BACK UP DATA PERENCANAAN

SD 268 TOWOTI

1 Pek. Sloef Beton (20 x 15)


P = 19.8 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 0.45 M3

- Pek. Pembesian Sloef

Besi = 12 MM 2 Ø 12

P = 19.8
Jml = 4.00 Bh 6 - 20
V = 79.20 M
Koef = 0.887 Kg/M
V = 70.28 Kg 2 Ø 12

Besi Begel = 6 MM

P = 19.8 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.52 M
Jarak Begel = 0.2 M
Jml Begel = 99.00 Bh
99.00 (di bulatkan)
P. total = 51.48 M
Koef = 0.222 Kg/M
V = 11.42 Kg

V. total 81.70 Kg

- Bekisting Sloef
P = 19.8 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
7.92
V = 2.64 M2

2 Pek. Sloef Beton (15 x 15)


P = 56.0 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 1.26 M3

- Pek. Pembesian Sloef

Besi = 12 MM 2 Ø 12

P = 56.0
Jml = 4.00 Bh 6 - 20
V = 224.00 M
Koef = 0.887 Kg/M
V = 198.77 Kg 2 Ø 12

Besi Begel = 6 MM

P = 56.0 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.52 M
Jarak Begel = 0.2 M
Jml Begel = 280.00 Bh
280.00 (di bulatkan)
P. total = 145.60 M
Koef = 0.222 Kg/M
V = 32.30 Kg

V. total 231.07 Kg

- Bekisting Sloef
P = 56.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
22.40
V = 7.47 M2

3 Pek. Ring Balk Beton (15 x 15)


P = 19.8 M 0.15
L = 0.15 M
T = 0.13 M
0.13
V1 = 0.39 M3

- Pek. Pembesian Ring Balk

Besi = 12 MM 2 Ø 12

P = 19.8
Jml = 4.00 Bh 6 - 20
V = 79.20 M
Koef = 0.887 Kg/M
V = 70.28 Kg 2 Ø 12

Besi = 6 MM

P = 19.8 M

L = 0.15 M
T = 0.13 M
P. Begel = 0.48 M
Jarak Begel = 0.2 M
Jml Begel = 99.00 Bh
99.00 (di bulatkan)
P. total = 47.52 M
Koef = 0.222 Kg/M
V = 10.54 Kg

V. total 80.82 Kg

- Bekisting Ring Balk


P = 19.8 M
T = 0.22 M
Sisi = 2 Bh
3X Pakai
8.71
V = 2.90 M2 13.71

3 Pek. Kolom Beton (20 x 15)


P = 2.20 M 0.15
L = 0.15 M
T = 0.13 M
0.13
V1 = 0.04 M3
0.39 9 Bh Jmlh Kolom

- Pek. Pembesian Kolom

Besi = 12 MM 2 Ø 12

P = 2.6
Jml = 4.00 Bh 6 - 20
V = 10.54 M
Koef = 0.887 Kg/M
V = 9.35 Kg 2 Ø 12
84.18 9 Bh Jmlh Kolom

Besi = 6 MM
P = 2.6 M

L = 0.15 M
T = 0.13 M
P. Begel = 0.43 M
Jarak Begel = 0.2
Jml Begel = 13.00 Bh
13.00 (di bulatkan)
P. total = 5.59 M

Koef = 0.222 Kg/M


V = 1.24 Kg
11.16 9 Jmlh Kolom

V. total 95.34 Kg

- Bekisting Kolom
P = 2.6 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.06 M2
0.53
4.76658 9 Jmlh Kolom
33.85
Pek. Kolom Teras (20 x 20)
P = 3.80 M 0.2
L = 0.20 M
T = 0.20 M
0.2
V1 = 0.15 M3
2.13 14 Bh Jmlh Kolom

- Pek. Pembesian Kolom

Besi = 12 MM 2 Ø 12

P = 4.2
Jml = 4.00 Bh 6 - 20
V = 16.94 M
Koef = 0.887 Kg/M
V = 15.03 Kg 2 Ø 12
210.45 14 Bh Jmlh Kolom

Besi = 6 MM

P = 4.2 M

L = 0.20 M
T = 0.20 M
P. Begel = 0.6 M
Jarak Begel = 0.2
Jml Begel = 21.00 Bh
21.00 (di bulatkan)
P. total = 12.60 M

Koef = 0.222 Kg/M


V = 2.80 Kg
39.13 14 Jmlh Kolom

V. total 249.58 Kg

- Bekisting Kolom
P = 4.2 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.71 M2
0.86
11.98 14 Jmlh Kolom

Pek. Kolom Praktis (15 x 15)


P = 3.80 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 0.09 M3
1.71 20 Bh Jmlh Kolom

- Pek. Pembesian Kolom

Besi = 12 MM 2 Ø 12

P = 4.2
Jml = 4.00 Bh 6 - 20
V = 16.94 M
Koef = 0.887 Kg/M
V = 15.03 Kg 2 Ø 12
300.64 20 Bh Jmlh Kolom

Besi = 6 MM

P = 4.2 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.45 M
Jarak Begel = 0.2
Jml Begel = 21.00 Bh
21.00 (di bulatkan)
P. total = 9.45 M

Koef = 0.222 Kg/M


V = 2.10 Kg
41.93 20 Jmlh Kolom

V. total 342.57 Kg

- Bekisting Kolom
P = 4.2 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.71 M2
0.86
= 17.11 20 Jmlh Kolom

3 Pek. Ring Balk Beton Kuda-kuda (15 x 15)


P = 73.7 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 1.66 M3

- Pek. Pembesian Ring Balk

Besi = 12 MM 2 Ø 12

P = 73.7
Jml = 4.00 Bh 6 - 20
V = 294.72 M
Koef = 0.887 Kg/M
V = 261.52 Kg 2 Ø 12

Besi = 6 MM

P = 73.7 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.50 M
Jarak Begel = 0.2 M
Jml Begel = 368.40 Bh
368.00 (di bulatkan)
P. total = 184.00 M
Koef = 0.222 Kg/M
V = 40.82 Kg

V. total 302.34 Kg

- Bekisting Ring Balk


P = 73.7 M
T = 0.22 M
Sisi = 2 Bh
3X Pakai
32.42
V = 10.81 M2

Rabat Depan P = 26
L = 0.5
T = 0.07
0.91

Rabat Samping/Belakang P = 44.45


L = 1
T = 0.07
3.1115
Vtot = 8.043

Lantai Saluran P = 74
L = 0.5
T = 0.05
V = 3.7
Pas. Bata Saluran P = 74
L = 0.6

V = 88.8

Sirtu Depan P = 26
L = 0.47
T = 0.07
0.8554
45
18
6
18.4
87.4

10.4
BACK UP DATA PERENCANAAN
SD 268 TOWOTI

1 Pek. Sloef Beton (20 x 15)


P = 57.0 M 0.15
L = 0.15 M
T = 0.20 M
0.2
V1 = 1.71 M3

- Pek. Pembesian Sloef

Besi = 12 MM 2 Ø 12

P = 57.0
Jml = 4.00 Bh 6 - 20
V = 228.00 M
Koef = 0.887 Kg/M
V = 202.32 Kg 2 Ø 12

Besi Begel = 6 MM

P = 57.0 M

L = 0.15 M
T = 0.20 M
P. Begel = 0.57 M
Jarak Begel = 0.2 M
Jml Begel = 285.00 Bh
285.00 (di bulatkan)
P. total = 162.45 M
Koef = 0.222 Kg/M
V = 36.04 Kg

V. total 238.36 Kg

- Bekisting Sloef
P = 57.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
22.80
V = 7.60 M2

2 Pek. Sloef Beton (15 x 15)


P = 22.0 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 0.49 M3

- Pek. Pembesian Sloef

Besi = 12 MM 2 Ø 12

P = 22.0
Jml = 4.00 Bh 6 - 20
V = 88.00 M
Koef = 0.887 Kg/M
V = 78.09 Kg 2 Ø 12

Besi Begel = 6 MM

P = 22.0 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.52 M
Jarak Begel = 0.2 M
Jml Begel = 110.00 Bh
110.00 (di bulatkan)
P. total = 57.20 M
Koef = 0.222 Kg/M
V = 12.69 Kg

V. total 90.78 Kg

- Bekisting Sloef
P = 22.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
8.80
V = 2.93 M2

3 Pek. Ring Balk Beton (15 x 15)


P = 57.0 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 1.28 M3

- Pek. Pembesian Ring Balk

Besi = 12 MM 2 Ø 12

P = 57.0
Jml = 4.00 Bh 6 - 20
V = 228.00 M
Koef = 0.887 Kg/M
V = 202.32 Kg 2 Ø 12

Besi = 6 MM

P = 57.0 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.50 M
Jarak Begel = 0.2 M
Jml Begel = 285.00 Bh
285.00 (di bulatkan)
P. total = 142.50 M
Koef = 0.222 Kg/M
V = 31.61 Kg

V. total 233.93 Kg

- Bekisting Ring Balk


P = 57.0 M
T = 0.22 M
Sisi = 2 Bh
3X Pakai
25.08
V = 8.36 M2 13.76

3 Pek. Kolom Beton (20 x 15)


P = 3.85 M 0.15
L = 0.15 M
T = 0.20 M
0.2
V1 = 0.12 M3
0.69 6 Bh Jmlh Kolom

- Pek. Pembesian Kolom

Besi = 12 MM 2 Ø 12

P = 4.3
Jml = 4.00 Bh 6 - 20
V = 17.14 M
Koef = 0.887 Kg/M
V = 15.21 Kg 2 Ø 12
91.26 6 Bh Jmlh Kolom

Besi = 6 MM
P = 4.3 M

L = 0.15 M
T = 0.20 M
P. Begel = 0.5 M
Jarak Begel = 0.2
Jml Begel = 21.25 Bh
21.00 (di bulatkan)
P. total = 10.50 M

Koef = 0.222 Kg/M


V = 2.33 Kg
13.98 6 Jmlh Kolom

V. total 105.23 Kg

- Bekisting Kolom
P = 4.3 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.73 M2
0.87
5.19435 6 Jmlh Kolom
23.93
Pek. Kolom Teras (20 x 20)
P = 3.60 M 0.2
L = 0.20 M
T = 0.20 M
0.2
V1 = 0.14 M3
1.01 7 Bh Jmlh Kolom

- Pek. Pembesian Kolom

Besi = 12 MM 2 Ø 12

P = 4.0
Jml = 4.00 Bh 6 - 20
V = 16.14 M
Koef = 0.887 Kg/M
V = 14.32 Kg 2 Ø 12
100.25 7 Bh Jmlh Kolom

Besi = 6 MM

P = 4.0 M

L = 0.20 M
T = 0.20 M
P. Begel = 0.6 M
Jarak Begel = 0.2
Jml Begel = 20.00 Bh
20.00 (di bulatkan)
P. total = 12.00 M

Koef = 0.222 Kg/M


V = 2.66 Kg
18.63 7 Jmlh Kolom

V. total 118.89 Kg

- Bekisting Kolom
P = 4.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.63 M2
0.81
5.70 7 Jmlh Kolom

Pek. Kolom Praktis (15 x 15)


P = 3.60 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 0.08 M3
1.30 16 Bh Jmlh Kolom

- Pek. Pembesian Kolom

Besi = 12 MM 2 Ø 12

P = 4.0
Jml = 4.00 Bh 6 - 20
V = 16.14 M
Koef = 0.887 Kg/M
V = 14.32 Kg 2 Ø 12
229.15 16 Bh Jmlh Kolom

Besi = 6 MM

P = 4.0 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.45 M
Jarak Begel = 0.2
Jml Begel = 20.00 Bh
20.00 (di bulatkan)
P. total = 9.00 M

Koef = 0.222 Kg/M


V = 2.00 Kg
31.95 16 Jmlh Kolom

V. total 261.10 Kg

- Bekisting Kolom
P = 4.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.63 M2
0.81
= 13.04 16 Jmlh Kolom

3 Pek. Ring Balk Beton Kuda-kuda (15 x 15)


P = 36.8 M 0.15
L = 0.15 M
T = 0.15 M
0.15
V1 = 0.83 M3

- Pek. Pembesian Ring Balk

Besi = 12 MM 2 Ø 12

P = 36.8
Jml = 4.00 Bh 6 - 20
V = 147.36 M
Koef = 0.887 Kg/M
V = 130.76 Kg 2 Ø 12

Besi = 6 MM

P = 36.8 M

L = 0.15 M
T = 0.15 M
P. Begel = 0.50 M
Jarak Begel = 0.2 M
Jml Begel = 184.20 Bh
184.00 (di bulatkan)
P. total = 92.00 M
Koef = 0.222 Kg/M
V = 20.41 Kg

V. total 151.17 Kg

- Bekisting Ring Balk


P = 36.8 M
T = 0.22 M
Sisi = 2 Bh
3X Pakai
16.21
V = 5.40 M2

Rabat Depan P = 20
L = 0.5
T = 0.07
0.7

Rabat Samping/Belakang P = 36
L = 1
T = 0.07
2.52
Vtot = 3.22

Lantai Saluran P = 62
L = 0.5
T = 0.05
V = 1.55
Pas. Bata Saluran P = 62
L = 0.6

V = 37.2

Sirtu Depan P = 20
L = 0.47
T = 0.07
0.658
45
18
6
18.4
87.4

17
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
TIPE A

1 Galian Tanah 32
32
19.8 L = 0.65 M 28
T = 0.3 M 0.65

V = 0.195 M2
= 3.86 M3 19.54 0.3 92

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

19.8 L1 = 0.25 M 0.25


L2 = 0.45 M
T = 0.50 M

L Rata2 = 0.35 0.5

V = 0.175
0.15
V = 3.47 M3 0.05
0.1 0.45 0.1

3 Pek. Pondasi Batu Kosong


L = 0.65 M
19.8 T = 0.15 M

V = 0.0975 M2
= 1.93 M3

4 Pek. Urugan Pasir Bawah Pondasi

19.8 L = 0.65 M
T = 0.05 M

V = 0.0325 M2
= 0.6435 M3 2.6035

5 Urugan Pasir
1 P = 7.85 M
L = 6.85 M
T = 0.05 M

V1 = 16.13 M3 6 0.20

2 P = 24.00 M
L = 2.00 M
T = 0.05 M

V2 = 4.80 M3 2

3 P = M
L = M
T = M

V3 = 0.00 M3

V = 20.93 M3 20.93

TIPE B
1 Galian Tanah 32
4
56.0 L = 0.7 M 16
T = 0.4 M 0.7 4
56
V = 0.28 M2
= 15.68 M3 0.4

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

56 L1 = 0.25 M 0.25
L2 = 0.50 M
T = 0.50 M

L Rata2 = 0.375 0.5

V = 0.1875
0.15
V = 10.50 M3 0.05
0.1 0.5 0.1

3 Pek. Pondasi Batu Kosong


L = 0.70 M
56 T = 0.15 M

V = 0.105 M2
= 5.88 M3

4 Pek. Urugan Pasir Bawah Pondasi

56 L = 0.70 M
T = 0.05 M

V = 0.035 M2
= 1.96 M3

5 Urugan Pasir
1 P = M
L = M
T = M

V1 = M3 2 0.20

2 P = M
L = M
T = M

V2 = M3

3 P = M
L = M
T = M

V3 = M3

V = 0.00 M3
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
TIPE A

1 Galian Tanah 32
32
92.0 L = 0.8 M 28
T = 0.4 M 0.8

V = 0.32 M2
= 29.44 M3 45.12 0.4 92

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

92 L1 = 0.25 M 0.25
L2 = 0.60 M
T = 0.60 M

L Rata2 = 0.425 0.6

V = 0.255
0.15
V = 23.46 M3 0.05
0.1 0.6 0.1

3 Pek. Pondasi Batu Kosong


L = 0.80 M
92 T = 0.15 M

V = 0.12 M2
= 11.04 M3

4 Pek. Urugan Pasir Bawah Pondasi

92 L = 0.80 M
T = 0.05 M

V = 0.04 M2
= 3.68 M3 5.64

5 Urugan Pasir
1 P = 8.85 M
L = 6.85 M
T = 0.05 M

V1 = 6.06 M3 2 0.20

2 P = 26.85 M
L = 1.85 M
T = 0.05 M

V2 = 2.48 M3 1

3 P = M
L = M
T = M

V3 = 0.00 M3

V = 8.55 M3 8.55

TIPE B
1 Galian Tanah 32
4
56.0 L = 0.7 M 16
T = 0.4 M 0.7 4
56
V = 0.28 M2
= 15.68 M3 0.4

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

56 L1 = 0.25 M 0.25
L2 = 0.50 M
T = 0.50 M

L Rata2 = 0.375 0.5

V = 0.1875
0.15
V = 10.50 M3 0.05
0.1 0.5 0.1

3 Pek. Pondasi Batu Kosong


L = 0.70 M
56 T = 0.15 M

V = 0.105 M2
= 5.88 M3

4 Pek. Urugan Pasir Bawah Pondasi

56 L = 0.70 M
T = 0.05 M

V = 0.035 M2
= 1.96 M3

5 Urugan Pasir
1 P = M
L = M
T = M

V1 = M3 2 0.20

2 P = M
L = M
T = M

V2 = M3

3 P = M
L = M
T = M

V3 = M3

V = 0.00 M3
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
TIPE A

1 Galian Tanah
36
57.0 L = 0.7 M 21
T = 0.27 M 0.7

V = 0.189 M2
= 10.77 M3 13.41 0.27 57

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

57 L1 = 0.25 M 0.25
L2 = 0.60 M
T = 0.60 M

L Rata2 = 0.425 0.6

V = 0.255
0.15
V = 14.54 M3 18.66 0.05
0.1 0.6 0.1

3 Pek. Pondasi Batu Kosong


L = 0.70 M
57 T = 0.15 M

V = 0.105 M2
= 5.98 M3 7.97

4 Pek. Urugan Pasir Bawah Pondasi

57 L = 0.70 M
T = 0.05 M

V = 0.035 M2
= 1.995 M3 2.655

5 Urugan Sirtu
1 P = 8.85 M
L = 6.85 M
T = 0.15 M

V1 = 18.19 M3 2 0.15

2 P = 23.85 M
L = 1.85 M
T = 0.15 M

V2 = 6.62 M3

3 P = M
L = M
T = M

V3 = 0.00 M3

V = 24.81 M3 24.81

TIPE B
1 Galian Tanah 18
4
22.0 L = 0.6 M
T = 0.2 M 0.6
22
V = 0.12 M2
= 2.64 M3 0.2

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

22.0 L1 = 0.25 M 0.25


L2 = 0.50 M
T = 0.50 M

L Rata2 = 0.375 0.5

V = 0.1875
0.15
V = 4.13 M3 0.05
0.1 0.5 0.1

3 Pek. Pondasi Batu Kosong


L = 0.60 M
22 T = 0.15 M

V = 0.09 M2
= 1.98 M3

4 Pek. Urugan Pasir Bawah Pondasi

22 L = 0.60 M
T = 0.05 M

V = 0.03 M2
= 0.66 M3

5 Urugan Sirtu
1 P = M
L = M
T = M

V1 = M3 2 0.20

2 P = M
L = M
T = M

V2 = M3

3 P = M
L = M
T = M

V3 = M3

V = 0.00 M3
14 Pek. Dinding Batu Bata

Dinding Belakang
L = 2.35 M
T = 3.65 M

V1 = 17.16 M2 2 3.85

0.15 8.00 0.15

Dinding Samping Kiri


1 L = 4.85 M
T = 3.65 M
Ventilasi roster = 0.13
3.80
V1 = 35.27 M2 2

Dinding Samping Kanan


1 L = 4.70 M
T = 3.65 M

V Pintu Jendela = 5.00


Ventilasi roster = 0.11

V1 = 29.20 M2 2
0.15 7.00 0.15

3.8

0.15 3.00 0.15

Dinding Depan
6 L = 4.85 M
T = 3.65 M

V1 = 53.11 M2 1 3.8

V. total = 53.11 M2

Dinding Atas = 8.184


0.15 1.50 0.15

Transram P = 47 Plesteran
T = 0.30
V1 = 14.10 M2
V. total Pas. B. Bata = 128.82 M2

15 Plesteran Biasa 1Pc : 3 Ps

V.Pas. B. bata = 128.82 M2 (Muka-Belakang)


= 257.64 M2 2 Bh

P = 0.15 M
L = 0.15 M
= 0.30 M2 Jml Kolom
5.40 M2 18 Bh

V = 263.04 M2
16 Pek. Pengecetan

V.Plesteran 263.04 M2

V = 263.04 M2

17 Pemasangan Atap Spandeck


9.00
P = 7.90 M
L = 12.40 M
V = 97.96 1 10.55

108.5

V. total Pas. Atap = 97.960 M2

18 Rangka Atap

Rangka Atap 97.960 M2

V = 97.960 M2

19 Pemasangan Plafond Kalsiboard


0.15
WC 1 P = 1.35 M
L = 1.85 M

V1 = 7.49 M2 3 1.50

0.15
0.15 3.00 0.15

0.15
Teras 2 P = 4.35 M
L = 1.35 M

V1 = 11.75 M2 1 3.00

0.15
0.15 3.00 0.15

0.15

Plafond Luar
P = 2.78 M
L = 0.60 M
0.70

V = 6.67 M2 4 11.20
M2
V. Total = 25.91 M2

20 Pek. Lisplank Zincalume

P = 53.88 M

V = 53.88 M2

List Palfond P = 41.72 3

170.80 LISPLANK

21 Pek. Lantai Keramik 40x40

L = 19.24 M

V = 19.24 M2 1.346625 Rabat


BACK UP DATA PERENCANAAN

TIPE A
9
1 Galian Tanah 9
7
52.0 L = 0.7 M 7
T = 0.4 M 0.7 32

V = 0.28 M2
= 14.56 M3 15.61 0.4

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

52.0 L1 = 0.25 M 0.25


L2 = M
T = 0.60 M

L Rata2 = 0.125 0.6

V = 0.255
0.2
V = 13.26 M3 0.05
0.1 0.6 0.05

3 Pek. Pondasi Batu Kosong


L = 0.70 M
52 T = 0.2 M

V = 0.14
= 7.28

4 Pek. Urugan Pasir Bawah Pondasi

52 L = 0.70 M
T = 0.05 M

V = 0.035 M2
= 1.82 M3 2.03

5 Urugan Sirtu
1 P = 9.85 M
L = 4.85 M
T = 0.15 M

V1 = 7.17 M3 0.15

5 Urugan Pasir
1 P = 9.85 M
L = 4.85 M
T = 0.05 M
0.05
V1 = 2.39 M3 0.05

5 Rabat Beton Lantai


1 P = 4.85 M
L = 9.85 M
T = 0.05 M

V1 = 2.39 M3 0.05

1 P = 1.00 M
L = 12.00 M
T = 0.05 M

V1 = 1.20 M3 2

1 P = 1.00 M
L = 5.00 M
T = 0.05 M

V1 = 0.50 M3 2

1.70

5 Urugan Tanah
1 P = 7.85 M
L = 5.85 M
T = 0.30 M

V1 = 13.78 M3 0.30

2 P = 3.35 M
L = 3.00 M
T = 0.30 M

V2 = 3.02 M3

3 P = 3.35 M
L = 2.85 M
T = 0.3 M

V2 = 2.86 M3

V = 19.66 M3 21.24
TIPE B

1 Galian Tanah 32
32
7.0 L = 0.5 M 28
T = 0.3 M 0.5

V = 0.15 M2
= 1.05 M3 0.3 92

2 Pek. Pondasi Batu Kali 1Pc : 4Pp

7 L1 = 0.25 M 0.25
L2 = 0.50 M
T = 0.50 M

L Rata2 = 0.375 0.5

V = 0.1875
0.2
V = 1.31 M3 0.05
0.1 0.5 0.05

3 Pek. Pondasi Batu Kosong


L = 0.60 M
7 T = 0.2 M

V = 0.12 M2
= 0.84 M3

4 Pek. Urugan Pasir Bawah Pondasi

7 L = 0.60 M
T = 0.05 M

V = 0.03 M2
= 0.21 M3

5 Urugan sirtu bawah lantai


1 P = 2.85 M
L = 1.85 M
T = 0.15 M

V1 = 0.79 M3 0.15

5 Urugan pasir bawah lantai


1 P = 2.85 M
L = 1.85 M
T = 0.05 M

V1 = 0.26 M3 0.05

5 Rabat Beton lantai


1 P = 2.85 M
L = 1.85 M
T = 0.05 M

V1 = 0.26 M3 0.05
5 Urugan Tanah
1 P = 2.85 M
L = 1.85 M
T = 0.30 M

V1 = 1.58 M3 0.30
REKAPITULASI

KEGIATAN : PEMBANGUNAN SCREENHOUSE


LOKASI : KABUPATEN LUWU TIMUR

NO URAIAN KEGIATAN HARGA

I. PEKERJAAN PENDAHULUAN / PERSIAPAN Rp 11,050,000.00

II. PEKERJAAN TANAH & PASIR Rp 9,936,067.50

III. PEKERJAAN STRUKTUR Rp 148,044,886.80

IV. PEKERJAAN INSTALASI LISTRIK Rp 37,000,000.00

V. PEKERJAAN RABAT SALURAN Rp 20,588,358.90

VI. PEKERJAAN PEMBERSIHAN AKHIR Rp 2,000,000.00

REAL COST Rp 228,619,313.20


PAJAK 11 % Rp 25,148,124.45
TOTAL Rp 253,767,437.65
DIBULATKAN Rp 253,767,000.00
Terbilang
DUA RATUS LIMA PULUH TIGA JUTA TUJUH RATUS ENAM PULUH TUJUH RIBU RUPIAH,-
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN SCREENHOUSE
LOKASI : KABUPATEN LUWU TIMUR

HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN VOLUME
UPAH UPAH
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Keselamatan dan Kesehatan Kerja 1.00 Ls Rp 6,050,000.00 Rp 6,050,000.00
2 Pembuatan Laporan & Dokumentasi 1.00 Ls Rp 3,000,000.00 Rp 3,000,000.00
3 Pembersihan Lahan 1.00 Ls Rp 2,000,000.00 Rp 2,000,000.00
Sub Total I Rp 11,050,000.00
II. PEKERJAAN TANAH & PASIR
1 Galian Tanah Biasa 104.00 M3 88,061.25 9,158,370.00
2 Urugan Tanah kembali 34.67 M3 22,015.31 777,697.50
Sub Total III Rp 9,936,067.50
III. PEKERJAAN STRUKTUR
1 Rangka Atap Pipa Galvanis 160.00 M2 Rp 450,000.00 Rp 72,000,000.00
2 Tiang Hollow Galvanis 160.00 M2 Rp 250,000.00 Rp 40,000,000.00
3 Pek. Pas. Dinding Bata 31.20 M2 Rp 155,951.50 Rp 4,865,686.80
4 Pek. Pas. Shading Net 45% 208.00 M2 Rp 85,100.00 Rp 17,700,800.00
5 Pek. Pas. Plastik UV 14% 208.00 M2 Rp 64,800.00 Rp 13,478,400.00
6 Pek. Pas. Screen Putih 60mesh 208.00 M2 Rp 82,900.00 Rp 17,243,200.00
Sub Total IV Rp 148,044,886.80
IV. PEKERJAAN INSTALASI LISTRIK
1 Pek. Instalasi Exhaust dan Kipas 1.00 LS Rp 14,000,000.00 Rp 14,000,000.00
2 Pek. Pas. Sytem Pengkabutan Ruangan 1.00 LS Rp 12,000,000.00 Rp 12,000,000.00
3 Panel Listrik 1.00 LS Rp 11,000,000.00 Rp 11,000,000.00
Sub Total VI Rp 37,000,000.00
V PEKERJAAN RABAT SALURAN
5 Lantai rabat beton (1 : 2 : 3) t : 15 cm 15.60 M3 Rp 1,319,766.60 Rp 20,588,358.90
Sub Total IX Rp 20,588,358.90
VI PEKERJAAN PEMBERSIHAN AKHIR
1 Pembersihan Sisa Pekerjaan 1.000 Ls Rp 2,000,000.00 Rp 2,000,000.00
Sub Total IX Rp 2,000,000.00
SNI DT 91 -0006-2007

Standar Nasional Indonesia


Tata cara perhitungan harga satuan pekerjaan tanah
untuk konstruksi bangunan gedung dan perumahan
ICS 91 .010.20 Badan Standardisasi
Nasional

6.1 Menggali 1 m3 tanah biasa sedalam 1 meter Rp - Rp 20,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 0.750 Rp 25,000 Rp - Rp 18,750
Mandor OH 0.025 Rp 50,000 Rp - Rp 1,250

6.2 Menggali 1 m3 tanah biasa sedalam 2 meter Rp - Rp 24,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 0.900 Rp 25,000 Rp - Rp 22,500
Mandor OH 0.045 Rp 50,000 Rp - Rp 2,250

6.3 Menggali 1 m3 tanah biasa sedalam 3 meter Rp - Rp 29,600


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 1.050 Rp 25,000 Rp - Rp 26,250
Mandor OH 0.067 Rp 50,000 Rp - Rp 3,350

6.4 Menggali 1 m3 tanah keras sedalam 1 meter Rp - Rp 26,600


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 1.000 Rp 25,000 Rp - Rp 25,000
Mandor OH 0.032 Rp 50,000 Rp - Rp 1,600

6.5 Menggali 1 m3 tanah cadas sedalam 1 meter Rp - Rp 40,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 1.500 Rp 25,000 Rp - Rp 37,500
Mandor OH 0.060 Rp 50,000 Rp - Rp 3,000

6.6 Menggali 1 m3 tanah lumpur sedalam 1 meter Rp - Rp 32,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 1.200 Rp 25,000 Rp - Rp 30,000
Mandor OH 0.045 Rp 50,000 Rp - Rp 2,250

6.7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter Rp - Rp 1,500

Page 30 of 141
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 0.050 Rp 25,000 Rp - Rp 1,250
Mandor OH 0.005 Rp 50,000 Rp - Rp 250

6.8 Membuang 1 m3 tanah sejauh 30 meter Rp - Rp 8,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 0.330 Rp 25,000 Rp - Rp 8,250
Mandor OH 0.010 Rp 50,000 Rp - Rp 500

Mengurug kembali 1 m3
galian dihitung dari 1/3
6.9 Mengurug kembali 1 m3 galian
kali upah pekerjaan
galian

Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

6.10 Memadatkan 1 m3 tanah (per 20 cm) Rp - Rp 15,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 0.500 Rp 25,000 Rp - Rp 12,500
Mandor OH 0.050 Rp 50,000 Rp - Rp 2,500

6.11 Mengurug 1 m3 pasir urug Rp 1,200 Rp 8,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pasir urug m3 1.200 Rp 1,000 Rp 1,200
Tenaga kerja Pekerja OH 0.300 Rp 25,000 Rp 7,500
Mandor OH 0.010 Rp 50,000 Rp 500

6.12 Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL Rp 1,483 Rp 41,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kapur padam m3 0.135 Rp 1,000 Rp 135
Bahan Pasir Pasang m3 0.400 Rp 1,000 Rp 400
Tanah Liat m3 0.948 Rp 1,000 Rp 948
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang batu OH 0.400 Rp 39,500 Rp 15,800
Tenaga kerja
Kepala tukang OH 0.040 Rp 42,500 Rp 1,700
Mandor OH 0.080 Rp 50,000 Rp 4,000

6.13 Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL Rp 1,488 Rp 41,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kapur padam m3 0.248 Rp 1,000 Rp 248
Bahan
Tanah Liat m3 1.240 Rp 1,000 Rp 1,240
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang batu OH 0.400 Rp 39,500 Rp 15,800
Tenaga kerja

Page 31 of 141
Tenaga kerja
Kepala tukang OH 0.040 Rp 42,500 Rp 1,700
Mandor OH 0.080 Rp 50,000 Rp 4,000

6.14 Memasang 1 m2 lapisan ijuk tebal 10 cm Rp 6,000 Rp 4,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Ijuk kg 6.000 Rp 1,000 Rp 6,000
Tenaga kerja Pekerja OH 0.150 Rp 25,000 Rp 3,750
Mandor OH 0.015 Rp 50,000 Rp 750

6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP Rp 203,685 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Bahan Portland Cement kg 202.000 Rp 1,000 Rp 202,000
Pasir Pasang m3 0.485 Rp 1,000 Rp 485
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Tenaga kerja
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Mandor OH 0.075 Rp 50,000 Rp 3,750

6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP Rp 164,720 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Bahan Portland Cement kg 163.000 Rp 1,000 Rp 163,000
Pasir Pasang m3 0.520 Rp 1,000 Rp 520
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Tenaga kerja
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Mandor OH 0.075 Rp 50,000 Rp 3,750

6.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP Rp 137,744 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Bahan Portland Cement kg 136.000 Rp 1,000 Rp 136,000
Pasir Pasang m3 0.544 Rp 1,000 Rp 544
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Tenaga kerja

Page 32 of 141
Tenaga kerja
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Mandor OH 0.075 Rp 50,000 Rp 3,750

6.4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP Rp 118,761 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Portland Cement kg 117.000 Rp 1,000 Rp 117,000
Bahan Pasir Pasang m3 0.561 Rp 1,000 Rp 561
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750

6.5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP Rp 92,784 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Portland Cement kg 91.000 Rp 1,000 Rp 91,000
Bahan Pasir Pasang m3 0.584 Rp 1,000 Rp 584
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750

6.6 Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP Rp 1,880 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Kapur padam m3 0.170 Rp 1,000 Rp 170
Semen Merah m3 0.170 Rp 1,000 Rp 170
Bahan Pasir Pasang m3 0.340 Rp 1,000 Rp 340
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750

6.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP Rp 62,839 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Portland Cement kg 61.000 Rp 1,000 Rp 61,000
Kapur padam m3 0.147 Rp 1,000 Rp 147
Bahan

Page 33 of 141
Bahan Pasir Pasang m3 0.492 Rp 1,000 Rp 492
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750

6.8 Memasang 1 m3 pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP Rp 42,854 Rp 74,063


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Portland Cement kg 41.000 Rp 1,000 Rp 41,000
Kapur padam m3 0.131 Rp 1,000 Rp 131
Bahan Pasir Pasang m3 0.523 Rp 1,000 Rp 523
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750

6.9 Memasang 1 m3 batu kosong (aanstamping) Rp 1,632 Rp 38,513


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 1,000 Rp 1,200
Bahan Pasir urug m3 0.432 Rp 1,000 Rp 432
Pekerja OH 0.780 Rp 25,000 Rp 19,500
Tukang batu OH 0.390 Rp 39,500 Rp 15,405
Kepala tukang OH 0.039 Rp 42,500 Rp 1,658
Tenaga kerja Mandor OH 0.039 Rp 50,000 Rp 1,950

6.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Rp 323,060 Rp 130,688
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 0.480 Rp 1,000 Rp 480
Portland Cement kg 194.000 Rp 1,000 Rp 194,000
Pasir beton m3 0.312 Rp 1,000 Rp 312
Koral Beton m3 0.468 Rp 1,000 Rp 468
Besi beton kg 126.000 Rp 1,000 Rp 126,000
Kawat beton kg 1.800 Rp 1,000 Rp 1,800
Bahan
Pekerja OH 3.400 Rp 25,000 Rp 85,000
Tukang batu OH 0.850 Rp 39,500 Rp 33,575
Kepala tukang OH 0.085 Rp 42,500 Rp 3,613
Tenaga kerja Mandor OH 0.170 Rp 50,000 Rp 8,500

6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Rp 195,230 Rp 100,950


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Batu belah 15 cm/20 cm m3 0.450 Rp 1,000 Rp 450

Page 34 of 141
Bahan
Portland Cement kg 194.000 Rp 1,000 Rp 194,000
Pasir beton m3 0.312 Rp 1,000 Rp 312
Koral Beton m3 0.468 Rp 1,000 Rp 468
Tenaga kerja Pekerja OH 2.400 Rp 25,000 Rp 60,000
Tukang batu OH 0.800 Rp 39,500 Rp 31,600
Kepala tukang OH 0.080 Rp 42,500 Rp 3,400
Mandor OH 0.119 Rp 50,000 Rp 5,950

6.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
±
Rp 463,361 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 247.000 Rp 1,000 Rp 247,000
Pasir beton ( kg ) kg 869.000 Rp 1 Rp 621
koral beton kg kg 999.000 Rp 1 Rp 740
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
±
Rp 492,341 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 276.000 Rp 1,000 Rp 276,000
Pasir beton ( kg ) kg 828.000 Rp 1 Rp 591
koral beton kg kg 1,012.000 Rp 1 Rp 750
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
±
Rp 515,324 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 299.000 Rp 1,000 Rp 299,000
Pasir beton ( kg ) kg 799.000 Rp 1 Rp 571
koral beton kg kg 1,017.000 Rp 1 Rp 753
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

Page 35 of 141
CATATAN Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %

6.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Rp 431,399 Rp 41,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 230.000 Rp 1,000 Rp 230,000
Pasir beton ( kg ) kg 893.000 Rp 1 Rp 638
koral beton kg kg 1,027.000 Rp 1 Rp 761
Bahan Air Liter 200.000 Rp 1,000 Rp 200,000
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.060 Rp 50,000 Rp 3,000

6.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
±
Rp 542,305 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 326.000 Rp 1,000 Rp 326,000
Pasir beton ( kg ) kg 760.000 Rp 1 Rp 543
koral beton kg kg 1,029.000 Rp 1 Rp 762
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
±
Rp 568,286 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 352.000 Rp 1,000 Rp 352,000
Pasir beton ( kg ) kg 731.000 Rp 1 Rp 522
koral beton kg kg 1,031.000 Rp 1 Rp 764
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
±
Rp 587,274 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 371.000 Rp 1,000 Rp 371,000
Pasir beton ( kg ) kg 698.000 Rp 1 Rp 499
koral beton kg kg 1,047.000 Rp 1 Rp 776
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250

Tenaga kerja Page 36 of 141


Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
±
Rp 600,264 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 384.000 Rp 1,000 Rp 384,000
Pasir beton ( kg ) kg 692.000 Rp 1 Rp 494
koral beton kg kg 1,039.000 Rp 1 Rp 770
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
±
Rp 622,249 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 406.000 Rp 1,000 Rp 406,000
Pasir beton ( kg ) kg 684.000 Rp 1 Rp 489
koral beton kg kg 1,026.000 Rp 1 Rp 760
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
±
Rp 2,330,000 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 413.000 Rp 1,000 Rp 413,000
Pasir beton m3 681.000 Rp 1,000 Rp 681,000
Koral Beton m3 1,021.000 Rp 1,000 Rp 1,021,000
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
±
Rp 655,224 Rp 73,063
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 439.000 Rp 1,000 Rp 439,000
Pasir beton ( kg ) kg 670.000 Rp 1 Rp 479
koral beton kg kg 1,006.000 Rp 1 Rp 745
Bahan

Page 37 of 141
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.105 Rp 50,000 Rp 5,250

6.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
±
Rp 664,217 Rp 73,063
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 448.000 Rp 1,000 Rp 448,000
Pasir beton ( kg ) kg 667.000 Rp 1 Rp 476
koral beton kg kg 1,000.000 Rp 1 Rp 741
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.105 Rp 50,000 Rp 5,250

6.13 Membuat 1 m3 beton kedap air dengan strorox – 100 Rp 402,480 Rp 73,063
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 400.000 Rp 1,000 Rp 400,000
Pasir beton m3 0.480 Rp 1,000 Rp 480
Koral Beton m3 0.800 Rp 1,000 Rp 800
Bahan Strorox – 100 kg 1.200 Rp 1,000 Rp 1,200
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.105 Rp 50,000 Rp 5,250

6.14 Memasang 1 m’ PVC Waterstop lebar 150 mm Rp 1,050 Rp 2,963


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Waterstop lebar 150 mm m’ 1.050 Rp 1,000 Rp 1,050
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang batu/pipa OH 0.030 Rp 39,500 Rp 1,185
Kepala tukang OH 0.003 Rp 42,500 Rp 128
Tenaga kerja Mandor OH 0.003 Rp 50,000 Rp 150

6.15 Memasang 1 m’ PVC Waterstop lebar 200 mm Rp 1,050 Rp 3,653


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Waterstop lebar 200 mm m’ 1.050 Rp 1,000 Rp 1,050
Pekerja OH 0.070 Rp 25,000 Rp 1,750

Tenaga kerja
Page 38 of 141
Tukang batu/pipa OH 0.035 Rp 39,500 Rp 1,383
Kepala tukang OH 0.004 Rp 42,500 Rp 170
Tenaga kerja Mandor OH 0.007 Rp 50,000 Rp 350

6.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm Rp 1,050 Rp 3,950


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Waterstop m’ 1.050 Rp 1,000 Rp 1,050
Bahan lebar 230 mm - 320 mm
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang batu/pipa OH 0.040 Rp 39,500 Rp 1,580
Kepala tukang OH 0.004 Rp 42,500 Rp 170
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.17 Pembesian 10 kg dengan besi polos atau besi ulir Rp 10,650 Rp 5,013
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi beton (polos/ulir) kg 10.500 Rp 1,000 Rp 10,500
Bahan Kawat beton kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang besi OH 0.070 Rp 39,500 Rp 2,765
Kepala tukang OH 0.007 Rp 42,500 Rp 298
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.18 Memasang 10 kg kabel presstressed polos/strands Rp 10,600 Rp 3,588


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi beton (polos/ulir) kg 10.500 Rp 1,000 Rp 10,500
Bahan Kawat beton kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.050 Rp 25,000 Rp 1,250
Tukang besi OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.003 Rp 50,000 Rp 150

6.19 Memasang 10 kg jaring kawat baja/wire mesh Rp 10,250 Rp 2,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Jaring kawat baja dilas kg 10.200 Rp 1,000 Rp 10,200
Bahan Kawat beton kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.025 Rp 25,000 Rp 625
Tukang besi OH 0.025 Rp 39,500 Rp 988
Kepala tukang OH 0.025 Rp 42,500 Rp 1,063
Tenaga kerja Mandor OH 0.001 Rp 50,000 Rp 50

6.20 Memasang 1 m2 bekisting untuk pondasi Rp 440 Rp 25,675


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.040 Rp 1,000 Rp 40
Paku 5 cm – 10 cm kg 0.300 Rp 1,000 Rp 300
Bahan

Page 39 of 141
Bahan Minyak bekisting Liter 0.100 Rp 1,000 Rp 100
Pekerja OH 0.520 Rp 25,000 Rp 13,000
Tukang kayu OH 0.260 Rp 39,500 Rp 10,270
Kepala tukang OH 0.026 Rp 42,500 Rp 1,105
Tenaga kerja Mandor OH 0.026 Rp 50,000 Rp 1,300

6.21 Memasang 1 m2 bekisting untuk sloof Rp 445 Rp 25,675


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.045 Rp 1,000 Rp 45
Paku 5 cm – 10 cm kg 0.300 Rp 1,000 Rp 300
Bahan Minyak bekisting Liter 0.100 Rp 1,000 Rp 100
Pekerja OH 0.520 Rp 25,000 Rp 13,000
Tukang kayu OH 0.260 Rp 39,500 Rp 10,270
Kepala tukang OH 0.026 Rp 42,500 Rp 1,105
Tenaga kerja Mandor OH 0.026 Rp 50,000 Rp 1,300

6.22 Memasang 1 m2 bekisting untuk kolom Rp 3,005 Rp 32,588


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.040 Rp 1,000 Rp 40
Paku 5 cm – 12 cm kg 0.400 Rp 1,000 Rp 400
Minyak bekisting Liter 0.200 Rp 1,000 Rp 200
Balok kayu kelas II m3 0.015 Rp 1,000 Rp 15
Plywood tebal 9 mm Lbr 0.350 Rp 1,000 Rp 350
Dolken kayu galam, Batang 2.000 Rp 1,000 Rp 2,000
Bahan φ(8–10) cm, panjang 4 m
Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp 39,500 Rp 13,035
Kepala tukang OH 0.033 Rp 42,500 Rp 1,403
Tenaga kerja Mandor OH 0.033 Rp 50,000 Rp 1,650

6.23 Memasang 1 m2 bekisting untuk balok Rp 3,008 Rp 32,588


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.040 Rp 1,000 Rp 40
Paku 5 cm – 12 cm kg 0.400 Rp 1,000 Rp 400
Minyak bekisting Liter 0.200 Rp 1,000 Rp 200
Balok kayu kelas II m3 0.018 Rp 1,000 Rp 18
Plywood tebal 9 mm Lbr 0.350 Rp 1,000 Rp 350
Dolken kayu galam, Rp 1,000 Rp 2,000
Bahan φ (8-10) cm, panjang 4 m Batang 2.000
Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp 39,500 Rp 13,035
Kepala tukang OH 0.033 Rp 42,500 Rp 1,403
Tenaga kerja Mandor OH 0.033 Rp 50,000 Rp 1,650

Page 40 of 141
6.24 Memasang 1 m2 bekisting untuk lantai Rp 7,005 Rp 32,588
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.040 Rp 1,000 Rp 40
Paku 5 cm – 12 cm kg 0.400 Rp 1,000 Rp 400
Minyak bekisting Liter 0.200 Rp 1,000 Rp 200
Balok kayu kelas II m3 0.015 Rp 1,000 Rp 15
Plywood tebal 9 mm Lbr 0.350 Rp 1,000 Rp 350
Dolken kayu galam, (8-10) cm,
Rp 6,000
ö

Bahan panjang 4 m Batang 6.000 Rp 1,000


Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp 39,500 Rp 13,035
Kepala tukang OH 0.033 Rp 42,500 Rp 1,403
Tenaga kerja Mandor OH 0.033 Rp 50,000 Rp 1,650

6.25 Memasang 1 m2 bekisting untuk dinding Rp 8,000 Rp 32,588


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.030 Rp 1,000 Rp 30
Paku 5 cm – 12 cm kg 0.400 Rp 1,000 Rp 400
Minyak bekisting Liter 0.200 Rp 1,000 Rp 200
Balok kayu kelas II m3 0.020 Rp 1,000 Rp 20
Plywood tebal 9 mm Lbr 0.350 Rp 1,000 Rp 350
Dolken kayu galam, (8-10) cm,
Rp 3,000
ö

panjang 4 m Batang 3.000 Rp 1,000


Formite/penjaga jarak
Rp 4,000
Bahan bekisting/spacer Buah 4.000 Rp 1,000
Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp 39,500 Rp 13,035
Kepala tukang OH 0.033 Rp 42,500 Rp 1,403
Tenaga kerja Mandor OH 0.033 Rp 50,000 Rp 1,650

6.26 Memasang 1 m2 bekisting untuk tangga Rp 2,945 Rp 32,588


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.030 Rp 1,000 Rp 30
Paku 5 cm – 12 cm kg 0.400 Rp 1,000 Rp 400
Minyak bekisting Liter 0.150 Rp 1,000 Rp 150
Balok kayu kelas II m3 0.015 Rp 1,000 Rp 15
Plywood tebal 9 mm Lbr 0.350 Rp 1,000 Rp 350
Dolken kayu galam, (8-10) cm,
Rp 2,000
ö

Bahan panjang 4 m Batang 2.000 Rp 1,000


Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp 39,500 Rp 13,035
Kepala tukang OH 0.033 Rp 42,500 Rp 1,403
Tenaga kerja Mandor OH 0.033 Rp 50,000 Rp 1,650

Page 41 of 141
6.27 Memasang 1 m2 jembatan untuk pengecoran beton Rp 1,126 Rp 6,338
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III (papan) m3 0.026 Rp 1,000 Rp 26
Paku 5 cm – 12 cm kg 0.600 Rp 1,000 Rp 600
Dolken kayu galam (kaso), (8-10)
Rp 500
ö

Bahan cm, panjang 4 m Batang 0.500 Rp 1,000


Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

6.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Rp 499,200 Rp 260,573
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.200 Rp 1,000 Rp 200
Paku 5 cm – 12 cm kg 1.500 Rp 1,000 Rp 1,500
Minyak bekisting Liter 0.400 Rp 1,000 Rp 400
Besi beton polos kg 157.500 Rp 1,000 Rp 157,500
Kawat beton kg 2.250 Rp 1,000 Rp 2,250
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Bahan Koral Beton m3 0.810 Rp 1,000 Rp 810
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.300 Rp 39,500 Rp 51,350
Tukang besi OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.262 Rp 42,500 Rp 11,135
Tenaga kerja Mandor OH 0.265 Rp 50,000 Rp 13,250

6.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Rp 556,720 Rp 296,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.270 Rp 1,000 Rp 270
Paku 5 cm-12cm kg 2.000 Rp 1,000 Rp 2,000
Minyak bekisting Liter 0.600 Rp 1,000 Rp 600
Besi beton polos kg 210.000 Rp 1,000 Rp 210,000
Kawat beton kg 3.000 Rp 1,000 Rp 3,000
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Plywood 9 mm Lembar 3.500 Rp 1,000 Rp 3,500
Pasir beton m3 0.540 Rp 1,000 Rp 540
Bahan Koral Beton m3 0.810 Rp 1,000 Rp 810
Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.560 Rp 39,500 Rp 61,620
Tukang besi OH 1.400 Rp 39,500 Rp 55,300
Kepala tukang OH 0.323 Rp 42,500 Rp 13,728
Tenaga kerja

Page 42 of 141
Tenaga kerja Mandor OH 0.283 Rp 50,000 Rp 14,150

6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Rp 686,900 Rp 370,015
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.400 Rp 1,000 Rp 400
Paku 5 cm – 12 cm kg 4.000 Rp 1,000 Rp 4,000
Minyak bekisting Liter 2.000 Rp 1,000 Rp 2,000
Besi beton polos kg 315.000 Rp 1,000 Rp 315,000
Kawat beton kg 4.500 Rp 1,000 Rp 4,500
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.150 Rp 1,000 Rp 150
Plywood 9 mm Lembar 3.500 Rp 1,000 Rp 3,500
Dolken kayu galam, (8-10) cm,
Rp 20,000
ö

Bahan panjang 4 m Batang 20.000 Rp 1,000


Pekerja OH 7.050 Rp 25,000 Rp 176,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.650 Rp 39,500 Rp 65,175
Tukang besi OH 2.100 Rp 39,500 Rp 82,950
Kepala tukang OH 0.403 Rp 42,500 Rp 17,128
Tenaga kerja Mandor OH 0.353 Rp 50,000 Rp 17,650

6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Rp 574,410 Rp 320,140
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp 1,000 Rp 320
Paku 5 cm – 12 cm kg 3.200 Rp 1,000 Rp 3,200
Minyak bekisting Liter 1.600 Rp 1,000 Rp 1,600
Besi beton polos kg 210.000 Rp 1,000 Rp 210,000
Kawat beton kg 3.000 Rp 1,000 Rp 3,000
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.140 Rp 1,000 Rp 140
Plywood 9 mm Lembar 2.800 Rp 1,000 Rp 2,800
Dolken kayu galam, (8-10) cm,
Rp 16,000
ö

Bahan panjang 4 m Batang 16.000 Rp 1,000


Pekerja OH 6.350 Rp 25,000 Rp 158,750
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.650 Rp 39,500 Rp 65,175
Tukang besi OH 1.400 Rp 39,500 Rp 55,300
Kepala tukang OH 0.333 Rp 42,500 Rp 14,153
Tenaga kerja Mandor OH 0.318 Rp 50,000 Rp 15,900

Page 43 of 141
6.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Rp 537,140 Rp 260,700
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp 1,000 Rp 320
Paku 5 cm – 12 cm kg 3.200 Rp 1,000 Rp 3,200
Minyak bekisting Liter 1.600 Rp 1,000 Rp 1,600
Besi beton polos kg 157.500 Rp 1,000 Rp 157,500
Kawat beton kg 2.250 Rp 1,000 Rp 2,250
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.120 Rp 1,000 Rp 120
Plywood 9 mm Lembar 2.800 Rp 1,000 Rp 2,800
Dolken kayu galam, (8-10) cm,
Rp 32,000
ö

Bahan panjang 4 m Batang 32.000 Rp 1,000


Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.300 Rp 39,500 Rp 51,350
Tukang besi OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.265 Rp 42,500 Rp 11,263
Tenaga kerja Mandor OH 0.265 Rp 50,000 Rp 13,250

6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Rp 529,100 Rp 260,573
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.240 Rp 1,000 Rp 240
Paku 5 cm – 12 cm kg 3.200 Rp 1,000 Rp 3,200
Minyak bekisting Liter 1.600 Rp 1,000 Rp 1,600
Besi beton polos kg 157.500 Rp 1,000 Rp 157,500
Kawat beton kg 2.250 Rp 1,000 Rp 2,250
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.160 Rp 1,000 Rp 160
Plywood 9 mm Lembar 2.800 Rp 1,000 Rp 2,800
Dolken kayu galam, (8-10) cm,
Rp 24,000
ö

Bahan panjang 4 m Batang 24.000 Rp 1,000


Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.300 Rp 39,500 Rp 51,350
Tukang besi OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.262 Rp 42,500 Rp 11,135
Tenaga kerja Mandor OH 0.265 Rp 50,000 Rp 13,250

6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Rp 571,405 Rp 296,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Page 44 of 141
Kayu kelas III m3 0.250 Rp 1,000 Rp 250
Paku 5 cm – 12 cm kg 3.000 Rp 1,000 Rp 3,000
Minyak bekisting Liter 1.200 Rp 1,000 Rp 1,200
Besi beton polos kg 210.000 Rp 1,000 Rp 210,000
Kawat beton kg 3.000 Rp 1,000 Rp 3,000
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.105 Rp 1,000 Rp 105
Plywood 9 mm Lembar 2.500 Rp 1,000 Rp 2,500
Dolken kayu galam, (8-10) cm,
Rp 14,000
ö

Bahan panjang 4 m Batang 14.000 Rp 1,000


Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.560 Rp 39,500 Rp 61,620
Tukang besi OH 1.400 Rp 39,500 Rp 55,300
Kepala tukang OH 0.323 Rp 42,500 Rp 13,728
Tenaga kerja Mandor OH 0.283 Rp 50,000 Rp 14,150

6.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Rp 7,477 Rp 7,575
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.002 Rp 1,000 Rp 2
Paku 5 cm – 12 cm kg 0.010 Rp 1,000 Rp 10
Minyak bekisting Liter Rp 1,000 Rp -
Besi beton polos kg 3.000 Rp 1,000 Rp 3,000
Kawat beton kg 0.450 Rp 1,000 Rp 450
Portland Cement kg 4.000 Rp 1,000 Rp 4,000
Pasir beton m3 0.006 Rp 1,000 Rp 6
Bahan Koral Beton m3 0.009 Rp 1,000 Rp 9
Pekerja OH 0.180 Rp 25,000 Rp 4,500
Tukang batu OH 0.020 Rp 39,500 Rp 790
Tukang kayu OH 0.020 Rp 39,500 Rp 790
Tukang besi OH 0.020 Rp 39,500 Rp 790
Kepala tukang OH 0.006 Rp 42,500 Rp 255
Tenaga kerja Mandor OH 0.009 Rp 50,000 Rp 450

6.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm Rp 9,197 Rp 12,511
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.003 Rp 1,000 Rp 3
Paku 5 cm – 12 cm kg 0.020 Rp 1,000 Rp 20
Minyak bekisting Liter Rp 1,000 Rp -
Besi beton polos kg 3.600 Rp 1,000 Rp 3,600
Kawat beton kg 0.050 Rp 1,000 Rp 50
Portland Cement kg 5.500 Rp 1,000 Rp 5,500

Bahan
Page 45 of 141
Pasir beton m3 0.009 Rp 1,000 Rp 9
Bahan Koral Beton m3 0.015 Rp 1,000 Rp 15
Pekerja OH 0.297 Rp 25,000 Rp 7,425
Tukang batu OH 0.033 Rp 39,500 Rp 1,304
Tukang kayu OH 0.033 Rp 39,500 Rp 1,304
Tukang besi OH 0.033 Rp 39,500 Rp 1,304
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP Rp 183,580 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 43.500 Rp 1,000 Rp 43,500
Bahan Pasir Pasang m3 0.080 Rp 1,000 Rp 80
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP Rp 173,041 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 32.950 Rp 1,000 Rp 32,950
Bahan Pasir Pasang m3 0.091 Rp 1,000 Rp 91
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP Rp 166,643 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 26.550 Rp 1,000 Rp 26,550
Bahan Pasir Pasang m3 0.093 Rp 1,000 Rp 93
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP Rp 162,302 Rp 25,250

Page 46 of 141
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 22.200 Rp 1,000 Rp 22,200
Bahan Pasir Pasang m3 0.102 Rp 1,000 Rp 102
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP Rp 158,622 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 18.500 Rp 1,000 Rp 18,500
Bahan Pasir Pasang m3 0.122 Rp 1,000 Rp 122
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 150,200 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 10.080 Rp 1,000 Rp 10,080
Pasir Pasang m3 0.093 Rp 1,000 Rp 93
Bahan Kapur padam m3 0.028 Rp 1,000 Rp 28
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP Rp 88,988 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 18.950 Rp 1,000 Rp 18,950
Bahan Pasir Pasang m3 0.038 Rp 1,000 Rp 38
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP Rp 84,410 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 14.370 Rp 1,000 Rp 14,370
Bahan

Page 47 of 141
Bahan Pasir Pasang m3 0.040 Rp 1,000 Rp 40
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP Rp 81,543 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 11.500 Rp 1,000 Rp 11,500
Bahan Pasir Pasang m3 0.043 Rp 1,000 Rp 43
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP Rp 79,725 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 9.680 Rp 1,000 Rp 9,680
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP Rp 78,369 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.049 Rp 1,000 Rp 49
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP Rp 76,550 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 6.500 Rp 1,000 Rp 6,500
Bahan Pasir Pasang m3 0.050 Rp 1,000 Rp 50
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja

Page 48 of 141
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.13 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 74,565 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 4.500 Rp 1,000 Rp 4,500
Pasir Pasang m3 0.050 Rp 1,000 Rp 50
Bahan Kapur padam m3 0.015 Rp 1,000 Rp 15
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.14 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP Rp 70,054 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Semen Merah m3 0.018 Rp 1,000 Rp 18
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Kapur padam m3 0.018 Rp 1,000 Rp 18
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.15 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP Rp 70,056 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Semen Merah m3 0.014 Rp 1,000 Rp 14
Pasir Pasang m3 0.028 Rp 1,000 Rp 28
Bahan Kapur padam m3 0.014 Rp 1,000 Rp 14
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.16 Memasang 1 m2 dinding HB 20 , campuran spesi 1 PC : 3 PP Rp 43,828 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 20 Buah 12.500 Rp 1,000 Rp 12,500
Portland Cement kg 30.320 Rp 1,000 Rp 30,320
Pasir Pasang m3 0.728 Rp 1,000 Rp 728
Bahan Besi angkur =8 mm
ö kg 0.280 Rp 1,000 Rp 280
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja

Page 49 of 141
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.17 Memasang 1 m2 dinding HB 20, cam puran spesi 1 PC : 4 PP Rp 37,812 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 20 Buah 12.500 Rp 1,000 Rp 12,500
Portland Cement kg 24.260 Rp 1,000 Rp 24,260
Pasir Pasang m3 0.772 Rp 1,000 Rp 772
Bahan Besi angkur =8 mm
ö kg 0.280 Rp 1,000 Rp 280
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.18 Memasang 1 m2 dinding HB 15, campuran spesi 1 PC : 3 PP Rp 36,070 Rp 15,150


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 15 Buah 12.500 Rp 1,000 Rp 12,500
Portland Cement kg 22.740 Rp 1,000 Rp 22,740
Pasir Pasang m3 0.550 Rp 1,000 Rp 550
Bahan Besi angkur =8 mm
ö kg 0.280 Rp 1,000 Rp 280
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.19 Memasang 1 m2 dinding HB 15, campuran spesi 1 PC : 4 PP Rp 31,562 Rp 15,150


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 15 Buah 12.500 Rp 1,000 Rp 12,500
Portland Cement kg 18.200 Rp 1,000 Rp 18,200
Pasir Pasang m3 0.582 Rp 1,000 Rp 582
Bahan Besi angkur =8 mm
ö kg 0.280 Rp 1,000 Rp 280
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.20 Memasang 1 m2 dinding HB 10, campuran spesi 1 PC : 3 PP Rp 28,304 Rp 12,625


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 10 Buah 12.500 Rp 1,000 Rp 12,500
Portland Cement kg 15.160 Rp 1,000 Rp 15,160
Pasir Pasang m3 0.364 Rp 1,000 Rp 364
Bahan Besi angkur =8 mm
ö kg 0.280 Rp 1,000 Rp 280
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja

Page 50 of 141
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.21 Memasang 1 m2 dinding HB 10, campuran spesi 1 PC : 4 PP Rp 25,298 Rp 12,625


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 10 Buah 12.500 Rp 1,000 Rp 12,500
Portland Cement kg 12.130 Rp 1,000 Rp 12,130
Pasir Pasang m3 0.388 Rp 1,000 Rp 388
Bahan Besi angkur =8 mm
ö kg 0.280 Rp 1,000 Rp 280
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.22 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 44,032 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp 1,000 Rp 30,000
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.23 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP Rp 41,035 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp 1,000 Rp 30,000
Portland Cement kg 11.000 Rp 1,000 Rp 11,000
Bahan Pasir Pasang m3 0.035 Rp 1,000 Rp 35
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.24 Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 84,032 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata berongga ekspose Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

Page 51 of 141
6.1 Memasang 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm Rp 15,520 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 15.504 Rp 1,000 Rp 15,504
Bahan Pasir Pasang m3 0.016 Rp 1,000 Rp 16
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.2 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm Rp 10,244 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.224 Rp 1,000 Rp 10,224
Bahan Pasir Pasang m3 0.020 Rp 1,000 Rp 20
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.3 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm Rp 7,799 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 7.776 Rp 1,000 Rp 7,776
Bahan Pasir Pasang m3 0.023 Rp 1,000 Rp 23
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.4 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm Rp 6,264 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.240 Rp 1,000 Rp 6,240
Bahan Pasir Pasang m3 0.024 Rp 1,000 Rp 24
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.5 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm Rp 5,210 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.184 Rp 1,000 Rp 5,184
Bahan Pasir Pasang m3 0.026 Rp 1,000 Rp 26
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

Page 52 of 141
6.6 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm Rp 4,443 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 4.416 Rp 1,000 Rp 4,416
Bahan Pasir Pasang m3 0.027 Rp 1,000 Rp 27
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.7 Memasang 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm Rp 3,964 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 3.936 Rp 1,000 Rp 3,936
Bahan Pasir Pasang m3 0.028 Rp 1,000 Rp 28
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.8 Memasang 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm Rp 3,485 Rp 14,813


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 3.456 Rp 1,000 Rp 3,456
Bahan Pasir Pasang m3 0.029 Rp 1,000 Rp 29
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.9 Memasang 1 m2 plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm Rp 5,776 Rp 15,150


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.760 Rp 1,000 Rp 5,760
Kapur padam m3 0.003 Rp 1,000 Rp 3
Bahan Pasir Pasang m3 0.013 Rp 1,000 Rp 13
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.10 Memasang 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm Rp 3,025 Rp 15,150


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 3.000 Rp 1,000 Rp 3,000
Kapur padam m3 0.005 Rp 1,000 Rp 5
Bahan Pasir Pasang m3 0.020 Rp 1,000 Rp 20
Pekerja OH 0.360 Rp 25,000 Rp 9,000

Tenaga kerja Page 53 of 141


Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.11 memasang 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm Rp 27 Rp 15,150


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Semen Merah m3 0.009 Rp 1,000 Rp 9
Kapur padam m3 0.009 Rp 1,000 Rp 9
Bahan Pasir Pasang m3 0.009 Rp 1,000 Rp 9
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.12 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm Rp 29 Rp 15,150


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Semen Merah m3 0.007 Rp 1,000 Rp 7
Kapur padam m3 0.007 Rp 1,000 Rp 7
Bahan Pasir Pasang m3 0.015 Rp 1,000 Rp 15
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.13 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm Rp 13,659 Rp 19,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 13.632 Rp 1,000 Rp 13,632
Bahan Pasir Pasang m3 0.027 Rp 1,000 Rp 27
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100

6.14 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm Rp 10,399 Rp 15,900


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.368 Rp 1,000 Rp 10,368
Bahan Pasir Pasang m3 0.031 Rp 1,000 Rp 31
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.15 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm Rp 8,352 Rp 19,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Page 54 of 141
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100

6.16 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm Rp 6,947 Rp 19,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.912 Rp 1,000 Rp 6,912
Bahan Pasir Pasang m3 0.035 Rp 1,000 Rp 35
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100

6.17 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm Rp 5,924 Rp 19,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.888 Rp 1,000 Rp 5,888
Bahan Pasir Pasang m3 0.036 Rp 1,000 Rp 36
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100

6.18 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm Rp 36 Rp 21,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Semen Merah m3 0.009 Rp 1,000 Rp 9
Kapur padam m3 0.009 Rp 1,000 Rp 9
Bahan Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Pekerja OH 0.440 Rp 25,000 Rp 11,000
Tukang batu OH 0.220 Rp 39,500 Rp 8,690
Kepala tukang OH 0.022 Rp 42,500 Rp 935
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100

6.19 Memasang 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm Rp 5,210 Rp 7,453


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.184 Rp 1,000 Rp 5,184
Bahan Pasir Pasang m3 0.026 Rp 1,000 Rp 26
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang batu OH 0.075 Rp 39,500 Rp 2,963
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

Page 55 of 141
6.20 Memasang 1 m’ Plesteran Skoning 1 PC : 2 PP, lebar 10 mm Rp 513 Rp 19,700
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 0.500 Rp 1,000 Rp 500
Bahan Pasir Pasang m3 0.013 Rp 1,000 Rp 13
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang batu OH 0.400 Rp 39,500 Rp 15,800
Kepala tukang OH 0.040 Rp 42,500 Rp 1,700
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.21 Memasang 1 m2 Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm Rp 25,000 Rp 22,265


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Batu granit kg 15.000 Rp 1,000 Rp 15,000
Pekerja OH 0.450 Rp 25,000 Rp 11,250
Tukang batu OH 0.225 Rp 39,500 Rp 8,888
Kepala tukang OH 0.023 Rp 42,500 Rp 978
Tenaga kerja Mandor OH 0.023 Rp 50,000 Rp 1,150

6.22 Memasang 1 m2 Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm Rp 25,000 Rp 22,265


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Batu teraso kg 15.000 Rp 1,000 Rp 15,000
Pekerja OH 0.450 Rp 25,000 Rp 11,250
Tukang batu OH 0.225 Rp 39,500 Rp 8,888
Kepala tukang OH 0.023 Rp 42,500 Rp 978
Tenaga kerja Mandor OH 0.023 Rp 50,000 Rp 1,150

6.23 Memasang 1 m2 Plesteran Ciprat 1 PC : 2 PP Rp 4,326 Rp 12,625


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 4.320 Rp 1,000 Rp 4,320
Bahan Pasir Pasang m3 0.006 Rp 1,000 Rp 6
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.24 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’) Rp 3,108 Rp 7,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.108 Rp 1,000 Rp 3,108
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang batu OH 0.075 Rp 39,500 Rp 2,963
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

Page 56 of 141
6.25 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’) Rp 1,600 Rp 3,503
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 1.600 Rp 1,000 Rp 1,600
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang batu OH 0.035 Rp 39,500 Rp 1,383
Kepala tukang OH 0.004 Rp 42,500 Rp 170
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.26 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP Rp 6,352 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.340 Rp 1,000 Rp 6,340
Bahan Pasir Pasang m3 0.012 Rp 1,000 Rp 12
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750

6.27 Memasang 1 m2 acian Rp 3,250 Rp 9,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.250 Rp 1,000 Rp 3,250
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500

6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I Rp 3,350 Rp 1,111,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp 1,000 Rp 1,100
Paku 10 cm kg 1.250 Rp 1,000 Rp 1,250
Bahan Lem kayu kg 1.000 Rp 1,000 Rp 1,000
Pekerja OH 7.000 Rp 25,000 Rp 175,000
Tukang kayu OH 21.000 Rp 39,500 Rp 829,500
Kepala tukang OH 2.100 Rp 42,500 Rp 89,250
Tenaga kerja Mandor OH 0.350 Rp 50,000 Rp 17,500

6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III Rp 3,450 Rp 952,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.200 Rp 1,000 Rp 1,200
Paku 10 cm kg 1.250 Rp 1,000 Rp 1,250
Bahan Lem kayu kg 1.000 Rp 1,000 Rp 1,000
Pekerja OH 6.000 Rp 25,000 Rp 150,000
Tukang kayu OH 18.000 Rp 39,500 Rp 711,000
Kepala tukang OH 1.800 Rp 42,500 Rp 76,500
Tenaga kerja Mandor OH 0.300 Rp 50,000 Rp 15,000

Page 57 of 141
6.3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II Rp 90 Rp 55,588
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp 1,000 Rp 40
Bahan Paku 5 cm - 7 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.105 Rp 42,500 Rp 4,463
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.4 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III Rp 90 Rp 55,588
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp 1,000 Rp 40
Bahan Paku 5 cm - 7 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.105 Rp 42,500 Rp 4,463
Tenaga kerj a Mandor OH 0.018 Rp 50,000 Rp 900

6.5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II Rp 540 Rp 158,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp 1,000 Rp 40
Bahan Lem kayu kg 0.500 Rp 1,000 Rp 500
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp 39,500 Rp 118,500
Kepala tukang OH 0.300 Rp 42,500 Rp 12,750
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500

6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II Rp 324 Rp 127,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.024 Rp 1,000 Rp 24
Bahan Lem kayu kg 0.300 Rp 1,000 Rp 300
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp 39,500 Rp 94,800
Kepala tukang OH 0.240 Rp 42,500 Rp 10,200
Tenaga kerja Mandor OH 0.040 Rp 50,000 Rp 2,000

6.7 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II Rp 564 Rp 158,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.064 Rp 1,000 Rp 64
Bahan Lem kayu kg 0.500 Rp 1,000 Rp 500
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp 39,500 Rp 118,500

Tenaga kerja

Page 58 of 141
Kepala tukang OH 0.300 Rp 42,500 Rp 12,750
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500

6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm) Rp 1,555 Rp 111,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp 1,000 Rp 25
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.500 Rp 1,000 Rp 500
Plywood tebal 4 mm Ukuran (90 x
Rp 1,000
Bahan 220) cm Lembar 1.000 Rp 1,000
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 2.100 Rp 39,500 Rp 82,950
Kepala tukang OH 0.210 Rp 42,500 Rp 8,925
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.9 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Rp 1,556 Rp 127,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.026 Rp 1,000 Rp 26
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.500 Rp 1,000 Rp 500
Plywood tebal 4 mm Ukuran (90 x
Rp 1,000
Bahan 220) cm Lembar 1.000 Rp 1,000
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp 39,500 Rp 94,800
Kepala tukang OH 0.240 Rp 42,500 Rp 10,200
Tenaga kerja Mandor OH 0.040 Rp 50,000 Rp 2,000

6.10 Memasang 1 m2 jalusi kusen, kayu kelas I atau II Rp 210 Rp 121,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.060 Rp 1,000 Rp 60
Bahan Paku 1 cm - 2,5 cm kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.670 Rp 25,000 Rp 16,750
Tukang kayu OH 2.000 Rp 39,500 Rp 79,000
Kepala tukang OH 0.200 Rp 42,500 Rp 8,500
Tenaga kerja Mandor OH 0.335 Rp 50,000 Rp 16,750

6.11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I Rp 1,355 Rp 127,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp 1,000 Rp 25
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.300 Rp 1,000 Rp 300
Teakwood tebal 4 mm ukuran (90 x
Rp 1,000
Bahan 220) cm Lembar 1.000 Rp 1,000
Pekerja OH 0.800 Rp 25,000 Rp 20,000

Tenaga kerja Page 59 of 141


Tukang kayu OH 2.400 Rp 39,500 Rp 94,800
Kepala tukang OH 0.240 Rp 42,500 Rp 10,200
Tenaga kerja Mandor OH 0.040 Rp 50,000 Rp 2,000

6.12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II Rp 2,355 Rp 134,963
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp 1,000 Rp 25
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.800 Rp 1,000 Rp 800
Teakwood tebal 4 mm ukuran (90 x
Rp 1,000
220) cm Lembar 1.000 Rp 1,000
Bahan Formika Lembar 0.500 Rp 1,000 Rp 500
Pekerja OH 0.850 Rp 25,000 Rp 21,250
Tukang kayu OH 2.550 Rp 39,500 Rp 100,725
Kepala tukang OH 0.255 Rp 42,500 Rp 10,838
Tenaga kerja Mandor OH 0.043 Rp 50,000 Rp 2,150

6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Rp 21,700 Rp 635,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp 1,000 Rp 1,100
Besi strip tebal 5 mm kg 15.000 Rp 1,000 Rp 15,000
Bahan Paku 12 cm kg 5.600 Rp 1,000 Rp 5,600
Pekerja OH 4.000 Rp 25,000 Rp 100,000
Tukang kayu OH 12.000 Rp 39,500 Rp 474,000
Kepala tukang OH 1.200 Rp 42,500 Rp 51,000
Tenaga kerja Mandor OH 0.200 Rp 50,000 Rp 10,000

6.14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I Rp 21,800 Rp 1,063,625


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.200 Rp 1,000 Rp 1,200
Besi strip tebal 5 mm kg 15.000 Rp 1,000 Rp 15,000
Bahan Paku 12 cm kg 5.600 Rp 1,000 Rp 5,600
Pekerja OH 6.700 Rp 25,000 Rp 167,500
Tukang kayu OH 20.100 Rp 39,500 Rp 793,950
Kepala tukang OH 2.010 Rp 42,500 Rp 85,425
Tenaga kerja Mandor OH 0.335 Rp 50,000 Rp 16,750

6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II Rp 19,100 Rp 381,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp 1,000 Rp 1,100
Besi strip tebal 5 mm kg 15.000 Rp 1,000 Rp 15,000
Bahan Paku 12 cm kg 3.000 Rp 1,000 Rp 3,000
Pekerja OH 2.400 Rp 25,000 Rp 60,000
Tukang kayu OH 7.200 Rp 39,500 Rp 284,400

Tenaga kerja
Page 60 of 141
Kepala tukang OH 0.720 Rp 42,500 Rp 30,600
Tenaga kerja Mandor OH 0.120 Rp 50,000 Rp 6,000

6.16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II Rp 300 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.014 Rp 1,000 Rp 14
Reng (2 x 3) cm m3 0.036 Rp 1,000 Rp 36
Bahan Paku 5 cm dan 10 cm kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II Rp 321 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.014 Rp 1,000 Rp 14
Reng (3 x 4) cm m3 0.057 Rp 1,000 Rp 57
Bahan Paku 5 cm dan 10 cm kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.18 Memasang 1 m2 rangka atap sirap, kayu kelas II Rp 365 Rp 8,550


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas II m3 0.165 Rp 1,000 Rp 165
Bahan Paku 5 cm dan 10 cm kg 0.200 Rp 1,000 Rp 200
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang kayu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.006 Rp 50,000 Rp 300

6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Rp 215 Rp 20,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.015 Rp 1,000 15.4
Bahan Paku 7 cm – 10 cm kg 0.200 Rp 1,000 Rp 200
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.300 Rp 39,500 Rp 11,850
Kepala tukang OH 0.030 Rp 42,500 Rp 1,275
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750

6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Rp 266 Rp 18,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.016 Rp 1,000 Rp 16
Bahan

Page 61 of 141
Bahan Paku 7 cm – 10 cm kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.300 Rp 39,500 Rp 11,850
Kepala tukang OH 0.030 Rp 42,500 Rp 1,275
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500

6.21 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Rp 111 Rp 11,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp 1,000 Rp 11
Bahan Paku 5 cm dan 7 cm kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.22 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Rp 61 Rp 11,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp 1,000 Rp 11
Bahan Paku 5 cm dan 7 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Rp 178 Rp 23,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 0.028 Rp 1,000 Rp 28
Bahan Paku 5 cm dan 7 cm kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II Rp 1,598 Rp 23,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp 1,000 Rp 28
Paku 5 cm dan 10 cm kg 0.150 Rp 1,000 Rp 150
Teakwood tebal 4 mm, Ukuran 120
Rp 860
cm x 240 cm Lembar 0.860 Rp 1,000
Bahan Lem kayu kg 0.560 Rp 1,000 Rp 560
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

Page 62 of 141
6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Rp 1,598 Rp 31,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp 1,000 Rp 28
Paku 5 cm dan 10 cm kg 0.150 Rp 1,000 Rp 150
Plywood tebal 4 mm, ukuran 120
Rp 860
cm x 240 cm Lembar 0.860 Rp 1,000
Bahan Lem kayu kg 0.560 Rp 1,000 Rp 560
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.600 Rp 39,500 Rp 23,700
Kepala tukang OH 0.060 Rp 42,500 Rp 2,550
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500

6.26 Memasang 1 m2 dinding lambriziring dari papan kayu kelas I Rp 257 Rp 95,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.007 Rp 1,000 Rp 7
Paku 5 cm dan 10 cm kg 0.100 Rp 1,000 Rp 100
Bahan Paku skrup 10 cm kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang kayu OH 1.800 Rp 39,500 Rp 71,100
Kepala tukang OH 0.180 Rp 42,500 Rp 7,650
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500

6.27 Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 x 240) cm Rp 450 Rp 3,978
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plywood tebal 4 mm Lembar 0.400 Rp 1,000 Rp 400
Bahan Paku 1 cm dan 2,5 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.025 Rp 25,000 Rp 625
Tukang kayu OH 0.075 Rp 39,500 Rp 2,963
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.001 Rp 50,000 Rp 50

6.28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV Rp 1,529 Rp 4,938
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bilik bambu m2 1.500 Rp 1,000 Rp 1,500
Kaso-kaso (5 x 7) cm m3 0.014 Rp 1,000 Rp 14
Paku kg 0.012 Rp 1,000 Rp 12
Bahan List kayu 2/4 m3 0.003 Rp 1,000 Rp 3
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

Page 63 of 141
6.1 Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm Rp 16,475 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.2 Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm Rp 21,915 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.3 Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm Rp 36,945 Rp 13,378
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 39,500 Rp 5,333
Kepala tukang OH 0.014 Rp 42,500 Rp 595
Tenaga kerja Mandor OH 0.014 Rp 50,000 Rp 700

6.4 Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.5 Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 11.870 Rp 1,000 Rp 11,870

Bahan Page 64 of 141


Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.6 Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm Rp 38,565 Rp 13,378
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.620 Rp 1,000 Rp 1,620
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 39,500 Rp 5,333
Kepala tukang OH 0.014 Rp 42,500 Rp 595
Tenaga kerja Mandor OH 0.014 Rp 50,000 Rp 700

6.7 Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.8 Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.9 Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 6.630 Rp 1,000 Rp 6,630

Bahan Page 65 of 141


Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.10 Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.11 Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.12 Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.13 Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm Rp 14,245 Rp 11,850
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 3.100 Rp 1,000 Rp 3,100

Bahan Page 66 of 141


Portland Cement kg 9.600 Rp 1,000 Rp 9,600
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.240 Rp 25,000 Rp 6,000
Tukang batu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.012 Rp 50,000 Rp 600

6.14 Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.15 Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650

6.16 Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm Rp 6,954 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.650 Rp 1,000 Rp 1,650
Bahan Pasir Pasang m3 0.004 Rp 1,000 Rp 4
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.17 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan

Page 67 of 141
Bahan Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.18 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.19 Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm Rp 6,543 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.20 Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.21 Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100

Page 68 of 141
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.22 Memasang 1 m plint ubin teraso ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.23 Memasang 1 m plint ubin teraso ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna Kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.24 Memasang 1 m plint ubin granit ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.25 Memasang 1 m plint ubin granit ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100

Page 69 of 141
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.26 Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.27 Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna Kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.28 Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm Rp 2,943 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 1.700 Rp 1,000 Rp 1,700
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.29 Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100

Page 70 of 141
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.30 Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.31 Memasang 1 m2 lantai teraso cor ditempat, tebal 3 cm Rp 36 Rp 17,775


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Bahan teraso cor m3 0.036 Rp 1,000 Rp 36
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.180 Rp 39,500 Rp 7,110
Kepala tukang OH 0.018 Rp 42,500 Rp 765
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.32 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm Rp 63,985 Rp 34,563
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 53.000 Rp 1,000 Rp 53,000
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.33 Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm Rp 117,435 Rp 34,563
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 106.000 Rp 1,000 Rp 106,000
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 3.200 Rp 1,000 Rp 3,200
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja

Page 71 of 141
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.34 Memasang 1 m2 lantai keramik ukuran (33 x 33) cm Rp 19,855 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 10.000 Rp 1,000 Rp 10,000
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.620 Rp 1,000 Rp 1,620
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.35 Memasang 1 m2 lantai keramik ukuran (30 x 30) cm Rp 23,415 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm Rp 38,565 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.620 Rp 1,000 Rp 1,620
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.37 Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border Rp 47,215 Rp 51,890
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 33.000 Rp 1,000 Rp 33,000
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 4.370 Rp 1,000 Rp 4,370
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang batu OH 0.525 Rp 39,500 Rp 20,738
Kepala tukang OH 0.053 Rp 42,500 Rp 2,253
Tenaga kerja

Page 72 of 141
Tenaga kerja Mandor OH 0.053 Rp 50,000 Rp 2,650

6.38 Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP Rp 28,059 Rp 34,563
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Mosaik Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 14.150 Rp 1,000 Rp 14,150
Pasir Pasang m3 0.039 Rp 1,000 Rp 39
Bahan Semen warna kg 2.000 Rp 1,000 Rp 2,000
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.39 Memasang 1 m’ plint keramik ukuran (10 x 20) cm Rp 6,468 Rp 6,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint keramik artistik Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.025 Rp 1,000 Rp 25
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.40 Memasang 1 m’ plint keramik ukuran (10 x 10) cm Rp 11,793 Rp 6,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint keramik artistik Buah 10.600 Rp 1,000 Rp 10,600
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.41 Memasang 1 m’ plint keramik ukuran (5 x 20) cm Rp 5,885 Rp 6,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint keramik artistik Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 0.570 Rp 1,000 Rp 570
Pasir Pasang m3 0.002 Rp 1,000 Rp 2
Bahan Semen warna kg 0.013 Rp 1,000 Rp 13
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja

Page 73 of 141
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.42 Memasang 1 m’ plint internal cove artistik ukuran (5 x 5 x 20) cm Rp 6,543 Rp 53,463
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Internal cove Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.750 Rp 25,000 Rp 18,750
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.038 Rp 50,000 Rp 1,900

6.43 Memasang 1 m2 lantai marmer ukuran (100 x 100) cm Rp 9,945 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Marmer Buah 1.060 Rp 1,000 Rp 1,060
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 0.650 Rp 1,000 Rp 650
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.44 Memasang 1 m2 lantai karpet Rp 1,400 Rp 12,138


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Karpet m2 1.050 Rp 1,000 Rp 1,050
Bahan Lem kg 0.350 Rp 1,000 Rp 350
Pekerja OH 0.170 Rp 25,000 Rp 4,250
Tukang kayu OH 0.170 Rp 39,500 Rp 6,715
Kepala tukang OH 0.017 Rp 42,500 Rp 723
Tenaga kerja Mandor OH 0.009 Rp 50,000 Rp 450

6.45 Memasang 1 m2 underlayer Rp 1,400 Rp 8,550


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Underlayer irubber corrugated m2 1.050 Rp 1,000 Rp 1,050
Bahan Lem kg 0.350 Rp 1,000 Rp 350
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang kayu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.006 Rp 50,000 Rp 300

6.46 Memasang 1 m2 lantai parquet Rp 1,650 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Page 74 of 141
Parquet m2 1.050 Rp 1,000 Rp 1,050
Bahan Lem kg 0.600 Rp 1,000 Rp 600
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.47 Memasang 1 m2 lantai kayu (gym floor) Rp 1,650 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Gymfloor m2 1.050 Rp 1,000 Rp 1,050
Bahan Lem kg 0.600 Rp 1,000 Rp 600
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.48 Memasang 1 m2 dinding porselen ukuran (11 x 11) cm Rp 96,818 Rp 49,375


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Porselen Buah 86.000 Rp 1,000 Rp 86,000
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang batu OH 0.500 Rp 39,500 Rp 19,750
Kepala tukang OH 0.050 Rp 42,500 Rp 2,125
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500

6.49 Memasang 1 m2 dinding porselin ukuran (10 x 20) cm Rp 65,068 Rp 44,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Porselen Buah 53.000 Rp 1,000 Rp 53,000
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250

6.50 Memasang 1 m2 dinding porselin ukuran (20 x 20) cm Rp 37,758 Rp 44,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Porselen Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 1.940 Rp 1,000 Rp 1,940

Page 75 of 141
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250

6.51 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm Rp 65,068 Rp 44,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik artistik Buah 53.000 Rp 1,000 Rp 53,000
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250

6.52 Memasang 1 m2 dinding keramik artistik ukuran (5 x 20) cm Rp 118,218 Rp 44,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik artistik Buah 106.000 Rp 1,000 Rp 106,000
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 2.900 Rp 1,000 Rp 2,900
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250

6.53 Memasang 1 m2 dinding keramik ukuran (10 x 20) cm Rp 65,068 Rp 44,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik Buah 53.000 Rp 1,000 Rp 53,000
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250

6.54 Memasang 1 m2 dinding keramik ukuran (20 x 20) cm Rp 37,758 Rp 44,438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 1.940 Rp 1,000 Rp 1,940

Page 76 of 141
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250

6.55 Memasang 1 m2 dinding marmer ukuran (100 x 100) cm Rp 17,178 Rp 64,188


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Marmer m2 1.060 Rp 1,000 Rp 1,060
Paku 12 cm Buah 3.003 Rp 1,000 Rp 3,003
Portland Cement kg 12.440 Rp 1,000 Rp 12,440
Pasir Pasang m3 0.025 Rp 1,000 Rp 25
Bahan Semen warna kg 0.650 Rp 1,000 Rp 650
Pekerja OH 1.300 Rp 25,000 Rp 32,500
Tukang batu OH 0.650 Rp 39,500 Rp 25,675
Kepala tukang OH 0.065 Rp 42,500 Rp 2,763
Tenaga kerja Mandor OH 0.065 Rp 50,000 Rp 3,250

6.56 Memasang 1 m2 dinding bata pelapis ukuran (3 x 7 x 24) cm Rp 78,215 Rp 49,375


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata pelapis dinding Buah 63.000 Rp 1,000 Rp 63,000
Portland Cement kg 12.440 Rp 1,000 Rp 12,440
Pasir Pasang m3 0.025 Rp 1,000 Rp 25
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang batu OH 0.500 Rp 39,500 Rp 19,750
Kepala tukang OH 0.050 Rp 42,500 Rp 2,125
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500

6.57 Memasang 1 m2 dinding batu paras Rp 12,885 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu paras m2 1.100 Rp 1,000 Rp 1,100
Portland Cement kg 11.750 Rp 1,000 Rp 11,750
Bahan Pasir Pasang m3 0.035 Rp 1,000 Rp 35
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.58 Memasang 1 m2 dinding batu tempel hitam Rp 12,885 Rp 34,563


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu tempel hitam m2 1.100 Rp 1,000 Rp 1,100
Portland Cement kg 11.750 Rp 1,000 Rp 11,750
Bahan Pasir Pasang m3 0.035 Rp 1,000 Rp 35
Pekerja OH 0.700 Rp 25,000 Rp 17,500

Tenaga kerja Page 77 of 141


Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750

6.59 Memasang 1 m2 lantai vinyl ukuran (30 x 30) cm KL I Rp 12,220 Rp 9,288


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vinyl Buah 11.870 Rp 1,000 Rp 11,870
Bahan Lem vinyl kg 0.350 Rp 1,000 Rp 350
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang OH 0.150 Rp 30,000 Rp 4,500
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

6.60 Memasang 1 m2 wall paper, lebar 50 cm Rp 2,450 Rp 14,823


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Wall paper m 2.200 Rp 1,000 Rp 2,200
Bahan Lem kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang OH 0.175 Rp 30,000 Rp 5,250
Kepala tukang OH 0.017 Rp 42,500 Rp 723
Tenaga kerja Mandor OH 0.002 Rp 50,000 Rp 100

6.61 Memasang 1 m2 floor hardener Rp 5,000 Rp 7,410


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Floor hardener kg 5.000 Rp 1,000 Rp 5,000
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang OH 0.120 Rp 30,000 Rp 3,600
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.006 Rp 50,000 Rp 300

6.62 Memasang 1 m plint vinyil karet ukuran (30 x 30) cm dengan perekat Rp 1,840 Rp 4,940
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vinyl karet Buah 1.760 Rp 1,000 Rp 1,760
Bahan Lem vinyl kg 0.080 Rp 1,000 Rp 80
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang OH 0.080 Rp 30,000 Rp 2,400
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.63 Memasang 1 m plint kayu kelas II ukuran (2 x 10) cm Rp 53 Rp 8,550


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu kelas II m3 0.003 Rp 1,000 Rp 3
Bahan Paku skrup 5 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.120 Rp 25,000 Rp 3,000

Tenaga kerja Page 78 of 141


Tukang kayu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.006 Rp 50,000 Rp 300

6.1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Rp 1,110 Rp 4,013
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes semen m2 1.100 Rp 1,000 Rp 1,100
Bahan Paku tripleks kg 0.010 Rp 1,000 Rp 10
Pekerja OH 0.030 Rp 25,000 Rp 750
Tukang kayu OH 0.070 Rp 39,500 Rp 2,765
Kepala tukang OH 0.007 Rp 42,500 Rp 298
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.2 Memasang 1 m2 langit-langit akustik ukuran (30 x 30) cm Rp 12,050 Rp 8,550


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
akustik ukuran (30 x 30) cm Lembar 12.000 Rp 1,000 Rp 12,000
Bahan Paku tripleks kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang kayu OH 0.120 Rp 39,500 Rp 4,740
Kepala tukang OH 0.012 Rp 42,500 Rp 510
Tenaga kerja Mandor OH 0.006 Rp 50,000 Rp 300

6.3 Memasang 1 m2 langit-langit akustik ukuran (30 x 60) cm Rp 5,850 Rp 7,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
akustik ukuran (30 x 60) cm Lembar 5.800 Rp 1,000 Rp 5,800
Bahan Paku tripleks kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.4 Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm Rp 1,550 Rp 7,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Akustik Ukuran 60 cm x 120 cm Lembar 1.500 Rp 1,000 Rp 1,500
Bahan Paku tripleks kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm Rp 405 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tripleks Lembar 0.375 Rp 1,000 Rp 375
Bahan

Page 79 of 141
Bahan Paku tripleks kg 0.030 Rp 1,000 Rp 30
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.6 Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm Rp 25 Rp 57,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu papan m3 0.015 Rp 1,000 Rp 15
Bahan Paku tripleks kg 0.010 Rp 1,000 Rp 10
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 0.800 Rp 39,500 Rp 31,600
Kepala tukang OH 0.080 Rp 42,500 Rp 3,400
Tenaga kerja Mandor OH 0.040 Rp 50,000 Rp 2,000

6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Rp 474 Rp 4,938
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Gypsum board Lembar 0.364 Rp 1,000 Rp 364
Bahan Paku skrup kg 0.110 Rp 1,000 Rp 110
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.8 Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium Rp 6,300 Rp 35,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil Alluminium "T" m’ 3.600 Rp 1,000 Rp 3,600
Kawat diameter 4 mm kg 0.150 Rp 1,000 Rp 150
Ramset Buah 1.050 Rp 1,000 Rp 1,050
Bahan Akustik Ukuran 60 cm x 120 cm Lembar 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.500 Rp 25,000 Rp 12,500
Tukang besi OH 0.500 Rp 39,500 Rp 19,750
Kepala tukang OH 0.050 Rp 42,500 Rp 2,125
Tenaga kerja Mandor OH 0.025 Rp 50,000 Rp 1,250

6.9 Memasang 1 m’ list langit-langit kayu profil Rp 1,060 Rp 3,588


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
List kayu profil m’ 1.050 Rp 1,000 Rp 1,050
Bahan Paku kg 0.010 Rp 1,000 Rp 10
Pekerja OH 0.050 Rp 25,000 Rp 1,250
Tukang kayu OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.003 Rp 50,000 Rp 150

Page 80 of 141
6.1 Memasang 1 kg besi profil Rp 1,150 Rp 4,455
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Besi profil kg 1.150 Rp 1,000 Rp 1,150
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang las OH 0.060 Rp 42,500 Rp 2,550
Kepala tukang OH 0.006 Rp 42,500 Rp 255
Tenaga kerja Mandor OH 0.003 Rp 50,000 Rp 150

6.2 Memasang 1 kg rangka kuda-kuda baja IWF Rp 1,150 Rp 4,455


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Besi baja IWF kg 1.150 Rp 1,000 Rp 1,150
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang las OH 0.060 Rp 42,500 Rp 2,550
Kepala tukang OH 0.006 Rp 42,500 Rp 255
Tenaga kerja Mandor OH 0.003 Rp 50,000 Rp 150

6.3 Mengerjakan 100 kg pekerjaan perakitan Rp 1,900 Rp 6,743


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Solar Liter 1.000 Rp 1,000 Rp 1,000
Bahan Minyak pelumas Liter 0.100 Rp 1,000 Rp 100
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang besi OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.001 Rp 42,500 Rp 43
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
Alat Sewa alat perakitan baja Jam 0.800 Rp 1,000 Rp 800

6.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Rp 47,850 Rp 74,788
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi siku L 30.30.3 kg 15.000 Rp 1,000 Rp 15,000
Besi plat baja kg 32.800 Rp 1,000 Rp 32,800
Bahan kawat las kg 0.050 Rp 1,000 Rp 50
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang besi OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.105 Rp 42,500 Rp 4,463
Tenaga kerja Mandor OH 0.052 Rp 50,000 Rp 2,600

6.5 Mengerjakan 10 cm pengelasan dengan las listrik Rp 740 Rp 1,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kawat las listrik kg 0.400 Rp 1,000 Rp 400
Solar Liter 0.300 Rp 1,000 Rp 300
Bahan Minyak pelumas Liter 0.040 Rp 1,000 Rp 40
Pekerja OH 0.040 Rp 25,000 Rp 1,000
Tukang besi OH 0.020 Rp 39,500 Rp 790

Tenaga kerja
Page 81 of 141
Kepala tukang OH 0.002 Rp 42,500 Rp 85
Tenaga kerja Mandor OH 0.002 Rp 50,000 Rp 100
Alat Sewa alat Jam 0.170

6.6 Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm Rp 29,282 Rp 46,288
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi scuare tube m 4.760 Rp 1,000 Rp 4,760
Besi lis kaca (1 x 1) cm m 4.522 Rp 1,000 Rp 4,522
Bahan Pengelasan cm 20.000 Rp 1,000 Rp 20,000
Pekerja OH 0.650 Rp 25,000 Rp 16,250
Tukang besi OH 0.650 Rp 39,500 Rp 25,675
Kepala tukang OH 0.065 Rp 42,500 Rp 2,763
Tenaga kerja Mandor OH 0.032 Rp 50,000 Rp 1,600

6.7 Memasang 1 m2 pintu rolling door besi Rp 1,000 Rp 82,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pintu gulung besi m2 1.000 Rp 1,000 Rp 1,000
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang besi OH 1.200 Rp 39,500 Rp 47,400
Kepala tukang OH 0.120 Rp 42,500 Rp 5,100
Tenaga kerja Mandor OH 0.006 Rp 50,000 Rp 300

6.8 Memasang 1 m2 pintu lipat (Folding door) Rp 1,000 Rp 31,350


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pintu lipat m2 1.000 Rp 1,000 Rp 1,000
Pekerja OH 0.440 Rp 25,000 Rp 11,000
Tukang besi OH 0.440 Rp 39,500 Rp 17,380
Kepala tukang OH 0.044 Rp 42,500 Rp 1,870
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100

6.9 Memasang 1 m2 sunscreen alluminium Rp 1,000 Rp 37,200


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sunscreen alluminium m2 1.000 Rp 1,000 Rp 1,000
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang besi OH 0.800 Rp 39,500 Rp 31,600
Kepala tukang OH 0.080 Rp 42,500 Rp 3,400
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200

6.10 Memasang 1 m2 rolling door alluminium Rp 1,000 Rp 71,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Rolling door alluminium m2 1.000 Rp 1,000 Rp 1,000
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang besi OH 1.000 Rp 39,500 Rp 39,500
Kepala tukang OH 0.100 Rp 42,500 Rp 4,250
Tenaga kerja

Page 82 of 141
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500

6.11 Memasang 1 m kusen pintu alluminium Rp 3,160 Rp 3,061


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil alluminium m 1.100 Rp 1,000 Rp 1,100
Skrup fixer Buah 2.000 Rp 1,000 Rp 2,000
Bahan Sealant Tube 0.060 Rp 1,000 Rp 60
Pekerja OH 0.043 Rp 25,000 Rp 1,075
Tukang besi konstruksi OH 0.043 Rp 39,500 Rp 1,698
Kepala tukang OH 0.004 Rp 42,500 Rp 183
Tenaga kerja Mandor OH 0.002 Rp 50,000 Rp 105

6.12 Memasang 1 m2 pintu alluminium strip lebar 8 cm Rp 19,000 Rp 6,054


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil alluminium m’ 4.400 Rp 1,000 Rp 4,400
Bahan Alluminium strip m’ 14.600 Rp 1,000 Rp 14,600
Pekerja OH 0.085 Rp 25,000 Rp 2,125
Tukang besi OH 0.085 Rp 39,500 Rp 3,358
Kepala tukang OH 0.009 Rp 42,500 Rp 361
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 210

6.13 Memasang 1 m2 pintu kaca rangka alluminium Rp 9,170 Rp 6,115


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pintu alluminium m 4.400 Rp 1,000 Rp 4,400
Profil kaca m 4.500 Rp 1,000 Rp 4,500
Bahan Sealant Tube 0.270 Rp 1,000 Rp 270
Pekerja OH 0.085 Rp 25,000 Rp 2,125
Tukang besi OH 0.085 Rp 39,500 Rp 3,358
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.14 Memasang 1 m2 venetions blinds dan Vertical blinds Rp 1,000 Rp 24,963


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Venetions blinds dan vertical blinds m2 1.000
Rp 1,000
Bahan (tirai) Rp 1,000
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang besi OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900

6.15 Memasang 1 m2 terali besi strip (2 x 3) mm Rp 33,257 Rp 66,017,998


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi strip kg 6.177 Rp 1,000 Rp 6,177
Bahan Pengelasan cm 27.080 Rp 1,000 Rp 27,080

Page 83 of 141
Pekerja OH 1.670 Rp 25,000 Rp 41,750
Tukang besi OH 1,670.000 Rp 39,500 Rp 65,965,000
Kepala tukang OH 0.167 Rp 42,500 Rp 7,098
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150

6.16 Memasang 1 m2 kawat nyamuk Rp 13,926 Rp 7,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kawat nyamuk m2 1.100 Rp 1,000 Rp 1,100
Pengelasan cm 11.110 Rp 1,000 Rp 11,110
Bahan Baja strip (0,2 x 2) cm kg 1.716 Rp 1,000 Rp 1,716
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang besi OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250

6.17 Memasang 1 m2 jendela nako & tralis Rp 18,100 Rp 13,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Jendela nako (rangka + kaca 5
mm) m2 1.100 Rp 1,000 Rp 1,100
Paku skrup 1 cm – 2,5 cm Buah 10.000 Rp 1,000 Rp 10,000
Bahan Besi strip m’ 7.000 Rp 1,000 Rp 7,000
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang besi OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.001 Rp 50,000 Rp 50

6.18 Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm Rp 1,084 Rp 22,363
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m’ 1.050 Rp 1,000 Rp 1,050
Paku 1 cm - 2,5 cm kg 0.015 Rp 1,000 Rp 15
Bahan Papan kayu kelas II atau III m3 0.019 Rp 1,000 Rp 19
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang besi OH 0.400 Rp 39,500 Rp 15,800
Kepala tukang OH 0.025 Rp 42,500 Rp 1,063
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500

6.19 Memasang 1 m’ talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Rp 1,060 Rp 17,775
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m 1.050 Rp 1,000 Rp 1,050
Paku 1 cm - 2,5 cm kg 0.010 Rp 1,000 Rp 10
Bahan Besi strip kg 0.500 Rp 1,000 Rp 1,000 Rp 500
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang besi OH 0.300 Rp 39,500 Rp 11,850
Kepala tukang OH 0.030 Rp 42,500 Rp 1,275
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400

Page 84 of 141
1 m' Pagar Sementara dari Kayu tinggi 2 m Rp 4,296 Rp 19,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp 1,000 Rp 1,250
Semen Portland Kg 2.500 Rp 1,000 Rp 2,500
Pasir beton m3 0.005 Rp 1,000 Rp 5
Bahan Koral Beton m3 0.009 Rp 1,000 Rp 9
Kaso 5 / 7 ( albasiah ) m3 0.072 Rp 1,000 Rp 72
Paku Biasa 2" - 5" Kg 0.060 Rp 1,000 Rp 60
Residu Lt 0.400 Rp 1,000 Rp 400
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tenaga
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Mandor Oh 0.020 Rp 50,000 Rp 1,000

1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m Rp 6,741 Rp 19,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp 1,000 Rp 1,250
Semen Portland Kg 2.500 Rp 1,000 Rp 2,500
Seng gelombang 3"-5" lbr 1.200 Rp 1,000 Rp 1,200
Pasir beton m3 1.200 Rp 1,000 Rp 1,200
Bahan
Koral Beton m3 0.009 Rp 1,000 Rp 9
Kaso 5 / 7 ( albasiah ) m3 0.072 Rp 1,000 Rp 72
Paku Biasa 2" - 5" Kg 0.060 Rp 1,000 Rp 60
Meni Besi Lt 0.450 Rp 1,000 Rp 450
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tenaga
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Mandor Oh 0.020 Rp 50,000 Rp 1,000

1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m Rp 28,074 Rp 17,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.000 Rp 1,000 Rp 1,000
Semen Portland Kg 2.000 Rp 1,000 Rp 2,000
Kawat Duri Kg 25.000 Rp 1,000 Rp 25,000
Pasir beton m3 0.005 Rp 1,000 Rp 5
Koral Beton m3 0.009 Rp 1,000 Rp 9
Bahan Paku Biasa 2" - 5" Kg 0.060 Rp 1,000 Rp 60
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Pekerja Oh 0.300 Rp 25,000 Rp 7,500
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.020 Rp 50,000 Rp 1,000

Page 85 of 141
1 m' Pek. Pengukuran & Pemasangan Bowplank Rp 39 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Kaso 5 / 7 (borneo) m3 0.012 Rp 1,000 Rp 12
Paku Biasa 2" - 5" Kg 0.020 Rp 1,000 Rp 20
Bahan Kayu Papan 3 / 20 borneo m3 0.007 Rp 1,000 Rp 7
Tukang kayu Oh 0.100 Rp 39,500 Rp 3,950
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 250

1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran Rp 69,820 Rp 183,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp 1,000 Rp 1,250
Kayu Balok Borneo m3 0.180 Rp 1,000 Rp 180
Paku Kg 0.850 Rp 1,000 Rp 850
Besi Strip Kg 1.100 Rp 1,000 Rp 1,100
Semen Portland Kg 35.000 Rp 1,000 Rp 35,000
Pasir Pasang m3 0.150 Rp 1,000 Rp 150
Pasir beton m3 0.100 Rp 1,000 Rp 100
Koral Beton m3 0.150 Rp 1,000 Rp 150
Bata merah bh 30.000 Rp 1,000 Rp 30,000
Seng Plat lbr 0.250 Rp 1,000 Rp 250
Jendela nako (rangka + kaca 5 mm) m2 0.500 Rp 1,000 Rp 500
Kaca Polos m2 0.080 Rp 1,000 Rp 80
Kunci Tanam bh 0.150 Rp 1,000 Rp 150
Bahan Plywood 4 mm lbr 0.060 Rp 1,000 Rp 60
Tukang kayu Oh 2.000 Rp 39,500 Rp 79,000
Tukang batu Oh 1.000 Rp 39,500 Rp 39,500
Pekerja Oh 2.000 Rp 25,000 Rp 50,000
Kepala tukang Oh 0.300 Rp 42,500 Rp 12,750
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500

1 m² Pembuatan Gudang Semen dan Alat - alat Rp 14,290 Rp 115,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.700 Rp 1,000 Rp 1,700
Kayu Balok Borneo m3 0.210 Rp 1,000 Rp 210
Paku Kg 0.300 Rp 1,000 Rp 300
Semen Portland Kg 10.500 Rp 1,000 Rp 10,500
Pasir beton m3 0.030 Rp 1,000 Rp 30
Koral Beton m3 0.050 Rp 1,000 Rp 50
Bahan Seng Gelombang BJLS 32 lbr 1.500 Rp 1,000 Rp 1,500
Tukang kayu Oh 2.000 Rp 39,500 Rp 79,000

Tenaga
Page 86 of 141
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.200 Rp 42,500 Rp 8,500
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500

1 m² Pembuatan Rumah Jaga / Konstruksi Kayu Rp 5,476 Rp 93,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 3.000 Rp 1,000 Rp 3,000
Kayu Balok Borneo m3 0.276 Rp 1,000 Rp 276
Paku Kg 0.700 Rp 1,000 Rp 700
Bahan Seng Gelombang BJLS 32 lbr 1.500 Rp 1,000 Rp 1,500
Tukang kayu Oh 1.500 Rp 39,500 Rp 59,250
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.150 Rp 42,500 Rp 6,375
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500

1 m2 Membersihkan Lapangan dan Perataan Rp - Rp 5,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500

1 m² Pembuatan Bedeng Buruh Rp 22,666 Rp 115,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp 1,000 Rp 1,250
Kayu Balok Borneo m3 0.186 Rp 1,000 Rp 186
Paku Kg 0.300 Rp 1,000 Rp 300
Semen Portland Kg 18.000 Rp 1,000 Rp 18,000
Pasir beton m3 0.030 Rp 1,000 Rp 30
Koral Beton m3 0.050 Rp 1,000 Rp 50
Seng Gelombang BJLS 32 lbr 1.500 Rp 1,000 Rp 1,500
Bahan Plywood 4 mm lbr 1.350 Rp 1,000 Rp 1,350
Tukang kayu Oh 2.000 Rp 39,500 Rp 79,000
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.200 Rp 42,500 Rp 8,500
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500

1 m² Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm Rp 1,116 Rp 1,260


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Terentang m3 0.036 Rp 1,000 Rp 36
Paku Kg 0.080 Rp 1,000 Rp 80
Bahan Kayu Kaso 5 / 7 (borneo) btg 1.000 Rp 1,000 Rp 1,000
Tukang kayu Oh 0.030 Rp 39,500 Rp 1,185
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 75

Page 87 of 141
1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm Rp 1,250 Rp 11,997
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bambu Ø 6 - 8 / 600 cm btg 1.000 Rp 1,000 Rp 1,000
Bahan Tali Ijuk Kg 0.250 Rp 1,000 Rp 250
Tukang kayu Oh 0.017 Rp 39,500 Rp 672
Pekerja Oh 0.002 Rp 25,000 Rp 50
Kepala tukang Oh 0.250 Rp 42,500 Rp 10,625
Tenaga Mandor Oh 0.013 Rp 50,000 Rp 650

1 m² Pembuatan Jalan Sementara Rp 250 Rp 27,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu Belah 5 / 20 m3 0.150 Rp 1,000 Rp 150
Batu Belah 5 / 7 m3 0.090 Rp 1,000 Rp 90
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500

1 m³ Bongkaran Beton Bertulang Rp - Rp 183,325


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja Oh 6.667 Rp 25,000 Rp 166,675
Tenaga Mandor Oh 0.333 Rp 50,000 Rp 16,650

1 m³ Bongkaran Dinding Tembok Bata Merah Rp - Rp 168,325


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja Oh 6.667 Rp 25,000 Rp 166,675
Tenaga Mandor Oh 0.033 Rp 50,000 Rp 1,650

1m² Pasang Atap Genteng Palentong Kecil Rp 25,000 Rp 7,453


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Palentong bh 25.000 Rp 1,000 Rp 25,000
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

1m² Pasang Atap Genteng Kodok / Glazzur Rp 25,000 Rp 7,453


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Kodok bh 25.000 Rp 1,000 Rp 25,000
Pekerja Oh 0.150 Rp 25,000 Rp 3,750

Tenaga Page 88 of 141


Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

1m² Pasang Atap Genteng Palentong Super / Besar Rp 12,000 Rp 6,775


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Palentong Super bh 12.000 Rp 1,000 Rp 12,000
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang kayu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

1m' Pasang Genteng Bubung Palentong Rp 13,032 Rp 18,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Bubung Palentong bh 5.000 Rp 1,000 Rp 5,000
Semen Portland Kg 8.000 Rp 1,000 Rp 8,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 100

1m' Pasang Genteng Bubung Kodok Glazzur Rp 13,032 Rp 18,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Bubung Kodok bh 5.000 Rp 1,000 Rp 5,000
Semen Portland Kg 8.000 Rp 1,000 Rp 8,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 100

1m' Pasang Genteng Bubung Palentong Besar Rp 12,032 Rp 18,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Bubung Palentong bh 4.000 Rp 1,000 Rp 4,000
Semen Portland Kg 8.000 Rp 1,000 Rp 8,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Tenaga Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Mandor Oh 0.002 Rp 50,000 Rp 100

1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm Rp 650 Rp 6,794

Page 89 of 141
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Roof Light Fiberglass lbr 0.600 Rp 1,000 Rp 600
Bahan Paku Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm Rp 620 Rp 7,203
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.500 Rp 1,000 Rp 500
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm Rp 720 Rp 7,203
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp 1,000 Rp 600
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm Rp 720 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp 1,000 Rp 600
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm Rp 870 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.750 Rp 1,000 Rp 750
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga

Page 90 of 141
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm Rp 470 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.350 Rp 1,000 Rp 350
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Tenaga Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm Rp 540 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.420 Rp 1,000 Rp 420
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm Rp 560 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.440 Rp 1,000 Rp 440
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm Rp 630 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.510 Rp 1,000 Rp 510
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm Rp 920 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.800 Rp 1,000 Rp 800
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500

Tenaga Page 91 of 141


Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm Rp 490 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.370 Rp 1,000 Rp 370
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm Rp 500 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.380 Rp 1,000 Rp 380
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm Rp 580 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.460 Rp 1,000 Rp 460
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm Rp 610 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.490 Rp 1,000 Rp 490
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm Rp 690 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Page 92 of 141
Asbes Gelombang lbr 0.570 Rp 1,000 Rp 570
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

1m' Pasang Bubung Stel Gelombang 0.92m Rp 8,400 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.400 Rp 1,000 Rp 2,400
Bahan Paku Pancing 60 x 230 Kg 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Stel Gelombang 0.92m Rp 8,400 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.400 Rp 1,000 Rp 2,400
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Stel Gelombang 1.05m Rp 8,100 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.100 Rp 1,000 Rp 2,100
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Stel Gelombang 1.08m Rp 8,050 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.050 Rp 1,000 Rp 2,050
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

Page 93 of 141
1m' Pasang Nok Paten 0.92m Rp 7,200 Rp 7,790
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp 1,000 Rp 1,200
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Paten 1.05m Rp 7,200 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp 1,000 Rp 1,200
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Paten 1.08m Rp 7,200 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp 1,000 Rp 1,200
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Stel rata 0.92m Rp 7,100 Rp 9,178


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Stel rata lbr 1.100 Rp 1,000 Rp 1,100
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m' Pasang Nok Stel rata 1.05m Rp 7,100 Rp 7,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Stel rata lbr 1.100 Rp 1,000 Rp 1,100
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100

Tenaga
Page 94 of 141
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200

1m² Pasang Atap Genteng Beton Rp 11,030 Rp 9,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Beton lbr 11.000 Rp 1,000 Rp 11,000
Bahan Paku Biasa 2" - 5" bh 0.030 Rp 1,000 Rp 30
Pekerja Oh 0.200 Rp 25,000 Rp 5,000
Tukang kayu Oh 0.100 Rp 39,500 Rp 3,950
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.010 Rp 50,000 Rp 500

1m² Pasang Atap Genteng Aspal Rp 7,780 Rp 17,478


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Aspal lbr 6.900 Rp 1,000 Rp 6,900
Plywood 4 mm lbr 0.350 Rp 1,000 Rp 350
Paku Biasa 1/2" - 1" Kg 0.030 Rp 1,000 Rp 30
Bahan Plastic Aerator Bh 0.500 Rp 1,000 Rp 500
Pekerja Oh 0.200 Rp 25,000 Rp 5,000
Tukang kayu Oh 0.300 Rp 39,500 Rp 11,850
Kepala tukang Oh 0.003 Rp 42,500 Rp 128
Tenaga Mandor Oh 0.010 Rp 50,000 Rp 500

1m² Pasang Atap Genteng Metal Rp 1,220 Rp 9,425


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Metal lbr 1.020 Rp 1,000 Rp 1,020
Bahan Paku Biasa 2" - 5" Kg 0.200 Rp 1,000 Rp 200
Pekerja Oh 0.200 Rp 25,000 Rp 5,000
Tukang kayu Oh 0.100 Rp 39,500 Rp 3,950
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 50

1m² Pasang Atap Sirap Rp 60,200 Rp 15,488


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Sirap lbr 60.000 Rp 1,000 Rp 60,000
Bahan Paku Biasa ½" - 1" Kg 0.200 Rp 1,000 Rp 200
Pekerja Oh 0.166 Rp 25,000 Rp 4,150
Tukang kayu Oh 0.250 Rp 39,500 Rp 9,875
Kepala tukang Oh 0.025 Rp 42,500 Rp 1,063
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

Page 95 of 141
1m' Pasang Nok Genteng Beton Rp 15,382 Rp 19,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Beton lbr 3.500 Rp 1,000 Rp 3,500
Paku Biasa 2" - 5" Kg 0.050 Rp 1,000 Rp 50
Semen abu -abu Kg 10.800 Rp 1,000 Rp 10,800
Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Bahan Semen Warna Kg 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.020 Rp 50,000 Rp 1,000

1m' Pasang Nok Genteng Aspal Rp 2,054 Rp 14,363


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Aspal lbr 2.000 Rp 1,000 Rp 2,000
Paku Biasa ½" - 1" Kg 0.050 Rp 1,000 Rp 50
Balok Kayu Borneo Kg 0.004 Rp 1,000 Rp 4
Tenaga Pekerja Oh 0.125 Rp 25,000 Rp 3,125
Tukang kayu Oh 0.250 Rp 39,500 Rp 9,875
Kepala tukang Oh 0.025 Rp 42,500 Rp 1,063
Mandor Oh 0.006 Rp 50,000 Rp 300

1m' Pasang Nok Genteng Metal Rp 1,150 Rp 13,463


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Decra Bond lbr 1.100 Rp 1,000 Rp 1,100
Bahan Paku Biasa ½" - 1" Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.250 Rp 25,000 Rp 6,250
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.013 Rp 50,000 Rp 650

1m' Pasang Nok Genteng Metal Rp 1,150 Rp 13,463


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Decra Bond lbr 1.100 Rp 1,000 Rp 1,100
Bahan Paku Biasa ½" - 1" Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.250 Rp 25,000 Rp 6,250
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.013 Rp 50,000 Rp 650

1m' Pasang Nok Sirap Rp 514 Rp 14,363


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng Plat 3" x 6" BJLS 28 Lbr 0.400 Rp 1,000 Rp 400

Bahan Page 96 of 141


Paku Biasa ½" - 1" Kg 0.060 Rp 1,000 Rp 60
Paku Biasa 2" - 5" Kg 0.050 Rp 1,000 Rp 50
Bahan Papan Kayu Borneo tebal 3cm m3 0.004 Rp 1,000 Rp 4
Pekerja Oh 0.125 Rp 25,000 Rp 3,125
Tukang kayu Oh 0.250 Rp 39,500 Rp 9,875
Kepala tukang Oh 0.025 Rp 42,500 Rp 1,063
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300

1m² Pasang Atap Seng Gelombang Rp 720 Rp 5,925


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng Gelombang 3" x 6" BJLS 28 Lbr 0.700 Rp 1,000 Rp 700
Bahan Paku Biasa ½" - 1" Kg 0.020 Rp 1,000 Rp 20
Pekerja Oh 0.120 Rp 25,000 Rp 3,000
Tukang kayu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300

1m² Pasang Atap Nok Seng Rp 340 Rp 3,780


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng Plat 3" x 6" BJLS 28 Lbr 0.300 Rp 1,000 Rp 300
Bahan Paku Biasa ½" - 1" Kg 0.040 Rp 1,000 Rp 40
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300

1m² Pasang Atap Alluminium Rp 1,070 Rp 3,978


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Atap Alluminium Gelombang tebal 0 m2 1.050 Rp 1,000 Rp 1,050
Bahan Paku Hak Pnjang 15 cm Kg 0.020 Rp 1,000 Rp 20
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300

1m² Pasang Nok Alluminium Rp 1,240 Rp 42,925


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok standar 40 cm 18, swg 22 m2 1.200 Rp 1,000 Rp 1,200
Bahan Paku Hak Pnjang 15 cm Kg 0.040 Rp 1,000 Rp 40
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang kayu Oh 1.000 Rp 39,500 Rp 39,500
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga

Page 97 of 141
Tenaga Mandor Oh 0.010 Rp 50,000 Rp 500

1m² Pasang Alluminium Foil / Sisalation Rp 1,050 Rp 6,338


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sisalation / Alluminium Foil m2 1.050 Rp 1,000 Rp 1,050
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang kayu Oh 0.050 Rp 39,500 Rp 1,975
Kepala tukang Oh 0.005 Rp 42,500 Rp 213
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400

Memasang 1 buah Kloset Duduk / Monoblok Rp 1,300 Rp 133,993


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kloset Duduk / Monoblok bh 1.000 Rp 1,000 Rp 1,000
Bahan Perlengkapan 30% Dari bahan Rp 300 Rp 300
Pekerja Oh 3.300 Rp 25,000 Rp 82,500
Tukang batu Oh 1.100 Rp 39,500 Rp 43,450
Kepala tukang Oh 0.001 Rp 42,500 Rp 43
Tenaga Mandor Oh 0.160 Rp 50,000 Rp 8,000

Memasang 1 buah Kloset Jongkok Porselen Rp 7,010 Rp 156,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kloset Jongkok Porselen bh 1.000 Rp 1,000 Rp 1,000
Semen Portland Kg 6.000 Rp 1,000 Rp 6,000
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.500 Rp 39,500 Rp 59,250
Kepala tukang Oh 1.500 Rp 42,500 Rp 63,750
Tenaga Mandor Oh 0.160 Rp 50,000 Rp 8,000

Memasang 1 buah Kloset Jongkok Teraso Rp 14,010 Rp 102,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kloset Jongkok Teraso bh 1.000 Rp 1,000 Rp 1,000
Bata merah bh 7.000 Rp 1,000 Rp 7,000
Semen Portland Kg 6.000 Rp 1,000 Rp 6,000
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.500 Rp 39,500 Rp 59,250
Kepala tukang Oh 0.300 Rp 42,500 Rp 12,750
Tenaga Mandor Oh 0.110 Rp 50,000 Rp 5,500

Memasang 1 buah Urinoir Rp 7,010 Rp 73,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Page 98 of 141
Urinoir bh 1.000 Rp 1,000 Rp 1,000
Perlengkapan Rp -
Semen Portland Kg 6.000 Rp 1,000 Rp 6,000
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.000 Rp 39,500 Rp 39,500
Kepala tukang Oh 0.100 Rp 42,500 Rp 4,250
Tenaga Mandor Oh 0.100 Rp 50,000 Rp 5,000

Memasang 1 buah Wastafel Rp 7,010 Rp 93,650


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Urinoir bh 1.000 Rp 1,000 Rp 1,000
Perlengkapan
Semen Abu -abu Kg 6.000 Rp 1,000 Rp 6,000
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.450 Rp 39,500 Rp 57,275
Kepala tukang Oh 0.150 Rp 42,500 Rp 6,375
Tenaga Mandor Oh 0.100 Rp 50,000 Rp 5,000

Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ Rp 7,010 Rp 90,600


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Teraso bh 1.000 Rp 1,000 Rp 1,000
Semen Portland Kg 6.000 Rp 1,000 Rp 6,000
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 2.100 Rp 25,000 Rp 52,500
Tukang batu Oh 0.750 Rp 39,500 Rp 29,625
Kepala tukang Oh 0.070 Rp 42,500 Rp 2,975
Tenaga Mandor Oh 0.110 Rp 50,000 Rp 5,500

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³ Rp 1,000 Rp 180,100


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Fiberglass bh 1.000 Rp 1,000 Rp 1,000
Bahan Perlengkapan Rp -
Pekerja Oh 1.800 Rp 25,000 Rp 45,000
Tukang batu Oh 2.700 Rp 39,500 Rp 106,650
Kepala tukang Oh 0.540 Rp 42,500 Rp 22,950
Tenaga Mandor Oh 0.110 Rp 50,000 Rp 5,500

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ Rp 486,700 Rp 296,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.400 Rp 1,000 Rp 400

Page 99 of 141
Bahan
Semen Portland Kg 120.000 Rp 1,000 Rp 120,000
Pasir Pasang m3 0.300 Rp 1,000 Rp 300
Porselen ( 11 x 11 ) cm bh 360.000 Rp 1,000 Rp 360,000
Bahan Semen Nat Kg 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 6.000 Rp 25,000 Rp 150,000
Tukang batu Oh 3.000 Rp 39,500 Rp 118,500
Kepala tukang Oh 0.300 Rp 42,500 Rp 12,750
Tenaga Mandor Oh 0.300 Rp 50,000 Rp 15,000

Memasang 1 buah Badkip Porselen Rp 1,000 Rp 47,338


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Badkip bh 1.000 Rp 1,000 Rp 1,000
Bahan Perlengkapan Rp -
Pekerja Oh Rp 25,000 Rp -
Tukang batu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.750 Rp 42,500 Rp 31,875
Tenaga Mandor Oh 0.250 Rp 50,000 Rp 12,500

Memasang 1 buah Bak Fiberglass volume 1 m³ air Rp 1,000 Rp 336,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Fiberglass bh 1.000 Rp 1,000 Rp 1,000
Bahan Perlengkapan Rp -
Pekerja Oh 3.000 Rp 25,000 Rp 75,000
Tukang batu Oh 4.500 Rp 39,500 Rp 177,750
Kepala tukang Oh 0.900 Rp 42,500 Rp 38,250
Tenaga Mandor Oh 0.900 Rp 50,000 Rp 45,000

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm Rp 2,304 Rp 2,938
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp 1,000 Rp 1,600
Semen Portland Kg 0.680 Rp 1,000 Rp 680
Pasir Pasang m3 0.013 Rp 1,000 Rp 13
Bahan Pasir Urug m3 0.011 Rp 1,000 Rp 11
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang batu Oh 0.030 Rp 39,500 Rp 1,185
Kepala tukang Oh 0.003 Rp 42,500 Rp 128
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm Rp 2,498 Rp 4,100
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp 1,000 Rp 1,600

Bahan
Page 100 of 141
Semen Portland Kg 0.870 Rp 1,000 Rp 870
Pasir Pasang m3 0.014 Rp 1,000 Rp 14
Bahan Pasir Urug m3 0.014 Rp 1,000 Rp 14
Pekerja Oh 0.080 Rp 25,000 Rp 2,000
Tukang batu Oh 0.040 Rp 39,500 Rp 1,580
Kepala tukang Oh 0.004 Rp 42,500 Rp 170
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

Memasang 1 m' Pipa Beton Ø 5 cm - 20 cm Rp 5,370 Rp 6,913


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Beton bh 1.100 Rp 1,000 Rp 1,100
Bata merah m3 0.270 Rp 1,000 Rp 270
Semen Portland Kg 3.920 Rp 1,000 Rp 3,920
Pasir Pasang m3 0.056 Rp 1,000 Rp 56
Bahan Pasir Urug m3 0.024 Rp 1,000 Rp 24
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang batu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350

Memasang 1 m' Pipa Beton Ø 30 cm - 100 cm Rp 12,080 Rp 18,763


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Beton bh 1.100 Rp 1,000 Rp 1,100
Bata merah m3 0.550 Rp 1,000 Rp 550
Semen Portland Kg 10.300 Rp 1,000 Rp 10,300
Pasir Pasang m3 0.061 Rp 1,000 Rp 61
Bahan Pasir Urug m3 0.069 Rp 1,000 Rp 69
Pekerja Oh 0.380 Rp 25,000 Rp 9,500
Tukang batu Oh 0.190 Rp 39,500 Rp 7,505
Kepala tukang Oh 0.019 Rp 42,500 Rp 808
Tenaga Mandor Oh 0.019 Rp 50,000 Rp 950

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm Rp 45,945 Rp 120,956
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.145 Rp 1,000 Rp 145
Semen Portland Kg 44.000 Rp 1,000 Rp 44,000
Pasir Pasang m3 0.070 Rp 1,000 Rp 70
Batu Kerikil m3 0.070 Rp 1,000 Rp 70
Besi beton Kg 1.600 Rp 1,000 Rp 1,600
Bahan Pasir beton m3 0.060 Rp 1,000 Rp 60
Pekerja Oh 3.200 Rp 25,000 Rp 80,000
Tukang batu Oh 1.015 Rp 39,500 Rp 40,092

Tenaga
Page 101 of 141
Kepala tukang Oh 0.002 Rp 42,500 Rp 64
Tenaga Mandor Oh 0.016 Rp 50,000 Rp 800

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm Rp 80,090 Rp 59,731
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.250 Rp 1,000 Rp 250
Semen Portland Kg 77.000 Rp 1,000 Rp 77,000
Pasir Pasang m3 0.130 Rp 1,000 Rp 130
Batu Kerikil m3 0.020 Rp 1,000 Rp 20
Besi beton Kg 2.600 Rp 1,000 Rp 2,600
Bahan Pasir beton m3 0.090 Rp 1,000 Rp 90
Pekerja Oh 1.420 Rp 25,000 Rp 35,500
Tukang batu Oh 0.473 Rp 39,500 Rp 18,684
Kepala tukang Oh 0.047 Rp 42,500 Rp 1,998
Tenaga Mandor Oh 0.071 Rp 50,000 Rp 3,550

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm Rp 119,558 Rp 93,900
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.371 Rp 1,000 Rp 371
Semen Portland Kg 114.000 Rp 1,000 Rp 114,000
Pasir Pasang m3 0.184 Rp 1,000 Rp 184
Batu Koral m3 0.033 Rp 1,000 Rp 33
Besi beton Kg 4.850 Rp 1,000 Rp 4,850
Bahan Pasir beton m3 0.120 Rp 1,000 Rp 120
Pekerja Oh 2.160 Rp 25,000 Rp 54,000
Tukang batu Oh 0.720 Rp 39,500 Rp 28,440
Kepala tukang Oh 0.072 Rp 42,500 Rp 3,060
Mandor Oh 0.108 Rp 50,000 Rp 5,400
Tenaga Tukang Gali Oh 0.100 Rp 30,000 Rp 3,000

Memasang 1 m' Pipa Galvanis Ø ½" Rp 1,200 Rp 6,638


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 39,500 Rp 3,555
Kepala tukang Oh 0.009 Rp 42,500 Rp 382
Tenaga Mandor Oh 0.027 Rp 50,000 Rp 1,350

Memasang 1 m' Pipa Galvanis Ø ¾" Rp 1,200 Rp 6,638


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp 1,000 Rp 1,200
Bahan

Page 102 of 141


Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 39,500 Rp 3,555
Kepala tukang Oh 0.009 Rp 42,500 Rp 382
Tenaga Mandor Oh 0.027 Rp 50,000 Rp 1,350

Memasang 1 m' Pipa Galvanis Ø 1" Rp 1,200 Rp 6,638


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 39,500 Rp 3,555
Kepala tukang Oh 0.009 Rp 42,500 Rp 382
Tenaga Mandor Oh 0.027 Rp 50,000 Rp 1,350

Memasang 1 m' Pipa Galvanis Ø 1½" Rp 1,200 Rp 10,845


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.108 Rp 25,000 Rp 2,700
Tukang batu Oh 0.180 Rp 39,500 Rp 7,110
Kepala tukang Oh 0.018 Rp 42,500 Rp 765
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 270

Memasang 1 m' Pipa Galvanis Ø 3" Rp 1,200 Rp 10,845


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.108 Rp 25,000 Rp 2,700
Tukang batu Oh 0.180 Rp 39,500 Rp 7,110
Kepala tukang Oh 0.018 Rp 42,500 Rp 765
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 270

Memasang 1 m' Pipa Galvanis Ø 4" Rp 1,200 Rp 13,559


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis D 4" m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.135 Rp 25,000 Rp 3,375
Tukang batu Oh 0.225 Rp 39,500 Rp 8,888
Kepala tukang Oh 0.023 Rp 42,500 Rp 956
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 340

Page 103 of 141


Memasang 1 m' Pipa PVC tipe AW Ø ½" Rp 1,200 Rp 3,615
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC D 1/2" m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 90

Memasang 1 m' Pipa PVC tipe AW Ø ¾" Rp 1,200 Rp 3,615


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø ¾" m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 90

Memasang 1 m' Pipa PVC tipe AW Ø 1" Rp 1,200 Rp 3,615


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 1" m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 90

Memasang 1 m' Pipa PVC tipe AW Ø 1½" Rp 1,200 Rp 3,615


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 1½" m' 1.200 Rp 1,000 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 90

Memasang 1 m' Pipa PVC tipe AW Ø 2" Rp 1,200 Rp 5,423


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 2" m' 1.200 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 39,500 Rp 3,555

Tenaga
Page 104 of 141
Kepala tukang Oh 0.009 Rp 42,500 Rp 382
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 135

Memasang 1 m' Pipa PVC tipe AW Ø 2½" Rp 1,200 Rp 3,615


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 2½" m' 1.200 Rp 1,000 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 39,500 Rp 2,370
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 90

Memasang 1 m' Pipa PVC tipe AW Ø 3" Rp 1,200 Rp 8,136


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 3" m' 1.200 Rp 1,000 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.081 Rp 25,000 Rp 2,025
Tukang batu Oh 0.135 Rp 39,500 Rp 5,333
Kepala tukang Oh 0.014 Rp 42,500 Rp 574
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 205

Memasang 1 m' Pipa PVC tipe AW Ø 4" Rp 1,200 Rp 8,136


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 4" m' 1.200 Rp 1,000 Rp 1,000 Rp 1,200
Bahan Perlengkapan Rp -
Pekerja Oh 0.081 Rp 25,000 Rp 2,025
Tukang batu Oh 0.135 Rp 39,500 Rp 5,333
Kepala tukang Oh 0.014 Rp 42,500 Rp 574
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 205

Memasang 1 bh Bak Cuci Piring Stainles Steel Rp 2,000 Rp 13,950


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak cuci Stainless steel bh 1.000 Rp 1,000 Rp 1,000
Bahan Water Drain + Asesories set 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.030 Rp 25,000 Rp 750
Tukang batu Oh 0.300 Rp 39,500 Rp 11,850
Kepala tukang Oh 0.030 Rp 42,500 Rp 1,275
Tenaga Mandor Oh 0.002 Rp 50,000 Rp 75

Memasang 1 bh Bak Cuci Piring Teraso Rp 22,050 Rp 23,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak cuci Teraso bh 1.000 Rp 1,000 Rp 1,000

Bahan
Page 105 of 141
Water Drain + Asesories set 1.000 Rp 1,000 Rp 1,000
Semen Portland Kg 20.000 Rp 1,000 Rp 20,000
Bahan Pasir Pasang m3 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.050 Rp 25,000 Rp 1,250
Tukang batu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.050 Rp 42,500 Rp 2,125
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

Memasang 1 bh Kran Ø ¾" atau ½" Rp 1,025 Rp 4,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kran Air bh 1.000 Rp 1,000 Rp 1,000
Bahan Seal tape bh 0.025 Rp 1,000 Rp 25
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang batu Oh 0.100 Rp 39,500 Rp 3,950
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 250

Memasang 1 bh Floor Drain Rp 1,000 Rp 4,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Floor Drain bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang batu Oh 0.100 Rp 39,500 Rp 3,950
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 250

1 Buah Pasang kunci Tanam Antik Rp 1,000 Rp 27,900


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Antik Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang kayu Oh 0.600 Rp 39,500 Rp 23,700
Kepala tukang Oh 0.060 Rp 42,500 Rp 2,550
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 150

1 Buah Pasang kunci Tanam Biasa Rp 1,000 Rp 20,675


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Biasa Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang kayu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 250

Page 106 of 141


1 Buah Pasang kunci Tanam Kamar Mandi Rp 1,000 Rp 20,213
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Kamar Mandi Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.005 Rp 25,000 Rp 125
Tukang kayu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.005 Rp 42,500 Rp 213
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 Buah Pasang kunci Silinder Rp 1,000 Rp 20,100


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Silinder Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.005 Rp 25,000 Rp 125
Tukang kayu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.005 Rp 42,500 Rp 213
Tenaga Mandor Oh 0.000 Rp 50,000 Rp 13

1 Buah Pasang Engsel Pintu Rp 1,000 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Pintu Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Engsel Jendela Kupu - kupu Rp 1,000 Rp 4,650


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Jendela Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang kayu Oh 0.100 Rp 39,500 Rp 3,950
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 25

1 Buah Pasang Engsel Angin Rp 1,000 Rp 9,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Angin Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.010 Rp 50,000 Rp 500

1 Buah Pasang Spring Knip Rp 1,000 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Spring Knip Bh 1.000 Rp 1,000 Rp 1,000

Page 107 of 141


Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Kait angin Rp 1,000 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kait Angin Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Door Closer Rp 1,000 Rp 23,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Door Closer Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.050 Rp 25,000 Rp 1,250
Tukang kayu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.050 Rp 42,500 Rp 2,125
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 Buah Pasang Kunci Selot Rp 1,000 Rp 9,300


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kunci Selot Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 50

1 Buah Pasang Pegangan Pintu / Door Holder Rp 1,000 Rp 23,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Door Holder Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.050 Rp 25,000 Rp 1,250
Tukang kayu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.050 Rp 42,500 Rp 2,125
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 Buah Pasang Door Stop Rp 1,000 Rp 4,650


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Door Stop Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang kayu Oh 0.100 Rp 39,500 Rp 3,950
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga

Page 108 of 141


Tenaga Mandor Oh 0.001 Rp 50,000 Rp 25

1 Buah Pasang Rel Pintu Dorong Rp 1,000 Rp 27,900


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Rel Pintu Dorong Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang kayu Oh 0.600 Rp 39,500 Rp 23,700
Kepala tukang Oh 0.060 Rp 42,500 Rp 2,550
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 150

1 Buah Pasang Kunci Lemari Rp 1,000 Rp 11,625


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kunci Lemari Bh 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.025 Rp 25,000 Rp 625
Tukang kayu Oh 0.250 Rp 39,500 Rp 9,875
Kepala tukang Oh 0.025 Rp 42,500 Rp 1,063
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 63

1 Buah Pasang Kaca tebal 3 mm Rp 1,100 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Polos m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Kaca tebal 5 mm Rp 1,100 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Polos m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Kaca tebal 8 mm Rp 1,100 Rp 7,671


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Polos m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.017 Rp 25,000 Rp 413
Tukang kayu Oh 0.165 Rp 39,500 Rp 6,518
Kepala tukang Oh 0.017 Rp 42,500 Rp 701
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 40

1 Buah Pasang Kaca Buram tebal 12 mm Rp 1,100 Rp 11,625

Page 109 of 141


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Buram m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.025 Rp 25,000 Rp 625
Tukang kayu Oh 0.250 Rp 39,500 Rp 9,875
Kepala tukang Oh 0.025 Rp 42,500 Rp 1,063
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 63

1 Buah Pasang Kaca Cermin tebal 5 mm Rp 1,100 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Cermin m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Kaca Cermin tebal 6 mm Rp 1,100 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Cermin m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Kaca Cermin tebal 8 mm Rp 1,100 Rp 7,671


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Cermin m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.017 Rp 25,000 Rp 413
Tukang kayu Oh 0.165 Rp 39,500 Rp 6,518
Kepala tukang Oh 0.017 Rp 42,500 Rp 701
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 40

1 Buah Pasang Kaca Wireglass tebal 5 mm Rp 1,100 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Wireglass m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 Buah Pasang Kaca Patri tebal 5 mm Rp 1,100 Rp 6,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Patri m2 1.100 Rp 1,000 Rp 1,100
Pekerja Oh 0.015 Rp 25,000 Rp 375

Tenaga Page 110 of 141


Tukang kayu Oh 0.150 Rp 39,500 Rp 5,925
Kepala tukang Oh 0.015 Rp 42,500 Rp 638
Tenaga Mandor Oh 0.001 Rp 50,000 Rp 38

1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama Rp 50 Rp 3,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Soda Api Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat Rp 3,800 Rp 125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Rp 50 Rp 3,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Menyabun Permukaan Tembok Lama Rp 50 Rp 3,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. Rp 50,000 Rp 139,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pasir Silika Kg 40.000 Rp 1,000 Rp 40,000
BBM Ltr 10.000 Rp 1,000 Rp 10,000
Peralatan Rp -
Bahan Kompresor, Blasting Pot , Selang Dan Nozzle Rp -
Pekerja Oh 1.600 Rp 25,000 Rp 40,000

Tenaga Page 111 of 141


Tukang Cat Oh 1.600 Rp 25,000 Rp 40,000
Kepala tukang Oh 0.800 Rp 42,500 Rp 34,000
Tenaga Mandor Oh 0.500 Rp 50,000 Rp 25,000

1 m² Mendempul dan Menggosok Kayu Rp 110 Rp 2,295


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dempul Jadi Kg 0.080 Rp 1,000 Rp 80
Minyak Cat Kg 0.020 Rp 1,000 Rp 20
Bahan Batu Apung Kg 0.010 Rp 1,000 Rp 10
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.040 Rp 25,000 Rp 1,000
Kepala tukang Oh 0.004 Rp 42,500 Rp 170
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Mengecatan Bidang Kayu Lama Rp 490 Rp 4,069


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir Kg 0.150 Rp 1,000 Rp 150
Cat Dasar Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Penutup Kg 0.170 Rp 1,000 Rp 170
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.075 Rp 25,000 Rp 1,875
Kepala tukang Oh 0.008 Rp 42,500 Rp 319
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Rp 780 Rp 2,355
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp 1,000 Rp 200
Plamir Kg 0.150 Rp 1,000 Rp 150
Cat Dasar Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Kayu glotek Kg 0.260 Rp 1,000 Rp 260
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.009 Rp 25,000 Rp 225
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp 870 Rp 4,670
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp 1,000 Rp 200
Plamir Kg 0.150 Rp 1,000 Rp 150
Cat Dasar Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Kayu glotek Kg 0.350 Rp 1,000 Rp 350
Pekerja Oh 0.070 Rp 25,000 Rp 1,750

Tenaga Page 112 of 141


Tukang Cat Oh 0.105 Rp 25,000 Rp 2,625
Kepala tukang Oh 0.004 Rp 42,500 Rp 170
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Pelaburan Bidang Kayu dengan Teak Oil Rp 360 Rp 5,378


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Teak Oil Ltr 0.360 Rp 1,000 Rp 360
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.063 Rp 25,000 Rp 1,575
Kepala tukang Oh 0.063 Rp 42,500 Rp 2,678
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Pelaburan Bidang Kayu dengan Pelitur Rp 2,522 Rp 5,378


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pelitur Ltr 0.150 Rp 1,000 Rp 150
Pelitur Jadi Ltr 0.372 Rp 1,000 Rp 372
Bahan Ampelas Lbr 2.000 Rp 1,000 Rp 2,000
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.063 Rp 25,000 Rp 1,575
Kepala tukang Oh 0.063 Rp 42,500 Rp 2,678
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter Rp 350 Rp 2,800
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Residu atau Ter Ltr 0.350 Rp 1,000 Rp 350
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300

1 m² Pelaburan Bidang Kayu dengan Vernis Rp 310 Rp 8,805


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vernis Ltr 0.150 Rp 1,000 Rp 150
Dempul Kg 0.050 Rp 1,000 Rp 50
Ampelas Lbr 0.100 Rp 1,000 Rp 100
Bahan Kuas Bh 0.010 Rp 1,000 Rp 10
Pekerja Oh 0.160 Rp 25,000 Rp 4,000
Tukang Cat Oh 0.160 Rp 25,000 Rp 4,000
Kepala tukang Oh 0.016 Rp 42,500 Rp 680
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 460 Rp 2,468

Page 113 of 141


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir Kg 0.100 Rp 1,000 Rp 100
Cat Dasar Kg 0.100 Rp 1,000 Rp 100
Bahan Cat Tembok Kg 0.260 Rp 1,000 Rp 260
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang Cat Oh 0.063 Rp 25,000 Rp 1,575
Kepala tukang Oh 0.006 Rp 42,500 Rp 268
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Melabur Tembok dengan Kapur Sirih Rp 502 Rp 3,904


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ampelas Lbr 0.100 Rp 1,000 Rp 100
Alang - alang ikat 0.250 Rp 1,000 Rp 250
Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Bahan Kapur Sirih Kg 0.150 Rp 1,000 Rp 150
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh 0.001 Rp 25,000 Rp 25
Kepala tukang Oh 0.000 Rp 42,500 Rp 4
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) Rp 302 Rp 1,271
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Bahan Kapur Sirih Kg 0.300 Rp 1,000 Rp 300
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.005 Rp 25,000 Rp 125
Kepala tukang Oh 0.001 Rp 42,500 Rp 21
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Pemasangan Wall Paper Rp 1,400 Rp 5,710


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Wall Paper m3 1.200 Rp 1,000 Rp 1,200
Bahan Perekat Kg 0.200 Rp 1,000 Rp 200
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang Cat Oh 0.200 Rp 25,000 Rp 5,000
Kepala tukang Oh 0.002 Rp 42,500 Rp 85
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125

1 m² Pengecatan Permukaan Baja dengan Meni Besi Rp 110 Rp 6,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni Besi Kg 0.100 Rp 1,000 Rp 100
Bahan Kuas Bh 0.010 Rp 1,000 Rp 10

Page 114 of 141


Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang Cat Oh 0.200 Rp 25,000 Rp 5,000
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.010 Rp 50,000 Rp 500

1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah Rp 112 Rp 13,206
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni Besi Kg 0.100 Rp 1,000 Rp 100
Kuas Bh 0.010 Rp 1,000 Rp 10
Bahan Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Pekerja Oh 0.250 Rp 25,000 Rp 6,250
Tukang Cat Oh 0.225 Rp 25,000 Rp 5,625
Kepala tukang Oh 0.023 Rp 42,500 Rp 956
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 375

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um Rp 292 Rp 1,631
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni ( Read Lead ) A Kg 0.100 Rp 1,000 Rp 100
Meni ( Read Lead ) B Kg 0.100 Rp 1,000 Rp 100
Alluminium C Kg 0.040 Rp 1,000 Rp 40
Alluminium B Kg 0.040 Rp 1,000 Rp 40
Pengencer Ltr 0.010 Rp 1,000 Rp 10
Bahan Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.006 Rp 25,000 Rp 150
Kepala tukang Oh 0.023 Rp 42,500 Rp 956
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 375

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um Rp 300 Rp 2,460
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Meni Besi Kg 0.300 Rp 1,000 Rp 300
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.060 Rp 25,000 Rp 1,500
Kepala tukang Oh 0.012 Rp 42,500 Rp 510
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um Rp 360 Rp 55,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Dasar Kg 0.110 Rp 1,000 Rp 110
Cat Antara Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Penutup Kg 0.080 Rp 1,000 Rp 80
Pekerja Oh 0.500 Rp 25,000 Rp 12,500

Tenaga
Page 115 of 141
Tukang Cat Oh 0.800 Rp 25,000 Rp 20,000
Kepala tukang Oh 0.300 Rp 42,500 Rp 12,750
Tenaga Mandor Oh 0.200 Rp 50,000 Rp 10,000

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um Rp 300 Rp 46,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Cat Dasar Kg 0.300 Rp 1,000 Rp 300
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang Cat Oh 0.700 Rp 25,000 Rp 17,500
Kepala tukang Oh 0.200 Rp 42,500 Rp 8,500
Tenaga Mandor Oh 0.200 Rp 50,000 Rp 10,000

Page 116 of 141


DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A.1. ANALISA HARGA SATUAN GALIAN TANAH

A.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m'


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 137,250.00 102,937.50
Mandor L.04 OH 0.025 159,000.00 3,975.00
JUMLAH TENAGA KERJA 106,912.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 106,912.50


E Overhead & Profit 15% x D 16,036.88
F Harga Satuan Pekerjaaan (D+E) 122,949.38

A.1.2 Pengurugan kembali 1 m3 galian tanah


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 128,400.00 64,200.00
Mandor L.04 OH 0.050 135,000.00 6,750.00
JUMLAH TENAGA KERJA 70,950.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 70,950.00


E Overhead & Profit 15% x D 10,642.50
F Harga Satuan Pekerjaaan (D+E) 81,592.50

A.1.3 Pengurugan 1 m3 dengan Tanah Timbunan


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 128,400.00 38,520.00
Mandor L.04 OH 0.010 135,000.00 1,350.00
JUMLAH TENAGA KERJA 39,870.00
B BAHAN
Tanah Timbunan m3 1.200 120,000.00 144,000.00
JUMLAH HARGA BAHAN 144,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 183,870.00


E Overhead & Profit 15% x D 27,580.50
F Harga Satuan Pekerjaaan (D+E) 211,450.50
A.1.3 Pengurugan 1 m3 dengan pasir urug
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 137,250.00 41,175.00
Mandor L.04 OH 0.010 159,000.00 1,590.00
JUMLAH TENAGA KERJA 42,765.00
B BAHAN
Pasir Urug m3 1.200 135,000.00 162,000.00
JUMLAH HARGA BAHAN 162,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 204,765.00


E Overhead & Profit 15% x D 30,714.75
F Harga Satuan Pekerjaaan (D+E) 235,479.75

A.1.4 Pengurugan 1 m3 sirtu padat


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 137,250.00 34,312.50
Mandor L.04 OH 0.025 159,000.00 3,975.00
JUMLAH TENAGA KERJA 38,287.50
B BAHAN
Sirtu m3 1.200 130,000.00 156,000.00
JUMLAH HARGA BAHAN 156,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 194,287.50


E Overhead & Profit 15% x D 29,143.13
F Harga Satuan Pekerjaaan (D+E) 223,430.63

A.2. ANALISA HARGA SATUAN PEKERJAAN PONDASI

A.2.1 Pemasangan 1 m3 batu kosong


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.780 137,250.00 107,055.00
Tukang batu L.02 OH 0.390 143,100.00 55,809.00
Kepala Tukang L.03 OH 0.039 159,000.00 6,201.00
Mandor L.04 OH 0.039 159,000.00 6,201.00
JUMLAH TENAGA KERJA 175,266.00
B BAHAN
Batu belah m3 1.200 250,000.00 300,000.00
Pasir pasang m3 0.432 150,000.00 64,800.00
JUMLAH HARGA BAHAN 364,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 540,066.00


E Overhead & Profit 15% x D 81,009.90
F Harga Satuan Pekerjaaan (D+E) 621,075.90
A.2.2 Pemasangan 1 m3 pondasi batu belah campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 137,250.00 205,875.00
Tukang batu L.02 OH 0.750 143,100.00 107,325.00
Kepala Tukang L.03 OH 0.075 159,000.00 11,925.00
Mandor L.04 OH 0.075 159,000.00 11,925.00
JUMLAH TENAGA KERJA 337,050.00
B BAHAN
Batu belah/Batu Kali m3 1.200 250,000.00 300,000.00
Semen Porlant Kg 163.000 1,800.00 293,400.00
Pasir pasang m3 0.520 150,000.00 78,000.00
JUMLAH HARGA BAHAN 671,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,008,450.00


E Overhead & Profit 15% x D 151,267.50
F Harga Satuan Pekerjaaan (D+E) 1,159,717.50

A.2.5 Pengurugan 1 m3 Tanah Padat


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 137,250.00 34,312.50
Mandor L.04 OH 0.025 159,000.00 3,975.00
JUMLAH TENAGA KERJA 38,287.50
B BAHAN
Tanah Timbunan m3 1.200 120,000.00 144,000.00
JUMLAH HARGA BAHAN 144,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 182,287.50


E Overhead & Profit 15% x D 27,343.13
F Harga Satuan Pekerjaaan (D+E) 209,630.63

A.3 . ANALISA HARGA SATUAN PEKERJAAN BETON

A.3.1 Membuat 1 m3 beton mutu f' = 9,8 Mpa (K 125), slump (12 ±2) cm, w/c = 0,78

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 137,250.00 226,462.50
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 150,000.00 4,200.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 280,237.50
B BAHAN
Semen portland Kg 326 1,800.00 586,800.00
Pasir beton Kg 760 107.14 81,428.57
Kerikil (Maks. 30 mm) Kg 1029 185.19 190,555.56
Air Ltr 215 25.00 5,375.00
JUMLAH HARGA BAHAN 864,159.13
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,144,396.63


E Overhead & Profit 15% x D 171,659.49
F Harga Satuan Pekerjaaan (D+E) 1,316,056.12
A.4. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN

A.4.1 Pemasangan 1 m2 plesteran 1SP:3PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 128,400.00 38,520.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 55,770.00
B BAHAN
Semen portland kg 7.776 1,800.00 13,996.80
Pasir pasang m3 0.023 150,000.00 3,450.00
JUMLAH HARGA BAHAN 17,446.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 73,216.80


E Overhead & Profit 15% x D 10,982.52
F Harga Satuan Pekerjaaan (D+E) 84,199.32

A.4.1 Pemasangan 1 m2 plesteran 1SP:3PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.200 137,250.00 27,450.00
Tukang batu L.02 OH 0.100 143,100.00 14,310.00
Kepala tukang L.03 OH 0.0100 159,000.00 1,590.00
Mandor L.04 OH 0.0150 159,000.00 2,385.00
JUMLAH TENAGA KERJA 45,735.00
B BAHAN
Semen portland kg 3.250 1,800.00 5,850.00
JUMLAH HARGA BAHAN 5,850.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 51,585.00


E Overhead & Profit 15% x D 7,737.75
F Harga Satuan Pekerjaaan (D+E) 59,322.75

A.4.2 Pemasangan 1 m2 plesteran Voeg 1SP:2PP tebal 15mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 128,400.00 38,520.00
Tukang batu L.02 OH 0.150 135,000.00 20,250.00
Kepala tukang L.03 OH 0.0150 150,000.00 2,250.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 63,270.00
B BAHAN
Semen portland kg 6.340 1,500.00 9,510.00
Pasir pasang m3 0.012 150,000.00 1,800.00
JUMLAH HARGA BAHAN 11,310.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 74,580.00


E Overhead & Profit 15% x D 11,187.00
F Harga Satuan Pekerjaaan (D+E) 85,767.00
A.4.3 Membuat 1 m3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,65
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 137,250.00 226,462.50
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 150,000.00 4,200.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 280,237.50
B BAHAN
Semen portland Kg 326.000 1,800.00 586,800.00
Pasir beton Kg 760 107.14 81,428.57
Kerikil (Maks. 30 mm) Kg 1029 185.19 190,555.56
Air Ltr 215 25.00 5,375.00
JUMLAH HARGA BAHAN 864,159.13
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,144,396.63


E Overhead & Profit 15% x D 171,659.49
F Harga Satuan Pekerjaaan (D+E) 1,316,056.12

A.3.2 Membuat 1 m3 beton mutu f' = 21,7 Mpa (K 225), slump (12 ±2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 137,250.00 226,462.50
Tukang batu L.02 OH 0.275 135,000.00 37,125.00
Kepala Tukang L.03 OH 0.028 150,000.00 4,200.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 280,237.50
B BAHAN
Semen portland Kg 384.000 1,800.00 691,200.00
Pasir beton Kg 692 107.14 74,142.86
Kerikil (Maks. 30 mm) Kg 1039 185.19 192,407.41
Air Ltr 215 25.00 5,375.00
JUMLAH HARGA BAHAN 963,125.26
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,243,362.76


E Overhead & Profit 15% x D 186,504.41
F Harga Satuan Pekerjaaan (D+E) 1,429,867.17

A.3.3 Membuat 1 kg dengan besi polos atau besi ulir


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 137,250.00 960.75
Tukang besi L.02 OH 0.007 135,000.00 945.00
Kepala Tukang L.03 OH 0.0007 150,000.00 105.00
Mandor L.04 OH 0.0004 150,000.00 60.00
JUMLAH TENAGA KERJA 2,070.75
B BAHAN
Besi beton (polos/ulir) Kg 1.050 15,000.00 15,750.00
Kawat beton Kg 0.015 27,000.00 405.00
JUMLAH HARGA BAHAN 16,155.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 18,225.75
E Overhead & Profit 15% x D 2,733.86
F Harga Satuan Pekerjaaan (D+E) 20,959.61
A.3.4 Membuat 1 m2 bekisting untuk Pondasi
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 137,250.00 71,370.00
Tukang Kayu L.02 OH 0.260 135,000.00 35,100.00
Kepala Tukang L.03 OH 0.026 150,000.00 3,900.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 114,270.00
B BAHAN
Kayu kelas III m3 0.040 2,200,000.00 88,000.00
Paku 5 - 10 cm Kg 0.300 20,000.00 6,000.00
Minyak bekisting Ltr 0.100 3,500.00 350.00
JUMLAH HARGA BAHAN 94,350.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 208,620.00


E Overhead & Profit 15% x D 31,293.00
F Harga Satuan Pekerjaaan (D+E) 239,913.00

A.3.5 Membuat 1 m2 bekisting untuk kolom


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 137,250.00 90,585.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 150,000.00 4,950.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 145,035.00
B BAHAN
Kayu kelas III m3 0.040 2,200,000.00 88,000.00
Paku 5 - 10 cm Kg 0.400 20,000.00 8,000.00
Minyak bekisting Ltr 0.200 3,500.00 700.00
Balok kayu kelas II m3 0.015 2,600,000.00 39,000.00
Plywood tebal 9 mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu φ 8-
10cm/400 cm Batang 2.000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 197,700.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 342,735.00


E Overhead & Profit 15% x D 51,410.25
F Harga Satuan Pekerjaaan (D+E) 394,145.25

A.4.8 Membuat 1 m2 bekisting untuk balok


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 137,250.00 90,585.00
Tukang Kayu L.02 OH 0.330 135,000.00 44,550.00
Kepala Tukang L.03 OH 0.033 150,000.00 4,950.00
Mandor L.04 OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 145,035.00
B BAHAN
Kayu kelas III m3 0.040 2,200,000.00 88,000.00
Paku 5 - 10 cm Kg 0.400 20,000.00 8,000.00
Minyak bekisting Ltr 0.200 3,500.00 700.00
Balok kayu kelas II m3 0.018 2,600,000.00 46,800.00
Plywood tebal 9 mm Lbr 0.350 120,000.00 42,000.00
Dolken kayu φ 8-
10cm/400 cm Batang 2.000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 205,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 350,535.00


E Overhead & Profit 15% x D 52,580.25
F Harga Satuan Pekerjaaan (D+E) 403,115.25
A.3.4 Membuat 1 m2 bekisting Sloef
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 137,250.00 71,370.00
Tukang Kayu L.02 OH 0.260 135,000.00 35,100.00
Kepala Tukang L.03 OH 0.026 150,000.00 3,900.00
Mandor L.04 OH 0.026 150,000.00 3,900.00
JUMLAH TENAGA KERJA 114,270.00
B BAHAN
Kayu kelas III m3 0.045 2,200,000.00 99,000.00
Paku 5 - 10 cm Kg 0.300 20,000.00 6,000.00
Minyak bekisting Ltr 0.100 3,500.00 350.00
JUMLAH HARGA BAHAN 105,350.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 219,620.00


E Overhead & Profit 15% x D 32,943.00
F Harga Satuan Pekerjaaan (D+E) 252,563.00

A.5. ANALIS HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.5.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 137,250.00 41,175.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 58,425.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen portland kg 14.370 1,800.00 25,866.00
Pasir pasang m3 0.040 150,000.00 6,000.00
JUMLAH HARGA BAHAN 80,866.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 139,291.00


E Overhead & Profit 15% x D 20,893.65
F Harga Satuan Pekerjaaan (D+E) 160,184.65

A.5.2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 137,250.00 41,175.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 58,425.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen portland kg 11.500 1,800.00 20,700.00
Pasir pasang m3 0.043 150,000.00 6,450.00
JUMLAH HARGA BAHAN 76,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 134,575.00


E Overhead & Profit 15% x D 20,186.25
F Harga Satuan Pekerjaaan (D+E) 154,761.25
A.5.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:5PP

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 137,250.00 41,175.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 58,425.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen portland kg 9.680 1,800.00 17,424.00
Pasir pasang m3 0.045 150,000.00 6,750.00
JUMLAH HARGA BAHAN 73,174.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 131,599.00


E Overhead & Profit 15% x D 19,739.85
F Harga Satuan Pekerjaaan (D+E) 151,338.85
FORMULIR STANDAR UNTUK
ANALISA BIAYA K3

JENIS PEKERJAAN : Keselamatan dan Kesehatan Kerja


SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, identifikasi bahaya, penilaian resiko,
dan pengendalian secara berkesinambungan sesuai RK3K.
2 Pedoman SMK3, dan Pelaksanaan K3 untuk Jalan dan Jembatan
3 Melibatkan Ahli K3 Konstruksi untuk pekerjaan beresiko tinggi dan
Petugas K3 untuk pekerjaan potensi rendah.

B. URUTAN KERJA
1 Penyedia membentuk Panitia Pembina K3 (P2K3), membuat
Laporan Rutin Kegiatan P2K3, melaksanakan Audit Internal K3
Konstruksi, melakukan inspeksi K3 Konstruksi secara periodik,
melakukan tindakan perbaikan atas ketidaksesuaian pada saat
inspeksi K3 Konstruksi,melakukan tinjauan ulang RK3K selama
pelaksanaan konstruksi.

2 Menyiapkan K3 Kantor Lapangan dan Fasilitasnya.

C. PELAKSANAAN K3 KONSTRUKSI JALAN DAN JEMBATAN


1 Penyiapan RK3K terdiri atas:
a. Pembuatan Manual, Prosedur, instruksi Kerja, Ijin Kerja dan Formu Set - - -
b. Pembuatan Kartu Identitas Pekerja (KIP); Lb - - -
- Fasilitas Pertolongan Pertama Pada Kecelakaan (P3K) buah - - -
- Akomodasi Makan dan Baju Ls - - -
- 417.80 Ls - - -

2 Sosialisasi dan Promosi K3 terdiri atas:


a. Induksi K3 (safety Induction); Org - -
b. Pengarahan K3 (safety briefing): Pertemuan Keselamatan Org - - -
(safety Talk 'dan/atau Tool Box Meeting);
c. Pelatihan K3; Org - - -
d. Simulasi K3; Org - - -
e. Spanduk (banner); Lb - - -
f. Poster; Lb - - -
g. Papan Informasi K3. Bh - - -

3 Alat Pelindung Kerja terdiri atas:


a. Jaring Pengaman (safety Net); Ls - - -
b. Tali Keselamatan (Life Line); Ls - - -
c. Penahan Jatuh (safety deck); Ls - - -
d. Pagar Pengaman (Guard Railling); Ls - - -
e. Pembatas Area (Restricted Area). Ls - - -

4 Alat Pelindung Diri terdiri atas:


a. Topi Pelindung (safety Helmet); Bh 10.00 100,000 1,000,000.00
b. Pelindung Mata (Goggles, Spectacles); Psg - - -
c. Tameng Muka (Face Shield); Bh - -
d. Masker Selam (Breathing Apparatus); Bh -
e. Pelindung Telinga (Ear Plug, Ear Muff); Psg -
f. Pelindung Pernapasan dan Mulut (Masker); Bh 10.00 60,000 600,000.00
g. Sarung Tangan (safety Gloves); Psg 10.00 55,000 550,000.00
h, Sepatu Keselamatan (safety Shoes); Psg 10.00 315,000 3,150,000.00
I, Penunjang Seluruh Tubuh (Full Body Harness); Bh - - -
j. Jaket Pelampung (Life Vest); Bh - - -
k. Rompi Keselamatan (safety Vest); Bh 10.00 65,000 650,000.00
l. Celemek (Apron/Coveralls); Bh - - -
m. Pelindung Jatuh (Fall Arrester). Bh - - -

5 Asuransi dan Perijinan terdiri atas:


a. BPJS Ketenagakerjaan dan Kesehatan Kerja; Ls - - -
b. Surat Ijin Kelaikan Alat; Alat/Kend - -
c. Surat Ijin Operator; Lb/Alat - - -
d. Surat Ijin Pengesahan Panitia Pembina Keselamatan dan ' Ls - - -
Kesehatan Kerja (P2K3).

- Alat komunikasi operator dengan personil Ls - - -


- Kunci pengaman pada kait alat pengangkat Ls - - -

6 Personil K3 terdiri atas:


a. Ahli K3 OB - - -
b. Petugas K3 OB - - -
c. Petugas Tanggap Darurat ; OB - - -
d. Petugas P3K OB - - -
e. Petugas Pengatur Lalu Lintas (Flagman) OB - - -
f. Petugas Medis OB - - -

7 Fasilitas Sarana Kesehatan;


a. Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Ls 1.00 100,000 100,000.00
Perban, dll);
b. Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Ls - - -
badan, Tensi Meter, dll);
c. Peralatan Pengasapan (Fogging); Bh - - -
d. Obat Pengasapan. Ls - - -

8 Rambu - Rambu terdiri atas:


a. Rambu Petunjuk; Bh -
b. Rambu larangan; Bh - - -
c. Rambu Peringatan; Bh - -
d. Rambu Kewajiban; Bh - -
e. Rambu Informasi; Bh - -
f. Rambu Pekerjaan Sementara; Bh - -
g. Tongkat Pengatur Lalu Lintas (Warning lights Stick); Bh - -
h. Kerucut Lalu Lintas (Traffic Cone); Bh - -
i. Lampu Putar ( Rotary Lamp); Bh - -
j. Lampu Selang Lalu Lintas. Ls - - -

9 Lain - Lain Terkait Pengendalian Risiko K3


a. Alat Pemadam Api Ringan (APAR); Bh - - -
b. Sirine; Bh - - -
c. Bendera K3; Bh - - -
d. Jalur Evakuasi (Escape Route); Ls - -
e. Lampu Darurat (Emergency Lamp); Bh - - -
f. Program Inspeksi dan Audit Internal; Ls - - -
g. Pelaporan dan Penyelidikan Insiden. Ls - - -

D TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 6,050,000.00


DAFTAR ANALISA BIAYA KONSTRUKSI (ABK)
SNI (STANDAR NASIONAL INDONESIA)
PEKERJAAN : PERENCANAAN PEMBANGUNAN KANTOR POLRES
LOKASI : DESA PUNCAK INDAH KECEMATAN MALILI
TAHUN ANGGARAN : 2021

A.2.3.1.7. Mengurug 1 m3 Tanah Timbunan untuk peninggian lantai bangunan


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.330 Rp 137,250.00 Rp 45,292.50
2 Mandor OH 0.033 Rp 159,000.00 Rp 5,247.00
JUMLAH HARGA TENAGA KERJA Rp 50,539.50
B BAHAN
1 Tanah Timbunan M³ 1.200 Rp 120,000.00 Rp 144,000.00
JUMLAH HARGA BAHAN Rp 144,000.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 194,539.50
E Overhead & Profit 15% x D Rp 29,180.93
F Harga Satuan Pekerjaan Rp 223,720.43

A.2.3.1.8. Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.330 Rp 137,250.00 Rp 45,292.50
2 Mandor OH 0.033 Rp 159,000.00 Rp 5,247.00
JUMLAH HARGA TENAGA KERJA Rp 50,539.50
B BAHAN
1 Sirtu M³ 1.200 Rp 130,000.00 Rp 156,000.00
JUMLAH HARGA BAHAN Rp 156,000.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 206,539.50
E Overhead & Profit 15% x D Rp 30,980.93
F Harga Satuan Pekerjaan Rp 237,520.43

A.2.3.1.9. Mengurug 1 m3 Pasir untuk peninggian lantai bangunan


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.400 Rp 137,250.00 Rp 54,900.00
2 Mandor OH 0.040 Rp 159,000.00 Rp 6,360.00
JUMLAH HARGA TENAGA KERJA Rp 61,260.00
B BAHAN
1 Pasir Urug M³ 1.200 Rp 135,000.00 Rp 162,000.00
JUMLAH HARGA BAHAN Rp 162,000.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 223,260.00
E Overhead & Profit 15% x D Rp 33,489.00
F Harga Satuan Pekerjaan Rp 256,749.00

A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam ≤1 m


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.563 Rp 137,250.00 Rp 77,271.75
2 Mandor OH 0.056 Rp 159,000.00 Rp 8,951.70
JUMLAH HARGA TENAGA KERJA Rp 86,223.45
B BAHAN

JUMLAH HARGA BAHAN Rp -


C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 86,223.45
E Overhead & Profit 15% 15% x D Rp 12,933.52
F Harga Satuan Pekerjaan Rp 99,156.97

ANALISA HARGA PEKERJAAN Page 127


A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.780 Rp 137,250.00 Rp 107,055.00
2 Tukang Batu OH 0.390 Rp 143,100.00 Rp 55,809.00
3 Kepala tukang OH 0.039 Rp 159,000.00 Rp 6,201.00
4 Mandor OH 0.039 Rp 159,000.00 Rp 6,201.00
JUMLAH HARGA TENAGA KERJA Rp 175,266.00
B BAHAN
1 Batu Gunung M³ 1.200 Rp 250,000.00 Rp 300,000.00
2 Pasir Urug M³ 0.432 Rp 135,000.00 Rp 58,320.00
JUMLAH HARGA BAHAN Rp 358,320.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
D Jumlah (A+B+C) Rp 533,586.00
E Overhead & Profit 15% 15% x D Rp 80,037.90
F Harga Satuan Pekerjaan Rp 613,623.90

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 1.500 Rp 137,250.00 Rp 205,875.00
2 Tukang Batu OH 0.750 Rp 143,100.00 Rp 107,325.00
3 Kepala tukang OH 0.075 Rp 159,000.00 Rp 11,925.00
4 Mandor OH 0.075 Rp 159,000.00 Rp 11,925.00
JUMLAH HARGA TENAGA KERJA Rp 337,050.00
B BAHAN
1 Batu Gunung M³ 1.200 Rp 250,000.00 Rp 300,000.00
2 Semen Portland Kg 202.000 Rp 1,800.00 Rp 363,600.00
3 Pasir Pasang M³ 0.485 Rp 150,000.00 Rp 72,750.00
JUMLAH HARGA BAHAN Rp 736,350.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 1,073,400.00
E Overhead & Profit 15% 15% x D Rp 161,010.00
F Harga Satuan Pekerjaan Rp 1,234,410.00

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 1.650 Rp 137,250.00 Rp 226,462.50
2 Tukang Batu OH 0.275 Rp 143,100.00 Rp 39,352.50
3 Kepala tukang OH 0.028 Rp 159,000.00 Rp 4,452.00
4 Mandor OH 0.083 Rp 159,000.00 Rp 13,197.00
JUMLAH HARGA TENAGA KERJA Rp 283,464.00
B BAHAN
1 Semen Portland Kg 276.000 Rp 1,800.00 Rp 496,800.00
2 Pasir beton Kg 828.000 Rp 107.14 Rp 88,714.29
3 Kerikil (Maks 30 mm) Kg 1,012.000 Rp 185.19 Rp 187,407.41
4 Air Liter 215.000 Rp 25.00 Rp 5,375.00
JUMLAH HARGA BAHAN Rp 778,296.69
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 1,061,760.69
E Overhead & Profit 15% 15% x D Rp 159,264.10
F Harga Satuan Pekerjaan Rp 1,221,024.80

ANALISA HARGA PEKERJAAN Page 128


A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 1.650 Rp 137,250.00 Rp 226,462.50
2 Tukang Batu OH 0.275 Rp 143,100.00 Rp 39,352.50
3 Kepala tukang OH 0.028 Rp 159,000.00 Rp 4,452.00
4 Mandor OH 0.083 Rp 159,000.00 Rp 13,197.00
JUMLAH HARGA TENAGA KERJA Rp 283,464.00
B BAHAN
1 Semen Portland Kg 326.000 Rp 1,800.00 Rp 586,800.00
2 Pasir beton Kg 760.000 Rp 107.14 Rp 81,428.57
3 Koral Beton Kg 1,029.000 Rp 185.19 Rp 190,555.56
4 Air Liter 215.000 Rp 25.00 Rp 5,375.00
JUMLAH HARGA BAHAN Rp 864,159.13
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 1,147,623.13
E Overhead & Profit 15% x D Rp 172,143.47
F Harga Satuan Pekerjaan Rp 1,319,766.60

A.4.1.1.17 Pembesian 10 kg dengan besi polos


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.070 Rp 137,250.00 Rp 9,607.50
2 Tukang Besi OH 0.070 Rp 143,100.00 Rp 10,017.00
3 Kepala tukang OH 0.007 Rp 159,000.00 Rp 1,113.00
4 Mandor OH 0.004 Rp 159,000.00 Rp 636.00
JUMLAH HARGA TENAGA KERJA Rp 21,373.50
B BAHAN
1 Besi beton polos Kg 10.500 Rp 15,000.00 Rp 157,500.00
2 Kawat beton Kg 0.150 Rp 27,000.00 Rp 4,050.00
JUMLAH HARGA BAHAN Rp 161,550.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
D Jumlah (A+B+C) Rp 182,923.50
E Harga Satuan Pekerjaan Per - Kg Rp 18,292.35
F Overhead & Profit 15% x D Rp 2,743.85
G Harga Satuan Pekerjaan Rp 21,036.20

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.520 Rp 137,250.00 Rp 71,370.00
2 Tukang Kayu OH 0.260 Rp 143,100.00 Rp 37,206.00
3 Kepala tukang OH 0.026 Rp 159,000.00 Rp 4,134.00
4 Mandor OH 0.026 Rp 159,000.00 Rp 4,134.00
JUMLAH HARGA TENAGA KERJA Rp 116,844.00
B BAHAN
1 Kayu kelas III M³ 0.045 Rp 2,500,000.00 Rp 112,500.00
2 Paku 5 – 10 cm Kg 0.300 Rp 25,000.00 Rp 7,500.00
3 Minyak bekisting Liter 0.100 Rp 25,000.00 Rp 2,500.00
JUMLAH HARGA BAHAN Rp 122,500.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 239,344.00
E Jumlah (D/2) Rp 119,672.00
F Overhead & Profit 15% x D Rp 17,950.80
G Harga Satuan Pekerjaan Rp 137,622.80

ANALISA HARGA PEKERJAAN Page 129


A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.660 Rp 137,250.00 Rp 90,585.00
2 Tukang Kayu OH 0.330 Rp 143,100.00 Rp 47,223.00
3 Kepala tukang OH 0.033 Rp 159,000.00 Rp 5,247.00
4 Mandor OH 0.033 Rp 159,000.00 Rp 5,247.00
JUMLAH HARGA TENAGA KERJA Rp 148,302.00
B BAHAN
1 Kayu kelas III M³ 0.040 Rp 2,500,000.00 Rp 100,000.00
2 Paku 5 cm – 12 cm Kg 0.400 Rp 25,000.00 Rp 10,000.00
3 Minyak bekisting Liter 0.200 Rp 25,000.00 Rp 5,000.00
4 Balok kayu kelas III M³ 0.015 Rp 2,500,000.00 Rp 37,500.00
5 Plywood tebal 9 mm Lembar 0.350 Rp 130,000.00 Rp 45,500.00
6 Dolken kayu ø 8 - 10 cm, panjang 4 m Batang 2.000 Rp 20,000.00 Rp 40,000.00
JUMLAH HARGA BAHAN Rp 238,000.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 386,302.00
E Jumlah (D/2) Rp 193,151.00
F Overhead & Profit 15% 15% x D Rp 28,972.65
G Harga Satuan Pekerjaan Rp 222,123.65

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.660 Rp 137,250.00 Rp 90,585.00
2 Tukang Kayu OH 0.330 Rp 143,100.00 Rp 47,223.00
3 Kepala tukang OH 0.033 Rp 159,000.00 Rp 5,247.00
4 Mandor OH 0.033 Rp 159,000.00 Rp 5,247.00
JUMLAH HARGA TENAGA KERJA Rp 148,302.00
B BAHAN
1 Kayu kelas III M³ 0.040 Rp 2,500,000.00 Rp 100,000.00
2 Paku 5 cm – 12 cm Kg 0.400 Rp 25,000.00 Rp 10,000.00
3 Minyak bekisting Liter 0.200 Rp 25,000.00 Rp 5,000.00
4 Balok kayu kelas III M³ 0.018 Rp 2,500,000.00 Rp 45,000.00
5 Plywood tebal 9 mm Lembar 0.350 Rp 130,000.00 Rp 45,500.00
6 Dolken kayu ø 8 - 10 cm, panjang 4 m Batang 2.000 Rp 20,000.00 Rp 40,000.00
JUMLAH HARGA BAHAN Rp 245,500.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 393,802.00
E Jumlah (D/2) Rp 196,901.00
F Overhead & Profit 15% 15% x D Rp 29,535.15
G Harga Satuan Pekerjaan Rp 226,436.15

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :3PP
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.300 Rp 137,250.00 Rp 41,175.00
2 Tukang Batu OH 0.100 Rp 143,100.00 Rp 14,310.00
3 Kepala tukang OH 0.010 Rp 159,000.00 Rp 1,590.00
4 Mandor OH 0.015 Rp 159,000.00 Rp 2,385.00
JUMLAH HARGA TENAGA KERJA Rp 59,460.00
B BAHAN
1 Bata merah buah 70.000 Rp 700.00 Rp 49,000.00
2 Semen Portland Kg 14.370 Rp 1,800.00 Rp 25,866.00
3 Pasir pasang m3 0.040 Rp 150,000.00 Rp 6,000.00
JUMLAH HARGA BAHAN Rp 80,866.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 140,326.00
E Overhead & Profit 15% 15% x D Rp 21,048.90
F Harga Satuan Pekerjaan Rp 161,374.90

ANALISA HARGA PEKERJAAN Page 130


A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.300 Rp 137,250.00 Rp 41,175.00
2 Tukang Batu OH 0.100 Rp 143,100.00 Rp 14,310.00
3 Kepala tukang OH 0.010 Rp 159,000.00 Rp 1,590.00
4 Mandor OH 0.015 Rp 159,000.00 Rp 2,385.00
JUMLAH HARGA TENAGA KERJA Rp 59,460.00
B BAHAN
1 Bata merah buah 70.000 Rp 700.00 Rp 49,000.00
2 Semen Portland Kg 11.500 Rp 1,800.00 Rp 20,700.00
3 Pasir pasang m3 0.043 Rp 150,000.00 Rp 6,450.00
JUMLAH HARGA BAHAN Rp 76,150.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
D Jumlah (A+B+C) Rp 135,610.00
E Overhead & Profit 15% 15% x D Rp 20,341.50
F Harga Satuan Pekerjaan Rp 155,951.50

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.300 Rp 137,250.00 Rp 41,175.00
2 Tukang Batu OH 0.150 Rp 143,100.00 Rp 21,465.00
3 Kepala tukang OH 0.015 Rp 159,000.00 Rp 2,385.00
4 Mandor OH 0.015 Rp 159,000.00 Rp 2,385.00
JUMLAH HARGA TENAGA KERJA Rp 67,410.00
B BAHAN
1 Semen Portland Kg 6.240 Rp 1,800.00 Rp 11,232.00
2 Pasir Pasang M³ 0.024 Rp 150,000.00 Rp 3,600.00
JUMLAH HARGA BAHAN Rp 14,832.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 82,242.00
E Overhead & Profit 15% x D Rp 12,336.30
F Harga Satuan Pekerjaan Rp 94,578.30

A.4.4.2.27. Pemasangan 1 m2 acian


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.200 Rp 137,250.00 Rp 27,450.00
2 Tukang Batu OH 0.100 Rp 143,100.00 Rp 14,310.00
3 Kepala tukang OH 0.010 Rp 159,000.00 Rp 1,590.00
4 Mandor OH 0.010 Rp 159,000.00 Rp 1,590.00
JUMLAH HARGA TENAGA KERJA Rp 44,940.00
B BAHAN
1 Semen Portland Kg 3.250 Rp 1,800.00 Rp 5,850.00
JUMLAH HARGA BAHAN Rp 5,850.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 50,790.00
E Overhead & Profit 15% x D Rp 7,618.50
F Harga Satuan Pekerjaan Rp 58,408.50

ANALISA HARGA PEKERJAAN Page 131


A.4.5.2.37. 1 M' PEKERJAAN KUDA-KUDA BAJA RINGAN
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.734 Rp 137,250.00 Rp 100,741.50
2 Tukang Kayu OH 0.734 Rp 143,100.00 Rp 105,035.40
3 Kepala tukang OH 0.073 Rp 159,000.00 Rp 11,607.00
4 Mandor OH 0.037 Rp 159,000.00 Rp 5,883.00
JUMLAH HARGA TENAGA KERJA Rp 223,266.90
B BAHAN
1 Baja ringan canai dingin C75 Btg 0.873 Rp 19,666.67 Rp 17,169.00

JUMLAH HARGA BAHAN Rp 17,169.00


C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 240,435.90
E Overhead & Profit 15% x D Rp 36,065.38
F Harga Satuan Pekerjaan Rp 276,501.29

A.4.5.2.37. 1 M' PEKERJAAN NOK ATAP SPANDEK


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.250 Rp 137,250.00 Rp 34,312.50
2 Tukang Kayu OH 0.150 Rp 143,100.00 Rp 21,465.00
3 Kepala tukang OH 0.015 Rp 159,000.00 Rp 2,385.00
4 Mandor OH 0.013 Rp 159,000.00 Rp 2,067.00
JUMLAH HARGA TENAGA KERJA Rp 60,229.50
B BAHAN
1 Nok Atap Zinkalume m 1.100 Rp 70,000.00 Rp 77,000.00
2 Self Drilling Screw bh 8.000 Rp 500.00 Rp 4,000.00
JUMLAH HARGA BAHAN Rp 81,000.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
D Jumlah (A+B+C) Rp 141,229.50
E Overhead & Profit 15% x D Rp 21,184.43
F Harga Satuan Pekerjaan Rp 162,413.93

A.4.5.2.41. 1 M2 PEKERJAAN ATAP SPANDEK


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.150 Rp 137,250.00 Rp 20,587.50
2 Tukang Kayu OH 0.075 Rp 143,100.00 Rp 10,732.50
3 Kepala tukang OH 0.008 Rp 159,000.00 Rp 1,192.50
4 Mandor OH 0.006 Rp 159,000.00 Rp 954.00
JUMLAH HARGA TENAGA KERJA Rp 33,466.50
B BAHAN
1 Zincalum m² 1.050 Rp 63,000.00 Rp 66,150.00
2 Self Drilling Screw bh 6.000 Rp 500.00 Rp 3,000.00
JUMLAH HARGA BAHAN Rp 69,150.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
D Jumlah (A+B+C) Rp 102,616.50
E Overhead & Profit 15% x D Rp 15,392.47
F Harga Satuan Pekerjaan Rp 118,008.98

ANALISA HARGA PEKERJAAN Page 132


A.4.6.1.21. Pemasangan 1 m’ Kalsiplank ukuran (2 x 20) cm
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.100 Rp 137,250.00 Rp 13,725.00
2 Tukang kayu OH 0.200 Rp 143,100.00 Rp 28,620.00
3 Kepala tukang OH 0.020 Rp 159,000.00 Rp 3,180.00
4 Mandor OH 0.005 Rp 159,000.00 Rp 795.00
JUMLAH HARGA TENAGA KERJA Rp 46,320.00
B BAHAN
1 Kalsiplank M3 0.011 Rp 15,000.00 Rp 162.00
2 Paku Scrup Kg 0.100 Rp 35,000.00 Rp 3,500.00
JUMLAH HARGA BAHAN Rp 3,662.00
C PERALATAN
JUMLAH HARGA PERALATAN Rp -
D Jumlah (A+B+C) Rp 49,982.00
E Overhead & Profit 15% x D Rp 7,497.30
F Harga Satuan Pekerjaan Rp 57,479.30

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.020 Rp 137,250.00 Rp 2,745.00
2 Tukang cat OH 0.063 Rp 143,100.00 Rp 9,015.30
3 Kepala tukang OH 0.006 Rp 159,000.00 Rp 1,001.70
4 Mandor OH 0.003 Rp 159,000.00 Rp 477.00
JUMLAH HARGA TENAGA KERJA Rp 13,239.00
B BAHAN
1 Plamuur Kg 0.100 Rp 30,000.00 Rp 3,000.00
2 Cat dasar Kg 0.100 Rp 35,000.00 Rp 3,500.00
3 Cat penutup Kg 0.260 Rp 35,000.00 Rp 9,100.00
JUMLAH HARGA BAHAN Rp 15,600.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 28,839.00
E Overhead & Profit 15% x D Rp 4,325.85
F Harga Satuan Pekerjaan Rp 33,164.85

A.4.7.1.10. Pengecatan 1 m2 Permukaan Baja dengan Meni Besi


JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.020 Rp 137,250.00 Rp 2,745.00
2 Tukang cat OH 0.200 Rp 143,100.00 Rp 28,620.00
3 Kepala tukang OH 0.020 Rp 159,000.00 Rp 3,180.00
4 Mandor OH 0.003 Rp 159,000.00 Rp 397.50
JUMLAH HARGA TENAGA KERJA Rp 34,942.50
B BAHAN
1 Meni Besi Kg 0.100 Rp 38,500.00 Rp 3,850.00
2 Kuas Bh 0.010 Rp 15,000.00 Rp 150.00
JUMLAH HARGA BAHAN Rp 4,000.00
C PERALATAN

JUMLAH HARGA PERALATAN Rp -


D Jumlah (A+B+C) Rp 38,942.50
E Overhead & Profit 15% x D Rp 5,841.38
F Harga Satuan Pekerjaan Rp 44,783.88

ANALISA HARGA PEKERJAAN Page 133


ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR

anl. 1 Menggali 1 m3 tanah biasa sedalam 1 meter Rp - Rp 106,913


Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Tenaga kerja Pekerja OH 0.750 Rp 137,250 Rp - Rp 102,938
Mandor OH 0.025 Rp 159,000 Rp - Rp 3,975

anl. 2 Mengurug 1 m3 pasir urug Rp 204,765


Rp 162,000 Rp 42,765
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Bahan Pasir urug m 3
1.200 Rp 135,000 Rp 162,000
Tenaga kerja Pekerja OH 0.300 Rp 137,250 Rp 41,175
Mandor OH 0.010 Rp 159,000 Rp 1,590

anl. 3 Mengurug 1 m3 Tanah Timbunan untuk peninggian lantai bangunan Rp 162,750


Rp 144,000 Rp 18,750
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Bahan Sirtu m 3
1.200 Rp 120,000 Rp 144,000
Tenaga kerja Pekerja OH 0.250 Rp 75,000 Rp 18,750
Mandor OH 0.025 Rp - Rp -

anl. 4 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan Rp 193,890


Rp 156,000 Rp 37,890
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Bahan Sirtu m 3
1.200 Rp 130,000 Rp 156,000
Tenaga kerja Pekerja OH 0.250 Rp 137,250 Rp 34,313
Mandor OH 0.025 Rp 143,100 Rp 3,578

anl. 5 6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP Rp 1,008,450


Rp 671,400 Rp 337,050
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Batu belah 15 cm/20 cm m 3
1.200 Rp 250,000 Rp 300,000
Bahan Portland Cement kg 163.000 Rp 1,800 Rp 293,400
Pasir Pasang m3 0.520 Rp 150,000 Rp 78,000
Pekerja OH 1.500 Rp 137,250 Rp 205,875
Tukang batu OH 0.750 Rp 143,100 Rp 107,325
Tenaga kerja
Kepala tukang OH 0.075 Rp 159,000 Rp 11,925
Mandor OH 0.075 Rp 159,000 Rp 11,925

anl. 6 Memasang 1 m3 batu kosong (aanstamping) Rp 533,586


Rp 358,320 Rp 175,266
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Batu belah 15 cm/20 cm m3 1.200 Rp 250,000 Rp 300,000
Bahan Pasir urug m3 0.432 Rp 135,000 Rp 58,320
Pekerja OH 0.780 Rp 137,250 Rp 107,055
Tukang batu OH 0.390 Rp 143,100 Rp 55,809
Kepala tukang OH 0.039 Rp 159,000 Rp 6,201
Tenaga kerja Mandor OH 0.039 Rp 159,000 Rp 6,201

anl. 7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Rp 289,880
Rp 170,960 Rp 118,920

Harga Satuan Harga Satuan


Jml Harga Bahan Jml Harga upah
Bahan upah
Kebutuhan Satuan Indeks
Bata merah Buah 140.000 Rp 700 Rp 98,000
Portland Cement kg 32.950 Rp 1,800 Rp 59,310
Bahan Pasir Pasang m3 0.091 Rp 150,000 Rp 13,650
Pekerja OH 0.600 Rp 137,250 Rp 82,350
Tukang batu OH 0.200 Rp 143,100 Rp 28,620
Tenaga Kepala tukang OH 0.020 Rp 159,000 Rp 3,180
kerja Mandor OH 0.030 Rp 159,000 Rp 4,770
ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR
anl. 8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP
Rp 278,660
Rp 159,740 Rp 118,920
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Bata merah Buah 140.000 Rp 700 Rp 98,000
Portland Cement kg 26.550 Rp 1,800 Rp 47,790
Bahan Pasir Pasang m3 0.093 Rp 150,000 Rp 13,950
Pekerja OH 0.600 Rp 137,250 Rp 82,350
Tukang batu OH 0.200 Rp 143,100 Rp 28,620
Tenaga Kepala tukang OH 0.020 Rp 159,000 Rp 3,180
kerja Mandor OH 0.030 Rp 159,000 Rp 4,770

anl. 9 Memasang 1 m2 bekisting untuk sloof Rp 239,344


Rp 122,500 Rp 116,844
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Kayu kelas III m3 0.045 Rp 2,500,000 Rp 112,500
Paku 5 cm – 10 cm kg 0.300 Rp 25,000 Rp 7,500
Bahan Minyak bekisting Liter 0.100 Rp 25,000 Rp 2,500
Pekerja OH 0.520 Rp 137,250 Rp 71,370
Tukang kayu OH 0.260 Rp 143,100 Rp 37,206
Tenaga Kepala tukang OH 0.026 Rp 159,000 Rp 4,134
kerja Mandor OH 0.026 Rp 159,000 Rp 4,134

anl. 8 Memasang 1 m2 bekisting untuk kolom Rp 378,552


Rp 230,250 Rp 148,302
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Kayu kelas III m3 0.040 Rp 2,500,000 Rp 100,000
Paku 5 cm – 12 cm kg 0.400 Rp 25,000 Rp 10,000
Minyak bekisting Liter 0.200 Rp 25,000 Rp 5,000
Balok kayu kelas II m3 0.015 Rp 3,500,000 Rp 52,500
Plywood tebal 9 mm Lbr 0.350 Rp 65,000 Rp 22,750
Dolken kayu galam φ (8–10) Batang 2.000
Rp 40,000
Bahan cm, panjang 4 m Rp 20,000
Pekerja OH 0.660 Rp 137,250 Rp 90,585
Tukang kayu OH 0.330 Rp 143,100 Rp 47,223
Tenaga Kepala tukang OH 0.033 Rp 159,000 Rp 5,247
kerja Mandor OH 0.033 Rp 159,000 Rp 5,247

anl. 9 Memasang 1 m2 bekisting untuk balok Rp 389,052


Rp 240,750 Rp 148,302
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Kayu kelas III m3 0.040 Rp 2,500,000 Rp 100,000
Paku 5 cm – 12 cm kg 0.400 Rp 25,000 Rp 10,000
Minyak bekisting Liter 0.200 Rp 25,000 Rp 5,000
Balok kayu kelas II m3 0.018 Rp 3,500,000 Rp 63,000
Plywood tebal 9 mm Lbr 0.350 Rp 65,000 Rp 22,750
Dolken kayu galam,φ (8-10)
Rp 40,000
Bahan cm, panjang 4 m Batang 2.000 Rp 20,000
Pekerja OH 0.660 Rp 137,250 Rp 90,585
Tukang kayu OH 0.330 Rp 143,100 Rp 47,223
Tenaga Kepala tukang OH 0.033 Rp 159,000 Rp 5,247
kerja Mandor OH 0.033 Rp 159,000 Rp 5,247

anl. 10 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
±

Rp 1,147,623
Rp 864,159 Rp 283,464
Harga Satuan Harga Satuan
Indeks Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Bahan upah
Portland Cement kg 326.000 Rp 1,800 Rp 586,800
Pasir beton ( kg ) kg 760.000 Rp 107 Rp 81,429
koral beton kg kg 1,029.000 Rp 185 Rp 190,556
Bahan Air Liter 215.000 Rp 25 Rp 5,375
Pekerja OH 1.650 Rp 137,250 Rp 226,463
Tukang batu OH 0.275 Rp 143,100 Rp 39,353
Tenaga Kepala tukang OH 0.028 Rp 159,000 Rp 4,452
kerja Mandor OH 0.083 Rp 159,000 Rp 13,197
ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR

anl.11 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Rp 1,011,546
Rp 728,082 Rp 283,464
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Semen Portland kg 247.000 Rp 1,800 Rp 444,600
Pasir beton ( kg ) kg 869.000 Rp 107 Rp 93,107
Bahan
kerikil saring kg kg 999.000 Rp 185 Rp 185,000
Air Liter 215.000 Rp 25 Rp 5,375
Pekerja OH 1.650 Rp 137,250 Rp 226,463
Tukang batu OH 0.275 Rp 143,100 Rp 39,353
Tenaga kerja
Kepala tukang OH 0.028 Rp 159,000 Rp 4,452
Mandor OH 0.083 Rp 159,000 Rp 13,197
ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR

anl. 12 6.17 Pembesian 10 kg dengan besi polos atau besi ulir PerKg Rp 18,292
Rp 182,924
Rp 161,550 Rp 21,374
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Besi beton (polos/ulir) kg 10.500 Rp 15,000 Rp 157,500
Bahan Kawat beton kg 0.150 Rp 27,000 Rp 4,050
Pekerja OH 0.070 Rp 137,250 Rp 9,608
Tukang besi OH 0.070 Rp 143,100 Rp 10,017
Tenaga Kepala tukang OH 0.007 Rp 159,000 Rp 1,113
kerja Mandor OH 0.004 Rp 159,000 Rp 636

anl. 13 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm Rp 84,857


Rp 17,447 Rp 67,410
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Portland Cement kg 7.776 Rp 1,800 Rp 13,997
Bahan Pasir Pasang m3 0.023 Rp 150,000 Rp 3,450
Pekerja OH 0.300 Rp 137,250 Rp 41,175
Tukang batu OH 0.150 Rp 143,100 Rp 21,465
Tenaga Kepala tukang OH 0.015 Rp 159,000 Rp 2,385
kerja Mandor OH 0.015 Rp 159,000 Rp 2,385

anl. 14 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm Rp 82,242


Rp 14,832 Rp 67,410
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Portland Cement kg 6.240 Rp 1,800 Rp 11,232
Bahan Pasir Pasang m3 0.024 Rp 150,000 Rp 3,600
Pekerja OH 0.300 Rp 137,250 Rp 41,175
Tukang batu OH 0.150 Rp 143,100 Rp 21,465
Tenaga Kepala tukang OH 0.015 Rp 159,000 Rp 2,385
kerja Mandor OH 0.015 Rp 159,000 Rp 2,385

anl.15 Memasang 1 m2 Atap Alluminium / Spandek Rp 103,264


Rp 76,300 Rp 26,964
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Spandek 0.35 m2 1.200 Rp 63,000 Rp 75,600
Bahan Bh 0.020 Rp 35,000
Paku skrup Rp 700
Pekerja Oh 0.120 Rp 137,250 Rp 16,470
Tukang Oh 0.060 Rp 143,100 Rp 8,586
Tenaga kerja
Kepala tukang Oh 0.006 Rp 159,000 Rp 954
Mandor Oh 0.006 Rp 159,000 Rp 954

anl.16 Memasang 1 m2 Nok Alluminium Rp 161,405


Rp 1,400 Rp 160,005
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Plat Alluminium Standar m2 1.200 Rp - Rp -
Bahan Kg 0.040 Rp 35,000
Paku skrup Rp 1,400
Pekerja Oh 0.100 Rp 137,250 Rp 13,725
Tukang Oh 1.000 Rp 143,100 Rp 143,100
Tenaga kerja
Kepala tukang Oh 0.010 Rp 159,000 Rp 1,590
Mandor Oh 0.010 Rp 159,000 Rp 1,590

anl.17 Memasang 1 m Listplank (Kalsiplank) Rp 49,820


Rp 3,500 Rp 46,320
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Kalsiplank m 1.550 Rp - Rp -
Bahan Kg 0.100 Rp 35,000
Paku skrup Rp 3,500
Pekerja Oh 0.100 Rp 137,250 Rp 13,725
Tukang Oh 0.200 Rp 143,100 Rp 28,620
Tenaga kerja
Kepala tukang Oh 0.020 Rp 159,000 Rp 3,180
Mandor Oh 0.005 Rp 159,000 Rp 795
ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR
anl.18 1 m² Pengecatan Permukaan Baja dengan Meni Besi Rp 39,985
Rp 3,850 Rp 36,135
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Cat Meni Kg 0.100 Rp 38,500 Rp 3,850
Bahan Kuas Kg 0.010 Rp - Rp -
Pekerja Oh 0.020 Rp 137,250 Rp 2,745
Tukang Oh 0.200 Rp 143,100 Rp 28,620
Tenaga kerja Kepala tukang Oh 0.020 Rp 159,000 Rp 3,180
Mandor Oh 0.010 Rp 159,000 Rp 1,590

anl.19 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 25,760
Rp 12,600 Rp 13,160
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Plamir Kg 0.100 Rp - Rp -
Bahan Cat Dasar Kg 0.100 Rp 35,000 Rp 3,500
Cat Tembok Kg 0.260 Rp 35,000 Rp 9,100
Pekerja Oh 0.020 Rp 137,250 Rp 2,745
Tukang Oh 0.063 Rp 143,100 Rp 9,015
Tenaga kerja
Kepala tukang Oh 0.006 Rp 159,000 Rp 1,002
Mandor Oh 0.003 Rp 159,000 Rp 398
DAFTAR HARGA BAHAN
LOKASI : KABUPATEN LUWU TIMUR

No. NAMA BAHAN SATUAN HARGA KET.

(1) (2) (3) (5) (6)


1 Air Ltr Rp 25
1 Pasir Pasang M3 Rp 150,000
2 Pasir Urug M3 Rp 135,000
3 Pasir Beton M3 Rp 150,000
Kg Rp 107
4 Semen Warna Kg Rp 20,000
5 Semen PC Zak Rp 90,000
Kg Rp 1,800
6 Sirtu M3 Rp 130,000
7 Tanah Timbunan M3 Rp 120,000
8 Kerikil Saring M3 Rp 250,000
Rp 185
9 Koral Beton (Steenslag 2-3 cm) Rp 500,000
Rp 370
10 Batu Gunung/Kali M3 Rp 250,000
11 Bata merah Bh Rp 700
12 Paku Biasa Kg Rp 25,000
13 Paku Sekrup Kg Rp 35,000
14 Baut (scre diver ) Bh Rp 500
15 Dynabolt Bh Rp 8,000
16 Kawat diameter 4 mm Kg Rp 15,000
17 Minyak Bekisting Ltr Rp 25,000
18 Papan Kayu kls III M3 Rp 2,500,000
19 Balok Kayu kls III m3 Rp 2,500,000
20 Papan Kayu kls II M3 Rp 3,500,000
21 Balok Kayu kls II m3 Rp 3,500,000
22 Papan Kayu kls I M3 Rp 5,500,000
23 Balok Kayu kls I m3 Rp 5,500,000
24 Tripleks 3 mm Lbr Rp 65,000
25 Plywood tebal 9 mm Lbr Rp 130,000
25 Dolken Kayu Galam f -8-10/4 m Btg Rp 20,000
1 Besi Beton Kg Rp 15,000
2 Kawat Beton Kg Rp 27,000
3 Lem Kayu Kg Rp 15,000
4 Rangka Baja C-75.75 Kg Rp 19,667
5 Reng M Rp 7,200
6 Atap Alluminium/Spandek 0,35 M2 Rp 63,000
7 Kalsiplank M Rp 15,000
8 Nok Atap Zinkalume M Rp 70,000
9 Rel Pintu Sorong Set Rp 1,200,000
10 Kuas Bh Rp 15,000
11 Plamuur Kg Rp 30,000
12 Cat Meni Kg Rp 38,500
13 Cat Dasar Kg Rp 35,000
14 Cat Tembok Kg Rp 35,000
15 Cat Kayu Kg Rp 75,000

catatan : Harga Sudah Termasuk Biaya Langsiran


No. NAMA BAHAN SATUAN HARGA KET.

(1) (2) (3) (5) (6)

DAFTAR UPAH
#REF!
#REF!
LOKASI : KABUPATEN LUWU TIMUR

No. TENAGA KERJA SATUAN HARGA SATUAN KETERANGAN


(1) (2) (3) -4 (5)

1 Pekerja Hari Rp 137,250.00


2 Tukang Hari Rp 143,100.00
3 Kepala Tukang Hari Rp 159,000.00
4 Mandor Hari Rp 159,000.00
TIME SCHEDULE / RENCANA KEMAJUAN PEKERJAAN
Lokasi : KABUPATEN LUWU TIMUR

Bulan Pertama Bulan Kedua Bulan Ketiga


JUMLAH HARGA BOBOT Keterangan
NO URAIAN PEKERJAAN I II III IV V VI VII VIII XIII XIV XV XVI
( Rp. ) (%)
I. PEKERJAAN PENDAHULUAN / PERSIAPAN 11,050,000.00 Err:509 Err:509 Err:509 100%
II PEKERJAAN TANAH & PASIR 9,936,067.50 Err:509 Err:509 Err:509 Err:509 Err:509
III ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV PEKERJAAN STRUKTUR 148,044,886.80 Err:509 Err:509 Err:509 Err:509 Err:509 50%
V PEKERJAAN INSTALASI LISTRIK 37,000,000.00 Err:509 Err:509 Err:509 Err:509 -
VI ### Err:509 Err:509 Err:509 Err:509 Err:509
V PEKERJAAN RABAT SALURAN 20,588,358.90 Err:509 Err:509 Err:509 Err:509 Err:509
VI PEKERJAAN PEMBERSIHAN AKHIR 2,000,000.00 Err:509 Err:509 0%
TOTAL Err:509 Err:509
Rencana Kemajuan 0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Komulatif Pekerjaan 0 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0 1 2 3 4 5 6 7 8 9 10 11 12