System Summary Report

GT PRO 26.1 Hewlett-Packard Company


2712 06-06-2018 15:00:33 file=C:\Users\Autocad LT\Downloads\Thermo (PLTGU Luwuk)\111 LUWUK 150 MW\L
uwuk 111 heavy duty (GE9151 E).GTP _______________________________________________________________
Program revision date: July 27, 2017
Plant Configuration: GT, HRSG, and condensing non-reheat ST
One GE 9151E Engine (Physical Model #175), One Steam Turbine, GT PRO Type 8, Subtype 9
Steam Property Formulation: IFC-67
SYSTEM SUMMARY
Power Output kW LHV Heat Rate kJ/kWh Elect. Eff. LHV%
@ gen. term. net @ gen. term. net @ gen. term. net
Gas Turbine(s) 97597 11518 31.26
Steam Turbine(s) 59837
Plant Total 157433 154121 7140 7294 50.42 49.36

PLANT EFFICIENCIES
PURPA efficiency CHP (Total) efficiency Power gen. eff. on Canadian Class 43
% % chargeable energy, % Heat Rate, kJ/kWh
49.36 49.36 49.36 7867
GT fuel HHV/LHV ratio = 1.102
DB fuel HHV/LHV ratio = 1.102
Total plant fuel HHV heat input / LHV heat input = 1.102
Fuel HHV chemical energy input (77F/25C) = 344038 kW
Fuel LHV chemical energy input (77F/25C) = 312253 kW
Total energy input (chemical LHV + ext. addn.) = 312253 kW
Energy chargeable to power (93.0% LHV alt. boiler) = 312253 kW
GAS TURBINE PERFORMANCE - GE 9151E (Physical Model #175)
Gross power Gross LHV Gross LHV Heat Rate Exh. flow Exh. temp.
output, kW efficiency, % kJ/kWh kg/s C
per unit 97597 31.26 11518 376 541
Total 97597 376

Number of gas turbine unit(s) = 1


Gas turbine load [%] = 100 %
Fuel chemical HHV (77F/25C) per gas turbine = 344038 kW
Fuel chemical LHV (77F/25C) per gas turbine = 312253 kW
STEAM CYCLE PERFORMANCE
HRSG eff. Gross power output Internal gross Overall Net process heat output
% kW elect. eff., % elect. eff., % kW
88.51 59837 31.96 28.29 0
Number of steam turbine unit(s) = 1
Fuel chemical HHV (77F/25C) to duct burners = 0 kW
Fuel chemical LHV (77F/25C) to duct burners = 0 kW
DB fuel chemical LHV + HRSG inlet sens. heat = 211520 kW
Net process heat output as % of total output (net elec. + net heat) = 0 %
if

GT PRO 26.0.1 Page: 1


2712 06-06-2018 15:00:33 file=C:\Users\Autocad LT\Downloads\Thermo (PLTGU Luwuk)\111 LUWUK 150 MW\Luwuk 111 heavy duty (GE9151E).

GTP
System Summary Report
ESTIMATED PLANT AUXILIARIES (kW)
GT fuel compressor(s)* 88.68 kW
GT supercharging fan(s)* 0 kW
GT electric chiMer(s)* 0 kW
GT chiller/heater water pump(s) 0 kW
HRSG feedpump(s)* 764.1 kW
Condensate pump(s)* 35.58 kW
HRSG forced circulation pump(s) 0 kW
LTE recirculation pump(s) 0 kW
Cooling water pump(s) 718.6 kW
Air cooled condenser fans 0 kW
Cooling tower fans 0 kW
Dilution air fan(s) 0 kW
Aux. from PEACE running motor/load list 580 kW
Miscellaneous gas turbine auxiliaries 227.4 kW
Miscellaneous steam turbine auxiliaries 31.96 kW
Miscellaneous plant auxiliaries 78.72 kW
Constant plant auxiliary load 0 kW
Gasification plant, ASU* 0 kW
Gasification plant, fuel preparation 0 kW
Gasification plant, AGR* 0 kW
Gasification plant, other/misc 0 kW
Desalination plant auxiliaries 0 kW
Program estimated overall plant auxiliaries 2525 kW
Actual (user input) overall plant auxiliaries 2525 kW
Transformer losses 787.2 kW
Total auxiliaries & transformer losses 3312 kW

* Heat balance related auxiliaries