You are on page 1of 16

Training Program

FIRE & SAFETY DEPT.


ORC-01
ERT-SHIFT B

:
P R E S E N TA I O N B Y

MUHAMMAD ARIF Fire Emergency


# 1911
Training Program
Topic :
1 Power Take Off (PTO) System of ERV-02

2 Using Awareness of Monitor Water/Foam ERV-02


3 Awareness Tank to Pump and Hydrant to pump Operation System

4 Use / Awareness of Fire Equip. ERV-02 and Foam and Water Tank Level Check
Training Program
1 Power Take Off (PTO) System of ERV-02

PTO SWITCH PUMP ERV-02


PRESSURE GAUGE
TANK TO PUMP SWITCH
FOAM SUPPLY VALVE
Training Program
2 Using Awareness of Foam & Water Monitor of ERV-02

ROUND WHEEL VALVE BUTTER FLY VALE FOR HANDLE VALVE


FOR UP & DOWN WATER ON & OFF FOR
LEFT & RIGHT
Training Program
3 Awareness Tank to Pump and Hydrant to Pump Operation System

TANK TO PUMP SWITCH HYDRANT TO PUMP SYSTEM


Training Program
4 SE & AWARENESS OF FIRE EQUIPMENT OF ERV-02
U
Training Program
4
USE & AWARENESS OF FIRE EQUIPMENT OF ERV-02

FMPB HANDLING JET NOZLE HANDLING AKRON NOZLE HANDLING SHUT NOZL. HAND.

BOUND POURER USE OF BOUND POURER PORTABLE GROUND USES OF PORTABLE


HANDLING MONITOR GROUND MONITOR
Training Program
4 & AWARENESS OF FIRE EQUIPMENT OF ERV-02
USE

HOSE CARRY METHOD HOSE CARRY METHOD HOSE RUNNING OUT


METHOD

HOSE WATER DRAING HOSE ROLL METHOD HOSE ROLL METHOD


METHODE
Training Program
4USE & AWARENESS OF FIRE SOUT OF ERV-02
Training Program
4USE & AWARENESS OF WATER & FOAM LEVEL CHECK OF ERV-02

FOAM & WATER LEVEL WATER TANK FOAM TANK


GAUGE
DUTIES & RESPONSIBILITIES
OF FIRE WARDENS

• In Case of Fire Alarm.

• Immediately make your job secure

• Check Rooms, Washrooms, Tea Rooms, Kitchens in order to ensure that


everybody has evacuated and assembled at the nearest Fire Assembly Point

• During this activity, Ensure that all the Doors are closed and Proceed to the
Nearest Assembly Point

• Contact all Supervisors / Senior Persons for grouping and head counting if
it is required.
DUTIES & RESPONSIBILITIES
OF FIRE WARDENS
• In Case of Fire Alarm.

• Supervise grouping / head counting

• Compile the head counting

• Fire Warden shall be responsible to inform Shift In charge on duty about


missing persons

• Fire Warden will be recognised by their Fluorescent Jacket.


DUTIES & RESPONSIBILITIES
OF AUXILARY FIRE FIGHTER

 How to use Akron & shut nozzle with charge hose,


with Practical
 How to use Fire Delivery Hoses, Including Lay out,
draining and Roll back with practical.
 How connect the hose from hydrant with practial.
 Fire hose and nozzles Connect and disconnect
methods, with practical.
 Laying, Connect, Charge, Roll back , handling,
holding charge hoses with Practical.
LIST OF FIRE ASSEMBLY
POINTS BPPL ORC-I SITE
S.No Fire Assembly Point Area Wise

1. Admin Administration / Mass/ Time Office

2. Plant Road -04 Process plant

3. Control Room road -02 Control Room Building/ power House

4. Work Shop Work shop/Tank Farm/ Wear House

5. Shipping Shipping Area

6. Decanting Decanting Area


DEFINITION

Admin
Any unplanned event where there is
flame, charring, glowing or smoke.

CALL
Fire Emergency #. 1911

You might also like