 0.142 1101 0

0120-0030 WS2 0.088 1201 0.0 -0.83 13.99 -5.47 0.00 0.00 40.4 16.5 0.087 1301 0

0120-T5J6 WS2 0.231 1301 0.0 -0.19 -45.91 -8.58 0.01 0.08 8.9 52.8 0.230 1401 0

0121-T5LU WS2 0.178 1201 0.0 4.61 4.15 34.92 -0.04 0.04 42.8 5.3 0.174 1101 0

0122-0019 WS2 0.192 1301 0.0 -1.79 -39.00 -2.67 0.00 0.04 42.8 13.2 0.190 1401 0

0129-0009 WS2 0.270 1301 0.0 0.98 -55.46 -7.27 0.01 0.05 36.4 13.2 0.269 1201 0

0132-T620 WS2 0.072 1201 0.0 -3.54 -11.18 -0.04 0.00 0.02 38.5 66.0 0.070 1301 0

0134-T493 WS2 0.254 1101 1.0 -4.14 9.89 -50.49 -0.05 0.03 15.4 26.4 0.254 1201 0

0137-0138 WS2 0.087 1201 1.0 -2.91 9.25 -6.88 0.00 -0.01 44.3 13.2 0.085 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0138-T6BB WS2 0.112 1201 0.0 -5.24 11.32 -6.79 0.02 -0.01 44.3 6.6 0.111 1101 0

0304-0327 WS2 0.163 1301 1.0 -6.58 -18.01 11.34 0.01 -0.03 44.3 13.2 0.162 1401 0

0327-0328 WS2 0.160 1201 0.0 -6.93 -19.02 8.95 -0.01 0.04 44.3 13.2 0.157 1101 0

0328-T6B9 WS2 0.146 1201 0.5 -8.86 9.73 11.90 0.03 0.02 44.3 6.6 0.144 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C108 of 116

0329-0330 WS2 0.141 1201 0.0 -5.91 11.76 -13.50 0.01 0.01 44.3 13.2 0.138 1301 0

0330-0331 WS2 0.117 1201 0.0 -4.28 13.05 8.87 -0.01 -0.01 44.3 13.2 0.115 1101 0

0331-0340 WS2 0.089 1201 0.0 6.78 -11.73 -1.71 0.00 0.01 30.8 52.8 0.088 1101 0

0331-T6B7 WS2 0.069 1201 0.0 -4.62 3.98 -4.30 0.02 -0.03 44.3 0.9 0.067 1301 0

T317-T685 WS2 0.238 1301 0.0 -3.84 -18.53 -10.78 0.00 0.11 44.3 1.7 0.236 1201 0

T320-T66F WS2 0.049 1301 0.0 0.38 -2.19 -8.77 0.00 0.00 44.3 39.6 0.049 1201 0

T492-T502 WS2 0.175 1101 0.0 4.66 11.58 24.88 -0.01 0.00 52.5 18.6 0.175 1201 0

T493-T492 WS2 0.456 1401 0.0 -2.50 16.15 -99.55 0.08 -0.02 15.4 26.4 0.456 1301 0

T502-T503 WS2 0.074 1301 0.0 3.71 8.95 4.28 0.00 -0.01 52.5 13.2 0.073 1401 0

T503-T504 WS2 0.065 1301 0.0 1.80 5.74 6.26 -0.01 -0.01 52.5 13.2 0.064 1401 0

T504-T5BJ WS2 0.149 1301 0.0 -4.65 20.27 8.63 0.00 0.00 38.5 39.6 0.148 1401 0

T58U-0010 WS2 0.108 1201 0.0 -6.29 15.62 0.98 0.00 -0.01 38.5 19.1 0.107 1101 0

T5BH-0133 WS2 0.049 1201 0.0 -0.23 8.13 1.93 0.00 -0.01 23.1 39.6 0.048 1101 0

T5BI-0116 WS2 0.079 1201 0.7 -3.54 12.39 -0.71 0.00 0.00 38.5 66.0 0.078 1101 0

T5BJ-0040 WS2 0.104 1301 0.0 -4.65 15.36 2.25 0.00 -0.01 38.5 39.6 0.102 1401 0

T5J6-T5BH WS2 0.047 1201 0.0 -0.23 8.70 2.26 0.00 0.00 23.1 39.6 0.047 1101 0

T5J6-T5J7 WS2 0.080 1401 1.2 3.07 14.63 0.53 0.00 0.03 90.0 16.5 0.080 1301 0

T5J6-T5JI WS2 0.109 1401 0.0 2.65 -7.08 8.78 0.00 0.05 90.0 5.3 0.107 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5J7-T5J8 WS2 0.129 1301 1.0 5.56 22.83 -1.34 0.00 0.02 90.0 13.2 0.128 1401 0

T5J8-T5J9 WS2 0.133 1301 0.0 7.14 21.45 -1.80 0.00 0.00 90.0 13.2 0.133 1401 0

T5J9-T5JA WS2 0.133 1301 0.0 6.83 20.90 -1.82 0.00 -0.02 90.0 13.2 0.132 1401 0

T5JA-T5JB WS2 0.117 1301 1.0 1.79 -6.18 20.43 0.01 -0.03 90.0 13.2 0.117 1401 0

T5JC-T5JJ WS2 0.161 1201 0.0 -0.04 16.79 22.79 -0.02 -0.02 90.0 5.3 0.160 1101 0

T5JD-T5JC WS2 0.168 1301 0.0 3.21 25.05 -9.84 0.01 -0.01 90.0 16.5 0.167 1401 0

T5JE-T5U3 WS2 0.161 1301 0.6 5.92 23.75 -7.87 0.00 0.00 90.0 7.9 0.161 1401 0

T5JF-T5JE WS2 0.166 1201 0.0 6.80 20.76 10.72 -0.01 0.01 90.0 13.2 0.166 1301 0

T5JG-T5U8 WS2 0.135 1301 0.6 7.24 17.92 6.35 0.00 0.01 90.0 7.9 0.134 1401 0

T5JH-T5JG WS2 0.095 1301 0.0 3.12 -5.66 -14.59 0.01 0.04 90.0 13.2 0.095 1401 0

T5O2-T5LV WS2 0.125 1201 0.0 3.97 -2.44 2.71 0.01 0.06 42.8 5.3 0.121 1301 0

T5O3-T5O2 WS2 0.022 1201 0.0 1.89 2.03 1.07 0.00 0.00 42.8 16.5 0.022 1401 0

T5O4-T5O3 WS2 0.050 1201 0.0 -1.68 -2.31 6.39 0.00 0.01 42.8 13.2 0.049 1101 0

T5U3-T5JD WS2 0.164 1301 0.4 5.92 22.59 -10.09 0.00 -0.01 90.0 5.3 0.163 1401 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C109 of 116

T5U8-T5JF WS2 0.156 1201 0.4 7.28 20.28 9.40 0.00 0.01 90.0 5.3 0.156 1301 0

T61Z-T58U WS2 0.113 1201 0.9 -6.26 15.65 0.98 0.00 0.00 38.5 46.8 0.112 1101 0

T620-T5BI WS2 0.074 1201 0.9 -3.54 11.31 -0.60 0.00 0.00 38.5 66.0 0.073 1101 0

T66F-T319 WS2 0.067 1401 2.7 -3.33 -0.73 12.01 0.00 0.00 44.3 36.3 0.067 1301 0

T66G-T320 WS2 0.049 1301 3.0 2.67 1.28 8.14 0.00 0.00 44.3 39.6 0.048 1401 0

T685-T6BE WS2 0.053 1401 1.6 5.71 -2.51 -2.67 0.00 0.00 44.3 21.4 0.053 1301 0

T686-T317 WS2 0.132 1201 0.1 -4.78 -15.11 -10.75 0.00 -0.05 0.8 1.3 0.132 1301 0

T6B6-0122 WS2 0.196 1301 0.6 -4.99 -36.88 2.29 0.00 -0.05 44.3 8.1 0.195 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T6B7-0063 WS2 0.113 1301 0.9 -5.61 -15.86 -2.28 0.00 -0.04 44.3 12.3 0.112 1201 0

T6B9-0329 WS2 0.139 1201 0.5 -5.48 11.38 -13.22 -0.03 0.01 44.3 6.6 0.136 1101 0

T6BB-0304 WS2 0.098 1201 0.0 -5.18 7.17 7.95 -0.02 -0.02 44.3 6.6 0.096 1101 0

T6BE-T66G WS2 0.044 1301 0.0 4.98 -1.87 -2.93 0.00 0.00 44.3 13.2 0.044 1401 0

T6BF-0042 WS2 0.126 1201 0.1 -3.34 -11.27 -14.68 -0.10 0.03 44.3 0.8 0.124 1101 0

0019-0003 WS3 0.243 1201 4.0 10.77 -41.71 3.18 0.00 -0.01 40.1 148.6 0.242 1301 0

0024-T58J WS3 0.082 1201 0.8 -2.07 11.52 -4.92 0.00 0.00 20.1 74.3 0.081 1301 0

0025-T5U5 WS3 0.149 1101 0.8 10.45 -1.24 -25.11 0.00 0.00 20.1 74.3 0.146 1201 0

0028-T58I WS3 0.214 1201 0.8 -20.50 16.24 -10.18 0.00 0.01 20.1 29.7 0.212 1101 0

0029-T58K WS3 0.209 1301 0.8 -3.76 24.80 -20.35 0.00 0.01 20.1 74.3 0.203 1401 0

0031-T5J8 WS3 0.029 1101 0.0 0.83 -1.28 5.05 0.00 0.00 10.0 37.1 0.029 1201 0

0032-T5J9 WS3 0.081 1201 1.0 2.98 -6.06 -10.29 0.00 0.00 10.0 37.1 0.081 1301 0

0033-T5JA WS3 0.114 1201 0.0 -0.07 -8.08 19.78 0.00 0.00 10.0 37.1 0.113 1301 0

0034-T502 WS3 0.019 1101 1.0 1.79 2.43 0.00 0.00 0.00 20.1 74.3 0.019 1201 0

0035-T503 WS3 0.036 1301 1.0 -3.66 2.27 0.00 0.00 0.00 20.1 74.3 0.034 1401 0

0043-0052 WS3 0.181 1301 2.5 -10.73 28.72 0.00 0.00 0.00 10.0 37.1 0.177 1401 0

0052-T58N WS3 0.268 1301 2.0 -29.65 12.09 1.82 0.00 0.00 50.1 76.1 0.262 1401 0

0063-T59P WS3 0.196 1201 0.0 13.77 -29.96 -0.73 0.00 0.00 40.1 148.6 0.195 1301 0

0085-T5T1 WS3 0.110 1401 2.5 5.16 19.95 0.21 0.00 0.00 50.1 94.7 0.108 1301 0

0086-T61X WS3 0.484 1201 2.6 -11.18 38.52 -0.27 0.00 0.00 50.1 131.8 0.482 1401 0

0101-0332 WS3 0.271 1401 0.0 -4.74 -38.03 1.70 0.00 0.01 40.1 148.6 0.270 1301 0

0121-T5BG WS3 0.251 1201 0.0 -4.93 25.43 -9.84 0.00 -0.01 40.1 148.6 0.235 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C110 of 116

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0133-T5JC WS3 0.456 1101 0.0 -7.34 -93.00 1.28 0.00 0.03 20.1 74.3 0.456 1201 0

0137-T5AE WS3 0.164 1401 0.0 -0.38 -35.15 -3.00 0.00 0.01 40.1 70.6 0.163 1301 0

0138-T5XA WS3 0.107 1101 1.9 4.24 20.05 -0.18 0.00 0.00 40.1 70.6 0.107 1401 0

0304-T5AF WS3 0.123 1201 1.9 6.03 21.87 0.20 0.00 0.01 40.1 70.6 0.123 1101 0

0328-T5XB WS3 0.147 1201 0.0 8.23 -22.90 1.51 0.00 0.01 40.1 70.6 0.146 1101 0

0329-T5A9 WS3 0.157 1201 0.0 9.35 -24.42 2.25 0.00 0.01 40.1 70.6 0.155 1101 0

0330-T5XK WS3 0.280 1201 0.0 7.28 -54.13 3.84 0.00 0.01 40.1 70.6 0.277 1101 0

0332-0341 WS3 0.355 1301 2.5 -9.05 14.16 0.00 0.00 0.00 50.1 185.7 0.341 1401 0

0340-T58V WS3 0.210 1401 2.5 23.57 22.59 0.87 0.00 0.00 50.1 94.7 0.210 1301 0

0341-T58X WS3 0.194 1301 2.0 -13.69 -20.19 2.45 0.00 0.00 50.1 76.1 0.191 1401 0

0342-T58Y WS3 0.504 1301 2.0 -6.55 104.54 2.88 0.00 0.02 50.1 76.1 0.503 1401 0

0343-T5TQ WS3 0.378 1301 2.0 -5.25 77.78 2.20 0.00 0.01 50.1 76.1 0.378 1401 0

0344-T623 WS3 0.392 1301 2.6 -7.42 38.80 0.00 0.00 0.00 50.1 185.7 0.389 1201 0

0346-T5BU WS3 0.327 1201 1.6 -6.11 33.31 0.00 0.00 0.00 50.1 185.7 0.326 1301 0

0347-T61U WS3 0.264 1201 2.6 -2.58 41.54 0.00 0.00 0.00 50.1 185.7 0.262 1101 0

0348-T5BR WS3 0.202 1201 1.6 -2.46 27.90 0.00 0.00 0.00 50.1 185.7 0.198 1101 0

0349-T61W WS3 0.548 1201 2.6 -6.06 50.66 -0.40 0.00 0.00 50.1 131.8 0.543 1101 0

RRRR-T5P9 WS3 0.091 1401 1.0 0.10 3.45 20.07 0.00 0.00 10.3 38.1 0.091 1301 0

T58I-T5JF WS3 0.101 1301 1.2 -2.16 4.12 13.28 0.00 0.00 20.1 44.6 0.101 1201 0

T58I-T5UA WS3 0.023 1201 0.4 3.28 1.70 0.00 0.00 0.00 10.0 14.9 0.023 1101 0

T58J-T5JD WS3 0.169 1401 1.2 7.00 -18.02 8.55 0.00 -0.01 20.1 74.3 0.167 1101 0

T58K-T5JG WS3 0.319 1301 0.0 -10.85 36.90 -18.31 0.00 -0.01 20.1 74.3 0.317 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T58N-T5TG WS3 0.065 1301 0.2 0.08 0.36 -16.79 0.00 0.00 10.0 9.3 0.063 1401 0

T58N-T62A WS3 0.233 1301 0.0 -28.84 12.09 1.82 0.00 0.00 50.1 55.7 0.228 1401 0

T58O-0053 WS3 0.186 1301 0.0 -29.57 -1.70 -0.80 0.00 0.00 50.1 53.9 0.181 1401 0

T58O-T5TH WS3 0.085 1301 0.2 -0.28 -6.16 15.26 0.00 -0.01 10.0 9.3 0.083 1401 0

T58P-T5TE WS3 0.001 1001 0.0 -0.02 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T58Q-T5TF WS3 0.001 1001 0.0 -0.01 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T58V-0349 WS3 0.398 1101 0.0 -17.13 57.31 1.47 0.00 -0.01 50.1 91.0 0.390 1301 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C111 of 116

T58V-T6A9 WS3 0.112 1201 0.2 -0.01 5.23 -23.83 0.00 0.01 10.0 9.3 0.108 1101 0

T58W-0475 WS3 0.292 1201 0.0 -7.83 56.86 -0.54 0.00 -0.01 50.1 53.9 0.289 1101 0

T58W-T6AA WS3 0.168 1201 0.2 0.01 7.06 36.60 0.01 0.01 10.0 9.3 0.167 1301 0

T58X-T5TS WS3 0.140 1301 0.4 0.38 -31.82 -0.74 0.00 -0.02 4.5 16.7 0.140 1401 0

T58X-T628 WS3 0.185 1301 0.0 -13.40 -20.12 2.45 0.00 0.02 50.1 55.7 0.182 1401 0

T58Y-T5TU WS3 0.225 1301 0.4 1.52 44.99 -7.02 0.00 0.03 4.5 16.7 0.225 1401 0

T58Y-T626 WS3 0.537 1301 0.0 -6.35 103.89 2.88 0.00 0.00 50.1 55.7 0.536 1401 0

T58Z-0350 WS3 0.337 1301 0.0 -13.90 58.08 -1.72 0.00 -0.01 50.1 53.9 0.335 1401 0

T58Z-T5TT WS3 0.198 1301 0.4 -0.37 37.66 9.46 0.00 0.03 4.5 16.7 0.198 1401 0

T590-0351 WS3 0.476 1301 0.0 -6.51 99.79 -2.93 0.00 -0.02 50.1 53.9 0.475 1401 0

T590-T5TV WS3 0.134 1101 0.4 7.51 -21.52 -1.88 0.00 -0.02 4.5 16.7 0.134 1401 0

T59P-0085 WS3 0.168 1301 2.8 13.88 -22.63 1.56 0.00 0.00 40.1 148.6 0.168 1401 0

T5A7-0338 WS3 0.179 1201 1.1 9.35 -23.38 9.30 0.00 -0.01 40.1 40.9 0.177 1301 0

T5A9-T5A7 WS3 0.126 1201 0.5 9.17 16.61 -3.28 0.00 0.00 40.1 37.1 0.126 1301 0

T5AC-0335 WS3 0.186 1101 1.1 6.00 -32.42 4.88 0.00 -0.01 40.1 40.9 0.185 1201 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5AD-0333 WS3 0.097 1201 1.1 -0.21 -12.53 -11.24 0.00 -0.01 40.1 40.9 0.097 1301 0

T5AE-T5AD WS3 0.040 1201 1.0 -0.23 4.56 5.19 0.00 0.00 40.1 37.1 0.040 1301 0

T5AF-T5AC WS3 0.123 1201 0.0 5.92 21.87 0.20 0.00 0.00 40.1 37.1 0.122 1101 0

T5BG-0131 WS3 0.632 1201 2.8 -4.93 -116.49 7.73 0.00 -0.01 40.1 148.6 0.610 1301 0

T5BR-T61V WS3 0.233 1201 1.0 -2.46 35.30 0.00 0.00 0.00 50.1 185.7 0.230 1101 0

T5BS-0474 WS3 0.203 1201 0.0 -2.46 28.34 0.00 0.00 0.00 50.1 185.7 0.200 1101 0

T5BT-0472 WS3 0.318 1201 0.0 -6.11 30.80 0.00 0.00 -0.01 50.1 185.7 0.317 1301 0

T5BU-T621 WS3 0.352 1201 1.0 -6.11 40.17 0.00 0.00 0.00 50.1 185.7 0.352 1301 0

T5J8-0025 WS3 0.154 1101 1.5 0.41 35.56 0.00 0.00 0.00 30.1 111.4 0.153 1401 0

T5J9-0028 WS3 0.207 1301 1.5 -4.62 35.56 0.00 0.00 0.00 30.1 111.4 0.206 1201 0

T5JA-T6BH WS3 0.146 1301 1.6 -5.17 18.15 1.65 0.00 0.00 30.1 111.4 0.144 1201 0

T5JD-T6BL WS3 0.096 1301 0.5 -6.91 2.96 -0.15 0.00 0.00 30.1 111.4 0.094 1401 0

T5JE-T6BK WS3 0.102 1301 0.5 -7.38 2.91 0.15 0.00 0.00 30.1 111.4 0.097 1401 0

T5JF-0036 WS3 0.053 1301 1.5 -2.93 4.21 0.00 0.00 0.00 30.1 111.4 0.043 1401 0

T5JG-T6BJ WS3 0.191 1301 0.5 -13.20 6.32 -2.21 0.00 0.00 30.1 111.4 0.184 1401 0

T5P9-TTTT WS3 0.075 1301 0.0 -0.01 3.41 -15.76 0.00 0.00 10.3 38.1 0.075 1401 0

T5T1-0086 WS3 0.324 1301 0.0 -17.28 38.74 1.08 0.00 0.00 50.1 91.0 0.323 1001 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C112 of 116

T5T1-T5T2 WS3 0.004 1301 0.4 0.70 0.13 0.00 0.00 0.00 7.5 27.9 0.004 1201 0

T5T2-T58T WS3 0.019 1301 0.5 3.76 0.24 0.00 0.00 0.00 10.0 37.1 0.018 1201 0

T5T3-0089 WS3 0.241 1201 0.0 -11.68 39.82 -0.37 0.00 -0.01 50.1 53.9 0.238 1101 0

T5T3-T5T4 WS3 0.003 1301 0.4 0.44 0.13 0.00 0.00 0.00 7.5 27.9 0.003 1401 0

T5T4-T58U WS3 0.002 1401 0.5 0.30 0.24 0.00 0.00 0.00 10.0 37.1 0.002 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T5TE-T58N WS3 0.003 1001 0.0 0.11 0.00 0.00 0.00 0.00 7.5 27.9 0.003 1101 0

T5TF-T58O WS3 0.002 1301 0.4 -0.31 0.13 0.00 0.00 0.00 7.5 27.9 0.002 1401 0

T5TG-T58X WS3 0.075 1301 0.0 0.43 1.11 -16.79 0.00 0.00 10.0 27.9 0.073 1401 0

T5TG-T629 WS3 0.010 1301 0.6 -1.05 0.85 0.00 0.00 0.00 15.0 55.7 0.010 1401 0

T5TH-T58Z WS3 0.099 1301 0.0 -0.42 -6.47 15.26 0.00 0.01 10.0 27.9 0.097 1401 0

T5TQ-T624 WS3 0.401 1301 0.0 -5.10 77.13 2.20 0.00 -0.01 50.1 55.7 0.401 1401 0

T5TR-0352 WS3 0.044 1301 0.7 -5.06 3.29 0.00 0.00 0.00 50.1 53.9 0.044 1401 0

T5TS-T58Y WS3 0.174 1301 0.0 1.58 -29.21 -0.74 0.00 0.02 5.5 20.4 0.174 1401 0

T5TS-T627 WS3 0.006 1301 0.6 -0.34 0.85 0.00 0.00 0.00 15.0 55.7 0.006 1401 0

T5TT-T590 WS3 0.319 1301 0.0 7.42 54.57 9.46 0.00 -0.03 5.5 20.4 0.319 1401 0

T5TU-T5TQ WS3 0.243 1301 0.0 0.03 41.77 -7.02 0.00 -0.02 5.5 20.4 0.243 1401 0

T5TU-T625 WS3 0.008 1301 0.6 -0.64 0.85 0.00 0.00 0.00 15.0 55.7 0.008 1401 0

T5TV-T5TR WS3 0.262 1101 0.0 -0.02 -37.85 -1.88 0.00 0.02 5.5 20.4 0.262 1201 0

T5U5-T58I WS3 0.015 1201 0.5 2.76 0.46 0.00 0.00 0.00 10.0 37.1 0.015 1101 0

T5U5-T5JE WS3 0.226 1301 0.0 -9.74 15.09 -21.51 0.00 0.00 20.1 44.6 0.224 1201 0

T5U6-T5U5 WS3 0.011 1201 0.0 1.90 0.44 0.00 0.00 0.00 10.0 22.3 0.011 1101 0

T5X9-0334 WS3 0.168 1201 1.1 4.20 -27.25 -8.45 0.00 -0.01 40.1 40.9 0.167 1101 0

T5XA-T5X9 WS3 0.107 1201 0.5 4.13 18.44 2.26 0.00 0.00 40.1 37.1 0.106 1101 0

T5XB-T5XC WS3 0.117 1301 0.0 7.88 16.58 -1.59 0.00 0.00 40.1 37.1 0.117 1201 0

T5XC-0337 WS3 0.203 1401 1.1 7.91 -32.23 -6.55 0.00 -0.01 40.1 40.9 0.202 1301 0

T5XJ-0339 WS3 0.105 1201 1.1 7.28 -2.05 16.46 0.00 0.00 40.1 40.9 0.103 1301 0

T5XK-T5XJ WS3 0.096 1201 1.0 7.22 4.84 -11.08 0.00 0.00 40.1 37.1 0.095 1301 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C113 of 116

ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T61U-0473 WS3 0.264 1201 0.0 -2.58 41.54 0.00 0.00 0.00 50.1 185.7 0.262 1101 0

T61V-T5BS WS3 0.233 1201 0.0 -2.46 35.30 0.00 0.00 0.00 50.1 185.7 0.230 1101 0

T61W-T58W WS3 0.347 1201 0.9 -6.06 56.86 -0.54 0.00 0.00 50.1 131.8 0.342 1101 0

T61X-T5T3 WS3 0.501 1401 0.5 -8.54 40.63 -0.27 0.00 0.00 50.1 131.8 0.501 1201 0

T621-T5BT WS3 0.352 1201 0.0 -6.11 40.17 0.00 0.00 0.00 50.1 185.7 0.352 1301 0

T623-0353 WS3 0.392 1301 0.0 -7.42 38.80 0.00 0.00 0.00 50.1 185.7 0.389 1201 0

T624-T5TR WS3 0.272 1301 0.0 -5.10 50.19 1.37 0.00 -0.02 50.1 55.7 0.271 1401 0

T625-T5TV WS3 0.008 1301 0.0 -0.64 0.85 0.00 0.00 0.00 15.0 55.7 0.008 1401 0

T626-T590 WS3 0.526 1301 0.0 -6.35 103.29 0.69 0.00 0.00 50.1 55.7 0.525 1401 0

T627-T5TT WS3 0.006 1301 0.0 -0.34 0.85 0.00 0.00 0.00 15.0 55.7 0.006 1401 0

T628-T58Z WS3 0.360 1301 0.9 -13.40 57.93 -1.72 0.00 0.02 50.1 55.7 0.357 1401 0

T629-T5TH WS3 0.010 1301 0.0 -1.05 0.85 0.00 0.00 0.00 15.0 55.7 0.010 1401 0

T62A-T58O WS3 0.215 1301 0.0 -28.84 8.77 0.83 0.00 0.00 50.1 55.7 0.210 1401 0

T66D-T6B8 WS3 0.063 1401 1.5 3.48 -9.83 0.84 0.00 0.00 15.0 55.7 0.062 1301 0

T66E-T6BC WS3 0.068 1101 0.7 1.77 -12.83 -1.31 0.00 0.00 6.9 25.6 0.068 1201 0

T66F-T66H WS3 0.145 1201 1.3 -2.13 -26.61 -4.56 0.00 -0.01 25.5 47.2 0.143 1101 0

T66G-T66I WS3 0.053 1401 1.3 -0.42 -9.20 -2.80 0.00 0.00 25.5 47.2 0.053 1301 0

T66H-0330 WS3 0.323 1201 1.3 7.68 -62.71 -4.81 0.00 -0.01 25.5 47.2 0.323 1101 0

T66H-T6B5 WS3 0.058 1201 1.1 -5.45 -5.95 0.55 0.00 0.00 10.7 39.6 0.058 1101 0

T66I-0137 WS3 0.221 1101 1.3 8.22 -42.39 0.39 0.00 -0.01 25.5 47.2 0.220 1401 0

T66I-T6BA WS3 0.012 1201 0.7 -1.00 1.30 -0.06 0.00 0.00 15.0 55.7 0.010 1101 0

T6A9-T5T1 WS3 0.120 1201 0.0 0.66 6.69 -21.92 0.00 0.00 10.0 27.9 0.117 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T6A9-T6AB WS3 0.136 1101 2.4 -1.13 -19.79 -1.24 0.00 0.00 24.6 91.0 0.135 1201 0

T6AA-T5T3 WS3 0.162 1201 0.0 0.42 7.90 31.11 0.00 0.00 10.0 27.9 0.160 1301 0

T6AB-T6AA WS3 0.248 1301 0.0 -1.49 -23.86 3.65 0.00 0.00 35.6 131.8 0.246 1401 0

T6B4-T66C WS3 0.079 1401 0.6 -1.40 11.53 -5.78 0.00 0.01 6.1 22.7 0.079 1301 0

T6B4-T6B6 WS3 0.110 1201 1.3 1.46 -19.52 -4.77 0.00 -0.01 12.7 47.2 0.110 1101 0

T6B5-T6B4 WS3 0.064 1201 0.0 -1.17 -9.65 -3.57 0.00 0.00 10.7 39.8 0.063 1101 0

T6B5-T6B7 WS3 0.134 1201 1.3 -0.05 -27.05 -4.32 0.00 -0.01 12.7 47.2 0.133 1101 0

T6B8-T66H WS3 0.100 1301 1.5 -10.25 4.42 3.93 0.00 0.00 15.0 55.7 0.099 1201 0

T6B8-T6B9 WS3 0.088 1201 1.3 -2.74 -14.53 -2.79 0.00 -0.01 12.7 47.2 0.088 1101 0
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C114 of 116

T6BA-T66D WS3 0.048 1201 1.5 -1.24 8.81 0.15 0.00 0.00 15.0 55.7 0.046 1101 0

T6BA-T6BB WS3 0.085 1401 1.3 -1.53 -16.23 -1.37 0.00 0.00 12.7 47.2 0.084 1301 0

T6BC-T6BD WS3 0.057 1201 0.0 -0.57 -11.00 -1.71 0.00 0.01 10.6 39.4 0.056 1101 0

T6BC-T6BF WS3 0.188 1101 1.3 -8.79 -31.87 -0.34 0.00 -0.01 12.7 47.2 0.188 1201 0

T6BD-0101 WS3 0.165 1101 1.3 -9.08 -21.63 -5.35 0.00 0.00 12.7 47.2 0.164 1401 0

T6BD-T66I WS3 0.097 1201 0.0 -6.69 10.81 -3.72 0.00 0.00 10.0 37.1 0.097 1301 0

T6BE-T6BD WS3 0.122 1401 1.3 -5.39 -19.30 -2.36 0.00 -0.01 12.7 47.2 0.121 1301 0

T6BH-0029 WS3 0.156 1301 0.0 -5.17 18.18 2.94 0.00 0.00 30.1 111.4 0.154 1201 0

T6BH-T6BG WS3 0.021 1201 1.0 -0.04 -3.50 -0.84 0.00 0.00 10.0 37.1 0.021 1301 0

T6BJ-0037 WS3 0.201 1301 1.2 -13.20 10.22 -1.10 0.00 0.00 30.1 111.4 0.197 1401 0

T6BJ-T6BI WS3 0.001 1001 0.0 0.06 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

T6BK-0035 WS3 0.109 1301 1.2 -7.38 4.52 0.07 0.00 0.00 30.1 111.4 0.103 1401 0

T6BL-0034 WS3 0.103 1301 1.2 -6.91 4.59 -0.07 0.00 0.00 30.1 111.4 0.100 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP I - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.80

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

T6BL-T6BK WS3 0.001 1001 0.0 0.00 0.00 0.00 0.00 0.00 10.0 37.1 0.001 1101 0

0131-T5O2 WS4 0.365 1201 0.0 -16.91 -55.03 -8.49 0.00 0.06 8.0 29.9 0.359 1301 0

T5O2-0132 WS4 0.424 1201 0.0 -17.99 45.20 -0.58 0.00 -0.01 32.1 119.4 0.403 1101 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP II - UNITY CHECKS GREATER THAN 0.80 AND LESS THAN 0.99

MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST TH


MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UN
ID UNITY CK NO. END N/mm2 N/mm2 N/mm2 kN kN CHECK COND CH

0047-0466 TV6 0.816 1301 0.0 -122.63 -37.17 5.16 0.00 0.02 47.1 47.1 0.792 1401 0

DATE 3-NOV-2019
SALMAN (S1) TOPSIDE

SACS-IV MEMBER UNITY CHECK RANGE SUMMARY

GROUP III - UNITY CHECKS GREATER THAN 0.99 AND LESS THAN*****

** NO UNITY CHECKS IN THIS GROUP **


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C115 of 116

APPENDIX C6
JOINTCAN CHECK SUMMARY
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 C116 of 116

* * J O I N T C A N S U M M A R Y * *
(UNITY CHECK ORDER)
**************** ORIGINAL ************* ***************** DESIGN **************

JOINT DIAMETER THICKNESS YLD STRS UC DIAMETER THICKNESS YLD STRS UC


(CM) (CM) (N/MM2) (CM) (CM) (N/MM2)

0047 91.440 4.800 327.005 0.895 91.440 4.800 327.005 0.895


0049 91.440 3.500 327.005 0.548 91.440 3.500 327.005 0.548
0114 91.440 3.500 327.005 0.482 91.440 3.500 327.005 0.482
0113 91.440 3.500 327.005 0.462 91.440 3.500 327.005 0.462
0081 91.440 3.500 327.005 0.453 91.440 3.500 327.005 0.453
0080 91.440 3.500 327.005 0.429 91.440 3.500 327.005 0.429
0046 91.440 3.500 327.005 0.424 91.440 3.500 327.005 0.424
0048 91.440 3.500 327.005 0.406 91.440 3.500 327.005 0.406
0004 91.440 3.500 327.005 0.366 91.440 3.500 327.005 0.366
T484 50.800 2.540 327.005 0.363 50.800 2.540 327.005 0.363
0000 91.440 3.500 327.005 0.187 91.440 3.500 327.005 0.187
T473 27.310 1.270 327.005 0.086 27.310 1.270 327.005 0.086
T485 27.310 1.270 327.005 0.063 27.310 1.270 327.005 0.063
T475 27.310 1.270 327.005 0.059 27.310 1.270 327.005 0.059
T476 27.310 1.270 327.005 0.058 27.310 1.270 327.005 0.058
T486 27.310 1.270 327.005 0.043 27.310 1.270 327.005 0.043
T478 27.310 1.270 327.005 0.039 27.310 1.270 327.005 0.039
T477 27.310 1.270 327.005 0.039 27.310 1.270 327.005 0.039
T487 27.310 1.270 327.005 0.030 27.310 1.270 327.005 0.030
T474 27.310 1.270 327.005 0.029 27.310 1.270 327.005 0.029
T480 27.310 1.270 327.005 0.025 27.310 1.270 327.005 0.025
T479 27.310 1.270 327.005 0.025 27.310 1.270 327.005 0.025
T488 27.310 1.270 327.005 0.014 27.310 1.270 327.005 0.014
T481 27.310 1.270 327.005 0.010 27.310 1.270 327.005 0.010
T483 27.310 1.270 327.005 0.010 27.310 1.270 327.005 0.010
T489 27.310 1.270 327.005 0.004 27.310 1.270 327.005 0.004
T490 11.430 0.856 327.005 0.001 11.430 0.856 327.005 0.001
T482 21.910 1.270 327.005 0.001 21.910 1.270 327.005 0.001
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 11 PAGES

APPENDIX D
RESULT PLOTS
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D1 of 11

PLAN VIEW AT Z = 21.780 MIN VALUE=0.600

0.76
0.68

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D2 of 11

PLAN VIEW AT Z = 18.730 MIN VALUE=0.600

0.63

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D3 of 11

PLAN VIEW AT Z = 14.730 MIN VALUE=0.600

0.63

0.68
0.68

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D4 of 11

PLAN VIEW AT Z = 10.080 MIN VALUE=0.600

0.61

0.68

0.61 0.61
0.74

0.61 0.67
0.67

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D5 of 11

PLAN VIEW AT Z = 6.530 MIN VALUE=0.600

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D6 of 11

PLAN VIEW AT X = 11.000 MIN VALUE=0.600

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D7 of 11

PLAN VIEW AT X = -1.000 MIN VALUE=0.600

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D8 of 11

PLAN VIEW AT X = -11.000 MIN VALUE=0.600

0.68
0.67

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D9 of 11

PLAN VIEW AT X = -15.000 MIN VALUE=0.600

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D10 of 11

PLAN VIEW AT Y = -5.750 MIN VALUE=0.600

0.67

64
0.
0.63

82
0.

0.61 0.67

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 D11 of 11

PLAN VIEW AT Y = 5.750 MIN VALUE=0.600

0.76
66
0.

0.
75

0.61

UC MAX COMB LC LIST


Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 12 PAGES

APPENDIX E
PADEYE DESIGN
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E1 of 12

Heavy Padeye

Design Type Shackle or Pin (S/P)? S

Contingency factor 1.03


dynamic amplification factor 1.15
COG shift factor 1
CG factor 1.03
YAW factor 1.05
TILT factor 1.03
consequence factor 1.35

1.Sling Load (unfactored) ~ 4101.65 KN USED 418.28 Tonnes

1a. Load Factor


Load Factor for Steel Pad-eye = 1.03*1.15*1.0*1.03*1.05*1.03*1.35 = 1.781 NDI 0027
Load Factor for Connector Shackle = 1.03*1.15*1.0*1.03*1.05*1.03*1.35/DAF= 1.147 NDI 0027

1b. Design Sling Load


Design Load for Padeye = 7306.2 KN 745.07 metric tonnes(MT)
Design Load for Connector Shakle = 4706.1 KN 479.92 metric tonnes(MT)

2.Steel Grade,FY
Steel Plate = 345 Mpa
Shackle = 345 Mpa

3.Allowable Stress Factors


3a.Steel Plate
Bearing 0.9 FY = 310.5 Mpa
Shear 0.4 FY = 138 Mpa
Tension1 (AISC D1) 0.6 FY = 207 Mpa

Tension2 (AISC D3.1) 0.45 FY = 155.25 Mpa

In-Plane Bending 0.6 FY = 207 Mpa


Out-Of Plane Bending 0.75 FY = 258.75 Mpa
Combined 0.66 FY = 227.7 Mpa

3b.Connector Shackle
Shear 0.4 FY = 138 Mpa

4.Shackle Selection and Details

Sling Load for Shackle Design = 4706.087 KN 479.92 metric tonnes(MT)


Type = GN
Selected Capacity (SWL) = 600 MT

Safety Factor = 1.250211 > 1.00 OK


Shackle Details:
Pin Diameter (D2) = 200.00 mm
Inside Width at Pin (jaw width) = 290 mm
Pin c/ Line to Inside Edge = 720.00 mm

5.Padeye Details
Pinhole Diameter (D1) Suggest: = 203.00 mm
Provided: = 205 mm
Pinhole Radius rP = 102.5 mm
minimum radius of Main Plate is the maximum value of following:
1.25*(2*rp) = 256.25 mm
rp+3" = 178.7 mm
minimum radius of Main Plate = 256.25 mm

Main Plate Thickness tm = 40 mm


Main Plate Radius rm = 400 mm
CHECK: rm >min(rm ) OK

Cheek Plate Thickness tc = 40 mm


Cheek Plate Radius rc = 350 mm
No. of Cheek Plates = 2 mm
Spacer Plate Thickness ts = 40 mm
Spacer Plate Radius rs = 250 mm
No. of Spacer Plates = 2 mm
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E2 of 12

6. Check Padeye Dimension

Try the following plate thickness:


main plate tm = 40 mm
cheek plate tc = 40 mm
Spacer Plate ts = 40 mm
Total thickness = tm +2tc+2ts = 200 mm

Total thickness < jaw width OK

Gap Between padeye & Shackle = 45 mm


% of Shackle Width = 15.5 % < 20 % OK
Main Plate Edge to Pinhole Edge = 297.5 mm
Clearance for Sling = 320.00 mm Clearance is adequate for Sling

7. Check for Bearing

Allowable Stress Bearing: 0.9 FY = 310.50 Mpa

Bearing Force = 7306.2 KN


Bearing Area = Pin Diameter*Total thickness = 46000 mm2
Bearing Stress = 158.83 Mpa

Actual/Capacity = 0.512 Bearing Capacity Satisfactory OK

8. Check for Shear (Failure line 1)

Allowable Stress Shear: 0.4 FY = 138.00 Mpa

Failure Mode Shape:

Shear Force = 7306.2 KN


Shear Area = 2*tm *(rm -rp)+2*2*tc*(rc-rp)+2*2*ts*(rs-rp) = 87000 mm2
Shear Stress = 83.98 Mpa

Actual/Capacity = 0.609 Shear Capacity Satisfactory OK

9. Check for Tension (Failure line 1 & 2)

Allowable Stress Tention1 0.6 FY = 207.00 Mpa


Tention2 0.45 FY = 155.25 Mpa

Failure Mode Shape:

Tension Force = 7306.2 KN


Tension Area line1 = π*rm *tm = 50265.48 mm2
Tension Stress = 145.35 Mpa

Actual/Capacity = 0.702 Tensile Capacity Satisfactory OK

Tension Area line2 = 2*tm *(rm -rp)+2*2*tc*(rc-rp)+2*2*ts*(rs-rp) = 87000 mm2


Tension Stress = 83.98 Mpa

Actual/Capacity = 0.541 Tensile Capacity Satisfactory OK

10.Padeye Properties
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E3 of 12

10a. Stiffeners and Gusset Plates Dimension

Upper Gusset Plate Thickness = 35.00 mm


Lower Gusset Plate Thickness = 35.00 mm
Main Plate Thickness = 40.00 mm
a1 = 300.00 mm
a2 = 300.00 mm
b1 = 1275.00 mm
b2 = 637.50 mm
b3 = 637.50 mm
b = 1345.00 mm

Stiffener No.1 Thickness = 25.00 mm


Stiffener No.2 Thickness = 25.00 mm
a4 = 143.00 mm
a5 = 143.00 mm
b4 = 500.00 mm
b5 = 775.00 mm

Note: Don't live any parameter 0, give them 0.00001

10b. Section Properties


I). Area Calculation
Upper Gusset Area (A1) = 10500 mm2
Lower Gusset Area (A2) = 10500 mm2
Main Plate Area (A3) = 51000 mm2
Stiffener No.1 Area (A4) = 7150 mm2
Stiffener No.2 Area (A5) = 7150 mm2

Total Area (A) = 86300 mm2


Y1 = 670.428737 mm
Y2 = 674.571263 mm

II). Moment of Inertia Calculation


IIa). Moment of Inertia X axis Ixx
IxxA1 = 4.48E+09 mm4
IxxA2 = 4.53E+09 mm4
IxxA3 = 6.91E+09 mm4
IxxA4 = 1.16E+08 mm4
IxxA5 = 1.57E+08 mm4

Total IxxA = 1.62E+10 mm4


Section Modulus X axis
SXX = 2.40E+07 mm3

IIb). Moment of Inertia Y axis Iyy


IyyA1 = 7.88E+07 mm4
IyyA2 = 7.88E+07 mm4
IyyA3 = 6.80E+06 mm4
IyyA4 = 7.20E+07 mm4
IyyA5 = 7.20E+07 mm4

Total IyyA = 3.08E+08 mm4


Section Modulus Y axis
SYY = 1.89E+06 mm3

L = 637.50 mm
K = 225 mm
e = -2.07 mm
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E4 of 12

11.Check Combined Stress


Applied Force Vertical Angle,Θ = 78 deg
Applied Force Out-of-Plane Angle = 5 deg Angle of force with plane

Forces at Padeye Pinhole 42.01681


In-Plane Force = 7278.40 KN
RP2A Out-of-Plane Force = 363.92 KN (5% of Sling Load per API WSD)
Out-of-Plane Force = 636.78 KN (Due to Padeye Orientation)
Combined Out-of-Plane Force = 1000.70 KN

In-Plane Force:
Y-Y Dir = 1513.26 KN
Z-Z Dir = 7119.35 KN
Combined Out-of-Plane Force
X-X Dir = 419.42 KN
Z-Z Dir = 634.35 KN

Moment
In-Plane Moment (M x-x) = 356.54 KN-m
Out-of-Plane Moment (M y-y) = 225.16 KN-m

Force
Tension Force (Z-Z Dir) = 7753.70 KN
Shear force (Y-Y Dir) = 1513.26 KN
Shear force (X-X Dir) = 419.42 KN

Stresses
Axial Stress (Tensile stress) = P/A = 89.85 Mpa < 0.6 Fy = 207 U.C = 0.43 OK

average Shear Stress = V/A = 22.39 Mpa < 0.4 Fy = 138 U.C = 0.16 OK

Shear stress @ point 1 (Y-Y Dir) = VQ/It = 9.21 Mpa < 0.4 Fy = 138 U.C = 0.07 OK
Shear stress @ point 1 (X-X Dir) = VQ/It = 15.30 Mpa < 0.4 Fy = 138 U.C = 0.11 OK
Shear stress @ point 2 (Y-Y Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 2 (X-X Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 3 (Y-Y Dir) = VQ/It = 9.15 Mpa < 0.4 Fy = 138 U.C = 0.07 OK
Shear stress @ point 3 (X-X Dir) = VQ/It = 15.30 Mpa < 0.4 Fy = 138 U.C = 0.11 OK
Shear stress @ point 4 (Y-Y Dir) = VQ/It = 1.70E+00 Mpa < 0.4 Fy = 138 U.C = 0.01 OK
Shear stress @ point 4 (X-X Dir) = VQ/It = 1.78E+01 Mpa < 0.4 Fy = 138 U.C = 0.13 OK
Shear stress @ point 5 (Y-Y Dir) = VQ/It = 1.98E+00 Mpa < 0.4 Fy = 138 U.C = 0.01 OK
Shear stress @ point 5 (X-X Dir) = VQ/It = 1.78E+01 Mpa < 0.4 Fy = 138 U.C = 0.13 OK
Shear stress @ centerline (Y-Y Dir) = VQ/It = 40.36 Mpa < 0.4 Fy = 138 U.C = 0.29 OK

max In-Plane Bending Stress = M x-x/S x-x = 14.85 Mpa < 0.6 Fy = 207 U.C = 0.07 OK
Bending stress @ point 1 = = 14.47 Mpa < 0.6 Fy = 207 U.C = 0.07 OK
Bending stress @ point 2 = = 14.85 Mpa < 0.6 Fy = 207 U.C = 0.07 OK
Bending stress @ point 3 = = 14.38 Mpa < 0.6 Fy = 207 U.C = 0.07 OK
Bending stress @ point 4 = = 2.80 Mpa < 0.6 Fy = 207 U.C = 0.01 OK
Bending stress @ point 5 = = 3.26 Mpa < 0.6 Fy = 207 U.C = 0.02 OK

max Out-of-Plane Bending Stress = M y-y/S y-y = 119.01 Mpa < 0.75 Fy = 258.75 U.C = 0.46 OK
Bending stress @ point 1 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Bending stress @ point 2 = = 119.01 Mpa < 0.75 Fy = 258.75 U.C = 0.46 OK
Bending stress @ point 3 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Bending stress @ point 4 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Bending stress @ point 5 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E5 of 12

11.a Combined Stress (Von mises)

Allowable Stress 0.66 Fy = 227.7 Mpa


POINT 1
Y-Y Dir
τxy = 9.21 Mpa
σxx = 104.31 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 105.5259 U.C = 0.46 OK
POINT 1
X-X Dir
τxy = 15.30 Mpa
σxx = 104.31 Mpa
σyy = 0 Mpa
COMBINED = (σxx2-σxx*σyy+σyy2+3*τxy2)0.5 = 107.6267 U.C = 0.47 OK
POINT 2
Y-Y Dir
τxy = 0.00 Mpa
σxx = 223.70 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 223.7048 U.C = 0.98 OK
POINT 2
X-X Dir
τxy = 0.00 Mpa
σxx = 223.70 Mpa
σyy = 0 Mpa
COMBINED = (σxx2-σxx*σyy+σyy2+3*τxy2)0.5 = 223.7048 U.C = 0.98 OK
POINT 3
Y-Y Dir
τxy = 9.15 Mpa
σxx = 104.22 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 105.4206 U.C = 0.46 OK
POINT 3
X-X Dir
τxy = 15.30 Mpa
σxx = 104.22 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 107.5383 U.C = 0.47 OK
POINT 4
Y-Y Dir
τxy = 1.70 Mpa
σxx = 92.64 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 92.69039 U.C = 0.41 OK
POINT 4
X-X Dir
τxy = 17.80 Mpa
σxx = 92.64 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 97.63639 U.C = 0.43 OK
POINT 5
Y-Y Dir
τxy = 1.98 Mpa
σxx = 93.10 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 93.16589 U.C = 0.41 OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E6 of 12

POINT 5
X-X Dir
τxy = 17.80 Mpa
σxx = 93.10 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 98.07224 U.C = 0.43 OK

12.Stress due to Pressure between elastic bodies


Kd=(D1*D2)/(D1-D2) = 8200
0.5
Fc=0.591*((((Sling Force/Tt))*E)/Kd) T: Wanted thickness
Young Modules(E) = 200000 Mpa

For Main Plate Tm = 40 mm Fc = 556.80 Mpa


For Cheek Plate Tc = 40 mm Fc = 556.80 Mpa
For Spacer Plate Ts = 40 mm Fc = 556.80 Mpa

Allowable Stress = 2.5 FY = 862.5 Mpa


CHECK: Fc < FY
U.C = 0.65 OK
13.Welding Check
The force divide between plates according to plate thickness
Total thickness = tm +2tc+2ts = 200 mm

Total Force = 7306.2 KN


Force taken by Main Plate = 1461.24 KN
Force taken by Cheek Plate = 2922.48 KN
Force taken by Spacer Plate = 2922.48 KN

Force act on weld(Spacer to Cheek plate) = 1461.24 KN


Force act on weld(Cheek to Main plate) = 2922.48 KN

Allowable Shear Stress for Fillet Weld is the lesser of:(Assume used E70xx Electrode, Tensile Strength)
Tensile Strength = 420 Mpa
Fs1= 0.3*0.707*Tensile Strength = 89.08 Mpa
Fs2=0.4*FY = 138 Mpa
Allowable Shear Stress=Min(Fs1,Fs2) = 89.08 Mpa

13a.Welding Check(Main Plate with Cheek Plate)

Weld Length = 2199.11 mm all around


throat of Weld Size required = 14.92 mm (min)
Weld size required = 21.10 mm

Selected weld size = 30 mm

Check space for welding


Space = min((rm -rc),(tc)) = 40 > 30 OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E7 of 12

Light Padeye

Design Type Shackle or Pin (S/P)? S

Contingency factor 1.03


dynamic amplification factor 1.15
COG shift factor 1
CG factor 1.03
YAW factor 1.05
TILT factor 1.03
consequence factor 1.35

1.Sling Load (unfactored) ~ 2084.17 KN USED 212.541 Tonnes

1a. Load Factor


Load Factor for Steel Pad-eye = 1.03*1.15*1.0*1.03*1.05*1.03*1.35 = 1.781 NDI 0027
Load Factor for Connector Shackle = 1.03*1.15*1.0*1.03*1.05*1.03*1.35/DAF= 1.147 NDI 0027

1b. Design Sling Load


Design Load for Padeye = 3712.5 KN 378.59 metric tonnes(MT)
Design Load for Connector Shakle = 2391.3 KN 243.86 metric tonnes(MT)

2.Steel Grade,FY
Steel Plate = 345 Mpa
Shackle = 345 Mpa

3.Allowable Stress Factors


3a.Steel Plate
Bearing 0.9 FY = 310.5 Mpa
Shear 0.4 FY = 138 Mpa
Tension1 (AISC D1) 0.6 FY = 207 Mpa

Tension2 (AISC D3.1) 0.45 FY = 155.25 Mpa

In-Plane Bending 0.6 FY = 207 Mpa


Out-Of Plane Bending 0.75 FY = 258.75 Mpa
Combined 0.66 FY = 227.7 Mpa

3b.Connector Shackle
Shear 0.4 FY = 138 Mpa

4.Shackle Selection and Details

Sling Load for Shackle Design = 2391.304 KN 243.86 metric tonnes(MT)


Type = G-2160
Selected Capacity (SWL) = 300 MT

Safety Factor = 1.230207 > 1.00 OK


Shackle Details:
Pin Diameter (D2) = 133.35 mm
Inside Width at Pin (jaw width) = 187.452 mm
Pin c/ Line to Inside Edge = 600.20 mm

5.Padeye Details
Pinhole Diameter (D1) Suggest: = 136.35 mm
Provided: = 140 mm
Pinhole Radius rP = 70 mm
minimum radius of Main Plate is the maximum value of following:
1.25*(2*rp) = 175 mm
rp+3" = 146.2 mm
minimum radius of Main Plate = 175 mm

Main Plate Thickness tm = 40 mm


Main Plate Radius rm = 250 mm
CHECK: rm >min(rm ) OK

Cheek Plate Thickness tc = 40 mm


Cheek Plate Radius rc = 200 mm
No. of Cheek Plates = 2 mm
Spacer Plate Thickness ts = 25 mm
Spacer Plate Radius rs = 150 mm
No. of Spacer Plates = 2 mm
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E8 of 12

6. Check Padeye Dimension

Try the following plate thickness:


main plate tm = 40 mm
cheek plate tc = 40 mm
Spacer Plate ts = 25 mm
Total thickness = tm +2tc+2ts = 170 mm

Total thickness < jaw width OK

Gap Between padeye & Shackle = 8.726 mm


% of Shackle Width = 4.7 % < 20 % OK
Main Plate Edge to Pinhole Edge = 180 mm
Clearance for Sling = 350.20 mm Clearance is adequate for Sling

7. Check for Bearing

Allowable Stress Bearing: 0.9 FY = 310.50 Mpa

Bearing Force = 3712.5 KN


Bearing Area = Pin Diameter*Total thickness = 39100 mm2
Bearing Stress = 94.95 Mpa

Actual/Capacity = 0.306 Bearing Capacity Satisfactory OK

8. Check for Shear (Failure line 1)

Allowable Stress Shear: 0.4 FY = 138.00 Mpa

Failure Mode Shape:

Shear Force = 3712.5 KN


Shear Area = 2*tm *(rm -rp)+2*2*tc*(rc-rp)+2*2*ts*(rs-rp) = 43200 mm2
Shear Stress = 85.94 Mpa

Actual/Capacity = 0.623 Shear Capacity Satisfactory OK

9. Check for Tension (Failure line 1 & 2)

Allowable Stress Tention1 0.6 FY = 207.00 Mpa


Tention2 0.45 FY = 155.25 Mpa

Failure Mode Shape:

Tension Force = 3712.5 KN


Tension Area line1 = π*rm *tm = 31415.93 mm2
Tension Stress = 118.17 Mpa

Actual/Capacity = 0.571 Tensile Capacity Satisfactory OK

Tension Area line2 = 2*tm *(rm -rp)+2*2*tc*(rc-rp)+2*2*ts*(rs-rp) = 43200 mm2


Tension Stress = 85.94 Mpa

Actual/Capacity = 0.554 Tensile Capacity Satisfactory OK

10.Padeye Properties
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E9 of 12

10a. Stiffeners and Gusset Plates Dimension

Upper Gusset Plate Thickness = 35.00 mm


Lower Gusset Plate Thickness = 35.00 mm
Main Plate Thickness = 40.00 mm
a1 = 300.00 mm
a2 = 300.00 mm
b1 = 1275.00 mm
b2 = 637.50 mm
b3 = 637.50 mm
b = 1345.00 mm

Stiffener No.1 Thickness = 25.00 mm


Stiffener No.2 Thickness = 25.00 mm
a4 = 143.00 mm
a5 = 143.00 mm
b4 = 500.00 mm
b5 = 775.00 mm

Note: Don't live any parameter 0, give them 0.00001

10b. Section Properties


I). Area Calculation
Upper Gusset Area (A1) = 10500 mm2
Lower Gusset Area (A2) = 10500 mm2
Main Plate Area (A3) = 51000 mm2
Stiffener No.1 Area (A4) = 7150 mm2
Stiffener No.2 Area (A5) = 7150 mm2

Total Area (A) = 86300 mm2


Y1 = 670.428737 mm
Y2 = 674.571263 mm

II). Moment of Inertia Calculation


IIa). Moment of Inertia X axis Ixx
IxxA1 = 4.48E+09 mm4
IxxA2 = 4.53E+09 mm4
IxxA3 = 6.91E+09 mm4
IxxA4 = 1.16E+08 mm4
IxxA5 = 1.57E+08 mm4

Total IxxA = 1.62E+10 mm4


Section Modulus X axis
SXX = 2.40E+07 mm3

IIb). Moment of Inertia Y axis Iyy


IyyA1 = 7.88E+07 mm4
IyyA2 = 7.88E+07 mm4
IyyA3 = 6.80E+06 mm4
IyyA4 = 7.20E+07 mm4
IyyA5 = 7.20E+07 mm4

Total IyyA = 3.08E+08 mm4


Section Modulus Y axis
SYY = 1.89E+06 mm3

L = 637.50 mm
K = 175 mm
e = -2.07 mm
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E10 of 12

11.Check Combined Stress


Applied Force Vertical Angle,Θ = 90 deg
Applied Force Out-of-Plane Angle = 5 deg Angle of force with plane

Forces at Padeye Pinhole 42.01681


In-Plane Force = 3698.37 KN
RP2A Out-of-Plane Force = 184.92 KN (5% of Sling Load per API WSD)
Out-of-Plane Force = 323.57 KN (Due to Padeye Orientation)
Combined Out-of-Plane Force = 508.48 KN

In-Plane Force:
Y-Y Dir = 0.00 KN
Z-Z Dir = 3698.37 KN
Combined Out-of-Plane Force
X-X Dir = 213.12 KN
Z-Z Dir = 322.33 KN

Moment
In-Plane Moment (M x-x) = 8.33 KN-m
Out-of-Plane Moment (M y-y) = 88.98 KN-m

Force
Tension Force (Z-Z Dir) = 4020.71 KN
Shear force (Y-Y Dir) = 0.00 KN
Shear force (X-X Dir) = 213.12 KN

Stresses
Axial Stress (Tensile stress) = P/A = 46.59 Mpa < 0.6 Fy = 207 U.C = 0.23 OK

average Shear Stress = V/A = 2.47 Mpa < 0.4 Fy = 138 U.C = 0.02 OK

Shear stress @ point 1 (Y-Y Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 1 (X-X Dir) = VQ/It = 7.77 Mpa < 0.4 Fy = 138 U.C = 0.06 OK
Shear stress @ point 2 (Y-Y Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 2 (X-X Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 3 (Y-Y Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 3 (X-X Dir) = VQ/It = 7.77 Mpa < 0.4 Fy = 138 U.C = 0.06 OK
Shear stress @ point 4 (Y-Y Dir) = VQ/It = 2.54E-16 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 4 (X-X Dir) = VQ/It = 9.04E+00 Mpa < 0.4 Fy = 138 U.C = 0.07 OK
Shear stress @ point 5 (Y-Y Dir) = VQ/It = 2.96E-16 Mpa < 0.4 Fy = 138 U.C = 0.00 OK
Shear stress @ point 5 (X-X Dir) = VQ/It = 9.04E+00 Mpa < 0.4 Fy = 138 U.C = 0.07 OK
Shear stress @ centerline (Y-Y Dir) = VQ/It = 0.00 Mpa < 0.4 Fy = 138 U.C = 0.00 OK

max In-Plane Bending Stress = M x-x/S x-x = 0.35 Mpa < 0.6 Fy = 207 U.C = 0.00 OK
Bending stress @ point 1 = = 0.34 Mpa < 0.6 Fy = 207 U.C = 0.00 OK
Bending stress @ point 2 = = 0.35 Mpa < 0.6 Fy = 207 U.C = 0.00 OK
Bending stress @ point 3 = = 0.34 Mpa < 0.6 Fy = 207 U.C = 0.00 OK
Bending stress @ point 4 = = 0.07 Mpa < 0.6 Fy = 207 U.C = 0.00 OK
Bending stress @ point 5 = = 0.08 Mpa < 0.6 Fy = 207 U.C = 0.00 OK

max Out-of-Plane Bending Stress = M y-y/S y-y = 47.03 Mpa < 0.75 Fy = 258.75 U.C = 0.18 OK
Bending stress @ point 1 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Bending stress @ point 2 = = 47.03 Mpa < 0.75 Fy = 258.75 U.C = 0.18 OK
Bending stress @ point 3 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Bending stress @ point 4 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Bending stress @ point 5 = = 0.00 Mpa < 0.75 Fy = 258.75 U.C = 0.00 OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E11 of 12

11.a Combined Stress (Von mises)

Allowable Stress 0.66 Fy = 227.7 Mpa


POINT 1
Y-Y Dir
τxy = 0.00 Mpa
σxx = 46.93 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 46.9278 U.C = 0.21 OK
POINT 1
X-X Dir
τxy = 7.77 Mpa
σxx = 46.93 Mpa
σyy = 0 Mpa
COMBINED = (σxx2-σxx*σyy+σyy2+3*τxy2)0.5 = 48.82159 U.C = 0.21 OK
POINT 2
Y-Y Dir
τxy = 0.00 Mpa
σxx = 93.97 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 93.96959 U.C = 0.41 OK
POINT 2
X-X Dir
τxy = 0.00 Mpa
σxx = 93.97 Mpa
σyy = 0 Mpa
COMBINED = (σxx2-σxx*σyy+σyy2+3*τxy2)0.5 = 93.96959 U.C = 0.41 OK
POINT 3
Y-Y Dir
τxy = 0.00 Mpa
σxx = 46.93 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 46.92567 U.C = 0.21 OK
POINT 3
X-X Dir
τxy = 7.77 Mpa
σxx = 46.93 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 48.81954 U.C = 0.21 OK
POINT 4
Y-Y Dir
τxy = 0.00 Mpa
σxx = 46.66 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 46.65524 U.C = 0.20 OK
POINT 4
X-X Dir
τxy = 9.04 Mpa
σxx = 46.66 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 49.21381 U.C = 0.22 OK
POINT 5
Y-Y Dir
τxy = 0.00 Mpa
σxx = 46.67 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 46.66596 U.C = 0.20 OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 E12 of 12

POINT 5
X-X Dir
τxy = 9.04 Mpa
σxx = 46.67 Mpa
σyy = 0 Mpa
COMBINED = (σxx -σxx*σyy+σyy2+3*τxy2)0.5
2
= 49.22398 U.C = 0.22 OK

12.Stress due to Pressure between elastic bodies


Kd=(D1*D2)/(D1-D2) = 2807.368421
0.5
Fc=0.591*((((Sling Force/Tt))*E)/Kd) T: Wanted thickness
Young Modules(E) = 200000 Mpa

For Main Plate Tm = 40 mm Fc = 735.76 Mpa


For Cheek Plate Tc = 40 mm Fc = 735.76 Mpa
For Spacer Plate Ts = 25 mm Fc = 735.76 Mpa

Allowable Stress = 2.5 FY = 862.5 Mpa


CHECK: Fc < FY
U.C = 0.85 OK
13.Welding Check
The force divide between plates according to plate thickness
Total thickness = tm +2tc+2ts = 170 mm

Total Force = 3712.5 KN


Force taken by Main Plate = 873.5294118 KN
Force taken by Cheek Plate = 1747.058824 KN
Force taken by Spacer Plate = 1091.911765 KN

Force act on weld(Spacer to Cheek plate) = 545.956 KN


Force act on weld(Cheek to Main plate) = 1419.49 KN

Allowable Shear Stress for Fillet Weld is the lesser of:(Assume used E70xx Electrode, Tensile Strength)
Tensile Strength = 420 Mpa
Fs1= 0.3*0.707*Tensile Strength = 89.08 Mpa
Fs2=0.4*FY = 138 Mpa
Allowable Shear Stress=Min(Fs1,Fs2) = 89.08 Mpa

13a.Welding Check(Main Plate with Cheek Plate)

Weld Length = 1256.64 mm all around


throat of Weld Size required = 12.68 mm (min)
Weld size required = 17.93 mm

Selected weld size = 25 mm

Check space for welding


Space = min((rm -rc),(tc)) = 40 > 25 OK
Engineering, Procurement, Construction and Installation
of Wellhead Platform(S1), Submarine Cables and
Pipelines Between S1 and Salman Complex

S1 Topside Lift Analysis & Report


AREA DISCIPL. DOC. SCOPE SEQ. REV.
Project Code: 4545 SL ELT AN WPS1 4114 C2 2 PAGES