PEKERJAAN HITUNGAN
La Lb T P
1. PEKERJAAN PONDASI
- Galian Tanah 0.70 x 0.30 x 89.17
2 PEKERJAAN BETON
- Plaster Dinding
- Acian
- Dinding
- Kolom
- Sloof
- Batu Kali
3 PEKERJAAN PEMBESIAN
- Pondasi Tapak
- Tiang Pedestal
- Kolom
- Sloof
- Ring Balok
TUNGAN JUMLAH SKETSA
J KOEF AREA
= 18.72 M3
= 6.24 M3
= 42.80 M3
= 273.68 M2
33 = 3.56 M3
33 = 3.56 M3
33 = 1.58 M3
= 6.42 M3
= 1.93 M3
= 238.07 M2
33 = -17.62 M2
= 220.45 M2
2 x 220.45 = 440.90 M2
340.33 x 3.56 1212.93 Kg
0.2 Total
B SLOOF 20 / 30
Luas Per 1M3
P 12
Tul. Utama P 12
H 0.3 P 12
Sengkang P 8 - 150
0.2 Total
B RING BALOK 10 / 18
Luas Per 1M3
P 12
Tul. Utama P 12
H 0.18 P 12
Sengkang P 8 - 150
0.1 Total
0.2 Total
0.15 Tul. X P 12
0.15 Tul. Y P 12
Sengkang P 150
0.3
0.15 0.3 0.15 Total
0.6
TUL X 1.600 Besi D
TUL TGH 1.5 RESULT Besi P
TUL Y 1.600 Bekisting
= 25.000 M' n
= 66.586 Kg 3
= 44.391 Kg 2
= 66.586 Kg 3
= 44.547 Kg 168
= 0.000 Kg
= 222.110 Kg
= 0.000 Kg
= 222.110 Kg
= 20.000 M²
= 16.667 M' n
= 44.391 Kg 3
= 29.594 Kg 2
= 44.391 Kg 3
= 38.537 Kg 112
= 0.000 Kg
= 156.912 Kg
= 0.000 Kg
= 156.912 Kg
= 16.667 M²
= 55.556 M' n
= 98.646 Kg 2
= 98.646 Kg 2
= 98.646 Kg 2
= 63.241 Kg 371
= 0.000 Kg
= 359.179 Kg
= 0.000 Kg
= 359.179 Kg
= 31.111 M²
= 25.000 M' n
= 66.586 Kg 3
= 44.391 Kg 2
= 66.586 Kg 3
= 44.547 Kg 168
= 0.000 Kg
= 222.110 Kg
= 0.000 Kg
= 222.110 Kg
= 20.000 M²
= 9.259 1M3 n
= 17.046 Kg 12
2.663 Kg 2
= 17.046 Kg 12
= 0.000 Kg 63
= 0.000 Kg
= 36.756 Kg
= 0.000 Kg
= 340.329 Kg
= 6.667 M²