COOLING TOWER MAKEUP WATER CALCULATION

Date : March 2015

Cooling tower make-up water calculation:


Total cooling load = 2500 TR

Total Condenser water flow = 7500 GPM

Required make-up water = 7500 x (1.6/100)

= 120 GPM 64.8

For 16 hrs, storage capacity = 115200 Gallons

~ 436 Cu.M

Tank capacity:

The cooling tower make-up water storage tank will be sized for 500 Cu.M