You are on page 1of 5

S.F at long edge=18.

627 Kn/m
SF at short edge=18.627 Kn/m

No torsional reinforce is required

SLAB (S5)
One-way Slab
Assuming 0.25% of steel Modification factor = 1.51
𝐿 1.400𝑥103
= 20𝑋1.51, 𝑑= = 40
𝑑 23×1.51

D=40 + 20 + 4 = 64mm Say100mm


d =100 – 24 = 76mm
Eff span= 1400 mm or 1150 + 76 = 1226 mm
Loading as S1 = 12.75 kN/m
B Max at center of span = 12.755 X 1.2262/10 = 1.916 kN/m
(-ve) B Max at edge = 12.755 X 1.2262 / 12 = 1.597 kN/m

Reinforcement
Fa +ve moment at mid span.
415×𝐴𝑠𝑡
1.916 X 106 = 0.87 X 415 X Ast X 76 (1-1000×76×20)

1.916x106=27440Ast-7.492Ast2
Or Ast2-3664Ast+0.256x106
√36642 −4x0.256x10
Ast=3664± 2

3521
= 3664 - = 72mm2 ˂ 120 mm2
2

0.12
Minimum Reinforcement = X 1000 X 100 = 120mm2
100

So spacing of stirrup (8) = 1000 X 50.3 / 120 = 419 mm say 300mm C/C
Fa(-ve) moment as continuous edge
8φ@300c/c
SF = ½ X (1400-250) X 12.755 = 7.334 kN/m

VERANDAH SLAB
Span=1100+250/2=1225m
Keep thickness of slab as 155 at support and 85 at end
Slab as155 as supported 85 at end

Effective depth =131 use 8 rod

LOADING
Self-weight = (0.155+0.085/2) X 1 X 25 X 1.1 = 3.3 kN/m
Flooring 0.04 X 24 X 1.1 = 1.056 kN/m
Live load 3.00 X 1.1 X 1 = 3.30 kN/m
Total = 7.656 kN/m
Factor load = 1.5 X 7.656 = 11.48kn/m
Load for railing = 1.00x0.90x0.5x0.1x19=0.855kn/m
Factor load = 1.5x0.855=1.283kN/m
Total = 12.767 kN/m
B.M = 11.484 X 1.2252 / 2 + 1.283 X 1.225 = 8.617 + 1.572 = 10.189 kN/m
10.189 ×106
D=√ = 61mm So safe.
2.76x1000

Reinforcement
10.189x106=0.87 X fy X Ast X 131(1-415Ast/1000x131x20) =47298-7.492ast2=47298
1.36x106=6313Ast-Ast2

Ast=6313+√63132-4x1.36x106=6313-5866/2=224 mm2

Use8∅ rod spacing = 1000 X 50.3/224 = 224.6 say 220 mm C/C

BEAM
Flow beam layout (for 1st and 2nd floor)
Beam FB/1 & FB/2

Member Span F.E.M due to Dead + Live load +ve moment (short span) S.F
𝑊𝑙 2 47.13 × 4.52 𝑊𝑙 2 47.13 × 4.52
AB 4.5 m = = 79.53 = = 119.30 100.15
12 12 8 8
𝑊𝑙 2 30.748 × 4.52 𝑊𝑙 2 30.748 × 4.52
BC 4.5 m = = 51.89 = = 77.83 65.34
12 12 8 8

Loading
Span AB
Assuming size = 250x425
Self-weight = 0.25 x 0.425 x 25/m = 2.656
Weight of B/wall = 0.69 x 2.985 x .2 x 19 = 7.838
Total = 10.494 kN/m
Factor load = 1.5x10.494kn/m=15.741 kN/m
Load form slab(S1) =18.619
Load form continuous slab =12.767
Total = 47.13 kN/m

SPAN BC
assumed size = 250x425
Self-weight of beam =2.656
Weight of B/wall=0.693x2.985x.2x19=7.861
Total = 10.517 kN/m
Factor load = 1.5 x 10.517 = 15.776 kN/m
Load for slab S2 = 14.973 kN/m
Total = 30.749 kN/m
column: beam = 1: 3.72
D.F AB=3.72/1+1+3.72=0.65
D.F BA=3.72/9.44 = 0.39
D.F BC =0.39
D.F CB =0.65
beam FB/1
The B.M=58.75-ve at A=29.73, -ve B.M at B=91.04
ly=Lo/6xdf+fw
=.7x4500/6+155+250
=525+930+250=1705,say1700

So using 16∅ rod, effective depth=425-25-8=392mm


Eff Span 1 c/c 4.500
Eff Span 2 4250+392=4642
So eff span=4500 mm

d =√91.04𝑥106/2.761x250=363 <392 ok.

Reinforcement (for +ve moment)


MUD=58.75khm
Mulim=0.36xfckxbfxdf(d-0.42Df)
=0.36x20x1700x155(392-0.4x155)
=1.8972x106x370=700.04x106 N.m>MUD
58.75x106=0.87x415xAstx392(1-415Ast/392x20)
Ast=32093-3803/2=421mm2

Use 4 - 12, total area = 4 x 113.1 = 452.4 mm2