MAN POWER REQUIREMENT FOR STERILE MANUFACTURING AREA AND PACKAGING AREA

S. No. Room/ Area Job Description Training Requirement Quantity of


Person
AMPOULE AREA
1. 109 Ampoule Feeding 1
110 Washing + Tunnel 2
111 Filling line 1+1
115 DHS and Autoclave 2
124/125 Solution Filtration 1
Spare Material Movement 1
VIAL AREA
135 Vial Feeding 1
136 Vial Washing 2
137 DHS and Autoclave 2
145 Solution Filtration 1
147 Vial Filling 2
148 Inhalation filling line 2
Spare Material Movement 1
FORMULATION AREA
131 Solution/ Suspe. Preparation 2
134 Solution/ Suspe. Preparation 2

TERMINAL STERILIZATION / INSPECTION AREA AMPOULES


153 Terminal Sterilization 1+1
155 Inspection (Auto) 1+1
TERMINAL STERILIZATION / INSPECTION AREA VIALS
166 Terminal Sterilization 1+1
New Room Inspection (Auto) 1+1
PACKAGING AMPOULES

PACKAGING VIALS