You are on page 1of 17

Hydraulic Mining Shovels

Cat® 6060/6060FS

12.1 Central Greasing System - Undercarriage

Dixio Torrez - 2013


1000kg Tank Service Training

2
Control Panel with second pump Service Training

-5Y1
-5Y5 -5Y3 -5Y4

-5B7 -5B6

-5Y2

-5B4

3
Control Panel Service Training

On/Off Solenoid
for Grease Pump
Undercarriage System
-5Y4

Unloader Valve
Undercarriage System
-5Y5

Grease pressure sensor


Undercarriage System
-5B7

From Undercarriage
Grease Pump

Servo Oil

Tank Return
Oil / Grease

Grease Supply
Grease Tank Return
4
Grease Pump Service Training

Quantity / Speed Pressure


Adjustment Adjustment

Active Oil
Pressure on
Grease Pump

Grease Pump Ratio:


Oil Piston : Grease Piston
6,6 : 1

Example:
Servo Pressure: 48 bar

Max. Grease Pressure:

6,6 x 48 bar = 316.8 bar

5
1000kg Tank – 2 Pumps Service Training

1000 kg Tank with one Pump and


Superstructure Control Unit.

Additional Pump with


Undercarriage Control Unit.

6
Undercarriage Grease Supply Service Training

From Undercarriage Control Panel

Through the Rotary Joint to the Injectors


7
Undercarriage Greasing – Two Injectors per Roller Service Training

to the Injectors

8
Grease Injectors Service Training

9
Grease Injectors Service Training

I. II. III. IV.


Break Time. Pump Pressure is increasing End of Grease flows from Top
Grease Pump Grease enters the Injector and greasing Process. of Pumping Piston to the
is stopped. Operates the pumping Piston down. measuring Chamber.
Grease is pumped to the Bearing. => Break!
10
Load Rollers with double Lube System Service Training

0,5bar

11
Load Rollers with double Lube System Service Training

0,5bar

12
Service Training
Load Rollers with double Lube System

13
Service Training
Load Rollers with double Lube System

14
Greasing System Function Service Training

Grease
Grease Pump “ON” Grease Pump “ON”
Pump

Travel
Travel Function “activated”
Function

180

Pump
Pressure
[bar]
50

Unloader Unloader Valve energized “closed” Unloader Valve energized “closed”


Valve

min. 5 s 5s
[Time]
max. 30 s max. 60 s max. 60 s max. 30 s max. 60 s

15
Greasing System Function Service Training

Normal greasing time or duration of a greasing cycle undercarriage:

The complete greasing cycle should take about 10-15 sec.

The conditions of greasing:

As well in the normal mode as in the test mode the following conditions must be given:
• The engine must be running.
• The grease drum must not be empty.
• There must not be any error message.

Fault messages (and switch-off of the grease pump) in the undercarriage:

• No “50bar pressure built up” after start of the pump within 30sec (t2 – t1)
• No “50bar to 180bar pressure built up” within 60sec (t3 – t2)
• No “180bar to 50bar pressure decrease” after switch off the pump within 60sec (t4 – t3)

=>Fault messages can only be deleted by pressing the reset button (for 1 sec).

BCS fault messages (without grease pump being switched off) undercarriage:

• When cable of the pressure sensor is broken.

The functions of the reset button:

Press button: Function:


1 sec resets values and deletes fault messages (also done upon engine start!).
5 sec starts the test mode (15 min).
1 sec stops the test mode.

Test mode undercarriage:

The test mode is initiated by pressing the reset button for 5 sec. The pump operates 15 min. continuously.
The test mode can be stopped by pressing the reset button for 1 sec !
16
More Information? Service Training

Hey Fellows,

Please find more Information


in the Technical Handbook!

Chapter 11.4.3.2 and 11.7:


Central Lubrication System for Undercarriage

17