Vol. Ground Resevoir 20 m3
Vol. Ground Resevoir 20 m3
L
Volume = ((P+2) x (L+2))
= 64.86 M2
P Vtotal = 64.860 M2
Volume = (L1+L2+Ln)
= 28.50 M1
Vtotal = 28.500 M1
Rabat
P = 6.800 M1
L = 4.300 M1
T = 0.200 M1
Jumlah = 1.000 Bh
Volume = (P x L x T) X Jumlah
= (6.8 x 4.3 x 0.2) X 1
= 5.848 M3
Drainase
P = 27.800 M1
L = 0.400 M1
T = 0.300 M1
Jumlah = 1.000 Bh
Volume = (P x L x T) X Jumlah
= (27.8 x 0.4 x 0.3) X 1
= 3.336 M3
Box Valve
P = 1.000 M1
L = 0.900 M1
T = 0.850 M1
Jumlah = 1.000 Bh
Volume = (P x L x T) X Jumlah
= (1 x 0.9 x 0.85) X 1
= 0.765 M3
Vtotal = 27.157 M3
Latas = 0.360 M1
Lbawah = 0.270 M1
Tinggi = 0.450 M1
P = 19.800 M1
Latas = 0.700 M1
Lbawah = 0.100 M1
Tinggi = 0.350 M1
P = 19.800 M1
Vtotal = 5.579 M3
L
Volume = (P x L x T)
= (5.8 x 3.3 x 0.1)
= 1.914 M2
- RABAT
P = 19.800 M1
L = 0.700 M1
T = 0.050 M1
Volume = (P x L x T)
= (19.8 x 0.7 x 0.05)
= 0.693 M2
- DRAINASE
P = 27.800 M1
L = 0.400 M1
T = 0.050 M1
Volume = (P x L x T)
= (27.8 x 0.4 x 0.05)
= 0.556 M2
- BOX VALVE
P = 1.000 M1
L = 0.900 M1
T = 0.050 M1
Volume = (P x L x T)
= (1 x 0.9 x 0.05)
= 0.045 M2
Volume = (P x L x T)
L
= (5.82 x 3.34 x 0.05)
= 0.972 M2
- RABAT
P = 19.800 M1
L = 0.700 M1
T = 0.150 M1
Volume = (P x L x T)
= (19.8 x 0.7 x 0.15)
= 2.079 M2
- DRAINASE
P = 27.800 M1
L = 0.200 M1
T = 0.100 M1
Volume = (P x L x T)
= (27.8 x 0.2 x 0.1)
= 0.556 M3
Volume = (P x L x J)
L = (27.8 x 0.25 x 2)
= 13.900 M2
Vtotal = 13.900 M2
SKETSA 7 - COR BETON BERTULANG 1 : 2 : 3
Lantai Dinding H Dinding V
P = 5.820 M1 P = 5.400 M1 P = 2.500 M1
L = 3.340 M1 L = 1.850 M1 L = 1.850 M1
T = 0.200 M 1
T = 0.200 M 1
T = 0.200 M1
J = 2.000 Bh J = 2.000 Bh
L
Vbeton B = 12.156 M3 Lantai = 3.936 M3
Dinding = 5.846 M3
Vlobang = 0.108 M3 Dak = 2.266 M3
L = 0.800 M 1
L = 0.700 M1
Vlobang = 0.720 M2
Balok
P = 2.500 M1
L = 0.100 M1
Volume = (P x L)
= (2.5 x 0.1)
= 0.250 M2
Vlobang = 0.720 M2
L
Vtotal = VPlesteran - Vlobang
= 52.280 M2
11 - PENGECETAN BIASA
Jumlah = 38.07 M2
- PEMASANGAN VENTILASI
Jumlah = 2.00 Unit
Jumlah = 1.00 Bh
- WATER STOP
Jumlah = 15.80 Meter
- POMPA
Jumlah = 0.00 Unit
16 PEKERJAAN BETON
- BEGESTING 50.55 M2
Lantai 3.64 M2
Dinding 29.23 M2
Dak 17.68 M2
- BESI Ø 12
PANJANG 1,157.40 M1
LEBAR 1,030.09 Kg
- BESI Ø 10
PANJANG 1,860.60 M1
LEBAR 1,153.57 Kg
PERHITUGAN VOLUME PAGAR BRC
L
Volume = ((P+2) x (L+2))
= 464.38 M2
P -GROUND
P = 12.400 M1
L = 7.210 M1
-Box Valve
P = 1.750 M1
L = 1.400 M1
RECAP BRONCAP
No Nama Pekerjaan
1 - PEKERJAAN PAFIN BLOCK
PAGAR BRC
-Box Valve
P = 1.000 M1
L = 1.000 M1
-Box Valve
P = 1.100 M1
L = 1.000 M1
Lahan - Ground
BRONCAP
Volume
300.71 M2