PURPOSE
The purpose of this memo is to document the summary of Q2 Subcon Test Forecast
Attainment.

SUMMARY:

Based on volume loading, KY, GO, G & UT are the 4 subcon sites that are currently
being tracked for the test forecast attainment.

Executive Summary Of Top Deviations:


Page 1 of 2
 May-13-CHIPMOS-ZW44A, Tool mark issue at Auto line 6 due to which lots were
re-routed to CML conventional (~1.2Mu) for Re-work & Test.

 June-13-ASE-Nextest constraint at ASE because of over forecast shown based


on the Test transfer plans, As a WIP control measure lots were diverted to KYEC.
Because of which we ended with +4% beyond the boundary limits for KYEC.

 June-13-UTAC-Die shortage because of un expected upside from the customer.


Now we are working closely with all the CFT’s & UTAC for giving a realistic
forecast.

END OF MEMO