PRODUCTION REPORT FOR NIGHT SHIFT 31/05/201

Sr.No. Machinary Start Time End Time Restart End Time Total Hours

1 Crane 1 Sany 9:00 10:30 12:00 7:00 8:30


2 Crane 2 Terex 9:00 11:00 12:00 7:00 9:00
3 Ex.350 Long boom Break Down full Night.

4 Doosan Exc. 8:30 6:30 10:00


5 Sany 1 9:30 11:00 1:00 4:00 5:00

6 Sany 2 9:30 4:00 6:30


7 L&T PC210 9:00 10:00 12:00 6:00 7:00
8 L&T Komatsu 9:30 10:30 12:30 7:30 9:00

9 Roller 1 (SPIPL) No Operator for Night Shift.


10 Roller2 (Techno) 1:00 6:00 5:00

11 Roller3(Dhupar) 8:30 12:30 3:00 6:30 7:30


12 Dozar (ASR) 8:30 1:30 3:30 7:00 8:30

13 Dozar (Shri- No Operator for Night Shift.


Bhagwan)

14 JCB (Techno) Break Down full Night.


15 Hydra (saiCran) 8:30 1:00 2:00 7:00 9:30

16 Hydra (Techno) 10:00 2:30 4:30


0
RT FOR NIGHT SHIFT 31/05/2019
Work Description Layer/ Level AREA (Cum) Chainage

Armour Placing 39 Nos./ 67.1MT 1st (+3.0) 40 10+170---180


Armour Placing 48 Nos./112.6MT 1st (+3.0) 60 10+360---370
full Night.

Boulder loading Car Parking


Armour Segregation 10+320

Access road 10 Road making/Tetrapod Car Parking


Access road 6 10+370----500
Gsb dozing 10+070---210

r Night Shift.
Ch.10+040---- 10+100 Rolling

10+070 to 10+210 Rolling/watering


Ch. 10+100---150/10+240---330 dozing/watering

r Night Shift.

full Night.
Tetrapod shifting Access road 10

DG light shifting at seawall Ch 10+070 to 350


PRODUCTION REPORT FOR NIGHT SHIFT 29/05/201
Sr.No. Machinary Start Time End Time Restart End Time Total Hours

1 Crane 1 Sany 12:10 3:10 3:00


2 Crane 2 Terex 9:00 11:00 12:00 7:00 9:00
3 Ex.350 Long boom 8:30 6:15 10:15

4 Doosan Exc. 8:30 1:00 2:00 6:00 8:30


5 Sany 1 9:00 3:00 4:00 7:00 9:00

6 Sany 2 9:00 7:00 10:00


7 L&T PC210 9:00
8 L&T Komatsu 9:30 11:30 12:30 7:00 9:30

9 Roller 1 (SPIPL) No Operator for Night Shift.


10 Roller2 (Techno) 8:30 10:30 2:30 4:10 3:40

11 Dozar (ASR) 8:30 1:30 3:00 7:00 9:00


12 Dozar (Shri- No Operator for Night Shift.
Bhagwan)
13 JCB (Techno) Break Down full Night.

14 Hydra (saiCran) 8:30 1:00 2:00 6:00 8:30


15 Hydra (Techno) Break Down full Night.
RT FOR NIGHT SHIFT 29/05/2019
Work Description Layer/ Level AREA (Cum) Chainage

Armour Segregation & Shifting stacking place 10+320---350


Armour Placing 1st (+3.0) 60 10+350---360
Under Layer Placing/Profilling 10+070---100

Under layer Loading Near Bay Bridge


Drain Excavation Car Parking

Under layer Loading Drain stone pitching

Access road 3 Excavation 10+300


Murrum stacking 10+100

r Night Shift.
(1) Ch.10+040 to 10+100 Rolling

Gsb Ch. 10+070 to 10+200 dozing


r Night Shift.
full Night.
Tetrapod shifting@ 10+040

full Night.
PRODUCTION REPORT FOR NIGHT SHIFT 28/05/201
Sr.No. Machinary Start Time End Time Restart End Time Total Hours

1 Crane 1 Sany 9:00 4.3Hrs


2 Crane 2 Terex 9:00 5:00
3 Ex.350 Long boom 8:30 9.4

4 Doosan Exc. 9:00 8.8


5 Sany 1 9:30 1:00 1:00 7:00 9:30

6 Sany 2 9:30 7:00 9:30


7 L&T PC210 10:00 6:00
8 L&T Komatsu 9:30 12:30 1:00 7:00 9:00

9 Roller 1 (SPIPL) No Operator for Night Shift.


10 Roller2 (Techno) 9:30 2:10 4:20 4:50 5:30

11 Dozar (ASR) Break Down full Night.


12 Dozar (Shri- No Operator for Night Shift.
Bhagwan)
13 JCB (Techno) Break Down full Night.

14 Hydra (saiCran) 9:00 9:00


15 Hydra (Techno) Break Down full Night.
RT FOR NIGHT SHIFT 28/05/2019
Work Description Layer/ Level AREA Chainage

Armour Placing 1st 50 10+210


Armour Placing 1st 52.5 10+340
Under Layer Placing 10+040

Under layer Loading Near Bay Bridge


Drain Excavation Car Parking

Under layer Loading Near Bay Bridge


Access road 3 Excavation 10+300
Jetty working platform 10+380

r Night Shift.
(1) Ch.10+040 to 10+100 (2)10+100 to
10+150, Near.Bay bridge Rolling

full Night.
r Night Shift.
full Night.
(1) shutter plate fix@gate No.1, Pipe fixing
@ gate no.2, Tetrapod shifting@ 10+040
full Night.
4.3
PRODUCTION REPORT FOR NIGHT SHIFT 02/06/201
Sr.No. Machinary Start Time End Time Restart End Time Total Hours

1 Crane 1 Sany 05:00PM 06:30PM 1:30


2 Crane 2 Terex 16:00 9:00 10:00 12:00 7:00
3 Ex.350 Long boom 3:00 4:00 4:30 7:00 3:30

4 Doosan Exc. IDLE Replaced 7mtr. Short Boom to 21 mtr. Long Boom. Now ready
5 Sany 1 IDLE 4:00 6:00 2:00

6 Sany 2 IDLE 4:00 6:00 2:00


7 L&T PC210 IDLE 2:00 6:00 4:00
8 L&T Komatsu IDLE

10 Roller1 (Techno) No Operator in Night Shift


11 Roller2(Dhupar) No Operator in Night Shift

12 Dozar (ASR) 8:30 10:30 IDLE


13 Dozar (Shri- No Operator for Night Shift.
Bhagwan)
14 JCB (Techno) Break Down full Night.

15 Hydra (saiCran) No Operator in Night Shift


16 Hydra (Techno) No Operator in Night Shift

0
RT FOR NIGHT SHIFT 02/06/2019
Work Description Layer/ Level AREA (m2) Chainage

Doosan long boom shifting


Armour Placing 46 Nos./ 79MT 1st (+3.0) 60 10+190---200
Nipping/ Access Rd 6 cleaning 10+070 --- 10+080

mtr. Short Boom to 21 mtr. Long Boom. Now ready to work.


Cleaning Access Road 6 10+330

Loading Boulder Access road 6 10+300


Access road 6 Boulder Cleaning 10+350
IDLE

No Operator in Night Shift


No Operator in Night Shift

Ch.10+240---330 dozing
r Night Shift.
full Night.

No Operator in Night Shift


No Operator in Night Shift