systems. situation was rather different and Enel had to adapt their
systems in order to integrate existing devices. Instead
Nevertheless, the 61850-90-17 will be just a technical from now on manufacturers must adapt themselves in
report (and not an international standards), moreover the order to meet these new highly detailed Enel GSTs.
file based transmission of PQ data will be still based on GSTQ001 mostly handles the following features:
[7] and IEC 60255-24 [11].
mechanical, either dimensions, environment,
Another similar approach is described in CIGRÉ TB596 installation modes and connectors;
[12] Annex 4.A, outlining a flat format for PQ data. This electrical, defining type of measurements, ranges,
format is able to manage most of the recorded data by immunity and emission limits;
PQIs, it is quite optimized in size and is close to the types, class and measurement method of devices
internal storage methods. In fact it was taken as a ground according to [3, 13 and 14];
basis for important improvements on Enel’s new PQIs. data interfacing, either protocols or formats;
recording and storage capabilities for periodic
Last but not least, it is also quite remarkable that most of variables, events and waveforms.
the times the new PQIs can be connected to always-on
broadband links, which is an important improvement In short, according to the standard any Enel new PQI
compared to past situations where data had to be behaves as a fully class A device with high degree of
electromagnetic immunity, wide measurement ranges,
downloaded manually or via lengthy phone calls. This very powerful recording capabilities and strong and
new situation is the main reason for another important robust interfacing methods.
improvement on Enel’s new PQIs: the distributed
database concept. The standard also defines how to accomplish a technical
conformity assessment (TCA) for any PQI, thus turning
out into a straightforward method for verifying
DISTRIBUTED DATABASE CONCEPT compliance.
PQIs do deliver great amounts of data that is rarely used.
Most of the times just percentile values are needed for a GSTQ002 ABOUT DATA FORMATS AND
compliance analysis, but instead thousands of 10-minute PROTOCOLS
and waveforms are uploaded to a central location and
stored in databases. Less than 1% (if not much less) of This Enel GST defines the formats to exchange PQ
this information is queried by end users, but since it must measurements and events between PQI and PQMS,
be managed centrally, it puts pressure on central systems mainly based on extension to international standard
and leads to huge and costly database systems. Currently formats (particularly [7]) or on the adoption of a REST
Enel is able to successfully manage all this information in server.
a few data centres, so this is the reason why we do know
about the limitations of such approach. As already stated in previous sections, PQIs manage lots
of information so the way it is transferred somewhere is a
Due to the widespread deployment of fibre optics key issue. No matter how good any PQI is doing its job
throughout substations, it turns out that both bandwidth according to [3]: if it does not have powerful interfacing
has increased and latency decreased dramatically. This methods it will be just useless. Keep in mind that these
means that querying a central database is no longer the PQIs must be integrated in an overall global PQMS, they
fastest method to downloading data, but instead each are not intended just for a single user.
query can be forwarded to distant locations without
noticing any special quality loss. Depending on the reliability and performance of the
communication network two different scenarios have
In order to tackle both the centric and the distributed data been addressed:
management, Enel developed a new and detailed
framework for global PQMS that will be depicted in Low reliability, low bandwidth and/or high latency
following sections (standards GTQ003, GTSQ004 and (typically older mobile networks): data is packed into
GTQ005). PQDIF files and uploaded to a central location for
later processing and integration into a central
GSTQ001 ABOUT INDOOR FIXED PQI database.
High reliability, high bandwidth and low latency
This Enel GST defines the characteristics of the fixed (typically fibre optics links): data is kept in the PQI
installed indoor PQI (according to IEC 62586 series [13 -
14]) and accessories for measurement of power quality in an embedded database and is accessed via a
parameters in a.c. distribution systems with a declared RESTful [15] interface (i.e. common HTTP
fundamental frequency of 50 Hz or 60 Hz. That means, requests).
the definition of hardware and software features of new
PQIs. Packed files are fully aligned to the PQDIF standard and
a more restrictive data structure, so when translated they
The main goal is the harmonisation of PQIs thus reducing can be easily inserted in a centric and global database. No
the engineering costs in substations. In the past the matter which manufacturer has produced the PQI, the
Paper 0645
Next follows a typical command line query by using the The main goal is the extension of the concept of
popular CURL command line utility embedded database and its RESTful interface into the
(https://curl.haxx.se): PQMS with two main tasks:
collecting and storing data from remote PQIs (via
curl –sPOST “http://PQI/data/periodic” --header “Content-Type:
application/json” --data “....JSON dictionary...”
translation of uploaded PQDIF files);
forwarding specific queries to remote PQIs when
Being the JSON dictionary and the output as simple as needed (via the REST API).
stated in the following examples: These tasks are transparent to the end user and the
associated HMIs, just a matter of IP-addressing.
Compared to the RESTful API for PQIs, just a list of
devices is added to the input JSON dictionary. The
results, either in JSON, CSV or COMTRADE formats,
do also include the requested devices into its body. Few
fig. 1 JSON input, some 10-min variables, CSV output. examples are depicted next:
{
"start": "2015-11-16T22:20:00Z" ,
"end": "2015-11-19T10:20:00Z" ,
"vars": [ "v_AN_min", "v_BN_avg", …, "q_AN_min" ] ,
"format": "json"
}
fig. 2 JSON input, some 10-min variables, JSON output.
{
"timestamps1": [ "2015-11-16T22:20:00Z", "2015-11-16T22:30:00Z", …, "2015-11-16T23:50:00Z" ] ,
"timestamps2": [ "2015-11-16T22:30:00Z", "2015-11-16T22:40:00Z", …, "2015-11-17T00:00:00Z" ] ,
"v_AN_avg": [ 231.5, 232.7, …, 235.3 ] ,
… …,
"v_CN_THD_avg": [ 5.12, 5.20, …, 5.68 ] fig. 5 JSON input example, some 10-min variables,
}
2 devices, CSV and JSON output.
fig. 3 JSON output, some 10-minute variables.
t1 t2 v_AN_avg … v_CN_THD_avg
2015-11-16T22:20:00Z 2015-11-16T22:30:00Z 231.5 … 5.12
2015-11-16T22:30:00Z 2015-11-16T22:40:00Z 232.7 … 5.20
… … … …
2015-11-16T23:50:00Z 2015-11-17T00:00:00Z 235.3 … 5.68
Paper 0645
name values type example
periodic_json { { } } extended json Each value corresponds to the same response a single PQI shall deliver. Each key is the PQI's id.
{
"DR0013801492RO": {
"timestamps1": [ "2015-11-16T22:20:00Z", "2015-11-16T22:30:00Z", …, "2015-11-16T23:50:00Z" ] ,
DISPATCHERS: they forward any request from the
"timestamps2": [ "2015-11-16T22:30:00Z", "2015-11-16T22:40:00Z", …, "2015-11-17T00:00:00Z" ] ,
"v_AN_avg":
…
[ 231.5, 232.7, …, 235.3 ] ,
…,
web server to the specific node.
"v_CN_THD_avg": [ 5.12, 5.20, …, 5.68 ]
"S1114|1":
},
{
BACKUP SERVERS: they connect to remote PQIs
"timestamps1": [ "2015-11-16T22:20:00Z", "2015-11-16T22:30:00Z", …, "2015-11-16T23:50:00Z" ] ,
"timestamps2":
"v_AN_avg":
[ "2015-11-16T22:30:00Z", "2015-11-16T22:40:00Z", …, "2015-11-17T00:00:00Z" ] ,
[ 110.5, 111.2, …, 117.3 ] , and download specific sets of measurements.
… …,
}
}
"v_CN_THD_avg": [ 3.10, 2.95, …, 3.75 ]
Typically they will consist of few 10-minute
fig. 7 JSON output example, recordings and events list. Data is stored in a PQ
some 10-min variables, 2 devices. DATABASE.
Last but not least, the PQMS shall be able to integrate GSTQ004 ABOUT PQMS HMI
data from diverse sources such as weather stations,
lightning activity and TSO/DSO grid events. The REST This text outlines a basilar framework for the web server
of any PQMS without getting into esthetical details,
API is just extended to these type of events. See next which will depend upon local country requirements. Any
examples for lightning activity inside geographic web server will communicate and exchange information
polygons: with other PQ elements via the global REST API.
The standard defines most likely input methods and
output reports. The exact shape of these methods within
the web server is open to every country implementation.
Next follows some examples of such input methods and
fig. 8 JSON input example for lightning activity inside a reports:
geographic area.
Paper 0645
CONCLUSIONS
Enel has deployed a new framework for their PQ
monitoring and analysis. This new architecture shows up
with many outstanding features that will likely improve
fig. 13 Example of a map with simultaneous events. and harmonize PQ analysis throughout the company. One
of the most challenging features are the embedded
database concept together with the global REST API.
GSTQ005 ABOUT PQMS BATCH DATA Due to country-local regulations, Romania will the first
PROCESSING place to meet the standards. Other countries will join
This standard is expected to be published in second half gradually.
of 2017. It handles the offline calculation of secondary REFERENCES
variables based on primary raw data. The results are
stored in a PQ database. Next follows some examples of [1] C. Noce, S. Sartore; Present and future functionalities of the Enel
resulting magnitudes: distribuzione power quality data warehouse; CIRED International
Conference 2011, June 6-9, 2011, Frankfurt, Germany.
Percentiles of any 10-minute variable. [2] J. M. Romero, 2012, “Experience with Voltage Quality
Time over or under certain thresholds. Monitoring in Spain”, CEER – ECRB – EURELECTRIC Joint
Voltage dips characterisation according to their Workshop on "Voltage Quality Monitoring", Session III: Current
Practices in VQM across Europe – Case Studies.
severity. [3] IEC, 2015, IEC 61000-4-30, Electromagnetic compatibility
EHV, HV or MV origin of voltage dips. (EMC) - Part 4-30: Testing and measurement techniques - Power
Most likely root fault for any voltage dip. quality measurement methods.
[4] Romanian legislation, 2016, Ord. 11/2016 privind aprobarea
Standardului de performanţă pentru serviciul de distribuţie a
COUNTRY DEPLOYMENT AND FUTURE energiei electrice.
PLANS [5] Brazilian legislation , 2017, Agência Nacional de Energia Elétrica
– ANEEL Procedimentos de Distribuição de Energia Elétrica no
First of all it was quite clear that existing PQIs shall be Sistema Elétrico Nacional – PRODIST Módulo 8 – Qualidade da
redesigned in order to cope with the new outstanding Energia Elétric (revision 7).
features stated both is GSTQ001 and GSTQ002. While [6] Chilean legislation, 1997, D.S. 327/1997, Norma técnica de
hardware requirements did not represent a challenge seguridad y calidad de servicio, Reglamento de la ley general de
servicios eléctricos.
itself, just a matter of time, the new interface methods [7] IEEE, 2003, IEEE Std 1159.3, Recommended Practice for the
and the embedded database concept put special pressure Transfer of Power Quality Data (PQDIF).
on the device. Indeed manufacturers are not comfortable [8] Daniel A. Cumming; Power quality enhancements for IEC 61850;
with embedded time series databases. 2010 14th International Conference on Harmonics and Quality of
Power (ICHQP),
Regarding country deployment plans, it must pointed out [9] Yue Fuchang, Shao Lin, Wu Zaijun; Modeling and
that a new Romanian act about power quality was implementation of power quality monitoring device based on IEC
published in 2016. This act specified that 150 units had to 61850; 2012 China International Conference on Electricity
be installed in MV busbars by the end of 2016 and 450 Distribution.
until 2018. Due to the shortage of time the first 150 units [10] IEC, TR on development, IEC 61850-90-17 TR: Communication
are based on existing hardware and rely on a firmware networks and systems for power utility automation – Part 90-17:
Using IEC 61850 to transmit power quality data.
upgrade, being the additional 450 units fully compliant to [11] IEC, 2013, IEC 60255-24, Measuring relays and protection
the standards. Moreover a fully compliant new PQMS for equipment - Part 24: Common format for transient data exchange
Romania is expected to be ready by the end of 2018. (COMTRADE) for power systems.
[12] CIGRÉ, 2014, TB596, CIGRE/CIRED JWG 4.112: Guidelines for
Regarding the rest of countries, there might be plans for Power quality monitoring – measurement locations, processing
massive installation of PQIs in Brazil and Chile, although and presentation of data.
it depends on the evolution of local regulations. [13] IEC, 2013, IEC 62586-1, Power quality measurement in power
supply systems - Part 1: Power quality instruments (PQI).
In the mid-term it is forecasted to migrating all the [14] IEC, 2013, IEC 62586-2, Power quality measurement in power
existing PQMS into the new architecture. These plans supply systems - Part 2: Functional tests and uncertainty
will depend mostly upon budget constraints. By meeting requirements.
the Enel PQ standards all these systems shall be [15] Fielding, Roy Thomas (2000). "Chapter 5: Representational State
interoperable among them, thus upper interface layers Transfer (REST)". Architectural Styles and the Design of
could be deployed regardless the HMI in use in every Network-based Software Architectures (Ph.D.). University of
country (turning out into a fully worldwide distributed California, Irvine.
[16] ECMA, 2013, ECMA-404, The JSON Data Interchange Format.
architecture). [17] The Internet Society, 2005, RFC 4180, Common Format and