0% found this document useful (0 votes)
350 views1 page

Competency Profile Chart (CPC) L4

This document is a competency profile chart that outlines the competencies for an Industrial Automation Engineering Systems Support role at NOSS level 4. It includes 5 core competency units related to industrial automation systems design, integration, installation and commissioning, maintenance coordination, and project coordination. The document provides information on the sector, sub-sector, job area, title, level, and code for the role.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
350 views1 page

Competency Profile Chart (CPC) L4

This document is a competency profile chart that outlines the competencies for an Industrial Automation Engineering Systems Support role at NOSS level 4. It includes 5 core competency units related to industrial automation systems design, integration, installation and commissioning, maintenance coordination, and project coordination. The document provides information on the sector, sub-sector, job area, title, level, and code for the role.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

COMPETENCY PROFILE CHART (CPC)

SECTOR MACHINERY & EQUIPMENT

SUB SECTOR INDUSTRIAL AUTOMATION & MECHATRONIC

JOB AREA MECHATRONIC, INDUSTRIAL AUTOMATION ENGINEERING, ROBOTIC TECHNOLOGY

NOSS TITLE INDUSTRIAL AUTOMATION ENGINEERING SYSTEMS SUPPORT

NOSS LEVEL 4 (FOUR) NOSS CODE MC-091-4:2016

COMPETENCY COMPETENCY UNIT

INDUSTRIAL INDUSTRIAL
INDUSTRIAL
INDUSTRIAL AUTOMATION AUTOMATION
AUTOMATION
CORE AUTOMATION SYSTEMS SYSTEMS
SYSTEMS
SYSTEMS DESIGN INSTALLATION AND MAINTENANCE
INTEGRATION
COMMISSIONING COORDINATION
MC-091-4:2016-C01 MC-091-4:2016-C02 MC-091-4:2016-C03 MC-091-4:2016-C04

INDUSTRIAL
AUTOMATION
PROJECT
COORDINATION
MC-091-4:2016-C05

ELECTIVE

You might also like