Besi = 12 MM 2 Ø 12
P = 19.8
Jml = 4.00 Bh 6 - 20
V = 79.20 M
Koef = 0.887 Kg/M
V = 70.28 Kg 2 Ø 12
Besi Begel = 6 MM
P = 19.8 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.52 M
Jarak Begel = 0.2 M
Jml Begel = 99.00 Bh
99.00 (di bulatkan)
P. total = 51.48 M
Koef = 0.222 Kg/M
V = 11.42 Kg
V. total 81.70 Kg
- Bekisting Sloef
P = 19.8 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
7.92
V = 2.64 M2
Besi = 12 MM 2 Ø 12
P = 56.0
Jml = 4.00 Bh 6 - 20
V = 224.00 M
Koef = 0.887 Kg/M
V = 198.77 Kg 2 Ø 12
Besi Begel = 6 MM
P = 56.0 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.52 M
Jarak Begel = 0.2 M
Jml Begel = 280.00 Bh
280.00 (di bulatkan)
P. total = 145.60 M
Koef = 0.222 Kg/M
V = 32.30 Kg
V. total 231.07 Kg
- Bekisting Sloef
P = 56.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
22.40
V = 7.47 M2
Besi = 12 MM 2 Ø 12
P = 19.8
Jml = 4.00 Bh 6 - 20
V = 79.20 M
Koef = 0.887 Kg/M
V = 70.28 Kg 2 Ø 12
Besi = 6 MM
P = 19.8 M
L = 0.15 M
T = 0.13 M
P. Begel = 0.48 M
Jarak Begel = 0.2 M
Jml Begel = 99.00 Bh
99.00 (di bulatkan)
P. total = 47.52 M
Koef = 0.222 Kg/M
V = 10.54 Kg
V. total 80.82 Kg
Besi = 12 MM 2 Ø 12
P = 2.6
Jml = 4.00 Bh 6 - 20
V = 10.54 M
Koef = 0.887 Kg/M
V = 9.35 Kg 2 Ø 12
84.18 9 Bh Jmlh Kolom
Besi = 6 MM
P = 2.6 M
L = 0.15 M
T = 0.13 M
P. Begel = 0.43 M
Jarak Begel = 0.2
Jml Begel = 13.00 Bh
13.00 (di bulatkan)
P. total = 5.59 M
V. total 95.34 Kg
- Bekisting Kolom
P = 2.6 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.06 M2
0.53
4.76658 9 Jmlh Kolom
33.85
Pek. Kolom Teras (20 x 20)
P = 3.80 M 0.2
L = 0.20 M
T = 0.20 M
0.2
V1 = 0.15 M3
2.13 14 Bh Jmlh Kolom
Besi = 12 MM 2 Ø 12
P = 4.2
Jml = 4.00 Bh 6 - 20
V = 16.94 M
Koef = 0.887 Kg/M
V = 15.03 Kg 2 Ø 12
210.45 14 Bh Jmlh Kolom
Besi = 6 MM
P = 4.2 M
L = 0.20 M
T = 0.20 M
P. Begel = 0.6 M
Jarak Begel = 0.2
Jml Begel = 21.00 Bh
21.00 (di bulatkan)
P. total = 12.60 M
V. total 249.58 Kg
- Bekisting Kolom
P = 4.2 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.71 M2
0.86
11.98 14 Jmlh Kolom
Besi = 12 MM 2 Ø 12
P = 4.2
Jml = 4.00 Bh 6 - 20
V = 16.94 M
Koef = 0.887 Kg/M
V = 15.03 Kg 2 Ø 12
300.64 20 Bh Jmlh Kolom
Besi = 6 MM
P = 4.2 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.45 M
Jarak Begel = 0.2
Jml Begel = 21.00 Bh
21.00 (di bulatkan)
P. total = 9.45 M
V. total 342.57 Kg
- Bekisting Kolom
P = 4.2 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.71 M2
0.86
= 17.11 20 Jmlh Kolom
Besi = 12 MM 2 Ø 12
P = 73.7
Jml = 4.00 Bh 6 - 20
V = 294.72 M
Koef = 0.887 Kg/M
V = 261.52 Kg 2 Ø 12
Besi = 6 MM
P = 73.7 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.50 M
Jarak Begel = 0.2 M
Jml Begel = 368.40 Bh
368.00 (di bulatkan)
P. total = 184.00 M
Koef = 0.222 Kg/M
V = 40.82 Kg
V. total 302.34 Kg
Rabat Depan P = 26
L = 0.5
T = 0.07
0.91
Lantai Saluran P = 74
L = 0.5
T = 0.05
V = 3.7
Pas. Bata Saluran P = 74
L = 0.6
V = 88.8
Sirtu Depan P = 26
L = 0.47
T = 0.07
0.8554
45
18
6
18.4
87.4
10.4
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
Besi = 12 MM 2 Ø 12
P = 57.0
Jml = 4.00 Bh 6 - 20
V = 228.00 M
Koef = 0.887 Kg/M
V = 202.32 Kg 2 Ø 12
Besi Begel = 6 MM
P = 57.0 M
L = 0.15 M
T = 0.20 M
P. Begel = 0.57 M
Jarak Begel = 0.2 M
Jml Begel = 285.00 Bh
285.00 (di bulatkan)
P. total = 162.45 M
Koef = 0.222 Kg/M
V = 36.04 Kg
V. total 238.36 Kg
- Bekisting Sloef
P = 57.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
22.80
V = 7.60 M2
Besi = 12 MM 2 Ø 12
P = 22.0
Jml = 4.00 Bh 6 - 20
V = 88.00 M
Koef = 0.887 Kg/M
V = 78.09 Kg 2 Ø 12
Besi Begel = 6 MM
P = 22.0 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.52 M
Jarak Begel = 0.2 M
Jml Begel = 110.00 Bh
110.00 (di bulatkan)
P. total = 57.20 M
Koef = 0.222 Kg/M
V = 12.69 Kg
V. total 90.78 Kg
- Bekisting Sloef
P = 22.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
8.80
V = 2.93 M2
Besi = 12 MM 2 Ø 12
P = 57.0
Jml = 4.00 Bh 6 - 20
V = 228.00 M
Koef = 0.887 Kg/M
V = 202.32 Kg 2 Ø 12
Besi = 6 MM
P = 57.0 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.50 M
Jarak Begel = 0.2 M
Jml Begel = 285.00 Bh
285.00 (di bulatkan)
P. total = 142.50 M
Koef = 0.222 Kg/M
V = 31.61 Kg
V. total 233.93 Kg
Besi = 12 MM 2 Ø 12
P = 4.3
Jml = 4.00 Bh 6 - 20
V = 17.14 M
Koef = 0.887 Kg/M
V = 15.21 Kg 2 Ø 12
91.26 6 Bh Jmlh Kolom
Besi = 6 MM
P = 4.3 M
L = 0.15 M
T = 0.20 M
P. Begel = 0.5 M
Jarak Begel = 0.2
Jml Begel = 21.25 Bh
21.00 (di bulatkan)
P. total = 10.50 M
V. total 105.23 Kg
- Bekisting Kolom
P = 4.3 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.73 M2
0.87
5.19435 6 Jmlh Kolom
23.93
Pek. Kolom Teras (20 x 20)
P = 3.60 M 0.2
L = 0.20 M
T = 0.20 M
0.2
V1 = 0.14 M3
1.01 7 Bh Jmlh Kolom
Besi = 12 MM 2 Ø 12
P = 4.0
Jml = 4.00 Bh 6 - 20
V = 16.14 M
Koef = 0.887 Kg/M
V = 14.32 Kg 2 Ø 12
100.25 7 Bh Jmlh Kolom
Besi = 6 MM
P = 4.0 M
L = 0.20 M
T = 0.20 M
P. Begel = 0.6 M
Jarak Begel = 0.2
Jml Begel = 20.00 Bh
20.00 (di bulatkan)
P. total = 12.00 M
V. total 118.89 Kg
- Bekisting Kolom
P = 4.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.63 M2
0.81
5.70 7 Jmlh Kolom
Besi = 12 MM 2 Ø 12
P = 4.0
Jml = 4.00 Bh 6 - 20
V = 16.14 M
Koef = 0.887 Kg/M
V = 14.32 Kg 2 Ø 12
229.15 16 Bh Jmlh Kolom
Besi = 6 MM
P = 4.0 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.45 M
Jarak Begel = 0.2
Jml Begel = 20.00 Bh
20.00 (di bulatkan)
P. total = 9.00 M
V. total 261.10 Kg
- Bekisting Kolom
P = 4.0 M
T = 0.20 M
Sisi = 2 Bh
3X Pakai
V = 1.63 M2
0.81
= 13.04 16 Jmlh Kolom
Besi = 12 MM 2 Ø 12
P = 36.8
Jml = 4.00 Bh 6 - 20
V = 147.36 M
Koef = 0.887 Kg/M
V = 130.76 Kg 2 Ø 12
Besi = 6 MM
P = 36.8 M
L = 0.15 M
T = 0.15 M
P. Begel = 0.50 M
Jarak Begel = 0.2 M
Jml Begel = 184.20 Bh
184.00 (di bulatkan)
P. total = 92.00 M
Koef = 0.222 Kg/M
V = 20.41 Kg
V. total 151.17 Kg
Rabat Depan P = 20
L = 0.5
T = 0.07
0.7
Rabat Samping/Belakang P = 36
L = 1
T = 0.07
2.52
Vtot = 3.22
Lantai Saluran P = 62
L = 0.5
T = 0.05
V = 1.55
Pas. Bata Saluran P = 62
L = 0.6
V = 37.2
Sirtu Depan P = 20
L = 0.47
T = 0.07
0.658
45
18
6
18.4
87.4
17
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
TIPE A
1 Galian Tanah 32
32
19.8 L = 0.65 M 28
T = 0.3 M 0.65
V = 0.195 M2
= 3.86 M3 19.54 0.3 92
V = 0.175
0.15
V = 3.47 M3 0.05
0.1 0.45 0.1
V = 0.0975 M2
= 1.93 M3
19.8 L = 0.65 M
T = 0.05 M
V = 0.0325 M2
= 0.6435 M3 2.6035
5 Urugan Pasir
1 P = 7.85 M
L = 6.85 M
T = 0.05 M
V1 = 16.13 M3 6 0.20
2 P = 24.00 M
L = 2.00 M
T = 0.05 M
V2 = 4.80 M3 2
3 P = M
L = M
T = M
V3 = 0.00 M3
V = 20.93 M3 20.93
TIPE B
1 Galian Tanah 32
4
56.0 L = 0.7 M 16
T = 0.4 M 0.7 4
56
V = 0.28 M2
= 15.68 M3 0.4
56 L1 = 0.25 M 0.25
L2 = 0.50 M
T = 0.50 M
V = 0.1875
0.15
V = 10.50 M3 0.05
0.1 0.5 0.1
V = 0.105 M2
= 5.88 M3
56 L = 0.70 M
T = 0.05 M
V = 0.035 M2
= 1.96 M3
5 Urugan Pasir
1 P = M
L = M
T = M
V1 = M3 2 0.20
2 P = M
L = M
T = M
V2 = M3
3 P = M
L = M
T = M
V3 = M3
V = 0.00 M3
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
TIPE A
1 Galian Tanah 32
32
92.0 L = 0.8 M 28
T = 0.4 M 0.8
V = 0.32 M2
= 29.44 M3 45.12 0.4 92
92 L1 = 0.25 M 0.25
L2 = 0.60 M
T = 0.60 M
V = 0.255
0.15
V = 23.46 M3 0.05
0.1 0.6 0.1
V = 0.12 M2
= 11.04 M3
92 L = 0.80 M
T = 0.05 M
V = 0.04 M2
= 3.68 M3 5.64
5 Urugan Pasir
1 P = 8.85 M
L = 6.85 M
T = 0.05 M
V1 = 6.06 M3 2 0.20
2 P = 26.85 M
L = 1.85 M
T = 0.05 M
V2 = 2.48 M3 1
3 P = M
L = M
T = M
V3 = 0.00 M3
V = 8.55 M3 8.55
TIPE B
1 Galian Tanah 32
4
56.0 L = 0.7 M 16
T = 0.4 M 0.7 4
56
V = 0.28 M2
= 15.68 M3 0.4
56 L1 = 0.25 M 0.25
L2 = 0.50 M
T = 0.50 M
V = 0.1875
0.15
V = 10.50 M3 0.05
0.1 0.5 0.1
V = 0.105 M2
= 5.88 M3
56 L = 0.70 M
T = 0.05 M
V = 0.035 M2
= 1.96 M3
5 Urugan Pasir
1 P = M
L = M
T = M
V1 = M3 2 0.20
2 P = M
L = M
T = M
V2 = M3
3 P = M
L = M
T = M
V3 = M3
V = 0.00 M3
BACK UP DATA PERENCANAAN
SD 268 TOWOTI
TIPE A
1 Galian Tanah
36
57.0 L = 0.7 M 21
T = 0.27 M 0.7
V = 0.189 M2
= 10.77 M3 13.41 0.27 57
57 L1 = 0.25 M 0.25
L2 = 0.60 M
T = 0.60 M
V = 0.255
0.15
V = 14.54 M3 18.66 0.05
0.1 0.6 0.1
V = 0.105 M2
= 5.98 M3 7.97
57 L = 0.70 M
T = 0.05 M
V = 0.035 M2
= 1.995 M3 2.655
5 Urugan Sirtu
1 P = 8.85 M
L = 6.85 M
T = 0.15 M
V1 = 18.19 M3 2 0.15
2 P = 23.85 M
L = 1.85 M
T = 0.15 M
V2 = 6.62 M3
3 P = M
L = M
T = M
V3 = 0.00 M3
V = 24.81 M3 24.81
TIPE B
1 Galian Tanah 18
4
22.0 L = 0.6 M
T = 0.2 M 0.6
22
V = 0.12 M2
= 2.64 M3 0.2
V = 0.1875
0.15
V = 4.13 M3 0.05
0.1 0.5 0.1
V = 0.09 M2
= 1.98 M3
22 L = 0.60 M
T = 0.05 M
V = 0.03 M2
= 0.66 M3
5 Urugan Sirtu
1 P = M
L = M
T = M
V1 = M3 2 0.20
2 P = M
L = M
T = M
V2 = M3
3 P = M
L = M
T = M
V3 = M3
V = 0.00 M3
14 Pek. Dinding Batu Bata
Dinding Belakang
L = 2.35 M
T = 3.65 M
V1 = 17.16 M2 2 3.85
V1 = 29.20 M2 2
0.15 7.00 0.15
3.8
Dinding Depan
6 L = 4.85 M
T = 3.65 M
V1 = 53.11 M2 1 3.8
V. total = 53.11 M2
Transram P = 47 Plesteran
T = 0.30
V1 = 14.10 M2
V. total Pas. B. Bata = 128.82 M2
P = 0.15 M
L = 0.15 M
= 0.30 M2 Jml Kolom
5.40 M2 18 Bh
V = 263.04 M2
16 Pek. Pengecetan
V.Plesteran 263.04 M2
V = 263.04 M2
108.5
18 Rangka Atap
V = 97.960 M2
V1 = 7.49 M2 3 1.50
0.15
0.15 3.00 0.15
0.15
Teras 2 P = 4.35 M
L = 1.35 M
V1 = 11.75 M2 1 3.00
0.15
0.15 3.00 0.15
0.15
Plafond Luar
P = 2.78 M
L = 0.60 M
0.70
V = 6.67 M2 4 11.20
M2
V. Total = 25.91 M2
P = 53.88 M
V = 53.88 M2
170.80 LISPLANK
L = 19.24 M
TIPE A
9
1 Galian Tanah 9
7
52.0 L = 0.7 M 7
T = 0.4 M 0.7 32
V = 0.28 M2
= 14.56 M3 15.61 0.4
V = 0.255
0.2
V = 13.26 M3 0.05
0.1 0.6 0.05
V = 0.14
= 7.28
52 L = 0.70 M
T = 0.05 M
V = 0.035 M2
= 1.82 M3 2.03
5 Urugan Sirtu
1 P = 9.85 M
L = 4.85 M
T = 0.15 M
V1 = 7.17 M3 0.15
5 Urugan Pasir
1 P = 9.85 M
L = 4.85 M
T = 0.05 M
0.05
V1 = 2.39 M3 0.05
V1 = 2.39 M3 0.05
1 P = 1.00 M
L = 12.00 M
T = 0.05 M
V1 = 1.20 M3 2
1 P = 1.00 M
L = 5.00 M
T = 0.05 M
V1 = 0.50 M3 2
1.70
5 Urugan Tanah
1 P = 7.85 M
L = 5.85 M
T = 0.30 M
V1 = 13.78 M3 0.30
2 P = 3.35 M
L = 3.00 M
T = 0.30 M
V2 = 3.02 M3
3 P = 3.35 M
L = 2.85 M
T = 0.3 M
V2 = 2.86 M3
V = 19.66 M3 21.24
TIPE B
1 Galian Tanah 32
32
7.0 L = 0.5 M 28
T = 0.3 M 0.5
V = 0.15 M2
= 1.05 M3 0.3 92
7 L1 = 0.25 M 0.25
L2 = 0.50 M
T = 0.50 M
V = 0.1875
0.2
V = 1.31 M3 0.05
0.1 0.5 0.05
V = 0.12 M2
= 0.84 M3
7 L = 0.60 M
T = 0.05 M
V = 0.03 M2
= 0.21 M3
V1 = 0.79 M3 0.15
V1 = 0.26 M3 0.05
V1 = 0.26 M3 0.05
5 Urugan Tanah
1 P = 2.85 M
L = 1.85 M
T = 0.30 M
V1 = 1.58 M3 0.30
REKAPITULASI
Page 30 of 141
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tenaga kerja Pekerja OH 0.050 Rp 25,000 Rp - Rp 1,250
Mandor OH 0.005 Rp 50,000 Rp - Rp 250
Mengurug kembali 1 m3
galian dihitung dari 1/3
6.9 Mengurug kembali 1 m3 galian
kali upah pekerjaan
galian
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
Page 31 of 141
Tenaga kerja
Kepala tukang OH 0.040 Rp 42,500 Rp 1,700
Mandor OH 0.080 Rp 50,000 Rp 4,000
Page 32 of 141
Tenaga kerja
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Mandor OH 0.075 Rp 50,000 Rp 3,750
Page 33 of 141
Bahan Pasir Pasang m3 0.492 Rp 1,000 Rp 492
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750
6.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Rp 323,060 Rp 130,688
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 0.480 Rp 1,000 Rp 480
Portland Cement kg 194.000 Rp 1,000 Rp 194,000
Pasir beton m3 0.312 Rp 1,000 Rp 312
Koral Beton m3 0.468 Rp 1,000 Rp 468
Besi beton kg 126.000 Rp 1,000 Rp 126,000
Kawat beton kg 1.800 Rp 1,000 Rp 1,800
Bahan
Pekerja OH 3.400 Rp 25,000 Rp 85,000
Tukang batu OH 0.850 Rp 39,500 Rp 33,575
Kepala tukang OH 0.085 Rp 42,500 Rp 3,613
Tenaga kerja Mandor OH 0.170 Rp 50,000 Rp 8,500
Page 34 of 141
Bahan
Portland Cement kg 194.000 Rp 1,000 Rp 194,000
Pasir beton m3 0.312 Rp 1,000 Rp 312
Koral Beton m3 0.468 Rp 1,000 Rp 468
Tenaga kerja Pekerja OH 2.400 Rp 25,000 Rp 60,000
Tukang batu OH 0.800 Rp 39,500 Rp 31,600
Kepala tukang OH 0.080 Rp 42,500 Rp 3,400
Mandor OH 0.119 Rp 50,000 Rp 5,950
6.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
±
Rp 463,361 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 247.000 Rp 1,000 Rp 247,000
Pasir beton ( kg ) kg 869.000 Rp 1 Rp 621
koral beton kg kg 999.000 Rp 1 Rp 740
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
±
Rp 492,341 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 276.000 Rp 1,000 Rp 276,000
Pasir beton ( kg ) kg 828.000 Rp 1 Rp 591
koral beton kg kg 1,012.000 Rp 1 Rp 750
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
±
Rp 515,324 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 299.000 Rp 1,000 Rp 299,000
Pasir beton ( kg ) kg 799.000 Rp 1 Rp 571
koral beton kg kg 1,017.000 Rp 1 Rp 753
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
Page 35 of 141
CATATAN Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
6.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Rp 431,399 Rp 41,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 230.000 Rp 1,000 Rp 230,000
Pasir beton ( kg ) kg 893.000 Rp 1 Rp 638
koral beton kg kg 1,027.000 Rp 1 Rp 761
Bahan Air Liter 200.000 Rp 1,000 Rp 200,000
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.060 Rp 50,000 Rp 3,000
6.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
±
Rp 542,305 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 326.000 Rp 1,000 Rp 326,000
Pasir beton ( kg ) kg 760.000 Rp 1 Rp 543
koral beton kg kg 1,029.000 Rp 1 Rp 762
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
±
Rp 568,286 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 352.000 Rp 1,000 Rp 352,000
Pasir beton ( kg ) kg 731.000 Rp 1 Rp 522
koral beton kg kg 1,031.000 Rp 1 Rp 764
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
±
Rp 587,274 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 371.000 Rp 1,000 Rp 371,000
Pasir beton ( kg ) kg 698.000 Rp 1 Rp 499
koral beton kg kg 1,047.000 Rp 1 Rp 776
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
6.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
±
Rp 600,264 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 384.000 Rp 1,000 Rp 384,000
Pasir beton ( kg ) kg 692.000 Rp 1 Rp 494
koral beton kg kg 1,039.000 Rp 1 Rp 770
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
±
Rp 622,249 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 406.000 Rp 1,000 Rp 406,000
Pasir beton ( kg ) kg 684.000 Rp 1 Rp 489
koral beton kg kg 1,026.000 Rp 1 Rp 760
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
±
Rp 2,330,000 Rp 57,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 413.000 Rp 1,000 Rp 413,000
Pasir beton m3 681.000 Rp 1,000 Rp 681,000
Koral Beton m3 1,021.000 Rp 1,000 Rp 1,021,000
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Kepala tukang OH 0.028 Rp 42,500 Rp 1,190
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
±
Rp 655,224 Rp 73,063
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 439.000 Rp 1,000 Rp 439,000
Pasir beton ( kg ) kg 670.000 Rp 1 Rp 479
koral beton kg kg 1,006.000 Rp 1 Rp 745
Bahan
Page 37 of 141
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.105 Rp 50,000 Rp 5,250
6.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
±
Rp 664,217 Rp 73,063
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 448.000 Rp 1,000 Rp 448,000
Pasir beton ( kg ) kg 667.000 Rp 1 Rp 476
koral beton kg kg 1,000.000 Rp 1 Rp 741
Bahan Air Liter 215.000 Rp 1,000 Rp 215,000
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.105 Rp 50,000 Rp 5,250
6.13 Membuat 1 m3 beton kedap air dengan strorox – 100 Rp 402,480 Rp 73,063
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 400.000 Rp 1,000 Rp 400,000
Pasir beton m3 0.480 Rp 1,000 Rp 480
Koral Beton m3 0.800 Rp 1,000 Rp 800
Bahan Strorox – 100 kg 1.200 Rp 1,000 Rp 1,200
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.105 Rp 50,000 Rp 5,250
Tenaga kerja
Page 38 of 141
Tukang batu/pipa OH 0.035 Rp 39,500 Rp 1,383
Kepala tukang OH 0.004 Rp 42,500 Rp 170
Tenaga kerja Mandor OH 0.007 Rp 50,000 Rp 350
6.17 Pembesian 10 kg dengan besi polos atau besi ulir Rp 10,650 Rp 5,013
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi beton (polos/ulir) kg 10.500 Rp 1,000 Rp 10,500
Bahan Kawat beton kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang besi OH 0.070 Rp 39,500 Rp 2,765
Kepala tukang OH 0.007 Rp 42,500 Rp 298
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200
Page 39 of 141
Bahan Minyak bekisting Liter 0.100 Rp 1,000 Rp 100
Pekerja OH 0.520 Rp 25,000 Rp 13,000
Tukang kayu OH 0.260 Rp 39,500 Rp 10,270
Kepala tukang OH 0.026 Rp 42,500 Rp 1,105
Tenaga kerja Mandor OH 0.026 Rp 50,000 Rp 1,300
Page 40 of 141
6.24 Memasang 1 m2 bekisting untuk lantai Rp 7,005 Rp 32,588
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.040 Rp 1,000 Rp 40
Paku 5 cm – 12 cm kg 0.400 Rp 1,000 Rp 400
Minyak bekisting Liter 0.200 Rp 1,000 Rp 200
Balok kayu kelas II m3 0.015 Rp 1,000 Rp 15
Plywood tebal 9 mm Lbr 0.350 Rp 1,000 Rp 350
Dolken kayu galam, (8-10) cm,
Rp 6,000
ö
Page 41 of 141
6.27 Memasang 1 m2 jembatan untuk pengecoran beton Rp 1,126 Rp 6,338
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III (papan) m3 0.026 Rp 1,000 Rp 26
Paku 5 cm – 12 cm kg 0.600 Rp 1,000 Rp 600
Dolken kayu galam (kaso), (8-10)
Rp 500
ö
6.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Rp 499,200 Rp 260,573
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.200 Rp 1,000 Rp 200
Paku 5 cm – 12 cm kg 1.500 Rp 1,000 Rp 1,500
Minyak bekisting Liter 0.400 Rp 1,000 Rp 400
Besi beton polos kg 157.500 Rp 1,000 Rp 157,500
Kawat beton kg 2.250 Rp 1,000 Rp 2,250
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Bahan Koral Beton m3 0.810 Rp 1,000 Rp 810
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.300 Rp 39,500 Rp 51,350
Tukang besi OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.262 Rp 42,500 Rp 11,135
Tenaga kerja Mandor OH 0.265 Rp 50,000 Rp 13,250
6.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Rp 556,720 Rp 296,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.270 Rp 1,000 Rp 270
Paku 5 cm-12cm kg 2.000 Rp 1,000 Rp 2,000
Minyak bekisting Liter 0.600 Rp 1,000 Rp 600
Besi beton polos kg 210.000 Rp 1,000 Rp 210,000
Kawat beton kg 3.000 Rp 1,000 Rp 3,000
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Plywood 9 mm Lembar 3.500 Rp 1,000 Rp 3,500
Pasir beton m3 0.540 Rp 1,000 Rp 540
Bahan Koral Beton m3 0.810 Rp 1,000 Rp 810
Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 39,500 Rp 10,863
Tukang kayu OH 1.560 Rp 39,500 Rp 61,620
Tukang besi OH 1.400 Rp 39,500 Rp 55,300
Kepala tukang OH 0.323 Rp 42,500 Rp 13,728
Tenaga kerja
Page 42 of 141
Tenaga kerja Mandor OH 0.283 Rp 50,000 Rp 14,150
6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Rp 686,900 Rp 370,015
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.400 Rp 1,000 Rp 400
Paku 5 cm – 12 cm kg 4.000 Rp 1,000 Rp 4,000
Minyak bekisting Liter 2.000 Rp 1,000 Rp 2,000
Besi beton polos kg 315.000 Rp 1,000 Rp 315,000
Kawat beton kg 4.500 Rp 1,000 Rp 4,500
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.150 Rp 1,000 Rp 150
Plywood 9 mm Lembar 3.500 Rp 1,000 Rp 3,500
Dolken kayu galam, (8-10) cm,
Rp 20,000
ö
6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Rp 574,410 Rp 320,140
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp 1,000 Rp 320
Paku 5 cm – 12 cm kg 3.200 Rp 1,000 Rp 3,200
Minyak bekisting Liter 1.600 Rp 1,000 Rp 1,600
Besi beton polos kg 210.000 Rp 1,000 Rp 210,000
Kawat beton kg 3.000 Rp 1,000 Rp 3,000
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.140 Rp 1,000 Rp 140
Plywood 9 mm Lembar 2.800 Rp 1,000 Rp 2,800
Dolken kayu galam, (8-10) cm,
Rp 16,000
ö
Page 43 of 141
6.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Rp 537,140 Rp 260,700
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp 1,000 Rp 320
Paku 5 cm – 12 cm kg 3.200 Rp 1,000 Rp 3,200
Minyak bekisting Liter 1.600 Rp 1,000 Rp 1,600
Besi beton polos kg 157.500 Rp 1,000 Rp 157,500
Kawat beton kg 2.250 Rp 1,000 Rp 2,250
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.120 Rp 1,000 Rp 120
Plywood 9 mm Lembar 2.800 Rp 1,000 Rp 2,800
Dolken kayu galam, (8-10) cm,
Rp 32,000
ö
6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Rp 529,100 Rp 260,573
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.240 Rp 1,000 Rp 240
Paku 5 cm – 12 cm kg 3.200 Rp 1,000 Rp 3,200
Minyak bekisting Liter 1.600 Rp 1,000 Rp 1,600
Besi beton polos kg 157.500 Rp 1,000 Rp 157,500
Kawat beton kg 2.250 Rp 1,000 Rp 2,250
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.160 Rp 1,000 Rp 160
Plywood 9 mm Lembar 2.800 Rp 1,000 Rp 2,800
Dolken kayu galam, (8-10) cm,
Rp 24,000
ö
6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Rp 571,405 Rp 296,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Page 44 of 141
Kayu kelas III m3 0.250 Rp 1,000 Rp 250
Paku 5 cm – 12 cm kg 3.000 Rp 1,000 Rp 3,000
Minyak bekisting Liter 1.200 Rp 1,000 Rp 1,200
Besi beton polos kg 210.000 Rp 1,000 Rp 210,000
Kawat beton kg 3.000 Rp 1,000 Rp 3,000
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp 1,000 Rp 540
Koral Beton m3 0.810 Rp 1,000 Rp 810
Kayu kelas II balok m3 0.105 Rp 1,000 Rp 105
Plywood 9 mm Lembar 2.500 Rp 1,000 Rp 2,500
Dolken kayu galam, (8-10) cm,
Rp 14,000
ö
6.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Rp 7,477 Rp 7,575
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.002 Rp 1,000 Rp 2
Paku 5 cm – 12 cm kg 0.010 Rp 1,000 Rp 10
Minyak bekisting Liter Rp 1,000 Rp -
Besi beton polos kg 3.000 Rp 1,000 Rp 3,000
Kawat beton kg 0.450 Rp 1,000 Rp 450
Portland Cement kg 4.000 Rp 1,000 Rp 4,000
Pasir beton m3 0.006 Rp 1,000 Rp 6
Bahan Koral Beton m3 0.009 Rp 1,000 Rp 9
Pekerja OH 0.180 Rp 25,000 Rp 4,500
Tukang batu OH 0.020 Rp 39,500 Rp 790
Tukang kayu OH 0.020 Rp 39,500 Rp 790
Tukang besi OH 0.020 Rp 39,500 Rp 790
Kepala tukang OH 0.006 Rp 42,500 Rp 255
Tenaga kerja Mandor OH 0.009 Rp 50,000 Rp 450
6.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm Rp 9,197 Rp 12,511
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.003 Rp 1,000 Rp 3
Paku 5 cm – 12 cm kg 0.020 Rp 1,000 Rp 20
Minyak bekisting Liter Rp 1,000 Rp -
Besi beton polos kg 3.600 Rp 1,000 Rp 3,600
Kawat beton kg 0.050 Rp 1,000 Rp 50
Portland Cement kg 5.500 Rp 1,000 Rp 5,500
Bahan
Page 45 of 141
Pasir beton m3 0.009 Rp 1,000 Rp 9
Bahan Koral Beton m3 0.015 Rp 1,000 Rp 15
Pekerja OH 0.297 Rp 25,000 Rp 7,425
Tukang batu OH 0.033 Rp 39,500 Rp 1,304
Tukang kayu OH 0.033 Rp 39,500 Rp 1,304
Tukang besi OH 0.033 Rp 39,500 Rp 1,304
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP Rp 183,580 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 43.500 Rp 1,000 Rp 43,500
Bahan Pasir Pasang m3 0.080 Rp 1,000 Rp 80
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP Rp 173,041 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 32.950 Rp 1,000 Rp 32,950
Bahan Pasir Pasang m3 0.091 Rp 1,000 Rp 91
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP Rp 166,643 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 26.550 Rp 1,000 Rp 26,550
Bahan Pasir Pasang m3 0.093 Rp 1,000 Rp 93
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP Rp 162,302 Rp 25,250
Page 46 of 141
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 22.200 Rp 1,000 Rp 22,200
Bahan Pasir Pasang m3 0.102 Rp 1,000 Rp 102
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP Rp 158,622 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 18.500 Rp 1,000 Rp 18,500
Bahan Pasir Pasang m3 0.122 Rp 1,000 Rp 122
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 150,200 Rp 25,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp 1,000 Rp 140,000
Portland Cement kg 10.080 Rp 1,000 Rp 10,080
Pasir Pasang m3 0.093 Rp 1,000 Rp 93
Bahan Kapur padam m3 0.028 Rp 1,000 Rp 28
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP Rp 88,988 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 18.950 Rp 1,000 Rp 18,950
Bahan Pasir Pasang m3 0.038 Rp 1,000 Rp 38
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP Rp 84,410 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 14.370 Rp 1,000 Rp 14,370
Bahan
Page 47 of 141
Bahan Pasir Pasang m3 0.040 Rp 1,000 Rp 40
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP Rp 81,543 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 11.500 Rp 1,000 Rp 11,500
Bahan Pasir Pasang m3 0.043 Rp 1,000 Rp 43
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP Rp 79,725 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 9.680 Rp 1,000 Rp 9,680
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP Rp 78,369 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.049 Rp 1,000 Rp 49
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP Rp 76,550 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 6.500 Rp 1,000 Rp 6,500
Bahan Pasir Pasang m3 0.050 Rp 1,000 Rp 50
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja
Page 48 of 141
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.13 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 74,565 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 4.500 Rp 1,000 Rp 4,500
Pasir Pasang m3 0.050 Rp 1,000 Rp 50
Bahan Kapur padam m3 0.015 Rp 1,000 Rp 15
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.14 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP Rp 70,054 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Semen Merah m3 0.018 Rp 1,000 Rp 18
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Kapur padam m3 0.018 Rp 1,000 Rp 18
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.15 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP Rp 70,056 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp 1,000 Rp 70,000
Semen Merah m3 0.014 Rp 1,000 Rp 14
Pasir Pasang m3 0.028 Rp 1,000 Rp 28
Bahan Kapur padam m3 0.014 Rp 1,000 Rp 14
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
Page 49 of 141
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
Page 50 of 141
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.22 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 44,032 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp 1,000 Rp 30,000
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.23 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP Rp 41,035 Rp 12,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp 1,000 Rp 30,000
Portland Cement kg 11.000 Rp 1,000 Rp 11,000
Bahan Pasir Pasang m3 0.035 Rp 1,000 Rp 35
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.24 Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 84,032 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata berongga ekspose Buah 70.000 Rp 1,000 Rp 70,000
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
Page 51 of 141
6.1 Memasang 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm Rp 15,520 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 15.504 Rp 1,000 Rp 15,504
Bahan Pasir Pasang m3 0.016 Rp 1,000 Rp 16
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
Page 52 of 141
6.6 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm Rp 4,443 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 4.416 Rp 1,000 Rp 4,416
Bahan Pasir Pasang m3 0.027 Rp 1,000 Rp 27
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
Page 54 of 141
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.022 Rp 50,000 Rp 1,100
Page 55 of 141
6.20 Memasang 1 m’ Plesteran Skoning 1 PC : 2 PP, lebar 10 mm Rp 513 Rp 19,700
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 0.500 Rp 1,000 Rp 500
Bahan Pasir Pasang m3 0.013 Rp 1,000 Rp 13
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang batu OH 0.400 Rp 39,500 Rp 15,800
Kepala tukang OH 0.040 Rp 42,500 Rp 1,700
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200
6.24 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’) Rp 3,108 Rp 7,453
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.108 Rp 1,000 Rp 3,108
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang batu OH 0.075 Rp 39,500 Rp 2,963
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400
Page 56 of 141
6.25 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’) Rp 1,600 Rp 3,503
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 1.600 Rp 1,000 Rp 1,600
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang batu OH 0.035 Rp 39,500 Rp 1,383
Kepala tukang OH 0.004 Rp 42,500 Rp 170
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200
6.26 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP Rp 6,352 Rp 14,813
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.340 Rp 1,000 Rp 6,340
Bahan Pasir Pasang m3 0.012 Rp 1,000 Rp 12
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 39,500 Rp 5,925
Kepala tukang OH 0.015 Rp 42,500 Rp 638
Tenaga kerja Mandor OH 0.015 Rp 50,000 Rp 750
6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I Rp 3,350 Rp 1,111,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp 1,000 Rp 1,100
Paku 10 cm kg 1.250 Rp 1,000 Rp 1,250
Bahan Lem kayu kg 1.000 Rp 1,000 Rp 1,000
Pekerja OH 7.000 Rp 25,000 Rp 175,000
Tukang kayu OH 21.000 Rp 39,500 Rp 829,500
Kepala tukang OH 2.100 Rp 42,500 Rp 89,250
Tenaga kerja Mandor OH 0.350 Rp 50,000 Rp 17,500
6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III Rp 3,450 Rp 952,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.200 Rp 1,000 Rp 1,200
Paku 10 cm kg 1.250 Rp 1,000 Rp 1,250
Bahan Lem kayu kg 1.000 Rp 1,000 Rp 1,000
Pekerja OH 6.000 Rp 25,000 Rp 150,000
Tukang kayu OH 18.000 Rp 39,500 Rp 711,000
Kepala tukang OH 1.800 Rp 42,500 Rp 76,500
Tenaga kerja Mandor OH 0.300 Rp 50,000 Rp 15,000
Page 57 of 141
6.3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II Rp 90 Rp 55,588
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp 1,000 Rp 40
Bahan Paku 5 cm - 7 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.105 Rp 42,500 Rp 4,463
Tenaga kerja Mandor OH 0.018 Rp 50,000 Rp 900
6.4 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III Rp 90 Rp 55,588
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp 1,000 Rp 40
Bahan Paku 5 cm - 7 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.105 Rp 42,500 Rp 4,463
Tenaga kerj a Mandor OH 0.018 Rp 50,000 Rp 900
6.5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II Rp 540 Rp 158,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp 1,000 Rp 40
Bahan Lem kayu kg 0.500 Rp 1,000 Rp 500
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp 39,500 Rp 118,500
Kepala tukang OH 0.300 Rp 42,500 Rp 12,750
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500
6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II Rp 324 Rp 127,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.024 Rp 1,000 Rp 24
Bahan Lem kayu kg 0.300 Rp 1,000 Rp 300
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp 39,500 Rp 94,800
Kepala tukang OH 0.240 Rp 42,500 Rp 10,200
Tenaga kerja Mandor OH 0.040 Rp 50,000 Rp 2,000
6.7 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II Rp 564 Rp 158,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.064 Rp 1,000 Rp 64
Bahan Lem kayu kg 0.500 Rp 1,000 Rp 500
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp 39,500 Rp 118,500
Tenaga kerja
Page 58 of 141
Kepala tukang OH 0.300 Rp 42,500 Rp 12,750
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500
6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm) Rp 1,555 Rp 111,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp 1,000 Rp 25
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.500 Rp 1,000 Rp 500
Plywood tebal 4 mm Ukuran (90 x
Rp 1,000
Bahan 220) cm Lembar 1.000 Rp 1,000
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 2.100 Rp 39,500 Rp 82,950
Kepala tukang OH 0.210 Rp 42,500 Rp 8,925
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750
6.9 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Rp 1,556 Rp 127,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.026 Rp 1,000 Rp 26
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.500 Rp 1,000 Rp 500
Plywood tebal 4 mm Ukuran (90 x
Rp 1,000
Bahan 220) cm Lembar 1.000 Rp 1,000
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp 39,500 Rp 94,800
Kepala tukang OH 0.240 Rp 42,500 Rp 10,200
Tenaga kerja Mandor OH 0.040 Rp 50,000 Rp 2,000
6.11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I Rp 1,355 Rp 127,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp 1,000 Rp 25
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.300 Rp 1,000 Rp 300
Teakwood tebal 4 mm ukuran (90 x
Rp 1,000
Bahan 220) cm Lembar 1.000 Rp 1,000
Pekerja OH 0.800 Rp 25,000 Rp 20,000
6.12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II Rp 2,355 Rp 134,963
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp 1,000 Rp 25
Paku 1 cm - 2,5 cm kg 0.030 Rp 1,000 Rp 30
Lem kayu kg 0.800 Rp 1,000 Rp 800
Teakwood tebal 4 mm ukuran (90 x
Rp 1,000
220) cm Lembar 1.000 Rp 1,000
Bahan Formika Lembar 0.500 Rp 1,000 Rp 500
Pekerja OH 0.850 Rp 25,000 Rp 21,250
Tukang kayu OH 2.550 Rp 39,500 Rp 100,725
Kepala tukang OH 0.255 Rp 42,500 Rp 10,838
Tenaga kerja Mandor OH 0.043 Rp 50,000 Rp 2,150
6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Rp 21,700 Rp 635,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp 1,000 Rp 1,100
Besi strip tebal 5 mm kg 15.000 Rp 1,000 Rp 15,000
Bahan Paku 12 cm kg 5.600 Rp 1,000 Rp 5,600
Pekerja OH 4.000 Rp 25,000 Rp 100,000
Tukang kayu OH 12.000 Rp 39,500 Rp 474,000
Kepala tukang OH 1.200 Rp 42,500 Rp 51,000
Tenaga kerja Mandor OH 0.200 Rp 50,000 Rp 10,000
Tenaga kerja
Page 60 of 141
Kepala tukang OH 0.720 Rp 42,500 Rp 30,600
Tenaga kerja Mandor OH 0.120 Rp 50,000 Rp 6,000
6.16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II Rp 300 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.014 Rp 1,000 Rp 14
Reng (2 x 3) cm m3 0.036 Rp 1,000 Rp 36
Bahan Paku 5 cm dan 10 cm kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II Rp 321 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.014 Rp 1,000 Rp 14
Reng (3 x 4) cm m3 0.057 Rp 1,000 Rp 57
Bahan Paku 5 cm dan 10 cm kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Rp 215 Rp 20,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.015 Rp 1,000 15.4
Bahan Paku 7 cm – 10 cm kg 0.200 Rp 1,000 Rp 200
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.300 Rp 39,500 Rp 11,850
Kepala tukang OH 0.030 Rp 42,500 Rp 1,275
Tenaga kerja Mandor OH 0.075 Rp 50,000 Rp 3,750
6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Rp 266 Rp 18,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.016 Rp 1,000 Rp 16
Bahan
Page 61 of 141
Bahan Paku 7 cm – 10 cm kg 0.250 Rp 1,000 Rp 250
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.300 Rp 39,500 Rp 11,850
Kepala tukang OH 0.030 Rp 42,500 Rp 1,275
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500
6.21 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Rp 111 Rp 11,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp 1,000 Rp 11
Bahan Paku 5 cm dan 7 cm kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.22 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Rp 61 Rp 11,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp 1,000 Rp 11
Bahan Paku 5 cm dan 7 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.200 Rp 39,500 Rp 7,900
Kepala tukang OH 0.020 Rp 42,500 Rp 850
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Rp 178 Rp 23,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 0.028 Rp 1,000 Rp 28
Bahan Paku 5 cm dan 7 cm kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400
6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II Rp 1,598 Rp 23,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp 1,000 Rp 28
Paku 5 cm dan 10 cm kg 0.150 Rp 1,000 Rp 150
Teakwood tebal 4 mm, Ukuran 120
Rp 860
cm x 240 cm Lembar 0.860 Rp 1,000
Bahan Lem kayu kg 0.560 Rp 1,000 Rp 560
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400
Page 62 of 141
6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Rp 1,598 Rp 31,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp 1,000 Rp 28
Paku 5 cm dan 10 cm kg 0.150 Rp 1,000 Rp 150
Plywood tebal 4 mm, ukuran 120
Rp 860
cm x 240 cm Lembar 0.860 Rp 1,000
Bahan Lem kayu kg 0.560 Rp 1,000 Rp 560
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.600 Rp 39,500 Rp 23,700
Kepala tukang OH 0.060 Rp 42,500 Rp 2,550
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500
6.26 Memasang 1 m2 dinding lambriziring dari papan kayu kelas I Rp 257 Rp 95,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.007 Rp 1,000 Rp 7
Paku 5 cm dan 10 cm kg 0.100 Rp 1,000 Rp 100
Bahan Paku skrup 10 cm kg 0.150 Rp 1,000 Rp 150
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang kayu OH 1.800 Rp 39,500 Rp 71,100
Kepala tukang OH 0.180 Rp 42,500 Rp 7,650
Tenaga kerja Mandor OH 0.030 Rp 50,000 Rp 1,500
6.27 Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 x 240) cm Rp 450 Rp 3,978
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plywood tebal 4 mm Lembar 0.400 Rp 1,000 Rp 400
Bahan Paku 1 cm dan 2,5 cm kg 0.050 Rp 1,000 Rp 50
Pekerja OH 0.025 Rp 25,000 Rp 625
Tukang kayu OH 0.075 Rp 39,500 Rp 2,963
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.001 Rp 50,000 Rp 50
6.28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV Rp 1,529 Rp 4,938
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bilik bambu m2 1.500 Rp 1,000 Rp 1,500
Kaso-kaso (5 x 7) cm m3 0.014 Rp 1,000 Rp 14
Paku kg 0.012 Rp 1,000 Rp 12
Bahan List kayu 2/4 m3 0.003 Rp 1,000 Rp 3
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
Page 63 of 141
6.1 Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm Rp 16,475 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.2 Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm Rp 21,915 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.3 Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm Rp 36,945 Rp 13,378
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Bahan Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 39,500 Rp 5,333
Kepala tukang OH 0.014 Rp 42,500 Rp 595
Tenaga kerja Mandor OH 0.014 Rp 50,000 Rp 700
6.4 Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.5 Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 11.870 Rp 1,000 Rp 11,870
6.6 Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm Rp 38,565 Rp 13,378
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 26.500 Rp 1,000 Rp 26,500
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.620 Rp 1,000 Rp 1,620
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 39,500 Rp 5,333
Kepala tukang OH 0.014 Rp 42,500 Rp 595
Tenaga kerja Mandor OH 0.014 Rp 50,000 Rp 700
6.7 Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.8 Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.9 Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 6.630 Rp 1,000 Rp 6,630
6.10 Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.11 Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.12 Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.13 Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm Rp 14,245 Rp 11,850
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 3.100 Rp 1,000 Rp 3,100
6.14 Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm Rp 17,775 Rp 12,390
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 6.630 Rp 1,000 Rp 6,630
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.300 Rp 1,000 Rp 1,300
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 39,500 Rp 4,938
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.15 Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm Rp 23,415 Rp 12,838
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 39,500 Rp 5,135
Kepala tukang OH 0.013 Rp 42,500 Rp 553
Tenaga kerja Mandor OH 0.013 Rp 50,000 Rp 650
6.16 Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm Rp 6,954 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.650 Rp 1,000 Rp 1,650
Bahan Pasir Pasang m3 0.004 Rp 1,000 Rp 4
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.17 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan
Page 67 of 141
Bahan Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.18 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.19 Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm Rp 6,543 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.20 Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.21 Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Page 68 of 141
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.22 Memasang 1 m plint ubin teraso ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.23 Memasang 1 m plint ubin teraso ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna Kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.24 Memasang 1 m plint ubin granit ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.25 Memasang 1 m plint ubin granit ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Page 69 of 141
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.26 Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.27 Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna Kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.28 Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm Rp 2,943 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 1.700 Rp 1,000 Rp 1,700
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.29 Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm Rp 3,893 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 2.650 Rp 1,000 Rp 2,650
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Page 70 of 141
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.30 Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm Rp 4,773 Rp 6,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 3.530 Rp 1,000 Rp 3,530
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 39,500 Rp 3,555
Kepala tukang OH 0.009 Rp 42,500 Rp 382
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.32 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm Rp 63,985 Rp 34,563
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 53.000 Rp 1,000 Rp 53,000
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750
6.33 Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm Rp 117,435 Rp 34,563
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 106.000 Rp 1,000 Rp 106,000
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 3.200 Rp 1,000 Rp 3,200
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja
Page 71 of 141
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750
6.37 Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border Rp 47,215 Rp 51,890
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 33.000 Rp 1,000 Rp 33,000
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 1,000 Rp 45
Bahan Semen warna kg 4.370 Rp 1,000 Rp 4,370
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang batu OH 0.525 Rp 39,500 Rp 20,738
Kepala tukang OH 0.053 Rp 42,500 Rp 2,253
Tenaga kerja
Page 72 of 141
Tenaga kerja Mandor OH 0.053 Rp 50,000 Rp 2,650
6.38 Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP Rp 28,059 Rp 34,563
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Mosaik Buah 11.870 Rp 1,000 Rp 11,870
Portland Cement kg 14.150 Rp 1,000 Rp 14,150
Pasir Pasang m3 0.039 Rp 1,000 Rp 39
Bahan Semen warna kg 2.000 Rp 1,000 Rp 2,000
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750
Page 73 of 141
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.42 Memasang 1 m’ plint internal cove artistik ukuran (5 x 5 x 20) cm Rp 6,543 Rp 53,463
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Internal cove Buah 5.300 Rp 1,000 Rp 5,300
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 1,000 Rp 3
Bahan Semen warna kg 0.100 Rp 1,000 Rp 100
Pekerja OH 0.750 Rp 25,000 Rp 18,750
Tukang batu OH 0.750 Rp 39,500 Rp 29,625
Kepala tukang OH 0.075 Rp 42,500 Rp 3,188
Tenaga kerja Mandor OH 0.038 Rp 50,000 Rp 1,900
Page 74 of 141
Parquet m2 1.050 Rp 1,000 Rp 1,050
Bahan Lem kg 0.600 Rp 1,000 Rp 600
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 0.350 Rp 39,500 Rp 13,825
Kepala tukang OH 0.035 Rp 42,500 Rp 1,488
Tenaga kerja Mandor OH 0.035 Rp 50,000 Rp 1,750
Page 75 of 141
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250
6.51 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm Rp 65,068 Rp 44,438
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik artistik Buah 53.000 Rp 1,000 Rp 53,000
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 1,000 Rp 18
Bahan Semen warna kg 2.750 Rp 1,000 Rp 2,750
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250
Page 76 of 141
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 39,500 Rp 17,775
Kepala tukang OH 0.045 Rp 42,500 Rp 1,913
Tenaga kerja Mandor OH 0.045 Rp 50,000 Rp 2,250
6.62 Memasang 1 m plint vinyil karet ukuran (30 x 30) cm dengan perekat Rp 1,840 Rp 4,940
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vinyl karet Buah 1.760 Rp 1,000 Rp 1,760
Bahan Lem vinyl kg 0.080 Rp 1,000 Rp 80
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang OH 0.080 Rp 30,000 Rp 2,400
Kepala tukang OH 0.008 Rp 42,500 Rp 340
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200
6.1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Rp 1,110 Rp 4,013
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes semen m2 1.100 Rp 1,000 Rp 1,100
Bahan Paku tripleks kg 0.010 Rp 1,000 Rp 10
Pekerja OH 0.030 Rp 25,000 Rp 750
Tukang kayu OH 0.070 Rp 39,500 Rp 2,765
Kepala tukang OH 0.007 Rp 42,500 Rp 298
Tenaga kerja Mandor OH 0.004 Rp 50,000 Rp 200
6.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm Rp 405 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tripleks Lembar 0.375 Rp 1,000 Rp 375
Bahan
Page 79 of 141
Bahan Paku tripleks kg 0.030 Rp 1,000 Rp 30
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp 39,500 Rp 3,950
Kepala tukang OH 0.010 Rp 42,500 Rp 425
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Rp 474 Rp 4,938
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Gypsum board Lembar 0.364 Rp 1,000 Rp 364
Bahan Paku skrup kg 0.110 Rp 1,000 Rp 110
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp 39,500 Rp 1,975
Kepala tukang OH 0.005 Rp 42,500 Rp 213
Tenaga kerja Mandor OH 0.005 Rp 50,000 Rp 250
6.8 Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium Rp 6,300 Rp 35,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil Alluminium "T" m’ 3.600 Rp 1,000 Rp 3,600
Kawat diameter 4 mm kg 0.150 Rp 1,000 Rp 150
Ramset Buah 1.050 Rp 1,000 Rp 1,050
Bahan Akustik Ukuran 60 cm x 120 cm Lembar 1.500 Rp 1,000 Rp 1,500
Pekerja OH 0.500 Rp 25,000 Rp 12,500
Tukang besi OH 0.500 Rp 39,500 Rp 19,750
Kepala tukang OH 0.050 Rp 42,500 Rp 2,125
Tenaga kerja Mandor OH 0.025 Rp 50,000 Rp 1,250
Page 80 of 141
6.1 Memasang 1 kg besi profil Rp 1,150 Rp 4,455
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Besi profil kg 1.150 Rp 1,000 Rp 1,150
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang las OH 0.060 Rp 42,500 Rp 2,550
Kepala tukang OH 0.006 Rp 42,500 Rp 255
Tenaga kerja Mandor OH 0.003 Rp 50,000 Rp 150
6.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Rp 47,850 Rp 74,788
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi siku L 30.30.3 kg 15.000 Rp 1,000 Rp 15,000
Besi plat baja kg 32.800 Rp 1,000 Rp 32,800
Bahan kawat las kg 0.050 Rp 1,000 Rp 50
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang besi OH 1.050 Rp 39,500 Rp 41,475
Kepala tukang OH 0.105 Rp 42,500 Rp 4,463
Tenaga kerja Mandor OH 0.052 Rp 50,000 Rp 2,600
Tenaga kerja
Page 81 of 141
Kepala tukang OH 0.002 Rp 42,500 Rp 85
Tenaga kerja Mandor OH 0.002 Rp 50,000 Rp 100
Alat Sewa alat Jam 0.170
6.6 Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm Rp 29,282 Rp 46,288
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi scuare tube m 4.760 Rp 1,000 Rp 4,760
Besi lis kaca (1 x 1) cm m 4.522 Rp 1,000 Rp 4,522
Bahan Pengelasan cm 20.000 Rp 1,000 Rp 20,000
Pekerja OH 0.650 Rp 25,000 Rp 16,250
Tukang besi OH 0.650 Rp 39,500 Rp 25,675
Kepala tukang OH 0.065 Rp 42,500 Rp 2,763
Tenaga kerja Mandor OH 0.032 Rp 50,000 Rp 1,600
Page 82 of 141
Tenaga kerja Mandor OH 0.050 Rp 50,000 Rp 2,500
Page 83 of 141
Pekerja OH 1.670 Rp 25,000 Rp 41,750
Tukang besi OH 1,670.000 Rp 39,500 Rp 65,965,000
Kepala tukang OH 0.167 Rp 42,500 Rp 7,098
Tenaga kerja Mandor OH 0.083 Rp 50,000 Rp 4,150
6.18 Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm Rp 1,084 Rp 22,363
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m’ 1.050 Rp 1,000 Rp 1,050
Paku 1 cm - 2,5 cm kg 0.015 Rp 1,000 Rp 15
Bahan Papan kayu kelas II atau III m3 0.019 Rp 1,000 Rp 19
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang besi OH 0.400 Rp 39,500 Rp 15,800
Kepala tukang OH 0.025 Rp 42,500 Rp 1,063
Tenaga kerja Mandor OH 0.010 Rp 50,000 Rp 500
6.19 Memasang 1 m’ talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Rp 1,060 Rp 17,775
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m 1.050 Rp 1,000 Rp 1,050
Paku 1 cm - 2,5 cm kg 0.010 Rp 1,000 Rp 10
Bahan Besi strip kg 0.500 Rp 1,000 Rp 1,000 Rp 500
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang besi OH 0.300 Rp 39,500 Rp 11,850
Kepala tukang OH 0.030 Rp 42,500 Rp 1,275
Tenaga kerja Mandor OH 0.008 Rp 50,000 Rp 400
Page 84 of 141
1 m' Pagar Sementara dari Kayu tinggi 2 m Rp 4,296 Rp 19,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp 1,000 Rp 1,250
Semen Portland Kg 2.500 Rp 1,000 Rp 2,500
Pasir beton m3 0.005 Rp 1,000 Rp 5
Bahan Koral Beton m3 0.009 Rp 1,000 Rp 9
Kaso 5 / 7 ( albasiah ) m3 0.072 Rp 1,000 Rp 72
Paku Biasa 2" - 5" Kg 0.060 Rp 1,000 Rp 60
Residu Lt 0.400 Rp 1,000 Rp 400
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tenaga
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Mandor Oh 0.020 Rp 50,000 Rp 1,000
1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m Rp 28,074 Rp 17,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.000 Rp 1,000 Rp 1,000
Semen Portland Kg 2.000 Rp 1,000 Rp 2,000
Kawat Duri Kg 25.000 Rp 1,000 Rp 25,000
Pasir beton m3 0.005 Rp 1,000 Rp 5
Koral Beton m3 0.009 Rp 1,000 Rp 9
Bahan Paku Biasa 2" - 5" Kg 0.060 Rp 1,000 Rp 60
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Pekerja Oh 0.300 Rp 25,000 Rp 7,500
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.020 Rp 50,000 Rp 1,000
Page 85 of 141
1 m' Pek. Pengukuran & Pemasangan Bowplank Rp 39 Rp 7,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Kaso 5 / 7 (borneo) m3 0.012 Rp 1,000 Rp 12
Paku Biasa 2" - 5" Kg 0.020 Rp 1,000 Rp 20
Bahan Kayu Papan 3 / 20 borneo m3 0.007 Rp 1,000 Rp 7
Tukang kayu Oh 0.100 Rp 39,500 Rp 3,950
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Kepala tukang Oh 0.010 Rp 42,500 Rp 425
Tenaga Mandor Oh 0.005 Rp 50,000 Rp 250
Tenaga
Page 86 of 141
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.200 Rp 42,500 Rp 8,500
Tenaga Mandor Oh 0.050 Rp 50,000 Rp 2,500
Page 87 of 141
1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm Rp 1,250 Rp 11,997
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bambu Ø 6 - 8 / 600 cm btg 1.000 Rp 1,000 Rp 1,000
Bahan Tali Ijuk Kg 0.250 Rp 1,000 Rp 250
Tukang kayu Oh 0.017 Rp 39,500 Rp 672
Pekerja Oh 0.002 Rp 25,000 Rp 50
Kepala tukang Oh 0.250 Rp 42,500 Rp 10,625
Tenaga Mandor Oh 0.013 Rp 50,000 Rp 650
Page 89 of 141
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Roof Light Fiberglass lbr 0.600 Rp 1,000 Rp 600
Bahan Paku Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm Rp 620 Rp 7,203
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.500 Rp 1,000 Rp 500
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400
1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm Rp 720 Rp 7,203
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp 1,000 Rp 600
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp 39,500 Rp 2,963
Kepala tukang Oh 0.008 Rp 42,500 Rp 340
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 400
1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm Rp 720 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp 1,000 Rp 600
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm Rp 870 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.750 Rp 1,000 Rp 750
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga
Page 90 of 141
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm Rp 470 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.350 Rp 1,000 Rp 350
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Tenaga Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm Rp 540 Rp 6,913
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.420 Rp 1,000 Rp 420
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp 39,500 Rp 2,765
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm Rp 560 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.440 Rp 1,000 Rp 440
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm Rp 630 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.510 Rp 1,000 Rp 510
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm Rp 920 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.800 Rp 1,000 Rp 800
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm Rp 490 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.370 Rp 1,000 Rp 370
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm Rp 500 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.380 Rp 1,000 Rp 380
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm Rp 580 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.460 Rp 1,000 Rp 460
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm Rp 610 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.490 Rp 1,000 Rp 490
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm Rp 690 Rp 6,794
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Page 92 of 141
Asbes Gelombang lbr 0.570 Rp 1,000 Rp 570
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp 1,000 Rp 120
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp 39,500 Rp 2,647
Kepala tukang Oh 0.007 Rp 42,500 Rp 298
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
Page 93 of 141
1m' Pasang Nok Paten 0.92m Rp 7,200 Rp 7,790
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp 1,000 Rp 1,200
Bahan Paku Skrup 3.5" bh 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200
Tenaga
Page 94 of 141
Tukang kayu Oh 0.125 Rp 39,500 Rp 4,938
Kepala tukang Oh 0.013 Rp 42,500 Rp 553
Tenaga Mandor Oh 0.004 Rp 50,000 Rp 200
Page 95 of 141
1m' Pasang Nok Genteng Beton Rp 15,382 Rp 19,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Beton lbr 3.500 Rp 1,000 Rp 3,500
Paku Biasa 2" - 5" Kg 0.050 Rp 1,000 Rp 50
Semen abu -abu Kg 10.800 Rp 1,000 Rp 10,800
Pasir Pasang m3 0.032 Rp 1,000 Rp 32
Bahan Semen Warna Kg 1.000 Rp 1,000 Rp 1,000
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp 39,500 Rp 7,900
Kepala tukang Oh 0.020 Rp 42,500 Rp 850
Tenaga Mandor Oh 0.020 Rp 50,000 Rp 1,000
Page 97 of 141
Tenaga Mandor Oh 0.010 Rp 50,000 Rp 500
Page 98 of 141
Urinoir bh 1.000 Rp 1,000 Rp 1,000
Perlengkapan Rp -
Semen Portland Kg 6.000 Rp 1,000 Rp 6,000
Bahan Pasir Pasang m3 0.010 Rp 1,000 Rp 10
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.000 Rp 39,500 Rp 39,500
Kepala tukang Oh 0.100 Rp 42,500 Rp 4,250
Tenaga Mandor Oh 0.100 Rp 50,000 Rp 5,000
Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ Rp 486,700 Rp 296,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.400 Rp 1,000 Rp 400
Page 99 of 141
Bahan
Semen Portland Kg 120.000 Rp 1,000 Rp 120,000
Pasir Pasang m3 0.300 Rp 1,000 Rp 300
Porselen ( 11 x 11 ) cm bh 360.000 Rp 1,000 Rp 360,000
Bahan Semen Nat Kg 6.000 Rp 1,000 Rp 6,000
Pekerja Oh 6.000 Rp 25,000 Rp 150,000
Tukang batu Oh 3.000 Rp 39,500 Rp 118,500
Kepala tukang Oh 0.300 Rp 42,500 Rp 12,750
Tenaga Mandor Oh 0.300 Rp 50,000 Rp 15,000
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm Rp 2,304 Rp 2,938
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp 1,000 Rp 1,600
Semen Portland Kg 0.680 Rp 1,000 Rp 680
Pasir Pasang m3 0.013 Rp 1,000 Rp 13
Bahan Pasir Urug m3 0.011 Rp 1,000 Rp 11
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang batu Oh 0.030 Rp 39,500 Rp 1,185
Kepala tukang Oh 0.003 Rp 42,500 Rp 128
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm Rp 2,498 Rp 4,100
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp 1,000 Rp 1,600
Bahan
Page 100 of 141
Semen Portland Kg 0.870 Rp 1,000 Rp 870
Pasir Pasang m3 0.014 Rp 1,000 Rp 14
Bahan Pasir Urug m3 0.014 Rp 1,000 Rp 14
Pekerja Oh 0.080 Rp 25,000 Rp 2,000
Tukang batu Oh 0.040 Rp 39,500 Rp 1,580
Kepala tukang Oh 0.004 Rp 42,500 Rp 170
Tenaga Mandor Oh 0.007 Rp 50,000 Rp 350
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm Rp 45,945 Rp 120,956
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.145 Rp 1,000 Rp 145
Semen Portland Kg 44.000 Rp 1,000 Rp 44,000
Pasir Pasang m3 0.070 Rp 1,000 Rp 70
Batu Kerikil m3 0.070 Rp 1,000 Rp 70
Besi beton Kg 1.600 Rp 1,000 Rp 1,600
Bahan Pasir beton m3 0.060 Rp 1,000 Rp 60
Pekerja Oh 3.200 Rp 25,000 Rp 80,000
Tukang batu Oh 1.015 Rp 39,500 Rp 40,092
Tenaga
Page 101 of 141
Kepala tukang Oh 0.002 Rp 42,500 Rp 64
Tenaga Mandor Oh 0.016 Rp 50,000 Rp 800
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm Rp 80,090 Rp 59,731
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.250 Rp 1,000 Rp 250
Semen Portland Kg 77.000 Rp 1,000 Rp 77,000
Pasir Pasang m3 0.130 Rp 1,000 Rp 130
Batu Kerikil m3 0.020 Rp 1,000 Rp 20
Besi beton Kg 2.600 Rp 1,000 Rp 2,600
Bahan Pasir beton m3 0.090 Rp 1,000 Rp 90
Pekerja Oh 1.420 Rp 25,000 Rp 35,500
Tukang batu Oh 0.473 Rp 39,500 Rp 18,684
Kepala tukang Oh 0.047 Rp 42,500 Rp 1,998
Tenaga Mandor Oh 0.071 Rp 50,000 Rp 3,550
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm Rp 119,558 Rp 93,900
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.371 Rp 1,000 Rp 371
Semen Portland Kg 114.000 Rp 1,000 Rp 114,000
Pasir Pasang m3 0.184 Rp 1,000 Rp 184
Batu Koral m3 0.033 Rp 1,000 Rp 33
Besi beton Kg 4.850 Rp 1,000 Rp 4,850
Bahan Pasir beton m3 0.120 Rp 1,000 Rp 120
Pekerja Oh 2.160 Rp 25,000 Rp 54,000
Tukang batu Oh 0.720 Rp 39,500 Rp 28,440
Kepala tukang Oh 0.072 Rp 42,500 Rp 3,060
Mandor Oh 0.108 Rp 50,000 Rp 5,400
Tenaga Tukang Gali Oh 0.100 Rp 30,000 Rp 3,000
Tenaga
Page 104 of 141
Kepala tukang Oh 0.009 Rp 42,500 Rp 382
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 135
Bahan
Page 105 of 141
Water Drain + Asesories set 1.000 Rp 1,000 Rp 1,000
Semen Portland Kg 20.000 Rp 1,000 Rp 20,000
Bahan Pasir Pasang m3 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.050 Rp 25,000 Rp 1,250
Tukang batu Oh 0.500 Rp 39,500 Rp 19,750
Kepala tukang Oh 0.050 Rp 42,500 Rp 2,125
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125
1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Rp 50 Rp 3,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp 1,000 Rp 50
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125
1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. Rp 50,000 Rp 139,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pasir Silika Kg 40.000 Rp 1,000 Rp 40,000
BBM Ltr 10.000 Rp 1,000 Rp 10,000
Peralatan Rp -
Bahan Kompresor, Blasting Pot , Selang Dan Nozzle Rp -
Pekerja Oh 1.600 Rp 25,000 Rp 40,000
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Rp 780 Rp 2,355
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp 1,000 Rp 200
Plamir Kg 0.150 Rp 1,000 Rp 150
Cat Dasar Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Kayu glotek Kg 0.260 Rp 1,000 Rp 260
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.009 Rp 25,000 Rp 225
Kepala tukang Oh 0.006 Rp 42,500 Rp 255
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp 870 Rp 4,670
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp 1,000 Rp 200
Plamir Kg 0.150 Rp 1,000 Rp 150
Cat Dasar Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Kayu glotek Kg 0.350 Rp 1,000 Rp 350
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter Rp 350 Rp 2,800
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Residu atau Ter Ltr 0.350 Rp 1,000 Rp 350
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang Cat Oh Rp 25,000 Rp -
Kepala tukang Oh Rp 42,500 Rp -
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300
1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 460 Rp 2,468
1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) Rp 302 Rp 1,271
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Bahan Kapur Sirih Kg 0.300 Rp 1,000 Rp 300
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.005 Rp 25,000 Rp 125
Kepala tukang Oh 0.001 Rp 42,500 Rp 21
Tenaga Mandor Oh 0.003 Rp 50,000 Rp 125
1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah Rp 112 Rp 13,206
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni Besi Kg 0.100 Rp 1,000 Rp 100
Kuas Bh 0.010 Rp 1,000 Rp 10
Bahan Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Pekerja Oh 0.250 Rp 25,000 Rp 6,250
Tukang Cat Oh 0.225 Rp 25,000 Rp 5,625
Kepala tukang Oh 0.023 Rp 42,500 Rp 956
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 375
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um Rp 292 Rp 1,631
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni ( Read Lead ) A Kg 0.100 Rp 1,000 Rp 100
Meni ( Read Lead ) B Kg 0.100 Rp 1,000 Rp 100
Alluminium C Kg 0.040 Rp 1,000 Rp 40
Alluminium B Kg 0.040 Rp 1,000 Rp 40
Pengencer Ltr 0.010 Rp 1,000 Rp 10
Bahan Perancah Kayu m3 0.002 Rp 1,000 Rp 2
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.006 Rp 25,000 Rp 150
Kepala tukang Oh 0.023 Rp 42,500 Rp 956
Tenaga Mandor Oh 0.008 Rp 50,000 Rp 375
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um Rp 300 Rp 2,460
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Meni Besi Kg 0.300 Rp 1,000 Rp 300
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.060 Rp 25,000 Rp 1,500
Kepala tukang Oh 0.012 Rp 42,500 Rp 510
Tenaga Mandor Oh 0.006 Rp 50,000 Rp 300
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um Rp 360 Rp 55,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Dasar Kg 0.110 Rp 1,000 Rp 110
Cat Antara Kg 0.170 Rp 1,000 Rp 170
Bahan Cat Penutup Kg 0.080 Rp 1,000 Rp 80
Pekerja Oh 0.500 Rp 25,000 Rp 12,500
Tenaga
Page 115 of 141
Tukang Cat Oh 0.800 Rp 25,000 Rp 20,000
Kepala tukang Oh 0.300 Rp 42,500 Rp 12,750
Tenaga Mandor Oh 0.200 Rp 50,000 Rp 10,000
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um Rp 300 Rp 46,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Cat Dasar Kg 0.300 Rp 1,000 Rp 300
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang Cat Oh 0.700 Rp 25,000 Rp 17,500
Kepala tukang Oh 0.200 Rp 42,500 Rp 8,500
Tenaga Mandor Oh 0.200 Rp 50,000 Rp 10,000
A.3.1 Membuat 1 m3 beton mutu f' = 9,8 Mpa (K 125), slump (12 ±2) cm, w/c = 0,78
A.3.2 Membuat 1 m3 beton mutu f' = 21,7 Mpa (K 225), slump (12 ±2) cm, w/c = 0,56
A.5.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 137,250.00 41,175.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 150,000.00 2,250.00
JUMLAH TENAGA KERJA 58,425.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen portland kg 14.370 1,800.00 25,866.00
Pasir pasang m3 0.040 150,000.00 6,000.00
JUMLAH HARGA BAHAN 80,866.00
C PERALATAN
A.5.2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.02 OH 0.300 137,250.00 41,175.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.015 150,000.00 2,250.00
JUMLAH TENAGA KERJA 58,425.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen portland kg 11.500 1,800.00 20,700.00
Pasir pasang m3 0.043 150,000.00 6,450.00
JUMLAH HARGA BAHAN 76,150.00
C PERALATAN
B. URUTAN KERJA
1 Penyedia membentuk Panitia Pembina K3 (P2K3), membuat
Laporan Rutin Kegiatan P2K3, melaksanakan Audit Internal K3
Konstruksi, melakukan inspeksi K3 Konstruksi secara periodik,
melakukan tindakan perbaikan atas ketidaksesuaian pada saat
inspeksi K3 Konstruksi,melakukan tinjauan ulang RK3K selama
pelaksanaan konstruksi.
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :3PP
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.300 Rp 137,250.00 Rp 41,175.00
2 Tukang Batu OH 0.100 Rp 143,100.00 Rp 14,310.00
3 Kepala tukang OH 0.010 Rp 159,000.00 Rp 1,590.00
4 Mandor OH 0.015 Rp 159,000.00 Rp 2,385.00
JUMLAH HARGA TENAGA KERJA Rp 59,460.00
B BAHAN
1 Bata merah buah 70.000 Rp 700.00 Rp 49,000.00
2 Semen Portland Kg 14.370 Rp 1,800.00 Rp 25,866.00
3 Pasir pasang m3 0.040 Rp 150,000.00 Rp 6,000.00
JUMLAH HARGA BAHAN Rp 80,866.00
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN
SATUAN
A TENAGA
1 Pekerja OH 0.020 Rp 137,250.00 Rp 2,745.00
2 Tukang cat OH 0.063 Rp 143,100.00 Rp 9,015.30
3 Kepala tukang OH 0.006 Rp 159,000.00 Rp 1,001.70
4 Mandor OH 0.003 Rp 159,000.00 Rp 477.00
JUMLAH HARGA TENAGA KERJA Rp 13,239.00
B BAHAN
1 Plamuur Kg 0.100 Rp 30,000.00 Rp 3,000.00
2 Cat dasar Kg 0.100 Rp 35,000.00 Rp 3,500.00
3 Cat penutup Kg 0.260 Rp 35,000.00 Rp 9,100.00
JUMLAH HARGA BAHAN Rp 15,600.00
C PERALATAN
anl. 7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP
Rp 289,880
Rp 170,960 Rp 118,920
anl. 10 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
±
Rp 1,147,623
Rp 864,159 Rp 283,464
Harga Satuan Harga Satuan
Indeks Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Bahan upah
Portland Cement kg 326.000 Rp 1,800 Rp 586,800
Pasir beton ( kg ) kg 760.000 Rp 107 Rp 81,429
koral beton kg kg 1,029.000 Rp 185 Rp 190,556
Bahan Air Liter 215.000 Rp 25 Rp 5,375
Pekerja OH 1.650 Rp 137,250 Rp 226,463
Tukang batu OH 0.275 Rp 143,100 Rp 39,353
Tenaga Kepala tukang OH 0.028 Rp 159,000 Rp 4,452
kerja Mandor OH 0.083 Rp 159,000 Rp 13,197
ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR
anl.11 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Rp 1,011,546
Rp 728,082 Rp 283,464
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Semen Portland kg 247.000 Rp 1,800 Rp 444,600
Pasir beton ( kg ) kg 869.000 Rp 107 Rp 93,107
Bahan
kerikil saring kg kg 999.000 Rp 185 Rp 185,000
Air Liter 215.000 Rp 25 Rp 5,375
Pekerja OH 1.650 Rp 137,250 Rp 226,463
Tukang batu OH 0.275 Rp 143,100 Rp 39,353
Tenaga kerja
Kepala tukang OH 0.028 Rp 159,000 Rp 4,452
Mandor OH 0.083 Rp 159,000 Rp 13,197
ANALISA HARGA SATUAN
PEKERJAAN Err:509
LOKASI : KABUPATEN LUWU TIMUR
anl. 12 6.17 Pembesian 10 kg dengan besi polos atau besi ulir PerKg Rp 18,292
Rp 182,924
Rp 161,550 Rp 21,374
Harga Satuan Harga Satuan
Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Bahan upah
Besi beton (polos/ulir) kg 10.500 Rp 15,000 Rp 157,500
Bahan Kawat beton kg 0.150 Rp 27,000 Rp 4,050
Pekerja OH 0.070 Rp 137,250 Rp 9,608
Tukang besi OH 0.070 Rp 143,100 Rp 10,017
Tenaga Kepala tukang OH 0.007 Rp 159,000 Rp 1,113
kerja Mandor OH 0.004 Rp 159,000 Rp 636
anl.19 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp 25,760
Rp 12,600 Rp 13,160
Harga Satuan Harga Satuan
Kebutuhan Satuan Indeks Jml Harga Bahan Jml Harga upah
Bahan upah
Plamir Kg 0.100 Rp - Rp -
Bahan Cat Dasar Kg 0.100 Rp 35,000 Rp 3,500
Cat Tembok Kg 0.260 Rp 35,000 Rp 9,100
Pekerja Oh 0.020 Rp 137,250 Rp 2,745
Tukang Oh 0.063 Rp 143,100 Rp 9,015
Tenaga kerja
Kepala tukang Oh 0.006 Rp 159,000 Rp 1,002
Mandor Oh 0.003 Rp 159,000 Rp 398
DAFTAR HARGA BAHAN
LOKASI : KABUPATEN LUWU TIMUR
DAFTAR UPAH
#REF!
#REF!
LOKASI : KABUPATEN LUWU TIMUR
0
0