The document calculates the makeup water needs for a cooling tower with a 2500 ton cooling load and 7500 GPM condenser water flow. It determines the required makeup water is 120 GPM or 115,200 gallons for a 16 hour period. It recommends sizing the cooling tower makeup water storage tank at 500 cubic meters.
The document calculates the makeup water needs for a cooling tower with a 2500 ton cooling load and 7500 GPM condenser water flow. It determines the required makeup water is 120 GPM or 115,200 gallons for a 16 hour period. It recommends sizing the cooling tower makeup water storage tank at 500 cubic meters.
The document calculates the makeup water needs for a cooling tower with a 2500 ton cooling load and 7500 GPM condenser water flow. It determines the required makeup water is 120 GPM or 115,200 gallons for a 16 hour period. It recommends sizing the cooling tower makeup water storage tank at 500 cubic meters.