Pintu L Total
PJ1 p = 0.00 m 0.00 6.19 M2
l = 0.00 m
n = 1.00 bh
P2 p = 2.01 m 3.30
l = 0.82 m
n = 2.00 bh
P3 p = 2.01 m 2.89
l = 0.72 m
n = 2.00 bh
GORDING
p = 0.04 m 144.48 0.00 0.35
l = 0.06 m 0.69
2.00
BALOK ANGIN
p = 0.05 m 2.71 0.01 0.01
l = 0.10 m 0.05
4.00
Atap L Total
1 p = lbr atas = 1.80 m 7.98 48.57 97.14 97.14 m2
l = lbr bawah = 12.35 m
t = tnggi = 6.09 m
2.00 pias
2 p = lbr atas = 1.00 m 6.28 38.21 -
l = lbr bawah = 10.55 m
t = tnggi = 6.09 m
0.00
Listplank P Total
p = 10.55 m 22.90 45.80 m1
l = 12.35 m
l = 2.00 m
URAIAN PEKERJAAN ANALISA PERHITUNGAN
Eternit L Total
Kelas p = 0.00 m 0.00
l = 10.15 m
Samp. Bang
n = 1.00 bh
p = 40.00 m 48.00
l = 1.20 m 48.00 m2
42 84
lantai keramik P L
wc p = 0.00 m 0.00
l = 1.85 m
Samp. Bang
n = 1.00 bh
p = 0.00 m 0.00
l = 1.20 m - m2
Samp. Bang
n = 0.00 bh
p = 0.00 m 0.00
l = 0.80 m 67.70 m1
0.50 m 1.48
2.95 m 6.34
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
1 PEKERJAAN PERSIAPAN
a. Mobilisasi Ls 1.00 2,000,000.00 2,000,000.00
b. Pembersihan Lokasi Ls 1.00 1,500,000.00 1,500,000.00
SUB TOTAL 3,500,000.00
2 PEKERJAAN PONDASI
a. Galian Pondasi m3 37.50 89,766.60 3,366,247.50
b. Urugan Pasir m3 15.63 118,063.44 1,844,741.25
c. Pasangan Batu Kosong m3 1,931.25 423,165.86 817,239,074.85
d. Pasangan Batu gunung m3 271.25 818,463.20 222,008,143.00
d. Pekerjaan Sloft
- Beton K 250 m3 5.00 1,019,558.70 5,097,793.48
- Pembesian Kg 281.12 18,845.57 5,297,941.91
- Bekisting m2 12.50 232,609.34 2,907,616.80
e. Pekerjaan Kolom
- Beton K250 m3 1.92 1,019,558.70 1,957,552.69
- Pembesian Kg 110.08 18,845.57 2,074,562.52
- Bekisting m2 3.20 431,765.75 1,381,650.41
f. Pekerjaan Plasteran m 49.00 72,092.33 3,532,524.07
g. Pasangan Bata Mereh m 12.50 251,129.03 3,139,112.90
SUB TOTAL 1,069,846,961.37
3 PEKERJAAN RAILING PAGAR
a. Pekerjaan Railing Hollow m2 110,413.52 -
SUB TOTAL -
NO URAIAN PEKERJAAN JUMLAH HARGA
Dibuat oleh :
Konsultan Perencana
CV. KARYA MANDIRI CONSULTAN
KHAERUDDIN RH, ST
SINARDIN SALENG, ST
Direktur Utama Team Leader
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA
A.2.2.1 ANALISA HARGA SATUAN PEKERJAAN BANGUNAN SEMENTARA
A.2.3.1.1 Penggalian 1 m3 Menggali tanah biasa sedalam 1 meter Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien (Rp.) (Rp.)
A. TENAGA
Pekerja L.01 Oh 0.750 103,440.00 77,580.00
Mandor L.04 Oh 0.025 161,040.00 4,026.00
JUMLAH TENAGA KERJA 81,606.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH HARGA ALAT -
D. Jumlah ( A + B + C ) 81,606.00
E. Overhead & Profit 10% 8,160.60
F. Harga Satuan Pekerjaan 89,766.60
A.3.2.1.1 pemasangan 1 m3 pondasi batu belah, campuran 1 SP : 3 PP Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien (Rp.) (Rp.)
A TENAGA
Pekerja Oh 1.5000 103,440.00 155,160.00
Tukang batu Oh 0.7500 120,960.00 90,720.00
Kepala tukang Oh 0.0750 137,600.00 10,320.00
Mandor Oh 0.0750 161,040.00 12,078.00
JUMLAH TENAGA KERJA 268,278.00
B BAHAN
Batu gunung 15/20 m3 1.2000 181,920.00 218,304.00
Semen PC kg 202.0000 1,254.40 253,388.80
Pasir Pasang m3 0.4850 161,840.00 78,492.40
JUMLAH HARGA BAHAN 550,185.20
C PERALATAN
A.3.2.1.9 (K3) Memasang 1m3 batu kosong (aanstamping) Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien (Rp.) (Rp.)
A TENAGA
Pekerja Oh 0.7800 103,440.00 80,683.20
Tukang batu Oh 0.3900 120,960.00 47,174.40
Kepala tukang Oh 0.0390 137,600.00 5,366.40
Mandor Oh 0.0390 161,040.00 6,280.56
JUMLAH TENAGA KERJA 139,504.56
B BAHAN
Batu gunung m3 1.2000 181,920.00 218,304.00
Pasir Urug m3 0.4320 62,240.00 26,887.68
JUMLAH HARGA BAHAN 245,191.68
C PERALATAN
A.4.1.1.8 Membuat 1 m3 beton mutu f' c = 21,7 Mpa ( K 250 ), slump ( 12 ± 2 ) cm, w/c Harga
= 0,56Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien (Rp.) (Rp.)
A TENAGA
Pekerja L.01 Oh 1.650 103,440.00 170,676.00
Tukang batu L.02 Oh 0.275 120,960.00 33,264.00
Kepala tukang L.03 Oh 0.028 137,600.00 3,852.80
Mandor L.04 Oh 0.083 161,040.00 13,366.32
JUMLAH TENAGA KERJA 221,159.12
B BAHAN
Semen PC kg 384.000 1,254.40 481,689.60
Pasir beton kg 692.000 96.17 66,550.63
Krikil (max. 30 mm ) kg 1,039.000 141.21 146,722.19
Air ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 705,712.42
C PERALATAN
JUMLAH HARGA PERALATAN
D. Jumlah ( A + B + C ) 926,871.54
E. Overheead & Profit 10% 92,687.15
F. Harga Satuan Pekerjaan 1,019,558.70
A.4.1.1.17 Pembesian 10 Kg dengan besi polos atau besi ulir Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefesien (Rp.) (Rp.)
A TENAGA
Pekerja L.01 Oh 0.070 103,440.00 7,240.80
Tukang batu L.02 Oh 0.070 120,960.00 8,467.20
Kepala tukang L.03 Oh 0.007 137,600.00 963.20
Mandor L.04 Oh 0.004 161,040.00 644.16
RENCANA ANGGARAN BIAYA (RAB)
Instansi : DINAS PEKERJAAN UMUM, PENATAAN RUANG DAN PERHUBUNGAN KAB. SIDRAP
Kegiatan : Pembangunan Gedung Kantor (Bidang Permukiman)
Pekerjaan : Pembangunan/Rehabilitasi Masjid At Tauhid Lagalumpang Desa Kalosi
Lokasi : Kecamatan Dua Pitue
Tahun Anggaran : 2019
Instansi : DINAS PEKERJAAN UMUM, PENATAAN RUANG DAN PERHUBUNGAN KAB. SIDRAP
Kegiatan : Pembangunan Gedung Kantor (Bidang Permukiman)
Pekerjaan : Pembangunan/Rehabilitasi Masjid At Tauhid Lagalumpang Desa Kalosi
Lokasi : Kecamatan Dua Pitue
Tahun Anggaran : 2019
JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp)
1 2 3
I PEKERJAAN PERSIAPAN 1,300,000.00
II PEKERJAAN TANAH 1,046,505.68
III PEKERJAAN BATU DAN STRUKTUR 11,940,242.96
IV PEKERJAAN DINDING 5,375,861.03
V PEKERJAAN SANITASI 1,155,728.11
Dibuat oleh :
Konsultan Perencana
CV. KARYA MANDIRI CONSULTAN